Sunteți pe pagina 1din 177

PERBAIKAN TANKI 15 DI PPP PRABUMULIH

PT PERTAMINA EP ASSET 2 PRABUMULIH


FIELD

DOCUMENT TITLE : CALCULATION FOR FOUNDATION TANK

EQUIPMENT NAME : TANKI 15 KAPASITAS 28000 BBLS

EQUIPMENT TAG NO. : -

CONTRACTOR : PT. HIKMA PUTRI

A 5 Sept 2018 Issued for Review


SM AF PR
PRE CHK APP APPROVED BY
REV DATE DESCRIPTION
PT. HIKMA PUTRI PERTAMINA EP

TANKI 15 FIELD PRABUMULIH PROJECT


Contract Number :

Vendor Document No. : PTPP-10-A3-CA-001

Copyright (c) GS E&C. All Rights Reserved


PERBAIKAN TANKI 15 DI PPP PRABUMULIH
PT PERTAMINA EP ASSET 2 PRABUMULIH
FIELD

CLIENT COMMENT SHEET


NO PAGE SUBJECT DESCRIPTION OF COMMENT REV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Copyright (c) GS E&C. All Rights Reserved


PERBAIKAN TANKI 15 DI PPP PRABUMULIH
PT PERTAMINA EP ASSET 2 PRABUMULIH
FIELD

TABULATION OF REVISION SHEET


REVISION REVISION
SHEET REMARKS SHEET REMARKS
0 1 2 3 4 5 0 1 2 3 4 5
1 41
2 42
3 43
4 44
5 45
6 46
7 47
8 48
9 49
10 50
11 51
12 52
13 53
14 54
15 55
16 56
17 57
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Copyright (c) GS E&C. All Rights Reserved


PERBAIKAN TANKI 15 DI PPP PRABUMULIH
PT PERTAMINA EP ASSET 2 PRABUMULIH
FIELD

REVISION SHEET DESCRIPTION


NO PAGE SUBJECT DESCRIPTION OF CHANGE REV.
1
2
3
4
5
6
7
8

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 1

FOUNDATION LISTS
GROUP NAME : PPP
No. Description No. Description No. Description
1 F1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING DATA
3.2 PIER DATA
3.3 SECTION DATA
3.4 LOAD CASE
3.5 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 RING WALL DESIGN
5.3 REQUIRED REINFORCEMENT
5.4 ONE WAY SHEAR FORCE
5.5 TWO WAY SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318)
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]
Unit System Input : SI, Output : MKS, Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items Value (Input Unit system / Output Unit System)
2 2
Concrete (fck : compressive strength) 18.80 N/mm 191.707 kgf/cm
2 2
Lean Concrete (Lfck : compressive strength) 3.00 N/mm 30.591 kgf/cm
2 2
Reinforcement (D10 ~ D16 , yield strength) 390.00 N/mm 3976.893 kgf/cm
2 2
Reinforcement (D19 ~ , yield strength) 390.00 N/mm 3976.893 kgf/cm
3 3
Rs (Soil unit weight) 17.000 kN/m 1.733 ton/m
3 3
Rc (Concrete unit weight) 24.000 kN/m 2.447 ton/m
2 2
Es (Steel Modulus of Elasticity) 200.00 kN/mm 2.039 106 kgf/cm
2 2
Ec (Concrete Modulus of Elasticity) 20.00 kN/mm 203943.200 kgf/cm

- Soil Capacity

Items Value (Input Unit system / Output Unit System)


Soil Name Unit-01
Footing List F1
2 2
Qa (Soil Bearing Capacity) 20 kN/m 2.04 tonf/m
Buoyancy Not Consider
WL (Water Label from the EL = 0) 0 mm 0 mm
FD (Frost Depth from the EL = 0) 0 mm 0 mm
Internal Friction Angle 0
Passive Soil Pressure Not Consider
2
Cu (Undrained cohesion) Clay , 0 tonf/m

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items Description (Input/Output)
Allowable Increase of Soil (Wind) 20 %
Allowable Increase of Soil (Seismic) 20 %
Allowable Increase of Soil (Test) 20 %
Safety factor against overturning for OVM1(FO1) 2
Safety factor against overturning for OVM2(FO2) 2
Safety factor against overturning for OVM3(FO3) 2
Safety factor against overturning for OVM4(FO4) 2
Safety factor against sliding for the SL1(FS1) 1.5
Safety factor against sliding for the SL2(FS2) 1.5
Safety factor against sliding for the SL3(FS3) 1.5
Safety factor against sliding for the SL4(FS4) 1.5

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 4

Friction factor () 0.35

1.4 LOAD COMBINATION


Comb . ID Load Combination for stability
1 1.0 SW + 1.0 TL + 1.0 Operation
10 1.0 SW + 1.0 Operation + 1.0 Friction + 1.0 Op EQy
11 1.0 SW + 1.0 Empty
12 1.0 SW + 1.0 Empty + 1.0 Bundle Pull
13 1.0 SW + 1.0 Empty + 1.0 Wlx
14 1.0 SW + 1.0 Empty + 1.0 Wly
15 1.0 SW + 1.0 Empty + 1.0 Er EQx
16 1.0 SW + 1.0 Empty + 1.0 Er EQy
17 1.0 SW + 1.0 Test
18 1.0 SW + 1.0 Test + 1.0 Wlx
19 1.0 SW + 1.0 Test + 1.0 Wly
2 1.0 SW + 1.0 Operation + 1.0 Friction
3 1.0 SW + 1.0 TL + 1.0 Operation + 1.0 Wlx
4 1.0 SW + 1.0 Operation + 1.0 Wlx + 1.0 Friction
5 1.0 SW + 1.0 TL + 1.0 Operation + 1.0 Wly
6 1.0 SW + 1.0 Operation + 1.0 Wly + 1.0 Friction
7 1.0 SW + 1.0 TL + 1.0 Operation + 1.0 Op EQx
8 1.0 SW + 1.0 Operation + 1.0 Friction + 1.0 Op EQx
9 1.0 SW + 1.0 TL + 1.0 Operation + 1.0 Op EQy
Comb . ID Load Combination for Reinforcement
101 1.0 SW + 1.6 TL + 1.6 Operation + 1.6 Friction
102 1.0 SW + 1.4 TL + 1.4 Operation + 1.4 Friction
103 1.0 SW + 1.4 TL + 1.4 Operation
104 1.0 SW + 1.4 Operation + 1.4 Friction
105 1.0 SW + 1.05 TL + 1.05 Operation + 1.275 Wlx
106 1.0 SW + 1.05 Operation + 1.275 Wlx + 1.05 Friction
107 1.0 SW + .9 TL + .9 Operation + 1.3 Wlx
108 1.0 SW + .9 Operation + 1.3 Wlx + .9 Friction
109 1.0 SW + 1.05 TL + 1.05 Operation + 1.275 Wly
110 1.0 SW + 1.05 Operation + 1.275 Wly + 1.05 Friction
111 1.0 SW + .9 TL + .9 Operation + 1.3 Wly
112 1.0 SW + .9 Operation + 1.3 Wly + .9 Friction
113 1.0 SW + 1.05 TL + 1.05 Operation + 1.403 Op EQx
114 1.0 SW + 1.05 Operation + 1.05 Friction + 1.403 Op EQx
115 1.0 SW + .9 TL + .9 Operation + 1.43 Op EQx
116 1.0 SW + .9 Operation + .9 Friction + 1.43 Op EQx
117 1.0 SW + 1.05 TL + 1.05 Operation + 1.403 Op EQy
118 1.0 SW + 1.05 Operation + 1.05 Friction + 1.403 Op EQy
119 1.0 SW + .9 TL + .9 Operation + 1.43 Op EQy
120 1.0 SW + .9 Operation + .9 Friction + 1.43 Op EQy

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 5

121 1.0 SW + 1.4 Empty


122 1.0 SW + 1.4 Empty + 1.4 Bundle Pull
123 1.0 SW + 1.05 Empty + 1.275 Wlx
124 1.0 SW + .9 Empty + 1.3 Wlx
125 1.0 SW + 1.05 Empty + 1.275 Wly
126 1.0 SW + .9 Empty + 1.3 Wly
127 1.0 SW + 1.05 Empty + 1.403 Er EQx
128 1.0 SW + .9 Empty + 1.43 Er EQx
129 1.0 SW + 1.05 Empty + 1.403 Er EQy
130 1.0 SW + .9 Empty + 1.43 Er EQy
131 1.0 SW + 1.0 Test
132 1.0 SW + 1.0 Test + 1.0 Wlx
133 1.0 SW + 1.0 Test + 1.0 Wly

