DRAFT REPORT
APPENDIX-H (Vol-1)TRANSMISSION LINE TOPOGRAPHY SURVEY
Updating Feasibility Study, Detailed Engineering Survey & Design and Environmental
Impact Assessment Study of Nalgad Hydropower Project (417 MW),
Jajarkot District, Nepal
AUGUST - 2018
Submitted By:
SMEC – MWH JV
(A Joint venture of SMEC International Pty Ltd, Australia and MWH International INC., USA
In association with UDAYA Consultancy Pvt. Ltd., Nepal)
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Table of Contents
1. OBJECTIVE ................................................................................................................. 4
2. TOR FOR SURVEY AND MAPPING ............................................................................ 5
3. SCOPE OF THE WORK ...................................................................................................... 7
4. DESK STUDY .................................................................................................................. 8
5. GPS SURVEY ................................................................................................................ 9
5.1. Feasibility DGPS Survey .................................................................................................... 9
5.2. Monumentation of Angle Points ........................................................................................ 12
5.3. Detailed Alignment Survey................................................................................................ 12
5.4. Major Crossings ................................................................................................................. 13
6. DATA ANALYSIS AND GENERATION OF PLAN AND PROFILE .............................. 17
7. DGPS SURVEY FOR TRANSMISSION LINE ............................................................ 18
7.1. Background ........................................................................................................................ 18
7.2. Scope of Works .................................................................................................................. 18
8. THE FIELD SURVEY ....................................................................................................... 19
8.1. Equipment .......................................................................................................................... 19
8.2. DGPS Survey ..................................................................................................................... 19
8.2.1. Specification of the Static Survey .............................................................................. 19
9. POST PROCESSING AND ADJUSTMENTS OF DGPS OBSERVATION. .................................... 21
9.1. General ............................................................................................................................... 21
9.2. Software ............................................................................................................................. 22
9.3. Final Control Points ........................................................................................................... 22
9.4. DGPS Occupation .............................................................................................................. 23
9.5. Adjustment Summary ........................................................................................................ 32
9.6. DGPS Observation ............................................................................................................. 33
9.7. GPS Observation Residuals ............................................................................................... 54
Page ii
In association with
List of Annexes
Abbreviation
Abbreviation/ Description
ADB Asian Development Bank
CAD Computer Added Design
CBO Community Based Organisation
CBS Central Bureau of Statistics
CDM Clean Development Mechanism
CDO Chief District Officer
CFRD Concrete Face Rock fill Dam
DAO District Agriculture Officer
DED Detailed Engineering Design
DDC District Development Committee
DGPS Differential Global Positioning System
DO Dissolved Oxygen
DoED Department of Electricity Development
DTM Digital Terrain Model
EA Environmental Assessment
ECRD Earth Core Rockfill Dam
EGM Earth Gravitational Model
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EPA Environmental Protection Act
EPR EnvironmentalProtectionRules,1997
ERMC Environment and Resource Management Consultant
ESIA Environmental and Social Impact Assessment
ESMP Environmental and Social Management Plan
FAT Factory Acceptance Test
FDM Fugitive Dust Model
FGD Focus Group Discussion
FS Feasibility Study
FSL Full Supply Level
GHG Green House Gas
GIS Geographical Information System
GLOF Glacier Lake Outburst Flood
GoN Government of Nepal
G-D Gauge height and Discharge
GP Gau Palika, Rural Municipality
GPS Global Positioning System
HDOP Horizontal Dilution of Precision
H RMS Horizontal Root Mean Square
Page 1
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 2
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 3
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
1. OBJECTIVE
The objective of the transmission line survey is to fix route alignment with angle points (90 angle points)
and perform detailed survey and mapping of 80m strip of transmission lines from Dalli to Kohalpur via
Chhinchu of about 112 km.
Sketch Map showing the location of 400 kV transmission line is attached as Map No. 1.1.
Page 4
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 5
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 6
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 7
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
4. DESK STUDY
Existing feasibility report along with reports of planned hydropower projects of the region whose power
are to be evacuated/ transmitted to Dalli and Chhinchu studied and tentative route was fixed during desk
study.
The World View 3(Air bus DS Geo), 0.5m resolution satellite imagery of December 23, 2016, was ordered
all along the route which fairly followed the feasibility route. The route was passing through Bardiya and
Banke National Parks. There were series of meetings with stake holders mainly with officials of the
project, NEA, and Ministries of Energy and Forest. The route was diverted to westward only passing
through Bardiya National Park only and southward along the open cultivated land to Bhajiya Gauri,
Baijanath Gaupalika-7. It was moved 7.2 km west from east of Kohalpur Road to Bhajiya Gauri where there
is rice field to acquire for transmission station area of about 1 sq. km.
The requirement ICAO and planned hydropower project areas also studied and considered to during the
transmission line route planning.
During the route planning and fixing angle points, the topographical maps at the scale of 1:25, 000, 0.5m
resolution satellite imageries, Google images and field visits were used. Angle points and sub stations
were tentatively fixed at Dalli, Chhinchu and Bhajiya Gauri, west of Kohalpur. The large scale maps of Dalli
and Kohalpur are available. The topographical maps at the scale of 1:5, 000 and aerial imagery was also
used in small area south of Bardiya National park.
Page 8
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
5. GPS SURVEY
The DGPS Survey performed to establish major control points connecting trig. Points for controlling survey
control points required to fix the Angle points (AP) and detail survey of 80 m strip along the proposed
transmission line alignment from Kohalpur to Dalli. During DGPS survey, one base stations, and 16 pairs of
major control points were established by Differential GPS observations at an average distance of 7 to 9 km
range and distance between pair is 100-360m. The powerhouse site base point and other points at Dalli is
are also used.
Page 9
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 10
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 11
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 12
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
S
Ang.
No Distance Chainage Land type Crossing Location NP /GP District
Point
.
Cultivatio Substatio Jajarko
1 AP1 Dalli Nalgad 7
n n t
Barren Jajarko
2 AP2 404.434 404.434 Road Tirmili Nalgad 7
land t
Barren Jajarko
3 AP3 608.195 1012.629 Road Tirmili Nalgad 7
land t
Cultivatio Bheri R./
4 AP4 372.330 1384.959 Chisapani Athbiskot 1 Rukum
n Road
Cultivatio
5 AP5 394.519 1779.478 Road Chisapani Athbiskot 1 Rukum
n
6 AP6 501.210 2280.688 Forest Chisapani Athbiskot 1 Rukum
Cultivatio
7 AP7 414.727 2695.415 Lareni Pakha Athbiskot 1 Rukum
n
1047.34 Cultivatio
8 AP8 3742.762 Kholsis Lareni Pakha Athbiskot 1 Rukum
8 n
9 AP9 372.393 4115.155 Forest Rithapani Athbiskot 1 Rukum
10 AP10 383.406 4498.562 Forest Rithapani Athbiskot 1 Rukum
Bheri
11 AP11 541.980 5040.542 Forest River, Bhalina Bajar Athbiskot 1 Rukum
road
Road,
12 AP12 573.362 5613.903 Forest Sota Danada Athbiskot 3 Rukum
buildings
1617.65 Khola, Pakhure
13 AP13 7231.563 Forest Athbiskot 4 Rukum
9 Road Pakha
Cultivatio
14 AP14 339.581 7571.144 Takura Athbiskot 4 Rukum
n
Cultivatio
15 AP15 150.590 7721.734 Khola Takura Athbiskot 4 Rukum
n
Barren
16 AP16 961.271 8683.005 Roads, Chote Bagar Athbiskot 4 Rukum
land
17 AP17 752.036 9435.041 Forest Road Chote Bagar Athbiskot 4 Rukum
1131.95 River, Nilkanthi Jajarko
18 AP18 10566.991 River bank Nal Gad 01
0 road Danda t
Road, Nilkanthi Jajarko
19 AP19 659.344 11226.335 River bank Nal Gad 01
River Danda t
Cultivatio Bheriganga Jajarko
20 AP20 699.035 11925.370 Rimna Danda
n 01 t
Cultivatio Banchare
21 AP21 917.592 12842.962 Sani Bheri 2 Rukum
n Danda
Page 13
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
S
Ang.
No Distance Chainage Land type Crossing Location NP /GP District
Point
.
1844.88 Barren
22 AP22 14687.848 Kholsis Daha Sani Bheri 1 Rukum
5 land
2023.36 Roads,
23 AP23 16711.214 Forest Gadhi Deurali Chaurjahari9 Rukum
6 Buildings
Cultivatio
24 AP24 830.995 17542.209 Kabra Chaurjahari9 Rukum
n
1163.52 Barren Roads,
25 AP25 18705.731 Kabra Chaurjahari9 Rukum
3 land buildings
Barren
26 AP26 369.186 19074.918 Kabra Chaurjahari9 Rukum
land
Barren Roads,
27 AP27 413.714 19488.632 Kabra Chaurjahari9 Rukum
land buildings,
1465.05 Cultivatio
28 AP28 20953.688 Mankot tata Chaurjahari4 Rukum
6 n
3235.39 Cultivatio Roads,
29 AP29 24189.085 Kumak Malika Baithan 4 Salyan
7 n Kholsis,
2925.15 Barren Kumak
30 AP30 27114.238 Kumak Malika Salyan
3 land Malika 4
5907.77 Kholsi, Kumak
31 AP31 33022.017 Forest Kumak Malika Salyan
9 Roads Malika 2
Kumak
32 AP32 412.628 33434.645 Forest Barule Salyan
Malika 2
1997.34 Road,
33 AP33 35431.989 Forest Bhatmare Kubinde 4 Salyan
4 building
1511.05 Barren Bhatmare
34 AP34 36943.041 Kholsis, Kubinde 4 Salyan
3 land Jangal
Barren
35 AP35 484.997 37428.038 Kholsis, Chyandanada Kubinde 4 Salyan
land
36 AP36 495.698 37923.736 Forest Kholsis, Bansniure Kubinde 4 Salyan
37 AP37 510.805 38434.541 Forest Kholsis, Bangad Kubinde 4 Salyan
38 AP38 371.115 38805.657 Forest Kholsis, Bangad Kubinde 4 Salyan
Cultivatio
39 AP39 706.946 39512.603 Kholsis, Bangad Kubinde 4 Salyan
n
1806.87
40 AP40 41319.474 Forest Kholsis, Bangad Kubinde 4 Salyan
2
Cultivatio
41 AP41 943.046 42262.520 Kholsis, Bangad Kubinde 1 Salyan
n
Cultivatio
42 AP42 607.573 42870.093 Kalagau Kubinde 1 Salyan
n
Kholas,
3626.50
43 AP-43 46496.595 Forest roads, Bangad Kubinde 1 Salyan
2
building
3442.95 Kholsis, Marmale
44 AP44 49939.545 Forest Kubinde 1 Salyan
0 building Danda
Marmale
45 AP45 910.578 50850.123 Forest Kholsi Kubinde 1 Salyan
Danda
46 AP46 480.053 51330.177 Forest Road, Kateri Kubinde 1 Salyan
Page 14
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
S
Ang.
No Distance Chainage Land type Crossing Location NP /GP District
Point
.
building
47 AP47 804.609 52134.786 Forest Gairi Kateri Kubinde 1 Salyan
Cultivatio Baluwa
48 AP-48 544.203 52678.989 Kubinde 11 Salyan
n Sangrah
1314.88 Barren Patuke
49 AP49 53993.878 Road Kubinde 11 Salyan
9 land Chaure
Road,
50 AP50 671.191 54665.068 Forest Churibajar Simte 7 Salyan
building
51 AP51 766.076 55431.144 Forest Syano danda Simte 7 Salyan
Khanya Khark
52 AP-52 567.048 55998.192 Forest Roads Kubinde 11 Salyan
a
S
Ang.
No Distance Chainage Land type Crossing Location Mun /R Mun District
Point
.
Khanya Khark
53 AP53 202.797 56200.989 Forest Kubinde 11 Salyan
a
2775.86 Cultivatio Khanya Khark
54 AP54 58976.852 Kubinde 11 Salyan
3 n a
1413.69 Surkhe
55 AP55 60390.544 Forest Pokhariya Gurbakot 9
2 t
Bhulkeni Surkhe
56 AP56 899.592 61290.136 Forest Road Gurbakot 9
Kamigau t
Surkhe
57 AP57 824.502 62114.639 Forest Bhurke gau Gurbakot 9
t
AP_5 1276.27 Cultivatio Surkhe
58 63390.914 Road Majhkhanda Gurbakot 9
8 6 n t
AP_5 Cultivatio Surkhe
59 526.690 63917.604 Road Kharayo chaur Gurbakot 10
9 n t
1709.93 Cultivatio Surkhe
61 AP-60 65627.542 Road Bhedabari Gurbakot 10
8 n t
AP_6 Road, Surkhe
62 458.385 66085.927 Forest Bhedabari Gurbakot 10
1 Building t
AP_6 1410.75 Surkhe
63 67496.677 Forest Road Bhedabari Gurbakot 10
2 0 t
AP_6 3004.55 Roads, Surkhe
64 70501.236 Forest Gimal tol Gurbakot 8
3 9 Kholsi t
2414.43 Barren Road, Surkhe
65 AP-64 72915.673 Shanti tol Bheriganga 8
8 land building t
AP_6 1321.81 Barren Surkhe
66 74237.489 Sano Jatri Bheriganga 9
5 5 land t
AP_6 1261.24 Surkhe
67 75498.730 Forest Road Thulo Jatri Bheriganga 9
6 1 t
AP_6 3117.46 Bheriganga1 Surkhe
68 78616.198 Forest Road Chuke tal
7 8 1 t
AP_6 1803.32 Madane Bheriganga1 Surkhe
69 80419.524 Forest Road
8 6 Chaur 0 t
Page 15
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
S
Ang.
No Distance Chainage Land type Crossing Location NP /GP District
Point
.
