Sunteți pe pagina 1din 1

D.7.

NECESSARY TIME
PART ITEM INTERVAL
NO.
(man×hr)
( )
INSIDE OF FURNACE REMOVING OF ASH AFTER OPERATION

INSIDE OF FURNACE CLEANING OF DEPOSIT AFTER OPERATION

THERMO-COUPLE CLEANING OF PROTECT COVER AFTER OPERATION

FLAME EYE CLEANING OF COVER GLASS AFTER OPERATION

MAIN BURNER CLEANING OF ATOMIZING CUP AND PRIMARY AIR NOZZLE AFTER OPERATION

IGNITION BURNER CLEANING OF ATOMIZAR AND ELECTRODES AFTER OPERATION

IGNITION BURNER RELOCATION OF ELECTRODES BEFORE OPERATION

SLUDGE STRAINER CLEANING OF SCREEN AFTER OPERATION

DIESEL OIL STRAINER CLEANING OF SCREEN WEEKLY

MAIN BURNER FILLING UP OF LUBRICANT WEEKLY

MAIN BURNER AND EXHAUST FAN ADJUSTMENT OF TENSION OF DRIVING BELT MONTHLY

MAIN BURNER AND EXHAUST FAN REPLACEMENT OF LUBRICANT THREE MONTHS

INSIDE OF FURNACE CHECK OF REFRACTORY THREE MONTHS

EVERY PARTS ENSURE AND TIGHTEN SCREWS AND THREADS THREE MONTHS

AIR CYLINDER (if equipped) CLEANING OF SPINDLE ANNUALLY


( )
PANELS AND SENSORS CLEANING OF CONTACTORS OF SWITCH-GEAR ANNUALLY

MAIN BURNER AND SLUDGE PUMP OVERHAUL ANNUALLY

SOLENOID VALVES OVERHAUL ANNUALLY

IGNITION BURNER AND D.O. PUMP OVERHAUL ANNUALLY

EXHAUST FAN OVERHAUL ANNUALLY

DUCT AND PIPINGS CLEANING OF INSIDE ANNUALLY

- D - 5 -

S-ar putea să vă placă și