Sunteți pe pagina 1din 347

UPDATED FEASIBILITY STUDY

DRAFT REPORT
APPENDIX-H (Vol-1)TRANSMISSION LINE TOPOGRAPHY SURVEY
Updating Feasibility Study, Detailed Engineering Survey & Design and Environmental
Impact Assessment Study of Nalgad Hydropower Project (417 MW),
Jajarkot District, Nepal

AUGUST - 2018
Submitted By:
SMEC – MWH JV
(A Joint venture of SMEC International Pty Ltd, Australia and MWH International INC., USA
In association with UDAYA Consultancy Pvt. Ltd., Nepal)
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Table of Contents
1. OBJECTIVE ................................................................................................................. 4
2. TOR FOR SURVEY AND MAPPING ............................................................................ 5
3. SCOPE OF THE WORK ...................................................................................................... 7
4. DESK STUDY .................................................................................................................. 8
5. GPS SURVEY ................................................................................................................ 9
5.1. Feasibility DGPS Survey .................................................................................................... 9
5.2. Monumentation of Angle Points ........................................................................................ 12
5.3. Detailed Alignment Survey................................................................................................ 12
5.4. Major Crossings ................................................................................................................. 13
6. DATA ANALYSIS AND GENERATION OF PLAN AND PROFILE .............................. 17
7. DGPS SURVEY FOR TRANSMISSION LINE ............................................................ 18
7.1. Background ........................................................................................................................ 18
7.2. Scope of Works .................................................................................................................. 18
8. THE FIELD SURVEY ....................................................................................................... 19
8.1. Equipment .......................................................................................................................... 19
8.2. DGPS Survey ..................................................................................................................... 19
8.2.1. Specification of the Static Survey .............................................................................. 19
9. POST PROCESSING AND ADJUSTMENTS OF DGPS OBSERVATION. .................................... 21
9.1. General ............................................................................................................................... 21
9.2. Software ............................................................................................................................. 22
9.3. Final Control Points ........................................................................................................... 22
9.4. DGPS Occupation .............................................................................................................. 23
9.5. Adjustment Summary ........................................................................................................ 32
9.6. DGPS Observation ............................................................................................................. 33
9.7. GPS Observation Residuals ............................................................................................... 54

Page ii
In association with
List of Annexes

Annex - A: List and Description Card of Angle Points


Annex - B: Ortho Imageries of Route Alignment
Annex - C: Traverse Computation Data
Annex -D Angle Point Location Map & Route Alignment Plan
Annex - E: Plan & Profile Drawing
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Abbreviation
Abbreviation/ Description
ADB Asian Development Bank
CAD Computer Added Design
CBO Community Based Organisation
CBS Central Bureau of Statistics
CDM Clean Development Mechanism
CDO Chief District Officer
CFRD Concrete Face Rock fill Dam
DAO District Agriculture Officer
DED Detailed Engineering Design
DDC District Development Committee
DGPS Differential Global Positioning System
DO Dissolved Oxygen
DoED Department of Electricity Development
DTM Digital Terrain Model
EA Environmental Assessment
ECRD Earth Core Rockfill Dam
EGM Earth Gravitational Model
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EPA Environmental Protection Act
EPR EnvironmentalProtectionRules,1997
ERMC Environment and Resource Management Consultant
ESIA Environmental and Social Impact Assessment
ESMP Environmental and Social Management Plan
FAT Factory Acceptance Test
FDM Fugitive Dust Model
FGD Focus Group Discussion
FS Feasibility Study
FSL Full Supply Level
GHG Green House Gas
GIS Geographical Information System
GLOF Glacier Lake Outburst Flood
GoN Government of Nepal
G-D Gauge height and Discharge
GP Gau Palika, Rural Municipality
GPS Global Positioning System
HDOP Horizontal Dilution of Precision
H RMS Horizontal Root Mean Square

Page 1
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

IEC International Electro-technical Commission


IEE Initial Environmental Examination
IFC International Finance Corporation
INPS Integrated Nepal Power System
IPCC Intergovernmental Panel on Climate Change
IPDP/VCDP Indigenous/Vulnerable People’s/Community Development
ITP Plan
Inspectionand Test Plan
IUCN International Resources Group
JV Joint Venture
Km Kilometer
km2 Square Kilometer
kV Kilo Volt
kWh Kilo Watt Hour
m Meter
MCT Main Central Thrust
MoEn Ministry of Energy
MOEST Ministry of Environment, Science and Technology
MoWR Ministry of Water Resources
MUTM Modified Universal Transverse Mercator
MW Mega Watt
NEA Nepal Electricity Authority
NHPDC Nalgad Hydropower Project Development Committee
NHCL Nalgad Hydropower Company Limited
NGO Non-Governmental Organisation
NP Nagar Palika, Municipality
NTPF Non Timber Forest Products
PAP Project Affected Person
PCDC Public Consultation and Information Disclosure Plan
PDOP Position Dilution of Precision
PRA Participatory Rural Appraisal
RAP Resettlement Action Plan
RCIA Rapid Cumulative Impact Assessment
SIA Social Impact Assessment
SPS Safeguard Policy Statement
ToR Terms of Reference
VDC Village Development Committee
VDOP Vertical Dilution of Precision
VEC Valued Ecosystem Component
WB World Bank
WECS Water and Energy Commission Secretariat

Page 2
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

WPG World Bank Group


WHO World Health Organisation
WQI Water Quality Indicator
WQMS Water Quality Monitoring Survey
WTP Water Treatment Plant
V RMS Vertical Root Mean Square

Page 3
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

1. OBJECTIVE
The objective of the transmission line survey is to fix route alignment with angle points (90 angle points)
and perform detailed survey and mapping of 80m strip of transmission lines from Dalli to Kohalpur via
Chhinchu of about 112 km.
Sketch Map showing the location of 400 kV transmission line is attached as Map No. 1.1.

Map No. 1.1: Location Map

Page 4
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

2. TOR FOR SURVEY AND MAPPING


The objective of the transmission line survey is as per TOR is as following:
Fix route alignment and perform detailed survey and mapping of transmission lines.
The topographic maps will be prepared clearly depicting all major geographical as well as anthropogenic
features (viz. Landslide area, land uses in the surveyed area, temples, holy trees, historical monuments/
places, schools, hospitals, civil structures/facilities like roads, canals, bridges etc.) with appropriate
legends to represent each facility.

Page 5
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Map No. 1.2: Location Map of Transmission Line

Page 6
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

3. SCOPE OF THE WORK


The main objective of the survey is to carry out the survey works to locate the selected angle points and to
prepare maps and longitudinal plan and profile of the whole route alignment. The main objective of the
survey work is as follows:
 To conduct desk study to fix route and angle points on map
 To procure high resolution satellite imageries and prepare Ortho photos of them
 To conduct ground control survey connecting trig points and BMs
 To fix and monument of Angle Points on ground
 To prepare of Location Map and Route Alignment Plan
 To survey and prepare of Plan and profile

Page 7
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

4. DESK STUDY
Existing feasibility report along with reports of planned hydropower projects of the region whose power
are to be evacuated/ transmitted to Dalli and Chhinchu studied and tentative route was fixed during desk
study.
The World View 3(Air bus DS Geo), 0.5m resolution satellite imagery of December 23, 2016, was ordered
all along the route which fairly followed the feasibility route. The route was passing through Bardiya and
Banke National Parks. There were series of meetings with stake holders mainly with officials of the
project, NEA, and Ministries of Energy and Forest. The route was diverted to westward only passing
through Bardiya National Park only and southward along the open cultivated land to Bhajiya Gauri,
Baijanath Gaupalika-7. It was moved 7.2 km west from east of Kohalpur Road to Bhajiya Gauri where there
is rice field to acquire for transmission station area of about 1 sq. km.
The requirement ICAO and planned hydropower project areas also studied and considered to during the
transmission line route planning.
During the route planning and fixing angle points, the topographical maps at the scale of 1:25, 000, 0.5m
resolution satellite imageries, Google images and field visits were used. Angle points and sub stations
were tentatively fixed at Dalli, Chhinchu and Bhajiya Gauri, west of Kohalpur. The large scale maps of Dalli
and Kohalpur are available. The topographical maps at the scale of 1:5, 000 and aerial imagery was also
used in small area south of Bardiya National park.

Page 8
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

5. GPS SURVEY
The DGPS Survey performed to establish major control points connecting trig. Points for controlling survey
control points required to fix the Angle points (AP) and detail survey of 80 m strip along the proposed
transmission line alignment from Kohalpur to Dalli. During DGPS survey, one base stations, and 16 pairs of
major control points were established by Differential GPS observations at an average distance of 7 to 9 km
range and distance between pair is 100-360m. The powerhouse site base point and other points at Dalli is
are also used.

5.1. Feasibility DGPS Survey


The two types of GPS instrument, namely, Promark 2 and Leica GPS1200 are used to carry out the survey
works. The base station was surveyed with standard equipment- GPS receiver Leica GPS 1200, however
they do not connect the BMs and trig points. ProMark 2 receivers were used which has accuracy less than
100 mm/km (Horizontal: 0.005m ± 100 ppm). Therefore, it required to re- establish the Angle and control
points by precise GPS receivers connecting the BMs and trig points established by Survey Department,
Nepal.
New Survey Methodology
The four GPS instruments, namely, Topcon GR-5 and GR-3 ( two of each) with horizontal accuracy of 3+-
3mm +0.1ppm and 3+-3mm +1ppm respectively are used to carry out the survey works. Before
proceeding the DGPS Survey, proper survey planning is needed as the proper planning greatly influenced
the chances of success. There were two primary areas of survey planning, the network design of survey
points and observation plan. These two survey planning was first carried out for fixing the APs. Then based
upon the survey planning, 3-4 trig points and BMs each in the south and base point established by the
consultant at Dalli. 33 points monumented and surveyed by DGPS observation along with 3-4 third or
second order trig points and BMs by about 2 hours observations. The Sketch Map showing the location of
DGPS points and 400MW transmission line is attached as Map No.2.1 & 2.2.

Page 9
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Map No. 2.1: Location of DGPS points

Page 10
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Map No. 2.2: Location of DGPS points

Page 11
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

5.2. Monumentation of Angle Points


All the 89 major control points and 90 angle points were made conspicuous in the field by monumentation
of concrete pillars (10cm x 10cm x 45cm) with iron pin set in the center. They were also annoted by red
enamel paint. The Feasibility stage APs are not selected in the national parks areas and Dilli area. The
monuments were all new and in good condition as they are new monumentation established. Two of
them were found destroyed were remonumented.
Altogether there are 90 angle points. Description cards of all angle points be completed with photo and
submitted in this survey report as Annex –A2.
In the DPR stage there are 90 angle points including two dead end points along the route. This route is
divided in two sectors:
a) Nal Gad switchyard, Dalli to proposed substation at Chhinchu
b) Chhinchu substation to proposed substation at Kohalpur Bhajiya Gauri, 7 km west of Kohalpur and
north of Mahendra Highway
The switchyard is at Dalli and sub stations will be at Chhinchu and Kohalpur.
Most of the angle points were located in geologically stable ground and at close to existing access road or
foot track. Hence, all the angle points are easily accessible from existing road.
The position of angle points were fixed traversing between DGPS points which are shown Map No. 2.1 &
2.2. The accuracy of DGPS survey is 90-0.1ppmin x,y and 117-0.7ppm in height and detail traversing ranges
1:10,000 to 1: 39,000 and in average is 1: 19,429.

5.3. Detailed Alignment Survey


1. Location Map of Angle Point & Route alignment Plan
Location Map of Angle Point and Route Alignment Plan is prepared at the scale of 1:25,000 by
updating existing digital topographical maps at the scale of 1:25,000 using latest high resolution
satellite imageries and the field survey data falling within the 1 km area either side of
transmission line. They are attached as Annex D: Angle Point Location Map & Route Alignment
Plan.
2. Plan and Profile
Plan and Profile prepared at the scale of 1:2,000 in horizontal and at the scale of 1:200 in vertical
by field survey method described below.
All the required area (40 m left and 40 m right from the central line) along the proposed route
alignment were fixed by the angle points. Then all the terrain features were surveyed by means
of field surveying method. Detail positions and elevation were taken by Total station from angle
point or traverse points. During the survey, the survey team recorded the longitudinal profile of
the transmission line route. It also documented the geological conditions, river crossings, land
use as well as other natural and artificial features, such as, houses, electric/communication lines
(indicate voltage level and height of top conductor), streams, roads, canals, bridges, etc. falling
within 50 m transmission line corridor. For documentation purposes, the team used ortho photo
prepared from satellite imagery the entire alignment from its initial point at Kohalpur to its
terminal point at Dalli. They are attached as Annex B: Ortho Imageries of Route Alignment and 97
Plan and Profiles prepared at the scale of 1:2,000 as Annex E
Plan and Profile.

Page 12
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

5.4. Major Crossings


During detailed survey all the major crossings like river, khola, cliff area, LT and HT lines, communication
lines, foot paths, permanent features etc. were recorded along the alignment.
Field data including all the major crossings along the alignment listed as in the following below Table.
Route Details

S
Ang.
No Distance Chainage Land type Crossing Location NP /GP District
Point
.
Cultivatio Substatio Jajarko
1 AP1 Dalli Nalgad 7
n n t
Barren Jajarko
2 AP2 404.434 404.434 Road Tirmili Nalgad 7
land t
Barren Jajarko
3 AP3 608.195 1012.629 Road Tirmili Nalgad 7
land t
Cultivatio Bheri R./
4 AP4 372.330 1384.959 Chisapani Athbiskot 1 Rukum
n Road
Cultivatio
5 AP5 394.519 1779.478 Road Chisapani Athbiskot 1 Rukum
n
6 AP6 501.210 2280.688 Forest Chisapani Athbiskot 1 Rukum
Cultivatio
7 AP7 414.727 2695.415 Lareni Pakha Athbiskot 1 Rukum
n
1047.34 Cultivatio
8 AP8 3742.762 Kholsis Lareni Pakha Athbiskot 1 Rukum
8 n
9 AP9 372.393 4115.155 Forest Rithapani Athbiskot 1 Rukum
10 AP10 383.406 4498.562 Forest Rithapani Athbiskot 1 Rukum
Bheri
11 AP11 541.980 5040.542 Forest River, Bhalina Bajar Athbiskot 1 Rukum
road
Road,
12 AP12 573.362 5613.903 Forest Sota Danada Athbiskot 3 Rukum
buildings
1617.65 Khola, Pakhure
13 AP13 7231.563 Forest Athbiskot 4 Rukum
9 Road Pakha
Cultivatio
14 AP14 339.581 7571.144 Takura Athbiskot 4 Rukum
n
Cultivatio
15 AP15 150.590 7721.734 Khola Takura Athbiskot 4 Rukum
n
Barren
16 AP16 961.271 8683.005 Roads, Chote Bagar Athbiskot 4 Rukum
land
17 AP17 752.036 9435.041 Forest Road Chote Bagar Athbiskot 4 Rukum
1131.95 River, Nilkanthi Jajarko
18 AP18 10566.991 River bank Nal Gad 01
0 road Danda t
Road, Nilkanthi Jajarko
19 AP19 659.344 11226.335 River bank Nal Gad 01
River Danda t
Cultivatio Bheriganga Jajarko
20 AP20 699.035 11925.370 Rimna Danda
n 01 t
Cultivatio Banchare
21 AP21 917.592 12842.962 Sani Bheri 2 Rukum
n Danda

Page 13
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

S
Ang.
No Distance Chainage Land type Crossing Location NP /GP District
Point
.
1844.88 Barren
22 AP22 14687.848 Kholsis Daha Sani Bheri 1 Rukum
5 land
2023.36 Roads,
23 AP23 16711.214 Forest Gadhi Deurali Chaurjahari9 Rukum
6 Buildings
Cultivatio
24 AP24 830.995 17542.209 Kabra Chaurjahari9 Rukum
n
1163.52 Barren Roads,
25 AP25 18705.731 Kabra Chaurjahari9 Rukum
3 land buildings
Barren
26 AP26 369.186 19074.918 Kabra Chaurjahari9 Rukum
land
Barren Roads,
27 AP27 413.714 19488.632 Kabra Chaurjahari9 Rukum
land buildings,
1465.05 Cultivatio
28 AP28 20953.688 Mankot tata Chaurjahari4 Rukum
6 n
3235.39 Cultivatio Roads,
29 AP29 24189.085 Kumak Malika Baithan 4 Salyan
7 n Kholsis,
2925.15 Barren Kumak
30 AP30 27114.238 Kumak Malika Salyan
3 land Malika 4
5907.77 Kholsi, Kumak
31 AP31 33022.017 Forest Kumak Malika Salyan
9 Roads Malika 2
Kumak
32 AP32 412.628 33434.645 Forest Barule Salyan
Malika 2
1997.34 Road,
33 AP33 35431.989 Forest Bhatmare Kubinde 4 Salyan
4 building
1511.05 Barren Bhatmare
34 AP34 36943.041 Kholsis, Kubinde 4 Salyan
3 land Jangal
Barren
35 AP35 484.997 37428.038 Kholsis, Chyandanada Kubinde 4 Salyan
land
36 AP36 495.698 37923.736 Forest Kholsis, Bansniure Kubinde 4 Salyan
37 AP37 510.805 38434.541 Forest Kholsis, Bangad Kubinde 4 Salyan
38 AP38 371.115 38805.657 Forest Kholsis, Bangad Kubinde 4 Salyan
Cultivatio
39 AP39 706.946 39512.603 Kholsis, Bangad Kubinde 4 Salyan
n
1806.87
40 AP40 41319.474 Forest Kholsis, Bangad Kubinde 4 Salyan
2
Cultivatio
41 AP41 943.046 42262.520 Kholsis, Bangad Kubinde 1 Salyan
n
Cultivatio
42 AP42 607.573 42870.093 Kalagau Kubinde 1 Salyan
n
Kholas,
3626.50
43 AP-43 46496.595 Forest roads, Bangad Kubinde 1 Salyan
2
building
3442.95 Kholsis, Marmale
44 AP44 49939.545 Forest Kubinde 1 Salyan
0 building Danda
Marmale
45 AP45 910.578 50850.123 Forest Kholsi Kubinde 1 Salyan
Danda
46 AP46 480.053 51330.177 Forest Road, Kateri Kubinde 1 Salyan

Page 14
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

S
Ang.
No Distance Chainage Land type Crossing Location NP /GP District
Point
.
building
47 AP47 804.609 52134.786 Forest Gairi Kateri Kubinde 1 Salyan
Cultivatio Baluwa
48 AP-48 544.203 52678.989 Kubinde 11 Salyan
n Sangrah
1314.88 Barren Patuke
49 AP49 53993.878 Road Kubinde 11 Salyan
9 land Chaure
Road,
50 AP50 671.191 54665.068 Forest Churibajar Simte 7 Salyan
building
51 AP51 766.076 55431.144 Forest Syano danda Simte 7 Salyan
Khanya Khark
52 AP-52 567.048 55998.192 Forest Roads Kubinde 11 Salyan
a

S
Ang.
No Distance Chainage Land type Crossing Location Mun /R Mun District
Point
.
Khanya Khark
53 AP53 202.797 56200.989 Forest Kubinde 11 Salyan
a
2775.86 Cultivatio Khanya Khark
54 AP54 58976.852 Kubinde 11 Salyan
3 n a
1413.69 Surkhe
55 AP55 60390.544 Forest Pokhariya Gurbakot 9
2 t
Bhulkeni Surkhe
56 AP56 899.592 61290.136 Forest Road Gurbakot 9
Kamigau t
Surkhe
57 AP57 824.502 62114.639 Forest Bhurke gau Gurbakot 9
t
AP_5 1276.27 Cultivatio Surkhe
58 63390.914 Road Majhkhanda Gurbakot 9
8 6 n t
AP_5 Cultivatio Surkhe
59 526.690 63917.604 Road Kharayo chaur Gurbakot 10
9 n t
1709.93 Cultivatio Surkhe
61 AP-60 65627.542 Road Bhedabari Gurbakot 10
8 n t
AP_6 Road, Surkhe
62 458.385 66085.927 Forest Bhedabari Gurbakot 10
1 Building t
AP_6 1410.75 Surkhe
63 67496.677 Forest Road Bhedabari Gurbakot 10
2 0 t
AP_6 3004.55 Roads, Surkhe
64 70501.236 Forest Gimal tol Gurbakot 8
3 9 Kholsi t
2414.43 Barren Road, Surkhe
65 AP-64 72915.673 Shanti tol Bheriganga 8
8 land building t
AP_6 1321.81 Barren Surkhe
66 74237.489 Sano Jatri Bheriganga 9
5 5 land t
AP_6 1261.24 Surkhe
67 75498.730 Forest Road Thulo Jatri Bheriganga 9
6 1 t
AP_6 3117.46 Bheriganga1 Surkhe
68 78616.198 Forest Road Chuke tal
7 8 1 t
AP_6 1803.32 Madane Bheriganga1 Surkhe
69 80419.524 Forest Road
8 6 Chaur 0 t

Page 15
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

S
Ang.
No Distance Chainage Land type Crossing Location NP /GP District
Point
.
AP_6 1798.21 Surkhe
70 82217.741 Forest Road Bired anda Bheriganga4
9 7 t
AP_7 Cultivatio Bheriganga1 Surkhe
71 924.008 83141.749 Road Bire danda
0 n 0 t
Surkhe
72 AP-71 337.702 83479.450 Forest Road Tuni Khola Bheriganga 4
t
AP_7 Cultivatio Surkhe
73 473.486 83952.936 Kholsi Tuni Khola Bheriganga 4
2 n t
AP_7 1184.08 Cultivatio Surkhe
74 85137.016 Buildings Tuni Khola Bheriganga 4
3 0 n t
AP_7 4392.01 Cultivatio Surkhe
75 89529.036 Harre Bheriganga 4
4 9 n t
AP_7 1315.02 Surkhe
76 90844.063 Forest Harre Bheriganga 4
5 7 t
Surkhe
77 AP76 865.658 91709.721 Forest Kholsi Harre Bheriganga 4
t
4100.63 Surkhe
78 AP.77 95810.353 Forest Harre Bheriganga 4
2 t
1790.47 Cultivatio Surkhe
79 AP-78 97600.825 Road Harre Bheriganga 4
2 n t
Surkhe
80 AP.79 687.585 98288.410 Forest Kholsi Harre Bheriganga 4
t
1109.15 Surkhe
81 AP.80 99397.568 Forest Harre Bheriganga 4
8 t
100100.38 Surkhe
82 AP81 702.821 Forest Khola Harre Bheriganga 4
9 t
100972.36
83 AP82 871.977 Forest Khola Tharubasti Bansgadhi 7 Banke
6
101922.66 Road,
84 AP83 950.300 Forest Hatisar Baijanath 1 Banke
6 Buildings
1603.94 103526.61 Roads,
85 AP84 Forest Mathillo Kardi Baijanath 1 Banke
3 0 Buildings
1868.21 105394.82 Cultivatio
86 AP85 Kardi Baijanath 1 Banke
1 1 n
2118.85 107513.67 Cultivatio Pahadipur,
87 AP86 Road Baijanath 2 Banke
8 9 n Pitmari
1810.05 109323.73 Cultivatio
88 AP87 Bhaurikuna Baijanath 2 Banke
4 4 n
110253.82 Cultivatio Dachhin
89 AP88 930.093 Road Baijanath 3 Banke
7 n Lataura
1524.83 111778.66 Cultivatio
90 AP89 Khola Bhajiya Gauri Baijanath 5 Banke
7 4 n
111916.80 Cultivatio
91 AP90 138.138 Bhajiya Gauri Baijanath 5 Banke
2 n

Page 16
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

6. DATA ANALYSIS AND GENERATION OF PLAN AND PROFILE


All the survey data computed in the field as well as in the Kathmandu office. Similarly, some field data
evaluated and northing, easting and elevation of each spot height were calculated with respect to given of
coordinates of DGPS control points connected to points established by Survey Department. Then survey
software was used for data analysis and generation of plan and profile. Finally, a plan and profile of the
entire alignment will be prepared with all the relevant details within 80 meters corridor in required scale.
The 187 plan and profile drawings are generated under the following format and scale, which is presented
as Annex-E
Profile Scale : Vertical : 1:200

Horizontal : 1:2,000

Plan Scale : Horizontal : 1:2,000

Format : Plan and profile drawings size : A3

Length per sheet : 0.5 km

Total no. of sheets : 97 sheets

All the plan and profile with Angle points is also being drawn in ARC GIS and AutoCAD formats with
required scale.