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 6

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

Copyright (c) GS E&C. All Rights Reserved


9/10/2018 Page 7

REFERENCE DWGS
NO. DWG NO. DWG TITLE
A01

NOTES
* OUTPUT UNIT : mm

01

Perbaikan Tanki 15 di PPP Prabumulih PROJECT

FOUNDATION LOCATION PLAN

Tank Foundation T.15

SQUAD CHECK
F11

Y
PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWPNon dasi Tanki T.15 Perta mina

Copyright (c) GS E&C. All Rights Reserved


9/10/2018 Page 8

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


9/10/2018 Page 9

REFERENCE DWGS
24100 CL FOOTING NO. DWG NO. DWG TITLE

600 22900 600 TOP BOTTOM

TYP.
50
D16@250

D16@250
NOTES
D16@250 * ANCHOR BOLT
D16@250 1X40-U-5/8 ANC. BOLTS (TYPE TYPE L)

FOUNDATION PLAN FOOTING REINF. PLAN * OUTPUT UNIT : mm


100 PROJ.

CL PED.
500 30 GROUT

24100

50
TOG EL. + -200 23600 600
250 250
2-D16
300

D13

Perbaikan Tanki 15 di PPP Prabumulih PROJECT


75
300

LEAN CONC. 50 THK


FOUNDATION DETAIL FOR
CRUSHED STONE 0 THK
F1
SECTION PEDESTAL REBAR

SQUAD CHECK
PROCESS PIPING VESSELS STRUCT. ELEC. INST.

D13@200

SCALE JOB NO. MICROFILM NO.


PEDESTAL REBAR ARRANGEMENT
REV. DATE DESCRIPTION DRWNCHKD APPD APPD APPD
AS SHOWPNondasi Tanki T.15 Pertamina

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 10

3. FOUNDATION DATA
3.1 FOOTING DATA
Unit : mm Ft. Name F1
Ft. Type TANK 1
24100 Area 456.167 m
2

Ft. Thickness 300.00 mm


3
Ft. Volume 136.850 m
Ft. Weight 334.910 tonf
Outer Soil Height 500.00 mm
3
Soil Volume 91.233 m
Soil Weight 158.152 tonf
Buoyancy Not Consider
Self Weight (except Pr.SW) 493.062 tonf

500
300

300
The Origin coordinate
The Center of gravity (0,0) mm

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : tonf , Area : m )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
F1 1 CircleWall 24100.000 22900.000 300.000 44.296 246.714 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 11

3.3 SECTION DATA


Ft.Name / Sec.Name F1 / S1
Unit : mm
24100

2
Direction All Direct Section Area 456.167 m
3
F.Volume 136.850 m F.Weight 334.910 tonf
3
S.Volume 91.233 m S.Weight 158.152 tonf
Pier Wt 246.714 tonf Total Weight 739.776 tonf

3.4 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch)
My
are based on the right hand rule.
Fx
Mx

Index Load Case Name


1 SW
2 Empty
3 DL
4 Operation
5 Test
6 Wlx
7 Wly
8 LL
9 Friction
10 Bundle Pull
11 Op EQx
12 Op EQy
13 Er EQx
14 Er EQy
15 WL
16 TL

Unit( tonf , tonf-m )


Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0.000 0.000 -246.714 0.000 0.000
2 0.000 0.000 0.000 0.000 0.000
F1 1
3 0.000 0.000 -13765.950 0.000 0.000
4 0.000 0.000 0.000 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 12

5 0.000 0.000 0.000 0.000 0.000


6 0.000 0.000 0.000 0.000 0.000
7 0.000 0.000 0.000 0.000 0.000
8 0.000 0.000 -38238.750 0.000 0.000
9 0.000 0.000 0.000 0.000 0.000
10 0.000 0.000 0.000 0.000 0.000
11 0.000 0.000 0.000 0.000 0.000
12 0.000 0.000 0.000 0.000 0.000
13 0.000 0.000 0.000 0.000 0.000
14 0.000 0.000 0.000 0.000 0.000
15 0.000 0.000 -30.591 0.000 0.000
16 0.000 0.000 0.000 0.000 0.000
Footing SW 0.000 0.000 -493.062 0.000 0.000

3.5 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.5.1 Load Combination in Pier Top (Without SW)


Unit( tonf , tonf-m )

Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My


F1 1 0.000 0.000 0.000 0.000 0.000
10 0.000 0.000 0.000 0.000 0.000
11 0.000 0.000 0.000 0.000 0.000
12 0.000 0.000 0.000 0.000 0.000
13 0.000 0.000 0.000 0.000 0.000
14 0.000 0.000 0.000 0.000 0.000
15 0.000 0.000 0.000 0.000 0.000
16 0.000 0.000 0.000 0.000 0.000
17 0.000 0.000 0.000 0.000 0.000
18 0.000 0.000 0.000 0.000 0.000
19 0.000 0.000 0.000 0.000 0.000
1 2 0.000 0.000 0.000 0.000 0.000
3 0.000 0.000 0.000 0.000 0.000
4 0.000 0.000 0.000 0.000 0.000
5 0.000 0.000 0.000 0.000 0.000
6 0.000 0.000 0.000 0.000 0.000
7 0.000 0.000 0.000 0.000 0.000
8 0.000 0.000 0.000 0.000 0.000
9 0.000 0.000 0.000 0.000 0.000
101 0.000 0.000 0.000 0.000 0.000
102 0.000 0.000 0.000 0.000 0.000
103 0.000 0.000 0.000 0.000 0.000
104 0.000 0.000 0.000 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 13

105 0.000 0.000 0.000 0.000 0.000


106 0.000 0.000 0.000 0.000 0.000
107 0.000 0.000 0.000 0.000 0.000
108 0.000 0.000 0.000 0.000 0.000
109 0.000 0.000 0.000 0.000 0.000
110 0.000 0.000 0.000 0.000 0.000
111 0.000 0.000 0.000 0.000 0.000
112 0.000 0.000 0.000 0.000 0.000
113 0.000 0.000 0.000 0.000 0.000
114 0.000 0.000 0.000 0.000 0.000
115 0.000 0.000 0.000 0.000 0.000
116 0.000 0.000 0.000 0.000 0.000
117 0.000 0.000 0.000 0.000 0.000
118 0.000 0.000 0.000 0.000 0.000
119 0.000 0.000 0.000 0.000 0.000
120 0.000 0.000 0.000 0.000 0.000
121 0.000 0.000 0.000 0.000 0.000
122 0.000 0.000 0.000 0.000 0.000
123 0.000 0.000 0.000 0.000 0.000
124 0.000 0.000 0.000 0.000 0.000
125 0.000 0.000 0.000 0.000 0.000
126 0.000 0.000 0.000 0.000 0.000
127 0.000 0.000 0.000 0.000 0.000
128 0.000 0.000 0.000 0.000 0.000
129 0.000 0.000 0.000 0.000 0.000
130 0.000 0.000 0.000 0.000 0.000
131 0.000 0.000 0.000 0.000 0.000
132 0.000 0.000 0.000 0.000 0.000
133 0.000 0.000 0.000 0.000 0.000

3.5.2 Load Combination in Footing Bottom (With Pier SW)


Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
F1 1 0.000 0.000 -246.714 0.000 0.000
10 0.000 0.000 -246.714 0.000 0.000
11 0.000 0.000 -246.714 0.000 0.000
12 0.000 0.000 -246.714 0.000 0.000
13 0.000 0.000 -246.714 0.000 0.000
14 0.000 0.000 -246.714 0.000 0.000
15 0.000 0.000 -246.714 0.000 0.000
16 0.000 0.000 -246.714 0.000 0.000
17 0.000 0.000 -246.714 0.000 0.000
18 0.000 0.000 -246.714 0.000 0.000
1
19 0.000 0.000 -246.714 0.000 0.000
2 0.000 0.000 -246.714 0.000 0.000
3 0.000 0.000 -246.714 0.000 0.000
4 0.000 0.000 -246.714 0.000 0.000
5 0.000 0.000 -246.714 0.000 0.000
6 0.000 0.000 -246.714 0.000 0.000
7 0.000 0.000 -246.714 0.000 0.000
8 0.000 0.000 -246.714 0.000 0.000
9 0.000 0.000 -246.714 0.000 0.000
101 0.000 0.000 -246.714 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 14

