No Device Quantity Hardware Type OS type

1 DL360 gen9 2 Server


2 Lenovo think Server RS 160 1 Server
3 DL360 gen10 2 Server
4 Synology RS814+ 1 Storage NAS
5 Synology Expansion RX415 1 Storage NAS
6 Dell Power Edge R630 2 Server
7 HP DL380 Gen8 1 Server
8 Dell R710 2 Server
9 brocade 300 2 SAN Switch
10 Pure Storage FlashArray M20 R2 1 SAN Storage
11 Synology NAS RS2416 2 Storage NAS
12 Netapp storage 1 SAN Storage
13 Netapp Enclsoure disk (SFF) 2 SAN Storage
14 Netapp Enclosure disk (LFF) 1 SAN Storage
14 IBM Storewize (storage) 1 SAN Storage
16
17
18
19
20
21
22
23
24
25

22
Hardware Dimension Weight
1.7 x 17.1 x 27.5 in 15.31 kg
1.7 x 17.3 x 16.2 in 7.6 kg
1.7 x 17.1 x 27.5 in 15.31 kg
44 X 430.5 X 457.5 mm 7.11 kg
44 x 430.5 x 290 mm 4.23 kg
1.68 x 18.98 x 29.72 in 17.4 kg
3.38 x 17.54 x 29.25 in 21 kg
26.8 x 17.4 x 3.4 in 26 kg
1.7 x 16.9 x 12.1 in 2.6 kg
5.12 x 18.94 x 29.72 in 50 kg
88mm x 430mm x 692mm 12.56 kg
5.12x17.6x23.92 in 37kg
7x19x24 in 49kg
7x19x28 in 72.6 kg
3.4 x 19 x 29.3 in 25. kg
No Virtual Machine IP Address Application CPU Memory
Total Size
Plan Date Plan Time
No Activities
Start Finish Start Finish
1 Preparation
1.1 Pre relocation activity
Asessment for relocation
Request for list server, storage and network
Scenario discussion with customer and partner
Request missing information
Scenario finalization
2 Relocation
2.1 DC Sari Roti
Coordinate with user to stop application/database services
Power off customer VM
Power Cycle Server
Power Off Servers
Unplug power cable
Reattach power cable
Power On Servers
Labeling port network on servers
Power off server
Power off switch
Backup configurations
Power off switch
Physical movement
Unplug power cable
Unplug network cable
Unmount servers
Unmount switch
Unmount Devices
Move to lif
Move to loading dock
Move to truck
Deliver all hardware to new DC
2.2 DC DCI
Mover parts
Receive all hardware at New DC
Move to loading dock
Move to lif
Move to DC
Mount Devices
Mount switch
Mount servers
Plug network cable
Plug power cable
Power on switch and network security
Power on server and Storage
Power on VMs
Coordinate with user to start application/database services
3 Testing & Monitoring
Test functionality system

Monitoring
Actual Date Actual Time
Status Notes
Start Finish Start Finish

v
Link Doc PIC

HIN
HIN, SR
HIN,SR
HIN, SR

SR
HIN, SR
HIN
HIN
HIN
HIN
HIN
HIN
HIN
HIN
HIN
HIN

HIN
HIN
HIN
HIN

HIN
HIN
HIN
HIN

HIN
HIN
HIN
HIN

HIN
HIN
HIN
HIN
HIN
HIN
HIN
SR

HIN, SR

HIN, SR