Page 17
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

7. DGPS SURVEY FOR TRANSMISSION LINE


7.1. Background
In pursuance of the Government's objective of development of hydropower in Nepal, Ministry of Energy has
decided to carry out DGPS Survey of Nalgad Transmission Line Project.

7.2. Scope of Works


The objectives of the assignment are as follow:
 Conduct checks on the existing points using DGPS control for relative accuracy.
 Establish new DGPS control points.
 Provide new coordinates for the existing control points using DGPS method.
 Submit DGPS Survey Report.

Page 18
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

8. THE FIELD SURVEY


8.1. Equipment
Modern dual frequency precision DGPS receiver capable of tracking multiple satellite system (GPS and
GLONASS) and three carrier phases (L1, L2 and L2C) were used for better accuracy and precision of the DGPS
control points.

S. No Survey Equipment and Model Serial Number Receiver ID

1 TOPCON DGPS RECEIVERS (GR-5) 1118-21457 U0CJ2QNIEBS

2 TOPCON DGPS RECEIVERS (GR-5) 1118-20942 U002SRVIBYG

3 TOPCON DGPS RECEIVERS (GR-3) 442-3175 P8OUDW85U68


4 TOPCON DGPS RECEIVERS (GR-3) 442-3150 R82SQM1YMM8
Table 1: List of DGPS Receivers.

8.2. DGPS Survey


Standard Static DGPS Survey method was adopted and simultaneous measurements of 4 receivers were
made for duration of 1 hours to 2 hours giving 6 correlated vectors. The DGPS network was designed as a
closed network with triangles connected from a double base to other points.
DGPS survey was carried out throughout the Transmission line projects. The main focus was relative
accuracy of points established.

8.2.1. Specification of the Static Survey


General Specifications were followed to conduct the DGPS survey. The following parameters were followed
for the static survey method and post-processing of the field data for better accuracy of the survey.

Page 19
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Table 3: Specifications of the Static Survey.
Specification Static
General Network Design

Minimum number of reference station to control the project. 1 previous control point.
Maximum distance between the survey project boundary and network
50 km
reference control stations

Minimum number of all baselines contained in a loop 100%

Field
Maximum PDOP during station occupation 5 (75% of time)
Minimum observation time on station 1 hrs
Maximum epoch interval for data sampling 5 sec

Minimum satellite mask angle above the horizon 15 degrees

Office
Fixed integer solution for all baselines Yes
Ephemeris Broadcast

Maximum loop length 50 km


Maximum misclosure per loop, in terms of loop length 15 ppm

Maximum misclosure per loop in any one component (x,y,z) not to exceed 5 cm

Repeat baseline difference in any component (x,y,z) not to exceed 10 ppm


Maximum length misclosure allowed for a baseline in a properly-weighted,
50ppm
least squares network adjustment
Maximum allowable residual in any one component (x,y,z) in a properly
5 cm
weighted, least squares network adjustment

Page 20
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

9. POST PROCESSING AND ADJUSTMENTS OF DGPS


OBSERVATION.
9.1. General
Project name: Nalgad Transmission Line Project
Post Processed by: Nitesh Shrestha
Linear unit: Meters
Projection: MUTM_81
Longitudinal of Central Meridian: 81 E
Scale factor at central Meridian: 0.9999
False Easting (m): 500000
False Northing (m): 0.000
Geoid: EGM2008
Datum: Everest 1830
Semi-Major Axis (a): 6377299.36
Inverse Flattening: 300.8017
Grid to Ground:
Ground Origin: BM-1
Scale Factor (Grid to Ground): 1.0000678373095
Northing offset (m): -212.329
Easting offset (m): -38.326
Post-Processing Engine: Auto`
Troposphere Model: Goad & Goodman
Elevation Mask: 15 degrees
Satellite System: GPS & GLONASS
Post-Processing Engine: Auto
 L1&L2 — Processing of dual frequency measurements (L1/L2 GPS/GLONASS code and
carrier phase measurements) for GPS observation which length is shorter than 10 km. L1
and L2 observables will be treated by the engine as independent data sets. The final
solution type of the processed GPS observation is "Fixed / Float".
 L1&L2, Fixed IonoFree — Processing of dual frequency measurements (L1/L2 GPS/GLONASS
code and carrier phase measurements) for GPS observation length falling into the 10 km to
30 km interval. After integer ambiguity resolution for a GPS observation with dual frequency
measurements, ionofree combinations will be created and ionospheric error is eliminated.

Page 21
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
The final solution type of the processed GPS observation is "Fixed, IonoFree / Float,
IonoFree".

9.2. Software
Topcon Receiver Utility was used for the download of the raw data from the receivers. Magnet
Tools was used for the post processing and adjustment of the raw data.

9.3. Final Control Points


The list of final coordinates is given in the table below.
Table 4: Final Coordinate.
Name Ground Easting (m) Ground Northing (m) Elevation (m) Code
NP2 626989.403 3186556.896 959.96 NP2
G100 627284.281 3186351.862 905.52 G100

AP-13 626312.196 3180048.6 846.33 AP-13


AP-13.1 626280.987 3180015.095 850.82 AP-13.1

AP-22 623063.798 3173807.825 1784.09 AP-22


AP-22.1 623015.188 3173810.184 1775.43 AP-22.1
AP-29 618326.846 3166361.351 795.67 AP-29

AP-29.1 618341.026 3166324.388 796.17 AP-29.1


AP-31 611882.343 3160824.984 1577.84 AP-31
AP-31.1 611845.262 3160830.32 1585.35 AP-31.1

AP-40 606044.839 3155668.87 780.53 AP-40

AP-40.1 606024.53 3155620.658 772.07 AP-40.1


AP-43.1 601172.68 3154196.409 738.73 AP-43.1
AP-43 601183.817 3154220.64 736.72 AP-43
AP-48.1 597994.017 3149432.406 556.2 AP-48.1

AP-48 597990.825 3149286.203 637.66 AP-48

AP-52 595210.119 3147569.366 605.54 AP-52


AP-52.1 595287.999 3147555.82 582.55 AP-52.1
AP-60 586126.472 3145637.045 471.3 AP-60

AP-60.1 586170.765 3145603.941 471.25 AP-60.1


AP-64.1 579183.966 3147105.911 469.98 AP-64.1
AP-64 579123.903 3147083.443 469.95 AP-64

Page 22
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

AP-68.1 572328.96 3149699.001 584.21 AP-68.1


AP-68 572263.07 3149702.058 583.76 AP-68
AP-74 567966.98 3142999.968 1035.58 AP-74
AP-74.1 567929.724 3142921.583 1041.45 AP-74.1

AP-78.1 566187.255 3135494.899 660.39 AP-78.1

AP-78 566144.509 3135493.695 656.52 AP-78


AP-84 564267.105 3130502.087 172.27 AP-84
AP-84.1 564205.018 3130414.963 171.29 AP-84.1
AP-89 562087.465 3122997.343 150 AP-89

AP-90 562188.022 3122902.631 150.04 AP-90

9.4. DGPS Occupation


Point Name AP-100 Original Name log0825e_IEBS Log File Name log0825e.tps

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

8/25/2017
Start Time 8/25/2017 9:48 Stop Time Duration 9:14:00
19:02

Method Static Slant Antenna Height (m) 1.65 H RMS (m)/V RMS (m) 31.838/33.075

Epoch Interval
5000 No. of Epoch 6648 GPS week,day 1,963,237
(msec)

Point Name AP-90 Original Name log0825e_5U68 Log File Name log0825e.tps

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

8/25/2017
Start Time 8/25/2017 10:01 Stop Time Duration 1:47:40
11:49

Method Static Slant Antenna Height (m) 1.464 H RMS (m)/V RMS (m) 17.422/22.068

Epoch Interval
5000 No. of Epoch 1292 GPS week,day 1,963,237
(msec)

Point Name AP-89 Original Name log0825e_IBYG Log File Name log0825e.tps

Antenna Type GR-5/Atlas Receiver U002SRVIBYG Vendor Topcon

Start Time 8/25/2017 10:02 Stop Time 8/25/2017 Duration 1:45:55

Page 23
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

11:48

Method Static Slant Antenna Height (m) 1.477 H RMS (m)/V RMS (m) 19.635/24.621

Epoch Interval
5000 No. of Epoch 1271 GPS week,day 1,963,237
(msec)

Point Name AP-84 Original Name log0825h_5U68 Log File Name log0825h.tps

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

8/25/2017
Start Time 8/25/2017 13:13 Stop Time Duration 0:58:25
14:12

Method Static Slant Antenna Height (m) 1.415 H RMS (m)/V RMS (m) 23.132/23.983

Epoch Interval
5000 No. of Epoch 701 GPS week,day 1,963,237
(msec)

Point Name AP-84-1 Original Name log0825h_IBYG Log File Name log0825h.tps

Antenna Type GR-5/Atlas Receiver U002SRVIBYG Vendor Topcon

8/25/2017
Start Time 8/25/2017 13:15 Stop Time Duration 0:57:00
14:12

Method Static Slant Antenna Height (m) 1.615 H RMS (m)/V RMS (m) 22.385/24.436

Epoch Interval
5000 No. of Epoch 684 GPS week,day 1,963,237
(msec)

Point Name AP-78-1 Original Name log0825j_5U68 Log File Name log0825j.tps

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

8/25/2017
Start Time 8/25/2017 15:01 Stop Time Duration 0:59:50
16:01

Method Static Slant Antenna Height (m) 1.609 H RMS (m)/V RMS (m) 28.587/18.366

Epoch Interval
5000 No. of Epoch 718 GPS week,day 1,963,237
(msec)

Point Name AP-78 Original Name log0825j_IBYG Log File Name log0825j.tps

Antenna Type GR-5/Atlas Receiver U002SRVIBYG Vendor Topcon

Page 24
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

8/25/2017
Start Time 8/25/2017 15:01 Stop Time Duration 0:59:40
16:01

Method Static Slant Antenna Height (m) 1.61 H RMS (m)/V RMS (m) 26.244/15.957

Epoch Interval
5000 No. of Epoch 716 GPS week,day 1,963,237
(msec)

Point Name AP-74-1 Original Name log0825l_5U68 Log File Name log0825l.tps

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

8/25/2017
Start Time 8/25/2017 17:19 Stop Time Duration 1:42:00
19:01

Method Static Slant Antenna Height (m) 1.522 H RMS (m)/V RMS (m) 24.917/23.719

Epoch Interval
5000 No. of Epoch 1224 GPS week,day 1,963,237
(msec)

Point Name AP-74 Original Name log0825l_IBYG Log File Name log0825l.tps

Antenna Type GR-5/Atlas Receiver U002SRVIBYG Vendor Topcon

8/25/2017
Start Time 8/25/2017 17:21 Stop Time Duration 1:39:00
19:00

Method Static Slant Antenna Height (m) 1.545 H RMS (m)/V RMS (m) 29.995/25.211

Epoch Interval
5000 No. of Epoch 1188 GPS week,day 1,963,237
(msec)

Point Name AP-68-1 Original Name log0826b_5U68 Log File Name log0826b.tps

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

Start Time 8/26/2017 7:37 Stop Time 8/26/2017 8:37 Duration 0:59:35

Method Static Slant Antenna Height (m) 1.52 H RMS (m)/V RMS (m) 33.965/18.643

Epoch Interval
5000 No. of Epoch 715 GPS week,day 1,963,238
(msec)

Point Name AP-68 Original Name log0826b_IBYG Log File Name log0826b.tps

Antenna Type GR-5/Atlas Receiver U002SRVIBYG Vendor Topcon

Page 25
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Start Time 8/26/2017 7:38 Stop Time 8/26/2017 8:38 Duration 0:59:50

Method Static Slant Antenna Height (m) 1.562 H RMS (m)/V RMS (m) 17.546/11.66

Epoch Interval
5000 No. of Epoch 718 GPS week,day 1,963,238
(msec)

Point Name AP-64-1 Original Name log0826b_IEBS Log File Name log0826b.tps

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

8/26/2017
Start Time 8/26/2017 7:38 Stop Time Duration 6:43:10
14:21

Method Static Slant Antenna Height (m) 1.601 H RMS (m)/V RMS (m) 32.534/33.794

Epoch Interval
5000 No. of Epoch 4838 GPS week,day 1,963,238
(msec)

Point Name AP-64-1 Original Name log0826d_5U68 Log File Name log0826d.tps

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

8/26/2017
Start Time 8/26/2017 9:12 Stop Time Duration 1:27:25
10:40

Method Static Slant Antenna Height (m) 1.575 H RMS (m)/V RMS (m) 19.688/19.108

Epoch Interval
5000 No. of Epoch 1049 GPS week,day 1,963,238
(msec)

Point Name AP-64 Original Name log0826d_IBYG Log File Name log0826d.tps

Antenna Type GR-5/Atlas Receiver U002SRVIBYG Vendor Topcon

8/26/2017
Start Time 8/26/2017 9:16 Stop Time Duration 1:23:55
10:40

Method Static Slant Antenna Height (m) 1.403 H RMS (m)/V RMS (m) 12.548/13.507

Epoch Interval
5000 No. of Epoch 1007 GPS week,day 1,963,238
(msec)

Point Name AP-60 Original Name log0826g_5U68 Log File Name log0826g.tps

Page 26
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

8/26/2017
Start Time 8/26/2017 12:18 Stop Time Duration 1:59:50
14:18

Method Static Slant Antenna Height (m) 1.665 H RMS (m)/V RMS (m) 28.522/30.056

Epoch Interval
5000 No. of Epoch 1438 GPS week,day 1,963,238
(msec)

Point Name AP-60-1 Original Name log0826g_IBYG Log File Name log0826g.tps

Antenna Type GR-5/Atlas Receiver U002SRVIBYG Vendor Topcon

8/26/2017
Start Time 8/26/2017 12:18 Stop Time Duration 1:58:50
14:17

Method Static Slant Antenna Height (m) 1.581 H RMS (m)/V RMS (m) 20.869/21.548

Epoch Interval
5000 No. of Epoch 1426 GPS week,day 1,963,238
(msec)

Point Name AP-60 Original Name log0826k_IEBS Log File Name log0826k.tps

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

8/26/2017
Start Time 8/26/2017 16:24 Stop Time Duration 1:36:40
18:01

Method Static Slant Antenna Height (m) 1.574 H RMS (m)/V RMS (m) 37.169/42.622

Epoch Interval
5000 No. of Epoch 1160 GPS week,day 1,963,238
(msec)

Point Name AP-52 Original Name log0826k_5U68 Log File Name log0826k.tps

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

8/26/2017
Start Time 8/26/2017 16:26 Stop Time Duration 1:30:10
17:56

Method Static Slant Antenna Height (m) 1.575 H RMS (m)/V RMS (m) 10.583/15.275

Epoch Interval
5000 No. of Epoch 1082 GPS week,day 1,963,238
(msec)

Point Name AP-52-1 Original Name log0826k_IBYG Log File Name log0826k.tps

Page 27
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Antenna Type GR-5/Atlas Receiver U002SRVIBYG Vendor Topcon

8/26/2017
Start Time 8/26/2017 16:26 Stop Time Duration 1:29:50
17:56

Method Static Slant Antenna Height (m) 1.617 H RMS (m)/V RMS (m) 9.272/14.537

Epoch Interval
5000 No. of Epoch 1078 GPS week,day 1,963,238
(msec)

Point Name AP-52-1 Original Name log0827b_IBYG Log File Name log0827b.tps

Antenna Type GR-5/Atlas Receiver U002SRVIBYG Vendor Topcon

8/27/2017
Start Time 8/27/2017 7:08 Stop Time Duration 9:11:35
16:20

Method Static Slant Antenna Height (m) 1.687 H RMS (m)/V RMS (m) 21.569/25.104

Epoch Interval
5000 No. of Epoch 6619 GPS week,day 1,964,239
(msec)

Point Name AP-48-1 Original Name log0827b_5U68 Log File Name log0827b.tps

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

Start Time 8/27/2017 7:16 Stop Time 8/27/2017 8:12 Duration 0:55:55

Method Static Slant Antenna Height (m) 1.352 H RMS (m)/V RMS (m) 20.088/30.396

Epoch Interval
5000 No. of Epoch 671 GPS week,day 1,964,239
(msec)

Point Name AP-48 Original Name log0827b_IEBS Log File Name log0827b.tps

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

Start Time 8/27/2017 7:16 Stop Time 8/27/2017 8:10 Duration 0:54:20

Method Static Slant Antenna Height (m) 1.346 H RMS (m)/V RMS (m) 12.516/17.079

Epoch Interval
5000 No. of Epoch 652 GPS week,day 1,964,239
(msec)

Point Name AP-43-1 Original Name log0827d_5U68 Log File Name log0827d.tps

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

Page 28
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

8/27/2017
Start Time 8/27/2017 9:06 Stop Time Duration 1:24:40
10:31

Method Static Slant Antenna Height (m) 1.555 H RMS (m)/V RMS (m) 48.371/44.888

Epoch Interval
5000 No. of Epoch 1016 GPS week,day 1,964,239
(msec)

Point Name AP-43 Original Name log0827d_IEBS Log File Name log0827d.tps

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

8/27/2017
Start Time 8/27/2017 9:06 Stop Time Duration 1:24:25
10:31

Method Static Slant Antenna Height (m) 1.672 H RMS (m)/V RMS (m) 27.929/26.264

Epoch Interval
5000 No. of Epoch 1013 GPS week,day 1,964,239
(msec)

Point Name AP-40 Original Name log0827h_5U68 Log File Name log0827h.tps

Antenna Type GR-3 Receiver P8OUDW85U68 Vendor Topcon

8/27/2017
Start Time 8/27/2017 13:40 Stop Time Duration 1:46:10
15:26

Method Static Slant Antenna Height (m) 1.47 H RMS (m)/V RMS (m) 9.489/7.302

Epoch Interval
5000 No. of Epoch 1274 GPS week,day 1,964,239
(msec)

Point Name AP-40-1 Original Name log0827h_IEBS Log File Name log0827h.tps

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

8/27/2017
Start Time 8/27/2017 13:40 Stop Time Duration 1:44:25
15:24

Method Static Slant Antenna Height (m) 1.146 H RMS (m)/V RMS (m) 37.639/37.819

Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)

Point Name AP-31 Original Name log0827h_IEBS Log File Name log0827h.tps

Page 29
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

8/28/2017
Start Time 8/28/2017 13:40 Stop Time Duration 1:34:25
15:14

Method Static Slant Antenna Height (m) 1.563 H RMS (m)/V RMS (m) 37.639/37.819

Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)

Point Name AP-31-1 Original Name log0827h_IEBS Log File Name log0827h.tps

Antenna Type GR-5/Atlas Receiver P8OUDW85U68 Vendor Topcon

8/28/2017
Start Time 8/28/2017 13:56 Stop Time Duration 1:15:25
15:11

Method Static Slant Antenna Height (m) 1.265 H RMS (m)/V RMS (m) 37.639/37.819

Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)

Point Name AP-29 Original Name log0827h_IEBS Log File Name log0827h.tps

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

8/29/2017
Start Time 8/29/2017 10:40 Stop Time Duration 1:15:5
11:55

Method Static Slant Antenna Height (m) 1.335 H RMS (m)/V RMS (m) 37.639/37.819

Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)

Point Name AP-29-1 Original Name log0827h_IEBS Log File Name log0827h.tps

Antenna Type GR-5/Atlas Receiver P8OUDW85U68 Vendor Topcon

8/29/2017
Start Time 8/29/2017 10:59 Stop Time Duration 1:08:15
12:07

Method Static Slant Antenna Height (m) 1.256 H RMS (m)/V RMS (m) 37.639/37.819

Epoch Interval 5000 No. of Epoch 1253 GPS week,day 1,964,239

Page 30
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

(msec)

Point Name AP-22 Original Name log0827h_IEBS Log File Name log0827h.tps

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

8/30/2017
Start Time 8/30/2017 9:16 Stop Time Duration 1:24:25
10:40

Method Static Slant Antenna Height (m) 1.221 H RMS (m)/V RMS (m) 37.639/37.819

Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)

Point Name AP-22-1 Original Name log0827h_IEBS Log File Name log0827h.tps

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

8/30/2017
Start Time 8/30/2017 10:05 Stop Time Duration 1:15:16
11:20

Method Static Slant Antenna Height (m) 1.265 H RMS (m)/V RMS (m) 37.639/37.819

Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)

Point Name AP-13 Original Name log0827h_IEBS Log File Name log0827h.tps

Antenna Type GR-5/Atlas Receiver P8OUDW85U68 Vendor Topcon

8/30/2017
Start Time 8/30/2017 13:40 Stop Time Duration 1:16:23
14:56

Method Static Slant Antenna Height (m) 1.365 H RMS (m)/V RMS (m) 37.639/37.819

Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)

