DESIGN CA
Conc mix - M 20
Yield strength of reinforcement bar (Fe) 500
2.80
0.40 0.40
0.30 0.30
2.30
X PLEASE NOTE THAT THE D
HENCE THE FORCES AND
PLEASE NOTE THAT THE D
HENCE THE FORCES AND
Mz due to
ecentricity
of vertical
L/C Fx kN Fy kN Fz kN Mx kNm Mz kNm ∑Fx KN ∑Fy KN ∑Fz KN forces
20 (DL+LL) -0.253 128.336 0.006 -0.022 -0.116 0 256.674 0.012 0.0023
21 .9 DL+ SL+X -0.286 105.297 -8.139 9.039 -0.131 0 210.595 -16.278 0.00115
22 .9 DL+ SL-X -0.286 105.395 8.145 -9.069 -0.131 0 210.792 16.29 0.0023
23 .9 DL+ SL+Z -7.771 143.699 0.019 -0.029 -8.322 -14.97 210.693 0.006 88.21075
24 .9 DL+ SL-Z 7.199 66.993 -0.013 -0.001 8.061 14.97 210.694 0.006 88.2142
25 (DL+LL+SL+X) -0.253 128.287 -8.136 9.032 -0.116 0 256.575 -16.272 0.00115
26 (DL+LL+SL-X) -0.253 128.385 8.149 -9.076 -0.116 0 256.772 16.298 0.0023
27 (DL+LL+SL+Z) -7.739 166.689 0.022 -0.036 -8.307 -14.971 256.673 0.012 88.21075
28 (DL+LL+SL-Z) 7.232 89.983 -0.01 -0.008 8.076 14.971 256.674 0.012 88.2142
Maximum 14.971 256.772 16.298 88.2142
L/C 28 26 26 24
Minimum -14.971 0 -16.278 0
L/C 27 0 21 0
DESIGN CALCULATIONS FOR FOUNDATION OF CABLE TRAY
SWITCH YES
1.50
PLEASE NOTE THAT THE DIRECTION CONVENTION OF STAAD AND DOCUMENT ARE NOT SAME
HENCE THE FORCES AND MOMENTS HAVE BEEN INTERCHANGED WHERE EVER NECCESARY
PLEASE NOTE THAT THE DIRECTION CONVENTION OF STAAD AND DOCUMENT ARE NOT SAME
HENCE THE FORCES AND MOMENTS HAVE BEEN INTERCHANGED WHERE EVER NECCESARY
Self wt.
of Soil
Wt. of Total (KN) for Total Vertical
∑Mx Self wt. of Concrete Vertical overturni Load for
KNm ∑Mz KNm Soil (KN) (KN) Load ng overturning
0.044 0.0003 84.8925 28.875 370.4415 48.51 334.059
18.078 0.00085 84.8925 28.875 324.3625 48.51 287.98
18.138 0.0003 84.8925 28.875 324.5595 48.51 288.177
0.03 71.82675 84.8925 28.875 324.4605 48.51 288.078
0.03 104.5962 84.8925 28.875 324.4615 48.51 288.079
18.064 0.00085 84.8925 28.875 370.3425 48.51 333.96
18.152 0.0003 84.8925 28.875 370.5395 48.51 334.157
0.044 71.82675 84.8925 28.875 370.4405 48.51 334.058
0.044 104.5962 84.8925 28.875 370.4415 48.51 334.059
18.152 104.5962 370.5395 334.157
26 24 26 26
0 0 113.7675 77.385
0 0 26 26
REV 0
PREPARED S.G
CHECKED V.S.A
1/27/2020
WAGON TIPPLER AND CONVEYEING
DESIGN CALCULATIONS FOR FOUNDA
NTPC KORBA
Total Vertical
L/C Load ∑Mx KNm ∑Mz KNm FY/A 6Mx/LxLz2
Kn/m2 Kn/m2
20 (DL+LL) 1.00 1.50 370.44 0.04 0.00 88.20 0.04
21 .9 DL+ SL+X 1.00 1.50 324.36 18.08 0.00 77.23 17.22
22 .9 DL+ SL-X 1.25 1.20 324.56 18.14 0.00 77.28 17.27
23 .9 DL+ SL+Z 1.25 1.20 324.46 0.03 71.83 77.25 0.03
24 .9 DL+ SL-Z 1.00 1.20 324.46 0.03 104.60 77.25 0.03
25 (DL+LL+SL+X) 1.25 1.20 370.34 18.06 0.00 88.18 17.20
26 (DL+LL+SL-X) 1.25 1.20 370.54 18.15 0.00 88.22 17.29
27 (DL+LL+SL+Z) 1.25 1.20 370.44 0.04 71.83 88.20 0.04
28 (DL+LL+SL-Z) 1.25 1.20 370.44 0.04 104.60 88.20 0.04
ENERGO
DESIGN CALCULATIONS FOR FOUN
ENGINEERING
PROJECTS LTD.