AP_6 1798.21 Surkhe
70 82217.741 Forest Road Bired anda Bheriganga4
9 7 t
AP_7 Cultivatio Bheriganga1 Surkhe
71 924.008 83141.749 Road Bire danda
0 n 0 t
Surkhe
72 AP-71 337.702 83479.450 Forest Road Tuni Khola Bheriganga 4
t
AP_7 Cultivatio Surkhe
73 473.486 83952.936 Kholsi Tuni Khola Bheriganga 4
2 n t
AP_7 1184.08 Cultivatio Surkhe
74 85137.016 Buildings Tuni Khola Bheriganga 4
3 0 n t
AP_7 4392.01 Cultivatio Surkhe
75 89529.036 Harre Bheriganga 4
4 9 n t
AP_7 1315.02 Surkhe
76 90844.063 Forest Harre Bheriganga 4
5 7 t
Surkhe
77 AP76 865.658 91709.721 Forest Kholsi Harre Bheriganga 4
t
4100.63 Surkhe
78 AP.77 95810.353 Forest Harre Bheriganga 4
2 t
1790.47 Cultivatio Surkhe
79 AP-78 97600.825 Road Harre Bheriganga 4
2 n t
Surkhe
80 AP.79 687.585 98288.410 Forest Kholsi Harre Bheriganga 4
t
1109.15 Surkhe
81 AP.80 99397.568 Forest Harre Bheriganga 4
8 t
100100.38 Surkhe
82 AP81 702.821 Forest Khola Harre Bheriganga 4
9 t
100972.36
83 AP82 871.977 Forest Khola Tharubasti Bansgadhi 7 Banke
6
101922.66 Road,
84 AP83 950.300 Forest Hatisar Baijanath 1 Banke
6 Buildings
1603.94 103526.61 Roads,
85 AP84 Forest Mathillo Kardi Baijanath 1 Banke
3 0 Buildings
1868.21 105394.82 Cultivatio
86 AP85 Kardi Baijanath 1 Banke
1 1 n
2118.85 107513.67 Cultivatio Pahadipur,
87 AP86 Road Baijanath 2 Banke
8 9 n Pitmari
1810.05 109323.73 Cultivatio
88 AP87 Bhaurikuna Baijanath 2 Banke
4 4 n
110253.82 Cultivatio Dachhin
89 AP88 930.093 Road Baijanath 3 Banke
7 n Lataura
1524.83 111778.66 Cultivatio
90 AP89 Khola Bhajiya Gauri Baijanath 5 Banke
7 4 n
111916.80 Cultivatio
91 AP90 138.138 Bhajiya Gauri Baijanath 5 Banke
2 n
Page 16
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Horizontal : 1:2,000
All the plan and profile with Angle points is also being drawn in ARC GIS and AutoCAD formats with
required scale.
Page 17
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 18
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 19
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Table 3: Specifications of the Static Survey.
Specification Static
General Network Design
Minimum number of reference station to control the project. 1 previous control point.
Maximum distance between the survey project boundary and network
50 km
reference control stations
Field
Maximum PDOP during station occupation 5 (75% of time)
Minimum observation time on station 1 hrs
Maximum epoch interval for data sampling 5 sec
Office
Fixed integer solution for all baselines Yes
Ephemeris Broadcast
Maximum misclosure per loop in any one component (x,y,z) not to exceed 5 cm
Page 20
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 21
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
The final solution type of the processed GPS observation is "Fixed, IonoFree / Float,
IonoFree".
9.2. Software
Topcon Receiver Utility was used for the download of the raw data from the receivers. Magnet
Tools was used for the post processing and adjustment of the raw data.
Page 22
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8/25/2017
Start Time 8/25/2017 9:48 Stop Time Duration 9:14:00
19:02
Method Static Slant Antenna Height (m) 1.65 H RMS (m)/V RMS (m) 31.838/33.075
Epoch Interval
5000 No. of Epoch 6648 GPS week,day 1,963,237
(msec)
Point Name AP-90 Original Name log0825e_5U68 Log File Name log0825e.tps
8/25/2017
Start Time 8/25/2017 10:01 Stop Time Duration 1:47:40
11:49
Method Static Slant Antenna Height (m) 1.464 H RMS (m)/V RMS (m) 17.422/22.068
Epoch Interval
5000 No. of Epoch 1292 GPS week,day 1,963,237
(msec)
Point Name AP-89 Original Name log0825e_IBYG Log File Name log0825e.tps
Page 23
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
11:48
Method Static Slant Antenna Height (m) 1.477 H RMS (m)/V RMS (m) 19.635/24.621
Epoch Interval
5000 No. of Epoch 1271 GPS week,day 1,963,237
(msec)
Point Name AP-84 Original Name log0825h_5U68 Log File Name log0825h.tps
8/25/2017
Start Time 8/25/2017 13:13 Stop Time Duration 0:58:25
14:12
Method Static Slant Antenna Height (m) 1.415 H RMS (m)/V RMS (m) 23.132/23.983
Epoch Interval
5000 No. of Epoch 701 GPS week,day 1,963,237
(msec)
Point Name AP-84-1 Original Name log0825h_IBYG Log File Name log0825h.tps
8/25/2017
Start Time 8/25/2017 13:15 Stop Time Duration 0:57:00
14:12
Method Static Slant Antenna Height (m) 1.615 H RMS (m)/V RMS (m) 22.385/24.436
Epoch Interval
5000 No. of Epoch 684 GPS week,day 1,963,237
(msec)
Point Name AP-78-1 Original Name log0825j_5U68 Log File Name log0825j.tps
8/25/2017
Start Time 8/25/2017 15:01 Stop Time Duration 0:59:50
16:01
Method Static Slant Antenna Height (m) 1.609 H RMS (m)/V RMS (m) 28.587/18.366
Epoch Interval
5000 No. of Epoch 718 GPS week,day 1,963,237
(msec)
Point Name AP-78 Original Name log0825j_IBYG Log File Name log0825j.tps
Page 24
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8/25/2017
Start Time 8/25/2017 15:01 Stop Time Duration 0:59:40
16:01
Method Static Slant Antenna Height (m) 1.61 H RMS (m)/V RMS (m) 26.244/15.957
Epoch Interval
5000 No. of Epoch 716 GPS week,day 1,963,237
(msec)
Point Name AP-74-1 Original Name log0825l_5U68 Log File Name log0825l.tps
8/25/2017
Start Time 8/25/2017 17:19 Stop Time Duration 1:42:00
19:01
Method Static Slant Antenna Height (m) 1.522 H RMS (m)/V RMS (m) 24.917/23.719
Epoch Interval
5000 No. of Epoch 1224 GPS week,day 1,963,237
(msec)
Point Name AP-74 Original Name log0825l_IBYG Log File Name log0825l.tps
8/25/2017
Start Time 8/25/2017 17:21 Stop Time Duration 1:39:00
19:00
Method Static Slant Antenna Height (m) 1.545 H RMS (m)/V RMS (m) 29.995/25.211
Epoch Interval
5000 No. of Epoch 1188 GPS week,day 1,963,237
(msec)
Point Name AP-68-1 Original Name log0826b_5U68 Log File Name log0826b.tps
Start Time 8/26/2017 7:37 Stop Time 8/26/2017 8:37 Duration 0:59:35
Method Static Slant Antenna Height (m) 1.52 H RMS (m)/V RMS (m) 33.965/18.643
Epoch Interval
5000 No. of Epoch 715 GPS week,day 1,963,238
(msec)
Point Name AP-68 Original Name log0826b_IBYG Log File Name log0826b.tps
Page 25
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Start Time 8/26/2017 7:38 Stop Time 8/26/2017 8:38 Duration 0:59:50
Method Static Slant Antenna Height (m) 1.562 H RMS (m)/V RMS (m) 17.546/11.66
Epoch Interval
5000 No. of Epoch 718 GPS week,day 1,963,238
(msec)
Point Name AP-64-1 Original Name log0826b_IEBS Log File Name log0826b.tps
8/26/2017
Start Time 8/26/2017 7:38 Stop Time Duration 6:43:10
14:21
Method Static Slant Antenna Height (m) 1.601 H RMS (m)/V RMS (m) 32.534/33.794
Epoch Interval
5000 No. of Epoch 4838 GPS week,day 1,963,238
(msec)
Point Name AP-64-1 Original Name log0826d_5U68 Log File Name log0826d.tps
8/26/2017
Start Time 8/26/2017 9:12 Stop Time Duration 1:27:25
10:40
Method Static Slant Antenna Height (m) 1.575 H RMS (m)/V RMS (m) 19.688/19.108
Epoch Interval
5000 No. of Epoch 1049 GPS week,day 1,963,238
(msec)
Point Name AP-64 Original Name log0826d_IBYG Log File Name log0826d.tps
8/26/2017
Start Time 8/26/2017 9:16 Stop Time Duration 1:23:55
10:40
Method Static Slant Antenna Height (m) 1.403 H RMS (m)/V RMS (m) 12.548/13.507
Epoch Interval
5000 No. of Epoch 1007 GPS week,day 1,963,238
(msec)
Point Name AP-60 Original Name log0826g_5U68 Log File Name log0826g.tps
Page 26
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8/26/2017
Start Time 8/26/2017 12:18 Stop Time Duration 1:59:50
14:18
Method Static Slant Antenna Height (m) 1.665 H RMS (m)/V RMS (m) 28.522/30.056
Epoch Interval
5000 No. of Epoch 1438 GPS week,day 1,963,238
(msec)
Point Name AP-60-1 Original Name log0826g_IBYG Log File Name log0826g.tps
8/26/2017
Start Time 8/26/2017 12:18 Stop Time Duration 1:58:50
14:17
Method Static Slant Antenna Height (m) 1.581 H RMS (m)/V RMS (m) 20.869/21.548
Epoch Interval
5000 No. of Epoch 1426 GPS week,day 1,963,238
(msec)
Point Name AP-60 Original Name log0826k_IEBS Log File Name log0826k.tps
8/26/2017
Start Time 8/26/2017 16:24 Stop Time Duration 1:36:40
18:01
Method Static Slant Antenna Height (m) 1.574 H RMS (m)/V RMS (m) 37.169/42.622
Epoch Interval
5000 No. of Epoch 1160 GPS week,day 1,963,238
(msec)
Point Name AP-52 Original Name log0826k_5U68 Log File Name log0826k.tps
8/26/2017
Start Time 8/26/2017 16:26 Stop Time Duration 1:30:10
17:56
Method Static Slant Antenna Height (m) 1.575 H RMS (m)/V RMS (m) 10.583/15.275
Epoch Interval
5000 No. of Epoch 1082 GPS week,day 1,963,238
(msec)
Point Name AP-52-1 Original Name log0826k_IBYG Log File Name log0826k.tps
Page 27
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8/26/2017
Start Time 8/26/2017 16:26 Stop Time Duration 1:29:50
17:56
Method Static Slant Antenna Height (m) 1.617 H RMS (m)/V RMS (m) 9.272/14.537
Epoch Interval
5000 No. of Epoch 1078 GPS week,day 1,963,238
(msec)
Point Name AP-52-1 Original Name log0827b_IBYG Log File Name log0827b.tps
8/27/2017
Start Time 8/27/2017 7:08 Stop Time Duration 9:11:35
16:20
Method Static Slant Antenna Height (m) 1.687 H RMS (m)/V RMS (m) 21.569/25.104
Epoch Interval
5000 No. of Epoch 6619 GPS week,day 1,964,239
(msec)
Point Name AP-48-1 Original Name log0827b_5U68 Log File Name log0827b.tps
Start Time 8/27/2017 7:16 Stop Time 8/27/2017 8:12 Duration 0:55:55
Method Static Slant Antenna Height (m) 1.352 H RMS (m)/V RMS (m) 20.088/30.396
Epoch Interval
5000 No. of Epoch 671 GPS week,day 1,964,239
(msec)
Point Name AP-48 Original Name log0827b_IEBS Log File Name log0827b.tps
Start Time 8/27/2017 7:16 Stop Time 8/27/2017 8:10 Duration 0:54:20
Method Static Slant Antenna Height (m) 1.346 H RMS (m)/V RMS (m) 12.516/17.079
Epoch Interval
5000 No. of Epoch 652 GPS week,day 1,964,239
(msec)
Point Name AP-43-1 Original Name log0827d_5U68 Log File Name log0827d.tps
Page 28
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8/27/2017
Start Time 8/27/2017 9:06 Stop Time Duration 1:24:40
10:31
Method Static Slant Antenna Height (m) 1.555 H RMS (m)/V RMS (m) 48.371/44.888
Epoch Interval
5000 No. of Epoch 1016 GPS week,day 1,964,239
(msec)
Point Name AP-43 Original Name log0827d_IEBS Log File Name log0827d.tps
8/27/2017
Start Time 8/27/2017 9:06 Stop Time Duration 1:24:25
10:31
Method Static Slant Antenna Height (m) 1.672 H RMS (m)/V RMS (m) 27.929/26.264
Epoch Interval
5000 No. of Epoch 1013 GPS week,day 1,964,239
(msec)
Point Name AP-40 Original Name log0827h_5U68 Log File Name log0827h.tps
8/27/2017
Start Time 8/27/2017 13:40 Stop Time Duration 1:46:10
15:26
Method Static Slant Antenna Height (m) 1.47 H RMS (m)/V RMS (m) 9.489/7.302
Epoch Interval
5000 No. of Epoch 1274 GPS week,day 1,964,239
(msec)
Point Name AP-40-1 Original Name log0827h_IEBS Log File Name log0827h.tps
8/27/2017
Start Time 8/27/2017 13:40 Stop Time Duration 1:44:25
15:24
Method Static Slant Antenna Height (m) 1.146 H RMS (m)/V RMS (m) 37.639/37.819
Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)
Point Name AP-31 Original Name log0827h_IEBS Log File Name log0827h.tps
Page 29
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8/28/2017
Start Time 8/28/2017 13:40 Stop Time Duration 1:34:25
15:14
Method Static Slant Antenna Height (m) 1.563 H RMS (m)/V RMS (m) 37.639/37.819
Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)
Point Name AP-31-1 Original Name log0827h_IEBS Log File Name log0827h.tps
8/28/2017
Start Time 8/28/2017 13:56 Stop Time Duration 1:15:25
15:11
Method Static Slant Antenna Height (m) 1.265 H RMS (m)/V RMS (m) 37.639/37.819
Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)
Point Name AP-29 Original Name log0827h_IEBS Log File Name log0827h.tps
8/29/2017
Start Time 8/29/2017 10:40 Stop Time Duration 1:15:5
11:55
Method Static Slant Antenna Height (m) 1.335 H RMS (m)/V RMS (m) 37.639/37.819
Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)
Point Name AP-29-1 Original Name log0827h_IEBS Log File Name log0827h.tps
8/29/2017
Start Time 8/29/2017 10:59 Stop Time Duration 1:08:15
12:07
Method Static Slant Antenna Height (m) 1.256 H RMS (m)/V RMS (m) 37.639/37.819
Page 30
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
(msec)
Point Name AP-22 Original Name log0827h_IEBS Log File Name log0827h.tps
8/30/2017
Start Time 8/30/2017 9:16 Stop Time Duration 1:24:25
10:40
Method Static Slant Antenna Height (m) 1.221 H RMS (m)/V RMS (m) 37.639/37.819
Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)
Point Name AP-22-1 Original Name log0827h_IEBS Log File Name log0827h.tps
8/30/2017
Start Time 8/30/2017 10:05 Stop Time Duration 1:15:16
11:20
Method Static Slant Antenna Height (m) 1.265 H RMS (m)/V RMS (m) 37.639/37.819
Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)
Point Name AP-13 Original Name log0827h_IEBS Log File Name log0827h.tps
8/30/2017
Start Time 8/30/2017 13:40 Stop Time Duration 1:16:23
14:56
Method Static Slant Antenna Height (m) 1.365 H RMS (m)/V RMS (m) 37.639/37.819
Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)
Point Name AP-13-1 Original Name log0827h_IEBS Log File Name log0827h.tps
Page 31
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
15:15
Method Static Slant Antenna Height (m) 1.425 H RMS (m)/V RMS (m) 37.639/37.819
Epoch Interval
5000 No. of Epoch 1253 GPS week,day 1,964,239
(msec)
Page 32
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8/25/2017 Common
Start Time Stop Time 8/25/2017 11:49 Duration 1:47:40 1292
10:01 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Rover
BASELINE From : AP-89 To : AP-90 Base Antenna Type GR-5/Atlas 1.464
Antenna Type
8/25/2017 Common
Start Time Stop Time 8/25/2017 11:48 Duration 1:45:55 1271
10:02 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Rover
BASELINE From : AP-89 To : AP-100 Base Antenna Type GR-5/Atlas 1.65
Antenna Type
8/25/2017 Common
Start Time Stop Time 8/25/2017 11:48 Duration 1:45:55 1271
10:02 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Page 33
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Orbit Broadcast Res E (m) 0 Res N (m) 0.001 Res El (m) 0.001
Res X (m) 0.001 Res Y (m) 0 Res Z (m) 0.001 Res D (m) 0
Rover
BASELINE From : AP-84 To : AP-100 Base Antenna Type GR-3 1.65
Antenna Type
8/25/2017 Common
Start Time Stop Time 8/25/2017 14:12 Duration 0:58:25 701
13:13 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Res X (m) 0 Res Y (m) -0.002 Res Z (m) -0.001 Res D (m) 0
Rover
BASELINE From : AP-84 To : AP-84-1 Base Antenna Type GR-3 1.615
Antenna Type
8/25/2017 Common
Start Time Stop Time 8/25/2017 14:12 Duration 0:57:00 684
13:15 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Res X (m) 0.001 Res Y (m) 0.004 Res Z (m) 0.003 Res D (m) 0
Page 34
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8/25/2017 Common
Start Time Stop Time 8/25/2017 14:12 Duration 0:57:00 684
13:15 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Res X (m) 0.001 Res Y (m) 0.004 Res Z (m) 0.003 Res D (m) -0.001
8/25/2017 Common
Start Time Stop Time 8/25/2017 16:01 Duration 0:59:50 718
15:01 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) -0.02 Res N (m) -0.082 Res El (m) -0.14
Res X (m) 0.007 Res Y (m) -0.093 Res Z (m) -0.142 Res D (m) 0.096
Rover
BASELINE From : AP-78 To : AP-78-1 Base Antenna Type GR-5/Atlas 1.609
Antenna Type
8/25/2017 Common
Start Time Stop Time 8/25/2017 16:01 Duration 0:59:35 715
15:01 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Page 35
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 36
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Rover
BASELINE From : AP-78 To : AP-100 Base Antenna Type GR-5/Atlas 1.65
Antenna Type
8/25/2017 Common
Start Time Stop Time 8/25/2017 16:01 Duration 0:59:40 716
15:01 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
8/25/2017 Common
Start Time Stop Time 8/25/2017 19:01 Duration 1:42:00 1224
17:19 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0 Res N (m) 0.005 Res El (m) 0.003
Res X (m) 0 Res Y (m) 0 Res Z (m) 0.006 Res D (m) -0.005
Rover
BASELINE From : AP-74 To : AP-74-1 Base Antenna Type GR-5/Atlas 1.522
Antenna Type
8/25/2017 Common
Start Time Stop Time 8/25/2017 19:00 Duration 1:39:00 1188
17:21 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Page 37
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Rover
BASELINE From : AP-74 To : AP-100 Base Antenna Type GR-5/Atlas 1.65
Antenna Type
8/25/2017 Common
