Having more than 8 years as electrical engineer, 2 years as field
www.linkedin.com/in/luky-
service engineer & 12 years as electrical designer in Working
d-90346148 (LinkedIn)
experience with engineering design and construction activities for
various projects such as Mining, Industry Plant, and Power Plant.
Top Skills
Etaps
Have working knowledge in the use of computer program applicable
AutoCAD 3D & 2D
to such design and analysis and familiar with applicable Codes &
PDMS
Standards.Capable as a checker of Designer product, Proficient in
Languages utilizing electrical design softwares AutoCAD 2D & 3D, and Etaps
power station software.
English (Professional Working)
Bahasa (Native or Bilingual)

Certifications Experience
PDMS Electrical
PT. Enviromate Technology International
Electrical Engineering
September 2019 - Present 
Greater Jakarta Area, Indonesia

PT Bajra Mandalasakti
Electrical Engineer
September 2018 - August 2019 (1 year)
Greater Jakarta Area, Indonesia

Schenck Process Indonesia


Sales Service Engineer
September 2016 - September 2018 (2 years 1 month)
Greater Jakarta Area, Indonesia

Leighton Contractor Indonesia


ME Engineer
March 2016 - August 2016 (6 months)
MSA Project tembaga pura Freeport

PT.ANTAM Tbk.
Electrical Engineer
  Page 1 of 4
   

February 2010 - December 2015 (5 years 11 months)


Project :
1. Package-8 : 2 x 20 MW Coal Feronickel Power Plant, Southeast-Sulawesi
(2013 – at present)
For auxiliary power of Feronickel plant.
2. Package-7: Oxygen Plant, Southeast-Sulawesi
(2014 – at present)
3. Paket-5: Line-4-Ore Preparation & Calcining System, Southeast-Sulawesi.
(2013 – at present)
4. Package-4 (Ladle Furnace), Southeast-Sulawesi
(2011 – 2012)
Support the refining operation of crude ferronickel process. Involved
commisioning team.
5. Cross Conveyor Project. Line-4, Southeast-Sulawesi
(Dec 2013 – Feb 2012)
6. Package-2: Belt Conveyor +3,5 km, Southeast-Sulawesi
(2012 – at present)
7. Package-1: Jetty & Facilities, Southeast-Sulawesi.
(2013 – at present)
Raw Ore/Coal transportation from 2x12000 DWT Barge to stockpile.
8. FeNi Halmahera Project,Buli – East Halmahera.
(2011 – 2011)
Site survey for Transmission Line 20kV
9. Internal Design Optimation Furnace for ferronickel, Southeast-Sulawesi
(2009 – 2010)

PT. AURECON (Formerly PT.CONNEL WAGNER)


Electrical Engineer
November 2007 - 2009 (2 years)
Project :
1. Transportation Project, Balantang Port – South Sulawesi. (Oct 2008
– July 2009)
Client : PT. Vale Indonesia Tbk. (Formerly PT. International Nickel Indonesia
Tbk)
2. Transportation Project, Soroako Coal Storage – South Sulawesi. (Oct
2008 –July 2009)
Client : PT. Vale Indonesia Tbk. (Formerly PT. International Nickel Indonesia
Tbk)
3. Strike Infrastructure – Port Stockyard & Mine Yard Area Facility -
Berau,Kalimantan. (Sep 2009 – Oct 2009)

  Page 2 of 4
   

Client : PT. Laing O'rourke Indonesia


4. Coal Terminal Bukit Asam Barge Loading Conveyor – Tarahan, South
Sumatera. (May 2009 – Jun 2009)
5. Melawan Overland Conveyor Coal Chain Expansion – Borneo, East
Kalimantan. (July 2008 - Aug 2008)
6. BlueScope Steel Badak Project. (Sep 2008 - Nov 2008)
7. Abbot Point Coal Terminal Expansion Project (Marc 2008 - May 2008).
Assignment to CONNELL HATCH - Brisbane, Australia
Client : Abbot Point Bulk Coal Pty Ltd, Australia

CONNEL HATCH
Senior Electrical Designer
March 2008 - May 2008 (3 months)
Brisbane, Australia

Overseas assignment from PT. AURECON Indonesia for request contributed


at coal terminal expansion project in CONNEL HATCH engineering division
team.
Project:
1. Abbot Point Coal Terminal, QLD X80 Expansion Preliminary Engineering
2. Abbot Point Coal Terminal, QLD X25/X50 Expansion
3. Dalrymple Bay Coal Terminal, QLD 7th Stage Expansion

PAUWELS CONTRACTING NV
Electrical / Mechanical Draftman
October 1997 - June 2007 (9 years 9 months)
Project :
1. Belgian Loan IV Project 150/66/20kV Substation, Sulawesi- Indonesia. (Jan
2007 – June 2007)
Client : PT.PLN (Persero) Tbk.
2. Mobile Skid Mounted 12.5/15MVA, 33/11kV Substation (June 2006 –
March 2007)
Client : Tanzania Electric Supply Company Ltd. (TANESCO), Tanzania.
3. 132/33KV Substation (March 2004 – July 2004)
Client : Meghna Engineering Works Ltd, Bangladesh
4. Mobile Substation Transformer 220/63-31.5kV, 40MVA (Jan 2002 – March
2002)
Client : Sonelgaz Electricity Company Ltd, Algeria.
5. 2 x Mobile Substation Transformers 132/66/23.3-11.7kV 33MVA (Nov 1999
– May 2000)
Client : Western Power, Australia.

  Page 3 of 4
   

6. North Duri 115KV Substation (Sep 1998 – Feb 1999)


Client : PT. Chevron Pacific Indonesia (Formerly PT.Caltex Pacific Indonesia)

PT.PAUWELS TRAFO ASIA


Mechanical Draftman
March 2001 - May 2001 (3 months)
Assignment from PAUWEL CONTRACTINGN NV for request contributed at
project in PT.PAUWELS TRAFO ASIA engineering division mechanical parts.
Assist senior engineer mechanical design department in making external parts
transformer drawing and material take off.
Checked final documents and drawings to completed mechanical transformer
design file.

PT.ARYA SADA PERKASA


Electrical Draftman
February 1996 - May 1997 (1 year 4 months)
Jakarta, Indonesia

 Design for Arrangement clearance electrical HV equipment’s for mobile and


modular substation.
 Manage and prepared all drawings 70Kv & 150Kv electrical/mechanical.
 Produced drawing all electrical layout, SLD, Schematic diagram,
Interconnection diagram, including primary sub-station and switchyard, Control
room layout, cable trench layout, grounding layout, foundation plan and typical
installation.
 Prepared drawings for support structure details HV equipment (LA, CT, CB,
CVT, DS, Gantry, TFO, etc.).

Education
University of Krisnadwipayana
Engineer's degree, Electrical Engineering · (2002 - 2008)

Senior Technical High School


 · (1990 - 1992)

AP-Greid

  Page 4 of 4

S-ar putea să vă placă și