Sunteți pe pagina 1din 6
7. j cr VIL-AID Technoclinic Pvt.Ltd. + No.1/4, 2nd Floor Annexe, Acharya Patashala Building, N.A. Colony, Bangalore - 560.019. Ph.: 26615974, 26615981 26612908, 26508833 Telefax: 26616524. E-Mail civiaid@eth.net ++ No, 1030, 13th Cross, BSK 2nd Stage, Bangalore - 560 070. 1/6 RefiCTPL:CGE/ 6/893.1 Date: 11.09.2007 Test Order dated: 25.6.2007 The Sr. Manager (Marketing Services) Saint Gobain Vetrotex India Ltd 13-6-437/2C, Khaderbagh HYDERABAD 28 AP. ‘TEST REPORT ON CEMFIL GLASS FIBRE SAMPLE Source of Sample Sample supplied by the customer No. of samples tested 2 (two) Customer's References Letter dated 9.7.2007 Period of Test 18.07.2007 to 11.09.2007 1. M20Grade of Concrete with and without CEMFIL Fibre: Mix Proportion C:FA:CA :W# 1 :1.87:3.57:05 Dosage of Cemfil fibre : 854 / bag of cement a L Test Results ] Ne Test Conducted iS With CEMFIL | % increase over 0. control Sample | v" | Fibre sample | control sample Flexural strength, N/sq.mm | a @7 day 24 30 | 25.0 @wday 35 44 257 Split Tensile strength, - e N/sq.mm @7 day 18 24 167 @ 28 day _34 37, 88 Compressive strength, | N/sq-mm c @3 day 154 197 279 @7 day 27 4 263 @ 28 da 35.1 44.0 254 # Cement : Fine Aggregate : Coarse Aggregate : Water Contd... H. No, 1-2-412/4/9/4, Lane No.1, St. No, 4, Gagan Mahal Colony, Domalguda, HYDERABAD - 500 028. WF: 040-28224582, Telex : 26824582 Branches: 1, 9, Vergese Avenue, Near JAK Matriculation Higher Secondary School, Ashok Nagar, CHENNAI - 600 083, St: 044:24729618, Fax: 24847345 CONTINUATION BHEEr 2/6 Re&CTPL:CGF/ 6/893.1 Date: 11.09.2007 Test Order dated: 25.6.2007 2. Mortar with and without CEMFIL Fibre: Mix Proportion = = C: FA : Wt 1:60:12 Dosage of Cemfil fibre 85 g / bag of cement # Cement: Fine Aggregate : Water al Test Results - ee Test Conducted With CEMFIL | % increase over a Control Sample! Fibre sample | control sample Flexural strength, N/sq.mm a @7 day 1 14 272 | | @ 28 day 15 20 3 ‘Compressive strength, N/sq.mm b @3day 13 16 23.0 @7 day 19 23 21.0 @eday «| 50 60 20.0 3. Workability of concrete and mortar a Test Results oo Test Conducted CEMFIL | % increase over No. 7 Control Sample | ‘Fibre sample | control sample a Slump (Concrete) mm 70 70 Nil b Flow(Mortar) mm 215 210 -23 4. Drying Shrinkage Test (Concrete) : a a - Test Results - No. Test Conducted Control With CEMFIL | % increase over Sample | Fibre sample | control sample 4 Dying Shrinkage, (%) oie 0.003 ooo VADHA KRISH) Technic Wa? 3/6 RefCTPL:CGE/ 6/893.1 Date: 11.09.2007 Test Order dated: 25.6.2007 5. Permeability Test as per BS : 1881 (Part V) (Concrete): aul | Test Results nal Test Conducted Control | With CEMFIL | % increase over Sample _| Fibre sample | control sample Permeability test (ml/Sq. m/s) (Initial Surface Absorption test) | at Omin 0.047 0.022 -533 5 10 min 0.036 0.014 61d 30 min 0.030 0.010 66.7 60 min 0.028 0.010 - 643, 120 min 0.028 0.010 64.3 6. Wear due to abrasion Test as per 15:1237-1980 (Concrete) : a aa Test Results ‘| No. Test Conducted ‘Control With CEMFIL | % increase over Sample | Fibresample | control sample 6 | Wear due toabrasion, mm aa ie Daa Note: 1, The results relate only to the items tested. 2 Report shall not be reproduced except, in full, without the written approval of the laboratory. 3. Any correction invalidates this report. for CIVIL-AID TECHNOCLINIC Pvt, Ltd. Ref: CTPL:CGS/6/893.1 Test Order dated : 25.6.2007 Flexural Strength - Concrete Split tensile Strength - Concrete Compressive Strength - Concrete 0 7 of 24 28 RADHA KRISH‘ vf CONTINUATION SHEET 46 Date ; 11.09.2007 —*—Control =" With Cemfil Camel |—e—Control with Comfi Sr. Technical Office 5/6 Ref | CTPL:CGS/6/893-1__ Date ; 11.09.2007 Test Prder dated : 25.6207 rLexual Srengin- Morar Compressive Strength - Mortar |e Controt —s— with Comnt Workability of Concrete and mortar 8 Slump Flow (mm) 3 8 Concrete Mortar oo - RADHA co Cay 9 oe A Sr 616 Ref: CTPL:CGS/6/893.1 mand Date ; 11.09.2007 ‘Test Order dated : 25.6.2007 Drying Shrinkage of Conerto Initial Surface Absorption Test —e—Control mith Cemf OP | Bay = cant et leo) | tot 20 irido : Time in Minutes | Wear due to Abrasion \Contvol With Cem OP ae a RADHA MRIS: bi Sr. Technical Otfics

S-ar putea să vă placă și