Start Time Stop Time 8/25/2017 19:00 Duration 1:39:00 1188
17:21 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.001 Res N (m) -0.009 Res El (m) -0.003
Res X (m) -0.001 Res Y (m) 0.002 Res Z (m) -0.01 Res D (m) 0.009
Rover
BASELINE From : AP-68 To : AP-68-1 Base Antenna Type GR-5/Atlas 1.52
Antenna Type
Common
Start Time 8/26/2017 7:38 Stop Time 8/26/2017 8:37 Duration 0:59:05 709
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) -0.001 Res N (m) 0.001 Res El (m) -0.003
Res X (m) 0 Res Y (m) -0.003 Res Z (m) -0.001 Res D (m) -0.001
Page 38
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Common
Start Time 8/26/2017 7:38 Stop Time 8/26/2017 8:37 Duration 0:59:05 709
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0 Res N (m) 0.001 Res El (m) -0.004
Res X (m) 0 Res Y (m) -0.004 Res Z (m) -0.001 Res D (m) -0.001
Rover
BASELINE From : AP-68 To : AP-74-1 Base Antenna Type GR-5/Atlas 1.601
Antenna Type
Common
Start Time 8/26/2017 7:38 Stop Time 8/26/2017 8:38 Duration 0:59:50 718
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.001 Res N (m) -0.001 Res El (m) 0.004
Res X (m) 0 Res Y (m) 0.004 Res Z (m) 0.001 Res D (m) 0.001
Common
Start Time 8/26/2017 9:12 Stop Time 8/26/2017 10:40 Duration 1:27:25 1049
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) -0.001 Res N (m) 0.005 Res El (m) 0.007
Res X (m) 0.001 Res Y (m) 0.004 Res Z (m) 0.008 Res D (m) -0.001
Page 39
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 40
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Rover
BASELINE From : AP-64 To : AP-64-1 Base Antenna Type GR-5/Atlas 1.575
Antenna Type
Common
Start Time 8/26/2017 9:16 Stop Time 8/26/2017 10:40 Duration 1:23:35 1003
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Rover
BASELINE From : AP-64 To : AP-74-1 Base Antenna Type GR-5/Atlas 1.601
Antenna Type
Common
Start Time 8/26/2017 9:16 Stop Time 8/26/2017 10:40 Duration 1:23:55 1007
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0 Res N (m) -0.003 Res El (m) -0.005
Res X (m) 0 Res Y (m) -0.003 Res Z (m) -0.005 Res D (m) 0.001
Rover
BASELINE From : AP-60 To : AP-74-1 Base Antenna Type GR-3 1.601
Antenna Type
8/26/2017 Common
Start Time Stop Time 8/26/2017 14:18 Duration 1:59:50 1438
12:18 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Page 41
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Orbit Broadcast Res E (m) -0.001 Res N (m) -0.003 Res El (m) -0.01
Res X (m) -0.001 Res Y (m) -0.008 Res Z (m) -0.008 Res D (m) 0.001
Rover
BASELINE From : AP-60 To : AP-60-1 Base Antenna Type GR-3 1.581
Antenna Type
8/26/2017 Common
Start Time Stop Time 8/26/2017 14:17 Duration 1:58:50 1426
12:18 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Res X (m) 0 Res Y (m) 0.001 Res Z (m) 0.001 Res D (m) 0
8/26/2017 Common
Start Time Stop Time 8/26/2017 14:17 Duration 1:58:50 1426
12:18 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.001 Res N (m) 0.004 Res El (m) 0.013
Res X (m) 0.001 Res Y (m) 0.009 Res Z (m) 0.009 Res D (m) -0.001
Rover
BASELINE From : AP-52 To : AP-60 Base Antenna Type GR-3 1.574
Antenna Type
Page 42
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8/26/2017 Common
Start Time Stop Time 8/26/2017 17:56 Duration 1:30:10 1082
16:26 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Res X (m) 0.001 Res Y (m) 0.001 Res Z (m) 0 Res D (m) 0
Rover
BASELINE From : AP-52 To : AP-52-1 Base Antenna Type GR-3 1.617
Antenna Type
8/26/2017 Common
Start Time Stop Time 8/26/2017 17:56 Duration 1:29:50 1078
16:26 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
8/26/2017 Common
Start Time Stop Time 8/26/2017 17:56 Duration 1:29:50 1078
16:26 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Res X (m) -0.001 Res Y (m) -0.001 Res Z (m) 0 Res D (m) 0
Page 43
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 44
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Common
Start Time 8/27/2017 7:16 Stop Time 8/27/2017 8:12 Duration 0:55:55 671
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Rover
BASELINE From : AP-48 To : AP-48-1 Base Antenna Type GR-5/Atlas 1.352
Antenna Type
Common
Start Time 8/27/2017 7:16 Stop Time 8/27/2017 8:10 Duration 0:54:20 652
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.001 Res N (m) 0 Res El (m) -0.003
Res X (m) -0.002 Res Y (m) -0.003 Res Z (m) -0.001 Res D (m) 0.002
Rover
BASELINE From : AP-48 To : AP-52-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type
Common
Start Time 8/27/2017 7:16 Stop Time 8/27/2017 8:10 Duration 0:54:20 652
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Page 45
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Orbit Broadcast Res E (m) -0.001 Res N (m) 0 Res El (m) 0.004
Res X (m) 0.002 Res Y (m) 0.003 Res Z (m) 0.001 Res D (m) 0.001
Common
Start Time 8/27/2017 9:06 Stop Time 8/27/2017 10:31 Duration 1:24:40 1016
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Res X (m) 0 Res Y (m) 0.001 Res Z (m) 0.001 Res D (m) 0
Rover
BASELINE From : AP-43 To : AP-43-1 Base Antenna Type GR-5/Atlas 1.555
Antenna Type
Common
Start Time 8/27/2017 9:06 Stop Time 8/27/2017 10:31 Duration 1:24:25 1013
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Rover
BASELINE From : AP-43 To : AP-52-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type
Page 46
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Common
Start Time 8/27/2017 9:06 Stop Time 8/27/2017 10:31 Duration 1:24:25 1013
Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Res X (m) 0 Res Y (m) -0.001 Res Z (m) -0.001 Res D (m) 0
Rover
BASELINE From : AP-40 To : AP-52-1 Base Antenna Type GR-3 1.687
Antenna Type
8/27/2017 Common
Start Time Stop Time 8/27/2017 15:26 Duration 1:46:10 1274
13:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) -0.002 Res N (m) -0.004 Res El (m) -0.005
Res X (m) 0.002 Res Y (m) -0.002 Res Z (m) -0.006 Res D (m) 0.005
Rover
BASELINE From : AP-40 To : AP-40-1 Base Antenna Type GR-3 1.146
Antenna Type
8/27/2017 Common
Start Time Stop Time 8/27/2017 15:24 Duration 1:44:25 1253
13:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Page 47
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 48
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Rover
BASELINE From : AP-40 To : AP-52-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type
8/27/2017 Common
Start Time Stop Time 8/27/2017 15:24 Duration 1:44:25 1253
13:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002
Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003
8/27/2017 Common
Start Time Stop Time 8/27/2017 15:24 Duration 1:44:25 1253
13:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002
Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003
ASELINE
Start Time 8/28/2017 Stop Time 8/28/2017 15:24 Duration 1:16:25 Common 1253
Page 49
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
13:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002
Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003
Rover
BASELINE From : AP-31 To : AP-31-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type
8/28/2017 Common
Start Time Stop Time 8/28/2017 12:24 Duration 1:16:25 1253
10:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002
Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003
8/29/2017 Common
Start Time Stop Time 8/29/2017 11:24 Duration 1:44:25 1253
09:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002
Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003
Page 50
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 51
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8/29/2017 Common
Start Time Stop Time 8/29/2017 15:24 Duration 1:44:25 1253
13:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002
Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003
Rover
BASELINE From : AP-29 To : AP-22-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type
8855.8226
Distance (m) Azimuth 233°36'13.4141" ∆E 14.18 ∆N -7448.83
8/30/2017 Common
Start Time Stop Time 8/30/2017 12:24 Duration 1:44:25 1253
10:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002
Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003
8/30/2017 Common
Start Time Stop Time 8/30/2017 15:14 Duration 1:44:15 1253
13:40 Epochs
Page 52
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Mask
Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002
Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003
Rover
BASELINE From : 22 To : AP-13 Base Antenna Type GR-5/Atlas 1.687
Antenna Type
8/30/2017 Common
Start Time Stop Time 8/30/2017 17:24 Duration 1:44:25 1253
16:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.002 Res N (m) 0.003 Res El (m) 0.002
Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003
Rover
BASELINE From : 13 To : AP-13-1 Base Antenna Type GR-5/Atlas 1.687
Antenna Type
8/31/2017 Common
Start Time Stop Time 8/31/2017 10:24 Duration 1:44:25 1253
08:40 Epochs
Elevation
Solution Type Fixed AutoReject Allowed Adjustment Status Adjusted 15
Mask
Orbit Broadcast Res E (m) 0.003 Res N (m) 0.003 Res El (m) 0.002
Res X (m) -0.002 Res Y (m) 0.001 Res Z (m) 0.004 Res D (m) -0.003
Page 53
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 54
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
NAME dE(m) dN(m) dHt(m) Horz RMS (m) Vert RMS (m)
AP-68-1−AP-74-1 4399.236 6777.418 -457.24 0.006 0.01
AP-74−AP-74-1 37.256 78.385 -5.87 0.002 0.004
AP-74−AP-90 5778.958 20097.337 885.54 0.011 0.015
Page 55
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
ANNEXES
All the documents and maps are presented in the following Annexes:
Annex - A: List and Description Card of Angle Points
Annex - B: Ortho Imageries of Route Alignment
Annex - C: Traverse Computation Data
Annex -D Angle Point Location Map & Route Alignment Plan
Annex - E: Plan & Profile Drawing
Page 56
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 57
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Annex A: 1
Table List of Angle Points
Page 58
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
SN EASTING( in m) NORTHING( in m) ELEVATION ( in m) Ang. Point
40 624894.575 3175878.002 836.320 AP20.1
41 624379.869 3175100.713 932.400 AP21
42 624389.782 3175075.102 939.510 AP21.1
43 623015.188 3173810.184 1775.430 AP22.1
44 623063.798 3173807.825 1784.090 AP22
45 621164.281 3173044.255 1392.180 AP23.1
46 621175.075 3173082.059 1410.570 AP23
47 620702.995 3172398.177 1280.350 AP24
48 620697.369 3172373.710 1279.610 AP24.1
49 620696.444 3171234.673 1155.260 AP25
50 620689.974 3171204.296 1156.310 AP25.1
51 620467.353 3170945.163 1080.620 AP26
52 620420.144 3170856.923 1077.200 AP26.1
53 620340.723 3170551.305 1034.190 AP27
54 620328.784 3170538.633 1032.460 AP27.1
55 619933.626 3169125.944 839.830 AP28.1
56 619921.419 3169147.534 838.600 AP28
57 618341.026 3166324.388 796.170 AP29
58 618326.846 3166361.351 795.670 AP29.1
59 615546.840 3165458.914 915.140 AP30
60 615537.369 3165487.194 906.850 AP30.1
61 611882.343 3160824.984 1577.840 AP31
62 611845.262 3160830.320 1585.350 AP31.1
63 611574.147 3160550.617 1447.240 AP32
64 611578.882 3160497.854 1432.200 AP32.1
65 609668.680 3159941.729 1187.410 AP33.1
66 609667.303 3159956.200 1187.560 AP33
67 608406.590 3159123.205 945.390 AP34
68 608391.616 3159058.907 922.690 AP34.1
69 608122.731 3158729.954 983.200 AP35
70 608103.029 3158737.641 986.050 AP35.1
71 608011.601 3158246.874 952.910 AP36
72 607994.661 3158238.621 951.740 AP36.1
73 608013.831 3157736.073 830.040 AP37
74 608003.556 3157723.805 836.060 AP37.1
75 607794.734 3157436.535 894.510 AP38
76 607774.427 3157451.937 904.610 AP38.1
77 607443.850 3156795.953 884.890 AP39.1
78 607426.835 3156832.861 890.540 AP39
79 606044.839 3155668.870 780.530 AP40
80 606024.530 3155620.658 772.070 AP40.1
81 605164.444 3155330.878 691.260 AP41
Page 59
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
SN EASTING( in m) NORTHING( in m) ELEVATION ( in m) Ang. Point
82 605167.950 3155303.127 685.400 AP41.1
83 604728.811 3154907.357 689.190 AP42
84 604757.088 3154927.253 688.160 AP42.1
85 601172.680 3154196.409 738.730 AP-43
86 601183.817 3154220.640 736.720 AP-43-1
87 599532.992 3151168.980 793.550 AP44
88 599536.453 3151147.141 793.300 AP44.1
89 599375.619 3150238.821 638.560 AP45.1
90 599380.831 3150271.205 634.480 AP45
91 599227.669 3149836.467 699.750 AP46.1
92 599224.390 3149817.357 710.990 AP46
93 598435.205 3149540.523 655.530 AP47.1
94 598463.368 3149556.128 658.530 AP47
95 597990.825 3149286.203 637.660 AP-48
96 597994.017 3149432.406 556.200 AP-48-1
97 596806.951 3148714.037 668.920 AP49
98 596837.317 3148683.941 664.010 AP49.1
99 596362.703 3148195.221 666.840 AP50.1
100 596362.751 3148210.863 672.270 AP50
101 595652.234 3147924.441 687.180 AP51
102 595629.804 3147922.875 682.730 AP51.1
103 595210.119 3147569.366 605.540 AP-52
104 595287.999 3147555.820 582.550 AP-52-1
105 595020.192 3147479.349 771.390 AP53.1
106 595039.117 3147460.348 777.870 AP53
107 592336.887 3146825.233 1147.250 AP54
108 592383.706 3146870.655 1146.440 AP54.1
109 591066.424 3146205.194 627.480 AP55
110 591050.322 3146213.432 618.560 AP55.1
111 590166.835 3146207.421 710.850 AP56
112 590164.763 3146280.935 669.410 AP56.1
113 589491.613 3145733.211 689.900 AP57.1
114 589481.746 3145748.664 680.350 AP57
115 588276.809 3145327.944 510.990 AP_58
116 588230.529 3145329.547 511.520 AP_58.1
117 587836.289 3145616.637 490.110 AP_59
118 587874.736 3145626.318 490.610 AP_59.1
119 586126.472 3145637.045 471.300 AP-60
120 586170.765 3145603.941 471.250 AP60.1
121 585708.240 3145449.433 528.240 AP_61
122 585718.346 3145455.325 525.220 AP_61.1
123 584299.307 3145521.006 536.540 AP_62
Page 60
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
SN EASTING( in m) NORTHING( in m) ELEVATION ( in m) Ang. Point
124 584299.965 3145579.287 535.300 AP_62.1
125 581374.810 3146209.987 494.570 AP_63
126 581313.050 3146227.665 494.490 AP_63.1
127 579123.903 3147083.443 469.950 AP-64
128 579183.966 3147105.911 469.980 AP64.1
129 577828.490 3147346.310 505.590 AP_65
130 577866.470 3147323.488 501.200 AP_65.1
131 576955.062 3148256.175 502.040 AP_66
132 576923.668 3148237.604 513.750 AP_66.1
133 574026.524 3149324.947 513.360 AP_67
134 573990.683 3149321.396 515.380 AP_67.1
135 572263.070 3149702.058 583.760 AP_68
136 572328.960 3149699.001 584.210 AP_68.1
137 570465.273 3149663.207 560.180 AP_69
138 570518.974 3149709.853 561.480 AP_69.1
139 569810.841 3149010.896 582.580 AP_70
140 569857.404 3148961.776 585.480 AP_70.1
141 569561.358 3148783.299 557.900 AP-71
142 569614.748 3148810.186 558.070 AP-71.1
143 569400.313 3148338.042 588.300 AP_72
144 569371.571 3148367.646 588.040 AP_72.1
145 568798.769 3147274.880 933.150 AP_73.1
146 568829.555 3147300.602 937.780 AP_73
147 567965.557 3142994.404 1035.580 AP_74
148 567928.522 3142915.919 1041.450 AP_74.1
149 567697.280 3141690.620 917.540 AP_75.1
150 567690.777 3141708.406 911.880 AP_75
151 567113.061 3141069.803 815.830 AP_76.1
152 567089.356 3141085.785 802.880 AP76
153 567168.033 3136940.031 551.030 AP77.1
154 567134.758 3136985.404 550.750 AP.77
155 566144.509 3135493.695 656.520 AP-78
156 566187.255 3135494.899 660.390 AP78.1
157 566439.617 3134872.660 609.620 AP.79
158 566438.605 3134837.852 600.120 AP.79.1
159 566558.766 3133761.328 315.350 AP.80.1
160 566528.769 3133767.091 325.140 AP.80
161 566224.302 3133135.454 322.370 AP81.1
162 566205.536 3133143.009 331.760 AP81
163 565800.501 3132332.925 209.350 AP82.1
164 565821.390 3132360.209 209.820 AP82
165 565595.681 3131449.867 217.380 AP83.1
Page 61
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
SN EASTING( in m) NORTHING( in m) ELEVATION ( in m) Ang. Point
166 565564.389 3131445.321 216.410 AP83
167 564267.105 3130502.087 172.270 AP84
168 564205.018 3130414.963 171.290 AP84-1
169 563731.163 3128712.400 160.970 AP85
170 563795.956 3128700.615 160.610 AP85.1
171 563844.108 3126568.414 156.100 AP86.1
172 563878.671 3126598.682 156.240 AP86
173 562774.533 3125179.879 158.060 AP87.1
174 562688.265 3125235.146 152.160 AP87
175 562848.140 3124318.896 152.150 AP88
176 562785.512 3124288.151 153.260 AP88.1
177 562087.465 3122997.343 150.040 AP89
178 562188.022 3122902.631 150.000 AP90
179 564969.673 3129976.392 170.260 AP100
Page 62