Point Name AP-13-1 Original Name log0827h_IEBS Log File Name log0827h.tps

Antenna Type GR-5/Atlas Receiver U0CJ2QNIEBS Vendor Topcon

Start Time 8/27/2017 13:51 Stop Time 8/30/2017 Duration 1:45:33

Page 31
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

15:15

Method Static Slant Antenna Height (m) 1.425 H RMS (m)/V RMS (m) 37.639/37.819

Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)

9.5. Adjustment Summary


Adjustment type: Plane + Height, Minimal constraint

Confidence level: 95%

Number of adjusted points: 23

Number of plane control points: 1

Number of used GPS vectors: 63

Number of rejected GPS vectors by plane: 1

A posteriori plane UWE: 0.5934908 , Bounds: ( 0.6924594 , 1.307096 )

Number of height control points: 1

Number of rejected GPS vectors by height: 1

A posteriori height UWE: 0.7661896 , Bounds: ( 0.5700877 , 1.431083 )

Page 32
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

9.6. DGPS Observation


Rover
BASELINE From : AP-90 To : AP-100 Base Antenna Type GR-3 1.65
Antenna Type

Distance (m) 7601.065 Azimuth 21°45'55.1432" ∆E 2781.65 ∆N 7073.762

8/25/2017 Common
Start Time Stop Time 8/25/2017 11:49 Duration 1:47:40 1292
10:01 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.877/1.763/1.9 Horizontal Vertical


9/9 0.005 0.009
Satellites PDOP/TDOP 69/1.15 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) -0.001

Res X (m) 0 Res Y (m) 0 Res Z (m) -0.001 Res D (m) 0

Rover
BASELINE From : AP-89 To : AP-90 Base Antenna Type GR-5/Atlas 1.464
Antenna Type

Distance (m) 138.137 Azimuth 133°35'02.4040" ∆E 100.556 ∆N -94.713

8/25/2017 Common
Start Time Stop Time 8/25/2017 11:48 Duration 1:45:55 1271
10:02 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.858/1.714/1.9 Horizontal Vertical


9/9 0.001 0.001
Satellites PDOP/TDOP 17/1.103 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0

Res X (m) 0 Res Y (m) 0 Res Z (m) 0 Res D (m) 0

Rover
BASELINE From : AP-89 To : AP-100 Base Antenna Type GR-5/Atlas 1.65
Antenna Type

Distance (m) 7550.813 Azimuth 22°44'16.7296" ∆E 2882.206 ∆N 6979.05

8/25/2017 Common
Start Time Stop Time 8/25/2017 11:48 Duration 1:45:55 1271
10:02 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

Page 33
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

GPS/GLONASS HDOP/VDOP/ 0.874/1.761/1.9 Horizontal Vertical


9/9 0.005 0.009
Satellites PDOP/TDOP 66/1.146 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0.001 Res El (m) 0.001

Res X (m) 0.001 Res Y (m) 0 Res Z (m) 0.001 Res D (m) 0

Rover
BASELINE From : AP-84 To : AP-100 Base Antenna Type GR-3 1.65
Antenna Type

Distance (m) 877.512 Azimuth 127°06'54.3914" ∆E 702.566 ∆N -525.696

8/25/2017 Common
Start Time Stop Time 8/25/2017 14:12 Duration 0:58:25 701
13:13 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.906/1.817/2.0 Horizontal Vertical


9/7 0.001 0.002
Satellites PDOP/TDOP 3/1.292 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) -0.002

Res X (m) 0 Res Y (m) -0.002 Res Z (m) -0.001 Res D (m) 0

Rover
BASELINE From : AP-84 To : AP-84-1 Base Antenna Type GR-3 1.615
Antenna Type

Distance (m) 106.988 Azimuth 215°47'09.7473" ∆E -62.091 ∆N -87.123

8/25/2017 Common
Start Time Stop Time 8/25/2017 14:12 Duration 0:57:00 684
13:15 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.917/1.825/2.0 Horizontal Vertical


9/7 0.002 0.004
Satellites PDOP/TDOP 42/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0.005

Res X (m) 0.001 Res Y (m) 0.004 Res Z (m) 0.003 Res D (m) 0

From : AP-84- Rover


BASELINE To : AP-100 Base Antenna Type GR-5/Atlas 1.65
1 Antenna Type

Distance (m) 881.552 Azimuth 120°08'44.4939" ∆E 764.656 ∆N -438.572

Page 34
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

8/25/2017 Common
Start Time Stop Time 8/25/2017 14:12 Duration 0:57:00 684
13:15 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.897/1.753/1.9 Horizontal Vertical


10/7 0.002 0.005
Satellites PDOP/TDOP 69/1.239 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0.005

Res X (m) 0.001 Res Y (m) 0.004 Res Z (m) 0.003 Res D (m) -0.001

From : AP-78- Rover


BASELINE To : AP-100 Base Antenna Type GR-3 1.65
1 Antenna Type

Distance (m) 5671.752 Azimuth 192°45'41.4548" ∆E -1217.596 ∆N -5518.5

8/25/2017 Common
Start Time Stop Time 8/25/2017 16:01 Duration 0:59:50 718
15:01 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.861/1.368/1.6 Horizontal Vertical


10/6 0.031 0.047
Satellites PDOP/TDOP 16/0.978 Precision (m) Precision (m)

Orbit Broadcast Res E (m) -0.02 Res N (m) -0.082 Res El (m) -0.14

Res X (m) 0.007 Res Y (m) -0.093 Res Z (m) -0.142 Res D (m) 0.096

Rover
BASELINE From : AP-78 To : AP-78-1 Base Antenna Type GR-5/Atlas 1.609
Antenna Type

Distance (m) 42.943 Azimuth 88°42'29.5230" ∆E 42.751 ∆N 1.202

8/25/2017 Common
Start Time Stop Time 8/25/2017 16:01 Duration 0:59:35 715
15:01 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.866/1.351/1.6 Horizontal Vertical


10/6 0.003 0.005
Satellites PDOP/TDOP 04/0.974 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0

Res X (m) 0 Res Y (m) 0 Res Z (m) 0 Res D (m) 0

Page 35
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 36
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Rover
BASELINE From : AP-78 To : AP-100 Base Antenna Type GR-5/Atlas 1.65
Antenna Type

Distance (m) 5661.134 Azimuth 192°20'23.5979" ∆E -1174.825 ∆N -5517.216

8/25/2017 Common
Start Time Stop Time 8/25/2017 16:01 Duration 0:59:40 716
15:01 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.852/1.366/1.6 Horizontal Vertical


10/6 0.014 0.023
Satellites PDOP/TDOP 1/0.981 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0

Res X (m) 0 Res Y (m) 0 Res Z (m) 0 Res D (m) 0

From : AP-74- Rover


BASELINE To : AP-100 Base Antenna Type GR-3 1.65
1 Antenna Type

Distance (m) 13307.995 Azimuth 193°12'28.5488" ∆E -2960.031 ∆N -12945.161

8/25/2017 Common
Start Time Stop Time 8/25/2017 19:01 Duration 1:42:00 1224
17:19 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.812/1.422/1.6 Horizontal Vertical


12/9 0.008 0.014
Satellites PDOP/TDOP 37/0.947 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0.005 Res El (m) 0.003

Res X (m) 0 Res Y (m) 0 Res Z (m) 0.006 Res D (m) -0.005

Rover
BASELINE From : AP-74 To : AP-74-1 Base Antenna Type GR-5/Atlas 1.522
Antenna Type

Distance (m) 86.998 Azimuth 205°44'59.6533" ∆E -37.257 ∆N -78.388

8/25/2017 Common
Start Time Stop Time 8/25/2017 19:00 Duration 1:39:00 1188
17:21 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

Page 37
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

GPS/GLONASS HDOP/VDOP/ 0.775/1.329/1.5 Horizontal Vertical


12/9 0.002 0.004
Satellites PDOP/TDOP 39/0.864 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0

Res X (m) 0 Res Y (m) 0 Res Z (m) 0 Res D (m) 0

Rover
BASELINE From : AP-74 To : AP-100 Base Antenna Type GR-5/Atlas 1.65
Antenna Type

Distance (m) 13392.191 Azimuth 193°17'20.0155" ∆E -2997.286 ∆N -13023.563

8/25/2017 Common
Start Time Stop Time 8/25/2017 19:00 Duration 1:39:00 1188
17:21 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.756/1.401/1.5 Horizontal Vertical


12/9 0.011 0.015
Satellites PDOP/TDOP 91/0.91 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.001 Res N (m) -0.009 Res El (m) -0.003

Res X (m) -0.001 Res Y (m) 0.002 Res Z (m) -0.01 Res D (m) 0.009

Rover
BASELINE From : AP-68 To : AP-68-1 Base Antenna Type GR-5/Atlas 1.52
Antenna Type

Distance (m) 65.974 Azimuth 92°52'44.5667" ∆E 65.906 ∆N -2.91

Common
Start Time 8/26/2017 7:38 Stop Time 8/26/2017 8:37 Duration 0:59:05 709
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 1.038/1.641/1.9 Horizontal Vertical


9/6 0.006 0.008
Satellites PDOP/TDOP 41/1.195 Precision (m) Precision (m)

Orbit Broadcast Res E (m) -0.001 Res N (m) 0.001 Res El (m) -0.003

Res X (m) 0 Res Y (m) -0.003 Res Z (m) -0.001 Res D (m) -0.001

From : AP-68- Rover


BASELINE To : AP-74-1 Base Antenna Type GR-3 1.601
1 Antenna Type

Distance (m) 8097.691 Azimuth 213°19'24.7344" ∆E -4399.762 ∆N -6782.013

Page 38
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Common
Start Time 8/26/2017 7:38 Stop Time 8/26/2017 8:37 Duration 0:59:05 709
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.967/1.477/1.7 Horizontal Vertical


9/6 0.006 0.01
Satellites PDOP/TDOP 65/1.062 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0.001 Res El (m) -0.004

Res X (m) 0 Res Y (m) -0.004 Res Z (m) -0.001 Res D (m) -0.001

Rover
BASELINE From : AP-68 To : AP-74-1 Base Antenna Type GR-5/Atlas 1.601
Antenna Type

Distance (m) 8064.542 Azimuth 212°55'06.3921" ∆E -4333.855 ∆N -6784.926

Common
Start Time 8/26/2017 7:38 Stop Time 8/26/2017 8:38 Duration 0:59:50 718
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.985/1.516/1.8 Horizontal Vertical


9/6 0.007 0.01
Satellites PDOP/TDOP 08/1.095 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.001 Res N (m) -0.001 Res El (m) 0.004

Res X (m) 0 Res Y (m) 0.004 Res Z (m) 0.001 Res D (m) 0.001

From : AP-64- Rover


BASELINE To : AP-74-1 Base Antenna Type GR-3 1.601
1 Antenna Type

Distance (m) 12021.313 Azimuth 249°59'18.5889" ∆E -11254.246 ∆N -4184.326

Common
Start Time 8/26/2017 9:12 Stop Time 8/26/2017 10:40 Duration 1:27:25 1049
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.911/1.608/1.8 Horizontal Vertical


9/7 0.008 0.014
Satellites PDOP/TDOP 48/1.149 Precision (m) Precision (m)

Orbit Broadcast Res E (m) -0.001 Res N (m) 0.005 Res El (m) 0.007

Res X (m) 0.001 Res Y (m) 0.004 Res Z (m) 0.008 Res D (m) -0.001

Page 39
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 40
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Rover
BASELINE From : AP-64 To : AP-64-1 Base Antenna Type GR-5/Atlas 1.575
Antenna Type

Distance (m) 64.127 Azimuth 69°52'29.3101" ∆E 60.062 ∆N 22.467

Common
Start Time 8/26/2017 9:16 Stop Time 8/26/2017 10:40 Duration 1:23:35 1003
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.864/1.566/1.7 Horizontal Vertical


9/7 0.002 0.004
Satellites PDOP/TDOP 89/1.095 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0.001

Res X (m) 0 Res Y (m) 0 Res Z (m) 0.001 Res D (m) 0

Rover
BASELINE From : AP-64 To : AP-74-1 Base Antenna Type GR-5/Atlas 1.601
Antenna Type

Distance (m) 11957.26 Azimuth 249°59'19.5771" ∆E -11194.184 ∆N -4161.868

Common
Start Time 8/26/2017 9:16 Stop Time 8/26/2017 10:40 Duration 1:23:55 1007
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.868/1.558/1.7 Horizontal Vertical


9/7 0.007 0.011
Satellites PDOP/TDOP 84/1.087 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) -0.003 Res El (m) -0.005

Res X (m) 0 Res Y (m) -0.003 Res Z (m) -0.005 Res D (m) 0.001

Rover
BASELINE From : AP-60 To : AP-74-1 Base Antenna Type GR-3 1.601
Antenna Type

Distance (m) 18408.17 Azimuth 261°55'47.0743" ∆E -18196.752 ∆N -2715.463

8/26/2017 Common
Start Time Stop Time 8/26/2017 14:18 Duration 1:59:50 1438
12:18 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

Page 41
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

GPS/GLONASS HDOP/VDOP/ 0.849/1.638/1.8 Horizontal Vertical


10/10 0.007 0.013
Satellites PDOP/TDOP 45/1.131 Precision (m) Precision (m)

Orbit Broadcast Res E (m) -0.001 Res N (m) -0.003 Res El (m) -0.01

Res X (m) -0.001 Res Y (m) -0.008 Res Z (m) -0.008 Res D (m) 0.001

Rover
BASELINE From : AP-60 To : AP-60-1 Base Antenna Type GR-3 1.581
Antenna Type

Distance (m) 55.296 Azimuth 127°12'01.7221" ∆E 44.287 ∆N -33.11

8/26/2017 Common
Start Time Stop Time 8/26/2017 14:17 Duration 1:58:50 1426
12:18 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.841/1.624/1.8 Horizontal Vertical


10/10 0.002 0.004
Satellites PDOP/TDOP 29/1.115 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0.001

Res X (m) 0 Res Y (m) 0.001 Res Z (m) 0.001 Res D (m) 0

From : AP-60- Rover


BASELINE To : AP-74-1 Base Antenna Type GR-5/Atlas 1.601
1 Antenna Type

Distance (m) 18447.109 Azimuth 262°03'07.4048" ∆E -18241.038 ∆N -2682.345

8/26/2017 Common
Start Time Stop Time 8/26/2017 14:17 Duration 1:58:50 1426
12:18 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.845/1.641/1.8 Horizontal Vertical


10/10 0.008 0.015
Satellites PDOP/TDOP 46/1.132 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.001 Res N (m) 0.004 Res El (m) 0.013

Res X (m) 0.001 Res Y (m) 0.009 Res Z (m) 0.009 Res D (m) -0.001

Rover
BASELINE From : AP-52 To : AP-60 Base Antenna Type GR-3 1.574
Antenna Type

Distance (m) 9287.88 Azimuth 258°27'09.1325" ∆E -9083.646 ∆N -1932.314

Page 42
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

8/26/2017 Common
Start Time Stop Time 8/26/2017 17:56 Duration 1:30:10 1082
16:26 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.972/1.763/2.0 Horizontal Vertical


11/6 0.005 0.01
Satellites PDOP/TDOP 13/1.313 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0.002

Res X (m) 0.001 Res Y (m) 0.001 Res Z (m) 0 Res D (m) 0

Rover
BASELINE From : AP-52 To : AP-52-1 Base Antenna Type GR-3 1.617
Antenna Type

Distance (m) 82.325 Azimuth 100°19'40.3237" ∆E 77.884 ∆N -13.545

8/26/2017 Common
Start Time Stop Time 8/26/2017 17:56 Duration 1:29:50 1078
16:26 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.974/1.78/2.02 Horizontal Vertical


11/6 0.001 0.002
Satellites PDOP/TDOP 9/1.327 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0

Res X (m) 0 Res Y (m) 0 Res Z (m) 0 Res D (m) 0

From : AP-52- Rover


BASELINE To : AP-60 Base Antenna Type GR-5/Atlas 1.574
1 Antenna Type

Distance (m) 9360.961 Azimuth 258°37'59.5493" ∆E -9161.53 ∆N -1918.768

8/26/2017 Common
Start Time Stop Time 8/26/2017 17:56 Duration 1:29:50 1078
16:26 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.953/1.74/1.98 Horizontal Vertical


11/6 0.005 0.009
Satellites PDOP/TDOP 4/1.289 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) -0.001

Res X (m) -0.001 Res Y (m) -0.001 Res Z (m) 0 Res D (m) 0

Page 43
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 44
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

From : AP-48- Rover


BASELINE To : AP-52-1 Base Antenna Type GR-3 1.687
1 Antenna Type

Distance (m) 3293.12 Azimuth 235°44'05.3144" ∆E -2706.016 ∆N -1876.585

Common
Start Time 8/27/2017 7:16 Stop Time 8/27/2017 8:12 Duration 0:55:55 671
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 1.021/1.832/2.0 Horizontal Vertical


9/5 0.002 0.004
Satellites PDOP/TDOP 98/1.395 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) -0.001

Res X (m) 0 Res Y (m) -0.001 Res Z (m) 0 Res D (m) 0

Rover
BASELINE From : AP-48 To : AP-48-1 Base Antenna Type GR-5/Atlas 1.352
Antenna Type

Distance (m) 167.405 Azimuth 1°44'07.1349" ∆E 3.218 ∆N 146.209

Common
Start Time 8/27/2017 7:16 Stop Time 8/27/2017 8:10 Duration 0:54:20 652
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 1.074/1.935/2.2 Horizontal Vertical


8/5 0.005 0.009
Satellites PDOP/TDOP 13/1.503 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.001 Res N (m) 0 Res El (m) -0.003

Res X (m) -0.002 Res Y (m) -0.003 Res Z (m) -0.001 Res D (m) 0.002

Rover
BASELINE From : AP-48 To : AP-52-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type

Distance (m) 3209.729 Azimuth 237°50'51.2062" ∆E -2702.801 ∆N -1730.377

Common
Start Time 8/27/2017 7:16 Stop Time 8/27/2017 8:10 Duration 0:54:20 652
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

Page 45
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

GPS/GLONASS HDOP/VDOP/ 1.102/2.049/2.3 Horizontal Vertical


8/5 0.005 0.009
Satellites PDOP/TDOP 27/1.604 Precision (m) Precision (m)

Orbit Broadcast Res E (m) -0.001 Res N (m) 0 Res El (m) 0.004

Res X (m) 0.002 Res Y (m) 0.003 Res Z (m) 0.001 Res D (m) 0.001

From : AP-43- Rover


BASELINE To : AP-52-1 Base Antenna Type GR-3 1.687
1 Antenna Type

Distance (m) 8899.704 Azimuth 221°59'17.5989" ∆E -5895.816 ∆N -6664.82

Common
Start Time 8/27/2017 9:06 Stop Time 8/27/2017 10:31 Duration 1:24:40 1016
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 1.085/1.89/2.17 Horizontal Vertical


9/7 0.003 0.006
Satellites PDOP/TDOP 9/1.47 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0.002

Res X (m) 0 Res Y (m) 0.001 Res Z (m) 0.001 Res D (m) 0

Rover
BASELINE From : AP-43 To : AP-43-1 Base Antenna Type GR-5/Atlas 1.555
Antenna Type

Distance (m) 26.733 Azimuth 25°10'43.5282" ∆E 11.138 ∆N 24.23

Common
Start Time 8/27/2017 9:06 Stop Time 8/27/2017 10:31 Duration 1:24:25 1013
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.88/1.508/1.74 Horizontal Vertical


9/7 0.001 0.001
Satellites PDOP/TDOP 6/1.073 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0

Res X (m) 0 Res Y (m) 0 Res Z (m) 0 Res D (m) 0

Rover
BASELINE From : AP-43 To : AP-52-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type

Distance (m) 8874.217 Azimuth 222°02'16.6600" ∆E -5884.678 ∆N -6640.59

Page 46
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Common
Start Time 8/27/2017 9:06 Stop Time 8/27/2017 10:31 Duration 1:24:25 1013
Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 1.085/1.89/2.18/ Horizontal Vertical


9/7 0.003 0.006
Satellites PDOP/TDOP 1.47 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) -0.002

Res X (m) 0 Res Y (m) -0.001 Res Z (m) -0.001 Res D (m) 0

Rover
BASELINE From : AP-40 To : AP-52-1 Base Antenna Type GR-3 1.687
Antenna Type

Distance (m) 13471.965 Azimuth 233°32'14.8518" ∆E -10761.125 ∆N -8102.64

8/27/2017 Common
Start Time Stop Time 8/27/2017 15:26 Duration 1:46:10 1274
13:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 1.221/2.41/2.70 Horizontal Vertical


10/8 0.007 0.013
Satellites PDOP/TDOP 1/1.898 Precision (m) Precision (m)

Orbit Broadcast Res E (m) -0.002 Res N (m) -0.004 Res El (m) -0.005

Res X (m) 0.002 Res Y (m) -0.002 Res Z (m) -0.006 Res D (m) 0.005

Rover
BASELINE From : AP-40 To : AP-40-1 Base Antenna Type GR-3 1.146
Antenna Type

Distance (m) 45.572 Azimuth 213°12'39.3364" ∆E -24.189 ∆N -37.686

8/27/2017 Common
Start Time Stop Time 8/27/2017 15:24 Duration 1:44:25 1253
13:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.923/1.658/1.8 Horizontal Vertical


10/8 0.001 0.002
Satellites PDOP/TDOP 97/1.189 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0 Res N (m) 0 Res El (m) 0

Res X (m) 0 Res Y (m) 0 Res Z (m) 0 Res D (m) 0

Page 47
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 48
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Rover
BASELINE From : AP-40 To : AP-52-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type

Distance (m) 13429.848 Azimuth 233°36'13.4141" ∆E -10736.932 ∆N -8064.946

8/27/2017 Common
Start Time Stop Time 8/27/2017 15:24 Duration 1:44:25 1253
13:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.966/1.748/1.9 Horizontal Vertical


10/8 0.005 0.009
Satellites PDOP/TDOP 97/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002

Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003

From : AP-40- Rover


ASELINE To : AP-52-1 Base Antenna Type GR-5/Atlas 1.687
1 Antenna Type

Distance (m) 13429.848 Azimuth 233°36'13.4141" ∆E -10736.932 ∆N -8064.946

8/27/2017 Common
Start Time Stop Time 8/27/2017 15:24 Duration 1:44:25 1253
13:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.966/1.748/1.9 Horizontal Vertical


10/8 0.005 0.009
Satellites PDOP/TDOP 97/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002

Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003

From : AP-40- Rover


To : AP-31 Base Antenna Type GR-5/Atlas 1.687
1 Antenna Type

ASELINE

Distance (m) 7829.2827 Azimuth 233°36'13.4141" ∆E 37.081 ∆N -5204.33

Start Time 8/28/2017 Stop Time 8/28/2017 15:24 Duration 1:16:25 Common 1253

Page 49
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

13:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.966/1.748/1.9 Horizontal Vertical


10/8 0.005 0.009
Satellites PDOP/TDOP 97/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002

Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003

Rover
BASELINE From : AP-31 To : AP-31-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type

Distance (m) 38.201 Azimuth 233°36'13.4141" ∆E -6495.76 ∆N -5.336

8/28/2017 Common
Start Time Stop Time 8/28/2017 12:24 Duration 1:16:25 1253
10:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.966/1.748/1.9 Horizontal Vertical


10/8 0.005 0.009
Satellites PDOP/TDOP 97/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002

Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003

From : AP-31- Rover


BASELINE To : AP-29-1 Base Antenna Type GR-5/Atlas 1.687
1 Antenna Type

Distance (m) 8518.7463 Azimuth 233°36'13.4141" ∆E 14.18 ∆N -5494.07

8/29/2017 Common
Start Time Stop Time 8/29/2017 11:24 Duration 1:44:25 1253
09:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.966/1.748/1.9 Horizontal Vertical


10/8 0.005 0.009
Satellites PDOP/TDOP 97/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002

Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003

Page 50
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 51
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

From : AP-29- Rover


BASELINE To : AP-29 Base Antenna Type GR-5/Atlas 1.687
1 Antenna Type

Distance (m) 39.5927 Azimuth 233°36'13.4141" ∆E -4688.34 ∆N -36.963

8/29/2017 Common
Start Time Stop Time 8/29/2017 15:24 Duration 1:44:25 1253
13:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.966/1.748/1.9 Horizontal Vertical


10/8 0.005 0.009
Satellites PDOP/TDOP 97/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002

Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003

Rover
BASELINE From : AP-29 To : AP-22-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type

8855.8226
Distance (m) Azimuth 233°36'13.4141" ∆E 14.18 ∆N -7448.83

8/30/2017 Common
Start Time Stop Time 8/30/2017 12:24 Duration 1:44:25 1253
10:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.966/1.748/1.9 Horizontal Vertical


10/8 0.002 0.009
Satellites PDOP/TDOP 97/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002

Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003

From : AP-22- Rover


BASELINE To : AP-22 Base Antenna Type GR-5/Atlas 1.687
1 Antenna Type

Distance (m) 49.432 Azimuth 233°36'13.4141" ∆E -48.61 ∆N 2.359

8/30/2017 Common
Start Time Stop Time 8/30/2017 15:14 Duration 1:44:15 1253
13:40 Epochs

Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted Elevation 15

Page 52
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Mask

GPS/GLONASS HDOP/VDOP/ 0.966/1.748/1.9 Horizontal Vertical


10/8 0.001 0.009
Satellites PDOP/TDOP 97/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002

Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003

Rover
BASELINE From : 22 To : AP-13 Base Antenna Type GR-5/Atlas 1.687
Antenna Type

Distance (m) 7097.799 Azimuth 233°36'13.4141" ∆E -3248.4 ∆N -6240.77

8/30/2017 Common
Start Time Stop Time 8/30/2017 17:24 Duration 1:44:25 1253
16:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.966/1.748/1.9 Horizontal Vertical


10/8 0.003 0.009
Satellites PDOP/TDOP 97/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002

Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003

Rover
BASELINE From : 13 To : AP-13-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type

Distance (m) 46.008 Azimuth 233°36'13.4141" ∆E 31.209 ∆N 33.505

8/31/2017 Common
Start Time Stop Time 8/31/2017 10:24 Duration 1:44:25 1253
08:40 Epochs

Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask

GPS/GLONASS HDOP/VDOP/ 0.966/1.748/1.9 Horizontal Vertical


10/8 0.005 0.009
Satellites PDOP/TDOP 97/1.299 Precision (m) Precision (m)

Orbit Broadcast Res E (m) 0.003 Res N (m) 0.003 Res El (m) 0.002

Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003

Page 53
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

9.7. GPS Observation Residuals


NAME dE(m) dN(m) dHt(m) Horz RMS (m) Vert RMS (m)

AP-13-13-1 31.209 33.505 -4.49 0.006 0.004

AP-22-AP-13 -3248.398 -6240.775 937.76 0.008 0.006


AP-22-1-AP-22 -48.61 2.359 -8.66 0.001 0.009
AP-29-AP-22-1 14.18 -7448.833 -979.76 0.005 0.047

AP-29-1-AP-29 -4688.342 -36.963 0.5 0.003 0.028


AP-31.1-AP-29.1 14.18 -5494.068 789.18 0.007 0.012
AP-31-AP-31.1 -6495.764 -5.336 -7.51 0.023 0.06

AP-40.1-AP-31 37.081 -5204.326 -805.77 0.06 0.05

AP-40−AP-40-1 -5857.813 48.212 8.46 0.001 0.002


AP-40−AP-52-1 20.309 8113.05 197.98 0.007 0.013
AP-40-1−AP-52-1 10756.84 8064.838 189.52 0.005 0.009
AP-43−AP-43-1 11.137 24.231 -2.01 0.001 0.001

AP-43−AP-52-1 5895.818 6664.82 154.17 0.003 0.006

AP-43-1−AP-52-1 5884.681 6640.589 156.18 0.003 0.006


AP-48−AP-48-1 -3.192 -146.203 81.46 0.005 0.009
AP-48−AP-52-1 -3.192 1730.383 55.11 0.005 0.009
AP-48-1−AP-52-1 2702.826 1876.586 -26.35 0.002 0.004

AP-52−AP-52-1 2706.018 13.546 22.99 0.001 0.002


AP-52−AP-60 -77.88 1932.321 134.24 0.005 0.01

AP-52-1−AP-60 9083.647 1918.775 111.25 0.005 0.009


AP-60−AP-60-1 9161.527 33.104 0.05 0.002 0.004

AP-60−AP-74-1 -44.293 2715.462 -570.15 0.007 0.013


AP-60-1−AP-74-1 18196.748 2682.358 -570.2 0.008 0.015
AP-64−AP-64-1 18241.041 -22.468 -0.03 0.002 0.004
AP-64−AP-74-1 11194.179 4161.86 -571.5 0.007 0.011

AP-64-1−AP-74-1 11254.242 4184.328 -571.47 0.008 0.014


AP-68−AP-68-1 -65.89 3.057 -0.45 0.006 0.008
AP-68−AP-74-1 4399.236 6780.475 -457.69 0.007 0.01

Page 54
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

NAME dE(m) dN(m) dHt(m) Horz RMS (m) Vert RMS (m)
AP-68-1−AP-74-1 4399.236 6777.418 -457.24 0.006 0.01
AP-74−AP-74-1 37.256 78.385 -5.87 0.002 0.004
AP-74−AP-90 5778.958 20097.337 885.54 0.011 0.015

AP-74-1−AP-90 5741.702 20018.952 891.41 0.008 0.014

AP-78−AP-78-1 -42.746 -1.204 -3.87 0.003 0.005


AP-78−AP-90 3999.233 12591.064 506.48 0.014 0.023
AP-78-1−AP-90 3999.233 12592.268 510.35 0.031 0.047
AP-84−AP-84-1 62.087 87.124 0.98 0.002 0.004

AP-84−AP-90 2079.083 7599.456 22.23 0.001 0.002

AP-84-1−AP-90 2016.996 7512.332 21.25 0.002 0.005


AP-89−AP-90 -100.557 94.712 -0.04 0.001 0.001

Page 55
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

ANNEXES
All the documents and maps are presented in the following Annexes:
Annex - A: List and Description Card of Angle Points
Annex - B: Ortho Imageries of Route Alignment
Annex - C: Traverse Computation Data
Annex -D Angle Point Location Map & Route Alignment Plan
Annex - E: Plan & Profile Drawing

Page 56
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Annex - A: List and Description Card of Angle Points

Page 57
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Annex A: 1
Table List of Angle Points

SN EASTING( in m) NORTHING( in m) ELEVATION ( in m) Ang. Point


1 627322.780 3186490.536 880.980 AP1
2 627258.507 3186429.700 879.740 AP1.1
3 627028.999 3186212.580 857.790 AP2
4 627015.150 3186221.208 856.920 AP2.1
5 626747.164 3185673.627 838.540 AP3
6 626760.189 3185701.563 837.740 AP3.1
7 626525.566 3185452.391 844.090 AP4.1
8 626489.197 3185405.145 837.800 AP4
9 626545.548 3185014.671 861.120 AP5
10 626571.571 3184888.653 857.500 AP5.1
11 626663.668 3184537.017 874.940 AP6.1
12 626651.157 3184524.714 874.420 AP6
13 626482.441 3184165.587 935.530 AP7.1
14 626469.669 3184151.806 934.420 AP7
15 625829.123 3183349.154 885.320 AP8.1
16 625820.407 3183329.981 885.780 AP8
17 625799.113 3182993.222 885.120 AP9.1
18 625829.209 3182957.692 884.910 AP9
19 626074.056 3182662.649 868.790 AP10
20 626083.507 3182652.543 866.980 AP10.1
21 626085.413 3182120.788 810.090 AP11
22 626053.029 3182086.071 809.810 AP11.1
23 625848.879 3181598.490 874.960 AP12
24 625871.480 3181600.906 887.950 AP12.1
25 626312.196 3180048.600 846.330 AP13
26 626280.987 3180015.095 850.820 AP13.1
27 626099.036 3179784.255 920.070 AP14
28 626035.322 3179732.145 917.220 AP14.1
29 626030.053 3179650.394 927.650 AP15
30 626037.168 3179635.428 929.140 AP15.1
31 625918.162 3178679.876 772.560 AP16.1
32 625945.748 3178692.827 773.920 AP16
33 625842.735 3177961.427 811.180 AP17.1
34 625850.884 3177946.798 817.960 AP17
35 624989.717 3177132.359 770.370 AP18.1
36 625017.900 3177180.347 779.220 AP18
37 624769.107 3176550.954 757.810 AP19.1
38 624759.026 3176573.948 757.880 AP19
39 624860.553 3175882.326 837.160 AP20

Page 58
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
SN EASTING( in m) NORTHING( in m) ELEVATION ( in m) Ang. Point
40 624894.575 3175878.002 836.320 AP20.1
41 624379.869 3175100.713 932.400 AP21
42 624389.782 3175075.102 939.510 AP21.1
43 623015.188 3173810.184 1775.430 AP22.1
44 623063.798 3173807.825 1784.090 AP22
45 621164.281 3173044.255 1392.180 AP23.1
46 621175.075 3173082.059 1410.570 AP23
47 620702.995 3172398.177 1280.350 AP24
48 620697.369 3172373.710 1279.610 AP24.1
49 620696.444 3171234.673 1155.260 AP25
50 620689.974 3171204.296 1156.310 AP25.1
51 620467.353 3170945.163 1080.620 AP26
52 620420.144 3170856.923 1077.200 AP26.1
53 620340.723 3170551.305 1034.190 AP27
54 620328.784 3170538.633 1032.460 AP27.1
55 619933.626 3169125.944 839.830 AP28.1
56 619921.419 3169147.534 838.600 AP28
57 618341.026 3166324.388 796.170 AP29
58 618326.846 3166361.351 795.670 AP29.1
59 615546.840 3165458.914 915.140 AP30
60 615537.369 3165487.194 906.850 AP30.1
61 611882.343 3160824.984 1577.840 AP31
62 611845.262 3160830.320 1585.350 AP31.1
63 611574.147 3160550.617 1447.240 AP32
64 611578.882 3160497.854 1432.200 AP32.1
65 609668.680 3159941.729 1187.410 AP33.1
66 609667.303 3159956.200 1187.560 AP33
67 608406.590 3159123.205 945.390 AP34
68 608391.616 3159058.907 922.690 AP34.1
69 608122.731 3158729.954 983.200 AP35
70 608103.029 3158737.641 986.050 AP35.1
71 608011.601 3158246.874 952.910 AP36
72 607994.661 3158238.621 951.740 AP36.1
73 608013.831 3157736.073 830.040 AP37
74 608003.556 3157723.805 836.060 AP37.1
75 607794.734 3157436.535 894.510 AP38
76 607774.427 3157451.937 904.610 AP38.1
77 607443.850 3156795.953 884.890 AP39.1
78 607426.835 3156832.861 890.540 AP39
79 606044.839 3155668.870 780.530 AP40
80 606024.530 3155620.658 772.070 AP40.1
81 605164.444 3155330.878 691.260 AP41

Page 59
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
SN EASTING( in m) NORTHING( in m) ELEVATION ( in m) Ang. Point
82 605167.950 3155303.127 685.400 AP41.1
83 604728.811 3154907.357 689.190 AP42
84 604757.088 3154927.253 688.160 AP42.1
85 601172.680 3154196.409 738.730 AP-43
86 601183.817 3154220.640 736.720 AP-43-1
87 599532.992 3151168.980 793.550 AP44
88 599536.453 3151147.141 793.300 AP44.1
89 599375.619 3150238.821 638.560 AP45.1
90 599380.831 3150271.205 634.480 AP45
91 599227.669 3149836.467 699.750 AP46.1
92 599224.390 3149817.357 710.990 AP46
93 598435.205 3149540.523 655.530 AP47.1
94 598463.368 3149556.128 658.530 AP47
95 597990.825 3149286.203 637.660 AP-48
96 597994.017 3149432.406 556.200 AP-48-1
97 596806.951 3148714.037 668.920 AP49
98 596837.317 3148683.941 664.010 AP49.1
99 596362.703 3148195.221 666.840 AP50.1
100 596362.751 3148210.863 672.270 AP50
101 595652.234 3147924.441 687.180 AP51
102 595629.804 3147922.875 682.730 AP51.1
103 595210.119 3147569.366 605.540 AP-52
104 595287.999 3147555.820 582.550 AP-52-1
105 595020.192 3147479.349 771.390 AP53.1
106 595039.117 3147460.348 777.870 AP53
107 592336.887 3146825.233 1147.250 AP54
108 592383.706 3146870.655 1146.440 AP54.1
109 591066.424 3146205.194 627.480 AP55
110 591050.322 3146213.432 618.560 AP55.1
111 590166.835 3146207.421 710.850 AP56
112 590164.763 3146280.935 669.410 AP56.1
113 589491.613 3145733.211 689.900 AP57.1
114 589481.746 3145748.664 680.350 AP57
115 588276.809 3145327.944 510.990 AP_58
116 588230.529 3145329.547 511.520 AP_58.1
117 587836.289 3145616.637 490.110 AP_59
118 587874.736 3145626.318 490.610 AP_59.1
119 586126.472 3145637.045 471.300 AP-60
120 586170.765 3145603.941 471.250 AP60.1
121 585708.240 3145449.433 528.240 AP_61
122 585718.346 3145455.325 525.220 AP_61.1
123 584299.307 3145521.006 536.540 AP_62

Page 60
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
SN EASTING( in m) NORTHING( in m) ELEVATION ( in m) Ang. Point
124 584299.965 3145579.287 535.300 AP_62.1
125 581374.810 3146209.987 494.570 AP_63
126 581313.050 3146227.665 494.490 AP_63.1
127 579123.903 3147083.443 469.950 AP-64
128 579183.966 3147105.911 469.980 AP64.1
129 577828.490 3147346.310 505.590 AP_65
130 577866.470 3147323.488 501.200 AP_65.1
131 576955.062 3148256.175 502.040 AP_66
132 576923.668 3148237.604 513.750 AP_66.1
133 574026.524 3149324.947 513.360 AP_67
134 573990.683 3149321.396 515.380 AP_67.1
135 572263.070 3149702.058 583.760 AP_68
136 572328.960 3149699.001 584.210 AP_68.1
137 570465.273 3149663.207 560.180 AP_69
138 570518.974 3149709.853 561.480 AP_69.1
139 569810.841 3149010.896 582.580 AP_70
140 569857.404 3148961.776 585.480 AP_70.1
141 569561.358 3148783.299 557.900 AP-71
142 569614.748 3148810.186 558.070 AP-71.1
143 569400.313 3148338.042 588.300 AP_72
144 569371.571 3148367.646 588.040 AP_72.1
145 568798.769 3147274.880 933.150 AP_73.1
146 568829.555 3147300.602 937.780 AP_73
147 567965.557 3142994.404 1035.580 AP_74
148 567928.522 3142915.919 1041.450 AP_74.1
149 567697.280 3141690.620 917.540 AP_75.1
150 567690.777 3141708.406 911.880 AP_75
151 567113.061 3141069.803 815.830 AP_76.1
152 567089.356 3141085.785 802.880 AP76
153 567168.033 3136940.031 551.030 AP77.1
154 567134.758 3136985.404 550.750 AP.77
155 566144.509 3135493.695 656.520 AP-78
156 566187.255 3135494.899 660.390 AP78.1
157 566439.617 3134872.660 609.620 AP.79
158 566438.605 3134837.852 600.120 AP.79.1
159 566558.766 3133761.328 315.350 AP.80.1
160 566528.769 3133767.091 325.140 AP.80
161 566224.302 3133135.454 322.370 AP81.1
162 566205.536 3133143.009 331.760 AP81
163 565800.501 3132332.925 209.350 AP82.1
164 565821.390 3132360.209 209.820 AP82
165 565595.681 3131449.867 217.380 AP83.1

Page 61
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
SN EASTING( in m) NORTHING( in m) ELEVATION ( in m) Ang. Point
166 565564.389 3131445.321 216.410 AP83
167 564267.105 3130502.087 172.270 AP84
168 564205.018 3130414.963 171.290 AP84-1
169 563731.163 3128712.400 160.970 AP85
170 563795.956 3128700.615 160.610 AP85.1
171 563844.108 3126568.414 156.100 AP86.1
172 563878.671 3126598.682 156.240 AP86
173 562774.533 3125179.879 158.060 AP87.1
174 562688.265 3125235.146 152.160 AP87
175 562848.140 3124318.896 152.150 AP88
176 562785.512 3124288.151 153.260 AP88.1
177 562087.465 3122997.343 150.040 AP89
178 562188.022 3122902.631 150.000 AP90
179 564969.673 3129976.392 170.260 AP100

Page 62
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Annex A: 2 Description Card (D-Card)

Page 63
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 64
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 65
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 66
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 67
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 68
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 69
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 70
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 71
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 72
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 73
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 74
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 75
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 76
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 77
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 78
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 79
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 80
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 81
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 82
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 83
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 84
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 85
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 86
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 87
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 88
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 89
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 90
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 91
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 92
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 93
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 94
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 95
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 96
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 97
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 98
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 99
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 100
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 101
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 102
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 103
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 104
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 105
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 106
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 107
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 108
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 109
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 110
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 111
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 112
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 113
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 114
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 115
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 116
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 117
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 118
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 119
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 120
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 121
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 122
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 123
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 124
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 125
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 126
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 127
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 128
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 129
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 130
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 131
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 132
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 133
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 134
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 135
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 136
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 137
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 138
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 139
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 140
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 141
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 142
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 143
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 144
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 145
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 146
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 147
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 148
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 149
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 150
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 151
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 152
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 153
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 154
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 155
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 156
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 157
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 158
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 159
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 160
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 161
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 162
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 163
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 164
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 165
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 166
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 167
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 168
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 169
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 170
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 171
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 172
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 173
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 174
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 175
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 176
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 177
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 178
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 179
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 180
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 181
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 182
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 183
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 184
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 185
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 186
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 187
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 188
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 189
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 190
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 191
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 192
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 193
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 194
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 195
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 196
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 197
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 198
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 199
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 200
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 201
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 202
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 203
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 204
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 205
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 206
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 207
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 208
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 209
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 210
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 211
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 212
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 213
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 214
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 215
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 216
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 217
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 218
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 219
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 220
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 221
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 222
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 223
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 224
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 225
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 226
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 227
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 228
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 229
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 230
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 231
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 232
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 233
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 234
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 235
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 236
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 237
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 238
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 239
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 240
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Annex – B: Ortho Photography of Route Alignment

Page 241
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 242
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 243
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 244
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 245
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 246
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 247
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 248
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 249
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 250
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 251
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 252
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 253
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 254
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 255
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 256
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 257
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 258
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 259
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 260
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Annex – C: Traverse Computation Data

Page 261
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Annex – C: Traverse Computation Data
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n

62698 31865 959.