DOC. NO.: 2100-155
Page | 114
ER AND CONVEYEING PLANT PACKAGE
TIONS FOR FOUNDATION OF CABLE TRAY
NTPC KORBA
Bearing
6Mz/LzLx2 Pmax(P1) Pmin(P2) capacity P1 P2 P3 P4
Kn/m 2
Kn/m 2
Kn/m 2
Kn/m 2
Kn/m 2
Kn/m 2
Kn/m2
0.00 88.24 88.16 176.25 SAFE 132.36 132.24 132.36 132.24
0.00 94.45 60.01 176.25 SAFE 141.67 90.02 141.67 90.02
0.00 94.55 60.00 220.31 SAFE 113.46 72.00 113.46 72.00
36.65 113.93 40.58 220.31 SAFE 136.71 48.69 48.76 136.64
53.37 130.65 23.86 176.25 SAFE 156.78 28.63 28.70 156.71
0.00 105.38 70.97 220.31 SAFE 126.46 85.17 126.46 85.17
0.00 105.51 70.94 220.31 SAFE 126.61 85.12 126.61 85.12
36.65 124.89 51.51 220.31 SAFE 149.87 61.81 61.91 149.77
53.37 141.61 34.79 220.31 SAFE 169.93 41.75 41.85 169.83
169.93 132.24 141.67 169.83 28.63
(Maximum Pressure) (Minimum
FACTORED PRESSURE LOAD CASE Pressure)
108 100 101 108 105
ULATIONS FOR FOUNDATION OF CABLE TRAY REV 0
PREPARED S.G
CHECKED V.S.A
OC. NO.: 2100-155-PVC-U-18A
1/27/2020
WAGON TIPPLER AND CONVEYEING PLANT PACKAGE
DESIGN CALCULATIONS FOR FOUNDATION OF CABLE TR
NTPC KORBA
DESIGN OF FOOTING :
These base pressure are for the above highlighted case(which is critical)
Soil Weight & wt of concrete is subtracted from the above highlighted pressure to get these pressure for design calculation of the footing
F.O.S of 1.2 is been taken for the design of footing (depends on the critical load case)
P1 = 142.8 kN/m2 P2 = 14.66 kN/m2
P3 = 14.8 kN/m2 P4 = 142.74 kN/m2
2.80 P3
14.8
C1 C2
0.30 0.30
1.50
Z P2
14.7
X 0.4 0.4
Design of Section Along Z Direction:
The net pressure on the footing at one edge P3 = 14.76 P1 =
The net pressure on the footing at other edge P2 = 14.66 P4 =
The net pressure on the footing at the face of the column, C2 (pz) =
The net pressure on the footing at the face of the column, C2 (pz) =
The net pressure on the footing at a distance 'd' from the column face (p4)
Depth of the footing at a distance 'd' from column face (d' )
Shear force at distance ' d ' from face of column ( V )
Nominal shear stress = tv = F.O.S(1.2) x V x 104
1000 x d
Design for the One Way Shear along x axis:
The critical section is at a distance 'd' from the
face of the column, and the shear span is, (lc-d)
The net pressure on the footing at a distance 'd' from the column face (p4)
Depth of the footing at a distance 'd' from column face (d' )
Shear force at distance ' d ' from face of column ( V )
Nominal shear stress , tv = F.O.S(1.2) x V x 104
1000 x d
Reinforcement is provided in the footing as per design requirements and also top reinforcement is given to avoid the shr
ENERGO
DESIGN CALCULATIONS FOR FOUNDATION OF CABLE
ENGINEERING
PROJECTS LTD.