102 0.000 0.000 -246.714 0.000 0.000


103 0.000 0.000 -246.714 0.000 0.000
104 0.000 0.000 -246.714 0.000 0.000
105 0.000 0.000 -246.714 0.000 0.000
106 0.000 0.000 -246.714 0.000 0.000
107 0.000 0.000 -246.714 0.000 0.000
108 0.000 0.000 -246.714 0.000 0.000
109 0.000 0.000 -246.714 0.000 0.000
110 0.000 0.000 -246.714 0.000 0.000
111 0.000 0.000 -246.714 0.000 0.000
112 0.000 0.000 -246.714 0.000 0.000
113 0.000 0.000 -246.714 0.000 0.000
114 0.000 0.000 -246.714 0.000 0.000
115 0.000 0.000 -246.714 0.000 0.000
116 0.000 0.000 -246.714 0.000 0.000
117 0.000 0.000 -246.714 0.000 0.000
118 0.000 0.000 -246.714 0.000 0.000
119 0.000 0.000 -246.714 0.000 0.000
120 0.000 0.000 -246.714 0.000 0.000
121 0.000 0.000 -246.714 0.000 0.000
122 0.000 0.000 -246.714 0.000 0.000
123 0.000 0.000 -246.714 0.000 0.000
124 0.000 0.000 -246.714 0.000 0.000
125 0.000 0.000 -246.714 0.000 0.000
126 0.000 0.000 -246.714 0.000 0.000
127 0.000 0.000 -246.714 0.000 0.000
128 0.000 0.000 -246.714 0.000 0.000
129 0.000 0.000 -246.714 0.000 0.000
130 0.000 0.000 -246.714 0.000 0.000
131 0.000 0.000 -246.714 0.000 0.000
132 0.000 0.000 -246.714 0.000 0.000
133 0.000 0.000 -246.714 0.000 0.000

3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )

Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads


F1 1 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0

10 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0


11 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
12 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
13 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
14 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
15 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
16 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
17 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
18 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
19 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
2 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 15

3 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0


4 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
5 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
6 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
7 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
8 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
9 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0

Load Combination of Ultimate Condition


- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name Sec.Nam L.Comb. Fx Fy Fz Mx My C.G. of Loads
101 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0

102 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0


103 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
104 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
105 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
106 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
107 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
108 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
109 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
110 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
111 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
112 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
113 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
114 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
115 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
116 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
F1 S1 117 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
118 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
119 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
120 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
121 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
122 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
123 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
124 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
125 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
126 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
127 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
128 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
129 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
130 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
131 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
132 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0
133 0.000 0.000 -739.776 0.000 0.000 12050.0 , 12050.0

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 16

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
 Fz + P.F
Formula : Fx2 + Fy2 > Fs => OK (Bi-Axial)
P.F = Passive Force (apply only in case checked passive force, mark by P ) Unit ( tonf )
2 2
Ft.Name Dir. L.Comb. ( Fz + P.F ) / Fx + Fy Fs(i) Result
2 2
1 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
10 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
11 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
12 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
13 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
14 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
15 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
16 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
17 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
F1 Bi-Axial 18 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
19 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
2 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
3 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
4 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
5 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
6 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
7 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
8 Fx + Fy = 0 , Then N/A 1.5 OK
2 2
9 Fx + Fy = 0 , Then N/A 1.5 OK

4.2 CHECK OF OVERTURNING MOMENT


Formula : (Mry / Moy or Mrx / Mox) > OVM(i) => OK Unit ( tonf-m )

Ft.Name Dir. L.Comb. Mry / Moy = OVM or Mrx / Mox = OVM OVM(i) Result
1 Mo = 0 , Then N/A 2 OK

10 Mo = 0 , Then N/A 2 OK


11 Mo = 0 , Then N/A 2 OK
12 Mo = 0 , Then N/A 2 OK
13 Mo = 0 , Then N/A 2 OK
14 Mo = 0 , Then N/A 2 OK
15 Mo = 0 , Then N/A 2 OK
F1 X 16 Mo = 0 , Then N/A 2 OK
17 Mo = 0 , Then N/A 2 OK
18 Mo = 0 , Then N/A 2 OK
19 Mo = 0 , Then N/A 2 OK
2 Mo = 0 , Then N/A 2 OK
3 Mo = 0 , Then N/A 2 OK
4 Mo = 0 , Then N/A 2 OK
5 Mo = 0 , Then N/A 2 OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 17

6 Mo = 0 , Then N/A 2 OK


7 Mo = 0 , Then N/A 2 OK
8 Mo = 0 , Then N/A 2 OK
9 Mo = 0 , Then N/A 2 OK
1 Mo = 0 , Then N/A 2 OK
10 Mo = 0 , Then N/A 2 OK
11 Mo = 0 , Then N/A 2 OK
12 Mo = 0 , Then N/A 2 OK
13 Mo = 0 , Then N/A 2 OK
14 Mo = 0 , Then N/A 2 OK
15 Mo = 0 , Then N/A 2 OK
16 Mo = 0 , Then N/A 2 OK
17 Mo = 0 , Then N/A 2 OK
Y 18 Mo = 0 , Then N/A 2 OK
19 Mo = 0 , Then N/A 2 OK
2 Mo = 0 , Then N/A 2 OK
3 Mo = 0 , Then N/A 2 OK
4 Mo = 0 , Then N/A 2 OK
5 Mo = 0 , Then N/A 2 OK
6 Mo = 0 , Then N/A 2 OK
7 Mo = 0 , Then N/A 2 OK
8 Mo = 0 , Then N/A 2 OK
9 Mo = 0 , Then N/A 2 OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 18

4.3 CHECK OF CONTACT PRESSURE


4.3.1 Contact Pressure Formula
from API 650 (Tank_1)
* Total vertical pressure loads at bottom of footing by vertical loading
P1 = [( Empty Wt. - Steel Bottom Wt.) + FDN.Wt. + ( Test or Operation Wt. - Empty Wt. ) A2 / A3 ] / A1
* Total vertical pressure loads at bottom of footing by overturning moment loading
2 2
1.273 Mx + My
P2 = (Bi-Axial)
Dp2 Fwid
P3 = [ ( Test or Operation Wt. - Empty Wt. )
+ Steel Bottom Wt. ] / A3 + s1 h1 + s2 h2
(Checking of pressure inside the ring wall under the soil)

Qmax = Max ( P1 + P2 , P3 )
2
Steel Bottom Wt. = Dp  / 4 Bthk Wtu SW Load Factor
3
Wtu = Steel Unit Weight (7.85 tonf/m )
2 2
A1 = ( D - d )  / 4
A2 = ( Dp2 - d2 )  / 4
2
A3 = Dp /4
Dp = Outer Diameter of Equipment Bottom
D = Outer Diameter of Footing
d = inner Diameter of Footing
Fwid = D/2 - d/2
Bthk = Thickness of Eq't Bottom Plate

4.3.2 Input Data


2 4 4
Ft.Name Af (m ) Fl (m ) Fw (m ) Ix (m ) Iy (m )
F1 456.167 24.100 24.100 16559.1500 16559.1500

4.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
- XY-Direction (Bi-Axial) Unit( tonf , tonf-m , tonf/m )
2

Ft.Nam L.Comb q1 q2 ci cj Qmax Qa Cont.A.R Result


1 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
10 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
11 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
12 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
13 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
14 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
15 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
F1 16 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
17 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
18 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
19 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
2 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
3 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
4 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
5 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 19

6 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK


7 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
8 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK
9 1.622 1.622 0.000 24.100 1.6 2.4 100 / 80 % OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 20

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data Unit( mm , tonf , tonf-m )


Ft.Name Sec.Nam Dir. L.Comb. Fl or Fw Sl or Sw Fz M Q
101 24100.00 24100.00 739.776 0.00 246.714

