Sunteți pe pagina 1din 2

S.No.

Item Description Qty Unit

1 PIPE SLEEPERS
Excavation of Soil, Backfilling & Compaction as per specs & civil
a) dwgs. 45 CU.M
b) Select Fill 18 CU.M
c) Concrete 3500 psi 12 CU.M
d) Reinforcement Rebars - 60 ksi 2.5 Tons
e) Lean Concrete - 1800 psi 2.5 CU.M
f) Bitumen coating over concrete surface with soil contact 66 SQ.M
g) Steel Structure above Fdn for eqp support 400 Kg

2 FOUNDATION FOR INLET BATH HEATER

a) Excavation of Soil, Backfilling & Compaction as per specs & civil


dwgs. 125 CU.M
b) Select Fill 60 CU.M
c) Concrete 3500 psi 60 CU.M
d) Grout 0.7 CU.M
e) Reinforcement Rebars - 60 ksi 2.75 Tons
f) Lean Concrete - 1800 psi 7 CU.M
g) Bitumen coating over concrete surface with soil contact 30 SQ.M
h) Anchor Bolts 300 Kg

3 PIPE SUPPORTS & STEEL STRUCTURE


Excavation of Soil, Backfilling & Compaction as per specs & civil
a) dwgs. 17 CU.M
b) Select Fill 8 CU.M
c) Concrete 3500 psi 3.5 CU.M
d) Reinforcement Rebars - 60 ksi 600 kgs
e) Lean Concrete - 1800 psi 1 CU.M
f) Bitumen coating over concrete surface with soil contact 20 SQ.M
g) Steel Structure above Fdn for eqp support 1050 Kg
h) Anchor Bolts 100 Kg
Remarks

(14 sleepers @ 300mm above FFL / FGL are considered)

S-ar putea să vă placă și