JOB SAFETY ANALYSIS Date: 05.02.2019.

Company: Douse Fire Systems Pvt. Ltd.


Project: Barclays Pune LTS Commerzone-2, Kharadi.
nd rd th th
Locaton: 2 3 4 & 5 floor.
The type of work, nature of work: Firefighting pipe, sprinkler assembly and Pre-Action System.

The tools and equipment used: Welding Machine, Threading Machine, Drilling Machine, Cutting Machine, Grinding Machine, Spanners, Lifting
attachment, Mobile Scafolding etc.

The training and skill required for the job: Safety induction training and JSA Briefng before starting the activity, Banks man Material handling training.

Personal Protectve Equipment Required: (As required PPE) safety shoes, Safety Helmet, reflective Jacket, Cut resistant gloves / leather gloves,
Face shield, Apron / Boiler Suit, ear plug, Nose Mask & Shoulder Pad.

Prepared By: Sachin Jagdale. (Safety Manager).


Reviewed Approved BY:

1 of 4
Sequence of Steps Potential Hazards Recommended Safe Procedure Responsibility
Risk (s)Involved
1. Mobilization and Use of  Contact with pedestrian / . Site supervisor
telehandler and Trailer Workers. 1. Trainings of all involved & records must be submitted to /Engineer
 Contact with other construction EHS Dept.
vehicles. 2. Segregate the vehicle and pedestrian access and appoint
 Contact with structures / flagman at intersection crossings with whistles.
Foundation bolts. 3. Barricade the structural material and foundation bolts.
 Approach access up to the point 4. All loads to be carried on the Vehicle must be held
of operation. securely and supported or suspended in a stable manner,
 Operative errors. not likely to lead to dropping of the lead.

2. Shifting of fabrication pipe to  Hit to member/nearby object 1. Unauthorized entry should be restricted near to the work Site supervisor
module area from fabrication yard  Falling of material from hand area. /Engineer
 Ergonomics hazards 2. All work area and path ways should be free from
Obstruction.
3. All workers must be trained in manual material handling.
4. Provide suficient manpower to carry the material.
5. Use required PPEs like Cut resistant hand gloves.

3. Stacking of sprinkler pipe near  Slip and Fall 1. Ensure batten should place on even ground. Site supervisor
module assembly area on the  Caught in between 2. Ensure use of proper PPE ( Cut resistant hand gloves) /Engineer
planks. 3. Ensure use of proper stopper to prevent the role of pipe.

 Fall or slip. 1. Ensure use of cut resistant hand gloves. Site supervisor
4. Installation of frefghting pipes at  Personal /hand injury. 2. Ensure sufficient manpower engaged for the task. Ensure /Engineer
ground level(Assembly with hold the pipe until pipe tied with module structure.
structural steel modules) 3. Ensure no loose material keep on the module structure
(use of tools pouches)
5. Hang the chain by proper bolting  Slip /Fall the chain /bolt 1. Ensure all loose bolts should kept on the tools pouches. Site supervisor
system. 2. Ensure all bolts should be proper tie. /Engineer
3. Ensure good housekeeping (clean bolts, nut and washer
fall on ground (If any) after completion of work.

2 of 4
6. Hydro test of fre hydrant and  Uses of damage scaffolding. 1. Ensure the proper design scafolding we are providing for Site supervisor
sprinkler headers  Unsafe working platform. working of height, even those we given full body harness /Engineer
 Exceeding maximum allowable for fall of person.
pressure. 2. Ensure the working platform should be proper
 Injury to workers. established and safe zone will be provided on the
 Damage to equipment/system. platform.
 Un-attended equipment/system. 3. Ensure the pressure relieving device is set at maximum
 Changing the duration of the allowable pressure for weakest portion of the segment
hydro-test. to be hydro tested.
4. Keep away from the pressurized segment of the system
 Unsafe depressurization of
hydro-test fluid. Being hydro-tested.
5. Monitor the pressure gauge from a safe distance away
from the potential source of high pressure jeting (such
as flange joint, spade and coupling).
6. Do not leave the pressurized hose or pump unattended
 Slip, trip & fall of material. When the hydro-test is going on. Site supervisor
7. Working at nights 1. Erection work is not allowed for night shift.
 Personal injury. Property /Engineer
2. Maximum avoids working in the nights.
damage.
3. Only work is done when proper illumination is provided
(Min 250 LUX).
4. Obtain night work permit is a mandatory.
8. Storage of material.  Cause damage to the tools, 1. Keep all the tools & materials in a proper store in orderly Site supervisor
missing, and delay of work. placed. /Engineer
 Personal injury / Property
2. Any damaged tools found, replace for new one.
damage. Slip, trip & fall from
heights.
9. Completion of work & other  Hit and slip hazards & cause 1. Ensure that operator keeps all the devices closed when it Site supervisor
devices. property damage. is not operated. /Engineer
 Personal injury. Property
2. Housekeeping in working area should be neat and clean.
damage.

3 of 4