102 24100.00 24100.00 739.776 0.00 246.714


103 24100.00 24100.00 739.776 0.00 246.714
104 24100.00 24100.00 739.776 0.00 246.714
105 24100.00 24100.00 739.776 0.00 246.714
106 24100.00 24100.00 739.776 0.00 246.714
107 24100.00 24100.00 739.776 0.00 246.714
108 24100.00 24100.00 739.776 0.00 246.714
109 24100.00 24100.00 739.776 0.00 246.714
110 24100.00 24100.00 739.776 0.00 246.714
111 24100.00 24100.00 739.776 0.00 246.714
112 24100.00 24100.00 739.776 0.00 246.714
113 24100.00 24100.00 739.776 0.00 246.714
114 24100.00 24100.00 739.776 0.00 246.714
115 24100.00 24100.00 739.776 0.00 246.714
116 24100.00 24100.00 739.776 0.00 246.714
S1 X 117 24100.00 24100.00 739.776 0.00 246.714
F1 118 24100.00 24100.00 739.776 0.00 246.714
119 24100.00 24100.00 739.776 0.00 246.714
120 24100.00 24100.00 739.776 0.00 246.714
121 24100.00 24100.00 739.776 0.00 246.714
122 24100.00 24100.00 739.776 0.00 246.714
123 24100.00 24100.00 739.776 0.00 246.714
124 24100.00 24100.00 739.776 0.00 246.714
125 24100.00 24100.00 739.776 0.00 246.714
126 24100.00 24100.00 739.776 0.00 246.714
127 24100.00 24100.00 739.776 0.00 246.714
128 24100.00 24100.00 739.776 0.00 246.714
129 24100.00 24100.00 739.776 0.00 246.714
130 24100.00 24100.00 739.776 0.00 246.714
131 24100.00 24100.00 739.776 0.00 246.714
132 24100.00 24100.00 739.776 0.00 246.714
133 24100.00 24100.00 739.776 0.00 246.714
101 24100.00 24100.00 739.776 0.000 246.714
S1 Y
102 24100.00 24100.00 739.776 0.000 246.714

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 21

103 24100.00 24100.00 739.776 0.000 246.714


104 24100.00 24100.00 739.776 0.000 246.714
105 24100.00 24100.00 739.776 0.000 246.714
106 24100.00 24100.00 739.776 0.000 246.714
107 24100.00 24100.00 739.776 0.000 246.714
108 24100.00 24100.00 739.776 0.000 246.714
109 24100.00 24100.00 739.776 0.000 246.714
110 24100.00 24100.00 739.776 0.000 246.714
111 24100.00 24100.00 739.776 0.000 246.714
112 24100.00 24100.00 739.776 0.000 246.714
113 24100.00 24100.00 739.776 0.000 246.714
114 24100.00 24100.00 739.776 0.000 246.714
115 24100.00 24100.00 739.776 0.000 246.714
116 24100.00 24100.00 739.776 0.000 246.714
117 24100.00 24100.00 739.776 0.000 246.714
118 24100.00 24100.00 739.776 0.000 246.714
119 24100.00 24100.00 739.776 0.000 246.714
120 24100.00 24100.00 739.776 0.000 246.714
121 24100.00 24100.00 739.776 0.000 246.714
122 24100.00 24100.00 739.776 0.000 246.714
123 24100.00 24100.00 739.776 0.000 246.714
124 24100.00 24100.00 739.776 0.000 246.714
125 24100.00 24100.00 739.776 0.000 246.714
126 24100.00 24100.00 739.776 0.000 246.714
127 24100.00 24100.00 739.776 0.000 246.714
128 24100.00 24100.00 739.776 0.000 246.714
129 24100.00 24100.00 739.776 0.000 246.714
130 24100.00 24100.00 739.776 0.000 246.714
131 24100.00 24100.00 739.776 0.000 246.714
132 24100.00 24100.00 739.776 0.000 246.714
133 24100.00 24100.00 739.776 0.000 246.714

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 22

5.1.2 Design Parameters


Yield Strength - D10 ~ D16 : fy1 , D19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
f_clb : Clear Cover for bottom of footing reinforcement
Loc. : Location of Critical Point from left side of footing

2
Unit(kgf/cm ,mm)
(Flexure) (Shear) fck fy1 fy2 f_cl f_clt f_clb
0.9 0.85 191.71 3976.89 3976.89 50.0 50.0 50.0

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 23

5.2 RING WALL DESIGN


5.2.1 Ring Wall Formula
Definitions,
W : Weight of tank shell plus the tributary weight
of a cone roof per feet of circumference (tonf/m)
N : Thickness of tank shell plate
BPT : Bottom Plate Thickness
D : Tank diameter
 : Angle of internal friction of soil
H : Height of tank (Height of liquid)
h : Height of ring wall
h1,h2 : Filling material height of ring wall
3
s1,s2 : Unit weight of soil under tank (ton/m )
 s1 h1 + s2 h2
s = h1 + h2
3
q = Unit weight of tank fluid (ton/m )
3
c = Unit weight of concrete (ton/m )
F = Radial outward force on ringwall
T = Axial tension in ring
Ko = Rest Earth Pressure Coefficient

Minimum required thickness of ringwall


The center-to-center diameter of ring wall is equal to the nominal tank diameter.
The tank diameter is 4572mm or more
If above assumptions are not applicable, an alternate foundation type shall be used.
EmptyLoad - Bottom Plate Weight
W= (tonf/m)
 tank diameter
3
Bottom Plate Weight = 7.85(tonf/m ) Bottom Plate Thickness Bottom Plate Area
2 W Tank
t.cal =
q H - 2 h (c - s) q H
t.min = Minimum wall thickness = 12 in
t.used = User input wall thickness (mm)
s1
h1

Pu2
Horizontal reinforcement of ringwall
2 Pu1 F
Pu1 = ko ( h1 + h2 ) q H Pu2 = 1/2 ko s1 h1
h2

2
Pu3 = ko s1 h1 * h2 Pu4 = 1/2 ko s2 h2 Pu3 Pu4 s2

F = Pu1 + Pu2 + Pu3 + Pu4


T = 1/2 F D , the F(horizontal force) causes a hoop tension in the ring wall
T
Req'd As = Load Factor  f ,  = 0.9
y t
Req'd As must not be less than that required for temperature
& shrinkage reinforcement.
T
fac : Shrinkage And Temperature Factor
Reinforcement is more than 60000 psi and D10 ~ D16...............fac = 0.002
D

else case......................................................................................fac = 0.0025 F


As.Min = factors (By Design Code) ringwall cross section area
Req'd As = Required steel area to resist entire axial tension T

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 24

Vertical reinforcement of ringwall


Mu = Load Factor ( Pu1 1/2 ( h1 + h2 ) + Pu2 (1/3 h1 + h2 ) + Pu3 1/2 h2 + Pu4 1/3 h2 )
200 3 fck
Selected As = Max ( fac b h , . b d , Min ( 1.333 . b d , Max ( bd, bd)))
req req
fy fy
fac : Shrinkage And Temperature Factor
Reinforcement is more than 60000 psi and D10 ~ D16...............fac = 0.0012
else case......................................................................................fac = 0.0015
= bd2Mu,  = 0.9 , .req = 0.85 fck
fy ( 1 - 1 - 2Rn 0.85fck )Rn

Asmax = 0.75 b b d
fck 0.003 Es
b = 0.85 1 fy 0.003 Es + fy
If Selected As < Using As < Asmax , then OK!!
When Fdn type is block, Selected As = fac b h

5.2.2 Check of Minimum required Thickness & Reinforcement of ringwall


Footing Name : F1 GroupType : Tank_1
Input Data

2 2 3
Dia (mm ) h (mm ) Hor. Bar Ver. Bar Hor. fy (kgf/cm ) Ver. fy (kgf/cm ) rc (ton/m ) Ko Load F.
24100.00 300.00 D16 @ 150 mm D13 @ 200 mm 3976.89 3976.89 2.45 0.500 1.4
Input Equipment Data
s1 (ton/m3 ) s2 (ton/m3 ) 3
Dia (mm ) H (mm ) N (mm ) BPT (mm ) h1 (m ) h2 (m ) q (ton/m )
23500 11000.00 8.00 10.00 0.100 0.200 0.11 0.12 0.10
Result of Thickness

W (tonf/m ) t.Cal (mm ) t.Min (mm ) t.Used (mm ) Result


0.69 -5018.18 304.80 600.00 OK
Result of Hooptension
2 2 2
F (tonf/m ) T (tonf ) Tu (tonf ) As.req (cm ) As.Min (cm ) As.Used (cm ) Result
0.171 2.008 2.811 0.785 4.500 11.913 OK
Result of Vertical Reinforcement
2 2 2
b(mm) d(mm) F(tonf) Mu(tonf-m) As.Used (cm ) As.Selected (cm ) As.Max (cm ) Result
1.00 1.78 0.17 0.04 1.93 1.37 26.23 OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 25

5.3 REQUIRED REINFORCEMENT


5.3.1 Reinforcement Formula
- Shrinkage And Temperature Reinforcement ---- ACI CODE 7.12.2
As As1 = fac b h , fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used.................................................................... 0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used...........................................0.0018
(c) Slabs where reinforcement with yield stress exceeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used ....................................................................................................... f
y

