Documente Academic
Documente Profesional
Documente Cultură
ICONIC PHARMACHEM
PLOT NO. 3202, PHASE-II, GIDC ESTATE, PANOLI-394116,
TA: ANKLESHWAR, DIST: BHARUCH, GUJARAT
Prepared By:
1
Nov. 24, 2018
UNDERTAKING
We, M/S. Iconic Pharmachem, Own This EIA Report Prepared By M/S. Aqua-Air Environmental
Engrs. P. Ltd., Surat For Proposed Bulk Drugs And Bulk Drug Intermediates Manufacturing Plant
located At Plot No. 3202, Phase-Iii, GIDC Estate, Panoli-394 116, Tal: Ankleshwar, Dist: Bharuch,
Gujarat
FOR
Bhavesh Chaodiya
(Partner)
3
Declaration by Experts Contributing to the EIA Report of
Name Signature
4
5
6
Declaration by Head of the Organization
I, Jayesh S. Patel hereby confirm that the above mentioned team members were
involved in preparation of EIA Report of M/s. Iconic pharmachem, Plot No.
3202,Phase-II, GIDC, Panoli-394116, Taluka: Ankleshwar, Dist: Bharuch, Gujarat. I also confirm
that I shall be fully accountable for any misleading information mentioned in this
statement.
7
INDEX
1 CHAPTER 1: INTRODUCTION
1.1 INTRODUCTION 32
1.1.1 PROMOTERS AND THEIR BACK GROUND 33
1.1.2 REGULATORY FRAMEWORK 33
1.1.3 JUSTIFICATION OF THE PROJECT 33
1.2 PROJECT DETAILS 34
1.3 KEY INFRASTRUCTURE 40
1.4 SALIENT FEATURES OF THE PROJECT & INFRASTRUCTURE 43
FACILITIES
1.5 PURPOSE OF EIA 44
1.6 OBJECTIVES OF EIA 44
1.7 METHODOLOGIES FOR EIA 45
1.7.1 BASE LINE CONDITION 45
1.7.2 AMBIENT AIR ENVIRONMENT 45
1.7.3 GROUND AND SURFACE WATER ENVIRONMENT 45
1.7.4 NOISE ENVIRONMENT 45
1.7.5 SOIL ENVIRONMENT 46
1.7.6 BIOLOGICAL ENVIRONMENT 46
1.7.7 SOCIO-ECONOMIC ENVIRONMENT 46
1.7.8 IDENTIFICATION OF POLLUTION SOURCE 46
1.7.9 EVALUATION OF POLLUTION CONTROL & EMS 46
1.7.10 EVALUATION OF IMPACT 46
1.7.11 PREAPARATION OF EMP 46
1.8 STRUCTURE OF EIA REPORT 47
2 CHAPTER 2: PROJECT DESCRIPTION AND INFRASTRUCTURAL FACILITIES
2.1 BACKGROUND 50
2.2 TECHNICAL DETAILS OF THE FACILITIES(BAT) 50
2.3 MANUFACTURING ACTIVITIES 51
2.4 RAW MATERIAL STORAGE AND HANDLING 112
2.5 INFRASTRUCTURE FACILITIES 118
8
2.5.1 LAND 118
2.5.2 TRANSPORTATION FACILITIES 118
2.5.3 WATER AND WASTEWATER 118
2.5.3.1 WATER BALANCE DIAGARAM 120
2.5.3.2 TREATMENT PROCESS 121
2.5.3.3 DETAILS OF TREATABILITY STUDY 124
2.5.3.4 EXPECTED CHARACTERISTIC OF WASTE WATER BEFORE & AFTER 125
TREATMENT
2.5.3.5 ECONOMICAL TECHNICAL VIABILITY OF ETP SYSTEM 125
2.5.4 AIR POLLUTION AND CONTROL SYSTEM 126
2.5.5 NOISE LEVEL AND CONTROL SYSTEM 126
2.5.6 HAZARDOUS WASTE GENERATIONS AND DISPOSAL SYSTEM 127
2.6 DETAILS OF UTILITIES 129
2.7 ELECTRICITY REQUIREMENT 129
2.8 FUEL REQUIREMENT 129
9
3.8.3 GEOLOGICAL MAP 172
3.8.4 HYDROLOGY 174
3.8.5 DRAINAGE PATTERN 176
3.9 LAND USE PATTERN 177
3.10 TOPOSHEET 180
3.11 ECOLOGICAL INFORMATION 181
3.11.1 PHYSIOGRAPHY 182
3.11.2 FOREST 182
3.11.3 FLORA 183
3.11.4 FAUNA 186
3.12 SOCIO ECONOMIC ENVIRONMENT 188
3.12.1 DEMOGRAPHY 188
3.12.2 LITERACY RATE 191
3.12.3 OCCUPATIONAL STRUCTURE 193
3.12.4 AMENITIES 195
10
6 CHAPTER 6: ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE) 235
7 CHAPTER 7: RISK ASSESSMENT & DMP 236
7.1 RISK ASSESSMENT 236
7.1.1 INTRODUCTION 236
7.1.2 APPROACH TO THE STUDY 236
7.1.3 METHODOLOGY 237
7.1.4 HAZARD IDENTIFICATION 239
7.1.5 PREACAUTIONS DURING STORAGE AND TRANSPORTATION 245
7.1.5 HANDLING OF CORROSIVE CHEMICALS 247
7.1.6 FOR DRUM STORAGE AREA 248
7.1.7 CONSEQUENCE ANALYSIS 248
7.2 RISK ASSESSMENT SUMMARY 263
7.3 TRANSPORTATION 265
7.3.1 OTHER RISK REDUCTION OPPORTUNITIES 266
7.4 RECOMMENDATION FOR ALARP 266
7.5 FIRE FIGHTING SYSTEM 267
7.6 DISASTER MANAGEMENT PLAN 268
7.7 COMMMUNICATION SYSTEM 278
7.8 ACTION ON SITE 282
7.9 OFF – SITE EMERGENCY PLAN 293
7.10 OCCUPATIONAL HEALTH AND SAFETY 297
7.11 TRAINING, REHERASAL & RECORDS 305
11
8.4.5.2 METHODOLOGY OF DE-CONTAMINATION AND DISPOSAL OF 322
DISCARDED CONTAINERS AND ITS RECORD KEEPING
8.4.5.3 IDENTIFICATION OF RECYCLE/REUSE, CLEANER PRODUCTION 323
8.5 GREEN BELT DEVELOPMENT 324
8.6 MEASURES FOR CONSERVATION OF ENERGY 326
8.7 SKILLED AND TRAINED MANPOWER 328
8.8 SOCIO-ECONOMIC DEVELOPMENTAL ACTIVITIES 328
8.9 CAPITAL COST FOR ENVIRONMENTAL MANGEMENT 330
8.10 SOLVENT RECOVERY PLAN 331
8.11 LDAR PROGRAM 333
ANNEXURES 357
12
LIST OF TABLES
TABLE TITLE PAGE NO.
NO.
13
4.6 CONSTRUCTION & OPERATE STAGE POTENTIAL IMPACTS & 225
MITIGATE MEASURES
4.7 ENVIRONMENTAL IMPACT MATRIX 227
14
LIST OF FIGURES
FIGURE TITLE PAGE NO.
NO.
1.1 LOCATION OF THE PROJECT SITE 35
1.2 LAYOUT OF THE PLANT 37
1.3 KEY INFRASTRUCTURE FEATURES AND SETTLEMENTS 41
1.4 TOPOSHEET 42
1.5 ACTIVITIES, SOURCES OF INFORMATION AND CONTENTS OF EIA 49
REPORT
2.1 WATER BALANCE DIAGRAM 120
2.2 ETP FLOW DIAGRAM 123
3.1 WIND ROSE DIAGRAM 139
3.2 STABILITY CLASS 140
3.3 LOCATION OF THE AMBIENT AIR, NOISE, WATER AND SOIL 141
3.4 EIA PHOTOGRAPHS 164-171
3.5 MAJOR GEOLIGICAL FEATURES 173
3.6 HYDROLOGICAL MAP 175
3.7 DRAINAGE PATTERN 176
3.8 PROCESS METHODOLOGY 178
3.9 LAND USE/ LAND COVER 179
3.10 TOPOSHEET 180
3.11 POPULATION DENSITY 190
3.12 LITERACY RATE 192
4.1 IMPACT NETWORKS 200-205
4.2 PROPOSED ISOPLETH OF SPM 210
4.3 PROPOSED ISOPLETH OF SO2 211
4.4 PROPOSED ISOPLETH OF NOX 212
4.5 PROPOSED ISOPLETH OF HCL 213
4.6 PROPOSED ISOPLETH OF NH3 214
7.1 QRA METHODOLOGY 237
7.2 FLOW CHART FOR QUANTITATIVE RISK ASSESSMENT 238
7.3 LAYOUT OF THE PLANT 240
7.4 RISK SCHENARIO 260-261
8.1 ORGANOGRAM OF ENVIRONMENT MANAGEMENT CELL 310
8.2 SOLVENT RECOVERY PLAN 332
8.3 LDAR VOC CONTROL 33
15
TOR LETTER
16
17
COMPLIANCE OF TERMS OF REFERENCES (TORs) – SEAC, GANDHINAGAR
SR. NO. TERMS OF REFERENCES COMPLIENCE
Specific TORs
1 Compliance of MoEFC's OM dated Please refer chapter-8, Section 8.8 , page
01/05/2018 regarding ''Corporate no. 280
Environment Responsibility
2 Diclofenac Sodium will be used completely Diclofenac sodium will be used in product in
for captive consumption of other proposed indolinone
products.
3 Details of spent aluminium chloride there is no generation of spent aluminium
solution details along with its disposal and chloride.
revised hazardous waste profile.
4 Explore the use of renewable energy please refer Chapter-8, Section 8.6
efficient to the maximum extent possible. page no.
details of provisions to make the project
energy efficient though of energy efficient
devices and adoption of modes of
alternatives eco-friendly sources of energy
like solar water heater, solar lighting
devices etc. Measure proposed for energy
conservation.
5 Qualitative and quantitative analysis of Please refer hazardous waste generation
hazardous waste streams like Spent and disposal system Chapter : 2, section
sulphuric acid, spent HCL and Ammonia 2.5.6, Table 2.5
solution generation from the
manufacturing process (Product wise).
Explore the possibility to reuse such waste
streams which premises as raw materials
for other products or to convert it into
valuable products instead of selling out
side. Sound management of such waste
streams as per the HW rules 2016 as
amended time to time. Feasibility report
for utilization shall be incorporated in EIA
report.
6 Safety precautions including flame proof, Annexure-13
electic fitting to be taken to avoid fire
hazard & occupational health hazards
during unloading, storage, transportation,
handling, and processing of hazardous
chemicals like sulphuric acid, toluene etc.
7 Safety precautions for toluene as per the Annexure--13
PESO standards.
8 Applicability of ozone depleting rules as per there is no process which is applicable of
consumption of ODS in process. Ozone depleting.
9 Leak Detection and repairing programme Chapter : 08, Section 8.11
(LDAR) for all the volatile organic solvent LDAR programme with leak detection and
proposed for use in house with detailed repair.
18
chemicals properties including vapour to prevent losses of these solvents in
pressure. LDAR Shall endeavor prevention atmosphere.
of losses of solvents to the best minimum
extent.
10 Submit the status of compliances of please refer Annexure-06, Common MEE
environmental norms of existing common membership certificate and Consent copy of
infrastructure of M/s. ACPTCPL, Ankleshwar MEE with compliance status.
Standard TORs
1 A tabular chart with index for point-wise Point-wise compliance of above TORs is
compliance of below mentioned TORs. given as Compliance of TORs in Index.
2 Executive summary of the project – giving a For executive summary of the project,
prima facie idea of the objectives of the Please refer Chapter - 10 in EIA Report.
proposal, use of resources, justification,
etc. In addition, it should provide a
compilation of EIA report, including EMP
and the post-project monitoring plan in
brief.
3 Justification for selecting the proposed For Justification of the project, Please refer
product and unit size. Section-1.1.3, Chapter-1 (Page No. 33) in EIA
Report.
4 Land requirement for the project including For the land break-up, Please refer Section-
its break up for various purposes, its 1.1.2, Table-1.2, Chapter-1 (Page No. 34) in
availability and optimization. EIA Report. Fig. 1.3 page no. 37
5 Land possession documents. Copy of NA Copy of plot holding certificate obtained
order showing permission to use the from GIDC.
project land for industrial purpose. If Please refer Annexure-7 in EIA Report.
located in GIDC, copy of plot holding Page no. 376
certificate obtained from GIDC Authority.
6 Location of the project site and nearest For location of the project site and nearest
habitats with distances from the project habitats with distances from the project
site to be demarcated on a toposheet (1: site, Please refer Section-1.2, Figure-1.1,
50000 scale). Chapter-1 (Page No. 35) in EIA Report.
7 Topography details of the project area. For topography details, Please refer Figure-
1.4, Chapter-1 (Page No. 42) in EIA Report.
8 Geological features and geo-hydrological For geological and geo-hydrological details,
status of the study area. Please refer Section-3.8, Chapter-3 (Page
No. 172) in EIA Report.
9 In case of project located outside notified Not Applicable
area: Legal Undertaking stating that unit is
complying the three conditions [i.e. water
consumption less than 25 M3/day; Fuel
consumption less than 25 TPD; and not
covered in the category of MAH units as per
the Management, Storage, Import of
Hazardous Chemical Rules (MSIHC Rules),
1989] as per the amendment to EIA
Notification, 2006 vide SO 1599 (E) dated
25/06/2014.
19
10 Present land use pattern of the study area For land use pattern of the study area,
shall be given based on satellite imagery. Please refer Section-3.9, Chapter-3 (Page
No. 177) in EIA Report.
11 Layout plan of the factory premises clearly For the layout plan of the factory, Please
demarcating various units within the plant. refer Figure-1.2, Chapter-1 (Page No. 37) in
Provision of separate entry & exit and EIA Report.
adequate margin all-round the periphery for
unobstructed easy movement of the
emergency vehicle / fire tenders without
reversing back. Mark the same in the plant
layout.
12 Technical details of the plant/s along with For the details of best available
details on best available technologies (BAT), technologies (BAT), Please refer Section-
proposed technology and reasons for 2.2, Chapter-2 (Page No. 50) in EIA Report.
selecting the same.
13 Product spectrum (Proposed products along For the list of products along with
with production Capacity) and processes. production capacity, Please refer Section-
1.2.5, Table 1.3, Chapter-1 (Page No. 38) in
EIA Report.
Details of manufacturing process, Please
refer Section-2.3, Chapter-2 (Page No. 51-
111) in EIA Report.
14 Chemical name of each proposed product For chemical name, CAS number and end
to be manufactured. Details on end use of use of each products, Please refer Section-
each product. (Provide CAS number of all 1.2.5, Chapter-1 (Page No. 38) in EIA
the products & raw materials. In case of Report.
Dyes, CI number).
15 Details on raw materials, source and For the details of raw material and storage,
storage within the premises. Please refer Section-2.4, Chapter-2 (Page
No. 65) in EIA Report.
16 Details of complete manufacturing process Details of complete manufacturing process /
/ operations of each product along with operations of each product along with
chemical reactions, process flow diagram chemical reactions Please refer Section-2.3,
describing each unit processes and unit Table : 2.4, Chapter-2 (Page No. 118) in EIA
operations along with material balance, Report.
consumption of raw materials etc.
17 Details on strategy for the implementation Details on strategy for the implementation
of cleaner production activities. of cleaner production activities are referred
as Section-8.4.5.3, Chapter-8 (Page No. 323)
in EIA Report.
18 Assessment of source of the water supply Water requirement will be met through
with adequacy of the same to meet with GIDC water supply.
the requirements for the project. Please refer Annexure-08, for GIDC Water
Permission obtained from the concern Supply Certificate. page no.379
authority for supply of raw water.
19 Undertaking stating that no bore well shall Please refer Annexure-08, for undertaking
be dug within the premises (If project is that no bore well shall be dug within the
located within the Industrial estate). premises. page no.380
20
20 Details on water balance including quantity Water balance diagram is referred as
of effluent generated, recycled & reused. Section- 2.5.3.1, Fig. 2.1, Chapter-2 (Page
Details of methods to be adopted for the No. 120) in EIA Report.
water conservation.
21 Efforts to minimize effluent discharge and Total water requirement will be 30.0 KL/Day
to maintain quality of receiving water body. which will be met through GIDC water
supply. The wastewater generation will be
17.5 KL/Day. The industrial effluent (15.7
KL/Day) will be sent to Common MEE of
M/s. ACPTCL, Ankleshwar
Domestic waste water (1.8 KL/Day) will be
disposed by septic tank & soak pit.
22 Explore the possibilities for Zero Liquid For ‘Zero’ discharge of effluent, Please refer
Discharge (ZLD) option for the proposed Section 2.5.3, Chapter-2 (Page No. 118-124)
project. in EIA Report.
23 Segregation of waste streams, There is no segregation of waste streams.
characterization and quality with specific Total water requirement will be 30.0 KL/Day
treatment and disposal of each stream which will be met through GIDC water
including action plan for maximum recycle supply. The wastewater generation will be
of treated waste water and minimum
17.5 KL/Day. The industrial effluent (15.7
discharge for effluent.
KL/Day) will be sent to Common MEE of
M/s. ACPTCL, Ankleshwar
Domestic waste water (1.8 KL/Day) will be
disposed by septic tank & soak pit.
24 Capacity of ETP in KL/day. Details of ETP Details of the ETP are referred as Section-
including dimensions of each unit along 2.5.3.2, Chapter-2 (Page No. 121) in EIA
with schematic flow diagram. Inlet, Report.
transitional and treated effluent qualities
with specific efficiency of each treatment
unit in reduction in respect of all
concerned/regulated environmental
parameters. Inlet effluent quality should be
based on worst case scenario considering
production of most polluting products that
can be manufactured in the plant
concurrently.
25 In case of discharge into GIDC drainage / There is no discharge into GIDC drainage/
Pipeline: pipelines.
I. Copy of permission letter with quantity
(KL/day) from the concern authority of Total water requirement will be 30.0 KL/Day
drainage network / pipeline with which will be met through GIDC water
confirmation for spare capacity available to supply. The wastewater generation will be
take additional effluent.
17.5 KL/Day. The industrial effluent (15.7
II. Characteristics of the combined effluent
and treated water to be sent to Common KL/Day) will be sent to Common MEE of
pipeline with reference to the M/s. ACPTCL, Ankleshwar
21
MoEFCC/CPCB/GPCB discharge norms. Domestic waste water (1.8 KL/Day) will be
III. Provision for Continuous Monitoring disposed by septic tank & soak pit.
System for waste water discharge.
26 In case of waste water sent to Common Total water requirement will be 30.0 KL/Day
Facilities (CF) like CETP, MEE, Spray Dryer which will be met through GIDC water
etc. supply. The wastewater generation will be
a. Details of Common facilities including
17.5 KL/Day. The industrial effluent (15.7
(1) Total capacity of the CF
KL/Day) will be sent to Common MEE of
(2) Copy of CC&A of the CF. M/s. ACPTCL, Ankleshwar
Domestic waste water (1.8 KL/Day) will be
(3) Actual load at present (Qualitative and disposed by septic tank & soak pit.
Quantitative – KL per day)
(4) Booked quantity & Spare capacity of CF Please refer Annexure-06 , Common MEE
membership certificate with CCA and
(5) Copies of XGN generated Inspection Compliance status.
reports with analysis reports of the water
/Air/Hazardous samples collected by GPCB
(Last 2 year). Copies of instructions issued
by GPCB in last 2 year and point wise
compliance thereof.
(6) Copies of Show- cause notices, closure
notices etc. served by the GPCB and its
compliance
(6) Recommendations and suggestions of
the last two Environment Audit reports of
CETP and its compliance report.
