Documente Academic
Documente Profesional
Documente Cultură
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 1.3
Width of drain mtrs ; rect.sect. 1
Dia of drain mtrs ; Circular sect. 1.2 OR, 0.9-2nos
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 1.2
Sr No DRAIN NO.Z1 DRAIN NO.South Campus_West spine road=Zone1
Calculation of discharge & design of Storm water in respect of trapezoidal section torm water in respect of trapezoidal section
Rational formula for calculating runoff Q = (C I A) / 360 Q = (C I A) / 360 Wetted Perimeter of a Trapezoid
C– Co-efficient of run off Co-efficient of run off P = B + [(Z1*D)2 + D2]1/2 + [(Z2*D)2 + D2]1/2
I – Intensity of rainfall in mm/ hr. Intensity of rainfall in mm/ hr.
A – Drainage area in hectares. Drainage area in hectares. P = Wetted perimeter (ft.)
Run-off co-efficient for various types of surfaces B = Bottom width (ft.)
Open grounds, unpaved street 0.10 - 0.30 D = Depth of flow
Parks, lawns, gardens 0.10- 0.25 Z1 = Left side slope (z:1)
Macadam roads, pavements 0.25 - 0.70 Z2 = Right side slope (z:1)
Asphalt pavements 0.85 - 0.90
Water tight roof surface 0.90 - 0.95
Storm frequency
Intensity of precipitation.
Time of concentration
Manning’s formula for calculating the size of drain
Q= A x V =AxV
V = Velocity of flow in m/sec.
n = Co-efficient of friction, 0.013 0.013 0.013
R = Hydraulic mean depth in mts.
R=A/P
A=(Top width + bottom width)/2xdepth of flow for trapezoidal Section h)/2xdepth of flow for trapezoidal Section
Bottom width x depth of flow for rectangular section dth x depth of flow for rectangular section
P = Wetted perimeter in meters P = Wetted perimeter in meters
P=Bottom width + (2 x √2 x depth of flow) for trapezoidal section = B + 2 x √2 x Y
Where Y= depth of flow
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.7
Width of drain mtrs ; rect.sect. 0.55
Dia of drain mtrs ; Circular sect. 0.7 OR, 0.5-2nos
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.55
Sr No DRAIN NO.Z2 DRAIN NO.South Campus_East spine road & shops 110,111,112=Zone2
Calculation of discharge & design of Storm water in respect of trapezoidal section rm water in respect of trapezoidal section
Rational formula for calculating runoff Q = (C I A) / 360 Q = (C I A) / 360 Wetted Perimeter of a Trapezoid
C– Co-efficient of run off Co-efficient of run off P = B + [(Z1*D)2 + D2]1/2 + [(Z2*D)2 + D2]1/2
I – Intensity of rainfall in mm/ hr. Intensity of rainfall in mm/ hr.
A – Drainage area in hectares. Drainage area in hectares. P = Wetted perimeter (ft.)
Run-off co-efficient for various types of surfaces B = Bottom width (ft.)
Open grounds, unpaved street 0.10 - 0.30 D = Depth of flow
Parks, lawns, gardens 0.10- 0.25 Z1 = Left side slope (z:1)
Macadam roads, pavements 0.25 - 0.70 Z2 = Right side slope (z:1)
Asphalt pavements 0.85 - 0.90
Water tight roof surface 0.90 - 0.95
Storm frequency
Intensity of precipitation.
Time of concentration
Manning’s formula for calculating the size of drain
Q= A x V =AxV
V = Velocity of flow in m/sec.
n = Co-efficient of friction, 0.013 0.013 0.013
R = Hydraulic mean depth in mts.
R=A/P
A=(Top width + bottom width)/2xdepth of flow for trapezoidal Section )/2xdepth of flow for trapezoidal Section
Bottom width x depth of flow for rectangular section h x depth of flow for rectangular section
P = Wetted perimeter in meters P = Wetted perimeter in meters
P=Bottom width + (2 x √2 x depth of flow) for trapezoidal section = B + 2 x √2 x Y
Where Y= depth of flow
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.75
Width of drain mtrs ; rect.sect. 0.6
Dia of drain mtrs ; Circular sect. 0.8 OR, 0.6-2nos
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.8
Sr No DRAIN NO.Z3 DRAIN NO.ZONE 3- Central Ph-3 RnD bldgs=Zone3
Calculation of discharge & design of Storm water in respect of trapezoidal section rm water in respect of trapezoidal section
Rational formula for calculating runoff Q = (C I A) / 360 Q = (C I A) / 360 Wetted Perimeter of a Trapezoid
C– Co-efficient of run off Co-efficient of run off P = B + [(Z1*D)2 + D2]1/2 + [(Z2*D)2 + D2]1/2
I – Intensity of rainfall in mm/ hr. Intensity of rainfall in mm/ hr.