- Required Reinforcement by Analysis


As As2 = .req b d
- At every section of flexural members where tensile reinforcement is required
3 fck 200
As (As5 = f bw d) (As4 = f b d) ---- ACI Eq (10-3)
y y
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
As3 = 1.333 .req b d
Asmax = 0.75 b b d
fck 0.003 Es
b = 0.85  1 fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
= bd2Mu,  = 0.9 , .req = 0.85 fck
fy ( 1- 1 - 2Rn Rn
0.85fck )
5.3.2 Check of Footing Reinforcement
Footing Name : F1 GroupType : Tank_1
- X direction (All Width)

2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
101 top 47 - D16 @ 250 22.729 11.412 24.205 93.322

101 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567


102 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
102 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
103 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
103 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
104 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
104 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
S1
105 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
105 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
106 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
106 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
107 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
107 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
108 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
108 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 26

109 top 47 - D16 @ 250 22.729 11.412 24.205 93.322


109 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
110 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
110 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
111 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
111 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
112 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
112 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
113 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
113 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
114 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
114 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
115 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
115 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
116 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
116 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
117 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
117 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
118 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
118 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
119 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
119 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
120 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
120 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
121 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
121 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
122 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
122 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
123 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
123 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
124 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
124 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
125 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
125 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
126 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
126 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
127 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
127 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
128 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
128 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
129 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
129 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
130 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
130 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
131 top 47 - D16 @ 250 22.729 11.412 24.205 93.322

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 27

131 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567


132 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
132 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567
133 top 47 - D16 @ 250 22.729 11.412 24.205 93.322
133 botom 30 - D16 @ 250 0.482 7.119 24.205 59.567

Sec.Name L.Comb. Mu (tonf-m) Rn .Req


101 top 1.896 0.315 0.0001

101 bottom 0.087 0.023 0.0000


102 top 1.896 0.315 0.0001
102 bottom 0.087 0.023 0.0000
103 top 1.896 0.315 0.0001
103 bottom 0.087 0.023 0.0000
104 top 1.896 0.315 0.0001
104 bottom 0.087 0.023 0.0000
105 top 1.896 0.315 0.0001
105 bottom 0.087 0.023 0.0000
106 top 1.896 0.315 0.0001
106 bottom 0.087 0.023 0.0000
107 top 1.896 0.315 0.0001
107 bottom 0.087 0.023 0.0000
108 top 1.896 0.315 0.0001
108 bottom 0.087 0.023 0.0000
109 top 1.896 0.315 0.0001
109 bottom 0.087 0.023 0.0000
110 top 1.896 0.315 0.0001
S1
110 bottom 0.087 0.023 0.0000
111 top 1.896 0.315 0.0001
111 bottom 0.087 0.023 0.0000
112 top 1.896 0.315 0.0001
112 bottom 0.087 0.023 0.0000
113 top 1.896 0.315 0.0001
113 bottom 0.087 0.023 0.0000
114 top 1.896 0.315 0.0001
114 bottom 0.087 0.023 0.0000
115 top 1.896 0.315 0.0001
115 bottom 0.087 0.023 0.0000
116 top 1.896 0.315 0.0001
116 bottom 0.087 0.023 0.0000
117 top 1.896 0.315 0.0001
117 bottom 0.087 0.023 0.0000
118 top 1.896 0.315 0.0001
118 bottom 0.087 0.023 0.0000
119 top 1.896 0.315 0.0001
119 bottom 0.087 0.023 0.0000

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 28

120 top 1.896 0.315 0.0001


120 bottom 0.087 0.023 0.0000
121 top 1.896 0.315 0.0001
121 bottom 0.087 0.023 0.0000
122 top 1.896 0.315 0.0001
122 bottom 0.087 0.023 0.0000
123 top 1.896 0.315 0.0001
123 bottom 0.087 0.023 0.0000
124 top 1.896 0.315 0.0001
124 bottom 0.087 0.023 0.0000
125 top 1.896 0.315 0.0001
125 bottom 0.087 0.023 0.0000
126 top 1.896 0.315 0.0001
126 bottom 0.087 0.023 0.0000
127 top 1.896 0.315 0.0001
127 bottom 0.087 0.023 0.0000
128 top 1.896 0.315 0.0001
128 bottom 0.087 0.023 0.0000
129 top 1.896 0.315 0.0001
129 bottom 0.087 0.023 0.0000
130 top 1.896 0.315 0.0001
130 bottom 0.087 0.023 0.0000
131 top 1.896 0.315 0.0001
131 bottom 0.087 0.023 0.0000
132 top 1.896 0.315 0.0001
132 bottom 0.087 0.023 0.0000
133 top 1.896 0.315 0.0001
133 bottom 0.087 0.023 0.0000
2 2 2 2 2 2
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm )
101 top 30.813 2.190 2.920 97.671 76.503 437.311

101 bottom 19.222 0.101 0.135 60.928 47.723 272.797


102 top 30.813 2.190 2.920 97.671 76.503 437.311
102 bottom 19.222 0.101 0.135 60.928 47.723 272.797
103 top 30.813 2.190 2.920 97.671 76.503 437.311
103 bottom 19.222 0.101 0.135 60.928 47.723 272.797
104 top 30.813 2.190 2.920 97.671 76.503 437.311
S1 104 bottom 19.222 0.101 0.135 60.928 47.723 272.797
105 top 30.813 2.190 2.920 97.671 76.503 437.311
105 bottom 19.222 0.101 0.135 60.928 47.723 272.797
106 top 30.813 2.190 2.920 97.671 76.503 437.311
106 bottom 19.222 0.101 0.135 60.928 47.723 272.797
107 top 30.813 2.190 2.920 97.671 76.503 437.311
107 bottom 19.222 0.101 0.135 60.928 47.723 272.797
108 top 30.813 2.190 2.920 97.671 76.503 437.311

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 29

108 bottom 19.222 0.101 0.135 60.928 47.723 272.797


109 top 30.813 2.190 2.920 97.671 76.503 437.311
109 bottom 19.222 0.101 0.135 60.928 47.723 272.797
110 top 30.813 2.190 2.920 97.671 76.503 437.311
110 bottom 19.222 0.101 0.135 60.928 47.723 272.797
111 top 30.813 2.190 2.920 97.671 76.503 437.311
111 bottom 19.222 0.101 0.135 60.928 47.723 272.797
112 top 30.813 2.190 2.920 97.671 76.503 437.311
112 bottom 19.222 0.101 0.135 60.928 47.723 272.797
113 top 30.813 2.190 2.920 97.671 76.503 437.311
113 bottom 19.222 0.101 0.135 60.928 47.723 272.797
114 top 30.813 2.190 2.920 97.671 76.503 437.311
114 bottom 19.222 0.101 0.135 60.928 47.723 272.797
115 top 30.813 2.190 2.920 97.671 76.503 437.311
115 bottom 19.222 0.101 0.135 60.928 47.723 272.797
116 top 30.813 2.190 2.920 97.671 76.503 437.311
116 bottom 19.222 0.101 0.135 60.928 47.723 272.797
117 top 30.813 2.190 2.920 97.671 76.503 437.311
117 bottom 19.222 0.101 0.135 60.928 47.723 272.797
118 top 30.813 2.190 2.920 97.671 76.503 437.311
118 bottom 19.222 0.101 0.135 60.928 47.723 272.797
119 top 30.813 2.190 2.920 97.671 76.503 437.311
119 bottom 19.222 0.101 0.135 60.928 47.723 272.797
120 top 30.813 2.190 2.920 97.671 76.503 437.311
120 bottom 19.222 0.101 0.135 60.928 47.723 272.797
121 top 30.813 2.190 2.920 97.671 76.503 437.311
121 bottom 19.222 0.101 0.135 60.928 47.723 272.797
122 top 30.813 2.190 2.920 97.671 76.503 437.311
122 bottom 19.222 0.101 0.135 60.928 47.723 272.797
123 top 30.813 2.190 2.920 97.671 76.503 437.311
123 bottom 19.222 0.101 0.135 60.928 47.723 272.797
124 top 30.813 2.190 2.920 97.671 76.503 437.311
124 bottom 19.222 0.101 0.135 60.928 47.723 272.797
125 top 30.813 2.190 2.920 97.671 76.503 437.311
125 bottom 19.222 0.101 0.135 60.928 47.723 272.797
126 top 30.813 2.190 2.920 97.671 76.503 437.311
126 bottom 19.222 0.101 0.135 60.928 47.723 272.797
127 top 30.813 2.190 2.920 97.671 76.503 437.311
127 bottom 19.222 0.101 0.135 60.928 47.723 272.797
128 top 30.813 2.190 2.920 97.671 76.503 437.311
128 bottom 19.222 0.101 0.135 60.928 47.723 272.797
129 top 30.813 2.190 2.920 97.671 76.503 437.311
129 bottom 19.222 0.101 0.135 60.928 47.723 272.797
130 top 30.813 2.190 2.920 97.671 76.503 437.311
130 bottom 19.222 0.101 0.135 60.928 47.723 272.797