1 NP2
9.403 56.896 96
124.8 359.1 62728 31863 905.
2 G100 70.7043 0.0003 70.7046
116 545 4.281 51.862 52
15.51 143.9 38.49 0.0 138. 0.0 138.67 62732 31864
3 AP-1 31.0578 0.0003 31.0581 38.497
62 189 98637 032 674 004 3 2.778 90.535
- -
226.5 88.49 0.0 - 0.0 - 62725 31864
4 AP-1.1 180.4172 0.0003 180.4175 64.27 60.8
743 88 032 64.277 004 60.836 8.501 29.7
3705 35
- -
226.9 115.5 0.0 - 0.0 - 62717 31863
5 TP-1 179.3660 0.0003 179.3663 84.52 78.8
918 933 032 84.531 004 78.847 3.969 50.853
8304 47
- - - -
226.3 200.3 0.0 0.0 62702 31862
6 AP-2 255.5663 0.0003 255.5666 144.9 144.98 138. 138.26
581 463 032 004 8.982 12.584
8408 7 269 9
-
301.9 16.31 0.0 - 8.62 0.0 62701 31862
7 AP-2.2 81.9267 0.0003 81.9270 13.84 8.628
247 68 032 13.852 8 004 5.130 21.212
8783
- - -
203.8 167.0 0.0 - 0.0 62694 31860
8 TP-2 179.5126 0.0003 179.5129 67.55 152. 152.79
517 671 032 67.560 004 7.570 68.413
7046 799 9
- -
203.3 104.4 0.0 - 0.0 - 62690 31859
9 TP-3 183.4694 0.0003 183.4697 41.41 95.8
646 4 032 41.422 004 95.876 6.148 72.536
8897 76
- - -
206.8 140.2 0.0 - 0.0 62684 31858
10 TP-4 182.7243 0.0003 182.7246 63.30 125. 125.13
343 321 032 63.306 004 2.842 47.405
2425 131 2

Page 262
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n

- - -
209.5 167.6 0.0 - 0.0 62676 31857
11 AP-3.1 175.4409 0.0003 175.4412 82.70 145. 145.82
589 486 032 82.707 004 0.135 01.575
4076 829 9
- -
205.0 30.82 0.0 - 0.0 - 62674 31856
12 AP-3 196.3369 0.0003 196.3372 13.02 27.9
001 32 032 13.030 004 27.936 7.105 73.64
6496 35
- -
221.3 112.6 0.0 - 0.0 - 62667 31855
13 TP-5 185.7955 0.0003 185.7958 74.42 84.6
373 874 032 74.432 004 84.610 2.673 89.03
8969 10
- - - -
227.1 200.8 0.0 0.0 62652 31854
14 AP-4.1 170.4590 0.0003 170.4593 147.1 147.18 136. 136.61
331 127 032 004 5.487 52.417
8286 6 612 3
- -
217.5 59.62 0.0 - 0.0 - 62648 31854
15 AP-4 135.4164 0.0003 135.4167 36.37 47.2
924 29 032 36.376 004 47.244 9.112 05.173
2358 43
- -
173.0 189.1 23.02 0.0 0.0 62651 31852
16 TP-6 179.9319 0.0003 179.9322 23.017 187. 187.73
091 399 05389 032 004 2.129 17.439
734 4
- -
172.9 159.7 19.62 0.0 0.0 62653 31850
17 TP-7 169.8447 0.0003 169.8450 19.625 158. 158.51
413 283 8396 032 004 1.754 58.921
518 8
-
162.7 46.29 13.70 0.0 0.0 - 62654 31850
18 AP-5 185.5426 0.0003 185.5429 13.697 44.2
863 59 06447 032 004 44.223 5.452 14.699
22
- -
168.3 128.6 26.02 0.0 0.0 62657 31848
19 AP-5.1 178.3384 0.0003 178.3387 26.027 126. 126.01
292 769 98213 032 004 1.478 88.682
017 7
20 TP-8 177.7936 0.0003 177.7939 166.6 141.5 32.64 0.0 32.639 - 0.0 - 62660 31847

Page 263
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n

679 543 17032 032 137. 004 137.74 4.117 50.942


739 0
- -
164.4 222.0 59.47 0.0 0.0 62666 31845
21 AP-6.1 241.0160 0.0003 241.0163 59.468 213. 213.89
618 063 12218 032 004 3.585 37.049
892 3
- -
225.4 17.54 0.0 - 0.0 - 62665 31845
22 AP-6 160.9547 0.0003 160.9550 12.51 12.3
781 68 032 12.514 004 12.304 1.071 24.745
0561 03
- - -
206.4 163.4 0.0 - 0.0 62657 31843
23 TP-9 176.4741 0.0003 176.4744 72.76 146. 146.36
331 57 032 72.766 004 8.305 78.377
3302 368 9
- -
202.9 78.12 0.0 - 0.0 - 62654 31843
24 TP-10 184.3255 0.0003 184.3258 30.40 71.9
075 08 032 30.411 004 71.960 7.893 06.416
8094 60
- -
207.2 110.6 0.0 - 0.0 - 62649 31842
25 TP-11 172.1277 0.0003 172.1280 50.61 98.3
333 102 032 50.620 004 98.349 7.273 08.067
6862 49
- -
199.3 44.99 0.0 - 0.0 - 62648 31841
26 AP-7.1 203.4616 0.0003 203.4619 14.91 42.4
613 91 032 14.921 004 42.455 2.352 65.612
828 54
- -
222.8 18.78 0.0 - 0.0 - 62646 31841
27 AP-7 172.7425 0.0003 172.7428 12.77 13.7
232 94 032 12.775 004 13.782 9.577 51.831
1876 81
- -
215.5 75.20 0.0 - 0.0 - 62642 31840
28 TP-12 189.0442 0.0003 189.0445 43.74 61.1
66 39 032 43.745 004 61.175 5.832 90.656
1624 74
224.6 100.5 - 0.0 - - 0.0 - 62635 31840
29 TP-13 169.5387 0.0003 169.5390
105 119 70.58 032 70.591 71.5 004 71.555 5.241 19.102

Page 264
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n

7852 54
- - -
214.1 146.2 0.0 - 0.0 62627 31838
30 TP-14 180.5607 0.0003 180.5610 82.07 120. 120.99
495 062 032 82.077 004 3.164 98.105
3461 997 7
- -
214.7 106.0 0.0 - 0.0 - 62621 31838
31 TP-15 182.2047 0.0003 182.2050 60.39 87.1
105 636 032 60.399 004 87.189 2.765 10.916
5815 88
- - - -
216.9 173.7 0.0 0.0 62610 31836
32 TP-16 182.0399 0.0003 182.0402 104.3 104.35 138. 138.90
155 363 032 004 8.410 72.009
5237 6 906 6
- - - -
218.9 211.4 0.0 0.0 62597 31835
33 TP-17 177.8937 0.0003 177.8940 132.9 132.97 164. 164.46
557 897 032 004 5.439 07.548
6766 1 461 2
- - -
216.8 134.5 0.0 - 0.0 62589 31833
34 TP-18 195.4468 0.0003 195.4471 80.66 107. 107.63
497 058 032 80.669 004 4.770 99.914
5543 633 3
- -
232.2 83.04 0.0 - 0.0 - 62582 31833
35 AP-8.1 152.1428 0.0003 152.1431 65.70 50.7
968 32 032 65.706 004 50.787 9.064 49.127
2898 87
- -
204.4 21.05 0.0 0.0 - 62582 31833
36 AP-8 155.2097 0.0003 155.2100 8.709 -8.713 19.1
399 12 032 004 19.165 0.351 29.962
6923 65
- -
179.6 142.7 0.872 0.0 0.0 62582 31831
37 TP-19 167.6264 0.0003 167.6267 0.869 142. 142.78
499 886 48971 032 004 1.221 87.176
786 6
- -
167.2 122.0 26.87 0.0 0.0 62584 31830
38 TP-20 225.8990 0.0003 225.8993 26.870 119. 119.02
766 154 32331 032 004 8.091 68.156
019 0

Page 265
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n

- -
213.1 89.59 0.0 - 0.0 - 62579 31829
39 AP-9.1 106.5519 0.0003 106.5522 49.02 74.9
759 35 032 49.030 004 74.990 9.061 93.166
6568 89
-
139.7 46.56 30.09 0.0 0.0 - 62582 31829
40 AP-9 177.3218 0.0003 177.3221 30.096 35.5
281 34 9311 032 004 35.528 9.157 57.639
27
- -
137.0 213.9 145.7 0.0 145.76 0.0 62597 31828
41 TP-21 187.3491 0.0003 187.3494 156. 156.59
502 437 72106 032 9 004 4.926 01.042
596 7
- -
144.3 170.3 99.17 0.0 0.0 62607 31826
42 AP-10 172.5139 0.0003 172.5142 99.175 138. 138.53
996 723 85964 032 004 4.102 62.513
529 0
-
136.9 13.82 9.444 0.0 0.0 - 62608 31826
43 AP-10.1 228.0755 0.0003 228.0758 9.442 10.0
138 66 92129 032 004 10.098 3.543 52.414
98
- - -
184.9 152.7 0.0 - 0.0 62607 31825
44 TP-22 167.3186 0.0003 167.3189 13.28 152. 152.12
896 006 032 13.284 004 0.259 00.292
1122 122 2
- -
172.3 274.9 36.80 0.0 0.0 62610 31822
45 TP-23 199.0553 0.0003 199.0556 36.801 272. 272.51
085 912 45936 032 004 7.060 27.775
517 7
- - -
191.3 109.4 0.0 - 0.0 62608 31821
46 AP-11 211.6411 0.0003 211.6414 21.56 107. 107.27
641 195 032 21.564 004 5.497 20.5
0356 274 5
- -
223.0 47.31 0.0 - 0.0 - 62605 31820
47 AP-11.1 162.4222 0.0003 162.4225 32.27 34.6
055 62 032 32.276 004 34.602 3.221 85.898
2892 02
48 TP-24 92.7598 0.0003 92.7601 205.4 72.55 - 0.0 - - 0.0 - 62602 31820

Page 266
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n

28 09 31.15 032 31.155 65.5 004 65.523 2.066 20.375


1654 23
-
118.1 20.35 17.94 0.0 0.0 62604 31820
49 TP-25 271.6264 0.0003 271.6267 17.942 9.61 -9.617
881 93 47192 032 004 0.008 10.757
7
- - -
209.8 174.5 0.0 - 0.0 62595 31818
50 TP-26 168.6561 0.0003 168.6564 86.78 151. 151.45
148 5415 032 86.791 004 3.216 59.307
7991 450 0
- - -
198.4 185.6 0.0 - 0.0 62589 31816
51 TP-27 176.9134 0.0003 176.9137 58.82 176. 176.10
712 665 032 58.828 004 4.389 83.206
4334 102 2
- -
195.3 85.93 0.0 - 0.0 - 62587 31816
52 AP-12.1 248.5117 0.0003 248.5120 22.79 82.8
849 15 032 22.801 004 82.853 1.588 00.353
7801 52
- -
263.8 22.71 0.0 - 0.0 62584 31815
53 AP-12 78.1354 0.0003 78.1357 22.59 2.41 -2.416
969 98 032 22.594 004 8.994 97.937
1029 6
- -
162.0 240.4 74.16 0.0 0.0 62592 31813
54 TP-28 185.3025 0.0003 185.3028 74.163 228. 228.71
326 282 62849 032 004 3.157 69.225
712 2
- -
167.3 163.7 35.89 0.0 0.0 62595 31812
55 TP-29 174.2753 0.0003 174.2756 35.895 159. 159.75
354 372 83056 032 004 9.052 09.471
754 4
- -
161.6 393.9 124.2 0.0 124.26 0.0 62608 31808
56 TP-30 180.2330 0.0003 180.2333 373. 373.61
11 227 69557 032 6 004 3.318 35.853
618 8
161.8 540.3 168.3 0.0 168.35 - 0.0 - 62625 31803
57 TP-31 185.6832 0.0003 185.6835
443 107 6099 032 8 513. 004 513.41 1.676 22.442

Page 267
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n

410 1
- -
167.5 281.0 60.68 0.0 0.0 62631 31800 846.
58 AP-13 235.4404 0.0003 235.4407 60.684 274. 274.37
278 046 7408 032 004 2.196 48.6 33
373 3
222.9 62628 31800 850.
59 AP-13.1
685 0.987 15.095 82
9998.139
M=
8
T(last bearing = first - - -
9998.156 7485. 6303.2
bearing+sum of obs angle - total 971.7 6303 972.0
8 46135 62
(2n+4*90°)= 4293 .773 85
E= + 0.0170
-
correction 0.342
0.0003 error= 0.51
error = 06686
126
-
0.00
8969
7485. 0.006
46135 00117
12168
Accuracy
.7156

Page 268
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
Station ted Bearin Disanc Corr(- correcte Diff Corr(- correcte Elevat
S,No. Hz.Angle Corr.(+) Diff.East Easting Northing
Name H.Angl g e ) d ΔE North ) d ΔN ion
e

626312. 3180048 846.3


1 AP-13
196 .6 3
171.24 222.9 626280. 3180015 850.8
2 AP13.1 171.2439 0.000717647
46 68 987 .095 2
- - -
187.36 214.2 133.28 0.000 0.000 626206. 3179904
3 TP-1 187.3671 0.000717647 74.94234 74.9426 110.22 -110.223
78 126 64 322 667 044 .872
48 665 2
- - -
189.14 221.5 161.20 0.000 0.000 626099. 3179784
4 AP-14 189.1421 0.000717647 106.9850 106.985 120.58 -120.584
28 804 2 322 667 059 .288
642 386 3
- - -
132.96 230.7 82.309 0.000 0.000 626035. 3179732
5 AP-14.1 132.9665 0.000717647 63.71586 63.7161 52.107 -52.1083
72 233 9 322 667 343 .18
292 846 7
- - -
150.88 183.6 81.920 0.000 0.000 626030. 3179650
6 AP-15 150.8854 0.000717647 5.272928 5.27325 81.750 -81.7514
61 905 6 322 667 07 .429
736 041 7
-
208.82 154.5 16.571 7.114085 0.000 7.11376 0.000 626037. 3179635
7 AP-15.1 208.823 0.000717647 14.966 -14.9671
37 766 2 951 322 4279 667 183 .462
4
- - -
185.12 183.4 106.43 0.000 0.000 626030. 3179529
8 TP-2 185.12 0.000717647 6.312835 6.31315 106.24 -106.248
07 003 49 322 667 87 .213
16 683 8
- -
164.55 188.5 312.19 0.000 - 0.000 625984. 3179220
9 TP-3 164.5563 0.000717647 46.25888 46.2592 -308.751
7 21 66 322 308.75 667 611 .462
845 101
203.11 173.0 221.56 26.70281 0.000 26.7024 - 0.000 626011. 3179000
10 TP-4 203.1125 0.000717647 -219.954
32 78 83 505 322 9338 219.95 667 313 .508

Page 269
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
Station ted Bearin Disanc Corr(- correcte Diff Corr(- correcte Elevat
S,No. Hz.Angle Corr.(+) Diff.East Easting Northing
Name H.Angl g e ) d ΔE North ) d ΔN ion
e

3
- - -
48.657 196.1 333.81 0.000 0.000 625918. 3178679
11 AP-16.1 48.6569 0.000717647 93.08170 93.0820 320.57 -320.573
62 913 21 322 667 231 .936
089 226 2
306.78 64.84 30.474 27.58548 0.000 27.5851 12.952 0.000 12.9513 625945. 3178692
12 AP-16 306.7887 0.000717647
94 888 8 228 322 606 01 667 4 817 .887
- - -
171.42 191.6 160.60 0.000 0.000 625913. 3178535
13 TP-5 171.4238 0.000717647 32.39926 32.3995 157.30 -157.304
45 383 5 322 667 417 .583
158 833 3
- - -
187.20 183.0 0.000 0.000 625899. 3178274
14 TP-6 187.2013 0.000717647 261.71 13.98334 13.9836 261.33 -261.337
2 628 322 667 433 .247
7 687 6
- - -
140.61 190.2 0.000 0.000 625842. 3177961
15 AP-17.1 140.6161 0.000717647 317.71 56.61535 56.6156 312.62 -312.626
68 648 322 667 818 .621
996 816 5
-
259.04 150.8 16.705 8.129199 0.000 8.12887 0.000 625850. 3177947
16 AP-17.1 259.0406 0.000717647 14.594 -14.595
13 816 6 579 322 7907 667 946 .026
3
- - -
176.17 229.9 72.904 0.000 0.000 625795. 3177900
17 TP-7 176.1706 0.000717647 55.78472 55.7850 46.936 -46.9376
13 23 1 322 667 161 .089
355 452 9
- - -
185.64 226.0 0.000 0.000 625419. 3177538
18 TP-8 185.6466 0.000717647 521.92 376.0339 376.034 361.93 -361.938
73 943 322 667 127 .15
197 241 8
- - -
173.98 231.7 230.03 0.000 0.000 625238. 3177395
19 TP-9 173.9802 0.000717647 180.6280 180.628 142.43 -142.439
09 416 31 322 667 499 .711
074 329 9

Page 270
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
Station ted Bearin Disanc Corr(- correcte Diff Corr(- correcte Elevat
S,No. Hz.Angle Corr.(+) Diff.East Easting Northing
Name H.Angl g e ) d ΔE North ) d ΔN ion
e

- - -
164.70 225.7 0.000 0.000 625017. 3177180
20 AP-18 164.7003 0.000717647 308.08 220.5751 220.575 215.08 -215.082
1 225 322 667 923 .629
628 485 1
- - -
175.87 210.4 0.000 0.000 624989. 3177132
21 AP-18.1 175.8738 0.000717647 55.61 28.16023 28.1605 47.952 -47.9535
45 235 322 667 763 .676
75 592 8
- - -
170.96 206.2 0.000 0.000 624835. 3176821
22 TP-10 170.9621 0.000717647 347.51 153.9610 153.961 311.54 -311.544
28 981 322 667 801 .132
826 404 3
- - -
139.06 197.2 258.43 0.000 0.000 624759. 3176574
23 AP-19 139.0651 0.000717647 76.68280 76.6831 246.79 -246.794
58 609 25 322 667 118 .337
551 272 4
-
197.83 156.3 25.106 10.08091 0.000 10.0805 0.000 624769. 3176551
24 AP-19.1 197.834 0.000717647 22.994 -22.9947
47 267 8 296 322 9129 667 199 .343
1
-
169.91 174.1 365.50 37.18110 0.000 37.1807 0.000 624806. 3176187
25 TP-11 169.9107 0.000717647 363.60 -363.606
14 614 1 835 322 8668 667 38 .737
5
-
293.17 164.0 88.25472 0.000 88.2544 0.000 624894. 3175878
26 AP-20.1 293.172 0.000717647 321.61 309.26 -309.264
27 728 391 322 0223 667 634 .473
4
- -
112.55 277.2 34.215 0.000 4.3153 0.000 4.31467 624860. 3175882
27 AP-20 112.5507 0.000717647 33.94247 33.9428
14 455 7 322 45 667 8 691 .787
968 014
- - -
189.58 209.7 350.20 0.000 0.000 624686. 3175578
28 TP-12 189.5871 0.000717647 174.0257 174.026 303.90 -303.904
78 97 32 322 667 665 .883
41 063 3

Page 271
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
Station ted Bearin Disanc Corr(- correcte Diff Corr(- correcte Elevat
S,No. Hz.Angle Corr.(+) Diff.East Easting Northing
Name H.Angl g e ) d ΔE North ) d ΔN ion
e

- - -
162.58 219.3 353.11 0.000 0.000 624462. 3175305
29 TP-13 162.58 0.000717647 224.0585 224.058 272.92 -272.922
07 848 21 322 667 606 .961
17 839 1
- - -
136.87 201.9 220.70 0.000 0.000 624380. 3175101
30 AP-21 136.8708 0.000717647 82.55362 82.5539 204.68 -204.683
15 655 32 322 667 052 .278
082 425 2
-
250.37 158.8 27.411 9.896016 0.000 9.89569 0.000 624389. 3175075
31 AP-21.1 250.3774 0.000717647 25.562 -25.5631
81 37 1 58 322 4908 667 948 .715
4
- -
176.03 229.2 389.99 0.000 - 0.000 624094. 3174820
32 TP-14 176.0366 0.000717647 295.2879 295.288 -254.75
73 151 02 322 254.75 667 66 .965
321 254
- - -
180.89 225.2 0.000 0.000 623825. 3174554
33 TP-15 180.8938 0.000717647 378.71 268.9656 268.966 266.60 -266.607
45 524 322 667 694 .358
904 012 6
- - -
178.61 226.1 644.71 0.000 0.000 623360. 3174107
34 TP-16 178.6101 0.000717647 464.9140 464.914 446.66 -446.664
08 47 18 322 667 779 .694
853 407 3
- - -
228.02 224.7 421.39 0.000 0.000 623063. 3173807 1784.
35 AP-22 228.0198 0.000717647 296.7113 296.711 299.23 -299.231
05 578 84 322 667 798 .825 09
25 647 1
272.7 623015. 3173810 1775.
36 AP-22.1
783 188 .184 43
-
7563.6
Total 6206.6
706
1
M 6169.786 6169.8 M - 6207.2

Page 272
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
Station ted Bearin Disanc Corr(- correcte Diff Corr(- correcte Elevat
S,No. Hz.Angle Corr.(+) Diff.East Easting Northing
Name H.Angl g e ) d ΔE North ) d ΔN ion
e

1 3216.908 7
58
0.6599
T 6169.81 T 3217.199
72
0.290420 0.0194
E -0.0241 E 6207.27
493 11
0.008541
779

-87.2461
272.7539
-0.0244
-0.00072
ACCUR 10489.85
ACY 566

Page 273
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Disanc Corr(- correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g e ) d ΔE North ) d ΔN ion
e

623063. 3173807 1784.