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Annex A: 2 Description Card (D-Card)
Page 63
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 64
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 65
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 66
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 67
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 68
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 69
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 70
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 71
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 72
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 73
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 74
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 75
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 76
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 77
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 78
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 79
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 80
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 81
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 82
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 83
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 84
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 85
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 86
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 87
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 88
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 89
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 90
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 91
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 92
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 93
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 94
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 95
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 96
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 97
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 98
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 99
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 100
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 101
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 102
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 103
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 104
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 105
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 106
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 107
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 108
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 109
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 110
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 111
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 112
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 113
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 114
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 115
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 116
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 117
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 118
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 119
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 120
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 121
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 122
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 123
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 124
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 125
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 126
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 127
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 128
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 129
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 130
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 131
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 132
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 133
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 134
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 135
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 136
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 137
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 138
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 139
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 140
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 141
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 142
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 143
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 144
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 145
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 146
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 147
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 148
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 149
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 150
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 151
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 152
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 153
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 154
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 155
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 156
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 157
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 158
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 159
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 160
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 161
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 162
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 163
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 164
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 165
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 166
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 167
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 168
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 169
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 170
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 171
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 172
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 173
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 174
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 175
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 176
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 177
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 178
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 179
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 180
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 181
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 182
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 183
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 184
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 185
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 186
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 187
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 188
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 189
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 190
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 191
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 192
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 193
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 194
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 195
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 196
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 197
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 198
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 199
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 200
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 201
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 202
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 203
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 204
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 205
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 206
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 207
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 208
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 209
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 210
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 211
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 212
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 213
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 214
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 215
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 216
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 217
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 218
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 219
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 220
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 221
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 222
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 223
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 224
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 225
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 226
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 227
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 228
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 229
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 230
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 231
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 232
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 233
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 234
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 235
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 236
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 237
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 238
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 239
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 240
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 241
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 242
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 243
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 244
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 245
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 246
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 247
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 248
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 249
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 250
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 251
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 252
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 253
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 254
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 255
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 256
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 257
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 258
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 259
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 260
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 261
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Annex – C: Traverse Computation Data
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n
Page 262
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n
- - -
209.5 167.6 0.0 - 0.0 62676 31857
11 AP-3.1 175.4409 0.0003 175.4412 82.70 145. 145.82
589 486 032 82.707 004 0.135 01.575
4076 829 9
- -
205.0 30.82 0.0 - 0.0 - 62674 31856
12 AP-3 196.3369 0.0003 196.3372 13.02 27.9
001 32 032 13.030 004 27.936 7.105 73.64
6496 35
- -
221.3 112.6 0.0 - 0.0 - 62667 31855
13 TP-5 185.7955 0.0003 185.7958 74.42 84.6
373 874 032 74.432 004 84.610 2.673 89.03
8969 10
- - - -
227.1 200.8 0.0 0.0 62652 31854
14 AP-4.1 170.4590 0.0003 170.4593 147.1 147.18 136. 136.61
331 127 032 004 5.487 52.417
8286 6 612 3
- -
217.5 59.62 0.0 - 0.0 - 62648 31854
15 AP-4 135.4164 0.0003 135.4167 36.37 47.2
924 29 032 36.376 004 47.244 9.112 05.173
2358 43
- -
173.0 189.1 23.02 0.0 0.0 62651 31852
16 TP-6 179.9319 0.0003 179.9322 23.017 187. 187.73
091 399 05389 032 004 2.129 17.439
734 4
- -
172.9 159.7 19.62 0.0 0.0 62653 31850
17 TP-7 169.8447 0.0003 169.8450 19.625 158. 158.51
413 283 8396 032 004 1.754 58.921
518 8
-
162.7 46.29 13.70 0.0 0.0 - 62654 31850
18 AP-5 185.5426 0.0003 185.5429 13.697 44.2
863 59 06447 032 004 44.223 5.452 14.699
22
- -
168.3 128.6 26.02 0.0 0.0 62657 31848
19 AP-5.1 178.3384 0.0003 178.3387 26.027 126. 126.01
292 769 98213 032 004 1.478 88.682
017 7
20 TP-8 177.7936 0.0003 177.7939 166.6 141.5 32.64 0.0 32.639 - 0.0 - 62660 31847
Page 263
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n
Page 264
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n
7852 54
- - -
214.1 146.2 0.0 - 0.0 62627 31838
30 TP-14 180.5607 0.0003 180.5610 82.07 120. 120.99
495 062 032 82.077 004 3.164 98.105
3461 997 7
- -
214.7 106.0 0.0 - 0.0 - 62621 31838
31 TP-15 182.2047 0.0003 182.2050 60.39 87.1
105 636 032 60.399 004 87.189 2.765 10.916
5815 88
- - - -
216.9 173.7 0.0 0.0 62610 31836
32 TP-16 182.0399 0.0003 182.0402 104.3 104.35 138. 138.90
155 363 032 004 8.410 72.009
5237 6 906 6
- - - -
218.9 211.4 0.0 0.0 62597 31835
33 TP-17 177.8937 0.0003 177.8940 132.9 132.97 164. 164.46
557 897 032 004 5.439 07.548
6766 1 461 2
- - -
216.8 134.5 0.0 - 0.0 62589 31833
34 TP-18 195.4468 0.0003 195.4471 80.66 107. 107.63
497 058 032 80.669 004 4.770 99.914
5543 633 3
- -
232.2 83.04 0.0 - 0.0 - 62582 31833
35 AP-8.1 152.1428 0.0003 152.1431 65.70 50.7
968 32 032 65.706 004 50.787 9.064 49.127
2898 87
- -
204.4 21.05 0.0 0.0 - 62582 31833
36 AP-8 155.2097 0.0003 155.2100 8.709 -8.713 19.1
399 12 032 004 19.165 0.351 29.962
6923 65
- -
179.6 142.7 0.872 0.0 0.0 62582 31831
37 TP-19 167.6264 0.0003 167.6267 0.869 142. 142.78
499 886 48971 032 004 1.221 87.176
786 6
- -
167.2 122.0 26.87 0.0 0.0 62584 31830
38 TP-20 225.8990 0.0003 225.8993 26.870 119. 119.02
766 154 32331 032 004 8.091 68.156
019 0
Page 265
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n
- -
213.1 89.59 0.0 - 0.0 - 62579 31829
39 AP-9.1 106.5519 0.0003 106.5522 49.02 74.9
759 35 032 49.030 004 74.990 9.061 93.166
6568 89
-
139.7 46.56 30.09 0.0 0.0 - 62582 31829
40 AP-9 177.3218 0.0003 177.3221 30.096 35.5
281 34 9311 032 004 35.528 9.157 57.639
27
- -
137.0 213.9 145.7 0.0 145.76 0.0 62597 31828
41 TP-21 187.3491 0.0003 187.3494 156. 156.59
502 437 72106 032 9 004 4.926 01.042
596 7
- -
144.3 170.3 99.17 0.0 0.0 62607 31826
42 AP-10 172.5139 0.0003 172.5142 99.175 138. 138.53
996 723 85964 032 004 4.102 62.513
529 0
-
136.9 13.82 9.444 0.0 0.0 - 62608 31826
43 AP-10.1 228.0755 0.0003 228.0758 9.442 10.0
138 66 92129 032 004 10.098 3.543 52.414
98
- - -
184.9 152.7 0.0 - 0.0 62607 31825
44 TP-22 167.3186 0.0003 167.3189 13.28 152. 152.12
896 006 032 13.284 004 0.259 00.292
1122 122 2
- -
172.3 274.9 36.80 0.0 0.0 62610 31822
45 TP-23 199.0553 0.0003 199.0556 36.801 272. 272.51
085 912 45936 032 004 7.060 27.775
517 7
- - -
191.3 109.4 0.0 - 0.0 62608 31821
46 AP-11 211.6411 0.0003 211.6414 21.56 107. 107.27
641 195 032 21.564 004 5.497 20.5
0356 274 5
- -
223.0 47.31 0.0 - 0.0 - 62605 31820
47 AP-11.1 162.4222 0.0003 162.4225 32.27 34.6
055 62 032 32.276 004 34.602 3.221 85.898
2892 02
48 TP-24 92.7598 0.0003 92.7601 205.4 72.55 - 0.0 - - 0.0 - 62602 31820
Page 266
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n
Page 267
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission Line
Diff Elev
Station Bearin Distan Diff.E Cor correc Cor correct Eastin Northi
S,No. Hz.Angle Corr.(+) Corrected H.Angle Nort atio
Name g ce ast r(-) ted ΔE r(-) ed ΔN g ng
h n
410 1
- -
167.5 281.0 60.68 0.0 0.0 62631 31800 846.
