Sunteți pe pagina 1din 16

AREA VIII: PHYSICAL PLANT AND FACILITIES

BENCHMARK STATEMENT EVIDENCE BEST PRACTICE


PARAMETER A: CAMPUS
SYSTEM – INPUTS AND PROCESSES
S.1. There is a Site Development Plan, and - Five year development plan
program of implementation. - Campus Development Plan/Site
Development Plan
S.2. The Campus has accessible good roads and - Pictures outside the school or road
pathways. outside the school (size 3R)
- Current land use
S.3. The Campus is in a well-planned, clean and - Pictures of the surroundings (size 3R)
properly landscaped environment. with complete caption
- request letters for repair, beautification
activities, procurement of needed
materials for cleanliness and others
S.4. There is a system to ensure that all of the
following are provided:
S.4.1. traffic safety in and outside the - Description of traffic safety measures
campus; - MOA from Local Government Unit
- Accomplishment Report of Auxiliary and
Security Services
- Pictures of security force implementing
security procedures/traffic rules (size 3R)
S.4.2. waste management program; - Description of a mechanism to ensure
waste management
- Schedule of cleaning activities both for
janitor and students by department
- Copy of Waste Management Program
implemented in the institution
- Calendar activities highlighting the
cleanliness activities of this institution
- Office memo for wide dissemination and
implementation of waste management
program in the campus
- Pictures of waste containers and cleaning
materials (size 3R)
- Pictures of waste collection and disposal
(3R)
- Evaluation survey rated by students and
faculty members
S.4.3. proper utilization, repair and upkeep of - Description of a mechanism to ensure
school facilities and equipment; and proper utilization, repair and upkeep of
school facilities and equipment
- Accomplishment reports of maintenance
and repair unit monthly
- Action plan of the unit
- Action report or request slip of repair
works and other
- Request letter for repair, procurement of
spare parts and other
- Logbook of daily activities
- Inspection report
- Picture with complete caption (size 3R)
- Accomplishment report of Planning Unit
S.4.4. cleanliness and orderliness of the - Description of a mechanism of cleanliness
school campus. and orderliness of the campus
- Policies on throwing and segregating
garbage
- Schedule of cleaning activities of janitors
including the department
- Calendar of activities by department
- Posted cleaning schedules
- Pictures of janitor and students with
complete caption (size 3R)
- Accomplishment report of maintenance
- Attendance of student during CIVAC
S.5. An area for outdoor educational activities, - Physical Plant Map
e.g. social, physical, athletic, cultural, - Pictures of the stated locations/areas
military training, etc. exists. with complete label (refer to the survey
instrument) (size 3R)
S.6. There is a campus security unit that ensures - Description of a mechanism of campus
safety of the academic community. security unit that ensures of the academic
community
- List or matrix of security force either
company or institution’s security force
(with pictures)
- Accomplishment report of the Security
Head
- Logbook for visitors

IMPLEMENTATION
I.1. The site infrastructure development plan is - Campus Development Plan
implemented as planned. - Accomplishment Report for Infrastructure
- Pictures of Project of Infrastructure
I.2. The site plan is strategically displayed inside - Pictures and print out of College/University
the campus indicating the location of the Site Plan displayed strategically in the
different buildings, driveways, parking areas, campus (size 3R)
etc. - Signage’s in the different areas of the
College
I.3. The infrastructure development plan is -Locational Clearance
implemented in accordance with approved -School Site
zoning ordinances.
I.4. Covered walks are provided to protect the - Pictures of covered walks with caption
academic community from inclement (size 3R)
weather.
I.5. The institution implements a Waste - Pictures of Waste Disposal Containers and
Management Program. Materials Recovery Facilities (MRF) (size
3R)
- Report of Unserviceable Equipment
I.6. The Maintenance Unit or its equivalent - Organizational Chart with function of
periodically inspects school facilities and Physical Plant Facilities
equipment to ensure their proper utilization - Action Plan and Inspection Report of PPF
and upkeep. - Accomplishment Report of Maintenance
of PPF
- Pictures of actual works, inspection, repair
and other (size 3R)

OUTCOME/S
O.1. The Campus environment is conducive to all - Documentation of all activities conducted
educational activities. inside the campus
O.2. The site can accommodate its present - Campus Development Plan
school population and future expansion. - Five Year Development Plan
- Floor Plan of Buildings
- Summary of Enrolment
O.3. The campus is safe and well-maintained. - Pictures of security during inspection and
roving with caption (size 3R)
- Pictures of maintenance/janitor with
caption (size 3R)
O.4. The campus is well-planned, clean and - Pictures of all buildings with caption (size
properly landscaped. 3R)
-

