Sunteți pe pagina 1din 2

Distance

from
Newtown
Cost Plant
Project Location Notes Estimate (miles) Feasibility

1 American Playground Renovation Franklin St. between Milton St. Renovation details to be determined. Project does not include $4-5m 0.67 A
& Noble St. de-mapping streets, which is likely infeasible.

2 Apollo Street End Apollo St. Greening and other improvements. $1m 0.58 B
3 Barge Park Dog Run Commercial St., Dupont St. and $500,000 0.72 A
West St.

4 Barge Park Renovation Commercial St., Dupont St. and Renovation details to be determined. $5m 0.72 A
West St.

5 Biosculpture (Green North Henry St. North Henry St. end; passive recreation and biological water $2.4m 0.22 B
Eggs/Biosculptures & Wetland Park) filtration; park will have 3 large 'biosculptures' - egg shaped
like the digesters.

6 Dutch Kills Basin Acquisition and/or 47th Ave. east of 27th St. to Acquire private parcel to expand waterfront access; $3m 0.77 B
29th St. Improvements 29th St. stormwater management & community facilities, including
multi-use park with athletic field.

7 Greenpoint Boathouse and GMDC Building, 1155-1205 Restore bulkhead and build out ground level of GMDC building $5m 0.57 B
Environmental Education Center Manhattan Ave. on Newtown Creek (at Manhattan Ave.), creating publicly
accessible open space, extending waterfront esplanade,
creating boat launches and other access to waterway and
creating community facility for recreational boating, including
educational programming.

8 Greenpoint Monitor Museum 56 Quay St. Funding for Phase II - site preparation and temporary $150,000 to 0.86 A
programming at park on Monitor Museum's donated land. $650,000

9 Greenpoint Playground Renovation Commercial St. & Dupont St. Project would include renovations, stormwater management $4-5m 0.66 A
and planting; demapping streets is likely infeasible.

10 McCarren Pool Nassau Ave., Bayard St., Pool is being renovated. Unfunded items in current Parks $1.5m to 0.94 A
Leonard St. and North 12 St. Department plan include: a comfort station ($1.5m) and $3.25m
handicap accessible spiral slides ($1.75m).

11 McCarren Park Renovation Nassau Ave., Bayard St., Renovation details to be determined. Unfunded items in $1.3m to 0.92 A
Leonard St. and North 12 St. current Parks Department plan include: field house ($4m), $7.3m
pathways ($2m) and tennis court lighting ($1.3m).

12 McGolrick Park Repairs/Renovation Driggs Ave., Nassau Ave., Renovate pavillion, fencing around park, benches, safety $6m 0.66 A
Russell St., Monitor St. surface in playground, fix drainage & flooding issues, repair
fence on Nassau Ave. side of park.

13 Pedestrian Bridge Study To be determined Feasibility study on creating a pedestrian bridge over Newtown $1m TBD A
Creek from Brooklyn to Queens.

14 Pulaski Bridge Study Pulaski Bridge Feasibility study on strategies to increase space for $1m 0.49 A
pedestrians & cyclists, creating a greenspace connection
between Brooklyn & Queens, and enhancing sustainable
transportation network.
Distance
from
Newtown
Cost Plant
Project Location Notes Estimate (miles) Feasibility

15 Materials for Queens Library & Hunters Point To purchase books and materials focused on environment and $200,000 0.82 A
Cultural Center at Hunters Point ecology to be housed at a new library facility.

16 Saint Savior's Site (New Park) 57-40 58th St. (Rust St. & 58th To purchase land from private owner and develop new park. $8.5m 1.97 B
St.)

17 Skate Park To be determined $1m TBD B


18 Transmitter Park Renovation Greenpoint Ave. Park is being renovated, but no funding exists to renovate $5-6m 0.78 A
(Building) building, which could include restrooms, meeting space,
restaurant concession, radio museum, or other features.

19 Tree-planting and Stormwater To be determined Tree planting projects that would also incorporate stormwater $1,500 to TBD A
Management management strategies. Sites could include McGuiness Blvd., $4,000 per
North Henry St., Jewell St., Bushwick Inlet Park, 54th St. and/or tree
others.

20 Velodrome To be determined A bicycle racing, or "track racing" facility, using a donated $1m TBD C
velodrome once used in the Goodwill Games.

21 West Street Greenway Project West St. Enhancements to existing project, including plantings and $2m 0.71 - .8 A
stormwater management.

22 Wetlands Rehabilitation Newtown Creek bulkheads Pilot project to build intertidal zones & seagrass using $2m TBD B
(along Creek) bulkheads to support terraced structures that support intertidal
communities of filter feeders. Locations to be determined.

S-ar putea să vă placă și