58 AP-13 235.4404 0.0003 235.4407 60.684 274. 274.37
278 046 7408 032 004 2.196 48.6 33
373 3
222.9 62628 31800 850.
59 AP-13.1
685 0.987 15.095 82
9998.139
M=
8
T(last bearing = first - - -
9998.156 7485. 6303.2
bearing+sum of obs angle - total 971.7 6303 972.0
8 46135 62
(2n+4*90°)= 4293 .773 85
E= + 0.0170
-
correction 0.342
0.0003 error= 0.51
error = 06686
126
-
0.00
8969
7485. 0.006
46135 00117
12168
Accuracy
.7156
Page 268
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
Station ted Bearin Disanc Corr(- correcte Diff Corr(- correcte Elevat
S,No. Hz.Angle Corr.(+) Diff.East Easting Northing
Name H.Angl g e ) d ΔE North ) d ΔN ion
e
Page 269
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
Station ted Bearin Disanc Corr(- correcte Diff Corr(- correcte Elevat
S,No. Hz.Angle Corr.(+) Diff.East Easting Northing
Name H.Angl g e ) d ΔE North ) d ΔN ion
e
3
- - -
48.657 196.1 333.81 0.000 0.000 625918. 3178679
11 AP-16.1 48.6569 0.000717647 93.08170 93.0820 320.57 -320.573
62 913 21 322 667 231 .936
089 226 2
306.78 64.84 30.474 27.58548 0.000 27.5851 12.952 0.000 12.9513 625945. 3178692
12 AP-16 306.7887 0.000717647
94 888 8 228 322 606 01 667 4 817 .887
- - -
171.42 191.6 160.60 0.000 0.000 625913. 3178535
13 TP-5 171.4238 0.000717647 32.39926 32.3995 157.30 -157.304
45 383 5 322 667 417 .583
158 833 3
- - -
187.20 183.0 0.000 0.000 625899. 3178274
14 TP-6 187.2013 0.000717647 261.71 13.98334 13.9836 261.33 -261.337
2 628 322 667 433 .247
7 687 6
- - -
140.61 190.2 0.000 0.000 625842. 3177961
15 AP-17.1 140.6161 0.000717647 317.71 56.61535 56.6156 312.62 -312.626
68 648 322 667 818 .621
996 816 5
-
259.04 150.8 16.705 8.129199 0.000 8.12887 0.000 625850. 3177947
16 AP-17.1 259.0406 0.000717647 14.594 -14.595
13 816 6 579 322 7907 667 946 .026
3
- - -
176.17 229.9 72.904 0.000 0.000 625795. 3177900
17 TP-7 176.1706 0.000717647 55.78472 55.7850 46.936 -46.9376
13 23 1 322 667 161 .089
355 452 9
- - -
185.64 226.0 0.000 0.000 625419. 3177538
18 TP-8 185.6466 0.000717647 521.92 376.0339 376.034 361.93 -361.938
73 943 322 667 127 .15
197 241 8
- - -
173.98 231.7 230.03 0.000 0.000 625238. 3177395
19 TP-9 173.9802 0.000717647 180.6280 180.628 142.43 -142.439
09 416 31 322 667 499 .711
074 329 9
Page 270
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
Station ted Bearin Disanc Corr(- correcte Diff Corr(- correcte Elevat
S,No. Hz.Angle Corr.(+) Diff.East Easting Northing
Name H.Angl g e ) d ΔE North ) d ΔN ion
e
- - -
164.70 225.7 0.000 0.000 625017. 3177180
20 AP-18 164.7003 0.000717647 308.08 220.5751 220.575 215.08 -215.082
1 225 322 667 923 .629
628 485 1
- - -
175.87 210.4 0.000 0.000 624989. 3177132
21 AP-18.1 175.8738 0.000717647 55.61 28.16023 28.1605 47.952 -47.9535
45 235 322 667 763 .676
75 592 8
- - -
170.96 206.2 0.000 0.000 624835. 3176821
22 TP-10 170.9621 0.000717647 347.51 153.9610 153.961 311.54 -311.544
28 981 322 667 801 .132
826 404 3
- - -
139.06 197.2 258.43 0.000 0.000 624759. 3176574
23 AP-19 139.0651 0.000717647 76.68280 76.6831 246.79 -246.794
58 609 25 322 667 118 .337
551 272 4
-
197.83 156.3 25.106 10.08091 0.000 10.0805 0.000 624769. 3176551
24 AP-19.1 197.834 0.000717647 22.994 -22.9947
47 267 8 296 322 9129 667 199 .343
1
-
169.91 174.1 365.50 37.18110 0.000 37.1807 0.000 624806. 3176187
25 TP-11 169.9107 0.000717647 363.60 -363.606
14 614 1 835 322 8668 667 38 .737
5
-
293.17 164.0 88.25472 0.000 88.2544 0.000 624894. 3175878
26 AP-20.1 293.172 0.000717647 321.61 309.26 -309.264
27 728 391 322 0223 667 634 .473
4
- -
112.55 277.2 34.215 0.000 4.3153 0.000 4.31467 624860. 3175882
27 AP-20 112.5507 0.000717647 33.94247 33.9428
14 455 7 322 45 667 8 691 .787
968 014
- - -
189.58 209.7 350.20 0.000 0.000 624686. 3175578
28 TP-12 189.5871 0.000717647 174.0257 174.026 303.90 -303.904
78 97 32 322 667 665 .883
41 063 3
Page 271
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
Station ted Bearin Disanc Corr(- correcte Diff Corr(- correcte Elevat
S,No. Hz.Angle Corr.(+) Diff.East Easting Northing
Name H.Angl g e ) d ΔE North ) d ΔN ion
e
- - -
162.58 219.3 353.11 0.000 0.000 624462. 3175305
29 TP-13 162.58 0.000717647 224.0585 224.058 272.92 -272.922
07 848 21 322 667 606 .961
17 839 1
- - -
136.87 201.9 220.70 0.000 0.000 624380. 3175101
30 AP-21 136.8708 0.000717647 82.55362 82.5539 204.68 -204.683
15 655 32 322 667 052 .278
082 425 2
-
250.37 158.8 27.411 9.896016 0.000 9.89569 0.000 624389. 3175075
31 AP-21.1 250.3774 0.000717647 25.562 -25.5631
81 37 1 58 322 4908 667 948 .715
4
- -
176.03 229.2 389.99 0.000 - 0.000 624094. 3174820
32 TP-14 176.0366 0.000717647 295.2879 295.288 -254.75
73 151 02 322 254.75 667 66 .965
321 254
- - -
180.89 225.2 0.000 0.000 623825. 3174554
33 TP-15 180.8938 0.000717647 378.71 268.9656 268.966 266.60 -266.607
45 524 322 667 694 .358
904 012 6
- - -
178.61 226.1 644.71 0.000 0.000 623360. 3174107
34 TP-16 178.6101 0.000717647 464.9140 464.914 446.66 -446.664
08 47 18 322 667 779 .694
853 407 3
- - -
228.02 224.7 421.39 0.000 0.000 623063. 3173807 1784.
35 AP-22 228.0198 0.000717647 296.7113 296.711 299.23 -299.231
05 578 84 322 667 798 .825 09
25 647 1
272.7 623015. 3173810 1775.
36 AP-22.1
783 188 .184 43
-
7563.6
Total 6206.6
706
1
M 6169.786 6169.8 M - 6207.2
Page 272
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
Station ted Bearin Disanc Corr(- correcte Diff Corr(- correcte Elevat
S,No. Hz.Angle Corr.(+) Diff.East Easting Northing
Name H.Angl g e ) d ΔE North ) d ΔN ion
e
1 3216.908 7
58
0.6599
T 6169.81 T 3217.199
72
0.290420 0.0194
E -0.0241 E 6207.27
493 11
0.008541
779
-87.2461
272.7539
-0.0244
-0.00072
ACCUR 10489.85
ACY 566
Page 273
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Disanc Corr(- correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g e ) d ΔE North ) d ΔN ion
e
Page 274
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Disanc Corr(- correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g e ) d ΔE North ) d ΔN ion
e
Page 275
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Disanc Corr(- correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g e ) d ΔE North ) d ΔN ion
e
Page 276
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Disanc Corr(- correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g e ) d ΔE North ) d ΔN ion
e
Page 277
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Disanc Corr(- correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g e ) d ΔE North ) d ΔN ion
e
- -
6458. 9467.8
Total =(M) 6186.204 4688.157 7448.369
982 24
392 776
-
0.184607 0.463223
T= 6458.982 201.0
662 668
18
158.9 0.005274 0.013234
E= -201.018
818 505 962
158.9818
-0.03
Accura 18986.74
-0.00086
cy = 722
Page 278
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad
Hydropower Project, Transmission
Line
Cor
S
rect
, correc
Station ed Diff.Eas correcte Diff Corr( Eastin Northi Elevatio
N Hz.Angle Corr.(-) Bearing Disance Corr(-) ted
Name H.A t d ΔE North +) g ng n
o ΔN
ngl
.
e
31663
61832
1 AP-29 61.35 795.67
6.846
1
273 31663
159.011 61834
2 AP29.1 273.8864 0.0025 .88 24.38 796.17
8 1.026
39 8
179 - 31662
252.895 345.787 - - 0.000 61801
3 TP-1 179.9317 0.0025 .92 0.00001 -330.494 101.7 22.68
7 8 330.494 101.7 1 0.532
92 00 8
179 - -
252.824 - 0.000 61801 31660
4 TP-2 179.6406 0.0025 .63 521.88 0.00001 -498.608 154.1 154.1
9 498.608 1 0.532 68.58
81 07 07
182 - - 31657
1006.85 - 0.000 61705
5 TP-3 182.0196 0.0025 .01 252.463 0.00001 -960.056 303.3 303.3 65.19
2 960.056 1 0.476
71 86 86 4
178 - - 31656
254.480 - 0.000 61646
6 TP-4 178.0253 0.0025 .02 606.6 0.00001 -584.482 162.3 162.3 02.88
1 584.482 1 5.994
28 1 10 5
191 - - 31654
252.502 353.320 - 0.000 61612
7 TP-5 191.698 0.0025 .69 0.00001 -336.973 106.2 106.2 96.65
9 2 336.973 1 9.021
55 28 28 6
AP- 77. 264.198 - 0.000 61603 31654
8 77.2883 0.0025 93.4102 -92.932 0.00001 -92.932 -9.442
30.1 285 4 9.442 1 6.089 87.21
Page 279
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8 28 4
236 - - 31654
AP- 161.484 0.000 61604
9 236.3087 0.0025 .30 29.812 9.467 0.00001 9.467 28.26 28.26 58.94
30.1 2 1 5.557
62 88 9 5
180 - - 31645
1 217.790 1128.71 - 0.000 61535
TP6 180.8447 0.0025 .84 0.00001 -691.647 891.9 891.9 66.97
0 4 3 691.647 1 3.91
22 74 74 1
180 - - 31639
1 218.632 - 0.000 61485
TP7 180.7593 0.0025 .75 792.91 0.00001 -495.033 619.3 619.3 47.57
1 6 495.033 1 8.877
68 94 94 8
178 - - 31634
1 219.389 622.708 - 0.000 61446
TP8 178.9465 0.0025 .94 0.00001 -395.163 481.2 481.2 66.31
2 4 6 395.163 1 3.714
4 61 61 7
178 - - 31628
1 218.333 759.990 - 0.000 61399
TP9 178.7272 0.0025 .72 0.00001 -471.374 596.1 596.1 70.16
3 4 1 471.374 1 2.34
47 48 47 9
182 - - 31623
1 217.058 - 0.000 61357
TP10 182.1833 0.0025 .18 688.12 0.00001 -414.678 549.1 549.1 21.03
4 1 414.678 1 7.662
08 37 37 2
177 - -
1 219.238 - 0.000 61322 31618
TP11 177.9434 0.0025 .94 552.31 0.00001 -349.367 427.7 427.7
5 9 349.367 1 8.296 93.26
09 72 72
183 - - 31612
1 217.179 - 0.000 61272
TP12 183.2039 0.0025 .20 836.119 0.00001 -505.282 666.1 666.1 27.08
6 8 505.282 1 3.014
14 72 72 8
237 - - 31608
1 220.381 - 0.000 61188
AP31 237.81 0.0025 .80 527.695 0.00001 -341.878 401.9 401.9 24.98 1577.84
7 2 341.878 1 2.343
75 72 72 4
1 278.188 61184 31608
AP31.1 1585.35
8 7 5.262 30.32
- -
8866.22
6458.49 5499.