1 AP-22
798 .825 09
146.6 272.7 623015. 3173810 1775.
2 AP-22.1 146.6872 0.000857
881 783 188 .184 43
- -
190.6 239.4 219.67 0.000 - 0.000 622825. 3173698
3 TP-1 190.6852 0.000857 189.2109 111.6032 -111.603
861 664 26 547 189.211 152 977 .581
029 5
- -
177.1 250.1 608.66 0.000 - 0.000 622253. 3173491
4 TP-2 177.1563 0.000857 572.5068 206.6514 -206.651
572 525 16 547 572.507 152 469 .93
705 616
- -
184.7 247.3 0.000 - 0.000 621755. 3173283
5 TP-3 184.7451 0.000857 540.02 498.2242 208.3126 -208.312
46 097 547 498.225 152 244 .617
929 361
- -
177.2 252.0 342.04 0.000 - 0.000 621429. 3173178
6 TP-4 177.2615 0.000857 325.4068 105.3814 -105.381
624 557 51 547 325.407 152 837 .236
214 549
- -
126.6 249.3 272.23 0.000 0.000 621175. 3173082
7 AP-23 126.6163 0.000857 254.6898 -254.69 96.14734 -96.1472
172 181 38 547 152 147 .089
693 703
- -
202.0 195.9 39.314 0.000 - 0.000 621164. 3173044
8 AP23.1 202.0113 0.000857 10.79394 37.80402 -37.8039
122 353 8 547 10.7945 152 352 .285
504 425
- -
181.3 217.9 240.50 0.000 - 0.000 621016. 3172854
9 TP-5 181.3968 0.000857 147.8945 189.6543 -189.654
977 475 27 547 147.895 152 457 .631
294 089
10 TP-6 172.1351 0.000857 172.1 219.3 211.25 - 0.000 - - 0.000 -163.368 620882. 3172691

Page 274
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Disanc Corr(- correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g e ) d ΔE North ) d ΔN ion
e

36 452 133.9306 547 133.931 163.3681 152 526 .263


303 388
- -
161.4 211.4 343.60 0.000 - 0.000 620703. 3172398
11 AP-24 161.4674 0.000857 179.4352 293.0275 -293.027
683 812 17 547 179.436 152 09 .235
56 024
- -
167.5 192.9 25.105 0.000 - 0.000 620697. 3172373
12 AP24.1 167.5621 0.000857 5.625945 24.46701 -24.4669
63 495 5 547 5.62649 152 463 .768
869 582
- -
178.0 180.5 0.000 - 0.000 620695. 3172172
13 TP-7 178.0234 0.000857 201.51 1.802445 201.5019 -201.502
243 125 547 1.80299 152 66 .267
114 387
-
180.4 178.5 399.51 10.20167 0.000 10.2011 0.000 620705. 3171772
14 TP-8 180.4378 0.000857 399.3890 -399.389
387 368 93 813 547 3 152 862 .878
294
-
183.9 178.9 215.72 3.857195 0.000 3.85664 0.000 620709. 3171557
15 TP-9 183.9571 0.000857 215.6930 -215.693
58 755 75 915 547 9 152 718 .185
14
- -
178.6 182.9 0.000 - 0.000 620700. 3171372
16 TP-10 178.6144 0.000857 184.51 9.442643 184.2682 -184.268
153 335 547 9.44319 152 275 .917
9 191
- -
190.4 181.5 0.000 - 0.000 620696. 3171234
17 AP-25 190.474 0.000857 138.11 3.732887 138.0595 -138.059
749 488 547 3.73344 152 542 .857
838 439
- -
211.6 192.0 0.000 - 0.000 620690. 3171204
18 AP-25.1 211.6403 0.000857 31.051 6.468428 30.36978 -30.3696
412 237 547 6.46898 152 073 .488
716 813
19 TP-11 175.5464 0.000857 175.5 223.6 111.62 - 0.000 - - 0.000 -80.7479 620613. 3171123

Page 275
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Disanc Corr(- correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g e ) d ΔE North ) d ΔN ion
e

473 649 45 77.06995 547 77.0705 80.74807 152 002 .74


104 519
- -
168.9 219.2 230.23 0.000 - 0.000 620467. 3170945
20 AP-26 168.9345 0.000857 145.5507 178.3852 -178.385
354 122 1 547 145.551 152 451 .355
253 565
- -
155.8 208.1 0.000 - 0.000 620420. 3170857
21 AP-26.1 155.8784 0.000857 100.01 47.17917 88.18234 -88.1822
793 476 547 47.1797 152 271 .173
435 295
- -
195.9 184.0 108.26 0.000 - 0.000 620412. 3170749
22 TP-12 195.9437 0.000857 7.602700 107.9950 -107.995
446 269 23 547 7.60325 152 668 .178
091 21
- -
203.3 199.9 0.000 - 0.000 620340. 3170551
23 AP-27 203.3215 0.000857 210.21 71.79778 197.5685 -197.568
224 715 547 71.7983 152 87 .609
891 238
- -
153.6 223.2 17.410 0.000 - 0.000 620328. 3170538
24 AP-27.1 153.6545 0.000857 11.93895 12.67201 -12.6719
554 939 3 547 11.9395 152 93 .937
421 32
- -
181.7 196.9 143.51 0.000 - 0.000 620287. 3170401
25 TP-13 181.7561 0.000857 41.83855 137.2821 -137.282
57 493 6 547 41.8391 152 091 .655
551 093
- -
173.8 198.7 0.000 - 0.000 620209. 3170173
26 TP-14 173.8848 0.000857 241.4 77.42111 228.6480 -228.648
857 063 547 77.4217 152 669 .008
756 495
- -
183.7 192.5 391.55 0.000 - 0.000 620124. 3169790
27 TP-15 183.7852 0.000857 85.36087 382.1332 -382.133
861 92 11 547 85.3614 152 308 .875
11 04
28 TP-16 182.375 0.000857 182.3 196.3 356.12 - 0.000 - - 0.000 -341.673 620023. 3169449

Page 276
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Disanc Corr(- correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g e ) d ΔE North ) d ΔN ion
e

759 781 42 100.4180 547 100.419 341.6733 152 889 .201


36 292
- -
131.7 198.7 318.21 0.000 - 0.000 619921. 3169147
29 AP--28 131.7619 0.000857 102.3066 301.3164 -301.316
628 54 1 547 102.307 152 582 .885
098 418
-
255.8 150.5 12.16147 0.000 12.1609 0.000 619933. 3169126
30 AP-28.1 255.85 0.000857 24.71 21.51005 -21.5099
509 168 962 547 3 152 743 .375
61
- -
163.0 226.3 70.523 0.000 - 0.000 619882. 3169077
31 TP-17 163.0709 0.000857 51.04356 48.66302 -48.6629
718 677 3 547 51.0441 152 699 .712
419 907
- -
181.8 209.4 286.75 0.000 - 0.000 619741. 3168827
32 TP-18 181.801 0.000857 140.9411 249.7274 -249.727
019 395 46 547 140.942 152 757 .985
064 618
- -
176.0 211.2 0.000 - 0.000 619465. 3168372
33 TP-19 176.0434 0.000857 532.21 276.0280 455.0340 -455.034
443 414 547 276.029 152 729 .951
19 832
- -
181.0 207.2 492.40 0.000 - 0.000 619239. 3167935
34 TP-20 181.0408 0.000857 225.7317 437.6151 -437.615
417 857 41 547 225.732 152 996 .336
072 209
- -
183.0 208.3 755.55 0.000 0.000 618881. 3167270
35 TP-21 183.0695 0.000857 358.5197 -358.52 665.0812 -665.081
704 274 9 547 152 476 .255
094 134
- -
127.6 211.3 1064.2 0.000 - 0.000 618326. 3166361 795.6
36 AP-29 127.6131 0.000857 554.4636 908.4357 -908.436
14 978 77 547 554.464 152 846 .351 7
869 724
37 AP-29.1 159.0 618341. 3166324 796.1

Page 277
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Disanc Corr(- correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g e ) d ΔE North ) d ΔN ion
e

118 026 .388 7

- -
6458. 9467.8
Total =(M) 6186.204 4688.157 7448.369
982 24
392 776
-
0.184607 0.463223
T= 6458.982 201.0
662 668
18
158.9 0.005274 0.013234
E= -201.018
818 505 962
158.9818
-0.03
Accura 18986.74
-0.00086
cy = 722

Page 278
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission
Line
Cor
S
rect
, correc
Station ed Diff.Eas correcte Diff Corr( Eastin Northi Elevatio
N Hz.Angle Corr.(-) Bearing Disance Corr(-) ted
Name H.A t d ΔE North +) g ng n
o ΔN
ngl
.
e

31663
61832
1 AP-29 61.35 795.67
6.846
1
273 31663
159.011 61834
2 AP29.1 273.8864 0.0025 .88 24.38 796.17
8 1.026
39 8
179 - 31662
252.895 345.787 - - 0.000 61801
3 TP-1 179.9317 0.0025 .92 0.00001 -330.494 101.7 22.68
7 8 330.494 101.7 1 0.532
92 00 8
179 - -
252.824 - 0.000 61801 31660
4 TP-2 179.6406 0.0025 .63 521.88 0.00001 -498.608 154.1 154.1
9 498.608 1 0.532 68.58
81 07 07
182 - - 31657
1006.85 - 0.000 61705
5 TP-3 182.0196 0.0025 .01 252.463 0.00001 -960.056 303.3 303.3 65.19
2 960.056 1 0.476
71 86 86 4
178 - - 31656
254.480 - 0.000 61646
6 TP-4 178.0253 0.0025 .02 606.6 0.00001 -584.482 162.3 162.3 02.88
1 584.482 1 5.994
28 1 10 5
191 - - 31654
252.502 353.320 - 0.000 61612
7 TP-5 191.698 0.0025 .69 0.00001 -336.973 106.2 106.2 96.65
9 2 336.973 1 9.021
55 28 28 6
AP- 77. 264.198 - 0.000 61603 31654
8 77.2883 0.0025 93.4102 -92.932 0.00001 -92.932 -9.442
30.1 285 4 9.442 1 6.089 87.21

Page 279
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8 28 4
236 - - 31654
AP- 161.484 0.000 61604
9 236.3087 0.0025 .30 29.812 9.467 0.00001 9.467 28.26 28.26 58.94
30.1 2 1 5.557
62 88 9 5
180 - - 31645
1 217.790 1128.71 - 0.000 61535
TP6 180.8447 0.0025 .84 0.00001 -691.647 891.9 891.9 66.97
0 4 3 691.647 1 3.91
22 74 74 1
180 - - 31639
1 218.632 - 0.000 61485
TP7 180.7593 0.0025 .75 792.91 0.00001 -495.033 619.3 619.3 47.57
1 6 495.033 1 8.877
68 94 94 8
178 - - 31634
1 219.389 622.708 - 0.000 61446
TP8 178.9465 0.0025 .94 0.00001 -395.163 481.2 481.2 66.31
2 4 6 395.163 1 3.714
4 61 61 7
178 - - 31628
1 218.333 759.990 - 0.000 61399
TP9 178.7272 0.0025 .72 0.00001 -471.374 596.1 596.1 70.16
3 4 1 471.374 1 2.34
47 48 47 9
182 - - 31623
1 217.058 - 0.000 61357
TP10 182.1833 0.0025 .18 688.12 0.00001 -414.678 549.1 549.1 21.03
4 1 414.678 1 7.662
08 37 37 2
177 - -
1 219.238 - 0.000 61322 31618
TP11 177.9434 0.0025 .94 552.31 0.00001 -349.367 427.7 427.7
5 9 349.367 1 8.296 93.26
09 72 72
183 - - 31612
1 217.179 - 0.000 61272
TP12 183.2039 0.0025 .20 836.119 0.00001 -505.282 666.1 666.1 27.08
6 8 505.282 1 3.014
14 72 72 8
237 - - 31608
1 220.381 - 0.000 61188
AP31 237.81 0.0025 .80 527.695 0.00001 -341.878 401.9 401.9 24.98 1577.84
7 2 341.878 1 2.343
75 72 72 4
1 278.188 61184 31608
AP31.1 1585.35
8 7 5.262 30.32
- -
8866.22
6458.49 5499.
8
8 27
TOTAL 2999.217 0.185 0.130

Page 280
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
555
0.008
3158.229 0.000
16
36
3240
-81.7713
278.2287
0.04
Accur 39096
0.0025
acy = .6858

Traverse Calculation of Nalgad Hydropower


Project, Transmission Line
E
l
E
e
Correct correc as
S,N Distanc correcte Nort v
Station Name Hz.Angle Corr.(-) ed Bearing Diff.East Corr(+) Diff North Corr(+) ted ti
o. e d ΔE hing a
H.Angle ΔN n
ti
g
o
n

6
1 1
1 5
316
8 7
082
AP31 8 7
4.98
2. .
4
3 8
4 4
3

Page 281
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
6
1 1
1 5
8 316 8
127.195 278.188
AP-31.1 127.1963 0.001 4 083 5
2 7
5. 0.32 .
2 3
6 5
2
6
1
1
316
- - 6
176.505 225.383 3.13697 065
TP-1 176.5067 0.001 247.256 -176.004 0.0002 176.003 -173.6609933 173.6 6
6 9 E-05 6.65
7365 61 9.
9
2
5
8
6
1
1
316
- 5
132.969 221.889 142.446 3.13697 055
AP-32 132.9710 0.001 -95.111 0.0002 -95.1108 -106.0419788 106.0 7
9 5 5 E-05 0.61
42 4.
7
1
4
7
6
1
1
- 316
262.079 174.859 4.74071 4.74092 3.13697 5
AP-32.1 262.0804 0.001 52.91 0.0002 -52.69718876 52.69 049
3 4 7 6202 E-05 7
72 7.92
8.
8
8

Page 282
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8
6
1
0 316
- -
175.081 256.938 3.13697 8 031
TP-2 175.0827 0.001 788.6 -768.198 0.0002 768.197 -178.2179413 178.2
6 7 E-05 1 9.70
8936 18
0. 2
6
9
6
1
0 316
- -
178.780 252.020 3.13697 1 010
TP-3 178.7818 0.001 704.61 -670.201 0.0002 670.200 -217.4985372 217.4
7 3 E-05 4 2.20
9831 99
0. 4
4
9
6
0
9
315
- - 7
192.834 250.801 416.690 3.13697 996
TP-4 192.8355 0.001 -393.515 0.0002 393.514 -137.0283959 137.0 4
4 1 5 E-05 5.17
9638 28 6.
5
9
7
5
6
0
9 315
- -
263.635 3.13697 6 995
AP-33 90.9300 0.001 90.9289 80.0957 -79.602 0.0002 79.6018 -8.878920963 8.878
5 E-05 6 6.29
3787 89
7. 6
3
7

Page 283
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
3
6
0
9 315
-
243.378 174.564 1.37699 1.37720 3.13697 6 994
AP-33.1 243.3799 0.001 14.5364 0.0002 -14.47103336 14.47
8 4 6 5503 E-05 6 1.82
1
8. 5
7
5
6
0
9
- - 4 315
179.918 237.943 276.801 3.13697
TP-5 179.9197 0.001 -234.595 0.0002 234.594 -146.9149749 146.9 3 979
6 2 1 E-05
8441 15 4. 4.91
1
5
5
6
0
9
315
- - 0
176.025 237.861 3.13697 952
TP-6 176.0261 0.001 509.034 -431.033 0.0002 431.033 -270.7875069 270.7 0
0 8 E-05 4.12
1296 87 3.
3
1
2
2
6
0
- - 8 315
185.367 233.886 3.13697
TP-7 185.3685 0.001 422.82 -341.577 0.0002 341.576 -249.2027538 249.2 6 927
4 8 E-05
634 03 6 4.92
1.
5

Page 284
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
4
5
6
0
8
315
- - 4
133.855 239.254 3.13697 912
AP34 133.8566 0.001 296.51 -254.834 0.0002 254.833 -151.5848331 151.5 0
5 2 E-05 3.33
4982 85 6.
5
7
1
2
6
0
8
315
- - 3
213.746 193.109 3.13697 905
AP34.1 213.7480 0.001 66.0186 -14.9741 0.0002 14.9738 -64.29799347 64.29 9
9 7 E-05 9.03
8768 8 1.
7
7
3
8
6
0
8
- - 2 315
163.575 226.856 3.13697
TP-8 163.5769 0.001 230.61 -168.263 0.0002 168.263 -157.6972161 157.6 2 890
8 6 E-05
156 97 3. 1.34
4
7
5
6
0 315
- -
260.881 210.432 3.13697 8 873
AP-35 260.8827 0.001 198.55 -100.57 0.0002 100.569 -171.1952016 171.1
6 4 E-05 1 0.14
6939 95
2 5
2.

Page 285
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
9
0
5
6
0
8
315
- 1
3.13697 7.687 873
AP-35.1 77.4782 0.001 77.4771 291.314 21.1485 -19.702 0.0002 19.7017 7.687044445 0
E-05 076 7.83
804 3.
2
2
0
3
6
0
8
315
- - 0
191.510 188.791 3.13697 847
TP-9 191.5117 0.001 267.32 -40.8553 0.0002 40.8551 -264.1795306 264.1 6
6 1 E-05 3.65
2088 79 2.
3
3
4
8
6
0
8
315
- - 0
158.952 200.301 3.13697 833
TP-10 158.9534 0.001 148.91 -51.6665 0.0002 51.6662 -139.6594633 139.6 1
3 7 E-05 3.99
4421 59 0.
3
6
8
2
6
315
- 0
244.771 179.254 1.12898 1.12919 3.13697 824
AP-36 244.7722 0.001 86.72 0.0002 -86.71265067 86.71 8
1 1 8 7104 E-05 7.28
26 0
1
1

Page 286
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
1.
8
1
1
6
0
7
315
- - 9
106.504 244.025 3.13697 823
AP-36.1 106.5055 0.001 18.8435 -16.9401 0.0002 16.9398 -8.253006732 8.252 9
4 2 E-05 9.02
4296 98 4.
8
8
7
1
6
0
8
315
- 0
190.488 170.529 28.0472 28.0474 3.13697 807
TP-11 190.4895 0.001 170.46 0.0002 -168.1367435 168.1 2
4 6 3 3896 E-05 0.89
37 2.
1
9
1
9
6
0
8
315
- - 0
180.757 3.13697 795
TP-12 180.7582 0.001 181.018 112.61 -2.00065 0.0002 2.00044 -112.5922266 112.5 2
1 E-05 8.29
5385 92 0.
9
9
1
8
6 315
- -
218.172 181.775 3.13697 0 773
AP-37 218.1737 0.001 221.91 -6.87394 0.0002 6.87372 -221.8035101 221.8
6 1 E-05 8 6.49
768 03
0 5

Page 287
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
1
4.
0
4
5
6
0
8 315
- -
174.820 219.947 3.13697 0 772
AP-37.1 174.8218 0.001 16.0025 -10.275 0.0002 10.2748 -12.26801042 12.26
7 7 E-05 0 4.22
0534 8
3. 7
7
7
6
0
7
- - 8 315
194.525 214.768 3.13697
TP-13 194.5261 0.001 225.91 -128.828 0.0002 128.827 -185.5768788 185.5 7 753
0 4 E-05
3892 77 4. 8.65
9
4
2
6
0
7 315
- -
229.293 132.315 3.13697 7 745
AP-38 77.8864 0.001 77.8853 -100.303 0.0002 100.302 -86.29412138 86.29
4 3 E-05 7 2.35
6482 41
4. 6
6
4
6
315
- 0
262.020 127.178 20.3070 20.3072 3.13697 743
AP-38.1 262.0218 0.001 25.4872 0.0002 -15.40199924 15.40 7
7 7 4 4712 E-05 6.95
2 7
4
9

Page 288
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
4.
9
4
7
6
0
7
315
- - 6
191.276 209.199 238.267 3.13697 722
TP-14 191.2777 0.001 -116.239 0.0002 116.238 -207.9900234 207.9 7
6 4 4 E-05 8.96
7861 9 8.
4
7
0
8
6
0
7
315
- - 4
159.607 3.13697 700
TP-15 159.6087 0.001 220.476 288.31 -187.151 0.0002 187.150 -219.3109205 219.3 9
6 E-05 9.65
4686 11 1.
3
5
5
8
6
0
315
- - 7
135.166 200.083 3.13697 683
AP-39 135.1673 0.001 187.71 -64.4581 0.0002 64.4578 -176.2957831 176.2 4
2 6 E-05 3.35
4655 96 2
8
7.
1
6
0
- 315
265.542 155.249 17.0149 17.0151 3.13697 7
AP-39.1 265.5440 0.001 40.6412 0.0002 -36.90798629 36.90 679
9 9 3 3472 E-05 4
8 6.45
4
4.

Page 289
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
1
1
5
6
0
7
315
- - 1
168.281 240.792 3.13697 665
TP-16 168.2828 0.001 296.41 -258.725 0.0002 258.724 -144.6391455 144.6 8
7 8 E-05 1.81
3656 39 5.
1
3
9
1
6
0
6
315
- - 8
179.556 229.074 3.13697 633
TP-17 179.5575 0.001 477.25 -360.592 0.0002 360.591 -312.6357263 312.6 2
4 5 E-05 9.17
6169 36 4.
5
7
9
9
6
0
6
315
- - 3
181.877 228.630 3.13697 591
TP-18 181.8789 0.001 642.431 -482.124 0.0002 482.123 -424.5874324 424.5 4
8 9 E-05 4.58
3246 87 2.
7
6
7
6
6 7
- - 0 315 8
152.334 230.508 3.13697
AP-40 152.3354 0.001 385.51 -297.506 0.0002 297.505 -245.1693864 245.1 6 566 0
3 7 E-05
979 69 0 8.87 .
4 5

Page 290
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
4. 3
8
3
9
6
0 7
6 315 7
0 562 2
AP-40.1 202.843
2 0.65 .
4. 8 0
5 7
3

8451.65
Total = 6404.6938 -5800.1 -5160.90297
5
0.32337
6682.8825 0.547029814
3
0.00898
76 0.015195273
3
6840
-157.1175
202.8825

error= 0.0395
0.001098333

13300.0
Accuracy =
251
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line

Page 291
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Correct
Station Distanc Diff.E correcte Corr(+ correcte Eastin Northin Eleva
S,No. Hz.Angle Corr.(+) ed Bearing Corr(+) Diff North
Name e ast d ΔE ) d ΔN g g tion
H.Angle

60118 3154220 736.