PARAMETER B: BUILDINGS
SYSTEM – INPUT AND PROCESSES
S.1. The buildings meet all requirements of the - Copy of national building code
Building Code. A Certificate of Occupancy - Copy of building permit
for each building are conspicuously - Displayed Certificate of Occupancy on the
displayed. newly constructed building
S.2. The buildings are constructed according to - Floor Plan of all building
their respective uses. - Bootique of the building
S.3. The buildings are well-planned and - Campus Development Plan
appropriately located to provide for future
expansion.
S.4. Entry and exit points permit the use of the - Floor Plan of all building and highlight the
buildings for public and other functions with entry and exit points
minimum interference to school activities.
S.5. Emergency exits are provided and properly - Building Plan showing the Fire/Emergency
marked. exit plan (Hard copy)
- Pictures of emergency exits signages
S.6. The buildings are equipped with - Floor plan
emergency/fire escapes which are readily - Pictures of emergency or fire escapes (size
accessible. 3R)
S.7. The corridors, doorways, and alleys are well- - Building plan showing corridors, doorways
constructed for better mobility. and alleys
- Pictures of corridors, doorways and alleys
outside and inside the campus with
caption (size 3R)
S.8. The buildings are well-ventilated and lighted. - Standard guidelines for construction of
buildings then highlight well ventilated
and lighted (PPF unit)

S.9. The buildings have facilities for persons with - Standard guidelines for construction of
disability (PWDs) as provided by law. buildings then highlight the portion (PPF
unit)

S.10. There is a central signal and fire alarm - Building Plan showing the central fire
system. alarm system
- Standard guidelines for construction of
buildings then highlight the portion (PPF
unit)
S.11. There are readily accessible and functional - Fire Inspection Report (BFP)
fire extinguishers and other fire-fighting - Floor/building plan indicating locations of
equipment. firefighting equipment

S.12. Bulletin boards, display boards, waste - Memo from VPAA and VPAFSS regarding
disposal containers and other amenities are bulletin boards, display boards and
strategically located inside the buildings. waste disposal
- Communication letter from LGU
regarding waste disposal
S.13. There are faculty rooms and offices. - Requirement for Initial Recognition
(Checklist for New program)
- Pictures with complete label of the
different offices in the campus (size 3R)
S.14. The buildings are insured. - Updated Building Insurance

S.15 There is a “no-smoking policy” inside the - Republic Act for No-Smoking Policy
campus - LGU Ordinance
- Student Manual
IMPLEMENTATION
I.1. The buildings are clean, well-maintained and - Monthly reports of janitorial staff
free from vandalistic acts. - Inspection Report from PPF
- Request letters for repair, and
procurement of needed materials/supplies
and others (paint, repair of some parts of
the building, and alike)
I.2. Toilets are clean and well-maintained. - Monthly reports of the janitorial staff/JO
for the maintenance and cleanliness of the
toilets/comfort rooms
- Accomplishment report of the Repair and
Maintenance Unit
- Inspection Report/Job Order slip for repair
and maintenance of toilets
- Request letters for repair, procurement of
needed materials/supplies
I.3. Electrical lines are safety installed and - Monthly report of the electrical staff for
periodically checked. repair and other related jobs
- Accomplishment report of the electrical
staff or report of inspection
- Job order slip
- Schedule of checking of electrical lines
- Picture showing of installation
I.4. Water facilities are functional and well- - Building Plan showing the water system
distributed in all buildings. - Other installed water facilities in the
campus
- Pictures of water facilities as many as
possible with label (size 3R)
I.5. There is a periodic potability testing of - Payment and schedule of water testing
drinking water. - Result of water testing
- Pictures of the activity if there’s any (size
3R)
- Other related documents
I.6. Floor plans indicating fire exits and location - Displayed floor plans for emergency
of fire-fighting equipment, stand pipes, and evacuation in the building
other water sources are conspicuously - Pictures of the fire exits and fire-fighting
displayed in each building. equipment (size 3R)
Note: Make sure that fire extinguishers are
not expired.
I.7. All schools facilities are periodically subjected - Annual certificate for pest control inspection
to pest control and inspection. - Inspection/written report of PPF regarding
pest control
I.8. Smoking is strictly prohibited inside the - Signages for smoking and no-smoking areas
campus. in the campus
- Memo on “no smoking policy”
I.9. Periodic drill on disaster and risk reduction - Memo for dissemination of disaster and
(earthquake, flood, fire, etc.) is conducted. risk reduction awareness
- Documentation on seminar about disaster
and risk reduction (NSTP) (Program,
pictures and attendance)
- Documentation on periodic drill on
disaster and risk reduction (NSTP)
(program, memo/letter, pictures)
- Accomplishment Report of IDRRMO
OUTCOME/S
O.1. The buildings and other facilities are safe, - Pictures of buildings with complete caption
well-maintained and functional. (size 3R)
- Monitoring report and evaluation report of
the PPF unit
- Accomplishment report of PPF director
then highlight the part