(7) Common Facility Up gradation scheme,
if any.
b. Status of compliance to the 18(1) (b)
direction issued by the CPCB with respect
to
CETP compliance & CEPI area action plan
along with relevant supportive document.
c. Give status of compliance of
Environmental norms of existing Common
Infrastructure i.e. CETP, MEE & Spray Dryer
(Whichever is applicable) in which you are a
member.
d. Submit adequacy of Common
Infrastructure i.e. CETP, MEE & Spray Dryer
for additional load (Whichever is
applicable) along with written
confirmation/membership certificate
mentioning the same (Total consented
quantity, total quantity booked so far,
quantity booked for the unit, spare
quantity available).
27 In case of Zero Liquid Discharge (ZLD) : i. Company will neutralize the effluent
22
I. Action plan for ‘Zero’ discharge of then it will be sent to Common MEE
effluent shall be included. Notarized Facility, which is Zero Liquid Discharge.
undertaking for assuring that underground
drainage connection will not be taken in
the unit and there shall be no effluent
discharge outside the plant premises. ii. Unit Refer Section 2.5.3.5, Chapter-2,
II. Economical and technical viability of the Page No. 125
effluent treatment system to achieve Zero
Liquid Discharge (ZLD). iii. Refer Annexure – 10 page no.385
III. Certification of adequacy of proposed
ZLD scheme through credible institutes of
National repute. iv. Refer Section 3.6, Chapter-3, Page
IV. To estimate & monitor ground water No.148
quality & its contamination status, piezo
meter wells, one on up gradient of the
groundwater flow and other three on the
down gradient side of the ground water
flow of the proposed project at different
depth based on available ground water
depth shall be established and all the
parameters mentioned in IS 10:500 for
potable water standard shall be monitored.
28 In case of in-house MEE/Spray dryer for Not applicable. The entire waste water send
waste water treatment: Capacity of to Common MEE of M/s.
MEE/Spray dryer in KL/hr. Technical details ACPTCPL,Ankleshwar.
of MEE including evaporation capacity,
steam required for evaporation, adequacy
of the proposed boiler to supply steam for
evaporation in addition to the steam
required for the process etc. Techno-
economical viability of the evaporation
system. Control measures proposed for the
evaporation system in order to
avoid/reduce gaseous emission/VOC from
evaporation of industrial effluent
containing solvents & other chemicals.
29 Technical details of ATFD/Crystallizer/ spray Not Applicable
Dryer, RO/NF system etc. (If any).
30 Undertaking stating that a separate electric Please refer Annexure-11, for undertaking
meter will be provided for the waste water that a separate electric meter will be
treatment system viz. ETP, RO, MEE, Spray provided for the ETP. page no. 393
dryer etc. (Whichever is applicable)
31 Economical and technical viability of the Unit Refer Section 2.5.3.5, Chapter-2, Page
effluent treatment system. No. 125
32 Plans for management, collection and Plans for management, collection and
disposal of waste streams to be generated disposal of waste streams to be generated
from spillage, leakages, vessel washing, from spillage, leakages, vessel washing,
used container washing etc. Measures used container washing etc. are referred as
23
proposed for preventing effluent discharge Section-8.4.2.1, Chapter-8 (Page No. 315) in
during unforeseen circumstances. EIA Report.
24
activities. The details of model used and Chapter-4 (Page No. 207) in EIA Report.
input parameters used for modelling should Wind rose diagram is referred as Figure-3.1,
be provided. The air quality contours may Chapter-3 (Page No. 139) in EIA Report.
be shown on location map clearly indicating
the location of sensitive receptors, if any,
and the habitation. The wind rose showing
pre-dominant wind direction should also be
indicated on the map. Impact due to
vehicular movement shall also be included
into the prediction using suitable model.
Results of Air dispersion modelling should
be superimposed on satellite Image /
geographical area map.
39 Base line status of the noise environment, Noise monitoring data is referred as Section
impact of noise on present environment - 3.5, Chapter-3 (Page No. 145) in EIA
due to the project and proposed measures Report.
for noise reduction including engineering Noise environment is referred as Section-
controls. 8.4.4, Chapter-8 (Page No. 319) in EIA
Report.
40 Specific details of a) Process gas emission is referred as
a) Process gas emission from each unit Section- 2.5.4, Chapter-2 (Page No. 126)
process with its quantification. in EIA Report.
b) Air pollution Control Measures (APCM) b) Air pollution Control Measures proposed
proposed for process gas emission. for process gas emission is referred as
Adequacy of the air pollution control Section- 2.5.4, Chapter-2 (Page No. 126)
measures (APCM) for process gas emission in EIA Report.
measures to achieve the GPCB norms. c) Details of utilities required are referred
c) Details of the utilities required. as Section-2.6, Chapter-2 (Page No. 129)
d) Type and quantity (MT/hr& MT/Day) of in EIA Report.
fuel to be used for each utility. d) Requirement of fuel is referred as
e) Flue gas emission rate emission from Section- 2.8, Chapter-2 (Page No. 129) in
each utility. EIA Report.
f) Air Pollution Control Measures (APCM) e) Flue gas emission is referred as Section-
proposed to each of the utility along with 2.5.4, Chapter-2 (Page No. 126) in EIA
its adequacy Report.
g) List the project specific sources of f) APCM is referred as Section-2.5.4,
fugitive emission along with its Chapter-2 (Page No. 126) in EIA Report.
quantification and proposed measures to g) Action plan to control & monitor fugitive
control it. emissions are referred as Section-
h) Details on tail gas treatment.(If any) 8.4.3.2, Chapter-8 (Page No. 317) in EIA
Report.
h) No
41 Provision of CEMS (Continuous Emission Unit shall provide Continuous Emission
Monitoring system). Monitoring System.
42 Action plan for odour control to be Action plan for odour control is referred as
submitted. Section-8.4.3.3, Chapter-8 (Page No. 319) in
EIA Report.
43 Management plan for hazardous/Solid Details of hazardous waste generation & its
25
waste including storage, handling, management are referred as Section-
utilization and safe disposal as per the 8.4.5.1, Chapter-8 (Page No. 321) in EIA
Hazardous and Other Wastes (Management Report.
and Tran boundary Movement) Rules 2016.
CPCB guidelines in respect of specific
treatment, such as solar evaporation,
incineration, etc., need to be followed.
44 How the manual handling of the hazardous Methodology of de-contamination and
wastes will be minimized? Methodology of disposal of discarded containers and its
decontamination and disposal of discarded records are referred as Section-8.4.5.2,
containers and its record keeping. Chapter-8 (Page No. 322) in EIA Report.
45 Management of by-products which fall Not Applicable
under the purview of the Hazardous and
Other Wastes (Management and
Transboundary Movement) Rules 2016 as
per the said rules and necessary
permissions from the concern authority.
46 Membership of Common Environmental Please refer Annexure-06, for Common
Infrastructure like TSDF, Common Solid Waste Disposal Facility. page no.370
Incineration Facility (CHWIF), MEE, Spray
dryer etc.
47 Name and quantity of each type of solvents Solvent Recovery System is referred as
to be used for proposed production. Details Section- 8.10, Chapter-8 (Page No. 330) in
of in-house solvent recovery system EIA Report.
including mass balance, solvent loss,
recovery efficiency (% recovery), feasibility
of reusing the recovered solvents etc. for
each type of solvent.
48 Appropriate monitoring network has to be Unit will be provided appropriate
designed and proposed, to assess the monitoring network to assess the possible
possible residual impacts on VECs. residual impacts on VECs.
49 A detailed EMP including the protection A details regarding EMP including -
and mitigation measures for impact on environmental management cell, concept of
human health and environment as well as waste-minimization, recycle/reuse/recover
detailed monitoring plan and techniques, energy conservation and
environmental management cell proposed natural resource conservation are referred
for implementation and monitoring of EMP. as section 8.4.5.3 Chapter-8 in EIA Report
The EMP should also include the concept of page no. 323.
waste-minimization, recycle/reuse/recover The details regarding environmental
techniques, energy conservation, and monitoring plan are referred as Chapter-5 in
natural resource conservation. Total capital EIA Report.
cost and recurring cost/annum earmarked Section 8.9 chaper-8, page no. 330
for environment pollution control Total costs of the project will be Rs. 3.0
measures. Crores.
50 Details of in-house monitoring capabilities Environmental monitoring will be carried by
and the recognized agencies if proposed for third party.
conducting monitoring.
51 Permission from PESO, Nagpur for storage Not Applicable
26
of solvents, other toxic chemicals, if any.
52 Occupational health impacts on the The details of Occupational Health & Safety
workers and mitigation measures proposed are referred as Section-7.10, Chapter-7
to avoid the human health hazards along (Page No. 297) in EIA Report.
with the personal protective equipment to
be provided. Provision of industrial
hygienist and monitoring of the
occupational injury to workers as well as
impact on the workers. Plan for periodic
medical check-up of the workers exposed.
Details of work place ambient air quality
monitoring plan as per Gujarat Factories
Rules.
53 Details on volatile organic compounds Details on volatile organic compounds
(VOCs) from the plant operations and (VOCs) are referred as Section-8.4.3.3,
occupational safety and health protection Chapter-8 (Page No.319) in EIA Report.
measures. Proposal for Leak Detection and
Repair (LDAR) program as per the CPCB
guidelines.
54 Risk assessment including prediction of the The details of risk assessment including
worst-case scenario and maximum credible prediction of the worst-case scenario and
accident scenarios should be carried out. maximum credible accident scenarios are
The worst-case scenario should take into referred as Section-7.1.7.3, Chapter-7 (Page
account the maximum inventory of storage No. 259) in EIA Report.
at site at any point of time. The risk The details of on-site / off-site emergency
contours should be plotted on the plant plan are referred as Section-7.8 Page No.
layout map clearly showing which of the 282 & Section 7.9, Chapter-7 (Page No. 293)
facilities would be affected in case of an in EIA Report.
accident taking place. Based on the same,
proposed safeguard measures including
On-Site / Off-Site Emergency Plan should be
provided.
55 MSDS of all the products and raw materials. For MSDS, please refer Annexure-14.page
no.400
56 Details of hazardous characteristics and The details of hazardous characteristics and
toxicity of raw materials and products to be toxicity of raw materials and products are
handled and the control measures referred as Table-7.1, 7.2 & 7.3, Chapter-7
proposed to ensure safety and avoid the (Page No. 241-244) in EIA Report.
human health impacts. This shall include Safety measurements for hazardous
the details of Antidotes also. chemicals to avoid the human health
impacts are referred as Section-7.1.4,
Chapter-7 (Page No. 239) in EIA Report.
57 Details of quantity of each hazardous The detail is referred as Table-7.1, Chapter-
chemical (including solvents) to be stored, 7 (Page No. 241) in EIA Report.
Material of Construction (MoC) of major The details of hazard, risk & measures to
hazardous chemical storage tanks, dyke prevent the accident is complied in Chapter-
details, threshold storage quantity as per 08 of EIA Report.
schedules of the Manufacture, Storage &
27
Import of Hazardous Chemicals Rules of
major hazardous chemicals, size of the
biggest storage tank to be provided for
each raw material & product etc. How the
manual handling of the hazardous
chemicals will be minimized?
58 Details of the separate isolated storage The details of Fire Fighting System are
area for flammable chemicals. Details of referred as Section-7.5, Chapter-7 (Page No.
flameproof electrical fittings, DCP 268) in EIA Report.
extinguishers and other safety measures
proposed. Detailed fire control plan for
flammable substances and processes
showing hydrant pipeline network,
provision of DG Sets, fire pumps, jockey
pump, toxic gas detectors etc.
59 Submit checklist in the form of Do’s & Please refer Annexure-12, for Check list of
Don’ts of preventive maintenance, Do’s & Don’ts. page no. 394
strengthening of HSE, manufacturing utility
staff for safety related measures.
60 Specify safety precautions to be taken for Annexure-13, Page no. 397
Chemical storage, process, handling
&transportation hazard.
61 Details on workers training before engaging Annexure-13, Page no. 397
work, periodical, in-house, outside etc.
62 Detailed five year greenbelt development Detailed five year greenbelt development
program including annual budget, planning plan is referred as Section-8.5, Chapter-8
schedule, species, width of plantations, (Page No. 324) in EIA Report.
number of trees to be planted, area under
green belt development [with map],
budgetary outlay etc. along with
commitment of the management to carry
out the tree plantation activities outside
the premises at appropriate places in the
nearby areas and elsewhere.
63 Action plan for the greenbelt development Action plan for the greenbelt development
– species, width of plantations, planning is referred as Section-8.5, Chapter-8 (Page
schedule, etc., in accordance to CPCB No. 324) in EIA Report.
published guidelines.
64 Detailed socio-economic development Socio-economic development activities are
measures including community welfare referred as Section-8.8, Chapter-8 (Page No.
program most useful in the project area for 328) in EIA Report.
the overall improvement of the
environment. Submit a detailed plan for
social corporate responsibilities, with
appropriate budgetary provisions for the
next five years and activities proposed to
be carried out; specific to the current
demographic status of the area.
28
65 (a) Does the company have a well laid Environment Policy is referred as Section-
down Environment Policy approved by its 8.3.1, Chapter-8 (Page No. 311) in EIA
Board of Directors? If so, it may be detailed Report.
in the EIA report.
(b). Does the Environment Policy prescribe
for standard operating process/ procedures
to bring into focus any infringement/
deviation/ violation of the environmental
or forest norms/ conditions? If so, it may be
detailed in the EIA.
66 What is the hierarchical system or Administrative order of the company to deal
administrative order of the company to with the environmental issues is referred as
deal with the environmental issues and for Section-8.3, Figure-8.1, Chapter-8 (Page No.
ensuring compliance with the EC 310) in EIA Report.
conditions. Details of this system may be
given.
67 Does the company have a system of Company will develop a system of reporting
reporting of non-compliances/ violations of of non-compliances/ violations of
environmental norms to the Board of environmental norms to the Board of
Directors of the company and/ or Directors of the company and/ or
shareholders or stakeholders at large? This shareholders or stakeholders.
reporting mechanism should be detailed in
the EIA Report.
68 Phase wise project implementation After getting EC/NOC, we start construction
schedule with bar chart and time frame, in work.
terms of site development, infrastructure
provision, EMS implementation etc.
69 Certificate of accreditation issued by the Please refer Annexure 9, for Stay Order
NABET, QCI to the environmental from Hon’ble High Court of Gujarat against
consultant should be incorporated in the NABET/QCI scheme. Page no. 381.0
EIA Report.
70 An undertaking by the Project Proponent An undertaking by the Project Proponent on
on the ownership of the EIA report as per the ownership of the EIA report, please
the MoEF&CC OM dated 05/10/2011 and refer Sr no. 3 Declaration of Consultant.
an undertaking by the Consultant regarding
the prescribed TORs have been complied
with and the data submitted is factually
correct as per the MoEF&CC OM dated
04/08/2009.
71 All documents to be properly referenced Complied.
with index and continuous page
numbering.
72 Where data are presented in the Report Complied.
especially in Tables, the period in which the
data were collected and the sources should
be indicated.
73 Project Proponent shall enclose all the Complied.
analysis/testing reports of water, air, soil,
29
noise etc. using the MoEF&CC/NABL
accredited laboratories. All the original
analysis/testing reports should be available
during appraisal of the Project.
74 79. In case of Expansion of the project Not Applicable
a. Need for the proposed expansion should
be justified in detail.
b. Adequacy of existing EMS
(Environmental Management System).
c. Explore the possibility to achieve Zero
Liquid Discharge (ZLD) for existing as well
as proposed activity.
d. Records of any legal breach of
Environmental laws i.e. details of show-
cause notices, closure notices etc. served
by the GPCB to the existing unit in last five
years and actions taken then after for
prevention of pollution.
e. Copies of Environmental Clearances
obtained for the existing plant, its point
wise compliance report.
f. Environmental audit reports for last 3
years and compliance of its
recommendations /Suggestions. (Include
latest audit report and its compliance.)
g. Copy of Consent to Operate (CC&A)
obtained along with point wise compliance
status of all the conditions stipulated
therein.
h. Compliance of MoEFCC circulars vide No:
J-11011/618/2010-IAII (I) dated
30/05/2012 and J-11013/41/2006-IA-II(I)
dated 20/10/2009.
i. Copies of XGN generated Inspection
reports with analysis reports of the water
/Air /Hazardous samples collected by GPCB
(Last 2 year). Copies of instructions issued
by GPCB in last 2 year and point wise
compliance thereof.
75 In case of project is located in Ankleshwar- Project located in Panoli GIDC
Panoli, Vatva-Narol & Vapi GIDC.
(A) Compliance of MOEFCC’s OM no. J- Total water requirement will be 30.0 KL/Day
11013/5/2010-IA.II (I) dated 25/11/2016 which will be met through GIDC water
regarding lifting of moratorium on the supply. The wastewater generation will be
consideration of projects for environmental
17.5 KL/Day. The industrial effluent (15.7
clearance.
(B) Compliance of direction under section KL/Day) will be sent to Common MEE of
18 (1) (b) of the Water (Prevention and M/s. ACPTCL, Ankleshwar
Control of Pollution) act, 1974 issued by
30
CPCB dated 31/03/2016 regarding
compliance of CETP. Domestic waste water (1.8 KL/Day) will be
a) Action initiated by GPCB, if any, against disposed by septic tank & soak pit.
proposed unit regarding noncompliance of
prescribed standards under the various
environmental laws.
b) Performance of CETP with respect to
current hydraulic load & prescribed
standards with No Objection Certificate of
CETP regarding incorporation of the
proposed unit for acceptance of w/w
c) Performance of TSDF site with respect to
current load & prescribed standards with
No Objection Certificate of TSDF site
regarding incorporation of the proposed
unit for acceptance of hazardous waste to
the common infrastructure.
d) Copies of quarterly action report taken
for the above points submitted to the
CPCB.
e) Report of GPCB which have conducted
monitoring as per the said direction by
CPCB dated 31/03/2016.
31
M/S. ICONIC PHARMACHEM
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
CHAPTER - 1
INTRODUCTION
1.1 INTRODUCTION
M/s. ICONIC PHARMACHEM, has proposed for manufacturing of bulk drugs and bulk drug
Intermediate located at Plot No. 3202, Phase-III,GIDC Estate, Panoli-394 116, Tal:
Ankleshwar, Dist: Bharuch, Gujarat.
Total 1500 m2 land area is available at site; out of this 495 m2 (33.0 %) area is developed as
greenbelt and other forms of greenery.
M/s. ICONIC PHARMACHEM is a newly formed company has project is for manufacturing of
Bulk Drugs and bulk drug intermediate for various categories of the drugs like Anti-
inflammatory , Anti Histamine, Anti Hypertension, Anti-Epileptic, Anti Diabetic etc. The
company will be managed by team of well experienced and qualified personnel are assisting
the promoters in the execution of the day to day affairs of the company.
MISSION
Our aim is to deliver superior long-term tangible, intangible benefits to our customers, our
stakeholders, investors and to the community in which we operate. We accomplish this
through the synergistic approach in remaining viable in the overall global economic context
and keep churning out value for customers, without compromising our core values.
CORE VALUE
Today, we are not among the top FIVE global business houses nor are we any nearer to any
of the top TEN or TWENTY such business houses. However, as the Chinese proverb goes, a
journey of thousand miles begins with a single step and that single step we have taken.
Determined as we are, we have chosen to take that single step on a road map that would
lead us to complete the legendry thousand miles.
To develop and strengthen, our business contacts across the five continents.
To ensure, that we create customers and retain them with abundance of their goodwill.
1 Mr. Bhavesh Partner C-8, Swami Mo. no. : +91 98983 48138
Chlodiya Narayan E-mail :
Nagar-2,Nr. iconicpharmachem@gmail.com
Kalakunj bhaveshchlodia@gmail.com
Society,
Varachha
Road, Surat
The demand for products intended to be manufacture is increasing in local as well as Global
market. By expanding this unit, M/s. Iconic Pharmachem will be able to meet the demand of
various products.