AP-43.1
3.817 .64 72
204.684 60117 3154196 738.
AP-43 208.143 0.004005 208.147
4 2.68 .409 73
-
155.858 232.831 0.00017 4.44E- 60107 3154124
TP-1 155.8545 0.004005 118.71 94.59 -94.5952 -71.720122 -71.7201
5 4 1 05 8.085 .689
54
-
185.152 208.689 799.727 0.00017 - 4.44E- 60069 3153423
TP-2 185.1481 0.004005 383.9 -383.924 -701.546
1 9 7 1 701.545705 05 4.16 .143
24
166.117 - 0.00017 - 4.44E- 59996 3152342
TP-3 166.1138 0.004005 213.842 1301.3 -724.7 -1080.83
8 724.7 1 1080.82896 05 9.46 .314
-
181.394 199.959 0.00017 - 4.44E- 59967 3151538
TP-4 181.3905 0.004005 854.81 291.7 -291.799 -803.463
5 8 1 803.463477 05 7.662 .851
99
-
149.640 201.354 0.00017 - 4.44E- 59953 3151169
AP-44 149.6365 0.004005 396.91 144.5 -144.528 -369.661
5 3 1 369.660697 05 3.133 .19
29
226.441 170.994 3.460 0.00017 3.46114 - 4.44E- 59953 3151147
AP-44.1 226.4377 0.004005 22.1115 -21.8389
7 8 971 1 2 21.8389585 05 6.594 .351
-
145.046 217.436 0.00017 4.44E- 59947 3151071
TP-5 145.0422 0.004005 95.6403 58.13 -58.1379 -75.940996 -75.941
2 5 1 05 8.457 .41
8
-
187.301 182.482 313.843 0.00017 4.44E- 59946 3150757
TP-6 187.2979 0.004005 13.59 -13.595 -313.549 -313.549
9 7 6 1 05 4.861 .861
52
179.358 189.784 493.626 - 0.00017 - 4.44E- 59938 3150271
AP-45 179.3544 0.004005 -83.8894 -486.446
4 6 5 83.88 1 486.445951 05 0.972 .416

Page 292
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
96
-
250.319 189.143 0.00017 - 4.44E- 59937 3150239
AP45.1 250.3153 0.004005 32.8007 5.212 -5.21186 -32.3839
3 1 1 32.3839571 05 5.76 .032
03
-
106.305 259.462 111.241 0.00017 - 4.44E- 59926 3150218
TP-7 106.3013 0.004005 109.3 -109.365 -20.3439
3 4 1 1 20.3439407 05 6.395 .688
65
-
183.968 185.767 0.00017 4.44E- 59922 3149836
AP-46.1 183.9647 0.004005 383.91 38.58 -38.5808 -381.96649 -381.966
7 7 1 05 7.815 .721
09
-
274.782 189.736 0.00017 4.44E- 59922 3149817
AP-46.1 274.7785 0.004005 19.3893 3.279 -3.27885 -19.110023 -19.11
5 4 1 05 4.536 .611
02
-
160.974 284.518 0.00017 20.7030113 4.44E- 59914 3149838
TP-8 160.9708 0.004005 82.5812 79.94 -79.9438 20.70306
8 9 1 5 05 4.592 .314
4
-
142.910 265.493 400.131 0.00017 - 4.44E- 59874 3149806
TP-9 142.9068 0.004005 398.8 -398.895 -31.438
8 7 9 1 31.4380221 05 5.697 .876
95
-
192.604 228.404 377.325 0.00017 4.44E- 59846 3149556
AP-47 192.6008 0.004005 282.1 -282.183 -250.49416 -250.494
8 5 4 1 05 3.515 .382
83
-
215.858 241.009 0.00017 - 4.44E- 59843 3149540
AP-47.1 215.8549 0.004005 32.1974 28.16 -28.1628 -15.605
9 3 1 15.6050455 05 5.352 .777
3
-
149.977 276.868 148.043 0.00017 17.7038665 4.44E- 59828 3149558
TP-10 149.9732 0.004005 146.9 -146.981 17.70391
2 2 4 1 4 05 8.371 .481
81
-
114.405 246.845 319.982 0.00017 4.44E- 59799 3149432 556.
AP-48.1 114.4013 0.004005 294.2 -294.207 -125.82138 -125.821
3 4 3 1 05 4.017 .406 2
07
181.250 59799 3149286 637.
AP-48
7 0.825 .203 66

Page 293
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
-
6304.28 -
TOTAL 3576.486 3178.
2 4763.75001
52
0.143 0.25299330
3781.171
965 6
0.007 0.01264966
44
198 5
3960
-178.829
181.1706
ERROR -0.0801
-0.00401
21657
Accuracy
.74

Page 294
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
Correct
S,N Station Hz.Angl Distanc Diff.Eas Corr( corrected Diff corrected Elevati
Corr.(-) ed Bearing Corr(+) Easting Northing
o. Name e e t -) ΔE North ΔN on
H.Angle

597994.01 3149432.4
AP-48.1 556.2
7 06
242.88 0.0092 242.874 181.25 597990.82 3149286.2
AP-48 637.66
34 38 2 07 5 03
-
175.95 0.0092 244.12 757.46 0.000 - 597309.29 3148955.6
TP-1 175.948 681.52 -681.529 0.0003 -330.566
72 38 49 66 2 330.567 61 37
9
-
254.68 0.0092 254.671 240.07 0.000 - 596837.39 3148683.9
AP-49.1 544.51 471.90 -471.906 0.0003 -271.655
03 38 1 29 2 271.655 04 82
5
-
82.908 0.0092 82.8989 314.74 42.753 0.000 596807.02 3148714.0
AP-49 30.366 -30.3663 30.0959 0.0003 30.09618
23 38 9 4 5 2 41 78
1
-
192.83 0.0092 192.825 217.64 179.26 0.000 - 596697.54 3148572.1
TP-2 109.48 -109.482 0.0003 -141.944
43 38 1 3 07 2 141.944 24 34
2
-
169.42 0.0092 169.411 230.46 137.39 0.000 - 596591.57 3148484.6
TP-3 105.96 -105.967 0.0003 -87.4511
07 38 5 81 24 2 87.4514 55 83
7
140.30 0.0092 219.87 356.76 0.000 596362.82 3148210.9
AP-50 140.296 -228.75 -228.75 -273.78 0.0003 -273.78
52 38 96 6 2 56 03
-
253.06 0.0092 253.056 180.17 0.000 - 596362.77 3148195.2
AP-50.1 15.61 0.0478 -0.04806 0.0003 -15.6096
56 38 4 55 2 15.6099 75 93
3
171.70 0.0092 171.693 253.23 - 0.000 - 595992.77 3148083.8
TP-4 386.43 -369.999 0.0003 -111.484
28 38 6 19 369.99 2 111.484 81 09

Page 295
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
Correct
S,N Station Hz.Angl Distanc Diff.Eas Corr( corrected Diff corrected Elevati
Corr.(-) ed Bearing Corr(+) Easting Northing
o. Name e e t -) ΔE North ΔN on
H.Angle

9
-
201.08 0.0092 201.080 244.92 0.000 - 595652.38 3147924.5
AP-51 375.81 340.39 -340.393 0.0003 -159.266
99 38 7 55 2 159.267 5 43
3
138.17 0.0092 138.168 266.00 22.484 0.000 - 595629.95 3147922.9
AP-51.1 -22.43 -22.4302 0.0003 -1.56573
78 38 6 62 6 2 1.56601 48 77
-
189.84 0.0092 189.831 224.17 230.56 0.000 - 595469.28 3147757.6
TP-5 160.66 -160.669 0.0003 -165.365
05 38 3 48 48 2 165.365 55 13
9
-
45.870 0.0092 45.8608 234.00 320.13 0.000 - 595210.11 3147569.3
AP-52 259.01 -259.016 0.0003 -188.144 605.54
13 38 9 61 66 2 188.144 9 66
6
595287.99 3147555.8
AP-52.1 99.867 582.55
9 2

-
2258.7 3369.1
TOTAL 2780.5 -1716.74
36 85
5
2439.9 0.1530
0.099523
87 62
0.0117
30 0.007656
74
2700
-
260.01
3

Page 296
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
Correct
S,N Station Hz.Angl Distanc Diff.Eas Corr( corrected Diff corrected Elevati
Corr.(-) ed Bearing Corr(+) Easting Northing
o. Name e e t -) ΔE North ΔN on
H.Angle

99.987
1
ERROR 0.1201
0.0092
38
ACCURA
18453.89
CY

Page 297
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Diff.East Corr(-) Easting Northing
H.Angl g ce +) d ΔE North d ΔN ion
e

595210. 3147569 605.5


AP-52
119 .366 4
322.05 99.86 595287. 3147555 582.5
AP52.1 322.0639 0.0073
66 7 999 .82 5
- -
192.05 241.9 7.57E 595190. 3147503
TP-1 192.0655 0.0073 110.5 97.49646 -97.4964 52.006 0.0003 -52.0069
82 236 -05 503 .813
049 6
- -
241.13 253.9 157.4 7.57E 595039. 3147460
AP-53 241.1403 0.0073 151.2984 -151.298 43.436 0.0003 -43.4363
3 818 1 -05 204 .377
339 1
-
131.21 315.1 26.81 7.57E 19.001 19.0007 595020. 3147479
AP-53.1 131.2259 0.0073 18.92500 -18.9249 0.0003
86 148 78 -05 02 6 279 .378
185
- -
168.31 266.3 406.5 7.57E 594614. 3147453
TP-2 168.3194 0.0073 405.7019 -405.702 25.997 0.0003 -25.998
21 335 341 -05 577 .38
762 7
- -
185.90 254.6 841.2 7.57E 593803. 3147230
TP-3 185.9171 0.0073 811.1840 -811.184 222.74 0.0003 -222.744
98 456 1 -05 393 .636
967 3
- -
159.75 260.5 1128. 7.57E 592690. 3147045
TP-4 159.7626 0.0073 1112.857 -1112.86 185.12 0.0003 -185.123
53 554 15 -05 536 .513
554 3
- -
165.55 240.3 352.9 7.57E 592383. 3146870
AP-54.1 165.5643 0.0073 306.5772 -306.577 174.79 0.0003 -174.793
7 107 052 -05 959 .72
059 3
AP-54 261.8732 0.0073 261.86 225.8 65.23 - 7.57E -46.8189 - 0.0003 -45.4222 592337. 3146825

Page 298
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Diff.East Corr(-) Easting Northing
H.Angl g ce +) d ΔE North d ΔN ion
e

59 677 17 46.81900 -05 45.422 14 .298


57
-
122.46 307.7 7.57E 40.519 40.5196 592284. 3146865
TP-5 122.4751 0.0073 66.21 52.36314 -52.3631 0.0003
78 336 -05 94 8 777 .817
286
- -
135.00 250.2 902.2 7.57E 591435. 3146560
TP-6 135.0101 0.0073 848.8796 -848.88 305.59 0.0003 -305.592
28 014 1 -05 897 .225
836 2
-
208.81 205.2 146.0 7.57E - 591373. 3146428
TP-7 208.8209 0.0073 62.19226 -62.1922 0.0003 -132.14
36 042 439 -05 132.14 705 .085
243
- -
243.07 234.0 379.3 7.57E 591066. 3146205
AP-55 243.0844 0.0073 306.9377 -306.938 222.85 0.0003 -222.857
71 179 1 -05 767 .228
191 7
-
191.91 297.0 18.08 7.57E 8.2380 8.23777 591050. 3146213
AP-55.1 191.9262 0.0073 16.10200 -16.1019 0.0003
89 95 7 -05 28 3 665 .466
18
-
119.98 309.0 198.8 7.57E 125.15 125.156 590896. 3146338
TP-8 119.9878 0.0073 154.4794 -154.479 0.0003
05 139 17 -05 7 8 186 .623
991
- -
199.90 248.9 344.1 7.57E 590574. 3146215
TP-9 199.9143 0.0073 321.2371 -321.237 123.34 0.0003 -123.348
7 944 045 -05 949 .275
716 7
- -
269.48 268.9 407.8 7.57E 590167. 3146207
AP-56 269.4915 0.0073 407.7700 -407.77 7.8195 0.0003 -7.81978
42 014 45 -05 179 .455
321 2
AP-56.1 146.4514 0.0073 146.44 358.3 73.54 - 7.57E -2.07181 73.514 0.0003 73.5137 590165. 3146280

Page 299
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Diff.East Corr(-) Easting Northing
H.Angl g ce +) d ΔE North d ΔN ion
e

41 856 32 2.071888 -05 01 5 107 .969


597
-
95.171 324.8 296.6 7.57E 242.46 242.461 589994. 3146523
TP-10 95.17913 0.0073 170.8497 -170.85 0.0003
81 297 1 -05 21 8 257 .431
597
- -
106.85 240.0 705.1 7.57E 589383. 3146170
TP-11 106.8669 0.0073 610.6527 -610.653 352.53 0.0003 -352.539
96 016 1 -05 605 .892
303 8
-
160.57 166.8 433.5 98.54175 7.57E 98.5418 589482. 3145748
AP-57 160.5863 0.0073 422.16 0.0003 -422.162
9 612 1 919 -05 3 147 .73
2
-
285.69 147.4 18.33 9.867258 7.57E 9.86733 589492. 3145733
AP-57.1 285.6977 0.0073 15.452 0.0003 -15.4531
04 402 45 702 -05 4 014 .277
9
- -
177.36 253.1 513.4 7.57E 589000. 3145584
TP-12 177.3711 0.0073 491.3172 -491.317 148.98 0.0003 -148.987
38 306 1 -05 697 .29
845 7
-
201.48 250.4 767.5 7.57E - 588277. 3145328
AP-58 201.4967 0.0073 723.4591 -723.459 0.0003 -256.27
94 944 072 -05 256.27 238 .02
173
-
224.95 271.9 46.30 7.57E 1.6030 1.60279 588230. 3145329
AP-58.1 224.9608 0.0073 46.28004 -46.28 0.0003
35 838 78 -05 5 4 958 .622
508
-
316.9 147.1 7.57E 107.47 107.479 588130. 3145437
TP-13 169.6173 0.0073 169.61 100.4463 -100.446 0.0003
373 1 -05 96 4 511 .102
936
AP-59 129.3266 0.0073 129.31 306.5 317.7 - 7.57E -255.291 189.23 0.0003 189.231 587875. 3145626

Page 300
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Diff.East Corr(-) Easting Northing
H.Angl g ce +) d ΔE North d ΔN ion
e

93 473 77 255.2909 -05 2 8 221 .333


359
-
218.72 255.8 39.64 7.57E 587836. 3145616
AP-59.1 218.7327 0.0073 38.44698 -38.4469 -9.681 0.0003 -9.68126
54 667 71 -05 774 .652
598
-
143.15 294.5 638.2 7.57E 265.59 265.598 587256. 3145882
TP-14 143.1654 0.0073 580.3294 -580.329 0.0003
81 921 2 -05 84 2 444 .25
197
- -
49.023 257.7 1155. 7.57E 586126. 3145637
AP-60 49.03113 0.0073 1129.425 -1129.43 245.21 0.0003 -245.219 471.3
81 502 739 -05 472 .045
096 8
126.7 586170. 3145603 471.2
AP-60.1
74 765 .941 5

- -
10704
TOTAL 5427.127 9160.981 1918.7
.21
887 8
-
0.545113
5526.994 0.0058
449
3
-
0.018170
64 0.0001
448
9
5760
-233.006
126.9936

Page 301
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Diff.East Corr(-) Easting Northing
H.Angl g ce +) d ΔE North d ΔN ion
e

ERROR 0.2196
Accura 19635.5
0.00732
cy = 5

Page 302
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr corrected Diff Corr corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st (-) ΔE North (-) ΔN on
e

586126.4 3145637.
1 AP-60 471.3
72 045
321.35 126.77 586170.7 3145603. 471.2
2 AP-60.1 321.362 0.008812
32 4 65 941 5
- - -
146.27 268.12 256.69 0.00 0.00 585914.2 3145595.
3 TP-1 146.2803 0.008812 256.55 256.5605 8.3888 -8.38916
15 72 41 4 03 044 552
7 657 9
- - -
185.36 234.39 240.88 0.00 0.00 585718.3 3145455.
4 AP-61.1 185.3777 0.008812 195.86 195.8641 140.22 -140.229
89 87 49 4 03 403 323
1 503 9
- - -
224.49 239.76 11.698 0.00 0.00 585708.2 3145449.
5 AP-61 224.5053 0.008812 10.107 10.11071 5.8901 -5.89041
65 76 2 4 03 296 432
1 281 4
- -
168.45 284.26 246.56 0.00 60.751 0.00 585469.2 3145510.
6 TP-2 168.4589 0.008812 238.96 238.9654 60.75113
01 41 34 4 4 03 641 183
2 543
- -
174.88 272.71 0.00 31.789 0.00 584798.7 3145541.
7 TP-3 174.8899 0.008812 671.31 670.55 670.5604 31.78964
11 43 4 91 03 037 973
7 503
- -
273.05 267.59 499.73 0.00 - 0.00 584299.4 3145521.
8 AP-62 273.0603 0.008812 499.29 499.2956 -20.9672
15 54 21 4 20.967 03 08 006
2 364
108.64 0.6468 58.284 0.6580 0.00 0.654454 58.280 0.00 584300.0 3145579.
9 AP-62.1 108.6506 0.008812 58.28071
18 82 7 34 4 636 99 03 625 286
168.90 289.28 582.14 - 0.00 - 192.30 0.00 583750.5 3145771.
10 TP-4 168.9102 0.008812 192.3
14 87 92 549.47 4 549.4745 03 03 88 586

Page 303
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr corrected Diff Corr corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st (-) ΔE North (-) ΔN on
e

1 041
- -
184.92 278.19 1335.4 0.00 190.23 0.00 582428.7 3145961.
11 TP-5 184.9322 0.008812 1321.7 1321.793 190.2396
34 01 1 4 99 03 945 826
9 527
- -
180.36 283.11 677.08 0.00 153.61 0.00 581769.3 3146115.
12 TP-6 180.3739 0.008812 659.43 659.4356 153.6184
51 35 89 4 87 03 588 444
2 707
- -
182.49 283.47 0.00 94.517 0.00 581375.0 3146209.
13 AP-63 182.5032 0.008812 405.51 394.34 394.3445 94.51708
44 86 4 35 03 142 961
1 865
-
190.15 285.97 64.240 0.00 17.677 0.00 581313.2 3146227.
14 AP-63.1 190.1621 0.008812 -61.76 61.76354 17.67767
33 3 2 4 94 03 506 639
714
- -
183.00 296.12 341.45 0.00 150.36 0.00 581006.6
15 TP-7 183.0148 0.008812 306.56 306.5715 150.3607 3146378
6 64 62 4 1 03 791
8 369
- -
172.92 299.13 0.00 365.95 0.00 580350.0 3146743.
16 TP-8 172.9379 0.008812 751.71 656.61 656.6202 365.9539
91 24 4 41 03 588 954
7 847
- -
167.66 292.06 747.66 0.00 280.82 0.00 579657.1 3147024.
17 TP-9 167.6749 0.008812 692.92 692.9285 280.8248
61 15 82 4 51 03 303 779
5 454
- -
149.76 279.72 479.80 0.00 81.070 0.00 579183.9 3147105. 469.9
18 AP-64.1 149.7717 0.008812 472.90 472.9125 81.06991
29 76 75 4 19 03 66 911 8
9 152
249.49 579123.9 3147083. 469.9
19 AP-64
05 03 443 5

Page 304
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr corrected Diff Corr corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st (-) ΔE North (-) ΔN on
e

-
7370.2 1501.9
TOTAL 3182.866 6986.4
08 12
9
-
0.3090
3309.64 0.0582
29
2
-
0.0181
38 ERROR 0.0034
78
2
3420
-110.36
249.6403
ACCURAC 23437.
Y= 18

Page 305
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e

579183. 3147105 469.9


1 AP-64.1
966 .911 8
199.82 249.4 579123. 3147083 469.9
2 AP-64 199.81363 0.009474
31 905 903 .443 5
- -
192.05 269.3 224.5 0.00 0.000 578899. 3147080
3 TP-1 192.04813 0.009474 224.5 -224.538 2.6900 -2.68997
76 136 541 01 1 365 .753
38 8
-
183.87 281.3 0.00 109.15 0.000 578356. 3147189
4 TP-2 183.86423 0.009474 553.6 542.7 -542.733 109.1504
37 712 01 03 1 632 .903
33
-
195.75 285.2 507.9 0.00 133.56 0.000 577866. 3147323
5 AP-65.1 195.74703 0.009474 490.0 -490.076 133.5632
65 449 5 01 31 1 557 .467
76
188.06 301.0 44.30 0.00 22.821 0.000 577828. 3147346
6 AP-65 188.05293 0.009474 -37.98 -37.9799 22.82207
24 014 94 01 96 1 577 .289
193.44 309.0 599.0 0.00 377.48 0.000 577363. 3147723
7 TP-3 193.43873 0.009474 -465.1 -465.1 377.4893
82 638 13 01 92 1 476 .778
-
96.881 322.5 0.00 532.34 0.000 576955. 3148256
8 AP-66 96.872226 0.009474 670.9 408.3 -408.306 532.3464
7 12 01 63 1 17 .124
07
-
252.95 239.3 36.47 0.00 - 0.000 576923. 3148237
9 AP-66.1 252.94093 0.009474 31.39 -31.3939 -18.5709
04 937 56 01 18.571 1 776 .554
4
-
171.85 312.3 316.4 0.00 213.15 0.000 576689. 3148450
10 TP-4 171.84333 0.009474 233.8 -233.894 213.1568
28 441 527 01 67 1 882 .71
94

Page 306
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e

-
161.94 304.1 0.00 268.54 0.000 576294. 3148719
11 TP-5 161.93383 0.009474 477.8 395.1 -395.194 268.5422
33 969 01 21 1 688 .253
94
-
173.57 286.1 631.7 0.00 175.61 0.000 575687. 3148894
12 TP-6 173.56943 0.009474 606.8 -606.837 175.616
89 402 374 01 59 1 851 .868
37
-
190.21 279.7 0.00 50.105 0.000 575395. 3148944
13 TP-7 190.20123 0.009474 296.8 292.5 -292.54 50.10528
07 191 01 17 1 311 .974
4
-
168.77 289.9 0.00 294.74 0.000 574582. 3149239
14 TP-8 168.77023 0.009474 864.7 812.9 -812.914 294.7492
97 298 01 9 1 398 .723
14
-
165.63 278.7 0.00 85.100 0.000 574026. 3149324
15 AP-67 165.62283 0.009474 562 555.5 -555.519 85.1008
23 095 01 69 1 878 .824
19
- -
253.96 264.3 36.01 0.00 0.000 573991. 3149321
16 AP-67.1 253.95643 0.009474 35.84 -35.841 3.5510 -3.5509
59 418 66 01 1 037 .273
11 1
-
174.23 338.3 74.78 0.00 69.486 0.000 573963. 3149390
17 TP-9 174.22353 0.009474 27.64 -27.6409 69.48613
3 077 19 01 01 1 396 .759
1
-
124.97 332.5 105.1 0.00 93.317 0.000 573914. 3149484
18 TP-10 124.96473 0.009474 48.49 -48.4939 93.31805
42 407 661 01 94 1 902 .077
4
-
180.27 277.5 449.7 0.00 58.818 0.000 573469. 3149542
19 TP-11 180.26883 0.009474 445.8 -445.872 58.81825
83 149 349 01 14 1 03 .895
72

Page 307
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e

-
174.86 277.7 1150. 0.00 155.97 0.000 572328. 3149699 584.2
20 AP-68.1 174.85373 0.009474 1139. -1139.68 155.9785
32 932 3 01 84 1 96 .001 1
68
272.6 572263. 3149702 583.7
21 AP-68
564 07 .058 6

-
7602. 2615.4
total 3442.9859 6794.
292 29
55
-
0.392
3692.4764 0.1292
786
9
-
0.021
42 0.0071
821
8
3780
-87.5236
error 272.4764
accur
-0.18 18384.41
acy

Page 308
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e

579183. 3147105 469.9


1 AP-64.1
966 .911 8
199.82 249.4 579123. 3147083 469.9
2 AP-64 199.81363 0.009474
31 905 903 .443 5
- -
192.05 269.3 224.5 0.00 0.000 578899. 3147080
3 TP-1 192.04813 0.009474 224.5 -224.538 2.6900 -2.68997
76 136 541 01 1 365 .753
38 8
-
183.87 281.3 0.00 109.15 0.000 578356. 3147189
4 TP-2 183.86423 0.009474 553.6 542.7 -542.733 109.1504
37 712 01 03 1 632 .903
33
-
195.75 285.2 507.9 0.00 133.56 0.000 577866. 3147323
5 AP-65.1 195.74703 0.009474 490.0 -490.076 133.5632
65 449 5 01 31 1 557 .467
76
188.06 301.0 44.30 0.00 22.821 0.000 577828. 3147346
6 AP-65 188.05293 0.009474 -37.98 -37.9799 22.82207
24 014 94 01 96 1 577 .289
193.44 309.0 599.0 0.00 377.48 0.000 577363. 3147723
7 TP-3 193.43873 0.009474 -465.1 -465.1 377.4893
82 638 13 01 92 1 476 .778
-
96.881 322.5 0.00 532.34 0.000 576955. 3148256
8 AP-66 96.872226 0.009474 670.9 408.3 -408.306 532.3464
7 12 01 63 1 17 .124
07
-
252.95 239.3 36.47 0.00 - 0.000 576923. 3148237
9 AP-66.1 252.94093 0.009474 31.39 -31.3939 -18.5709
04 937 56 01 18.571 1 776 .554
4
-
171.85 312.3 316.4 0.00 213.15 0.000 576689. 3148450
10 TP-4 171.84333 0.009474 233.8 -233.894 213.1568
28 441 527 01 67 1 882 .71
94