8
8 27
TOTAL 2999.217 0.185 0.130
Page 280
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
555
0.008
3158.229 0.000
16
36
3240
-81.7713
278.2287
0.04
Accur 39096
0.0025
acy = .6858
6
1 1
1 5
316
8 7
082
AP31 8 7
4.98
2. .
4
3 8
4 4
3
Page 281
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
6
1 1
1 5
8 316 8
127.195 278.188
AP-31.1 127.1963 0.001 4 083 5
2 7
5. 0.32 .
2 3
6 5
2
6
1
1
316
- - 6
176.505 225.383 3.13697 065
TP-1 176.5067 0.001 247.256 -176.004 0.0002 176.003 -173.6609933 173.6 6
6 9 E-05 6.65
7365 61 9.
9
2
5
8
6
1
1
316
- 5
132.969 221.889 142.446 3.13697 055
AP-32 132.9710 0.001 -95.111 0.0002 -95.1108 -106.0419788 106.0 7
9 5 5 E-05 0.61
42 4.
7
1
4
7
6
1
1
- 316
262.079 174.859 4.74071 4.74092 3.13697 5
AP-32.1 262.0804 0.001 52.91 0.0002 -52.69718876 52.69 049
3 4 7 6202 E-05 7
72 7.92
8.
8
8
Page 282
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
8
6
1
0 316
- -
175.081 256.938 3.13697 8 031
TP-2 175.0827 0.001 788.6 -768.198 0.0002 768.197 -178.2179413 178.2
6 7 E-05 1 9.70
8936 18
0. 2
6
9
6
1
0 316
- -
178.780 252.020 3.13697 1 010
TP-3 178.7818 0.001 704.61 -670.201 0.0002 670.200 -217.4985372 217.4
7 3 E-05 4 2.20
9831 99
0. 4
4
9
6
0
9
315
- - 7
192.834 250.801 416.690 3.13697 996
TP-4 192.8355 0.001 -393.515 0.0002 393.514 -137.0283959 137.0 4
4 1 5 E-05 5.17
9638 28 6.
5
9
7
5
6
0
9 315
- -
263.635 3.13697 6 995
AP-33 90.9300 0.001 90.9289 80.0957 -79.602 0.0002 79.6018 -8.878920963 8.878
5 E-05 6 6.29
3787 89
7. 6
3
7
Page 283
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
3
6
0
9 315
-
243.378 174.564 1.37699 1.37720 3.13697 6 994
AP-33.1 243.3799 0.001 14.5364 0.0002 -14.47103336 14.47
8 4 6 5503 E-05 6 1.82
1
8. 5
7
5
6
0
9
- - 4 315
179.918 237.943 276.801 3.13697
TP-5 179.9197 0.001 -234.595 0.0002 234.594 -146.9149749 146.9 3 979
6 2 1 E-05
8441 15 4. 4.91
1
5
5
6
0
9
315
- - 0
176.025 237.861 3.13697 952
TP-6 176.0261 0.001 509.034 -431.033 0.0002 431.033 -270.7875069 270.7 0
0 8 E-05 4.12
1296 87 3.
3
1
2
2
6
0
- - 8 315
185.367 233.886 3.13697
TP-7 185.3685 0.001 422.82 -341.577 0.0002 341.576 -249.2027538 249.2 6 927
4 8 E-05
634 03 6 4.92
1.
5
Page 284
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
4
5
6
0
8
315
- - 4
133.855 239.254 3.13697 912
AP34 133.8566 0.001 296.51 -254.834 0.0002 254.833 -151.5848331 151.5 0
5 2 E-05 3.33
4982 85 6.
5
7
1
2
6
0
8
315
- - 3
213.746 193.109 3.13697 905
AP34.1 213.7480 0.001 66.0186 -14.9741 0.0002 14.9738 -64.29799347 64.29 9
9 7 E-05 9.03
8768 8 1.
7
7
3
8
6
0
8
- - 2 315
163.575 226.856 3.13697
TP-8 163.5769 0.001 230.61 -168.263 0.0002 168.263 -157.6972161 157.6 2 890
8 6 E-05
156 97 3. 1.34
4
7
5
6
0 315
- -
260.881 210.432 3.13697 8 873
AP-35 260.8827 0.001 198.55 -100.57 0.0002 100.569 -171.1952016 171.1
6 4 E-05 1 0.14
6939 95
2 5
2.
Page 285
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
9
0
5
6
0
8
315
- 1
3.13697 7.687 873
AP-35.1 77.4782 0.001 77.4771 291.314 21.1485 -19.702 0.0002 19.7017 7.687044445 0
E-05 076 7.83
804 3.
2
2
0
3
6
0
8
315
- - 0
191.510 188.791 3.13697 847
TP-9 191.5117 0.001 267.32 -40.8553 0.0002 40.8551 -264.1795306 264.1 6
6 1 E-05 3.65
2088 79 2.
3
3
4
8
6
0
8
315
- - 0
158.952 200.301 3.13697 833
TP-10 158.9534 0.001 148.91 -51.6665 0.0002 51.6662 -139.6594633 139.6 1
3 7 E-05 3.99
4421 59 0.
3
6
8
2
6
315
- 0
244.771 179.254 1.12898 1.12919 3.13697 824
AP-36 244.7722 0.001 86.72 0.0002 -86.71265067 86.71 8
1 1 8 7104 E-05 7.28
26 0
1
1
Page 286
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
1.
8
1
1
6
0
7
315
- - 9
106.504 244.025 3.13697 823
AP-36.1 106.5055 0.001 18.8435 -16.9401 0.0002 16.9398 -8.253006732 8.252 9
4 2 E-05 9.02
4296 98 4.
8
8
7
1
6
0
8
315
- 0
190.488 170.529 28.0472 28.0474 3.13697 807
TP-11 190.4895 0.001 170.46 0.0002 -168.1367435 168.1 2
4 6 3 3896 E-05 0.89
37 2.
1
9
1
9
6
0
8
315
- - 0
180.757 3.13697 795
TP-12 180.7582 0.001 181.018 112.61 -2.00065 0.0002 2.00044 -112.5922266 112.5 2
1 E-05 8.29
5385 92 0.
9
9
1
8
6 315
- -
218.172 181.775 3.13697 0 773
AP-37 218.1737 0.001 221.91 -6.87394 0.0002 6.87372 -221.8035101 221.8
6 1 E-05 8 6.49
768 03
0 5
Page 287
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
1
4.
0
4
5
6
0
8 315
- -
174.820 219.947 3.13697 0 772
AP-37.1 174.8218 0.001 16.0025 -10.275 0.0002 10.2748 -12.26801042 12.26
7 7 E-05 0 4.22
0534 8
3. 7
7
7
6
0
7
- - 8 315
194.525 214.768 3.13697
TP-13 194.5261 0.001 225.91 -128.828 0.0002 128.827 -185.5768788 185.5 7 753
0 4 E-05
3892 77 4. 8.65
9
4
2
6
0
7 315
- -
229.293 132.315 3.13697 7 745
AP-38 77.8864 0.001 77.8853 -100.303 0.0002 100.302 -86.29412138 86.29
4 3 E-05 7 2.35
6482 41
4. 6
6
4
6
315
- 0
262.020 127.178 20.3070 20.3072 3.13697 743
AP-38.1 262.0218 0.001 25.4872 0.0002 -15.40199924 15.40 7
7 7 4 4712 E-05 6.95
2 7
4
9
Page 288
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
4.
9
4
7
6
0
7
315
- - 6
191.276 209.199 238.267 3.13697 722
TP-14 191.2777 0.001 -116.239 0.0002 116.238 -207.9900234 207.9 7
6 4 4 E-05 8.96
7861 9 8.
4
7
0
8
6
0
7
315
- - 4
159.607 3.13697 700
TP-15 159.6087 0.001 220.476 288.31 -187.151 0.0002 187.150 -219.3109205 219.3 9
6 E-05 9.65
4686 11 1.
3
5
5
8
6
0
315
- - 7
135.166 200.083 3.13697 683
AP-39 135.1673 0.001 187.71 -64.4581 0.0002 64.4578 -176.2957831 176.2 4
2 6 E-05 3.35
4655 96 2
8
7.
1
6
0
- 315
265.542 155.249 17.0149 17.0151 3.13697 7
AP-39.1 265.5440 0.001 40.6412 0.0002 -36.90798629 36.90 679
9 9 3 3472 E-05 4
8 6.45
4
4.
Page 289
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
1
1
5
6
0
7
315
- - 1
168.281 240.792 3.13697 665
TP-16 168.2828 0.001 296.41 -258.725 0.0002 258.724 -144.6391455 144.6 8
7 8 E-05 1.81
3656 39 5.
1
3
9
1
6
0
6
315
- - 8
179.556 229.074 3.13697 633
TP-17 179.5575 0.001 477.25 -360.592 0.0002 360.591 -312.6357263 312.6 2
4 5 E-05 9.17
6169 36 4.
5
7
9
9
6
0
6
315
- - 3
181.877 228.630 3.13697 591
TP-18 181.8789 0.001 642.431 -482.124 0.0002 482.123 -424.5874324 424.5 4
8 9 E-05 4.58
3246 87 2.
7
6
7
6
6 7
- - 0 315 8
152.334 230.508 3.13697
AP-40 152.3354 0.001 385.51 -297.506 0.0002 297.505 -245.1693864 245.1 6 566 0
3 7 E-05
979 69 0 8.87 .
4 5
Page 290
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
4. 3
8
3
9
6
0 7
6 315 7
0 562 2
AP-40.1 202.843
2 0.65 .
4. 8 0
5 7
3
8451.65
Total = 6404.6938 -5800.1 -5160.90297
5
0.32337
6682.8825 0.547029814
3
0.00898
76 0.015195273
3
6840
-157.1175
202.8825
error= 0.0395
0.001098333
13300.0
Accuracy =
251
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Page 291
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Correct
Station Distanc Diff.E correcte Corr(+ correcte Eastin Northin Eleva
S,No. Hz.Angle Corr.(+) ed Bearing Corr(+) Diff North
Name e ast d ΔE ) d ΔN g g tion
H.Angle
Page 292
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
96
-
250.319 189.143 0.00017 - 4.44E- 59937 3150239
AP45.1 250.3153 0.004005 32.8007 5.212 -5.21186 -32.3839
3 1 1 32.3839571 05 5.76 .032
03
-
106.305 259.462 111.241 0.00017 - 4.44E- 59926 3150218
TP-7 106.3013 0.004005 109.3 -109.365 -20.3439
3 4 1 1 20.3439407 05 6.395 .688
65
-
183.968 185.767 0.00017 4.44E- 59922 3149836
AP-46.1 183.9647 0.004005 383.91 38.58 -38.5808 -381.96649 -381.966
7 7 1 05 7.815 .721
09
-
274.782 189.736 0.00017 4.44E- 59922 3149817
AP-46.1 274.7785 0.004005 19.3893 3.279 -3.27885 -19.110023 -19.11
5 4 1 05 4.536 .611
02
-
160.974 284.518 0.00017 20.7030113 4.44E- 59914 3149838
TP-8 160.9708 0.004005 82.5812 79.94 -79.9438 20.70306
8 9 1 5 05 4.592 .314
4
-
142.910 265.493 400.131 0.00017 - 4.44E- 59874 3149806
TP-9 142.9068 0.004005 398.8 -398.895 -31.438
8 7 9 1 31.4380221 05 5.697 .876
95
-
192.604 228.404 377.325 0.00017 4.44E- 59846 3149556
AP-47 192.6008 0.004005 282.1 -282.183 -250.49416 -250.494
8 5 4 1 05 3.515 .382
83
-
215.858 241.009 0.00017 - 4.44E- 59843 3149540
AP-47.1 215.8549 0.004005 32.1974 28.16 -28.1628 -15.605
9 3 1 15.6050455 05 5.352 .777
3
-
149.977 276.868 148.043 0.00017 17.7038665 4.44E- 59828 3149558
TP-10 149.9732 0.004005 146.9 -146.981 17.70391
2 2 4 1 4 05 8.371 .481
81
-
114.405 246.845 319.982 0.00017 4.44E- 59799 3149432 556.
AP-48.1 114.4013 0.004005 294.2 -294.207 -125.82138 -125.821
3 4 3 1 05 4.017 .406 2
07
181.250 59799 3149286 637.
AP-48
7 0.825 .203 66
Page 293
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
-
6304.28 -
TOTAL 3576.486 3178.
