ETAP

Project: Page: 1
12.6.0H
Location: Date: 12-12-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: RICKY_SEGAHABAN Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent

ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus2 150.000 0 0 0 0 0 0 0 0 37.821 87.8 145.6

Bus3 20.000 0 0 32.185 15.588 0 0 0 0 35.761 90.0 1091.8

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating ).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating ).
ETAP
Project: Page: 2
12.6.0H
Location: Date: 12-12-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: RICKY_SEGAHABAN Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor

Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

T2 Transformer 50.000 37.821 75.6 35.761 71.5

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: Page: 3
12.6.0H
Location: Date: 12-12-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: RICKY_SEGAHABAN Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

T2 33.205 18.107 -32.185 -15.588 1019.9 2519.2 100.0 94.6 5.45

1019.9 2519.2
ETAP
Project: Page: 4
12.6.0H
Location: Date: 12-12-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: RICKY_SEGAHABAN Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus3 Bus Under Voltage 20.000 kV 18.911 94.6 3-Phase


ETAP
Project: Page: 5
12.6.0H
Location: Date: 12-12-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: RICKY_SEGAHABAN Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 33.205 18.107 37.821 87.79 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 33.205 18.107 37.821 87.79 Lagging

Total Motor Load: 0.000 0.000 0.000

Total Static Load: 32.185 15.588 35.761 90.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 1.020 2.519

System Mismatch: 0.000 0.000

Number of Iterations: 2