This will also generate direct and indirect employment opportunity for various levels of
people.
TABLE 1.2
Project Site
FIGURE - 1.2
LAYOUT OF THE PLANT
Key infrastructure features have been extracted from Survey of India (SoI) topographical
maps of 1:50,000 scale. The features have been updated using satellite data and have been
verified with ancillary information derived from TTK maps and guide maps. The locations of
the settlement have been extracted from Census of India (CoI) maps and verified by using SoI
topographical maps and satellite data.
TABLE 1.5
___________________________________________________________________________
DISTANCE OF NEAREST KEY INFRASTRUCTURE FEATURES FROM PROJECT SITE
FIGURE – 1.3
Key Infrastructure
FIGURE - 1.4
TOPOSHEET
10 Details of process emissions The source of flue gas emission will be Boiler,
Noise pollution survey was conducted in the study zone. The anticipated noise sources were
industrial activities, which are likely to be increased due to proposed activity. Noise levels
were also recorded in surrounding villages for evaluating general scenario of the study area.
Hourly equivalent sound levels (Leq) were also recorded for calculating Day and Night noise
levels in the surrounding villages.
1.7.5 Soil Environment
Soil sampling and analysis was carried out to assess physico-chemical characteristics of the
soils and delineate existing cropping pattern, existing land use and topography, within the
study area.
1.7.6 Biological Environment
Keeping in view, the importance of biological component of total environment due to the
proposed project, biological characterization of terrestrial and aquatic environments,
changes in species diversity of flora and fauna in terrestrial as well as aquatic systems were
studied for impact analysis due to proposed project activity, if any.
1.7.7 Socio-economic Environment
Demographic and related socio-economic data was collected from census handbook to
assess socio-economic status of the study area. Assessment of impact on significant
historical, cultural, and archeological sites/places in the area and economic and employment
benefit arisen out from the project is given special attention.
1.7.8 Identification of Pollution Source
Detailed study of manufacturing process for proposed scenario is carried out along with
input and output of materials, water, and wastewater as well as infrastructure facilities
available.
1.7.9 Evaluation of Pollution Control and Environmental Management System
The qualitative and quantitative analysis of various pollution sources as well as evaluation of
pollution control system is carried out.
1.7.10 Evaluation of Impact
A comprehensive evaluation of environmental impact with reference to proposed activities
is carried out.
District and the study area in terms of land use pattern, biological environment, and
socio-economic environment.
• Chapter 4 Deals with Anticipated Environmental Impacts and Mitigation Measures,
which provides quantification of significant impacts of the proposed activities of
plant on various environmental components. Evaluation of the proposed pollution
control facilities has been presented.
• Chapter 5 Deals with Environmental Monitoring Plan
• Chapter 6 Describes Alternatives site analysis
• Chapter 7 Describes Risk Assessment and Disaster Management Plan that shall be
adopted by the company.
• Chapter 8 Describes Environment Management Plan (EMP) to be adopted for
mitigation of anticipated adverse impacts if any and to ensure acceptable impacts.
• Chapter 9 Describes Environment cost benefits
• Chapter 10 Describes Executive Summary & Conclusion of the Project.
• Chapter 11 Describes Details of Consultants Engaged.
• Chapter 12 Project Benefits
M/s. ICONIC PHARMACHEM is a newly formed company has project is for manufacturing of
Bulk Drugs and bulk drug intermediate for various categories of the drugs like Anti-
inflammatory , Anti Histamine, Anti Hypertension, Anti-Epileptic, Anti Diabetic etc. The
company will be managed by team of well experienced and qualified personnel are assisting
the promoters in the execution of the day to day affairs of the company.
2.2 TECHNICAL DETAILS OF THE PLANT/S ALONG WITH DETAILS ON BEST AVAILABLE
TECHNOLOGIES (BAT)
DETAILS ABOUT THE PROCESS TECHNOLOGIES:
The complexity and diversity of bulk drugs and its Intermediate product makes it a rich
platform for innovation in equipment design, process monitoring, process engineering and
catalysis. These innovations and developments provide the industrial development team
with an arsenal of new tools and ideas to create new products and improve processes. The
industrial development team with an arsenal of new tools and ideas to create new products
and improve processes.
Company will make the GMP plant (Good Manufacturing Practice) for proposed products.
Based on informal survey of the market with potential customers and various traders, it is
found that there is a big demand in the market for the range of the products unit is
planning. With such a rapid growth of pharmaceutical industries, the demand of our
proposed products has also increased significantly over a period of time. Today, increased
focus is being laid on environmental friendliness and at the same time the industry is
ensuring greater customer focus through technical services and marketing capabilities, in
order to face global competition.
Process Description
1. Charge 2,6 DCP, Toluene and Potassium carbonate, heat to 110-115OC for 2 hrs and
remove Toluene. Charge MCA and reflux 4 Hr at temperature 115OC .Charge Aniline
and sodium Methoxide solution.Chill to 4-7OC and centrifuge wash with water and
spin dry and unload
2. Charge Reaction mass from Step 1 with Toluene ,Sulphuric acid and heat to
75OC,distill out toluene,charge CAC ,heat and reflux for 20 HRS.Chill to 15OC and
centrifuge mass.
3. Charge ,stage 2 mass and alluminium chloride and raise temperature to 140OC,stop
heating temperature will reach upto 190OC ,then quinch in water .Then centrifuge
the wet cake in another reactor, charge water and HCL and charge wet cake
,centrifuge the mass and wash with water.
4. Charge stage 3 mass with caustic potash,water ,sodium Hydrosulphite and reflux for
8 hrs.Check TLC and then charge another 10 kg extra caustic flakes.cool to 25-30OC
5. Charge Stage 4 mass ,DM water ,EDTA ,Activated Carbon and IPA ,heat to 80OC till
dissolution,Check pH 10-13.Charge IPA ,Carbon and stir for 30 mins and then filter
and centrifuge the mass with chilled wash of IPA.
Chemical Reaction:
Material Balance:
Process Description
1. Charge 2,6 DCP, Toluene and Potassium carbonate, heat to 110-115OC for 2 hrs and
remove Toluene. Charge MCA and reflux 4 Hr at temperature 115OC .Charge Aniline
and sodium Methoxide solution.Chill to 4-7OC and centrifuge wash with water and
spin dry and unload
2. Charge Reaction mass from Step 1 with Toluene ,Sulphuric acid and heat to
75OC,distill out toluene,charge CAC ,heat and reflux for 20 HRS.Chill to 15OC and
centrifuge mass.
3. Charge ,stage 2 mass and alluminium chloride and raise temperature to 140OC,stop
heating temperature will reach upto 190OC ,then quinch in water .Then centrifuge
the wet cake in another reactor, charge water and HCL and charge wet cake
,centrifuge the mass and wash with water.
4. Charge stage 3 mass with Potassium Hydroxide ,water ,sodium Hydrosulphite and
reflux for 10 hrs. Check TLC and then charge another 10 kg extra Potassium
Hydroxide. cool to 25-30OC
5. Charge Stage 4 mass ,DM water ,EDTA ,Activated Carbon and IPA ,heat to 80OC till
dissolution,Check pH 10-13.Charge IPA ,Carbon and stir for 30 mins and then filter
and centrifuge the mass with chilled wash of IPA.
Material Balance:
1. Charge N Dimethyl Amine , Tertiary Butyl Alcohol stirr 1/2 Hrs & unload in clean
drum, again charge Chloro Acetyl Chloride in same reactor chill to 8-10OC.Add mix
solution of NNDMA + T Butanol at 8-10 OC addition time 8-10hrs. Maintain 5 hrs at
8-10 OC, slowly raise Temp up to 35 OC.
2. Charge water , stirr 1.0 Hr & settle , seperate organic layer from bottom aqueous
layer for NN DMA recovery , organic Layer charge in GLR add water , stirring &
separate bottom organic to give soda ash solution wash to make ph 8.5 to 9.5.
3. Stirr & separate in organic layer, charge sodium sulphate & filter through 5 Micron
cloth .Collect all organic in GLR and Distilled out product at 85 to 105 OC under
vacuum .
4. Charge Reaction mass from Step 2 with crude Diclofenac Sodium ,heat the reaction
mass to 80-85 OC ,maintain 5 Hrs and cool to 55 to 60 OC ,charge formic acid heat to
48 to 55 OC maintain 8 hrs check TLC , cool to 40 OC ,charge water and Toluene
stirring 2 Hrs Centrifuge wash with water . centrifuge and Unload cake & Dry.
Chemical Reaction:
Stage 1:
+ +
Chloro Acetyl Chloride Tertiary Butyl Alcohol NNDMA Tert Buyl Chloroacetate
Stage 2:
+ +
Tert Buyl Chloroacetate Diclofenac Sodium Formic Acid Aceclofenac
Stage-2
1 Diclofenac Sodium 964 1 ML TO ETP 2989
2 STEP 1 530 2 RECOVERED TOLUENE 1735
3 Toluene 1928 3 TOLUENE LOSS 193
4 Water 1928 4 OUTPUT 877
5 FORMIC ACID 444
MANUFACTURING PROCESS:
STAGE 1:
Starting raw materials p-chloro benzoic acid, thionyl chloride, benzene, aluminium chloride
are charged into the reaction vessel. And stirred until reaction is completed.
Further water is added into the reaction and two layer are separated.
Water layer is sent to the ETP and benzene layer is then distilled to obtain stage 1 product.
STAGE 2:
Starting raw materials Stage 1 product, methanol, sodium borohydride,water are charged
into the reaction vessel and stirred until reaction is completed.
Further sodium carbonate and water are added in reaction mass & adjust PH with dilute
hydrochloric acid.
The reaction is then centrifuge to obtain stage 1 product.
Further aqueous layer is sent to ETP.
STAGE 3:
Starting raw materials stage 2 product, hydrochloric acid and calcium chloride are charged
into the reaction vessel.
Further toluene is added to result into the layer separation.
Two layers namely toluene layer and hydrochloric acid layer are obtained.
Toluene layer is then distilled to obtain stage 2 products.
Hydrochloric acid layer is sent to ETP.
STAGE 4:
Starting raw materials stage 3 product, toluene, piperazine anhydrous, tetra butyl
ammonium bromide are charged into the reaction vessel and are stirred until reaction is
completed.
Further water is added and result into the layer separation.
Two layers namely toluene layer and water layer are obtained and water is layer sent to
ETP.
STAGE 5:
Starting raw materials Stage 4 product, 2-chloro ehthanol, tri ethyl amine, toluene are
charged into the reaction vessel & are agitated till reaction completed.
Further toluene layer is distilled to recover toluene wherein vapor loss occurs during the
operation.
Stage 1 product is isolated by continuing distillation.
STAGE 6:
Starting raw materials stage 5 product, dimethyl formamide, sodium monochloro acetate,
potassium hydroxide are charged into the reaction vessel & are stirred until reaction is
completed.
Further water and dichloro methane are added into the reaction mass to obtain layer
separation.
Namely two layer MDC layer and water layer are obtained.
MDC layer is then distilled to recover MDC wherein vapor loss occurs during operation.
Stage 2 product is then isolated by continuing distillation.
STAGE 7:
Starting raw materials acetone, stage 6 product are charged into the reaction vessel.
Further dry hydrochloric acid gas is passed to the reaction mass to obtain precipitation.
Reaction mass is then centrifuge to obtain wet cake and wet cake so obtained is dried to
obtain final product.
CHEMICAL REACTION:
Cl Cl
O Cl
OH
SoCL2 /
Pipirazine / Toluene
MeOH/ NBH HCl / Hexane
Benzene
O OH Cl
AlCL3
Cl
Cl
Cl Cl
HCl
SMCA / KOH
2 CE/ Toluene CETIRIZINE
N N
N NH
N N O O
2 HCl
OH
OH
STAGE 2
1 Stage 1 1.00 1 Recovered Methanol 2.80
2 Sodium borohydride 0.08 2 Loss Methanol 0.20
3 Water 0.83 3 ML to ETP 1.44
4 Sodium carbonate 0.03 4 Stage 2 Output 1.00
5 HCL 0.50
6 Methanol 3.00
STAGE 3
1 Stage 2 1.00 1 Recovered Toluene 1.68
2 Calcium Chloride 1.33 2 Loss Toluene 0.19
3 HCL 3.33 3 ML TO ETP 4.66
4 Toluene 1.87 4 Stage 3 Out Put 1.00
TOTAL 7.53 TOTAL 7.53
STAGE 4
1 Stage 3 1.00 1 Recovered Toluene 1.68
2 Toluene 1.87 2 Loss Toluene 0.19
3 Piperazine anhydrous 1.40 3 Recovery of Piperazine 1.12
4 Tetra butyl ammonium bromide 0.02 ML to ETP 1.80
5 water 1.00 Stage 4 product 1.00
6 Caustic soda flakes 0.50
TOTAL 5.79 TOTAL 5.79
5. LEVOCETIRIZINE DIHYDROCHLORIDE
MANUFACTURING PROCESS:
STAGE 1:
Starting raw materials ammonium formate, 4-chloro benzophenone, & water are charged
into the reaction vessel . entire mass is then filtered to obtain stage 1 product.
STAGE 2:
Starting raw materials stage 1 product , conc. Hydrochloric acid, methanol are charged into
the reaction vessel and agitated. It is then filtered to obtain hydrochloride. Hydrochloride is
then decomposed to obtain stage 2 product.
STAGE 3:
Starting raw materials stage 2 product, water , tartaric acid are charged into the reaction
vessel. Entire mass is then filtered to obtain T-salt. T-salt is then decomposed to obtain
stage 3 product.
STAGE 4:
Starting raw materials stage 3 product, di isopropyl ethyl amine, bis-amide, methanol are
charged into the reaction vessel. Reaction mass is then filtered to obtain stage 4 product.
STAGE 5:
Starting raw materials HBR in acetic acid, stage 4 product, water, toluene are charged into
the reaction vessel. Entire reaction mass is filtered to remove organic salt. Toluene layer is
separated from the filtrate and further adjust pH=12 with sodium hydroxide solution to
isolate final product. Final product is then dried and packed.
STAGE 6:
Starting raw materials stage 5 product, 2-chloro ehthanol, tri ethyl amine, toluene are
charged into the reaction vessel & are agitated till reaction completed.
Further toluene layer is distilled to recover toluene wherein vapor loss occurs during the
operation.
Stage 6 product is isolated by continuing distillation.
STAGE 8 [FINAL]:
Starting raw materials acetone, stage 7 product are charged into the reaction vessel.
Further dry hydrochloric acid gas is passed to the reaction mass to obtain precipitation.
Reaction mass is then centrifuge to obtain wet cake and wet cake so obtained is dried to
obtain final product.
Cl
Cl Cl
O
Tartaric acid
H
O NH NH 2
CH 3
Cl
Bis - amide O
HBR in acetic acid
S
N O
Cl N NH
N
Cl
Cl
N N
N N
O O
OH
OH
stage 7 product
stage 6 product
HCl / ACETONE
LEVOCETIRIZINE
DIHYDROCHLORIDE
MANUFACTURING PROCESS:
STAGE 1:
Starting raw materials p-chloro benzoic acid, thionyl chloride, benzene, aluminium chloride
are charged into the reaction vessel. And stirred until reaction is completed.
Further water is added into the reaction and two layer are separated.
Water layer is sent to the ETP and benzene layer is then distilled to obtain stage 1 product.
STAGE 2:
Starting raw materials Stage 1 product, methanol, sodium borohydride,water are charged
into the reaction vessel and stirred until reaction is completed.
Further sodium carbonate and water are added in reaction mass & adjust PH with dilute
hydrochloric acid.
The reaction is then centrifuge to obtain stage 1 product.
Further aqueous layer is sent to ETP.
STAGE 3:
Starting raw materials stage 2 product, hydrochloric acid and calcium chloride are charged
into the reaction vessel.
Further toluene is added to result into the layer separation.
Two layers namely toluene layer and hydrochloric acid layer are obtained.
Toluene layer is then distilled to obtain stage 2 products.
Hydrochloric acid layer is sent to ETP.
STAGE 4:
Starting raw materials stage 3 product, toluene, piperazine anhydrous, tetra butyl
ammonium bromide are charged into the reaction vessel and are stirred until reaction is
completed.
Further water is added and result into the layer separation.
Two layers namely toluene layer and water layer are obtained and water is layer sent to
ETP.
STAGE 5:
Starting raw materials Stage 4 product, 3-Methylbenzylchloride, tri ethyl amine, toluene are
charged into the reaction vessel & are agitated up to 20 hr at reflux condition till reaction
completed.
Further toluene layer purified with using of activated charcoal. After completion of charcoal
treatment adjust pH with Hydrochloric acid less than 1.6 of reaction mass to obtain
precipitation.
Reaction mass is then centrifuge to obtain wet cake and wet cake crude is dried.
Further acetone, dry crude products are charged into the reaction vessel.
Purification of Reaction mass is then centrifuge to obtain wet cake and wet cake so obtained
is dried to obtain final product.
CHEMICAL REACTION:
STAGE 2
1 Stage 1 1.00 1 Recovered Methanol 2.80
2 Sodium borohydride 0.08 2 Loss Methanol 0.20
3 Water 0.83 3 ML to ETP 1.44
4 Sodium carbonate 0.03 4 Stage 2 Output 1.00
5 HCL 0.50
6 Methanol 3.00
STAGE 3
1 Stage 2 1.00 1 Recovered Toluene 1.68
2 Calcium Chloride 1.33 2 Loss Toluene 0.19
3 HCL 3.33 3 ML TO ETP 4.66
4 Toluene 1.87 4 Stage 3 Out Put 1.00
TOTAL 7.53 TOTAL 7.53
STAGE 4
1 Stage 3 1.00 1 Recovered Toluene 1.68
2 Toluene 1.87 2 Loss Toluene 0.19
3 Piperazine anhydrous 1.40 3 Recovery of Piperazine 1.12
4 Tetra butyl ammonium bromide 0.02 ML to ETP 1.80
5 water 1.00 Stage 4 product 1.00
6 Caustic soda flakes 0.50
TOTAL 5.79 TOTAL 5.79
STAGE 2
1 Stage 1 1.00 1 Recovered Methanol 2.80
2 Sodium borohydride 0.08 2 Loss Methanol 0.20
3 Water 0.83 3 ML to ETP 1.44
4 Sodium carbonate 0.03 4 Stage 2 Output 1.00
5 HCL 0.50
6 Methanol 3.00
STAGE 3
1 Stage 2 1.00 1 Recovered Toluene 1.81
2 Calcium Chloride 0.90 2 Loss Toluene 0.21
3 HCL 3.33 3 ML TO ETP 4.23
4 Toluene 2.02 4 Stage 3 Out Put 1.00
STAGE 4
1 Stage 3 1.00 1 Recovered toluene 2.73
2 Toluene 2.87 2 Loss toluene 0.14
3 Piperazine anhydrous 1.40 3 Recovery of Piperazine 1.12
4 Tetra butyl ammonium bromide 0.02 ML to ETP 1.80
5 water 1.00 Stage 4 product 1.00
6 Caustic soda flakes 0.50
7. CILNIDIPINE
MANUFACTURING PROCESS:
STAGE 1:
Charge Isopropyl alcohol and 2-methoxy ethyl acetoacetate in mixing vessel at room
temperature, add Piperidine and glacial acetic acid under stirring, Charge 3-
Nitrobenzaldehyde in Reaction mass at room Temperature.
Maintain reaction mass at room temperature under stirring till reaction completed.
After maintaining completed chill the reaction mass and filter and dry it.
STAGE 2:
Charge Isopropyl alcohol and Cinnamyl acetoacetate in Reaction vessel at room
temperature under stirring. Chilll the reaction mass and start ammonia gas purging into
reaction mass till reaction completed after distill out isopropyl alcohol under vacuum.