PARAMETER C: CLASSROOMS
SYSTEM- INPUT AND PROCESSES
S.1. Classroom size (1.5 sq. m. per student) - CMO
meets the standard specifications for - Floor Plan of every classrooms
instruction. - Standard guidelines e.g deped guidelines
(PPF unit)
S.2. The classrooms are well-lighted, ventilated - Floor Plan of every classrooms
and acoustically conditioned. - Standard guidelines - deped guidelines (PPF
unit)
S.3. The classrooms are adequate and are - OBE guidelines for classroom
provided with enough chairs, furniture and - Inventory report of classrooms
equipment. - Pictures of furniture and equipment with
complete caption (size 3R)
S.4. There are sufficient supplies - OBE guidelines for classroom
(chalkboards/whiteboards, and - Inventory report of classrooms
instructional materials) in each classroom. - PPMP
- Physical count of department/college
- Pictures of furniture and equipment with
complete caption (size 3R)

IMPLEMENTATION
I.1. The classrooms are clearly marked and -Pictures of classrooms with marks/signages
arranged relative to their functions. as many as possible with label (size 3R)
I.2. The classrooms are well-maintained and - Pictures of students cleaning the classrooms
free from interference. and surroundings (size 3R)
- Pictures of classrooms
- Request letters for repair, procurement of
needed materials/supplies for the
classrooms
I.3. Students cooperate in maintaining the - Classroom’s cleaners and officers
cleanliness and orderliness of the
classrooms.

OUTCOME/S
O.1. Classrooms are adequate and conducive to - Pictures of classrooms with faculty and
learning. students with captions (size 3R)
- Evaluation result from SAS survey
- Student feedback result

PARAMETER D: OFFICES AND STAFF ROOMS


SYSTEM – INPUTS AND PROCESSES
S.1. The administrative offices are accessible to - Building Plan
stakeholders. - Vicinity/site Plan
S.2. All offices are accessible and conveniently - Floor Plan of Administration Building
located in accordance to their functions.
S.3. There are offices and workspaces for all - Floor plan per office
officials, faculty and administrative staff. - Pictures of different offices (size 3R)

S.4. Administration and faculty offices and staff - Floor plan indicating ventilation and
rooms are clean, well-lighted and lighting
ventilated. - Pictures of well-lighted offices (size 3R)
S.5. Function rooms and lounge are available - Floor plan of function rooms and lounge
and accessible. - Pictures of function rooms, waiting areas,
reception rooms with complete label (size
3R)
S.6. Storerooms are strategically located. - Floor plan of offices with store rooms
- Pictures of storerooms in and out with
complete label as many as possible (size 3R)
S.7. There is internal and external - Procedures on internal and external
communication system. communication system (QMS and
Administrative manual)
- Document showing inter-office
communication system and external
communication such as telephone lines and
fax machines in different offices in the
campus (documents from globe, smart,
pldt)
- Pictures of telephone and internet
connections
S.8. There are clean toilets for administrators, - Cleaning schedule posted in each office
faculty, staff, and students. - Pictures of restrooms in different areas in
the campus (size 3R)

IMPLEMENTATION
I.1. All offices are furnished with the necessary - MRs/Acknowledgment Receipt of
equipment, furniture, supplies and materials. equipment, supplies, materials and alike
- Approved PPMP per office
- Pictures of offices with caption (size 3R)
I.2. All offices are well-maintained. - Accomplishment report of JO
- Request for repair and maintenance
- Pictures of offices with caption (size 3R)

OUTCOME/S
O.1. The offices and staff rooms are adequate - Pictures of offices with caption (size 3R)
and conducive to working environment. - Customer satisfaction report