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 30

131 top 30.813 2.190 2.920 97.671 76.503 437.311


131 bottom 19.222 0.101 0.135 60.928 47.723 272.797
132 top 30.813 2.190 2.920 97.671 76.503 437.311
132 bottom 19.222 0.101 0.135 60.928 47.723 272.797
133 top 30.813 2.190 2.920 97.671 76.503 437.311
133 bottom 19.222 0.101 0.135 60.928 47.723 272.797
2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
101 top 93.322 30.813 OK

101 bottom 59.567 19.222 OK


102 top 93.322 30.813 OK
102 bottom 59.567 19.222 OK
103 top 93.322 30.813 OK
103 bottom 59.567 19.222 OK
104 top 93.322 30.813 OK
104 bottom 59.567 19.222 OK
105 top 93.322 30.813 OK
105 bottom 59.567 19.222 OK
106 top 93.322 30.813 OK
106 bottom 59.567 19.222 OK
107 top 93.322 30.813 OK
107 bottom 59.567 19.222 OK
108 top 93.322 30.813 OK
108 bottom 59.567 19.222 OK
109 top 93.322 30.813 OK
109 bottom 59.567 19.222 OK
S1 110 top 93.322 30.813 OK
110 bottom 59.567 19.222 OK
111 top 93.322 30.813 OK
111 bottom 59.567 19.222 OK
112 top 93.322 30.813 OK
112 bottom 59.567 19.222 OK
113 top 93.322 30.813 OK
113 bottom 59.567 19.222 OK
114 top 93.322 30.813 OK
114 bottom 59.567 19.222 OK
115 top 93.322 30.813 OK
115 bottom 59.567 19.222 OK
116 top 93.322 30.813 OK
116 bottom 59.567 19.222 OK
117 top 93.322 30.813 OK
117 bottom 59.567 19.222 OK
118 top 93.322 30.813 OK
118 bottom 59.567 19.222 OK
119 top 93.322 30.813 OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 31

119 bottom 59.567 19.222 OK


120 top 93.322 30.813 OK
120 bottom 59.567 19.222 OK
121 top 93.322 30.813 OK
121 bottom 59.567 19.222 OK
122 top 93.322 30.813 OK
122 bottom 59.567 19.222 OK
123 top 93.322 30.813 OK
123 bottom 59.567 19.222 OK
124 top 93.322 30.813 OK
124 bottom 59.567 19.222 OK
125 top 93.322 30.813 OK
125 bottom 59.567 19.222 OK
126 top 93.322 30.813 OK
126 bottom 59.567 19.222 OK
127 top 93.322 30.813 OK
127 bottom 59.567 19.222 OK
128 top 93.322 30.813 OK
128 bottom 59.567 19.222 OK
129 top 93.322 30.813 OK
129 bottom 59.567 19.222 OK
130 top 93.322 30.813 OK
130 bottom 59.567 19.222 OK
131 top 93.322 30.813 OK
131 bottom 59.567 19.222 OK
132 top 93.322 30.813 OK
132 bottom 59.567 19.222 OK
133 top 93.322 30.813 OK
133 bottom 59.567 19.222 OK

- Y direction (All Width)

2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
101 top 47 - D16 @ 250 22.729 11.412 22.615 93.322

101 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567


102 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
102 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
103 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
103 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
S1 104 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
104 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
105 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
105 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
106 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
106 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
107 top 47 - D16 @ 250 22.729 11.412 22.615 93.322

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 32

107 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567


108 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
108 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
109 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
109 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
110 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
110 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
111 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
111 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
112 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
112 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
113 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
113 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
114 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
114 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
115 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
115 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
116 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
116 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
117 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
117 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
118 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
118 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
119 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
119 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
120 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
120 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
121 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
121 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
122 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
122 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
123 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
123 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
124 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
124 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
125 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
125 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
126 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
126 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
127 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
127 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
128 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
128 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
129 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
129 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 33

130 top 47 - D16 @ 250 22.729 11.412 22.615 93.322


130 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
131 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
131 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
132 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
132 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567
133 top 47 - D16 @ 250 22.729 11.412 22.615 93.322
133 botom 30 - D16 @ 250 0.482 7.119 22.615 59.567

Sec.Name L.Comb. Mu (tonf-m) Rn .Req


101 top 1.896 0.361 0.0001

101 bottom 0.087 0.027 0.0000


102 top 1.896 0.361 0.0001
102 bottom 0.087 0.027 0.0000
103 top 1.896 0.361 0.0001
103 bottom 0.087 0.027 0.0000
104 top 1.896 0.361 0.0001
104 bottom 0.087 0.027 0.0000
105 top 1.896 0.361 0.0001
105 bottom 0.087 0.027 0.0000
106 top 1.896 0.361 0.0001
106 bottom 0.087 0.027 0.0000
107 top 1.896 0.361 0.0001
107 bottom 0.087 0.027 0.0000
108 top 1.896 0.361 0.0001
108 bottom 0.087 0.027 0.0000
109 top 1.896 0.361 0.0001
S1 109 bottom 0.087 0.027 0.0000
110 top 1.896 0.361 0.0001
110 bottom 0.087 0.027 0.0000
111 top 1.896 0.361 0.0001
111 bottom 0.087 0.027 0.0000
112 top 1.896 0.361 0.0001
112 bottom 0.087 0.027 0.0000
113 top 1.896 0.361 0.0001
113 bottom 0.087 0.027 0.0000
114 top 1.896 0.361 0.0001
114 bottom 0.087 0.027 0.0000
115 top 1.896 0.361 0.0001
115 bottom 0.087 0.027 0.0000
116 top 1.896 0.361 0.0001
116 bottom 0.087 0.027 0.0000
117 top 1.896 0.361 0.0001
117 bottom 0.087 0.027 0.0000
118 top 1.896 0.361 0.0001

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 34

118 bottom 0.087 0.027 0.0000


119 top 1.896 0.361 0.0001
119 bottom 0.087 0.027 0.0000
120 top 1.896 0.361 0.0001
120 bottom 0.087 0.027 0.0000
121 top 1.896 0.361 0.0001
121 bottom 0.087 0.027 0.0000
122 top 1.896 0.361 0.0001
122 bottom 0.087 0.027 0.0000
123 top 1.896 0.361 0.0001
123 bottom 0.087 0.027 0.0000
124 top 1.896 0.361 0.0001
124 bottom 0.087 0.027 0.0000
125 top 1.896 0.361 0.0001
125 bottom 0.087 0.027 0.0000
126 top 1.896 0.361 0.0001
126 bottom 0.087 0.027 0.0000
127 top 1.896 0.361 0.0001
127 bottom 0.087 0.027 0.0000
128 top 1.896 0.361 0.0001
128 bottom 0.087 0.027 0.0000
129 top 1.896 0.361 0.0001
129 bottom 0.087 0.027 0.0000
130 top 1.896 0.361 0.0001
130 bottom 0.087 0.027 0.0000
131 top 1.896 0.361 0.0001
131 bottom 0.087 0.027 0.0000
132 top 1.896 0.361 0.0001
132 bottom 0.087 0.027 0.0000
133 top 1.896 0.361 0.0001
133 bottom 0.087 0.027 0.0000
2 2 2 2 2 2
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm )
101 top 30.813 2.345 3.125 91.255 71.477 408.585

101 bottom 19.222 0.108 0.144 56.926 44.588 254.877


102 top 30.813 2.345 3.125 91.255 71.477 408.585
102 bottom 19.222 0.108 0.144 56.926 44.588 254.877
103 top 30.813 2.345 3.125 91.255 71.477 408.585
103 bottom 19.222 0.108 0.144 56.926 44.588 254.877
S1
104 top 30.813 2.345 3.125 91.255 71.477 408.585
104 bottom 19.222 0.108 0.144 56.926 44.588 254.877
105 top 30.813 2.345 3.125 91.255 71.477 408.585
105 bottom 19.222 0.108 0.144 56.926 44.588 254.877
106 top 30.813 2.345 3.125 91.255 71.477 408.585
106 bottom 19.222 0.108 0.144 56.926 44.588 254.877