Release the vacuum and stop distillation. Cool the reaction mixture up to below 30°C.
Further Charge stage-01 at room temperature under stirring. Again slightly raise the
temperature of reaction mass tll clear solution. Gradually chill the reaction mass and filter
Crude. Further purification of crude Charge Methanol and wet crude in mixing vessel at
room temperature under stirring. Raise the temperature and reflux the material.
Gradually chill the reaction mass under stirring Filter the material and dry the product.
STAGE-1
STAGE-2
STAGE 2
1 Stage 1 1.13 1 Recovered Methanol 6.75
2 Cinnamyl Aceto Acetate 0.86 2 Loss Methanol 0.75
3 METHANOL 7.50 3 Recovered Isopropyl 6.78
Alcohol
4 Ammonia Anhydrous 0.34 4 Isopropyl Alcohol Loss 0.59
5 Isopropyl Alcohol 7.37 5 ML to ETP 1.33
6 Stage 2 Output 1.00
TOTAL 17.20 TOTAL 17.20
8. AZELINIDIPINE
MANUFACTURING PROCESS
The process for the synthesis of Azelnidipine involves synthesis of Isopropyl 2-(3-
nitrobenzylidene)-3-oxobutanoate by condensation of 3-nitrobenzaldehyde and isopropyl
acetoacetate. The esterification of cyanoacetic acid with 1-(diphenylmethyl)azetidin-3-ol by
using Dicyclohexyl Carbodiimide (DCC) in toluene gives the corresponding cyanoacetic ester,
which is treated with methanol and HCl(g) followed by (NH4)2CO3 to give 1-
benzhydrylazetidin-3-yl 3,3-diaminoacrylate. Finally, this compound is cyclized with
isopropyl 2-(3-nitrobenzylidene)-3-oxobutanoate in isopropanol to give Azelnidipine.
CHEMICAL REACTION
STAGE 2
1 1-Benzhydrylazetidin-3-ol 1.00 1 Recovered Isopropyl 0.90
Alcohol
2 2-cyanoacetic acid 0.39 2 Isopropyl Alcohol Loss 0.10
3 N,N'-dicyclohexylcarbodiimide 1.04 3 ML to ETP 5.99
4 Dimethyl amino pyridine 0.02 4 Stage 2 Output 1.20
5 Toluene 2.20 Solid waste 0.06
6 Isopropyl alcohol 1.00
7 Sodium bicarbonate 0.80
8 Sodium chloride 0.80
9 water 1.00
STAGE 3 to 4
1 Stage 2 2.29 1 Recovered Acetronitrile 2.32
2 Methanol 0.33 2 Acetronitrile Loss 0.18
3 MDC 4.00 3 Recovered MDC 3.60
4 Sodium Sulfate 0.96 4 MDC Loss 0.40
5 Acetonitrile 2.50 5 ML to ETP 2.85
6 Ammonium Carbonate 1.79 6 Stage 4 Output 2.52
STAGE 5
1 Stage 1 1.73 1 Recovered Isopropyl 1.35
Alcohol
2 Stage 4 2.52 2 Isopropyl Alcohol Loss 0.25
3 Piperidine 0.05 3 Recovered Ethyal Acetate 2.16
9. NIFIDIPINE
MANUFACTURING PROCESS
STAGE-1
Charge Methanol , Ortho Nitro Benzaldehyde, Piperidine and Acetic acid in mixing vessel at
room temperature, slowly raise temperature up to reaction mass observed clear solution
and start slowly addition of Methyl aceto acetate and reflux reaction mass till TLC complies.
Further cool to room temperature and filter the product and dry it.
STAGE-2
Charge Methanol , Methyl aceto acetate in mixing vessel at room temperature, chill the
reaction mass up to 15o C and start slowly addition of Ammonium anhydrous gas to
reaction mass till TLC complies.
Further cool to room temperature and filter the product and dry it.
STAGE-3
Charge Methanol, Stage-1 and Stage-2 under string in mixing vessel at room temperature;
raise the temperature up to reflux the reaction mass till reaction complies. Cool to room
temperature and filter the reaction mass and wash with Methanol.
Further charge Acetic Acid and moist material observed previously and raise temperature up
to reflux and filter the mass through sparkler filter, cool the reaction mass to room
temperature and filter the mass and wash up to neutral pH. Unload the wet cake and dry it.
CHEMICAL REACTION
STEP-1
STEP-2
STEP-3
STAGE 2
1 METHANOL 0.60 1 Recovered Methanol 0.54
2 Methyl Aceto Acetate 0.60 2 Loss Methanol 0.06
3 Ammonia Anhydrous 0.15 3 ML to ETP 0.24
4 Stage 2 Output 0.51
TOTAL 1.35 TOTAL 1.35
STAGE 3
1 Stage-1 1.00 1 Recovered Methanol 3.80
2 Stage-2 0.51 2 Methanol Loss 0.43
3 Acetic Acid Glacial 1.59 3 Spent Acetic Acid 2.10
4 METHANOL 4.23 4 Stage 3 Output 1.00
10. PREGABALINE
MANUFACTURING PROCESS
Stage 3: Pregabalin
Material Balance:
STAGE 2
1 Stage-1 600 1 R(-) 3-(Carbamoylmethyl)- 198
5-methyl hexanoic acid
2 Chaloform 1450 2 R (+)3-(Carbamoylmethyl)- 450
5-methyl hexanoic acid
3 Alpha Phenyl ethyl amine 330 3 Chlroform recovery 1305
4 Sodium Hydroxide 240 4 Chloroform loss 145
5 Hydrochaloric Acid 400 5 R(-) Phenylethyl amine 313
recovery
6 Water 100 6 R(+) Phenylethyl amine loss 17
STAGE 3
1 Stage 2 198 1 Stage- 3 Out put 145
2 Sodium Hydroxide 245 2 Isopropyl alcohol recovery 410
3 Sodium hypochlorite 435 3 Isopropyl alcohol loss 45
4 Hydrochloric acid 450 4 Effluent 1257
5 Isopropyl alcohol 455 5 Residue 8
6 Water 82
TOTAL 1865 TOTAL 1865
MANUFACTURING PROCESS
STAGE 2
1 Stage-1 600 1 R(-) 3-(Carbamoylmethyl)- 198
5-methyl hexanoic acid
2 Chaloform 2574 2 R (+)3-(Carbamoylmethyl)- 450
5-methyl hexanoic acid
3 Alpha Phenyl ethyl amine 330 3 Chlroform recovery 2316
4 Sodium Hydroxide 240 4 Chloroform loss 258
5 Hydrochaloric Acid 400 5 R(-) Phenylethyl amine 313
recovery
6 Water 594 6 R(+) Phenylethyl amine loss 17
7 ML TO ETP 1184
8 Residue 2
MANUFACTURING PROCESS:
STAGE 1:
• Starting materials 3-ethyl-4-methyl-2-oxo-3-pyrroline, 2-phenyl ethyl isocyanate and n-
hexane acid are added into the reaction vessel and agitated until reaction is completed.
• Further entire mass is then filtered to obtained Stage 1 product. And filtrate is then
distilled to obtained recover n-hexane.
STAGE 2:
• Starting materials stage 1 and chloro sulphonic acid are charged into the reaction vessel
and stirred until reaction is completed.
• Further water and ammonia are added to the reaction mass.
• Reaction mass is then filtered to obtained Stage 2 product. And Filtered is then sent to
ETP
STAGE 3:
• Starting materials stage 2, acetone, trans-4-methyl cyclohexyl isocyanate and potassium
carbonate are charged into the reaction vessel and stirred until reaction is completed.
• Further water and acetic acid are added to adjust the PH. .
• Reaction mass is then filtered to obtained final product. Final product is then purified in
methanol.
CHEMICAL REACTION:
STAGE 1:
O O
O
NH + N N
H
3-Ethyl-4-methyl 3-Ethyl-4-methyl-2-oxo-3-pyrroline-1(N
pyrrolin-2-one -2-phenylethyl)-carboxamide
2- Phenyl ethyl
OCN isocyanate
STAGE -2 :
O O
O O S
O O NH2
N N 1) ClSO3H N N
H 2) NH3 H
4-[2-(3-Ethyl-4-methyl-2-oxo-3-pyrroline]
3-Ethyl-4-methyl-2-oxo-3-pyrroline- -carboxamido) ethyl] benzene sulfonamide
1-(N-2-phenylethyl)-carboxamide
STAGE – 3:
O O
O S
O NH2
N N +
H
4-[2-(3-Ethyl-4-methyl-2-oxo-3-pyrro NCO
line]-carboxamido) ethyl] benzene O CH3
sulfonamide O O
O S
O N N
H H
N N
H
N- (4-[2-(3-Ethyl-4-methyl-2-oxo-3-pyrroline-1-carboxamido)
ethyl] benzene sulfonyl)-N'-4-methylcyclohexyl urea (Glimepiride)
Material Balance:
MANUFACTURING PROCESS
Stage 1
Charge purified water, Gadonium Oxide and Penteic Acid in to mixing vessel and stirr it.
Raise temperature of reaction mass up to reflux temperature and maintain for 12 hrs. After
12 hr sent sample of reaction for GC analysis. If result complies cool to room temperature of
reaction mass and filter the mass and dry the product.
CHEMICAL REACTION
Material balance
Sr Qty Sr Qty
No. Material INPUT (in kg) No. Material OUTPUT (in kg)
STAGE 1
1 Water 18.0 1 Stage-1 OUT PUT 6.00
2 Gadolinium Oxide 2.00 2 ML TO ETP 18.37
3 Pentetic Acid 4.37
Process Description:
1. Charge Isopropyl Alcohol, Cyclohexanone, DMA HCl and stir for 30 mins and raise
temperature up to 60oC the reaction mass.
6. Cool to room temperature and filter the reaction mass and dry the product.
CHEMICAL REACTION
STAGE -I
(CH3)2 NH
+ HCL + →
CYCLOHEXANONE DMA- HCL PARAFORMALDEHY MANNICH
DE HYDROCHLORIDE
Material balance
Sr Material INPUT Qty Sr Material OUTPUT Qty
No. (in kg) No. (in kg)
STAGE 1
1 Cyclohexanone 440 1 RECOVERED IPA 950
2 Dimethyl Amine HCl 275 2 LOSS IPA 50
3 Paraformaldehyde 101 3 RECOVERED ACETONE 828
4 IPA 1000 4 ACETONE LOSS 92
5 Acetone 920 5 ML to ETP 366
6 OUTPUT STAGE 1 450
MANUFACTURING PROCESS:
STAGE 1:
Into a SS reactor charge 3,5-Dibromo-2-Aminobenzyl alcohol and Trans-4-Amino
cyclohexanol. Add Tetrahydrofuran and caustic soda solution at 5-100C. Reduce the reaction
mass using sodium borohydride. Wash with toluene. Chill the reaction mass and filter. Dry
the wet cake in tray dryer at 50-600C.
STAGE 2:
Into a SS Reactor add crude Ambroxol hydrochloride and dissolve in methanol at reflux
temperature. Chill the reaction mass to 0-50C and filter. Dry the wet cake at 50-600C.
CHEMICAL REACTION:
STAGE 1:
STAGE 2 :
Material Balance:
STAGE-2
1 STAGE-1 105 1 Stage-2 OUT PUT 100
2 Isopropyl Alcohol 500 2 Isopropyl Alcohol recover 450
3 Hydrochaloric Acid 5 3 Isopropyl Alcohol loss 50
4 Residue 10
TOTAL 610 TOTAL 610
MANUFACTURING PROCESS:
STAGE 1:
Tert-Butyl-2-((4R,6S)-6--((E)-2-(4-(4-fluorophenyl)-6-isopropyl-2-(N-methyl methyl
sulfonamide)pyrimidin-5-yl)vinyl)-2,2-dimethyl-1,3-dioxan-4-yl)acetate or R1 reacted in
presence of Sodium hydroxide, hydrochloric acid in methanol and Toluene media with
Calcium Acetate to form Rosuvastatin calcium.
CHEMICAL REACTION:
MANUFACTURING PROCESS
Stage 1
CHEMICAL REACTION
MANUFACTURING PROCESS
Stage 1
Ethyl 2-(2-pyrrolidone)-butyrate [2-(2-pyrrolidone)-butyrate ethyl ester or 2-PBE] is
obtained by the alkoxide-mediated condensation of 2-pyrrolidone and ethyl 2-
bromobutyrate or 2-BBE) in toluene. 2-Pyrrolidone is added under agitation to a
suspension of sodium methoxide in toluene. The mixture is then heated to reflux under
agitation and the methanol formed during the reaction is removed by azeotropic distillation.
Distillate may be extracted with water and the organic phase recovered in the reaction
medium. If not, toluene loss is compensated with proportional addition. Ethyl 2-
bromobutyrate is added with agitation to the refluxing medium, and the reaction mixture is
then maintained at reflux temperature for 15 to 60 minutes. The reaction medium is mixed
with water and inorganic salts; by-products of the reaction are removed. Toluene is then
removed by evaporation which is carried out by heating under vacuum until the
temperature of the reactor contents rises up to 150°C. The crude product is fractionated by
distillation into light fractions and purified final product at a pressure of less than 30 mbar
Stage 2
Crude 2-(2-pyrrolidone)-butyramide is obtained by the alkoxide-mediated ammonolysis of
ethyl 2-(2-pyrrolidone)-butyrate and ammonia in methanol. Ethyl 2-(2-pyrrolidone)-butyrate
is dissolved in methanol and sodium methoxide is added to the solution together with
ammonia The reactor contents are heated under pressure using a mass temperature set
between 40 and 60°C. The reaction mixture is then cooled to 0°C whilst the excess ammonia
is released from the system by degassing and recovered. The product in suspension is
isolated by filtration and then washed with methanol. The wet product (crude) is dried
under vacuum or at atmospheric pressure
Further The crude ((R)-2-(2-pyrrolidone)-butyramide) is racemized in methanol in order to
as the racemic mixture
Further the crude product is dissolved in methanol by heating at above 60°C. The solution
may be filtered and is cooled to 0°C .The product in suspension is isolated by solid/liquid
19. TELMISARTAN
MANUFACTURING PROCESS:
STAGE 1:
Charge EDC, 4’-(Methyl) Biphenyl -2- Carboxylate and in mixing vessel at room temperature
till clear the solution, charge sodium bicarbonate solution in reaction mass and stir it.
Separate bottom organic layer. Further charge Dibenzoyl Peroxide and heat the reaction
mass up to reflux temperature and maintain it. Cool and filter the reaction through nutch
filter. Further start distillation of EDC under vacuum. Charge MIBK to reaction mass and
again distilled EDC traces. Cool the reaction mass to room temperature and charge MIBK
and stir it and unload in carboys. Further charge Water, MIBK,Potassium Hydroxide , 2n-
Propyl-4-methyl-6(1-Methyl Benzimidazole-2-yl) Benzimidazole, previous reaction mass and
Tetra Butyl Ammonium Bromide in mixing vessel at room temperature. After completion of
reaction filter the mass and wash with water and unload it.Prepare dilute Sodium hydroxide
solution. Charge Methanol, previous wet cake and Sodium hydroxide solution previously
prepared in mixing vessel in stirring condition at room temperature. Check pH of reaction
mass it should be between 13.0-14.0 slowly Heat the reaction mass up to reflux and
maintain it. Further give charcoal treatment to reaction mass and Filter the mass through
sparkler filter in hot condition. Slowly add acetic acid and adjust pH between 5.5 to 6.5.
Afterward chilled the reaction mass and maintain it. Filter the reaction mass and wash with
methanol and wet cake to be unload. Further charge water and wet cake in mixing vessel at
room temperature. Slowly raise the temperature of reaction mass up to 60 oC. Filter the
reaction mass and wash with water and wet cake to be unloading and dry it.
MATERIAL BALANCE
20. INDOLINONE
Process Description
1. Charge 2,6 DCP, Toluene and Potassium carbonate, heat to 110-115OC for 2 hrs and
remove Toluene. Charge MCA and reflux 4 Hr at temperature 115OC .Charge Aniline
and sodium Methoxide solution.Chill to 4-7OC and centrifuge wash with water and
spin dry and unload
2. Charge Reaction mass from Step 1 with Toluene ,Sulphuric acid and heat to
75OC,distill out toluene,charge CAC ,heat and reflux for 20 Hrs. Chill to 15OC and
centrifuge mass.
3. Charge ,stage 2 mass and alluminium chloride and raise temperature to 140OC,stop
heating temperature will reach upto 190OC ,then quinch in water .Then centrifuge
the wet cake in another reactor, charge water and HCL and charge wet cake
,centrifuge the mass and wash with water.
Chemical Reaction:
Sr Qty Sr Qty
No. Material INPUT (in kg) No. Material OUTPUT (in kg)
Stage-1
1 2,6 Dichloro phenol 1.00 1 STAGE-1 (AMINE) 1.35
2 Toluene 2.00 2 Toluene Recovery 1.91
3 Potassium carbonate 0.45 3 Toluene loss 0.09
Mono Methyl chloro Acetic
4 Acid 0.72 4 Methanol Recovery 1.94
5 Aniline 0.55 5 Methanol Loss 0.11
Sodium Methoxide
6 Solution 2.05 6 ML TO ETP 2.82
7 WATER 2.00 7 Solid waste 0.55
TOTAL 8.77 8.77
Stage-2
1 STAGE I (AMINE) 1.00 1 Stage-2 (Chloro) 1.20
2 Chloro Acetyl Chloride 0.54 2 Toluene Recovery 1.14
3 Toluene 1.20 3 Toluene loss 0.06
4 Water 1.50 4 ML TO ETP 1.84
TOTAL 4.24 TOTAL 4.24
Stage-3
1 Stage-2 (Chloro) 1.20 1 Stage-3 ( Indolinone) 1.04
2 Alluminium Chloride 0.84 2 Solid waste 0.66
3 Water 3.90 3 ML TO ETP 4.24
TOTAL 5.94 TOTAL 5.94
Process Description
1. Charge 2,6 DCP, Toluene and Potassium carbonate, heat to 110-115OC for 2 hrs and
remove Toluene. Charge MCA and reflux 4 Hr at temperature 115OC .Charge Aniline
and sodium Methoxide solution.Chill to 4-7OC and centrifuge wash with water and
spin dry and unload
2. Charge Reaction mass from Step 1 with Toluene ,Sulphuric acid and heat to
75OC,distill out toluene,charge CAC ,heat and reflux for 20 Hrs. Chill to 15OC and
centrifuge mass.
Chemical Reaction:
Sr Qty Sr Qty
No. Material INPUT (in kg) No. Material OUTPUT (in kg)
Stage-1
1 2,6 Dichloro phenol 1.00 1 STAGE-1 (AMINE) 1.35
2 Toluene 2.00 2 Toluene Recovery 1.91
3 Potassium carbonate 0.45 3 Toluene loss 0.09
Mono Methyl chloro Acetic
4 Acid 0.72 4 Methanol Recovery 1.94
5 Aniline 0.55 5 Methanol Loss 0.11
Sodium Methoxide
6 Solution 2.05 6 ML TO ETP 2.82
7 WATER 2.00 7 Solid waste 0.55
TOTAL 8.77 8.77
Stage-2
1 STAGE I (AMINE) 1.00 1 Stage-2 (Chloro) 1.20
2 Chloro Acetyl Chloride 0.54 2 Toluene Recovery 1.14
3 Toluene 1.20 3 Toluene loss 0.06
4 Water 1.15 4 ML TO ETP 1.99
TOTAL 4.39 TOTAL 4.39
Process Description
Charge 2,6 DCP, Toluene and Potassium carbonate, heat to 110-115OC for 2 hrs and
remove Toluene. Charge MCA and reflux 4 Hr at temperature 115OC .Charge Aniline
and sodium Methoxide solution.Chill to 4-7OC and centrifuge wash with water and
spin dry and unload
Chemical Reaction:
Material Balance:
Sr Qty Sr Qty
No. Material INPUT (in kg) No. Material OUTPUT (in kg)
Stage-1
1 2,6 Dichloro phenol 1.00 1 STAGE-1 (AMINE) 1.35
2 Toluene 2.00 2 Toluene Recovery 1.91
3 Potassium carbonate 0.45 3 Toluene loss 0.09
Mono Methyl chloro Acetic
4 Acid 0.72 4 Methanol Recovery 1.94
5 Aniline 0.55 5 Methanol Loss 0.11
Sodium Methoxide
6 Solution 2.05 6 ML TO ETP 3.82
7 WATER 3.00 7 Solid waste 0.55
TOTAL 9.77 9.77
The raw materials shall be received in MS/SS tank, HDPE/fibre drums and bags as well as
through tankers. All the storage tanks of hazardous flammable substances shall be located
within premises in separate storage area i.e. Tank farm area shall be stored in MS/SS tank
with all precautionary process instrumentation and safety appliances. Large area is covered
by well-designed warehouse, which shall be containing store office, raw material store,
finished product store, etc. The personnel protective equipments like hand gloves, safety
shoes, goggles, helmet, clothing, etc. will be provided to those handling hazardous
chemicals as per requirement. All the motors and electrical connections will be flame proof.
