ARCH 2016-21 : 7TH SEM AD PROJECTMIXED USED HIGH RISE

PRINCIPALS SIGNATURE : DR. (Ar). Ganesh Babu K. N DESIGN FACULTY SIGNATURE : SID, RK, RB
B.ARCH 2016-21 : 7TH SEM AD PROJECTMIXED USED HIGH RISE

DELIVERABLES

 INTRODUCTION : Introducing the design problem and requirement of the same


 URBAN FABRIC STUDY : Site Surroundings
 LITERATURE STUDY: Standards , By Laws, Fire Norms, Structural Systems, History
 CASE STUDIES : Live and Literature Studies
 GRIHA AND LEED ANALYSIS
 SITE ANALYSIS
 CLIMATE ANALYSIS
 AREA STATEMENT AND CALCULATIONS
 CONCEPT WITH MASSING
 RADIATION AND WIND TUNNEL SIMULATION – FINAL MASSING
 SITE PLAN :
a. Circulation – Different Users and Different Modes with drop off zones
b. Built and Unbuilt Representation
c. Surface parking
d. Services
 PODIUM PLAN :
a. All Podium Floor Plans
b. Detail Service Core Plan
c. Detail Floor Plan with Furniture Layout
d. Zoning based on Activity
e. Circulation of Different User Types
f. Fire Escape
g. Service – Vertical Transport and MEP
 TOWER :
a. Typical Floor Plan
b. Detailed Service Core
c. Detailed Floor Plan with Furniture Layout
d. Mechanical/Service Floor Plan
e. Fire Escape
f. Services – Vertical Transport and MEP
g. Efficiency and Flexibility of Floor Plate
 BASEMENT:
a. Basement level one
b. Typical Floor Plan
c. Parking Layout
d. Circulation – Vehicular

PRINCIPALS SIGNATURE : DR. (Ar). Ganesh Babu K. N DESIGN FACULTY SIGNATURE : SID, RK, RB
B.ARCH 2016-21 : 7TH SEM AD PROJECTMIXED USED HIGH RISE

e. Services
f. Fire escape
 SECTION :
a. Vertical Circulation – Lift Calculation ( No of banks) and Zoning (Lr, Mr
and Hr)
b. Vertical Zoning – Based on Activity ( Distribution of Activities)
c. Architectural Sections ( Min 2)
d. Part Sections ( Highlighting certain Design Features)
e. Sectional elevations

VACATION ASSIGNMENT

Introduction of Project Site on 27th June 2019 - Pre Vacation Briefing

ASSIGNMENT ONE

Analysis of bye-laws, fire norms and standards relevant to project and site context

Submission Format - A2 Sheets Printed + POWERPOINT PPT - 15th JUNE

ASSIGNMENT TWO

Literature/ Internet Case Study of Two Indian and One Foreign High Rise Building

Parameters to be Studied as per Checklist attached

Submission Format - A2 Sheets Printed + POWERPOINT PPT - 15th JUNE

PRINCIPALS SIGNATURE : DR. (Ar). Ganesh Babu K. N DESIGN FACULTY SIGNATURE : SID, RK, RB
B.ARCH 2016-21 : 7TH SEM AD PROJECTMIXED USED HIGH RISE

CASE STUDY CHECKLIST

PRINCIPALS SIGNATURE : DR. (Ar). Ganesh Babu K. N DESIGN FACULTY SIGNATURE : SID, RK, RB
B.ARCH 2016-21 : 7TH SEM AD PROJECTMIXED USED HIGH RISE

Tentative Semester Timeline


COMMENCEMENT OF CLASSES – 15TH JULY

• REVIEW on 15th JULY with MARKING – VACATION ASSIGNMENT (100 MARKS)

• 16th - 21st JULY – URBAN FABRIC STUDY AND SITE ANALYSIS – GROUP WORK

• 22ND JULY - INTERIM MARKING 1 (100 MARKS) : REVIEW OF SITE ANALYSIS AND
URBAN FABRIC STUDY – A1 SHEETS

• 26TH JULY - INTRODUCTION TO REQUIREMENTS AND AREA CALCULATIONS

• 29TH JULY – INTERIM MARKING 2 (100 MARKS) : REQUIREMENTS AND AREA


CALCULATIONS - A1 SHEETS

PRINCIPALS SIGNATURE : DR. (Ar). Ganesh Babu K. N DESIGN FACULTY SIGNATURE : SID, RK, RB
B.ARCH 2016-21 : 7TH SEM AD PROJECTMIXED USED HIGH RISE

• 2ND AUG – INTRODUCTION OF CONCEPT , CONCEPTUAL MASSING, CONCEPTUAL


SECTION AND ACTIVITIES IN BUILDING

• 5TH AUG – INTERIM MARKING 3 (100 MARKS) : REVIEW OF CONCEPT , CONCEPTUAL


MASSING, CONCEPTUAL SECTION AND ACTIVITIES IN BUILDING - A1 SHEETS

• 9TH - 16TH AUG – WORK ON SITE PLAN WITH LANDSCAPE + REVIEW OF SITE PLAN

• 19TH AUG – JURY ( CONCEPT ,CONCEPTUAL MASSING, CONCEPTUAL


SECTION , AREAS , ACTIVITIES AND SITE PLAN) - JURY ONE (100 MARKS)
• 23RD AUG – 2ND SEPT – FLOOR PLANS (BASEMENT , PODIUM AND TOWER)

• 6TH SEPT – INTERIM MARKING 4 (100 MARKS) : – REVIEW OF PLANS

• 9TH - 13TH SEPT – ARCHTECTURAL SECTIONS

• 16TH – INTERIM MARKING 5 (100 MARKS) : – REVIEW OF SECTIONS

• 20TH - 27TH SEPT – PART SECTIONS + FURNITURE LAYOUT + DETAILS

• 30TH SEPT – ALL 2D DRAWINGS - JURY TWO (100 MARKS)

• 4TH OCT – 11TH OCT : 3D MODEL IN DETAIL

• 14TH OCT – INTERIM MARKING 6 (100 MARKS) : – REVIEW OF 3D MODELS

• 18TH OCT – 25TH OCT : PRESENTATION DRAWING AND PHOTOSHOP COMPOSITION

• 28TH OCT – INTERIM MARKING 7 (100 MARKS) : – REVIEW OF PRESENTATION


DRAWINGS/ PHOTOSHOP

• 1ST - 8TH NOV - IMPROVEMENT AND FINAL CORRECTION WORK

• 11TH NOV - FINAL PRESENTATION SHEETS AND SUBMISSION - JURY THREE

( FINAL INTERNAL JURY)

NOTE: STUDENTS WHO DONTS ATTEND OR CLEAR ANY OF THE JURY ( 1, 2 AND 3) WILL
BE DETAINED AND DEBARRED FROM ATTENDING AD-VII CLASSES AND EXTERNAL JURY