A – Drainage area in hectares. Drainage area in hectares. P = Wetted perimeter (ft.)
Run-off co-efficient for various types of surfaces B = Bottom width (ft.)
Open grounds, unpaved street 0.10 - 0.30 D = Depth of flow
Parks, lawns, gardens 0.10- 0.25 Z1 = Left side slope (z:1)
Macadam roads, pavements 0.25 - 0.70 Z2 = Right side slope (z:1)
Asphalt pavements 0.85 - 0.90
Water tight roof surface 0.90 - 0.95
Storm frequency
Intensity of precipitation.
Time of concentration
Manning’s formula for calculating the size of drain
Q= A x V =AxV
V = Velocity of flow in m/sec.
n = Co-efficient of friction, 0.013 0.013 0.013
R = Hydraulic mean depth in mts.
R=A/P
A=(Top width + bottom width)/2xdepth of flow for trapezoidal Section )/2xdepth of flow for trapezoidal Section
Bottom width x depth of flow for rectangular section h x depth of flow for rectangular section
P = Wetted perimeter in meters P = Wetted perimeter in meters
P=Bottom width + (2 x √2 x depth of flow) for trapezoidal section = B + 2 x √2 x Y
Where Y= depth of flow
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.65
Width of drain mtrs ; rect.sect. 0.5
Dia of drain mtrs ; Circular sect. 0.6 OR, 0.45-2nos
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.5
Sr No DRAIN NO.Z4 DRAIN NO.- S campus-Z4
Calculation of discharge & design of Storm water in respect of trapezoidal section orm water in respect of trapezoidal section
Rational formula for calculating runoff Q = (C I A) / 360 Q = (C I A) / 360 Wetted Perimeter of a Trapezoid
C– Co-efficient of run off Co-efficient of run off P = B + [(Z1*D)2 + D2]1/2 + [(Z2*D)2 + D2]1/2
I – Intensity of rainfall in mm/ hr. Intensity of rainfall in mm/ hr.
A – Drainage area in hectares. Drainage area in hectares. P = Wetted perimeter (ft.)
Run-off co-efficient for various types of surfaces B = Bottom width (ft.)
Open grounds, unpaved street 0.10 - 0.30 D = Depth of flow
Parks, lawns, gardens 0.10- 0.25 Z1 = Left side slope (z:1)
Macadam roads, pavements 0.25 - 0.70 Z2 = Right side slope (z:1)
Asphalt pavements 0.85 - 0.90
Water tight roof surface 0.90 - 0.95
Storm frequency
Intensity of precipitation.
Time of concentration
Manning’s formula for calculating the size of drain
Q= A x V =AxV
V = Velocity of flow in m/sec.
n = Co-efficient of friction, 0.013 0.013 0.013
R = Hydraulic mean depth in mts.
R=A/P
A=(Top width + bottom width)/2xdepth of flow for trapezoidal Section )/2xdepth of flow for trapezoidal Section
Bottom width x depth of flow for rectangular section th x depth of flow for rectangular section
P = Wetted perimeter in meters P = Wetted perimeter in meters
P=Bottom width + (2 x √2 x depth of flow) for trapezoidal section = B + 2 x √2 x Y
Where Y= depth of flow
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.65
Width of drain mtrs ; rect.sect. 0.5
Dia of drain mtrs ; Circular sect. 0.6 0.6 -2nos
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.5
Sr No DRAIN NO.Z5 DRAIN NO.- S campus-66Kv s/s, testTrack-Z5
Calculation of discharge & design of Storm water in respect of trapezoidal section orm water in respect of trapezoidal section
Rational formula for calculating runoff Q = (C I A) / 360 Q = (C I A) / 360 Wetted Perimeter of a Trapezoid
C– Co-efficient of run off Co-efficient of run off P = B + [(Z1*D)2 + D2]1/2 + [(Z2*D)2 + D2]1/2
I – Intensity of rainfall in mm/ hr. Intensity of rainfall in mm/ hr.
A – Drainage area in hectares. Drainage area in hectares. P = Wetted perimeter (ft.)
Run-off co-efficient for various types of surfaces B = Bottom width (ft.)
Open grounds, unpaved street 0.10 - 0.30 D = Depth of flow
Parks, lawns, gardens 0.10- 0.25 Z1 = Left side slope (z:1)
Macadam roads, pavements 0.25 - 0.70 Z2 = Right side slope (z:1)
Asphalt pavements 0.85 - 0.90
Water tight roof surface 0.90 - 0.95
Storm frequency
Intensity of precipitation.
