Comparing the results obtained by both software's to find the significant &
feasible one.
3 STUDY AREA
Each floor includes 1BHK (10 Flats), 2BHK (3 Flats) & 3BHK (8 Flats).
Size of Flats –
1BHK = 484 Sq. Ft
2BHK = 727 – 950 Sq. Ft
3BHK = 1050 – 1250 Sq. Ft
B-Wing also contains a Swimming pool of size 20’ X 40’
The text of this chapter has been discusses about the studies reviewed that
Planning, Scheduling and allocation of resources for multi storied building
structure as:
Annappa & Jamadar (2017) studied that the software Primavera proved
like a perfect and efficient tool for the purpose of monitoring and
controlling of the various construction project. The usages of various
resources throughout the project run would be optimum. They also finds
that primavera fulfills the role of planning, Scheduling, Monitoring and
Control of the project progress with timely accomplishment of any
construction project.
Thangam, P., (2016) discuss that, before work was carried out was not
done properly with lack of planning, scheduling and resource allocation.
So that resources were wasted and their result in increasing time. After
using primavera software in work, it gives improvement in quality of
construction with stipulated cost and time.
Deepika et al. (2016) stated that Primavera is a very useful in finding out
critical activities so that special concern can be given to those activities
and delay in the project can be avoided.
Fernans et al. (2013) found that the present project management system
is not efficient and studied the project management software Primavera P6
and found that such software's are very efficient in planning, monitoring
and controlling.
Bhosekar et al. (2012) stated From the comparison of result of Microsoft
Project and Primavera P6 they found that the final result gives almost
99.5% accuracy.
Ahmed et al. (2016) found that with the help of Primavera Software profit
outcome of the project can be increased. They also identified that 5%
reduction in the cost of labor can be achieved with the use of Primavera
software.
Saini et al. (2017) stated that the Primavera software shows the progress
of the project step by step and it can show the clear image of the project
progress which helps in minimizing the impact of delays in the project.
5 THEORETICAL BACKGROUND
The two mains scheduling and control software packages used in the building,
construction and resources industries (BCRCs) are:
• Microsoft Project
• Oracle Primavera P6.
Microsoft Project-
Microsoft Project was developed in the US during for the management of the
development of Microsoft software. It was put on sale in 1984 and was aimed at
managing software development projects.
Microsoft Project is the world's most popular project management software
developed and sold by Microsoft. The application is designed to assist project
managers in developing plans, assigning resources to tasks, tracking progress,
managing budgets and analyzing workloads.
Microsoft project is mainly used by the following types of companies:
Residential builders.
Architects and Quantity Surveyors.
Companies constructing small and medium commercial buildings.
Smaller civil construction companies.
Oracle Primavera-
This was originally called Eagle Ray in the US in 1990s and purchased by
Primavera Systems. This again was developed for the management of software,
business development projects and building & construction projects. Primavera
is generally own by ‘Oracle’.
Oracle Primavera is mainly used by the following types of companies:
Companies constructing large commercial buildings.
Medium and large civil construction companies.
Almost all resource companies in the mining and oil and gas industries.
Steps of Primavera-
Working in Primavera –
Working in MS-Project –
Comparing the results obtained by both software's to find the simple &
significant one.
7 REFERENCE