2 4763.75001
52
0.143 0.25299330
3781.171
965 6
0.007 0.01264966
44
198 5
3960
-178.829
181.1706
ERROR -0.0801
-0.00401
21657
Accuracy
.74
Page 294
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
Correct
S,N Station Hz.Angl Distanc Diff.Eas Corr( corrected Diff corrected Elevati
Corr.(-) ed Bearing Corr(+) Easting Northing
o. Name e e t -) ΔE North ΔN on
H.Angle
597994.01 3149432.4
AP-48.1 556.2
7 06
242.88 0.0092 242.874 181.25 597990.82 3149286.2
AP-48 637.66
34 38 2 07 5 03
-
175.95 0.0092 244.12 757.46 0.000 - 597309.29 3148955.6
TP-1 175.948 681.52 -681.529 0.0003 -330.566
72 38 49 66 2 330.567 61 37
9
-
254.68 0.0092 254.671 240.07 0.000 - 596837.39 3148683.9
AP-49.1 544.51 471.90 -471.906 0.0003 -271.655
03 38 1 29 2 271.655 04 82
5
-
82.908 0.0092 82.8989 314.74 42.753 0.000 596807.02 3148714.0
AP-49 30.366 -30.3663 30.0959 0.0003 30.09618
23 38 9 4 5 2 41 78
1
-
192.83 0.0092 192.825 217.64 179.26 0.000 - 596697.54 3148572.1
TP-2 109.48 -109.482 0.0003 -141.944
43 38 1 3 07 2 141.944 24 34
2
-
169.42 0.0092 169.411 230.46 137.39 0.000 - 596591.57 3148484.6
TP-3 105.96 -105.967 0.0003 -87.4511
07 38 5 81 24 2 87.4514 55 83
7
140.30 0.0092 219.87 356.76 0.000 596362.82 3148210.9
AP-50 140.296 -228.75 -228.75 -273.78 0.0003 -273.78
52 38 96 6 2 56 03
-
253.06 0.0092 253.056 180.17 0.000 - 596362.77 3148195.2
AP-50.1 15.61 0.0478 -0.04806 0.0003 -15.6096
56 38 4 55 2 15.6099 75 93
3
171.70 0.0092 171.693 253.23 - 0.000 - 595992.77 3148083.8
TP-4 386.43 -369.999 0.0003 -111.484
28 38 6 19 369.99 2 111.484 81 09
Page 295
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
Correct
S,N Station Hz.Angl Distanc Diff.Eas Corr( corrected Diff corrected Elevati
Corr.(-) ed Bearing Corr(+) Easting Northing
o. Name e e t -) ΔE North ΔN on
H.Angle
9
-
201.08 0.0092 201.080 244.92 0.000 - 595652.38 3147924.5
AP-51 375.81 340.39 -340.393 0.0003 -159.266
99 38 7 55 2 159.267 5 43
3
138.17 0.0092 138.168 266.00 22.484 0.000 - 595629.95 3147922.9
AP-51.1 -22.43 -22.4302 0.0003 -1.56573
78 38 6 62 6 2 1.56601 48 77
-
189.84 0.0092 189.831 224.17 230.56 0.000 - 595469.28 3147757.6
TP-5 160.66 -160.669 0.0003 -165.365
05 38 3 48 48 2 165.365 55 13
9
-
45.870 0.0092 45.8608 234.00 320.13 0.000 - 595210.11 3147569.3
AP-52 259.01 -259.016 0.0003 -188.144 605.54
13 38 9 61 66 2 188.144 9 66
6
595287.99 3147555.8
AP-52.1 99.867 582.55
9 2
-
2258.7 3369.1
TOTAL 2780.5 -1716.74
36 85
5
2439.9 0.1530
0.099523
87 62
0.0117
30 0.007656
74
2700
-
260.01
3
Page 296
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
Correct
S,N Station Hz.Angl Distanc Diff.Eas Corr( corrected Diff corrected Elevati
Corr.(-) ed Bearing Corr(+) Easting Northing
o. Name e e t -) ΔE North ΔN on
H.Angle
99.987
1
ERROR 0.1201
0.0092
38
ACCURA
18453.89
CY
Page 297
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Diff.East Corr(-) Easting Northing
H.Angl g ce +) d ΔE North d ΔN ion
e
Page 298
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Diff.East Corr(-) Easting Northing
H.Angl g ce +) d ΔE North d ΔN ion
e
Page 299
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Diff.East Corr(-) Easting Northing
H.Angl g ce +) d ΔE North d ΔN ion
e
Page 300
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Diff.East Corr(-) Easting Northing
H.Angl g ce +) d ΔE North d ΔN ion
e
- -
10704
TOTAL 5427.127 9160.981 1918.7
.21
887 8
-
0.545113
5526.994 0.0058
449
3
-
0.018170
64 0.0001
448
9
5760
-233.006
126.9936
Page 301
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Diff.East Corr(-) Easting Northing
H.Angl g ce +) d ΔE North d ΔN ion
e
ERROR 0.2196
Accura 19635.5
0.00732
cy = 5
Page 302
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr corrected Diff Corr corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st (-) ΔE North (-) ΔN on
e
586126.4 3145637.
1 AP-60 471.3
72 045
321.35 126.77 586170.7 3145603. 471.2
2 AP-60.1 321.362 0.008812
32 4 65 941 5
- - -
146.27 268.12 256.69 0.00 0.00 585914.2 3145595.
3 TP-1 146.2803 0.008812 256.55 256.5605 8.3888 -8.38916
15 72 41 4 03 044 552
7 657 9
- - -
185.36 234.39 240.88 0.00 0.00 585718.3 3145455.
4 AP-61.1 185.3777 0.008812 195.86 195.8641 140.22 -140.229
89 87 49 4 03 403 323
1 503 9
- - -
224.49 239.76 11.698 0.00 0.00 585708.2 3145449.
5 AP-61 224.5053 0.008812 10.107 10.11071 5.8901 -5.89041
65 76 2 4 03 296 432
1 281 4
- -
168.45 284.26 246.56 0.00 60.751 0.00 585469.2 3145510.
6 TP-2 168.4589 0.008812 238.96 238.9654 60.75113
01 41 34 4 4 03 641 183
2 543
- -
174.88 272.71 0.00 31.789 0.00 584798.7 3145541.
7 TP-3 174.8899 0.008812 671.31 670.55 670.5604 31.78964
11 43 4 91 03 037 973
7 503
- -
273.05 267.59 499.73 0.00 - 0.00 584299.4 3145521.
8 AP-62 273.0603 0.008812 499.29 499.2956 -20.9672
15 54 21 4 20.967 03 08 006
2 364
108.64 0.6468 58.284 0.6580 0.00 0.654454 58.280 0.00 584300.0 3145579.
9 AP-62.1 108.6506 0.008812 58.28071
18 82 7 34 4 636 99 03 625 286
168.90 289.28 582.14 - 0.00 - 192.30 0.00 583750.5 3145771.
10 TP-4 168.9102 0.008812 192.3
14 87 92 549.47 4 549.4745 03 03 88 586
Page 303
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr corrected Diff Corr corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st (-) ΔE North (-) ΔN on
e
1 041
- -
184.92 278.19 1335.4 0.00 190.23 0.00 582428.7 3145961.
11 TP-5 184.9322 0.008812 1321.7 1321.793 190.2396
34 01 1 4 99 03 945 826
9 527
- -
180.36 283.11 677.08 0.00 153.61 0.00 581769.3 3146115.
12 TP-6 180.3739 0.008812 659.43 659.4356 153.6184
51 35 89 4 87 03 588 444
2 707
- -
182.49 283.47 0.00 94.517 0.00 581375.0 3146209.
13 AP-63 182.5032 0.008812 405.51 394.34 394.3445 94.51708
44 86 4 35 03 142 961
1 865
-
190.15 285.97 64.240 0.00 17.677 0.00 581313.2 3146227.
14 AP-63.1 190.1621 0.008812 -61.76 61.76354 17.67767
33 3 2 4 94 03 506 639
714
- -
183.00 296.12 341.45 0.00 150.36 0.00 581006.6
15 TP-7 183.0148 0.008812 306.56 306.5715 150.3607 3146378
6 64 62 4 1 03 791
8 369
- -
172.92 299.13 0.00 365.95 0.00 580350.0 3146743.
16 TP-8 172.9379 0.008812 751.71 656.61 656.6202 365.9539
91 24 4 41 03 588 954
7 847
- -
167.66 292.06 747.66 0.00 280.82 0.00 579657.1 3147024.
17 TP-9 167.6749 0.008812 692.92 692.9285 280.8248
61 15 82 4 51 03 303 779
5 454
- -
149.76 279.72 479.80 0.00 81.070 0.00 579183.9 3147105. 469.9
18 AP-64.1 149.7717 0.008812 472.90 472.9125 81.06991
29 76 75 4 19 03 66 911 8
9 152
249.49 579123.9 3147083. 469.9
19 AP-64
05 03 443 5
Page 304
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr corrected Diff Corr corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st (-) ΔE North (-) ΔN on
e
-
7370.2 1501.9
TOTAL 3182.866 6986.4
08 12
9
-
0.3090
3309.64 0.0582
29
2
-
0.0181
38 ERROR 0.0034
78
2
3420
-110.36
249.6403
ACCURAC 23437.
Y= 18
Page 305
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e
Page 306
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e
-
161.94 304.1 0.00 268.54 0.000 576294. 3148719
11 TP-5 161.93383 0.009474 477.8 395.1 -395.194 268.5422
33 969 01 21 1 688 .253
94
-
173.57 286.1 631.7 0.00 175.61 0.000 575687. 3148894
12 TP-6 173.56943 0.009474 606.8 -606.837 175.616
89 402 374 01 59 1 851 .868
37
-
190.21 279.7 0.00 50.105 0.000 575395. 3148944
13 TP-7 190.20123 0.009474 296.8 292.5 -292.54 50.10528
07 191 01 17 1 311 .974
4
-
168.77 289.9 0.00 294.74 0.000 574582. 3149239
14 TP-8 168.77023 0.009474 864.7 812.9 -812.914 294.7492
97 298 01 9 1 398 .723
14
-
165.63 278.7 0.00 85.100 0.000 574026. 3149324
15 AP-67 165.62283 0.009474 562 555.5 -555.519 85.1008
23 095 01 69 1 878 .824
19
- -
253.96 264.3 36.01 0.00 0.000 573991. 3149321
16 AP-67.1 253.95643 0.009474 35.84 -35.841 3.5510 -3.5509
59 418 66 01 1 037 .273
11 1
-
174.23 338.3 74.78 0.00 69.486 0.000 573963. 3149390
17 TP-9 174.22353 0.009474 27.64 -27.6409 69.48613
3 077 19 01 01 1 396 .759
1
-
124.97 332.5 105.1 0.00 93.317 0.000 573914. 3149484
18 TP-10 124.96473 0.009474 48.49 -48.4939 93.31805
42 407 661 01 94 1 902 .077
4
-
180.27 277.5 449.7 0.00 58.818 0.000 573469. 3149542
19 TP-11 180.26883 0.009474 445.8 -445.872 58.81825
83 149 349 01 14 1 03 .895
72
Page 307
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e
-
174.86 277.7 1150. 0.00 155.97 0.000 572328. 3149699 584.2
20 AP-68.1 174.85373 0.009474 1139. -1139.68 155.9785
32 932 3 01 84 1 96 .001 1
68
272.6 572263. 3149702 583.7
21 AP-68
564 07 .058 6
-
7602. 2615.4
total 3442.9859 6794.
292 29
55
-
0.392
3692.4764 0.1292
786
9
-
0.021
42 0.0071
821
8
3780
-87.5236
error 272.4764
accur
-0.18 18384.41
acy
Page 308
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e
Page 309
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e
-
161.94 304.1 0.00 268.54 0.000 576294. 3148719
11 TP-5 161.93383 0.009474 477.8 395.1 -395.194 268.5422
33 969 01 21 1 688 .253
94
-
173.57 286.1 631.7 0.00 175.61 0.000 575687. 3148894
12 TP-6 173.56943 0.009474 606.8 -606.837 175.616
89 402 374 01 59 1 851 .868
37
-
190.21 279.7 0.00 50.105 0.000 575395. 3148944
13 TP-7 190.20123 0.009474 296.8 292.5 -292.54 50.10528
07 191 01 17 1 311 .974
4
-
168.77 289.9 0.00 294.74 0.000 574582. 3149239
14 TP-8 168.77023 0.009474 864.7 812.9 -812.914 294.7492
97 298 01 9 1 398 .723
14
-
165.63 278.7 0.00 85.100 0.000 574026. 3149324
15 AP-67 165.62283 0.009474 562 555.5 -555.519 85.1008
23 095 01 69 1 878 .824
19
- -
253.96 264.3 36.01 0.00 0.000 573991. 3149321
16 AP-67.1 253.95643 0.009474 35.84 -35.841 3.5510 -3.5509
59 418 66 01 1 037 .273
11 1
-
174.23 338.3 74.78 0.00 69.486 0.000 573963. 3149390
17 TP-9 174.22353 0.009474 27.64 -27.6409 69.48613
3 077 19 01 01 1 396 .759
1
-
124.97 332.5 105.1 0.00 93.317 0.000 573914. 3149484
18 TP-10 124.96473 0.009474 48.49 -48.4939 93.31805
42 407 661 01 94 1 902 .077
4
-
180.27 277.5 449.7 0.00 58.818 0.000 573469. 3149542
19 TP-11 180.26883 0.009474 445.8 -445.872 58.81825
83 149 349 01 14 1 03 .895
72
Page 310
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line Survey
Correc
Station ted Bearin Distan Diff.Ea Corr correcte Diff Corr( correcte Elevat
S,No. Hz.Angle Corr.(+) Easting Northing
Name H.Angl g ce st (+) d ΔE North +) d ΔN ion
e
-
174.86 277.7 1150. 0.00 155.97 0.000 572328. 3149699 584.2
20 AP-68.1 174.85373 0.009474 1139. -1139.68 155.9785
32 932 3 01 84 1 96 .001 1
68
272.6 572263. 3149702 583.7
21 AP-68
564 07 .058 6
-
7602. 2615.4
total 3442.9859 6794.