Time of concentration
Manning’s formula for calculating the size of drain
Q= A x V =AxV
V = Velocity of flow in m/sec.
n = Co-efficient of friction, 0.013 0.013 0.013
R = Hydraulic mean depth in mts.
R=A/P
A=(Top width + bottom width)/2xdepth of flow for trapezoidal Section )/2xdepth of flow for trapezoidal Section
Bottom width x depth of flow for rectangular section th x depth of flow for rectangular section
P = Wetted perimeter in meters P = Wetted perimeter in meters
P=Bottom width + (2 x √2 x depth of flow) for trapezoidal section = B + 2 x √2 x Y
Where Y= depth of flow
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.75
Width of drain mtrs ; rect.sect. 0.6
Dia of drain mtrs ; Circular sect. 0.4
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.6
Sr No DRAIN NO.Z5 DRAIN NO.- S campus-66Kv s/s, testTrack-Z5
Calculation of discharge & design of Storm water in respect of trapezoidal section orm water in respect of trapezoidal section
Rational formula for calculating runoff Q = (C I A) / 360 Q = (C I A) / 360 Wetted Perimeter of a Trapezoid
C– Co-efficient of run off Co-efficient of run off P = B + [(Z1*D)2 + D2]1/2 + [(Z2*D)2 + D2]1/2
I – Intensity of rainfall in mm/ hr. Intensity of rainfall in mm/ hr.
A – Drainage area in hectares. Drainage area in hectares. P = Wetted perimeter (ft.)
Run-off co-efficient for various types of surfaces B = Bottom width (ft.)
Open grounds, unpaved street 0.10 - 0.30 D = Depth of flow
Parks, lawns, gardens 0.10- 0.25 Z1 = Left side slope (z:1)
Macadam roads, pavements 0.25 - 0.70 Z2 = Right side slope (z:1)
Asphalt pavements 0.85 - 0.90
Water tight roof surface 0.90 - 0.95
Storm frequency
Intensity of precipitation.
Time of concentration
Manning’s formula for calculating the size of drain
Q= A x V =AxV
V = Velocity of flow in m/sec.
n = Co-efficient of friction, 0.013 0.013 0.013
R = Hydraulic mean depth in mts.
R=A/P
A=(Top width + bottom width)/2xdepth of flow for trapezoidal Section )/2xdepth of flow for trapezoidal Section
Bottom width x depth of flow for rectangular section th x depth of flow for rectangular section
P = Wetted perimeter in meters P = Wetted perimeter in meters
P=Bottom width + (2 x √2 x depth of flow) for trapezoidal section = B + 2 x √2 x Y
Where Y= depth of flow
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.75
Width of drain mtrs ; rect.sect. 0.6
Dia of drain mtrs ; Circular sect. 0.5
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.6
Sr No DRAIN NO.Z5 DRAIN NO.- S campus-66Kv s/s, testTrack-Z5
Calculation of discharge & design of Storm water in respect of trapezoidal section orm water in respect of trapezoidal section
Rational formula for calculating runoff Q = (C I A) / 360 Q = (C I A) / 360 Wetted Perimeter of a Trapezoid
C– Co-efficient of run off Co-efficient of run off P = B + [(Z1*D)2 + D2]1/2 + [(Z2*D)2 + D2]1/2
I – Intensity of rainfall in mm/ hr. Intensity of rainfall in mm/ hr.
A – Drainage area in hectares. Drainage area in hectares. P = Wetted perimeter (ft.)
Run-off co-efficient for various types of surfaces B = Bottom width (ft.)
Open grounds, unpaved street 0.10 - 0.30 D = Depth of flow
Parks, lawns, gardens 0.10- 0.25 Z1 = Left side slope (z:1)
Macadam roads, pavements 0.25 - 0.70 Z2 = Right side slope (z:1)
Asphalt pavements 0.85 - 0.90
Water tight roof surface 0.90 - 0.95
Storm frequency
Intensity of precipitation.
Time of concentration
Manning’s formula for calculating the size of drain
Q= A x V =AxV
V = Velocity of flow in m/sec.
n = Co-efficient of friction, 0.013 0.013 0.013
R = Hydraulic mean depth in mts.