PARAMETER E: ASSEMBLY, ATHLETIC AND


SPORTS FACILITIES
SYSTEM- INPUTS AND PROCESSES
S.1. Function rooms for holding meetings, - Floor plan of Conference Room, AVR and
conferences, convocations and similar Gymnasium
activities are sufficient.
S.2. Facilities for athletics sports, cultural - Site/vicinity plan of Gymnasium,
activities, military training, etc. are Quadrangle and Firing Range
accessible.
S.3. The seating capacity conforms to standards. - Seating capacity of Gymnasium and
Conference Room
S.4. There are adequate and well-marked entry - Floor Plan of Gymnasium, Quadrangle and
and exit points. Firing Range with marked of entry and exit
- Pictures of well-marked entrances and exits
for every facility (size 3R)
S.5. There are storage facilities for athletic - Floor plan indicating storage facilities for
sports and other curricular training athletic sports (gym, ROTC bunk house,
equipment. NSTP)
- Pictures of storage facilities for athletic
equipment (size 3R)

IMPLEMENTATION
I.1. Indoor facilities are constructed with:
I.1.1. appropriately flooring; - Request for flooring (e.g rubber mat for
gymnasium)
- Pictures of gymnasium flooring (size 3R)
I.1.2. proper lighting and ventilation; - Request for additional/repair of light and
ventilation
- Supporting documents for air-conditioning
of gymnasium
- Pictures of gymnasium(size 3R)
I.1.3. safety measures; - Pictures of safety measures posted on the
wall (size 3R)
- Medical kit
- Pictures of posted precautionary measures
I.1.4. toilets; - Pictures of toilets in indoor facilities(size
3R)
I.1.5. functional drinking facilities; and - Proof of procurement of drinking
fountain/water dispenser
- Pictures of drinking fountain/water
dispenser (size 3R)
I.1.6. enough chairs. - Proof of procurement for additional
benches and chairs
- Pictures of bench (size 3R)
I.2. The constructed outdoor facilities are:
I.2.1. free from hazards; - Pictures of precautionary signages
- Pictures showing that outdoor facilities are
free from hazards (size 3R)
I.2.2. suitably surfaced floor; - Pictures showing that the outdoor facilities
are guarded and with drainage system (size
3R)
I.2.3. appropriately laid out for a variety of - Lay-out pictures or plan of outdoor
activities; facilities
I.2.4. properly maintained and secured; and - Monthly report of janitorial staff for
cleaning the facilities
- Pictures of cleaning activities (size 3R)
- Accomplishment Reports of the Unit Head
I.2.5. installed with drainage system. - Document/proof of construction of
drainage system
- Inspection/accomplishment report on
construction of drainage system
- Pictures of drainage system (size 3R)
I.3. Assembly, athletic sports and cultural - Inventory report of sports facilities by
facilities are sufficient and varied to meet department
the requirements of the institution. - Total number of students enrolled
I.4. Audio-visual room and facilities with - Inventory of AVR
appropriate equipment are utilized in - Logbook of AVR users
support of the teaching-learning such as but - Pictures of AVR and facilities (size 3R)
not limited to video/overhead/ slide - Pictures of equipment (size 3R)
projector, sound system, LCD projectors and
screens.

OUTCOME/S
O.1. Indoor and outdoor facilities are well- - Inventory report
equipped and properly maintained. - Accomplishment report of the custodian
- Pictures of Gymnasium, Quadrangle, Firing
Range, and Conference Room (size 3R)

PARAMETER F: MEDICAL AND DENTAL CLINIC


SYSTEM – INPUTS AND PROCESSES
S.1. The Medical and Dental Clinic has basic - CHED requirements
facilities such as: reception area, records - Pictures of reception area, records section,
section, examination/ treatment room and examination/ treatment room and toilets
toilets. with caption (size 3R)
S.2. The institution has functional medical and - Functional chart
dental section/area. - Matrix of medical and dental personnel with
corresponding duties and responsibilities
(educ. qualification, eligibility, years of
service)
S.3. Potable water is available and sufficient. - Request for water potability testing
- Budget allocation for water potability testing
S.4. Medical and dental equipment are provided. - Request letters for procurement
- Approved PPMP
S.5. There are enough medical and dental - Approved PPMP and PRE of medical and
supplies and materials. dental
- Request letter for procurement of supplies
or replacement of medical and dental
supplies
S.6. Storage facilities (refrigerator, steel - Approved PPMP and PRE of medical and
cabinets, etc.) are available. dental (highlight)
- Request letter for procurement
S.7. Medical and dental supplies and materials -Pictures of medical/dental supplies with
are properly labeled. complete label (size 3R)