DOC. NO.: 2100-155-PVC-U-18A
Page | 117
EING PLANT PACKAGE
NDATION OF CABLE TRAY
BA
Load Factor
gf = 1.20
lculation of the footing
P1
142.8
P4
PRESSURE AT BASE 142.7
0.4 lc =
0.60
142.8 kN/sqm Z
142.7 kN/sqm D
q = 450
142.80 kN/sqm L= 1.50
2.30
142.8 kN/sqm 0.05 0.40 0.40 0.05
14.8 kN/sqm
140.55 kN/sqm
X
0.05 m
0.18 kNm/m
2.80
17.05 kN/sqm
142.8 17.05
0.05 m 140.55 14.8
0.02 kNm/m
mm
Bar Dia = 12
Clear Cover = 50
= 0.381 m
One Way shear Check Reqd
= 142.8 kN/sqm
= 219 mm
= 54.42 kN/m
0.30 N/mm
2
=
= 0.419 m OR -0.17 m
One Way shear Check Reqd
= 123.7 kN/sqm OR 7.03 kN/sqm
= 219 mm OR 219 mm
= 55.84 kN/m OR -1.83 kN/m
0.306 N/mm -0.010 N/mm
2 2
= OR
0.64 N/mm
2
0.33 N/mm
2
335 sqmm Prov. pt = 0.21 tc =
tc > tv
452 sqmm safe
0.00 N/mm
2
0.33 N/mm
2
4 sqmm Prov. pt = 0.21 tc =
tc > tv
452 sqmm safe
1.30 N/mm
2
0.41 N/mm
2
703 sqmm Prov. pt = 0.34 tc =
tc > tv
754 sqmm safe
2.8
a+dp
a
b+dp
0.40 m
b
0.30 m
2276 mm 1.5
219 mm
256.8 kN
61.1 Kn/Sqm
237.1 kN
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
Horizontal Vertical Horizontal Moment
Node Node L/C Fx KN Fy KN Fz KN Mx kNm
1 5 20 (DL+LL) 0.006 128.338 0.253 0.114
21 .9 DL+ SL+X -8.139 105.298 0.286 0.129
22 .9 DL+ SL-X 8.145 105.397 0.286 0.129
23 .9 DL+ SL+Z -0.013 66.994 -7.199 -8.062
24 .9 DL+ SL-Z 0.019 143.701 7.771 8.321
25 (DL+LL+SL+X) -8.136 128.288 0.253 0.114
26 (DL+LL+SL-X) 8.149 128.387 0.253 0.114
27 (DL+LL+SL+Z) -0.01 89.984 -7.232 -8.077
28 (DL+LL+SL-Z) 0.022 166.691 7.739 8.306
4
My kNm Mz kNm Fx KN Fy KN Fz KN Mx kNm My kNm Mz kNm
0 -0.022 6 20 (DL+LL) 0.006 128.336 -0.253 -0.116 0 -0.022
0 9.039 21 .9 DL+ SL+X -8.139 105.297 -0.286 -0.131 0 9.039
0 -9.069 22 .9 DL+ SL-X 8.145 105.395 -0.286 -0.131 0 -9.069
0.016 -0.001 23 .9 DL+ SL+Z 0.019 143.699 -7.771 -8.322 0.016 -0.029
-0.016 -0.029 24 .9 DL+ SL-Z -0.013 66.993 7.199 8.061 -0.016 -0.001
0 9.032 25 (DL+LL+SL+X) -8.136 128.287 -0.253 -0.116 0 9.032
0 -9.076 26 (DL+LL+SL-X) 8.149 128.385 -0.253 -0.116 0 -9.076
0.016 -0.008 27 (DL+LL+SL+Z) 0.022 166.689 -7.739 -8.307 0.016 -0.036
-0.016 -0.036 28 (DL+LL+SL-Z) -0.01 89.983 7.232 8.076 -0.016 -0.008