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 35

107 top 30.813 2.345 3.125 91.255 71.477 408.585


107 bottom 19.222 0.108 0.144 56.926 44.588 254.877
108 top 30.813 2.345 3.125 91.255 71.477 408.585
108 bottom 19.222 0.108 0.144 56.926 44.588 254.877
109 top 30.813 2.345 3.125 91.255 71.477 408.585
109 bottom 19.222 0.108 0.144 56.926 44.588 254.877
110 top 30.813 2.345 3.125 91.255 71.477 408.585
110 bottom 19.222 0.108 0.144 56.926 44.588 254.877
111 top 30.813 2.345 3.125 91.255 71.477 408.585
111 bottom 19.222 0.108 0.144 56.926 44.588 254.877
112 top 30.813 2.345 3.125 91.255 71.477 408.585
112 bottom 19.222 0.108 0.144 56.926 44.588 254.877
113 top 30.813 2.345 3.125 91.255 71.477 408.585
113 bottom 19.222 0.108 0.144 56.926 44.588 254.877
114 top 30.813 2.345 3.125 91.255 71.477 408.585
114 bottom 19.222 0.108 0.144 56.926 44.588 254.877
115 top 30.813 2.345 3.125 91.255 71.477 408.585
115 bottom 19.222 0.108 0.144 56.926 44.588 254.877
116 top 30.813 2.345 3.125 91.255 71.477 408.585
116 bottom 19.222 0.108 0.144 56.926 44.588 254.877
117 top 30.813 2.345 3.125 91.255 71.477 408.585
117 bottom 19.222 0.108 0.144 56.926 44.588 254.877
118 top 30.813 2.345 3.125 91.255 71.477 408.585
118 bottom 19.222 0.108 0.144 56.926 44.588 254.877
119 top 30.813 2.345 3.125 91.255 71.477 408.585
119 bottom 19.222 0.108 0.144 56.926 44.588 254.877
120 top 30.813 2.345 3.125 91.255 71.477 408.585
120 bottom 19.222 0.108 0.144 56.926 44.588 254.877
121 top 30.813 2.345 3.125 91.255 71.477 408.585
121 bottom 19.222 0.108 0.144 56.926 44.588 254.877
122 top 30.813 2.345 3.125 91.255 71.477 408.585
122 bottom 19.222 0.108 0.144 56.926 44.588 254.877
123 top 30.813 2.345 3.125 91.255 71.477 408.585
123 bottom 19.222 0.108 0.144 56.926 44.588 254.877
124 top 30.813 2.345 3.125 91.255 71.477 408.585
124 bottom 19.222 0.108 0.144 56.926 44.588 254.877
125 top 30.813 2.345 3.125 91.255 71.477 408.585
125 bottom 19.222 0.108 0.144 56.926 44.588 254.877
126 top 30.813 2.345 3.125 91.255 71.477 408.585
126 bottom 19.222 0.108 0.144 56.926 44.588 254.877
127 top 30.813 2.345 3.125 91.255 71.477 408.585
127 bottom 19.222 0.108 0.144 56.926 44.588 254.877
128 top 30.813 2.345 3.125 91.255 71.477 408.585
128 bottom 19.222 0.108 0.144 56.926 44.588 254.877
129 top 30.813 2.345 3.125 91.255 71.477 408.585

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 36

129 bottom 19.222 0.108 0.144 56.926 44.588 254.877


130 top 30.813 2.345 3.125 91.255 71.477 408.585
130 bottom 19.222 0.108 0.144 56.926 44.588 254.877
131 top 30.813 2.345 3.125 91.255 71.477 408.585
131 bottom 19.222 0.108 0.144 56.926 44.588 254.877
132 top 30.813 2.345 3.125 91.255 71.477 408.585
132 bottom 19.222 0.108 0.144 56.926 44.588 254.877
133 top 30.813 2.345 3.125 91.255 71.477 408.585
133 bottom 19.222 0.108 0.144 56.926 44.588 254.877
2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
101 top 93.322 30.813 OK

101 bottom 59.567 19.222 OK


102 top 93.322 30.813 OK
102 bottom 59.567 19.222 OK
103 top 93.322 30.813 OK
103 bottom 59.567 19.222 OK
104 top 93.322 30.813 OK
104 bottom 59.567 19.222 OK
105 top 93.322 30.813 OK
105 bottom 59.567 19.222 OK
106 top 93.322 30.813 OK
106 bottom 59.567 19.222 OK
107 top 93.322 30.813 OK
107 bottom 59.567 19.222 OK
108 top 93.322 30.813 OK
108 bottom 59.567 19.222 OK
109 top 93.322 30.813 OK
S1
109 bottom 59.567 19.222 OK
110 top 93.322 30.813 OK
110 bottom 59.567 19.222 OK
111 top 93.322 30.813 OK
111 bottom 59.567 19.222 OK
112 top 93.322 30.813 OK
112 bottom 59.567 19.222 OK
113 top 93.322 30.813 OK
113 bottom 59.567 19.222 OK
114 top 93.322 30.813 OK
114 bottom 59.567 19.222 OK
115 top 93.322 30.813 OK
115 bottom 59.567 19.222 OK
116 top 93.322 30.813 OK
116 bottom 59.567 19.222 OK
117 top 93.322 30.813 OK
117 bottom 59.567 19.222 OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 37

118 top 93.322 30.813 OK


118 bottom 59.567 19.222 OK
119 top 93.322 30.813 OK
119 bottom 59.567 19.222 OK
120 top 93.322 30.813 OK
120 bottom 59.567 19.222 OK
121 top 93.322 30.813 OK
121 bottom 59.567 19.222 OK
122 top 93.322 30.813 OK
122 bottom 59.567 19.222 OK
123 top 93.322 30.813 OK
123 bottom 59.567 19.222 OK
124 top 93.322 30.813 OK
124 bottom 59.567 19.222 OK
125 top 93.322 30.813 OK
125 bottom 59.567 19.222 OK
126 top 93.322 30.813 OK
126 bottom 59.567 19.222 OK
127 top 93.322 30.813 OK
127 bottom 59.567 19.222 OK
128 top 93.322 30.813 OK
128 bottom 59.567 19.222 OK
129 top 93.322 30.813 OK
129 bottom 59.567 19.222 OK
130 top 93.322 30.813 OK
130 bottom 59.567 19.222 OK
131 top 93.322 30.813 OK
131 bottom 59.567 19.222 OK
132 top 93.322 30.813 OK
132 bottom 59.567 19.222 OK
133 top 93.322 30.813 OK
133 bottom 59.567 19.222 OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 38

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 101
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 39

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 102
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 40

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 103
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 41

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 104
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 42

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 105
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 43

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 106
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 44

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 107
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 45

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 108
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 46

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 109
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 47

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 110
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 48

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 111
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 49

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 112
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 50

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 113
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 51

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 114
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 52

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 115
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 53

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 116
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 54

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 117
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 55

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 118
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 56

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 119
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 57

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 120
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 58

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 121
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 59

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 122
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 60

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 123
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 61

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 124
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 62

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 125
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 63

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 126
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 64

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 127
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 65

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 128
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 66

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 129
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 67

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 130
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 68

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 131
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 69

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 132
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 70

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 X 133
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 71

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 101
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 72

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 102
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 73

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 103
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 74

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 104
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 75

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 105
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 76

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 106
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 77

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 107
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 78

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 108
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 79

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 109
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 80

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 110
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 81

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 111
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 82

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 112
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 83

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 113
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 84

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 114
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 85

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 115
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 86

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 116
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 87

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 117
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 88

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 118
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 89

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 119
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 90

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 120
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 91

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 121
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 92

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 122
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 93

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 123
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 94

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 124
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 95

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 125
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 96

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 126
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 97

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 127
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 98

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 128
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 99

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 129
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 100

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 130
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 101

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 131
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 102

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 132
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 103

Title

Moment force Diagram


Foundation name Section name Direction L/C ID
24100

F1 S1 Y 133
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Mubottom = 0.087 tonf-m , Mutop = -1.896 tonf-m

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[B.M.D] [ tonf-m ]

-87.2
-65.4
-43.6
-21.8
--01..993
0.-00-9.19.2
89
0
21.8
43.6
65.4
87.2

[B/L.M.D] [ tonf-m / ft ]

-1.1
-0.8
-0.6
-0.3
-0
-0.0.053
-0-0.00.3
05
0
0.3
0.6
0.8
1.1

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 104

5.4 ONE WAY SHEAR FORCE


5.4.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
-  Vc = 0.85 2 fck B'w d (eq 11-3)
- Vu <=  Vc , then OK!!