R=A/P
A=(Top width + bottom width)/2xdepth of flow for trapezoidal Section )/2xdepth of flow for trapezoidal Section
Bottom width x depth of flow for rectangular section th x depth of flow for rectangular section
P = Wetted perimeter in meters P = Wetted perimeter in meters
P=Bottom width + (2 x √2 x depth of flow) for trapezoidal section = B + 2 x √2 x Y
Where Y= depth of flow
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.75
Width of drain mtrs ; rect.sect. 0.6
Dia of drain mtrs ; Circular sect. 0.5
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.6
Sr No DRAIN NO.Z5 DRAIN NO.- S campus-66Kv s/s, testTrack-Z5
Calculation of discharge & design of Storm water in respect of trapezoidal section orm water in respect of trapezoidal section
Rational formula for calculating runoff Q = (C I A) / 360 Q = (C I A) / 360 Wetted Perimeter of a Trapezoid
C– Co-efficient of run off Co-efficient of run off P = B + [(Z1*D)2 + D2]1/2 + [(Z2*D)2 + D2]1/2
I – Intensity of rainfall in mm/ hr. Intensity of rainfall in mm/ hr.
A – Drainage area in hectares. Drainage area in hectares. P = Wetted perimeter (ft.)
Run-off co-efficient for various types of surfaces B = Bottom width (ft.)
Open grounds, unpaved street 0.10 - 0.30 D = Depth of flow
Parks, lawns, gardens 0.10- 0.25 Z1 = Left side slope (z:1)
Macadam roads, pavements 0.25 - 0.70 Z2 = Right side slope (z:1)
Asphalt pavements 0.85 - 0.90
Water tight roof surface 0.90 - 0.95
Storm frequency
Intensity of precipitation.
Time of concentration
Manning’s formula for calculating the size of drain
Q= A x V =AxV
V = Velocity of flow in m/sec.
n = Co-efficient of friction, 0.013 0.013 0.013
R = Hydraulic mean depth in mts.
R=A/P
A=(Top width + bottom width)/2xdepth of flow for trapezoidal Section )/2xdepth of flow for trapezoidal Section
Bottom width x depth of flow for rectangular section th x depth of flow for rectangular section
P = Wetted perimeter in meters P = Wetted perimeter in meters
P=Bottom width + (2 x √2 x depth of flow) for trapezoidal section = B + 2 x √2 x Y
Where Y= depth of flow
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.75
Width of drain mtrs ; rect.sect. 0.6
Dia of drain mtrs ; Circular sect. 0.7
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.6
Sr No DRAIN NO. 112+112a sheds DRAIN NO.- S campus-112+112a sheds (part Z2)
Calculation of discharge & design of Storm water in respect of trapezoidal section orm water in respect of trapezoidal section
Rational formula for calculating runoff Q = (C I A) / 360 Q = (C I A) / 360 Wetted Perimeter of a Trapezoid
C– Co-efficient of run off Co-efficient of run off P = B + [(Z1*D)2 + D2]1/2 + [(Z2*D)2 + D2]1/2
I – Intensity of rainfall in mm/ hr. Intensity of rainfall in mm/ hr.
A – Drainage area in hectares. Drainage area in hectares. P = Wetted perimeter (ft.)
Run-off co-efficient for various types of surfaces B = Bottom width (ft.)
Open grounds, unpaved street 0.10 - 0.30 D = Depth of flow
Parks, lawns, gardens 0.10- 0.25 Z1 = Left side slope (z:1)
Macadam roads, pavements 0.25 - 0.70 Z2 = Right side slope (z:1)
Asphalt pavements 0.85 - 0.90
Water tight roof surface 0.90 - 0.95
Storm frequency
Intensity of precipitation.
Time of concentration
Manning’s formula for calculating the size of drain
Q= A x V =AxV
V = Velocity of flow in m/sec.
n = Co-efficient of friction, 0.013 0.013 0.013
R = Hydraulic mean depth in mts.
R=A/P
A=(Top width + bottom width)/2xdepth of flow for trapezoidal Section )/2xdepth of flow for trapezoidal Section
Bottom width x depth of flow for rectangular section th x depth of flow for rectangular section
P = Wetted perimeter in meters P = Wetted perimeter in meters
P=Bottom width + (2 x √2 x depth of flow) for trapezoidal section = B + 2 x √2 x Y
Where Y= depth of flow
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.45
Width of drain mtrs ; rect.sect. 0.4
Dia of drain mtrs ; Circular sect. 0.3
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.3
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.5
Width of drain mtrs ; rect.sect. 0.4
Dia of drain mtrs ; Circular sect. 0.45
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.4
Open drain for 111 towards West Existing from 111a SE corner to 111SE corner
Start IL @ 111 SE corner 898.599 898.836 111a SE corner
Dist.m 46 53
Slope 1: 300 223.63
Drop 0.153 0.237
IL at passage - before chamber connection 111SW corner 898.446 898.599 111 SE corner
Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.7
Width of drain mtrs ; rect.sect. 0.6
Dia of drain mtrs ; Circular sect. 0.6 OR 0.45-2nos
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.45