Page 309
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e

-
161.94 304.1 0.00 268.54 0.000 576294. 3148719
11 TP-5 161.93383 0.009474 477.8 395.1 -395.194 268.5422
33 969 01 21 1 688 .253
94
-
173.57 286.1 631.7 0.00 175.61 0.000 575687. 3148894
12 TP-6 173.56943 0.009474 606.8 -606.837 175.616
89 402 374 01 59 1 851 .868
37
-
190.21 279.7 0.00 50.105 0.000 575395. 3148944
13 TP-7 190.20123 0.009474 296.8 292.5 -292.54 50.10528
07 191 01 17 1 311 .974
4
-
168.77 289.9 0.00 294.74 0.000 574582. 3149239
14 TP-8 168.77023 0.009474 864.7 812.9 -812.914 294.7492
97 298 01 9 1 398 .723
14
-
165.63 278.7 0.00 85.100 0.000 574026. 3149324
15 AP-67 165.62283 0.009474 562 555.5 -555.519 85.1008
23 095 01 69 1 878 .824
19
- -
253.96 264.3 36.01 0.00 0.000 573991. 3149321
16 AP-67.1 253.95643 0.009474 35.84 -35.841 3.5510 -3.5509
59 418 66 01 1 037 .273
11 1
-
174.23 338.3 74.78 0.00 69.486 0.000 573963. 3149390
17 TP-9 174.22353 0.009474 27.64 -27.6409 69.48613
3 077 19 01 01 1 396 .759
1
-
124.97 332.5 105.1 0.00 93.317 0.000 573914. 3149484
18 TP-10 124.96473 0.009474 48.49 -48.4939 93.31805
42 407 661 01 94 1 902 .077
4
-
180.27 277.5 449.7 0.00 58.818 0.000 573469. 3149542
19 TP-11 180.26883 0.009474 445.8 -445.872 58.81825
83 149 349 01 14 1 03 .895
72

Page 310
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e

-
174.86 277.7 1150. 0.00 155.97 0.000 572328. 3149699 584.2
20 AP-68.1 174.85373 0.009474 1139. -1139.68 155.9785
32 932 3 01 84 1 96 .001 1
68
272.6 572263. 3149702 583.7
21 AP-68
564 07 .058 6

-
7602. 2615.4
total 3442.9859 6794.
292 29
55
-
0.392
3692.4764 0.1292
786
9
-
0.021
42 0.0071
821
8
3780
-87.5236
error 272.4764
accur
-0.18 18384.41
acy

Page 311
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
S,N Station Corr.( Corrected Bearin Distanc Diff.Ea Corr( corrected Diff corrected Elevati
Hz.Angle Corr(+) Easting Northing
o. Name +) H.Angle g e st -) ΔE North ΔN on

572328.9 3149699.
1 AP-68.1 584.21
6 001
211.9716 0.009 211.9811 272.65 572263.0 3149702.
2 AP-68 583.76
348 56 957 64 7 058
-
136.3641 0.009 136.3736 304.63 278.90 - 0.00 158.522 158.52302 3149860.
3 TP-1 229.4700 0.0002 572033.6
348 56 957 76 1 229.47 05 79 95 581
83
- - - -
187.0743 0.009 187.0838 261.01 0.00 571229.8 3149733.
4 TP-2 813.7 803.70 803.7075 127.132 0.0002 127.13210
348 56 957 13 05 92 449
7 67 3 33
- - - -
140.9168 0.009 140.9263 268.09 0.00 570519.0 3149709.
5 AP-69.1 711.2 710.80 710.8075 23.6396 0.0002 23.639436
348 56 957 52 05 85 809
7 05 7 77
- - -
202.3389 0.009 202.3484 229.02 71.131 - 0.00 570465.3 3149663.
6 AP-69 53.70146 46.6460 0.0002 46.645804
348 56 957 16 2 53.701 05 83 164
76 4 4
- - - -
139.9098 0.009 139.9193 251.37 0.00 570140.9 3149553.
7 TP-3 342.41 324.46 324.4687 109.384 0.0002 109.38408
348 56 957 01 05 15 78
8 96 3 36
- - - -
105.2317 0.009 105.2412 211.28 635.30 0.00 569810.9 3149010.
8 AP-70 329.95 329.9517 542.899 0.0002 542.89893
348 56 957 95 1 05 63 881
1 73 2 89
- -
275.4313 0.009 275.4408 136.53 67.682 46.563 0.00 46.56255 569857.5 3148961.
9 AP-70.1 49.1200 0.0002 49.119782
348 56 957 08 3 05 05 392 25 761
2 21
- - - -
190.6320 0.009 190.6415 231.97 0.00 569759.5 3148885.
10 TP-4 124.4 97.990 97.99114 76.6367 0.0002 76.636520
348 56 957 17 05 34 124
7 49 6 31

Page 312
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
S,N Station Corr.( Corrected Bearin Distanc Diff.Ea Corr( corrected Diff corrected Elevati
Hz.Angle Corr(+) Easting Northing
o. Name +) H.Angle g e st -) ΔE North ΔN on

- - - -
180.6474 0.009 180.6569 242.61 0.00 569614.9 3148810.
11 AP-71.1 162.8 144.55 144.5541 74.8870 0.0002 74.886834
348 56 957 33 05 8 238
4 76 7 2
- - - -
128.5811 0.009 128.5906 243.27 0.00 569561.6 3148783.
12 AP-71 59.71 53.329 53.32976 26.8565 0.0002 26.856288
348 56 957 03 05 5 381
3 57 3 98
- - - -
172.3911 0.009 172.4006 191.86 125.00 0.00 569535.9 3148661.
13 TP-5 25.692 25.69327 122.334 0.0002 122.33386
348 56 957 1 3 05 57 047
8 02 1 06
- - -
230.4610 0.009 230.4705 184.26 0.00 - 569518.0 3148421.
14 TP-6 240.5 17.871 17.87234 0.0002 239.83480
348 56 957 16 05 239.835 85 213
8 38 48
- - - -
261.1044 0.009 261.1139 234.73 0.00 569400.6 3148338.
15 AP-72 143.81 117.41 117.4159 83.0356 0.0002 83.035405
348 56 957 22 05 69 177
5 89 4 55
- -
78.89353 0.009 78.90309 315.84 0.00 29.5670 29.567298 569371.9 3148367.
16 AP-72.1 41.21 28.706 28.70681 0.0002
478 56 565 62 05 62 91 62 744
3 66
- - - -
180.9942 0.009 181.0037 214.74 0.00 569243.5 3148182.
17 TP-7 225.3 128.41 128.4186 185.118 0.0002 185.11830
348 56 957 93 05 43 626
8 16 5 97
- - - -
156.6154 0.009 156.6249 215.75 0.00 568927.0 3147743.
18 TP-8 541.61 316.45 316.4599 439.539 0.0002 439.53905
348 56 957 31 05 83 087
9 71 3 84
- - - -
217.7331 0.009 217.7426 192.37 0.00 568830.0 3147300.
19 AP-73 452.81 97.065 97.06595 442.284 0.0002 442.28382
348 56 957 81 05 17 803
5 38 1 7
123.9441 0.009 123.9536 230.12 40.117 - 0.00 - - - 568799.2 3147275.
20 AP-73.1 0.0002
348 56 957 08 3 30.785 05 30.78643 25.7220 25.721804 31 081

Page 313
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
S,N Station Corr.( Corrected Bearin Distanc Diff.Ea Corr( corrected Diff corrected Elevati
Hz.Angle Corr(+) Easting Northing
o. Name +) H.Angle g e st -) ΔE North ΔN on

9 89 4 72
- -
190.5208 0.009 190.5303 174.07 65.636 0.00 65.63627 568864.8 3146642.
21 TP-9 635.8 632.402 0.0002 632.40268
348 56 957 45 77 05 124 67 679
9 49
- - - -
175.8369 0.009 175.8464 184.60 0.00 568813.4 3146004.
22 TP-10 640.2 51.398 51.39856 638.133 0.0002 638.13319
348 56 957 49 05 69 546
1 55 4 66
- - - -
203.4343 0.009 203.4438 180.45 0.00 568804.6 3144890.
23 TP-11 1114.5 8.7805 8.781067 1114.46 0.0002 1114.4651
348 56 957 14 05 88 08
7 97 5 74
- - -
181.5166 0.009 181.5261 203.89 0.00 - 0.000236 567966.9 3142999. 1035.5
24 AP-74 2066.9 837.23 837.2327 1889.7398
348 56 957 53 05 1889.74 424 8 968 8
2 7 85
205.42 567929.7 3142921. 1041.4
25 AP-74.1
15 24 583 5

-
4072.545 9534.9 -
TOTAL 6701.72
2 96 4295.6
3
4345.201 0.4856 0.36732
6 28 27
0.0220 0.01669
50
74 65
4500
-154.7984
15659.35
205.2016 Accuracy
01

Page 314
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
S,N Station Corr.( Corrected Bearin Distanc Diff.Ea Corr( corrected Diff corrected Elevati
Hz.Angle Corr(+) Easting Northing
o. Name +) H.Angle g e st -) ΔE North ΔN on

ERROR -0.2199
-
0.009560
87

Page 315
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff Corr(- correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g ce +) d ΔE North ) d ΔN ion
e

567966. 3142999 1035.


AP-74
98 .968 58
152.10 205.4 567929. 3142921 1041.
AP-74.1 152.0914 0.009327
07 215 724 .583 45
-
176.95 177.5 12.25206 9.25E 12.2520 7.37E 567941. 3142638
TP-1 176.9464 0.009327 283.4 283.135 -283.135
57 222 387 -06 7 -05 976 .448
033
-
249.45 174.4 76.43542 9.25E 76.4354 7.37E 568018. 3141847
TP-2 249.4432 0.009327 794.3 790.613 -790.614
25 779 467 -06 3 -05 412 .834
759
- -
275.98 243.9 357.5 9.25E 7.37E 567697. 3141690
AP-75.1 275.9767 0.009327 321.1380 -321.138 157.112 -157.113
6 304 11 -06 -05 273 .721
879 837
-
77.648 339.9 18.93 9.25E 17.7860 7.37E 17.7859 567690. 3141708
AP-75 77.63917 0.009327 6.503007 -6.503
49 164 76 -06 5039 -05 8 77 .507
403
- -
160.10 237.5 280.8 9.25E 7.37E 567453. 3141557
TP-3 160.0936 0.009327 237.0118 -237.012 150.616 -150.616
29 649 2 -06 -05 759 .891
559 243
- -
86.320 217.6 9.25E 7.37E 567089. 3141085
AP-76 86.31097 0.009327 596.2 364.3269 -364.327 471.932 -471.933
29 678 -06 -05 432 .958
254 55
-
195.73 123.9 23.63089 9.25E 7.37E 567113. 3141070
AP-76.1 195.7256 0.009327 28.5 23.6309 15.9320 -15.9321
49 881 331 -06 -05 063 .026
708
TP-4 232.9557 0.009327 232.96 139.7 787 508.7831 9.25E 508.783 - 7.37E -600.424 567621. 3140469

Page 316
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
5 229 306 -06 1 600.423 -05 846 .602
789
- -
169.79 192.6 1895. 9.25E 7.37E 567205. 3138620
TP-5 169.7843 0.009327 416.2260 -416.226 1848.75 -1848.76
36 879 03 -06 -05 62 .847
455 498
- -
141.26 182.4 1636. 9.25E 7.37E 567134. 3136985
AP-77 141.2541 0.009327 70.86483 -70.8648 1635.16 -1635.17
34 815 7 -06 -05 755 .682
45 515
-
168.80 143.7 56.26 33.27500 9.25E 33.2750 7.37E 567168. 3136940
AP-77.1 168.7987 0.009327 45.3729 -45.373
8 449 66 12 -06 1 -05 03 .309
498
-
267.67 132.5 151.0 111.2520 9.25E 111.252 7.37E 567279. 3136838
TP-6 267.6697 0.009327 102.132 -102.133
9 529 237 659 -06 1 -05 282 .176
932
- -
176.38 220.2 1197. 9.25E 7.37E 566505. 3135924
TP-7 176.3719 0.009327 773.3157 -773.316 914.062 -914.062
12 319 3 -06 -05 966 .113
356 396
- -
231.77 216.6 534.3 9.25E 7.37E 566187. 3135494 660.3
AP-78.1 231.7642 0.009327 318.6672 -318.667 428.880 -428.881
35 131 104 -06 -05 255 .899 9
682 841
268.3 566144. 3135493 656.5
AP-78
866 509 .695 2

- -
8617.
TOTAL 1742.425 7426.34
299
181 947
0.043819 0.33452
2762.825
343 6309
0.003129 0.02389
2968.247
953 4736
34
3060
-91.7533

Page 317
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
25541.5
268.2467 Accuracy
151
ERROR -0.1399
-0.00933

Page 318
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Corr(-) Easting Northing
H.Angl g ce st d ΔE North ) d ΔN ion
e

566187.2 3135494. 660.3


AP-78.1
55 899 9
55.598 268.3 566144.5 3135493. 656.5
AP-78 55.60769 0.0091
59 866 09 695 2
-
197.33 143.9 270.8 159.2 0.000 159.228 0.000 566303.7 3135274.
TP-1 197.348 0.0091 219.04 -219.041
89 852 004 291 243 9 112 379 654
1
-
200.34 161.3 424.3 135.8 0.000 135.870 0.000 566439.6 3134872.
AP-79 200.3503 0.0091 401.96 -401.968
12 241 1 704 243 1 112 08 686
8
-
176.55 181.6 34.82 0.000 - 0.000 566438.5 3134837.
AP-79.1 176.5684 0.0091 1.011 -1.0122 -34.8079
93 653 27 243 34.808 112 958 878
96
-
174.60 178.2 14.54 0.000 14.5490 0.000 566453.1 3134368.
TP-2 174.6172 0.0091 469.6 469.37 -469.374
81 246 927 243 2 112 448 504
5
-
108.04 172.8 606.0 75.61 0.000 75.6102 0.000 566528.7 3133767.
AP-80 108.0515 0.0091 601.27 -601.275
24 327 1 052 243 8 112 551 229
5
-
100.8 30.54 29.99 0.000 29.9967 0.000 566558.7 3133761.
AP-80.1 241.5491 0.0091 241.54 5.7629 -5.76286
75 56 703 243 9 112 519 467
7
-
268.91 162.4 146.7 0.000 146.769 0.000 566705.5 3133298.
TP-3 268.9272 0.0091 485.8 463.09 -463.098
81 15 698 243 5 112 214 368
9
AP-81.1 220.6051 0.0091 220.59 251.3 508.0 - 0.000 -481.287 - 0.000 -162.596 566224.2 3133135.

Page 319
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Corr(-) Easting Northing
H.Angl g ce st d ΔE North ) d ΔN ion
e

6 331 1 481.2 243 162.59 112 348 772


86 6
-
78.683 291.9 0.000 7.5476 0.000 566205.4 3133143.
AP-81 78.69269 0.0091 20.21 18.74 -18.748 7.547724
59 291 243 12 112 868 32
77
- -
169.12 190.6 407.0 0.000 0.000 566130.5 3132743.
TP-4 169.136 0.0091 74.96 -74.9675 400.09 -400.093
69 127 56 243 112 193 227
72 3
-
247.56 179.7 1.149 0.000 1.14914 0.000 566131.6 3132490.
TP-5 247.5739 0.0091 252.9 252.89 -252.897
48 396 385 243 3 112 684 329
7
- -
150.13 247.3 0.000 0.000 565821.4 3132360.
AP-82 150.1428 0.0091 336.3 310.2 -310.26 129.75 -129.756
37 044 243 112 087 573
6 6
-
97.815 217.4 34.36 0.000 - 0.000 565800.5 3132333.
AP-82.1 97.82479 0.0091 20.88 -20.8892 -27.2839
69 381 23 243 27.284 112 195 289
9
-
260.38 135.2 173.8 0.000 173.809 0.000 565974.3 3132157.
TP-6 260.3925 0.0091 246.9 175.35 -175.356
34 538 097 243 4 112 289 933
6
- -
169.31 215.6 241.6 0.000 0.000 565833.5 3131961.
TP-7 169.3207 0.0091 140.7 -140.774 196.36 -196.362
16 372 1 243 112 545 571
74 2
- -
236.78 204.9 0.000 0.000 565595.7 3131450.
AP-83.1 236.7944 0.0091 563.8 237.8 -237.815 511.18 -511.189
53 488 243 112 392 382
15 9
AP-83 94.81829 0.0091 94.809 261.7 31.62 - 0.000 -31.2922 - 0.000 -4.54591 565564.4 3131445.

Page 320
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Corr(-) Easting Northing
H.Angl g ce st d ΔE North ) d ΔN ion
e

19 34 05 31.29 243 4.5460 112 47 836


2 2
-
202.06 176.5 208.5 12.57 0.000 12.5719 0.000 565577.0 3131237.
TP-8 202.0725 0.0091 208.13 -208.131
34 432 1 218 243 3 112 189 706
1
- -
180.15 198.6 0.000 0.000 565445.3 3130846.
TP-9 180.1651 0.0091 412.6 131.6 -131.648 391.03 -391.034
6 066 243 112 708 672
48 4
- -
264.36 198.7 605.5 0.000 0.000 565250.6 3130273.
TP-10 264.3752 0.0091 194.7 -194.765 573.34 -573.342
61 626 2 243 112 063 33
64 2
-
112.34 283.1 1009. 0.000 229.36 0.000 564267.1 3130502. 172.2
AP-84 112.3551 0.0091 983.4 -983.416 229.3677
6 287 81 243 75 112 05 087 7
16
215.4 564205.0 3130414. 171.2
AP-84.1
747 18 963 9

-
7201.
Total 3907.288 1877. -4991
098
31
0.090 0.6078
4175.675
288 27
0.004 0.0289
48
299 44
4320
-144.325

Page 321
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Corr(-) Easting Northing
H.Angl g ce st d ΔE North ) d ΔN ion
e

11718.69
215.6749 Accuracy
643

error 0.2002

Page 322
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr( correcte Diff Corr( corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st -) d ΔE North +) ΔN on
e

564267. 3130502.
AP-84 172.27
105 087
154.13 215.47 564205. 3130414.
AP-84.1 154.1506 0.012222 171.29
84 47 018 963
188.22 189.61 286.11 0.00 0.00 564157. 3130132.
TP-1 188.2356 0.012222 -47.78 -47.7802 -282.1 -282.1
34 31 77 02 01 238 863
- -
176.99 197.83 0.00 0.00 563875. 3129256.
TP-2 177.0077 0.012222 920.7 282.01 -282.012 876.44 -876.446
55 65 02 01 225 417
2 6
- -
85.476 194.83 562.71 0.00 0.00 563731. 3128712.
AP-85 85.48892 0.012222 144.04 -144.047 543.96 -543.966
7 2 53 02 01 178 451
7 6
283.58 100.30 64.792 0.00 - 0.00 563795. 3128700.
AP-85.1 283.5994 0.012222 65.856 64.7927 -11.7849
72 87 94 02 11.785 01 971 666
- -
152.70 203.89 0.00 0.00 563760. 3128620.
TP-3 152.7212 0.012222 87.51 35.448 -35.4485 80.008 -80.0088
9 59 02 01 522 658
2 9
-
179.82 176.60 43.285 0.00 0.00 563803. 3127891.
TP-4 179.8326 0.012222 730.91 43.28498 729.62 -729.627
04 49 22 02 01 807 03
7
-
180.46 176.42 35.627 0.00 0.00 563839. 3127320.
TP-5 180.4733 0.012222 571.41 35.62707 570.29 -570.298
11 53 31 02 01 434 732
8
-
231.90 176.88 39.265 0.00 0.00 563878. 3126598.
AP-86 231.916 0.012222 722.91 39.26521 721.84 -721.843
38 64 46 02 01 7 89
3

Page 323
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr( correcte Diff Corr( corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st -) d ΔE North +) ΔN on
e

-
174.05 228.79 45.942 0.00 - 0.00 563844. 3126568.
AP-86.1 174.0633 0.012222 34.562 -34.5632 -30.2679
11 02 9 02 30.268 01 136 622
9
- -
177.12 222.84 0.00 0.00 563446. 3126139.
TP-6 177.1415 0.012222 585.41 398.06 -398.061 429.24 -429.246
93 13 02 01 075 376
1 6
-
82.674 219.97 1179.4 0.00 0.00 562688. 3125235.
AP-87 82.68692 0.012222 757.67 -757.672 -903.9 -903.9
7 06 5 02 01 403 476
2
-
246.91 122.64 102.45 86.268 0.00 0.00 562774. 3125180.
AP-87.1 246.9247 0.012222 86.26786 55.266 -55.2668
25 53 3 11 02 01 67 209
9
-
162.49 189.55 0.00 - 0.00 562749. 3125028.
TP-7 162.5057 0.012222 153.41 25.472 -25.4728 -151.28
35 78 02 151.28 01 198 929
6
-
251.80 172.05 99.083 0.00 0.00 562848. 3124319.
AP-88 251.8137 0.012222 716.51 99.08335 709.62 -709.626
15 13 59 02 01 281 303
6
- -
134.74 243.85 69.767 0.00 0.00 562785. 3124288.
AP-88.1 134.7544 0.012222 62.627 -62.6282 30.745 -30.745
22 28 6 02 01 653 558
9 1
- -
196.03 198.59 0.00 0.00 562601. 3123742.
TP-8 196.0499 0.012222 576.31 183.77 -183.772 546.22 -546.224
77 5 02 01 881 334
2 4
- -
98.652 214.63 904.90 0.00 0.00 562087. 3122997.
AP-89 98.66502 0.012222 514.26 -514.268 744.56 -744.564 150
8 27 17 02 01 465 343
8 4

Page 324
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr( correcte Diff Corr( corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st -) d ΔE North +) ΔN on
e

133.28 562188. 3122902.


AP-90 150.04
55 022 631

8282.2 - -
Total 3158.031
84 2117.4 7417.2
0.1519 0.4247
3373.506
07 75
0.0089 0.0249
40
36 87
3600
-226.495
18359.3
133.5055 Accuracy
538

error 0.22
0.012222

Page 325
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

ANNEX – D: Angle Point Location Map & Route Alignment Plan

Page 326
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 327
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 328
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 329
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 330
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 331
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 332
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 333
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 334
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 335
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 336
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 337
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 338
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 339
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 340
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 341
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 342
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 343
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report

Page 344
In association with

S-ar putea să vă placă și