List of raw materials are given in Table-2.1.
TABLE – 2.1
LIST OF RAW MATERIALS
Sr. Name of the Products Name of the Raw CAS / CI no. Quantity
no. Materials of raw MT/Month
materials.
1 DICLOFENAC SODIUM 2,6 Dichloro phenol 87-65-0 22.50
Toluene 108-88-3 18.00
Potassium carbonate 584-08-7 12.15
Mono Methyl Chloro 96-34-4 16.65
Acetate
Aniline 62-53-3 12.60
Sodium Methoxide 124-41-4 25.92
Solution
Chloro Acetyl Chloride 79-04-9 16.92
Alluminium Chloride 12125-02-9 21.60
Sodium Hydroxide 1310-73-2 8.40
Activated Carbon 7440-44-0 1.50
2 DICLOFENAC POTASSIUM 2,6 Dichloro phenol 87-65-0 22.50
Toluene 108-88-3 18.00
Potassium carbonate 584-08-7 12.15
Mono Methyl 96-34-4 16.65
ChloroAcetate
Aniline 62-53-3 12.60
Sodium Methoxide 124-41-4 25.92
Solution
Chloro Acetyl Chloride 79-04-9 16.92
2.5.1 LAND
Total 1500 sq. Meter land area is available at site; out of this area about 495.0 sq. meter
(33.0 %) area will be covered as greenbelt and other forms of greenery. In addition to this,
majority of the vacant land shall be planted with trees, shrubs and grasses.
Domestic waste water (1.8 KL/Day) will be disposed by septic tank & soak pit.
1.8
Septic tank
& soak pit
Cooling: 3.0 Boiler: 5 Process: 15.0 Washing: 1 Scrubber
: 2.0
15.0
Reuse0.7
KL/Day
ETP-15.0
First all wastewater streams shall be passed through Oil & Grease Removal Tank (OGRT-01).
Here free-floating oil and grease shall be removed from the top manually and collected in
Oil & Grease Collection Tank (OGCT-01). Then effluent shall be collected in Equalisation cum
Neutralisation tank (ENT-01) where Lime shall be added from Lime Dosing Tank to maintain
neutral pH of wastewater. Mixer is provided at bottom of the ENT-01 to keep all suspended
solids in suspension and to provide proper mixing.
Then after, neutralized wastewater shall be pumped to Flash Mixer (FM-01). Alum and
Polyelectrolyte shall be dosed from Flocculants Dosing Tank (ADT) and Polyelectrolyte
Dosing Tank (PEDT) respectively by gravity into FM-01 to carry out coagulation by using a
Flash Mixer.
Then after, coagulated wastewater shall be settled in Primary Tube Settler (PTS-01). Clear
supernatant from PTS-01 shall be passed in Aeration Tank (AT-01) Here, biodegradation of
organic matter of the wastewater shall be carried out by bacteria (suspended growth) in the
AT-01 and for that oxygen shall be supplied by 2 nos. of air blowers (B-01) through diffusers.
Air blowers also keep MLSS in suspension.
Then after, wastewater shall go to Secondary Settling Tank (SST-01) from AT-01. Here, the
suspended solids shall be settled. Sludge shall be removed from bottom of SST-01 and
pumped to AT-01 to maintain MLSS and excess activated sludge shall be sent to Filter Press
for dewatering. Clear supernatant from SST-01 shall be collected in Treated Effluent Sump
(TES-01) before sent to common MEE of M/s ACPTCL for further treatment and disposal.
Sludge settled in PTS-01 and excess sludge from SST-01 shall be sent to Filter Press for
dewatering before storage in HWSA and ultimate disposal to TSDF. Filtrate from FP-01 shall
be sent back to ENT-01 for further treatment.
PROCESS EFFLUENT:
The comprehensive effluent treatment and management system for proposed project
will comprise of Primary ETP and Common MEE discharge.
Approx.
Min. Profit= 20 % of total turnover of the plant= 48,00,000 Rs.
so it is viable
TABLE 2.5
DETAILS OF FLUE GAS EMISSION
PARTICULARS FUEL FUEL STACK EMISSION APCM
QUANTITY HEIGHT NORMS
(Flue Gas Emission)
Boiler Bio-Coal/ 2 MT/Day 30 m PM<150 mg/Nm3 Cyclone
(1000 kg/hr.) Agro Waste SO2< 100 ppm Separator
NOx< 50 ppm with bag filter
TFH Bio-Coal/ 2 MT/Day 30 m PM<150 mg/Nm3 Cyclone
(2 lakh kcal/hr.) Agro Waste SO2< 100 ppm Separator
NOx< 50 ppm with bag filter
D.G.Set Diesel 15 lit/hr 11 m PM<150 mg/Nm3 Adequate height
(150 KVA) SO2< 100 ppm Provided
NOx< 50 ppm
(Process Gas Emission)
Process Vent*- -- -- 11m HCl < 20 mg/Nm3 Two Stage
Scrubber
(water + water)
Process Vent* -- -- 11m NH3 < 175.0 Two Stage
mg/Nm3 Scrubber
(water + water)
Extensive oiling and lubrication and preventive maintenance shall be carried out to reduce
noise generation at source to the permissible limit. Acoustic enclosures provided for DG set.
The Noise level is within the prescribed limit. At noisy area, adequate preventive & control
measures are taken. No significant noise, vibration or emission of light & heat from the unit.
CHAPTER – 3:
BASELINE ENVIRONMENTAL STATUS
3.1 INTRODUCTION
The baseline status of environmental quality in the vicinity of project site serves as the
basis for identification, prediction and evaluation of impacts. The baseline
environmental quality is assessed through field studies within the impact zone for
various components of the environment, viz. air, noise, water, land and socio-economic.
The baseline environmental quality has been assessed in the summer season of March,
2017 to May, 2017 in a study area of 10 km radial distance from the project site.
The existing environmental setting is considered to establish the baseline conditions which
are described with respect to following:
• Land environment
• Land Use Pattern
• Water Environment
• Air Environment
• Meteorology
• Noise Environment
• Ecology
• Topography
• Demography and Socio-economic Environment
3.2 METHODOLOGY
Following the guidelines of MoEFCC, the baseline environmental study was conducted.
The details of the study period, frequency of sampling & method of environmental
sampling & analysis are shown below in succeeding paragraphs under respective
titles.
Attributes Sampling
Locations Frequency
A. Air Environment
Meteorological Project Site 1 hourly continuous for
Study Period
Ambient Air Quality 9 locations in the study area 24 hourly twice a week
(10 km radius from project site) during study period
B. Noise Various Locations within the study Once during Study Period
area
(10 Km radius from project site)
C. Water
Ground Water Grab samples from 9 Locations from Once during Study Period
Study Area
(10 km radius from project site)
Surface Water Grab samples from 1 Locations Once during Study Period
(10 km radius from project site)
D. Soil Quality Soil samples from 9 locations within Once during Study Period
study area
E. Land Use & Land Study area (10 km from Project Site) Once during Study Period
Cover
F. Ecological Data Study area (10 km from Project Site) Once during Study Period
G. Socioeconomic Study area (10 km from Project Site) Once during Study Period
Data
3.3 MICROMETEOROLOGY
The climate of Gujarat is varied, as it is moist in the southern districts and dry in the
northern region. The Arabian Sea and the Gulf of Cambay in the west and the forest-
covered hills in the east soften the rigours of climatic extremes, consequently reducing the
temperature and render the climate more pleasant and healthy. Surat lies along the
southern part of the state and experiences a climate with aridity index of 15 to 20 per
cent indicating adequate moisture availability in the soils for most part of the year. The
annual meteorological data (Temperature, Relative Humidity, Rainfall and Wind speed) for
the year 2016 was collected from own weather station at Sachin, Surat.
Minimum, Maximum and Average Temperatures for Surat Station of the year 2016 are given
in Table 3.3.
TABLE 3.3 A
__________________________________________________________________
TEMPERATURE DATA
MONTH MINIMUM MAXIMUM AVERAGE
(2016) TEMPERATURE TEMPERATURE TEMPERATURE
(0C) (0C) (0C)
January 17 34 25
February 19 37 28
March 19 40 29
April 25 39 31
May 28 41 32
June 26 37 31
July 25 33 29
August 25 32 29
September 8 33 28
October 19 37 28
November 17 34 25
December 15 35 24
TABLE 3.3 B
___________________________________________________________________________
RELATIVE HUMIDITY DATA
MONTH MINIMUM R.H.% MAXIMUM R.H.% AVERAGE R.H.%
(2016)
January 6 55 25
February 6 100 25
March 6 82 28
April 6 70 30
May 6 69 37
June 11 77 34
July 19 94 52
August 65 100 91
September 16 100 72
October 6 97 39
November 6 39 15
December 6 39 14
3.3.3 RAINFALL
Rainfall data for Bharuch Station of the year 2016 is presented in Table 3.5.
TABLE 3.3 C
RAINFALL DATA
MONTH MONTHLY TOTAL NUMBERS OF RAINY DAYS
(2016) (MM)
January 0 0
February 0 0
March 0 0
April 0 0
May 0 0
June 25 7
July 159 25
August 118 17
September 94 12
October 100 3
November 0 0
December 0 0
Total 496 64
Total rainfall, during the monsoon period, has been recorded as 496 mm.
Wind speed for Surat Station of the year 2016 is given in Table 3.6.
TABLE 3.3 D
___________________________________________________________________________
WIND SPEED DATA
SR. NO. MONTH AVERAGE WIND SPEED
(2016) (KMPH)
1. January 0.4
2. February 0.9
3. March 1.5
4. April 2.4
5. May 6.1
6. June 6.7
7. July 5.3
8. August 6.9
9. September 4.1
TABLE - 3.4 SITE SPECIFIC METEOROLOGICAL DATA (Period: March, 2017 to May, 2017)
Temperature (0C)
Min. 0 0 0
60.1
60
50
40
%
30
20
16.6
11.4
10 8.7
3.0
0.2 0.0
0
Calms 0.50 - 2.10 2.10 - 3.60 3.60 - 5.70 5.70 - 8.80 8.80 - 11.10 >= 11.10
Wind Class (m/s)
26
24 23.8
22
20
18
16
% 13.9
14 13.6
12
10.8
10.4
10 9.9
9.0
8
A B C D E F G
Stability Class
TABLE - 3.5 LOCATIONS OF THE AMBIENT AIR, NOISE, WATER AND SOIL
SR. NAME OF VILLAGE BEARING APPROXIMATE AMBIENT NOISE WATER SOIL TYPE OF
NO. W.R.T. RADIAL AIR AREA
PROJECT DISTANCE
SITE FROM
PROJECT
SITE (KM)
1. Project site -- -- A1 N1 GW1 - Industrial
2. Kosamdi NE 5.75 A2 N2 GW2 S1 Residential
3. Bakrol NE 3.25 A3 N3 GW3 S2 Residential
4. Sanjali W 0.16 A4 N4 GW4 S3 Residential
5. Amboli NW 8.23 A5 N5 GW5 S4 Residential
6. Kapodara NE 5.5 A6 N6 GW6 S5 Residential
7. Bhadi E 4.3 A7 N7 GW7 S6 Residential
8. Panoli SW 2.9 A8 N8 GW8 S7 Residential
9. Alonj W 3.7 A9 N9 GW9 S8 Residential
10. Umarwada NW 4.15 A10 N10 GW10 S9 Residential
11. Umarwada Pond NW 4.15 -- -- SW1 - --
The air quality status in the impact zone is assessed through a network of ambient air
quality monitoring locations. The tropical climatic conditions mainly control the transport
and dispersion of air pollutant emissions during various seasons.
The conventional and project specific parameters such as Suspended Particulate Matter,
Respirable Suspended Particulate Matter (RSPM-PM10), Respirable Suspended Particulate
Matter (RSPM-PM2.5), Sulphur Dioxide (SO2), Oxides of Nitrogen (NOx), Ammonia (NH3),
Ozone (O3), Lead (Pb), Arsenic (As), Nickel (Ni), Benzene (C6H6), Hydro Carbon (HC), HCl, Cl2
& Carbon Monoxide (CO) were monitored at site.
The values for mentioned concentrations of various pollutants at all the monitoring
locations were processed for different statistical parameters like arithmetic mean, minimum
concentration, and maximum concentration and percentile values. The baselines levels of
Suspended Particulate Matter, Respirable Suspended Particulate Matter (RSPM-PM10),
Respirable Suspended Particulate Matter (RSPM-PM2.5), Sulphur Dioxide (SO2), Oxides of
Nitrogen (NOx), Ammonia (NH3), Ozone (O3), Lead (Pb), Arsenic (As), Nickel (Ni), Benzene
(C6H6), Hydro Carbon (HC), HCL, CL2 & Carbon Monoxide (CO) are expressed in terms of
various statistical parameters.
To establish the baseline status around the project site of the study region monitoring was
conducted at 9 Ambient Air Quality Monitoring (AAQM) Stations in and around the study
region during March 1, 2017 to May 31, 2017.
TABLE - 3.6 AMBIENT AIR QUALITY STATUS (MARCH, 2017 TO MAY, 2017)
SR. Sampling Location Sampling SPM PM10 PM2.5 SO2 NOx NH3 O3
NO. DURATION
µg/m3
1. Project-site 24 hours 122.3 84.20 48.5 25.12 20.15 BDL 10.50
2. Kosamdi 24 hours 127.6 85.94 49.87 26.72 28.53 BDL 11.08
3. Bakrol 24 hours 125.3 88.60 48.29 21.06 23.59 BDL 11.24
4. Sanjali 24 hours 118.5 77.84 44.39 17.52 21.06 BDL 10.95
5. Amboli 24 hours 121.1 78.35 43.98 16.87 19.03 BDL 10.65
6. Kapodara 24 hours 120.6 77.49 46.11 20.42 22.36 BDL 10.83
7. Bhadi 24 hours 123.4 80.42 47.73 17.98 20.04 BDL 10.46
8. Panoli 24 hours 123.4 82.05 51.28 21.63 24.59 BDL 11.73
9. Alonj 24 hours 119.8 75.36 44.13 17.81 19.47 BDL 11.32
10. Umarwada 24 hours 143.0 82.4 57.51 20.42 21.64 BDL 10.76
NAAQS 200 100 60 80 80 400 180
m3
1. Project site : (A1) BDL BDL 10.50 BDL BDL 1.20 0.5 BDL BDL
2. Kosamdi BDL BDL 10.81 BDL BDL 1.21 0.4 BDL BDL
3. Bakrol BDL BDL 10.91 BDL BDL 1.27 0.6 BDL BDL
4. Sanjali BDL BDL 10.76 BDL BDL 1.22 0.5 BDL BDL
5. Amboli BDL BDL 10.48 BDL BDL 1.28 0.4 BDL BDL
6. Kapodara BDL BDL 10.47 BDL BDL 1.23 0.6 BDL BDL
7. Bhadi BDL BDL 10.77 BDL BDL 1.29 0.4 BDL BDL
8. Panoli BDL BDL 10.94 BDL BDL 1.30 0.7 BDL BDL
9. Alonj BDL BDL 10.74 BDL BDL 1.31 0.3 BDL BDL
10. Umarwada BDL BDL 10.56 BDL BDL 1.29 0.5 BDL BDL
NAAQS 1 6 20 5 300 4 -- 200 100
Note: BDL = Below Detectable Limit
The Minimum Detectable Limits for various parameters are as below:
Parameters Value
Ammonia (as NH3) 1.0 µg/m3
Lead (as Pb) 0.5 µg/m3
The maximum concentration of SPM (143 µg/m3), PM10 (88.86 µg/m3), PM2.5 (57.51 µg/m3),
SO2 (26.72 µg/m3), maximum concentration of NOx (28.53 µg/m3), maximum concentration
of O3 (11.73 µg/m3), maximum concentration of CO (1.31 µg/m3), maximum concentration
of VOC (0.7 ppm), was recorded in study area.
The minimum concentration of SPM (118.5 µg/m3), PM10 (75.36 µg/m3), PM2.5 (43.98
µg/m3), SO2 (16.87 µg/m3), minimum concentration of NOx (19.03 µg/m3), minimum
concentration of O3 (10.46 µg/m3), minimum concentration of CO (1.20 µg/m3), minimum
concentration of VOC (0.3 ppm), was recorded in study area.
The PM10 and PM2.5 concentrations at all the AAQM locations were primarily caused by local
phenomena including industrial & vehicular activities and natural dust getting air borne due
to manmade activities and blowing wind. PM10 and PM2.5 concentrations were observed
below stipulated standards of CPCB for Industrial, Residential, Rural and Other Area at all
air quality monitoring locations during the monitoring period. Result of all parameters are
found within limit.
The noise monitoring was carried out at ten locations in day time during (6 am to 10 pm)
and at night time (10 pm to 6 am) in the study area covering all the areas i.e. industrial,
commercial, residential and silence zones as mentioned in Noise (Pollution and Control)
Rules, 2000. CPCB Recommendations for community noise exposure are attached as
Annexure – 2. Hourly Equivalent noise levels Leq (day) and Leq (night) were measured at
each monitoring locations. One day monitoring ranging from March 2, 2017 during day and
night time was carried out at all the locations.
INDIAN STANDARDS FOR NOISE LEVEL
Sr. Locations Noise Level in Noise Level in
No. Day Time Night Time
dB(A) dB(A)
1 Industrial Area 75 65
2 Commercial Area 65 55
3 Residential Area 55 45
4 Silence Zone i.e. Hospital, Educational 50 45
institute etc.
10. Chemical mg/L 3.96 4.28 5.78 3.96 5.29 3.96 APHA &
Oxygen AWWA.22nd
Demand Ed.5220-
(COD) B.(5-17)
11. Biochemic mg/L <1.0 <1.0 <1.0 BDL BDL <1.0 IS:3025 (P-
al Oxygen 44):1993
Demand
(BOD327)
12. Chlorides mg/L 157.4 171.5 246.4 206.9 586.4 228.6 IS:3025 (P-
(as Cl-) 32):1988
13. Sulphates mg/L 90.11 45.32 542.8 131.8 92.37 125.4 APHA &
(as SO4-2) AWWA.
