Sunteți pe pagina 1din 1

VESSEL NAME: Glycol Flash Drum

TAG NUMBER: K-VD-024102/202 Glycol Flash Dum


VESSEL CONTENTS:
VESSEL P&ID NUMBER:

TASK DESCRIPTION: EQUIPMENT REQUIRED BEFORE


ENTRY:
FULL BODY ENTRY VIA HORIZONTAL MAN WAY
- Scaffold Erection GAS DETECTOR TO BE CONTINUOUS
- Internal cleaning LIGHTING IF REQUIRED
- NDT Inspection FULL BODY HARNESS
STANDBY MAN
- Enact Inspection APPROPRIATE RESPIRATORY PROTECTION
- Scaffolding Removal

Pre installed access platform


RESCUE EQUIPMENT

ERT TO ATTEND TBT BEFORE


WORK COMMENCES

BASKET STRETCHER
ROPE RESCUE EQUIPMENT
SCBA

NO WORK TO COMMENCE BEFORE THE


RESCUE TEAM AND EQUIPMENT ARE IN
POSITION.
RESCUE TECHNIQUE:

Enter under respiratory protection until internal air quality is confirmed (gas
tested)

Taking injuries in to account, stabilise casualty and manhandle to the entrance


hatch, utilise the basket Stretcher or lower directly onto stretcher on ground level
(due to access for stretcher area)
MSDS/COSHH DATA

Potential Health Effects:

TEG Glycol (MSDS)

HEAT STRESS

FATIGUE

EMERGENCY CONTACT DETAILS: PREVIOUS TRAINING NOTES:


CALL: Control Room – Radio Channel 4
TELEPHONE: 777 From site emergency phones Rescue Plans Created by: D Gillespie ER Coach (March 2019)
OPERATE: MANUAL ALARM POINT
MEDIC: Call sign - XRAY

ISG - REG SITE – ALGERIA RESCUE SHEET NUMBER: 13

S-ar putea să vă placă și