S.8. The following basic medical equipment and


medicines are all available:
S.8.1. emergency medicines; - Approved PPMP and PRE
- Request/communication letter to
purchase medicines
S.8.2. ambo bag; - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.8.3. oxygen tank; - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.8.4. intravenous fluid; - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.8.5. sphygmomanometer (at least 2 sets); - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.8.6. thermometer (at least 10 pcs); - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.8.7. diagnosis sets; - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.8.8. stethoscope ( at least 2 units); - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.8.9. treatment cart; and - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.8.10. nebulizer. - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.9. The following basic dental equipment and
apparatuses are available:
S.9.1. dental chair; - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.9.2. autoclave (sterilizer); - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.9.3. medical supplies; - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.9.4. filling instruments; and - Approved PPMP and PRE
- Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.9.5. basic instruments (forceps, mouth - Approved PPMP and PRE
mirror, cotton fliers, explorer, etc). - Request/communication letter to
purchase
- Picture with complete label (size 3R)
S.10. The Medical/Dental Clinic has ample space, - Floor plan of medical and dental clinic
adequate lighting and ventilation. - Picture with complete label (size 3R)

IMPLEMENTATION
I.1. The Medical and Dental Clinics are managed - Matrix of Medical and Dental officer
by qualified medical and dental officers. - Organizational structure of medical and
dental clinic
- TOR
- Appointment/designation
- License/eligibility
- PDS
- Certificates of trainings and seminars

I.2. Distinct rooms and storage areas are properly - Pictures of the medical and dental clinic (size
labeled. 3R)
I.3. Medical and dental services are regularly - Logbook of monitoring
monitored and evaluated - Unit accomplishment report
- Summary of Evaluation Report (SAS)

OUTCOME/S
O.1. The medical, dental clinic and services are - OPCR of medical and dental officer
functional.

PARAMETER G: STUDENT CENTER


SYSTEM – INPUTS AND PROCESSES
S.1. The institution has a Student Center with - Floor plan for Student Center
supplies and materials. - PPMP
S.2. Policies and guidelines on the proper - Portion in the student manual/handbook
utilization of Student Center are in place. on the use of student center
S.3. The Student Center is well-lighted and - Floor plan of student center showing light
ventilated. and ventilation
S.4. A conference room is available for student’s - Floor plan of student center showing the
use. actual set up of the center
S.5. There are facilities and equipment for table - Approved PPMP
games, music appreciation, and TV or video
viewing.
S.6. Clean and sanitary toilets, for men separate - Lay-out of student center indicating toilets
from those of women are available. for men and women
S.7. Toilet fixtures for students with special - Lay-out of toilets indicating toilets PWDs
needs and PWD’s are provided.
S.8. There are offices for student leaders, the - Floor plans of the student org. offices,
editorial staff of the student publication and student centers an publication
the officers of other student organizations.

IMPLEMENTATION
I.1. Student activities at the Student Center are - Accomplishment Report
regularly conducted and monitored. - Minutes of meeting of the student
government/organizations
- Program
- Attendance
- Pictures with complete caption (size 3R)
I.2. The Student Center is properly maintained. - Schedule of officers of the day
- Pictures with complete caption (size 3R)
OUTCOME/S
O.1. The Student Center is fully equipped and - Pictures with complete caption (size 3R)
functional - Logbook of student center users
- Accomplishment report of SSG/SSGF

PARAMETER H: FOOD
SERVICES/CANTEEN/CAFETERIA
SYSTEM – INPUTS AND PROCESSES
S.1. The canteen/cafeteria is well-lighted, - Lay out of the canteen indicating well
ventilated, screened and provided with lighted, ventilated, screened and with
potable water supply. potable water
S.2. There are enough;
S.2.1. cooking and preparatory equipment; - Proof of procurement from marketing
director
S.2.2. serving tools and utensils; - Proof of procurement from marketing
director
S.2.3. cleaning supplies and materials; and - Proof of procurement from marketing
director
S.2.4. dining tables and chairs. - Proof of procurement from marketing
director
S.3. Wash area and toilets are available. - Lay out/floor plan of the canteen indicating
wash area and toilets