22nd Ed.-
4500-SO42--
E.(4-190)
14. Total mg/L 185.0 425 320 430.0 470.3 390.0 IS:3025 (P-
Alkalinity 23):1986
(as CaCO3)
15. Total mg/L 226.9 263 753 178.7 338.7 236.9 IS:3025 (P-
Hardness 21):1983
(as CaCO3)
16. Calcium mg/L 68.27 46.18 240.9 84.33 86.68 114.4 APHA &
Hardness AWWA.22nd
Ed.3500 Ca-
B (3-67)
17. Magnesiu mg/L 38.54 52.69 124.4 22.93 61.23 29.76 APHA &
m (as Mg) AWWA.22nd
Ed. 3500
Mg-B (3-84)
18. Ammonica mg/L <0.4 <0.4 <0.4 BDL BDL <0.4 APHA &
l Nitrogen AWWA.22nd
(as NH3-N) Ed.4500-
NH3 B &
C.(4-
110,111,11
2)
19. Copper (as mg/L BDL* BDL* BDL* BDL* BDL* BDL* APHA &
Cu) AWWA.22nd
Ed.3500-Cu
B.(3-74)
20. Fluoride mg/L BDL* BDL* BDL* BDL* BDL* BDL* APHA &
(as F-) AWWA.22nd
Ed.4500-F--
B & D.(4-
84,87)
21. Total Iron mg/L 0.41 22.08 6.10 0.39 0.22 0.29 IS:3025 (P-
(as Fe) 53):2003
22. Phenol (as mg/L BDL* BDL* BDL* BDL* BDL* BDL* APHA &
C6H5OH) AWWA.22nd
Ed.5530-
B.5-47 &
D.(5-49)
23. Oil & mg/L <0.4 BDL BDL BDL BDL <0.4 IS:3025 (P-
Grease 39):1991
24. Hexavalen mg/L BDL* BDL* BDL* BDL* BDL* BDL* APHA &
t AWWA.22nd
Chromium Ed.3500-
**
26. Total mg/L <0.005 BDL BDL BDL BDL <0.005 APHA &
Chromium AWWA.
(as Cr+3) 22nd
Ed.3111. B-
AAS
**
27. Zinc (as mg/L <0.022 BDL BDL BDL BDL <0.022 APHA &
Zn) AWWA.
22nd Ed.-
3111. B-
AAS
**
28. Lead (as mg/L <0.005 BDL BDL BDL BDL <0.005 APHA &
Pb) AWWA.
22nd Ed.-
3111. B-
AAS
**
29. Sodium mg/L 32.59 41.58 194.87 79.64 118.5 89.12 APHA &
(as Na) AWWA.
22nd Ed.-
3111. B-
AAS
**
30. Potassiu mg/L 8.43 9.37 3.08 15.35 32.10 13.75 APHA &
m (as K) AWWA.22nd
Ed.3500 K
B- Flame
Photomete
r
**
31. Arsenic mg/L <0.000 BDL BDL BDL BDL <0.00015 APHA &
(as As) 15 AWWA.
22nd Ed.-
3112. B-
AAS
**
32. Cadmiu mg/L <0.001 BDL BDL BDL BDL <0.001 APHA &
m (as Cd) AWWA.
22nd Ed.-
3111. B-
AAS
(as CaCO3)
16. Calcium mg/L 60.24 86.34 28.22 483.8 APHA &
Hardness AWWA.22nd
Ed.3500 Ca-B
(3-67)
17. Magnesium mg/L 37.57 41.47 40.66 103.4 APHA &
(as Mg) AWWA.22nd Ed.
3500 Mg-B (3-
84)
18. Ammonical mg/L <0.4 <0.4 <0.4 BDL APHA &
Nitrogen AWWA.22nd
(as NH3-N) Ed.4500-NH3 B
& C.(4-
110,111,112)
19. Copper (as mg/L BDL* BDL* BDL* BDL* APHA &
Cu) AWWA.22nd
Ed.3500-Cu
B.(3-74)
20. Fluoride (as F- mg/L BDL* BDL* BDL* BDL* APHA &
) AWWA.22nd
Ed.4500-F--B &
D.(4-84,87)
21. Total Iron (as mg/L 7.24 0.23 0.19 0.14 IS:3025 (P-
Fe) 53):2003
22. Phenol (as mg/L BDL* BDL* BDL* BDL* APHA &
C6H5OH) AWWA.22nd
Ed.5530-B.5-47
& D.(5-49)
23. Oil & Grease mg/L <0.4 <0.4 <0.4 BDL IS:3025 (P-
39):1991
24. Hexavalent mg/L BDL* BDL* BDL* BDL* APHA &
Chromium AWWA.22nd
(as Cr+6) Ed.3500-Cr.-B
(3-69)
25. Nickel (as Ni) mg/L BDL* BDL* BDL* BDL* IS:3025 (P-
54):2003
**
26. Total mg/L <0.005 <0.005 <0.005 BDL APHA & AWWA.
Chromium 22nd Ed.3111. B-
(as Cr+3) AAS
**
27. Zinc (as Zn) mg/L <0.022 <0.022 <0.022 BDL APHA & AWWA.
22nd Ed.-3111.
B-AAS
**
28. Lead (as Pb) mg/L <0.005 <0.005 <0.005 BDL APHA & AWWA.
22nd Ed.-3111.
B-AAS
**
29. Sodium (as mg/L 65.52 29.36 86.92 246.45 APHA & AWWA.
Na) 22nd Ed.-3111.
B-AAS
**
30. Potassium mg/L 13.27 3.69 31.55 91.50 APHA &
(as K) AWWA.22nd
Ed.3500 K B-
Flame
Photometer
**
31. Arsenic (as mg/L <0.00015 <0.00015 <0.00015 BDL APHA & AWWA.
As) 22nd Ed.-3112.
B-AAS
**
32. Cadmium mg/L <0.001 <0.001 <0.001 BDL APHA & AWWA.
(as Cd) 22nd Ed.-3111.
B-AAS
Parameters Value
Phenol as C6H5OH 0.01 mg/L
Total Phosphorus as P 0.01 mg/L
Total Iron as Fe 0.01 mg/L
Copper as Cu 0.05 mg/L
Nickel as Ni 0.03 mg/L
+6
Hexavalent Chromium as Cr 0.01 mg/L
10. Chemical Oxygen Demand (COD) mg/L 25.13 APHA & AWWA.22nd Ed.5220-B.(5-17)
11. Biochemical Oxygen Demand mg/L BDL IS:3025 (P-44):1993
(BOD327)
12. Chlorides (as Cl-) mg/L 19.71 IS:3025 (P-32):1988
13. Sulphates (as SO4-2) mg/L 47.19 APHA & AWWA. 22nd Ed.-4500-SO42--
E.(4-190)
14. Total Alkalinity mg/L 222.8 IS:3025 (P-23):1986
(as CaCO3)
15. Total Hardness mg/L 167.3 IS:3025 (P-21):1983
(as CaCO3)
16. Calcium Hardness mg/L 50.40 APHA & AWWA.22nd Ed.3500 Ca-B (3-
67)
17. Magnesium (as Mg) mg/L 28.41 APHA & AWWA.22nd Ed. 3500 Mg-B
(3-84)
18. Ammonical Nitrogen mg/L BDL APHA & AWWA.22nd Ed.4500-NH3 B &
(as NH3-N) C.(4-110,111,112)
19. Copper (as Cu) mg/L BDL* APHA & AWWA.22nd Ed.3500-Cu B.(3-
74)
20. Fluoride (as F-) mg/L BDL* APHA & AWWA.22nd Ed.4500-F--B &
D.(4-84,87)
21. Total Iron (as Fe) mg/L 0.36 IS:3025 (P-53):2003
22. Phenol (as C6H5OH) mg/L BDL* APHA & AWWA.22nd Ed.5530-B.5-47 &
D.(5-49)
23. Oil & Grease mg/L BDL IS:3025 (P-39):1991
24. Hexavalent Chromium mg/L BDL* APHA & AWWA.22nd Ed.3500-Cr.-B (3-
**
26. Total Chromium mg/L BDL APHA & AWWA. 22nd Ed.3111. B-AAS
(as Cr+3)
**
27. Zinc (as Zn) mg/L BDL APHA & AWWA. 22nd Ed.-3111. B-AAS
**
28. Lead (as Pb) mg/L BDL APHA & AWWA. 22nd Ed.-3111. B-AAS
**
29. Sodium (as Na) mg/L 8.09 APHA & AWWA. 22nd Ed.-3111. B-AAS
**
30. Potassium (as K) mg/L 2.26 APHA & AWWA.22nd Ed.3500 K B-
Flame Photometer
**
31. Arsenic (as As) mg/L BDL APHA & AWWA. 22nd Ed.-3112. B-AAS
**
32. Cadmium (as Cd) mg/L BDL APHA & AWWA. 22nd Ed.-3111. B-AAS
Parameters Value
Phenol as C6H5OH 0.01 mg/L
Total Phosphorus as P 0.01 mg/L
Total Iron as Fe 0.01 mg/L
Copper as Cu 0.05 mg/L
Nickel as Ni 0.03 mg/L
Hexavalent Chromium as Cr+6 0.01 mg/L
SUMMARY
The statistical interpretation of observed ground water & surface water quality is
presented in Table-3.11.
3.6.2 BASELINE GROUND WATER QUALITY
pH of ground water samples varied from 7.15 to 8.02. Turbidity was found 0.06 to 0.70 NTU,
Total Dissolved Solids varied in the range of 576.0 to 2536.0 mg/L. DO and COD are found in
range of 4.60 to 6.67 mg/L, and 2.64 to 21.84 mg/L respectively. BOD3 was found to be BDL.
Total Hardness (as CaCO3) varied from 178.7 to 909.2 mg/L. Total Alkalinity varied from
178.2 to 628.7 mg/L. Chlorides and Sulfates are found in the range of 157.4 to 768.7 mg/L
and 45.32 to 542.8 mg/L respectively.
studies.Vol.2,
Edition: 2011,
S.K.Maiti-10.4
5. Porosity % 46.26 56.60 37.29 53.20 55.66 Handbook of
methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-10.4
6. Water % 98.64 68.57 73.47 58.56 70.51 Handbook of
Holding methods in
Capacity environmental
(WHC) studies.Vol.2,
Edition: 2011,
S.K.Maiti-10.7
*
7. Specific -- 2.35 2.52 2.43 2.36 2.19 IS:2720 (P-
Gravity 3/S-1):1980
*
8. Total -- 403.2 175.7 766.0 510.0 200.8 IS:3025 (P-
Hardness 21):2009
(as CaCO3)
9. Calcium (as mg/Kg 123.4 40.24 266.0 200.4 125.5 Handbook of
Ca+2) methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-
11.15
10. Magnesium mg/Kg 23.0 18.29 24.40 2.40 18.29 Handbook of
(as Mg+2) methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-
11.15
11. Chlorides (as mg/Kg 43.9 132.6 172.4 99.95 108.5 Handbook of
Cl-) methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-
11.16
12. Total mg/Kg 83.0 53.90 63.49 18.0 28.50 Handbook of
Phosphorus methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-11.9
13. Available mg/Kg 10.24 2.55 10.7 3.73 11.10 Vol.2:, Edition:
Phosphorus 2011,
S.K.Maiti-11.8,
pg no.177
14. Organic % 7.28 6.45 7.43 7.22 6.55 Handbook of
Matter (OM) methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-11.5
*
15. Total mg/Kg 900.0 297.0 693.0 519.2 247.5 IS:3025 (P-
Alkalinity 23):1986
(as CaCO3)
16. Total mg/Kg 94.8 120.6 245.2 96.28 156.2 Handbook of
Nitrogen methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-11.6
*
17. Nitrate mg/Kg 7.25 6.26 0.2 9.35 15.0 APHA &
Nitrogen AWWA.22nd
(as NO3--N) Ed.4500-NO3-
B. (4-122)
*
18. Sulphates (as mg/Kg 64.2 131.0 2.67 4.65 74.85 IS:2720(P-
SO4-2) 27):1977
*
19. Total Iron (as mg/Kg 0.94 15.51 33.0 2.20 35.23 IS:3025 (P-
Fe) 53):2003
20. *Copper (as mg/Kg BDL* BDL* BDL* BDL* BDL* APHA &
Cu) AWWA.22nd
Ed.3500-Cu B.
(3-74)
*
21. Nickel (as Ni) mg/Kg BDL* BDL* BDL* BDL* BDL* IS:3025 (P-
54):2003
**
22. Lead (as Pb) mg/Kg BDL* BDL* BDL* BDL* BDL* USEPA-3500-
B/AAS
**
23. Arsenic (as mg/Kg BDL* BDL* BDL* BDL* BDL* USEPA-3500-
As) B/AAS
24. **TOC mg/Kg 24.65 20.97 23.67 23.84 19.52 USEPA-3500-
B/AAS
**
25. Color -- Yellowish Light Light Blackish Blackish USEPA-3500-B
Brown Brown Brown Brown Brown
**
26. Sodium (as mg/Kg 813.0 842.0 956.0 783.0 438.0 USEPA-3500-
Na) B/AAS
27. **Potassium mg/Kg 1082.0 497.5 822.0 562.0 341.0
(as K)
**
28. Cadmium mg/Kg BDL* BDL* BDL* BDL* BDL*
(as Cd)
**
29. Permeability cm/sec 2.17x10-6 3.69 x 4.21 x 4.64 x 2.17 x 10- IS: 2720 (Part-
10-4 10-3 10-4 6
16):2006
**
30. Grain Size Analysis:
Gravel % 34 02 00 02 00
Coarse Sand % 09 02 06 01 03
Medium Sand % 04 12 11 02 05 IS:2720 (Part-
4):2006
Fine Sand % 31 12 06 48 10
Silt + Clay % 22 72 77 47 82
*
7. Specific -- 2.38 2.87 2.28 2.46 IS:2720 (P-
Gravity 3/S-1):1980
*
8. Total -- 577.3 552.2 390.0 650.0 IS:3025 (P-
Hardness 21):2009
(as CaCO3)
9. Calcium (as mg/Kg 100.6 181.1 150.3 210.4 Handbook of
Ca+2) methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-
11.15
10. Magnesium mg/Kg 79.04 24.39 1.35 24.3 Handbook of
(as Mg+2) methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-
11.15
11. Chlorides (as mg/Kg 97.84 122.3 199.9 250.0 Handbook of
Cl-) methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-
11.16
12. Total mg/Kg 219.0 78.90 19.5 20.25 Handbook of
Phosphorus methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-11.9
13. Available mg/Kg 8.30 11.50 4.97 4.29 Vol.2:, Edition:
Phosphorus 2011,
S.K.Maiti-11.8,
pg no.177
14. Organic % 5.78 7.19 7.46 6.23 Handbook of
Matter (OM) methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-11.5
*
15. Total mg/Kg 396.0 173.3 84.5 742.5 IS:3025 (P-
Alkalinity 23):1986
(as CaCO3)
16. Total mg/Kg 105.8 143.6 116.3 109.6 Handbook of
Nitrogen methods in
environmental
studies.Vol.2,
Edition: 2011,
S.K.Maiti-11.6
*
17. Nitrate mg/Kg 0.62 36.25 2.05 2.45 APHA &
Nitrogen AWWA.22nd
(as NO3--N) Ed.4500-NO3-
B. (4-122)
*
18. Sulphates (as mg/Kg 66.80 292.0 16.0 29.40 IS:2720(P-
SO4-2) 27):1977
*
19. Total Iron (as mg/Kg 15.74 10.64 8.39 1.97 IS:3025 (P-
Fe) 53):2003
*
20. Copper (as mg/Kg BDL* BDL* BDL* BDL* APHA &
Cu) AWWA.22nd
Ed.3500-Cu B.
(3-74)
*
21. Nickel (as Ni) mg/Kg BDL* BDL* BDL* BDL* IS:3025 (P-
54):2003
**
22. Lead (as Pb) mg/Kg 2.05 BDL* BDL* 1.74 USEPA-3500-
B/AAS
**
23. Arsenic (as mg/Kg BDL* BDL* BDL* BDL* USEPA-3500-
As) B/AAS
**
24. TOC mg/Kg 28.71 18.29 18.65 22.56 USEPA-3500-
B/AAS
**
25. Color -- Light Blackish Light Yellowish USEPA-3500-B
Brown Brown Brown Brown
**
26. Sodium (as mg/Kg 1232.0 520.0 585.0 838.0 USEPA-3500-
Na) B/AAS
**
27. Potassium mg/Kg 986.0 260.0 393.0 792.0
(as K)
**
28. Cadmium mg/Kg BDL* BDL* BDL* BDL*
(as Cd)
**
29. Permeability cm/sec 6.28x10- 4.38×10- 6.28 x 7.37 x 10-5 IS: 2720 (Part-
5 3 10-5 16):2006
**
30. Grain Size Analysis:
Gravel % 06 00 06 02
Coarse Sand % 04 02 04 02
IS:2720 (Part-
Medium Sand % 08 06 08 12
4):2006
Fine Sand % 28 07 28 12
Silt + Clay % 54 85 54 72
The porosity of soils varied from 37.29% to 58.07% and can be considered as moderate to
good for air and water movement in the soil. The Water Holding Capacity varied from
58.56% to 98.64%. Bulk Density varied from 1.11 to 1.25 g/cm3. The moisture content varied
from 3.86% to 15.33%.pH varied from 7.12 to 8.16. Calcium varied from 40.24 to 266.0
mg/kg. Total Hardness varied from 175.7 to 766 mg/kg. Magnesium varied from 1.35 to
79.04 mg/kg. Total Phosphorus varied from 18 to 219.0 mg/kg. Organic Matter varied from
5.78 to 7.46 mg/kg. Nitrate-Nitrogen varied from 0.62 to 15 mg/kg. Total Iron varied from
0.94 to 35.23 mg/kg.
BHADI VILLAGE
ALONJ VILLAGE
Kosamdi village
Bakrol Village
Panoli Village
AMBOLI
SANJALI
The map also marks the area within 10 km with project site as a centre. Town and village
Table – 3.11 Description of geological classification and area under different formations
STRATIGRA AREA AGE DESCRIPTION
PHY (SQ. KM.)
Q= 212.73 Holocene in Some gypsum deposits are found in these
Undifferenti Quaternary Quarternary sediments. High potential for
ated fluvial/ period (1 million yielding significant quantities of ground water.
Aeolian/ year to recent)
coastal
sediments
N1k = Khari 67.83 Miocene (23.8 to Comprises variegated siltstones, and grey
Formation 5.3 million years) gypseous marls deposited in a quiet epi-neritic
basin. The upper part of this formation has
yielded a rich assemblage of Miocene fossils. It
unconformably overlies the Bermoti Formation.
3.8.4 HYDROLOGY
The geology of the district with vast area affected by inherent/coastal salinity, presents a
complex hydrogeological pattern. Hydrogeological map is shown. The hard rocks, the semi-
consolidated Cretaceous, and Tertiary formations and unconsolidated alluvial deposits, all
comprise multi – aquifer systems thereby presenting unconfined as well as confined
groundwater conditions in the entire district. Tertiary formations are inherently saline and
contain poor quality of groundwater. Groundwater occurs under unconfined conditions in
the limestone and sandstone aquifers of Bagh beds. Occurrence and movement of
groundwater is restricted mainly to the fractures and joints in the limestones and
sandstones. The discharge in dug wells varies from 30 to 50 m3/day. The bagh beds, where
overlain by Deccan Trap are likely to yield groundwater under confined conditions. The
Deccan Trap have given rise to multi-layered stratified aquifers. Each individual flow
comprises two distinct units, namely the upper vesicular basalt and the lower massive
basalt. The massive basalt is hard and compact with primary porosity but the vesicular
basalts exhibit porosity. The movement of groundwater is therefore controlled by the
secondary porosity developed by the presence of fractures and joints. The paleoweathering
which is invariably observed at depth near the top of every flow, has given rise to good
aquifers at depth. The yield of the dug wells in Deccan traps, which range in depth from 5 to
25 m bgl, sustain pumping from 1/2 hour to 10 hour with discharge varying from 200 to
1200 litre per minute (LPM) for drawdown of 4 to 7 m. Bore well tapping deeper zones
down to 150 m below ground level(bgl), have yielded 100 to 600 LPM for a drawdown of 6
to 15 m. The sandstone are the main aquifers in the Tertiary formations but the limestone
also yield significant quantities of groundwater wherever karstic development have taken
place. Deep tube well tapping the Tertiary formations is capable of yielding 300 to 3000
LPM of water for meager drawdown of 1 to 7 m. The alluvium formations in the western
most part of the area do not constitute potential aquifers on account of inferior quality of
water.