292 29
55
-
0.392
3692.4764 0.1292
786
9
-
0.021
42 0.0071
821
8
3780
-87.5236
error 272.4764
accur
-0.18 18384.41
acy
Page 311
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
S,N Station Corr.( Corrected Bearin Distanc Diff.Ea Corr( corrected Diff corrected Elevati
Hz.Angle Corr(+) Easting Northing
o. Name +) H.Angle g e st -) ΔE North ΔN on
572328.9 3149699.
1 AP-68.1 584.21
6 001
211.9716 0.009 211.9811 272.65 572263.0 3149702.
2 AP-68 583.76
348 56 957 64 7 058
-
136.3641 0.009 136.3736 304.63 278.90 - 0.00 158.522 158.52302 3149860.
3 TP-1 229.4700 0.0002 572033.6
348 56 957 76 1 229.47 05 79 95 581
83
- - - -
187.0743 0.009 187.0838 261.01 0.00 571229.8 3149733.
4 TP-2 813.7 803.70 803.7075 127.132 0.0002 127.13210
348 56 957 13 05 92 449
7 67 3 33
- - - -
140.9168 0.009 140.9263 268.09 0.00 570519.0 3149709.
5 AP-69.1 711.2 710.80 710.8075 23.6396 0.0002 23.639436
348 56 957 52 05 85 809
7 05 7 77
- - -
202.3389 0.009 202.3484 229.02 71.131 - 0.00 570465.3 3149663.
6 AP-69 53.70146 46.6460 0.0002 46.645804
348 56 957 16 2 53.701 05 83 164
76 4 4
- - - -
139.9098 0.009 139.9193 251.37 0.00 570140.9 3149553.
7 TP-3 342.41 324.46 324.4687 109.384 0.0002 109.38408
348 56 957 01 05 15 78
8 96 3 36
- - - -
105.2317 0.009 105.2412 211.28 635.30 0.00 569810.9 3149010.
8 AP-70 329.95 329.9517 542.899 0.0002 542.89893
348 56 957 95 1 05 63 881
1 73 2 89
- -
275.4313 0.009 275.4408 136.53 67.682 46.563 0.00 46.56255 569857.5 3148961.
9 AP-70.1 49.1200 0.0002 49.119782
348 56 957 08 3 05 05 392 25 761
2 21
- - - -
190.6320 0.009 190.6415 231.97 0.00 569759.5 3148885.
10 TP-4 124.4 97.990 97.99114 76.6367 0.0002 76.636520
348 56 957 17 05 34 124
7 49 6 31
Page 312
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
S,N Station Corr.( Corrected Bearin Distanc Diff.Ea Corr( corrected Diff corrected Elevati
Hz.Angle Corr(+) Easting Northing
o. Name +) H.Angle g e st -) ΔE North ΔN on
- - - -
180.6474 0.009 180.6569 242.61 0.00 569614.9 3148810.
11 AP-71.1 162.8 144.55 144.5541 74.8870 0.0002 74.886834
348 56 957 33 05 8 238
4 76 7 2
- - - -
128.5811 0.009 128.5906 243.27 0.00 569561.6 3148783.
12 AP-71 59.71 53.329 53.32976 26.8565 0.0002 26.856288
348 56 957 03 05 5 381
3 57 3 98
- - - -
172.3911 0.009 172.4006 191.86 125.00 0.00 569535.9 3148661.
13 TP-5 25.692 25.69327 122.334 0.0002 122.33386
348 56 957 1 3 05 57 047
8 02 1 06
- - -
230.4610 0.009 230.4705 184.26 0.00 - 569518.0 3148421.
14 TP-6 240.5 17.871 17.87234 0.0002 239.83480
348 56 957 16 05 239.835 85 213
8 38 48
- - - -
261.1044 0.009 261.1139 234.73 0.00 569400.6 3148338.
15 AP-72 143.81 117.41 117.4159 83.0356 0.0002 83.035405
348 56 957 22 05 69 177
5 89 4 55
- -
78.89353 0.009 78.90309 315.84 0.00 29.5670 29.567298 569371.9 3148367.
16 AP-72.1 41.21 28.706 28.70681 0.0002
478 56 565 62 05 62 91 62 744
3 66
- - - -
180.9942 0.009 181.0037 214.74 0.00 569243.5 3148182.
17 TP-7 225.3 128.41 128.4186 185.118 0.0002 185.11830
348 56 957 93 05 43 626
8 16 5 97
- - - -
156.6154 0.009 156.6249 215.75 0.00 568927.0 3147743.
18 TP-8 541.61 316.45 316.4599 439.539 0.0002 439.53905
348 56 957 31 05 83 087
9 71 3 84
- - - -
217.7331 0.009 217.7426 192.37 0.00 568830.0 3147300.
19 AP-73 452.81 97.065 97.06595 442.284 0.0002 442.28382
348 56 957 81 05 17 803
5 38 1 7
123.9441 0.009 123.9536 230.12 40.117 - 0.00 - - - 568799.2 3147275.
20 AP-73.1 0.0002
348 56 957 08 3 30.785 05 30.78643 25.7220 25.721804 31 081
Page 313
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
S,N Station Corr.( Corrected Bearin Distanc Diff.Ea Corr( corrected Diff corrected Elevati
Hz.Angle Corr(+) Easting Northing
o. Name +) H.Angle g e st -) ΔE North ΔN on
9 89 4 72
- -
190.5208 0.009 190.5303 174.07 65.636 0.00 65.63627 568864.8 3146642.
21 TP-9 635.8 632.402 0.0002 632.40268
348 56 957 45 77 05 124 67 679
9 49
- - - -
175.8369 0.009 175.8464 184.60 0.00 568813.4 3146004.
22 TP-10 640.2 51.398 51.39856 638.133 0.0002 638.13319
348 56 957 49 05 69 546
1 55 4 66
- - - -
203.4343 0.009 203.4438 180.45 0.00 568804.6 3144890.
23 TP-11 1114.5 8.7805 8.781067 1114.46 0.0002 1114.4651
348 56 957 14 05 88 08
7 97 5 74
- - -
181.5166 0.009 181.5261 203.89 0.00 - 0.000236 567966.9 3142999. 1035.5
24 AP-74 2066.9 837.23 837.2327 1889.7398
348 56 957 53 05 1889.74 424 8 968 8
2 7 85
205.42 567929.7 3142921. 1041.4
25 AP-74.1
15 24 583 5
-
4072.545 9534.9 -
TOTAL 6701.72
2 96 4295.6
3
4345.201 0.4856 0.36732
6 28 27
0.0220 0.01669
50
74 65
4500
-154.7984
15659.35
205.2016 Accuracy
01
Page 314
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of NALGAD GAD
TL
S,N Station Corr.( Corrected Bearin Distanc Diff.Ea Corr( corrected Diff corrected Elevati
Hz.Angle Corr(+) Easting Northing
o. Name +) H.Angle g e st -) ΔE North ΔN on
ERROR -0.2199
-
0.009560
87
Page 315
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower
Project, Transmission Line
Correc
ted Bearin Distan Corr( correcte Diff Corr(- correcte Elevat
S,No. Station Name Hz.Angle Corr.(+) Diff.East Easting Northing
H.Angl g ce +) d ΔE North ) d ΔN ion
e
Page 316
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
5 229 306 -06 1 600.423 -05 846 .602
789
- -
169.79 192.6 1895. 9.25E 7.37E 567205. 3138620
TP-5 169.7843 0.009327 416.2260 -416.226 1848.75 -1848.76
36 879 03 -06 -05 62 .847
455 498
- -
141.26 182.4 1636. 9.25E 7.37E 567134. 3136985
AP-77 141.2541 0.009327 70.86483 -70.8648 1635.16 -1635.17
34 815 7 -06 -05 755 .682
45 515
-
168.80 143.7 56.26 33.27500 9.25E 33.2750 7.37E 567168. 3136940
AP-77.1 168.7987 0.009327 45.3729 -45.373
8 449 66 12 -06 1 -05 03 .309
498
-
267.67 132.5 151.0 111.2520 9.25E 111.252 7.37E 567279. 3136838
TP-6 267.6697 0.009327 102.132 -102.133
9 529 237 659 -06 1 -05 282 .176
932
- -
176.38 220.2 1197. 9.25E 7.37E 566505. 3135924
TP-7 176.3719 0.009327 773.3157 -773.316 914.062 -914.062
12 319 3 -06 -05 966 .113
356 396
- -
231.77 216.6 534.3 9.25E 7.37E 566187. 3135494 660.3
AP-78.1 231.7642 0.009327 318.6672 -318.667 428.880 -428.881
35 131 104 -06 -05 255 .899 9
682 841
268.3 566144. 3135493 656.5
AP-78
866 509 .695 2
- -
8617.
TOTAL 1742.425 7426.34
299
181 947
0.043819 0.33452
2762.825
343 6309
0.003129 0.02389
2968.247
953 4736
34
3060
-91.7533
Page 317
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
25541.5
268.2467 Accuracy
151
ERROR -0.1399
-0.00933
Page 318
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Corr(-) Easting Northing
H.Angl g ce st d ΔE North ) d ΔN ion
e
Page 319
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Corr(-) Easting Northing
H.Angl g ce st d ΔE North ) d ΔN ion
e
Page 320
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Corr(-) Easting Northing
H.Angl g ce st d ΔE North ) d ΔN ion
e
-
7201.
Total 3907.288 1877. -4991
098
31
0.090 0.6078
4175.675
288 27
0.004 0.0289
48
299 44
4320
-144.325
Page 321
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea correcte Diff Corr(+ correcte Elevat
S,No. Station Name Hz.Angle Corr.(-) Corr(-) Easting Northing
H.Angl g ce st d ΔE North ) d ΔN ion
e
11718.69
215.6749 Accuracy
643
error 0.2002
Page 322
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr( correcte Diff Corr( corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st -) d ΔE North +) ΔN on
e
564267. 3130502.
AP-84 172.27
105 087
154.13 215.47 564205. 3130414.
AP-84.1 154.1506 0.012222 171.29
84 47 018 963
188.22 189.61 286.11 0.00 0.00 564157. 3130132.
TP-1 188.2356 0.012222 -47.78 -47.7802 -282.1 -282.1
34 31 77 02 01 238 863
- -
176.99 197.83 0.00 0.00 563875. 3129256.
TP-2 177.0077 0.012222 920.7 282.01 -282.012 876.44 -876.446
55 65 02 01 225 417
2 6
- -
85.476 194.83 562.71 0.00 0.00 563731. 3128712.
AP-85 85.48892 0.012222 144.04 -144.047 543.96 -543.966
7 2 53 02 01 178 451
7 6
283.58 100.30 64.792 0.00 - 0.00 563795. 3128700.
AP-85.1 283.5994 0.012222 65.856 64.7927 -11.7849
72 87 94 02 11.785 01 971 666
- -
152.70 203.89 0.00 0.00 563760. 3128620.
TP-3 152.7212 0.012222 87.51 35.448 -35.4485 80.008 -80.0088
9 59 02 01 522 658
2 9
-
179.82 176.60 43.285 0.00 0.00 563803. 3127891.
TP-4 179.8326 0.012222 730.91 43.28498 729.62 -729.627
04 49 22 02 01 807 03
7
-
180.46 176.42 35.627 0.00 0.00 563839. 3127320.
TP-5 180.4733 0.012222 571.41 35.62707 570.29 -570.298
11 53 31 02 01 434 732
8
-
231.90 176.88 39.265 0.00 0.00 563878. 3126598.
AP-86 231.916 0.012222 722.91 39.26521 721.84 -721.843
38 64 46 02 01 7 89
3
Page 323
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr( correcte Diff Corr( corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st -) d ΔE North +) ΔN on
e
-
174.05 228.79 45.942 0.00 - 0.00 563844. 3126568.
AP-86.1 174.0633 0.012222 34.562 -34.5632 -30.2679
11 02 9 02 30.268 01 136 622
9
- -
177.12 222.84 0.00 0.00 563446. 3126139.
TP-6 177.1415 0.012222 585.41 398.06 -398.061 429.24 -429.246
93 13 02 01 075 376
1 6
-
82.674 219.97 1179.4 0.00 0.00 562688. 3125235.
AP-87 82.68692 0.012222 757.67 -757.672 -903.9 -903.9
7 06 5 02 01 403 476
2
-
246.91 122.64 102.45 86.268 0.00 0.00 562774. 3125180.
AP-87.1 246.9247 0.012222 86.26786 55.266 -55.2668
25 53 3 11 02 01 67 209
9
-
162.49 189.55 0.00 - 0.00 562749. 3125028.
TP-7 162.5057 0.012222 153.41 25.472 -25.4728 -151.28
35 78 02 151.28 01 198 929
6
-
251.80 172.05 99.083 0.00 0.00 562848. 3124319.
AP-88 251.8137 0.012222 716.51 99.08335 709.62 -709.626
15 13 59 02 01 281 303
6
- -
134.74 243.85 69.767 0.00 0.00 562785. 3124288.
AP-88.1 134.7544 0.012222 62.627 -62.6282 30.745 -30.745
22 28 6 02 01 653 558
9 1
- -
196.03 198.59 0.00 0.00 562601. 3123742.
TP-8 196.0499 0.012222 576.31 183.77 -183.772 546.22 -546.224
77 5 02 01 881 334
2 4
- -
98.652 214.63 904.90 0.00 0.00 562087. 3122997.
AP-89 98.66502 0.012222 514.26 -514.268 744.56 -744.564 150
8 27 17 02 01 465 343
8 4
Page 324
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Traverse Calculation of Nalgad Hydropower Project,
Transmission Line
Correc
ted Bearin Distan Diff.Ea Corr( correcte Diff Corr( corrected Elevati
S,No. Station Name Hz.Angle Corr.(-) Easting Northing
H.Angl g ce st -) d ΔE North +) ΔN on
e
8282.2 - -
Total 3158.031
84 2117.4 7417.2
0.1519 0.4247
3373.506
07 75
0.0089 0.0249
40
36 87
3600
-226.495
18359.3
133.5055 Accuracy
538
error 0.22
0.012222
Page 325
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 326
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 327
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 328
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 329
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 330
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 331
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 332
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 333
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 334
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 335
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 336
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 337
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 338
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 339
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 340
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 341
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 342
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 343
In association with
Updated Feasibility Study Nalgad Hydropower Project Transmission Line Topographic Survey
Draft Report
Page 344
In association with