IMPLEMENTATION
I.1. The institution requires business and sanitary - Copy of permit to operate and sanitary
permits for the operation of the Food permit renewed yearly
Center/Cafeteria/Canteen. - Health certificate of each personnel
I.2. Food served is varied, nutritious, safe and - Schedule menu for a week duly approved by
sold at affordable price. the canteen/project manager
- Customer satisfaction report
- Result of evaluation conducted for this
purpose (SAS)
- Pictures of displayed menu and the price
with complete caption (size 3R)
I.3. The Food Center/ Cafeteria/Canteen is well- - Matrix of canteen personnel/staff
managed by qualified and competent staff. - Accomplishment or monthly report of the
Management
- PDS of staff
I.4. Cleanliness and orderliness are enforced. - Minutes of meeting of the Canteen
Management for imposing the cleanliness
and orderliness in the canteen
- Accomplishment report of personnel and
staff
- Customer satisfaction report
- Result of evaluation conducted for this
purpose (SAS)
I.5. The food services are prompt. - Customer satisfaction report
- Result of evaluation conducted for this
purpose (SAS)
- Pictures with complete caption (size 3R)

OUTCOME/S
O.1. The Canteen/Cafeteria/Food Center is well- - Pictures with complete caption (size 3R)
patronized. - Evaluation of customer satisfaction survey

O.2. The food services generate income for the - Income Generated statement Report
institution. (EFIPP)

PARAMETER I: ACCREDITATION CENTER


SYSTEM – INPUTS AND PROCESSES
S.1. The Accreditation Center (AC) is accessible - Floor plan of office
and conveniently located.
S.2. The AC has the following equipment and
fixtures:
S.2.1. working tables and chairs; - Lay-out of the Office indicating the area
S.2.2. cabinets for display and filing; - Lay-out of the Office indicating the area
S.2.3. good ventilation and lighting; - Lay-out of the Office indicating the area)
S.2.4. computer unit; - Lay-out of the Office indicating the area
S.2.5. toilets; and - Lay-out of the Office indicating the area
S.2.6. lounge. - Lay-out of the Office indicating the area

IMPLEMENTATION
I.1. The Institution/College/Academic Unit - Inventory of equipment
maintains the AC with the required resources, - Approved PPMP
furniture, and documents. - Proof of procurement
- Pictures with complete caption (size 3R)
I.2. The AC is managed by a qualified and - Organizational Chart
committed staff/faculty. - Matrix of personnel (educ. Qualification,
status, of appointment, length of service,
duties and responsibilities and other
qualifications)
- Portfolio of IQA director and coordinator
I.3. Required documents/information and - Pictures with complete caption (size 3R)
exhibits are updated, systematically packaged
and readily available.
OUTCOME/S
O.1. The AC is well-equipped and managed. - Certificate of accreditation status, COPC,
and alike
PARAMATER J: HOUSING (optional)
SYSTEM – INPUTS AND PROCESSES
S.1. There are dormitories and housing facilities - Policies and procedures about
for students, faculty and staff. dormitories/housing (student and
administrative manual)
S.2. There is an implementing Rules and - Student Manual
Regulations (IRR) for in-campus housing - Memo on House rules
services.
S.3. There is a system of coordinating with the - Minutes of the meeting
LGU’s on privately owned boarding houses. - Memorandum of Agreement from LGU

IMPLEMENTATION
I.1 The housing facilities are functionally designed. - List of students who live in the dormitory
- Proof of income generated from dormitory
- Pictures with complete caption (size 3R)
I.2. The housing facilities and surroundings are - Monthly report of cleanliness and
properly maintained and monitored. maintenance of the dormitory custodian
- Pest Control Inspection Report
- Request letters for repair
- Pictures with complete caption (size 3R)
I.3. The IRR on housing services is strictly followed - Proof of income generated from dormitory
(e.g. dormitory fees, etc.) - Incident Report and intervention done by
the dormitory custodian
I.4. The institution coordinates with LGU’s and - Communication letter to the LGU
owners of private boarding houses. - Minutes of the meeting
- Pictures
- attendance

OUTCOME/S
O.1. The housing facilities are safe, habitable and - Monthly report of the dormitory custodian
well-maintained. - Profile/list of boarders/tenants of the
dormitory
- Pictures with complete caption (size 3R)
O.2. There is wholesome coordination among the - Memorandum of Agreement from LGU
institution, the LGU’s and the owners of - Documentation of signing
private boarding houses.

S-ar putea să vă placă și