A map depicting major land use/ land cover classes comprising lands under agriculture,
fallow land, open/degraded vegetation; lands falling under water bodies, scrub and lands
under inhabitations is presented at Figure 3.6. The map also marks the area within 10 km of
the project site as the area of interest.
Data Preparation
- Radiometric correction Pre field process
- Geometric correction
3.10 Toposheet
Figure 3.10- Toposheet
Introduction
Bharuch (formerly commonly known as Broach) in India, is a district in the southern part of
the Gujarat peninsula on the west coast of state of Gujarat with a size and population
comparable to that of Greater Boston. The Narmada River outlets into the Gulf of Khambhat
through its lands located in the central and northern parts of the sub-continent of India. The
geographical location of the district is 21.30° to 22.00° N Latitude and 72.45° to 73.15° E
Longitude. The district has eight Talukas, Bharuch (District Headquarter), Ankleshwar, Valia,
Jhagadia, Vagra, Aamos, Hansot and Jambusar. The total area of the district is 5,253 sq km,
as per the census of 2001; the population is 1.3 million, with 261 persons per sq. km. The
district is situated at the mouth of River Narmada. The major rivers flowing through the
district are: Narmadha, Dhadhar, Kim and Kaveri.
Climate
The weather of Bharuch district is hot and dry-starting from mid-march till mid-June, mid-
during summer season weather remains hot and dry. While from mid-June till end of
September weather remains humid and can be considered pleasant. From October-
November weather is bit hot. From December to February climate remains cool
Rainfall
Biogeography
According to Rodgers and Panwar (1988), Gujarat has parts of four biogeographic zones:
3.11.1 PHYSIOGRAPHY
The region provides a combination of most of the geo-environmental features for the
development of favorable ecosystems. The alluvial sediments and reasonable water
resources have provided impetus towards developing human induced ecosystems of
agricultural cropping agro-forestry and horticulture. The elevation range of the region is
about 20 m showing a very gentle flat gradient of 1:800 to 1:1000. The region shows more
or less a flat topography with a series of sections cut by deeply incised channels of rivers
flowing across the region. The riverbanks are generally marked by levee deposits, creating a
ridge type banks with higher elevations than the general ground level. The flat topography is
dotted by low height sandy mounds of stabilized dunes. Formation of ravine landscape is
quite common on most of the riverbanks due to deep gully erosion. The rivers are prone to
heavy floods and land erosion.
3.11.2 FOREST
Bharuch area is characterized by tropical dry deciduous forests. The total forest area of
district is 1449.68 sq.m. That accounts for 0.73 % of the total geographical area of the
district. (Courtesy: Environmental Information Centre, New Delhi)
White Stork
Solanum incanum - Rare
3.11.3 FLORA
Some of the flora found in Bharuch area is listed below:
3.11.4 FAUNA
benghalense Woodpecker
14 Eudynamys Koel Cuculidae
scolopacea
15 Fracolinus Black partiridge Pharianidae
francollinus
16 Halcyon rustica Whitebrested Kingfisher Aicenidae
17 Hirundo rustica Common swallow Hirundinidae
18 Lanius exubitor Grey Shrike Daniidae
19 Launchura malabarica Whitethroated munia Estrildinae
20 Megalaima Smallgreen barbet Capilonidae
rubricapilla
21 M. malabarica Crimsonbrestwd Barbet Capilonidae
22 Merops orientalis Littlegreen Bea-eater Miropidae
23 Milvus migrans Patih Kite Accipitridae
24 Motacilla Large pied wagtail Motacillidae
maderatensis
25 Nactarinia asiatica Purplerumpled sunbird Nectarinidae
26 Nectarinia minima Small sunbird Nectarinidae
27 Oriolus oriolus Golden Oriole Oriolidae
28 Orthotomus sutorius Tailor Bird Pachycephaline
29 Passer domesticus House Sparrow Passerinae
30 Psittacula Blossamheaded parakeet Psittacidae
cyanocephala
31 Pycnonotus caffer Redvented bulbul Pycnonotidae
32 Ploceus philipinensis Weaver bird Plocidae
33 Sexicoloides fulicate Indian Robin Corvidae
34 Sopsychus saularis Magpie Robin Corvidae
35 Streptopelia chinensis Spotted dove Columbidae
36 S. senegalensis Little brown dove Columbidae
37 Sternus pagodramus Brahiminy myna Sternidae
38 Turdoides caudatus Common Babbler Muscicapidae
39 Upupa epops Hoopoe Upupidae
40 Vanellus indicus Redwattled Lapwing Jacanidae
41 Metopidius indicus Brongewinged jacana Jacanidae
42 Ardea alba Large egrd Ardeidae
43 A. cinerea Grey Heron Ardeidae
44 Falica atra Coot Rallidae
45 Phalacrocorax niger Little cormorant Phalacrocoracidae
Source: Survey of Avifauna under the study area.
3.12.1 DEMOGRAPHY
On an average, Taluka Ankleshwar has population density of about 752 persons per sq. km.
(2011 Census data), compared to the Bharuch District, which has a population density of
234 persons per sq. km. (2011 Census data). Population density within 10 km radius of the
site is only 687 persons per sq. km. (2011 Census data), while population density within 5
km radius of site is 635 persons per sq. km. (2011 Census data). The population details (i.e.
population distribution and population density) of the Taluka Ankleshwar, District Bharuch
and the study area within 10 km radius are presented in Table-3.18 & its graphical
representation is given in Figure-3.8.
TABLE - 3.16
POPULATION DENSITY
POPULATION DENSITY
800
700
Population Density
600
500
400
300
200
100
0
Within 5 km Within 10 km Ankleshwar Bharuch
radius radius Taluka (2011) District (2011)
Locations
Within 10 km radius of the study area, the literacy rate is observed 71.65 % having 80.25 %
among males and 62.54 % among females, whereas literacy rate within 5 km radius of study
area is 74.84 % having 82.50 % among males and 63.65 % among females.
TABLE - 3.17
Literacy rate
FIGURE - 3.12
LITERACY DATA
100
90
80
70
Litercy rate (%)
60
50 Total
Literacy(%)
40
30 Male
Literacy
20
10 Female
Literacy
0
Within 5 km radius Within 10 km radius Ankleshwar Taluka Bharuch District
(2011) (2011)
Locations
TABLE - 3.18
Occupational Structure
3.12.4 AMENITIES
Infrastructure resource base of the surveyed villages with reference to education, medical,
water resources, post and telegraph, communication, power supply is presented in
Table3.21. There are 45 villages within study area of 10 km radius of plant site. Significant
observations with respect to availability of amenities in study area are as follows.
Education facilities in study area are quite good because all villages have primary schools, 7
villages have both primary and secondary education schools while one village caters to the
need of junior collage education, 4 villages provide facilities for adult literacy class, 17
villages have Other Educational Institute and one village has Training center.
Almost all villages in the impact zone have community health center/workers, 13 villages
have primary health sub center, 7 villages have registered private practitioners while 5
villages have family planning center and 2 villages have public health center. One village
has child welfare center and 3 villages have dispensary with qualified Doctor.
In the study area drinking water facility is good as tube well, tank and tap water is available
almost in all the villages.
31 villages have post office facility and out of these villages, one village has also telegraph
facility. 21 villages have phone facilities.
All villages are well connected through a network of Pucca road as well as Kaccha approach
road. Bus is the main mode of transportation and is available in 42 villages, while 5 villages
are connected with railways.
All the villages in the study area get electricity for all purposes.
TABLE – 3.19
ABBREVIATIONS
1. Education
P - Primary / Elementary School
S - Matriculation or Secondary
O - Other Educational Institution
PUC - Higher Secondary/Intermediate/pre-University/junior Collage
2. Medical Facilities
RP - Registered Private Practitioner
PHS - Primary Health Sub-Centre
FPC - Family Planning Centre
PHC - Primary Health Centre
D - Dispensary
CHW - Community Health Worker/Health Worker
H - Hospital
NH - Nursing Home
MH - Maternity Home
PHC - Public Health Centre
CWC - Child Welfare Centre
O - Others
3. Drinking Water
T - Tap Water
HP - Hand Pump
TK - Tank Water
W - Well Water
R - River Water
C - Canal
N - Nallah
S - Spring
TW - Tube well Water
4. Post & Telegraph
PO - Post Office
PTO - Post & Telegraph
PH - Telephone Communication
5. Communication
BS - Bus Station
NW - Navigable Waterway
6. Approaches to Village
PR - Pucca Road / Paved Road
MR - Kuchcha Road / Mud Road
FP - Foot Path
7. Power Supply
EA - Electricity for all purposes
EAG - Electricity for Agriculture
ED - Electricity for Domestic
EO - Electricity for other purpose like Industrial, Commercial etc.
Various sources of pollution with respect to wastewater, the flue gas / process emission,
hazardous waste and noise generation along with their qualitative and quantitative analysis
as well as measures taken to control them are discussed herein with details. The network
method was adopted to identify potential impact, which involves understanding of cause-
condition-effect relationship between an activity and environmental parameters. This
method involves the "road map" type of approach to the identification of second and third
order effect. The basic idea is to account for the project activity and identify the type of
impact that could initially occur followed by the identification of secondary and tertiary
impacts.
Identified potential impacts for the various components of the environment, i.e. air, noise,
water, land and socio-economic, are presented in Figure 4.1. It should be noted that in these
illustrations the lines are to be read as "might have an effect on".
Project
Project
Noise Emission
Primary
Impacts Change in
Ambient
Noise Level
Project
Impact on Runoff/
Seepage
Project
Cnstruction Operational
Phase Phase
Project
Project
Net Income
Output
Secondary Change in Development Better Air, Water Empolyment Demand for Demand for Aesthetic
Impacts Economic Base of Ancillary Product Land, Noise Opportunity Communication Infrastructural Risk
of The Region Industries Avaliability Pollution Facilities Facilities
Saving of Foreign
Exchange Effect On Effect On Effect On Effect on
Human Health Agriculture & Visual Buildings
Fisheries Environment Materials
Mounments
Tertiary Effect On Water Supply, Effect On Educational Effect On Human, Nature &
Impacts Sewerage & Soild Waste Medical, Transport Recreational Facilities
Management Facilities Facilities
The nature of the impacts due to said project activities are discussed here in detail. Each
parameters identified in the proceeding chapter, is singularly considered for the anticipated
impact due to various activities listed. The impact is quantified using numerical scores 0, 1,
2, 3, 4 and 5 in increasing order of activity. In order to assess the impact accurately, each
parameter is discussed in detail covering the following:
1) Project activities likely to generate impact
2) Quantification and prediction of impact
The peak water requirement during construction will be met from the GIDC Water Supply.
Further, the wastewater generation during the construction period will be basically from
construction activities and the sanitary units provided for the workers. Hence, there will not
be any impact on the water environment.
Water Consumption & Wastewater Generation is given in Table 2.2. Details of ETP are
discussed in Topic 2.5.3.2 of Chapter 2. Overall there won’t be any significant adverse
Total water requirement will be 30.0 KL/Day which will be met through GIDC water supply.
The wastewater generation will be 17.5 KL/Day. The industrial effluent (15.7 KL/Day) will be
sent to Common MEE of M/s. ACPTCL, Ankleshwar
Domestic waste water (1.8 KL/Day) will be disposed by septic tank & soak pit.
The proposed air emissions at M/s. Iconic Pharmachem are SPM, SO2 NOx, HCl, NH3. The
site specific and monitored details considered for input data for the software “ISC-AERMOD
View” by Lakes Environmental, Canada for prediction of impact on air environment are
given in Table 4.1. In order to conduct a refined air dispersion modeling using ISCST3 and
ISC-PRIME short-term air quality dispersion models, the site specific hourly meteorological
data measured at site is pre-processed using the U.S. EPA PCRAMMET and U.S. EPA AERMET
programs. Before starting air dispersion modeling with ISC-AERMOD View, a building
downwash analysis using BPIP View was done. BPIP View is a graphical user interface
designed to speed up the work involved in setting up input data for the U.S. EPA Building
Profile Input Program (BPIP) and Building Profile Input Program – Plume Rise Model
Enhancements (BPIP-PRIME).
The air pollution caused by the gaseous emissions from a single or small group of stacks is a
local phenomenon. Its impacts will occur at a distance ranging from within the immediate
vicinity of the stack to several kilometers away from the stack. Maximum ground level
concentration will occur within this range. All plumes at more downwind distances from the
source by stack emission become so diluted by diffusion in the ambient atmosphere, that
concentrations of pollutants become negligible. The maximum ground level concentration
for different parameters is given in Table 4.2. Equal concentration contour plots for SPM,
SO2, NOx, HCl, NH3 are given in Figure 4.1. Adequate measures shall be taken to minimize air
pollution by providing air pollution control equipment. Flue gases are discharged from
stacks at adequate height (as per GPCB norms).
(* Permissible Limits)
Note:
P-Proposed
As proposed expanded capacity manufacturing activities have not yet started, the
predictions were made using CPCB permissible limit as these concentrations will in no case
be exceeded. Ground level concentrations calculated for proposed activities are
superimposed on existing ambient air quality monitoring results and combined values
(Table-4.4) are found within permissible National Ambient Air Quality Standards.
4.2.7 HOUSING
Enough number of dwellings is available in the town for accommodating extra workforce.
On neighboring towns or villages, the impact on this account is minimal.
4.2.8 ECOLOGY
The impact due to operation of the project and its activities on the ecological parameters
like natural vegetation, cropping pattern, fisheries and aquatic life, forests and species
diversity could be summarized as below.
4.2.8.2 CROPS
Since, the project shall be on a non-agricultural land, it shall not alter the crop production of
the area. Further, the necessary environmental protection measures have been planned
under EMP e.g. air pollution control systems shall be designed to take care of even
emergency releases of the gaseous pollutants like SPM, SO2, NOx, HCl and NH3 and regular
environmental surveillance shall be done, so as not to have any short-term or cumulative
effect on the crops and the natural vegetation of the area.
ACTIVITIES Air Noise Water Land Infrastr Servic Env. Terrestrial Socio-
DURING Quali & Qualit Quality ucture es Hazard Ecology Economic
CONSTRUCTI ty Odour y s Land use Status
ON PHASE
Water x × ×
Requirement
Material × × × × x
Storage/
Transport
Material × × × ×
Handling
Utilities × × × ×
Effluent ×
Discharge
Gaseous × ×
Emissions
Fugitive × x ×
Emissions
Solid Waste × x × ×
Disposal
Spills & Leaks × × × ×
Shutdown/ ×
Startup
Equipment × x
Failures
Transport of × × × × ×
Workers
Movement of × × x × ×
Vehicles
ACTIVITIES Air Nois Wate Land Infrastr Servic Env. Terrestri Socio-
DURING Qualit e& r Qualit ucture es Hazards al Econom
OPERATION y Odou Quali y Ecology ic Status
PHASE r ty Land use
Water X x X
Requirement
Raw material X X X X X X
Storage/
Transport
Raw Material X X X X
Handling
Utilities X X X X X
Effluent X X X X
Discharge
Gaseous X X
Emissions
Fugitive X X X X
Emissions
Solid Waste X X X X X X
Disposal
Product X X X
Storage/
Handling
Spills & Leaks X X X X X X
Shutdown/ X
Startup
Equipment X X
Failures
Plant X X X X X X X X X
Operations
Transport of X X X
Workers
Movement of X X X
Vehicles
Activities
Air Noise & Water Land Infrastr Servi Environ Housing Terrestrial Socioec
Quality Odour Quality Environ ucture ces mental Ecology/ onomic
ment Hazard Land use Status
Water 0 0 1 0 2 2 0 0 0 1
Requirement
Effluent 0 0 1 0 1 2 1 0 0 0
Discharge
Gaseous 2 0 0 0 0 0 2 0 0 0
Emissions
Fugitive 2 0 0 0 1 0 2 0 0 0
Emissions
Solid Waste 1 0 1 2 2 2 2 0 0 0
Disposal
Raw Material 2 2 0 1 2 2 2 0 0 0
Storage/
Transport
Raw Material 2 1 0 1 0 2 1 0 0 0
Handling
Product 1 0 0 1 0 0 1 0 0 0
Storage
Shut down/ 0 0 0 0 0 1 0 0 0 0
Start up
Equipment 0 0 0 0 2 1 0 0 0 0
Failure
Plant 1 1 1 0 1 1 1 1 1 1
Operations
Transport of 2 2 0 0 1 1 0 0 0 0
workers
Movement of 2 2 0 0 1 2 0 0 0 0
Vehicles
Utilities 2 2 2 0 1 1 1 0 0 0
Cumulative 17 10 6 5 14 17 13 1 1 2
score
Total Project Cost for proposed expansion activity is Rs. 4.0 Crores.
M/s. ICONIC PHARMACHEM, has proposed for manufacturing of bulk drugs and bulk drug
Intermediate located at Plot No. 3202, Phase-III,GIDC Estate, Panoli-394 116, Tal:
Ankleshwar, Dist: Bharuch, Gujarat.
Total 1500 m2 land area is available at site; out of this 495 m2 (33.0 %) area is developed as
greenbelt and other forms of greenery.
M/s. ICONIC PHARMACHEM is a newly formed company has project is for manufacturing of
Bulk Drugs and bulk drug intermediate for various categories of the drugs like Anti-
inflammatory , Anti Histamine, Anti Hypertension, Anti-Epileptic, Anti Diabetic etc. The
company will be managed by team of well experienced and qualified personnel are assisting
the promoters in the execution of the day to day affairs of the company.
MISSION
Our aim is to deliver superior long-term tangible, intangible benefits to our customers, our
stakeholders, investors and to the community in which we operate. We accomplish this
through the synergistic approach in remaining viable in the overall global economic context
and keep churning out value for customers, without compromising our core values.
CORE VALUE
Today, we are not among the top FIVE global business houses nor are we any nearer to any
of the top TEN or TWENTY such business houses. However, as the Chinese proverb goes, a
journey of thousand miles begins with a single step and that single step we have taken.
Determined as we are, we have chosen to take that single step on a road map that would
lead us to complete the legendry thousand miles.
To develop and strengthen, our business contacts across the five continents.
To ensure, that we create customers and retain them with abundance of their goodwill.
Risk assessment follows an extensive hazard analysis. It involves the identification and
assessment of risks the neighboring populations are exposed to as a result of hazards
present. This requires a thorough knowledge of failure probability, credible accident
scenario, vulnerability of population etc. Much of this information is difficult to get or
generate. Consequently, the risk assessment is often confined to maximum credible
accident studies. It provides basis for what should be type and capacity of its on-site and off-
site emergency plan also what types of safety measures shall be required.
7.1.3 METHODOLOGY
Quantitative risk assessment (QRA) is a means of making a systematic assessment of the
risks from hazardous activities, and forming a rational evaluation of their significance, in
order to provide input to a decision-making process. The term ‘quantitative risk assessment’
is widely used, but strictly this refers to the purely numerical assessment of risks without
any evaluation of their significance. The study has been conducted based on the premises of
a traditional Quantitative Risk Assessment. The key components of a QRA are explained
below, and illustrated in Figure-7.1 and Figure-7.2.
FIGURE – 7.1
QRA METHODOLOGY
Next Next
Determine Frequency
Estimate Consequence
It is to be noted that for Quantitative Risk Assessment, worst case scenarios has been
considered, though their frequency of occurrence is much lower than the cases of small
leaks.
