THE NEW ACB SHALL BE RETROFITTED IN PLACE OF THE GE MAKE M-PACT ACB.
THE DETAIL SPECIFICATION OF EXISTING ACB IS AS FOLLOWS:
SCOPE OF SUPPLY:
I) RATED CURRENT: 1600A
II) NO. OF POLES: 3
III) ELECTRICALLY OPERATED DRAWOUT VERSION.
IV) RATED OPERATIONAL VOLTAGE: UPTO 690VAC
V) RATED INSULATION VOLTAGE: 1000V
VI) UTILISATION CATAGORY: B
VII) RATED BREAKING CAPACITY: 50KA
VIII) PROTECTION RELEASE WITH DIGITAL DISPLAY UNIT HAVING LSIG
PROTECTION.INBUILT RATING PLUG THROUGH DIP SWITCH,TEST BUTTON TO CHECK
THE HEALTH OF PROTECTION RELEASE.
IX) MODEL: U POWER OMEGA ACB WITH MATRIX 1.5 RELEASE OF L<(>&<)>T MAKE
OR ITS EQUIVALENT.
X) ACB SHALL CONFORMS TO THE IS/IEC 60947(PART-2), EN 60947-2
XI) NECESSARY COPPER BUSBARS FOR RETROFITTING JOB SHALL BE PROVIDED BY
THE VENDOR.(ESTIMATED LENGTH: 13-15 MTRS OF SUITABLE SIZE)
NOTES:
Special instruction:
1.,,PRICE: Offer should be made on F.O.R Destination/Free Delivery at
Site basis inclusive of Taxes, Duties, Levies, Packing, Forwarding and
Freight charges etc., each indicated clearly and separately in the
Format as per BOQ attached in NIT. Wherever the Taxes and Duties are not
specifically indicated, the prices quoted will be presumed as inclusive
of all Taxes & Duties and no statutory variation will be payable by
NALCO. The rates of Taxes and Duties should be clearly mentioned. GSTIN,
HSN Code and Dispatch station should be indicated in the offer.
2.,,WARRANTY: The materials to be supplied shall be warranted for 18
months from the date of receipt of materials at our site or 12 months
from the date of commissioning whichever is earlier against defective
design, faulty materials of construction, poor workmanship and
unsatisfactory performance. The warranty certificate to this effect
shall be sent by you along with dispatch documents.
3.,,PAYMENT TERM:
A) 80% payment shall be made within 30 days of receipt and acceptance of
the material at our site & balance 20% payment shall be made after
successful retrofitting & commissioning of the ACB on certification of
Engineer in-charge.
B) Service: 100% payment shall be made after successful completion of
commissioning of the ACB on certification of Engineer in-charge.
AGM (Elect.), E&I of RPU, Smelter plant or their representative
shall be the Engineer-In-charge.