5.4.2 Check of One-Way Shear


Footing Name : F1 GroupType : Tank_1 PileType : False

Unit : mm
24100
22971

22971

- X direction One-Way Shear (All Width)


Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
101 22971 242.1 10243.7 154.747 3.439 OK

102 22971 242.1 10243.7 154.747 3.439 OK


103 22971 242.1 10243.7 154.747 3.439 OK
104 22971 242.1 10243.7 154.747 3.439 OK
105 22971 242.1 10243.7 154.747 3.439 OK
106 22971 242.1 10243.7 154.747 3.439 OK
107 22971 242.1 10243.7 154.747 3.439 OK
108 22971 242.1 10243.7 154.747 3.439 OK
109 22971 242.1 10243.7 154.747 3.439 OK
110 22971 242.1 10243.7 154.747 3.439 OK
S1
111 22971 242.1 10243.7 154.747 3.439 OK
112 22971 242.1 10243.7 154.747 3.439 OK
113 22971 242.1 10243.7 154.747 3.439 OK
114 22971 242.1 10243.7 154.747 3.439 OK
115 22971 242.1 10243.7 154.747 3.439 OK
116 22971 242.1 10243.7 154.747 3.439 OK
117 22971 242.1 10243.7 154.747 3.439 OK
118 22971 242.1 10243.7 154.747 3.439 OK
119 22971 242.1 10243.7 154.747 3.439 OK
120 22971 242.1 10243.7 154.747 3.439 OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 105

121 22971 242.1 10243.7 154.747 3.439 OK


122 22971 242.1 10243.7 154.747 3.439 OK
123 22971 242.1 10243.7 154.747 3.439 OK
124 22971 242.1 10243.7 154.747 3.439 OK
125 22971 242.1 10243.7 154.747 3.439 OK
126 22971 242.1 10243.7 154.747 3.439 OK
127 22971 242.1 10243.7 154.747 3.439 OK
128 22971 242.1 10243.7 154.747 3.439 OK
129 22971 242.1 10243.7 154.747 3.439 OK
130 22971 242.1 10243.7 154.747 3.439 OK
131 22971 242.1 10243.7 154.747 3.439 OK
132 22971 242.1 10243.7 154.747 3.439 OK
133 22971 242.1 10243.7 154.747 3.439 OK
- Y direction One-Way Shear (All Width)
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
101 22971 226.1 10243.7 144.582 3.439 OK

102 22971 226.1 10243.7 144.582 3.439 OK


103 22971 226.1 10243.7 144.582 3.439 OK
104 22971 226.1 10243.7 144.582 3.439 OK
105 22971 226.1 10243.7 144.582 3.439 OK
106 22971 226.1 10243.7 144.582 3.439 OK
107 22971 226.1 10243.7 144.582 3.439 OK
108 22971 226.1 10243.7 144.582 3.439 OK
109 22971 226.1 10243.7 144.582 3.439 OK
110 22971 226.1 10243.7 144.582 3.439 OK
111 22971 226.1 10243.7 144.582 3.439 OK
112 22971 226.1 10243.7 144.582 3.439 OK
113 22971 226.1 10243.7 144.582 3.439 OK
114 22971 226.1 10243.7 144.582 3.439 OK
115 22971 226.1 10243.7 144.582 3.439 OK
S1
116 22971 226.1 10243.7 144.582 3.439 OK
117 22971 226.1 10243.7 144.582 3.439 OK
118 22971 226.1 10243.7 144.582 3.439 OK
119 22971 226.1 10243.7 144.582 3.439 OK
120 22971 226.1 10243.7 144.582 3.439 OK
121 22971 226.1 10243.7 144.582 3.439 OK
122 22971 226.1 10243.7 144.582 3.439 OK
123 22971 226.1 10243.7 144.582 3.439 OK
124 22971 226.1 10243.7 144.582 3.439 OK
125 22971 226.1 10243.7 144.582 3.439 OK
126 22971 226.1 10243.7 144.582 3.439 OK
127 22971 226.1 10243.7 144.582 3.439 OK
128 22971 226.1 10243.7 144.582 3.439 OK
129 22971 226.1 10243.7 144.582 3.439 OK
130 22971 226.1 10243.7 144.582 3.439 OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 106

131 22971 226.1 10243.7 144.582 3.439 OK


132 22971 226.1 10243.7 144.582 3.439 OK
133 22971 226.1 10243.7 144.582 3.439 OK

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 107

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 101
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 108

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 102
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 109

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 103
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 110

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 104
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 111

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 105
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 112

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 106
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 113

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 107
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 114

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 108
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 115

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 109
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 116

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 110
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 117

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 111
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 118

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 112
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 119

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 113
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 120

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 114
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 121

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 115
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 122

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 116
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 123

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 117
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 124

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 118
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 125

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 119
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 126

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 120
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 127

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 121
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 128

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 122
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 129

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 123
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 130

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 124
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 131

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 125
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 132

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 126
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 133

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 127
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 134

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 128
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 135

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 129
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 136

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 130
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 137

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 131
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 138

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 132
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 139

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 X 133
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz My Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 140

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 101
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 141

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 102
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 142

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 103
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 143

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 104
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 144

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 105
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 145

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 106
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 146

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 107
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 147

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 108
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 148

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 109
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 149

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 110
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 150

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 111
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 151

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 112
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 152

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 113
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 153

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 114
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 154

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 115
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 155

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 116
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 156

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 117
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 157

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 118
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 158

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 119
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 159

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 120
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 160

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 121
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 161

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 122
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 162

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 123
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 163

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 124
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 164

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 125
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 165

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 126
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 166

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 127
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 167

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 128
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 168

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 129
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 169

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 130
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 170

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 131
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 171

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 132
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 172

Title

Foundation name
Shear force Diagram Section name Direction L/C ID
24100

F1 S1 Y 133
Analysis Method
Conventional Rigid Method with eqilibrium equation (Method 2)
Fz Mx Moment intia
-739.776 tonf 0.000 tonf-m 16559.1500 m4
Area 2 Contact Area 2 Critical Point Method
456.167 m 456.167 m (100 %) Critical Max Point
Critical Value
Vu = 3.439 tonf

[ mm ]

-35.15 -36.16 -36.16 -35.15 -33.18


-30.31 -33.18 -30.31
[Loading] -22.31 -26.64 -26.64
-22.31
-17.4 -17.4

-7.16 -7.16
[ tonf , tonf/m ]

10.74 10.74
18.11 18.11
24.61 24.61
30.11 30.11
34.42 37.38 34.42
37.38 38.89 38.89

[S.F.D] [ tonf ]

11.7
8.8
5.9 4.64
3.44
2.9
0
-2.9 -3.43
-4.62
-5.9
-8.8
-11.7

[S/L.F.D] [ tonf / ft ]

0.2
0.1 0.12
0.1
0.1
0
0
0
-0.1 -0.1
-0.12
-0.1
-0.2

Copyright (c) GS E&C. All Rights Reserved


9/10/2018

Project Na. : Perbaikan Tanki 15 di PPP Pr..


Calculation Sheet
of Project No. : Pondasi Tanki T.15 Pertamina

Foundation Client : Pertamina EP A... Page 173

5.5 TWO WAY SHEAR FORCE


5.5.1 Two-Way Shear Formula
Vu = Fz Shade Ratio
(a)  Vc1 = 0.85 2 (1 + 2/c) fck bo d (eq 11-33) <- Vc1
(b)  Vc2 = 0.85 2 (1 + s d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c)  Vc3 = 0.85 4 fck bo d (eq 11-35) <- Vc3
 Vc = Min( Vc1 ,  Vc2 ,  Vc3) ACI 318-05 CODE 11.12.2.1
Vu  Vc , then OK
where
 = ratio of long side to short side of the column, concentrated load or reaction area
s = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio = Footing Area

5.5.2 Check of Two-WayShear

2
Ft.Name F1 Punching Area 4.576 106 cm

24100 Pr.Name 1 Ratio Shade -0.003

Shape CircleWall  Vc1 0.000 tonf

L.Comb. 133  Vc2 0.000 tonf

Pl 24100 mm  Vc3 0.000 tonf

Pw 24100 mm  Vc 0.000 tonf


1
bo / d 0 / 242.05 mm Vu 0.789 tonf

c / s 1 / 20 Result OK