FIGURE-7.3
LAYOUT OF THE PLANT
Sr. Name of the Maximum Mode of Actual State & Possible type
No. Hazardous Storage Storage Storage Operating of Hazards
Substance pressure &
temperature
1 Methanol 5 MT Drum 200 Liter x NTP Flammable/
25 Toxic
2 Toluene 4 MT Drum 200 Liter x NTP Flammable/
20 Toxic
3 Acetone 3 MT Drum 200 Liter x NTP Flammable/
15 Toxic
4 Hydrochloric 5 MT Drum 250 Liter x NTP Corrosive
Acid 25
5 IPA (Isopropyl 5 MT Drum 250 Liter x NTP Flammable
Alcohol) 25
6 Acetic Acid 5 MT Drum 250 Liter x NTP Toxic
25
7 Sulphuric Acid 5 MT Drum 250 Liter x NTP Corrosive
4
8 Sodium 2 MT Bags 50 kg x 40 NTP Toxic
Hydroxide
9 Potassium 2 MT Bags 50 kg x 40 NTP Toxic
Carbonate
10 Aluminum 2 MT Bags 50 kg x 40 NTP Toxic
Chloride
SR. NAME OF THE POSSIBLE ITS SOURCES ITS EFFECTS ON PLACE OF ITS CONTROL MEASURES PROVIDED
NO. HAZARD OR & PERSONS, PROPERTY EFFECT
EMERGENCY REASONS & ENVIRONMENT
1 BOILER Over pressure in the boiler if Minor/Major Injury Boiler House and Lower & Upper Level Indication System provision. Safety valves
(1) Burning safety valve not working. Loss of human life surrounding places for pressure control fixed temp. & pressure indicator provided.
(2) Physical injury Water level indicator not Loss of property (Loss Blow down & blowing system provided for cleaning tube and
(3) Explosion working. Low water level of Main/ Machine shell. Soft water used. Inter locking provided on pumps, FD fan, ID
indicator fail. High temp. Material) fan. Periodical checking & inspection maintenance done. Yearly
System fails. inspection done by Boiler Inspector
2 ELECTRICITY Loose Contacts, Weak Burning, Shock, Surrounding the Proper Earthing, Periodical Checking of joints, proper insulations
(1) Burning earthling Short Circuit Death accident area of Equipments, etc. Flame proof fitting in solvent storage area,
(2) Fire Improper Insulation bounding and jumpers to all solvent barrier lines provided.
(3) Shock
3 HOUSE KEEPING Bad House keeping Physical / Chemical In all surrounding Proper Handling, regular cleaning, Proper placement of material
(1) Physical Thermal Burn Injury areas i.e. Storage, (RIGHT THING AT THE RIGHT PLACE)
(2) Burning (Major / Minor) Plants
(3) Fire
(4) Chemical Exposure
4 PIPE LINE LEAKAGES Leaking of pipe line due to Physical / Chemical Plant area Proper maintenance, Proper Selection of Material for pipe lines,
Spillages etc. corrosion, Loose contact etc. Thermal Burn Injury Immediate attention, Earthing provided, flame proof fitting, NO
(1) Corrosion (Major / Minor) SMOKING Boards displayed.
(2) Toxic gas release
5 Structural Failure Inside the factory (Corrosion) Injury/Death to Within the factory Automatic operation Periodic Testing of safety valves Regular
persons, damage to Inspection and Maintenance
property
7 Toxic Release from Outside the factory Injury/Death Within & outside Alarm, Evacuation rescue & shelter/ Welfare
outside the unit
7 Natural Calamity Nature Injury / Death to Within & outside Alarm, Evacuation rescue & shelter/ Welfare
persons, damage to the unit
property
SR. NAME OF CHEMICAL HAZARD FLASH BP LEL % UEL SP.GR. VD SOLUBILITY NFPA TLV IDLH LC50 CARCINO ANTIDOTE
0 0
POINT C % 20 C WITH H F R PPM PPM mg/m3 GENIC
0
C WATER at 20 TWA CHARACT
0
C ERISTIC
1. Hydrochloric Acid C/T NF 108 NF NF 1.12 - 1.267 Soluble 3 0 1 5 ppm 50 ppm 1108 ppm No Sodium Hydro-
HCL 1.19 for 1h rat Carbonate (4% Conc.),
Milk, Lime Juice, Milk
of Megnesia
2. Sulfuric acid C - 290 - - 1.84 3.4 -- 3 0 2 1 mg/m3 -- LD50: 2140 No --
mg/kg (rat)
3. Caustic Soda lye C -- 1390 -- -- 2.13 > 1.0 -- 301 2 -- -- No --
mg/m3
4. Liq. Ammonia T 11 -33.34 15 30 0.9 0.597 54 g/100 ml 3 1 0 50 300 2000 Wash with Lactic
CAS No. 7664-41-7 ppm/4-hr Acid, Apply
soframycin
Smelling Ethanol
or Ether
5. Toluene F 4.0 111 1.1 7.1 0.87 3.2 Insoluble 2 3 0 50 500 28.1 No --
CAS # 108-88-3 ppm mg/Ltr for
4 Hrs
6. Methanol F 11 64.5 6 36.5 0.793 1.11 Very soluble 1 3 0 200 - 128.2 No --
CAS No. 67-56-1 ppm/4h
7. Acetic acid C 39 118.1 4 19.9 1.049 2.07 -- -- 15 ppm -- LD 50-3310 No Milk of Magnesia
(rat)
8. Chlorine T - -34.6 - - 1.424 2.5 Reacts 4 0 0 - - 1017 No milk, milk butter
CAS No. 7782-50-5 and milk of
Magnesia.
9. Soda Ash C NA NA NA NA 2.532 NA -- -- NA -- LD 50-4090 No --
mg/kg
10. Acetic Anhydride Flammable 49.0 139.9 49.0 51.0 1.08 3.52 N.A 321 - - (LD50): N.A --
1780
mg/kg
[Rat]
SOLIDS
• Vendor will be asked to provide MSDS to Truck Driver.
• Driver to have concerned Safety Officer’s contact details to contact him in case of
emergency.
• Provide muffler on exhaust while entering truck within premises.
THE MAJOR HAZARDS IN THE M/S. ICONIC PHARMACHEM ARE DESCRIBED BELOW.
• Toxic hazard due to leakage of hazardous chemicals like Ammonia from storage tank.
• Corrosive hazard due to leakage of chemicals like HCl, H2SO4 etc. from storage tank.
• Electrical hazards due to the electrical major equipment/ machinery, operations,
welding, motors, and heavy lift devices, cabling, human intervention (short circuit
possibility), maintenance work (due to machinery breakdown etc.), plant lighting related
electrical hazards.
• Possibility of human injury due to working with mechanical machines, manual handling
etc.
• Possibility of injury during chemicals handled, during operations and due to intoxication.
• Major dropped objects hazard due to large number of physical handling steps /
operations involved with crane/ overhead lifting/ hoisting equipment.
• Fires in any part of the plant working areas – there is a possibility of rapid escalation if it
is not brought under control quickly.
• Possibilities of fire hazards at transformers, switchgear and other electrical equipment
etc.
Operating Parameters
Potential vapour release for the same material depends significantly on the operating
conditions. Especially for any liquefied gas, the operating conditions are very critical to
assess the damage potential. If we take up an example of ammonia, if it is stored at ambient
temperature, say 30oC, and then the vapour release potential of the inventory is much
higher as compared to the case if it is stored at 0oC.
Inventory
Inventory Analysis is commonly used in understanding the relative hazards and short listing
of release scenarios. Inventory plays an important role in regard to the potential hazard.
Larger the inventory of a vessel or a system, larger the quantity of potential release. The
potential vapour release (source strength) depends upon the quantity of liquid release, the
Loss of Containment
Plant inventory can get discharged to Environment due to Loss of Containment. Certain
features of materials to be handled at the plant need to the clearly understood to firstly list
out all significant release cases and then to short list release scenarios for a detailed
examination. Liquid release can be either instantaneous or continuous. Failure of a vessel
leading to an instantaneous outflow assumes the sudden appearance of such a major crack
that practically all of the contents above the crack shall be released in a very short time. The
more likely event is the case of liquid release from a hole in a pipe connected to the vessel.
The flow rate is depending on the size of the hole as well as on the pressure, which was
present, in front of the hole, prior to the accident. Such pressure is basically dependent on
the pressure in the vessel. The vaporisation of released liquid depends on the vapour
pressure and weather conditions. Such consideration and others have been kept in mind
both during the initial listing as well as during the short listing procedure. In the study,
Maximum Credible Loss accident methodology is to be used, therefore, the largest potential
hazard inventories have been considered for consequence estimation.
Consequential effects
* Dispersion of gaseous material in the atmosphere as a function of source strength,
relative density of the gas, weather conditions and topographical situation of the
surrounding area.
* Intensity of heat radiation [in kW/ m2] due to a fire or a BLEVE, as a function of the
distance to the source.
* Energy of vapour cloud explosions [in N/m2], as a function of the distance to the
distance of the exploding cloud.
* Concentration of gaseous material in the atmosphere, due to the dispersion of
evaporated chemical. The latter can be either explosive or toxic.
It may be obvious, that the types of models that must be used in a specific risk study
strongly depend upon the type of material involved:
- Gas, vapour, liquid, solid
- Inflammable, explosive, toxic, toxic combustion products
- Stored at high/low temperatures or pressure
- Controlled outflow (pump capacity) or catastrophic failure?
Heat Radiation
The consequence caused by exposure to heat radiation is a function of:
2
• The radiation energy onto the human body [kW/m ];
• The exposure duration [sec];
• The protection of the skin tissue (clothed or naked body).
• The limits for 1% of the exposed people to be killed due to heat radiation, and for
second-degree burns are given in the table herein:
Since in practical situations, only the own employees will be exposed to heat radiation in
case of a fire, it is reasonable to assume the protection by clothing. It can be assumed that
people would be able to find a cover or a shield against thermal radiation in 10 sec. time.
Furthermore, 100% lethality may be assumed for all people suffering from direct contact
with flames, such as the pool fire, a flash fire or a jet flame. The effects due to relatively
lesser incident radiation intensity are given below.
Explosion
In case of vapour cloud explosion, two physical effects may occur:
* A flash fire over the whole length of the explosive gas cloud;
* A blast wave, with typical peak overpressures circular around ignition source.
As explained above, 100% lethality is assumed for all people who are present within the
cloud proper.
From this it may be concluded that p = 0.17 E+5 pa corresponds approximately with 1%
lethality. Furthermore it is assumed that everyone inside an area in which the peak
overpressure is greater than 0.17 E+ 5 pa will be wounded by mechanical damage. For the
gas cloud explosion this will be inside a circle with the ignition source as its centre.
Intoxication
The consequences from inhalation of a toxic vapour/gas are determined by the toxic dose.
This dose D is basically determined by:
- Concentration of the vapour in air;
- Exposure duration.
Furthermore, of course, the breathing rates of the victim, as well as the specific toxic
mechanism unto the metabolism play an important role.
n
The dose is defined as D = C .t, with:
C = concentration of the toxic vapour, in [ppm] or [mg/m3];
t = exposure duration, in [sec] or [min];
n = exponent, mostly > 1.0; this exponent takes into account the fact that a high
concentration over a short period results in more serious injury than a low
concentration over a relatively longer period of exposure. The value of n
should be greater than zero but less than 5.
The given definition for D only holds if the concentration is more or less constant over the
exposure time; this may be the case for a (semi) continuous source. In case of an
instantaneous source, the concentration varies with time; the dose D must be calculated
with an integral equation:
D = ∫ Cn.dt
For a number of toxic materials, so-called Vulnerability Models (V.M.) has been developed.
The general equation for a V.M. (probit function) is:
Pr = a + b.ln (Cn.t), with
The Maximum Credible Loss (MCL) scenarios have been developed for the Facility. The MCL
cases considered, attempt to include the worst “Credible” incidents - what constitutes a
credible incident is always subjective. Nevertheless, guidelines have evolved over the years
DISPERSION
The dispersion models within Phast are able to model the following phenomena
• Dispersion of gas, liquid and two-phase releases
• Liquid droplet thermo dynamics calculations and liquid droplet rainout
• Pool spreading and vaporization
• Building wake dispersion effects for vapour releases
FLAMMABLE EFFECTS
For releases of flammable material Phast calculates
• Radiation profiles and contours from a range of fire scenarios including pool fires,
flash fires, jet fires and fire balls, including cross-wind effects on a jet fire
• Vapour Cloud Explosion modeling using industry standards models including the
TNO Multi-energy, Baker Strehlow Tang and TNT Equivalence models
• Overpressure contours from Boiling Liquid Expanding Vapour Explosions
TOXIC EFFECTS
• Graphs of toxic concentration profile
• Indoor and outdoor toxic dose prediction
PHAST RISK
Phast Risk allows you to combine the flammable and toxic consequences from each
scenario in your QRA model with their likelihood to quantify the risk of fatalities. Phast Risk
allows you to take account of local population distribution, sources of ignition, land usage
and local prevailing weather conditions. It is designed to perform all the analysis, data
handling and results presentation elements of a QRA within a structured framework.
Phast Risk allows you to quickly identify major risk contributors so that time and efforts can
be directed to mitigating these highest risk activities. Based on effects calculations and
population vulnerabilities, Phast Risk can integrate over all scenarios and weather
conditions to estimate the total risk. The established individual and societal risk indicators
are predicted by Phast Risk across your facility and surrounding area using the classical QRA
methodology. Risk ranking reports can be produced at points of strategic importance to
show the relative influence of the various failure scenarios and their contribution to both
the individual and societal risk metrics.
A key benefit of Phast Risk is the ability to identify major risk contributors and differentiate
these from incidents with worst case consequences which might otherwise dominate the
safety reviews. Whilst medium scale incidents have lesser consequences, they may have a
higher frequency, which, when combined with their hazardous effects, generate a higher
level of risk. Time and effort directed to mitigating high consequence but often low
frequency events may not be well spent. Phast Risk helps you direct this effort more
effectively.
Phast Risk also provides facilities to help you manage large quantities of input data,
including scenarios, parameters, wind roses, ignition and population, and combine these in
many ways. This is critical when looking at sensitivity analyses and assessing the merits of a
range of risk reduction measures.
7.3 TRANSPORTATION
• Road tanker unloading procedure will be in place and will be implemented for safe
unloading of road tanker.
• Static earthing provision will be made for tanker unloading.
• Earthed Flexible Steel hose will be used for solvent unloading from the road tanker.
• Fixed pipelines with pumps will be provided for solvent transfer up to Day
tanks/reactors.
• Provision for adequate water capacity to supply fire protection systems and critical
process water;
• Isolate people from load carrying/mechanical handling systems, vehicle traffic and
storage and stacks locations;
LEVEL - 1:
The leakage or emergency, which is confinable within the plant, premises. It may be due to -
a) Small fire in the plant
b) Low toxic gas release for short duration.
c) Collapsing of equipment that do not affect out side premises.
LEVEL - 3:
The emergency, which is not confinable within the factory premises and general public in
the vicinity likely to be affected. It may arise due to -
a) Explosion of high magnitude affecting the adjacent area
b) Heavy / Profuse leakage of toxic / flammable gases for a long duration.
13. Nominate a person from advisory team, to maintain chronological log of event
during the entire period of emergency.
• Instruct upstream/down stream units to take emergency shut down /cutting off
supply and other appropriate actions and emergency evacuation help etc.
• Direct for search of casualties.
• Evacuate non-essential workers/visitors/contractors to safe assembly points.
• Brief site main controller and keep him informed about the developments.
The Shift Engineer of non-affected Plant will act as SMC till arrival of the designated SMC at
Emergency Control Centre (ECC). Until the arrival of SMC, he may have to execute following
responsibilities.
• As soon as he received the information or comes to know about the incident, he
shall proceed to Emergency Control Room (Control Room) and shall take charge of
the incident. If Control Room gets affected due to unfavorable wind direction, Fire
Control Room shall be used as alternate Emergency Control Room.
• He has overall responsibility for directing emergency action, operation and calling
outside help.
• He shall ensure that all the Key Personnel are called.
• He shall assess the gravity of situation with the help of Incident Controller (IC), Plant
Manager and Key Personnel and after quickly assess the situation, shall find out the
of emergency from Incident Controller (l C), and declare the emergency.
• Level-l: Emergency - may be handled within the plant premises.
• Level-2: Emergency - On Site Emergency plant shag be activated.
• Level-3: Emergency - Action to be taken to operate Off-Site Emergency Plan.
• He shed direct all emergency operations within the affected area with the following
priorities.
• Personnel safety, including of surrounding community.
• Minimum damage to Plant, Property and Environment.
• Appropriate actions to minimize loss of Production and Material.
• He shall direct for evacuation of plant and areas likely to be affected by the
emergency.
1. On hearing fire alarm, emergency siren they shall immediately report to control room
and proceed to the scene of emergency and work under the direction of IC/ Dy IC.
2. The personal availability at the scene of incident to be made optimize.
The alarm sound informs the I.C and the S.M.C that an emergency has been created and
emergency organization is to be activated. The I.C. rushes to the site and takes charge of the
scene.
7.7.2 DECLARING THE MAJOR EMERGENCY
Major emergency has to be declared after sufficient and through check because the
declaration of major emergency puts many agencies on action and it may disturb the
running system, which may be Costly at, time or its Consequence may be Serious. Therefore
major emergency must not be decided on whims or immature judgment or without proper
Mock drills shall be regularly conducted in our unit by our Emergency Control Organization
and the findings are compiled to analyze whether employees are familiarized with the
emergency control procedures and what sort of training is required to be given.
Control action –
1. Any one who notices the release shall sound emergency alarm.
2. SMC/IC who is at site, shall immediately rush to the scene and assess the situation.
For toxic release from a reactor, he activates the on-site plan as -
• He evacuates all the persons to safe assembly point.
• He calls in DIC (if DIC is not present there) and asks essential workers to wear self-
breathing apparatus and if the reaction is exothermic, start cooling water flow in the
reactor jacket and cool the reactor as soon as possible.
7.8.12 REHABILITATION
In case of Toxic release or chemical spillage, Senior Fire Brigade Officer would ensure that
the incident area shall be safe and cleaned up of all mess. Then only, he would allow people
to re-enter the location.
In case of fire, the Senior Fire-Brigade Officer shall ensure that the area is cooled down and
there are no chances of re-ignition. IC shall arrange for clean-up of the area and then only
people shall be allowed to re-enter the area for work.
Even when all clear has been given, great care shall be taken when re-entering affected
areas and no work in connection with the salvage, collection of evidence or start up shall be
taken up until a thorough examination of the area has been carried out. The statutory
powers of the Factory Inspector shall be kept in mind before any evidence is disturbed.
Particular care shall be taken to avoid the introduction of possible sources of ignition, such
as diesel engines, hand or power operated tools, flame cutting equipment, etc. until it has
been established that no flammable materials are present where they could be ignited.
The industrial planner, therefore, has to properly plan and take steps to minimize the
impacts of industrialization and to ensure appropriate occupational health and safety
including fire plans. All these activities again may be classified under construction and
erection, and operation and maintenance.
(2) No person shall be employed for the first time without a certificate of granted by the
Factory Medical Officer.
7.10.1.8 EMP FOR THE OCCUPATIONAL SAFETY & HEALTH HAZARDS SO THAT SUCH
EXPOSURE CAN BE KEPT WITHIN PERMISSIBLE EXPOSURE LEVEL (PEL)/THRESHOLD
LEVEL VALUE (TLV) SO AS TO PROTECT HEALTH OF WORKERS
4. The proposed EMP will also include measure to keep air-born concentration of
toxic and hazardous chemicals below its PEL and TLV, like…
a. Leak Surveys
b. Separate storage for toxic chemicals
c. Exhaust Ventilation
d. Proper illumination
e. On-line detectors toxic chemicals
f. Close processes to avoid spills and exposures
g. Atomization of process operations to hazards of manual handling of
chemicals
h. Supply of proper PPEs like Air mask, Berating canisters, SCBA sets, On-line
breathing apparatus at the places where there is possibility of presence of
toxic chemicals
i. Decontamination procedure for empty drums and carboys
j. Regular maintenance program for pumps, equipment, instruments handling
toxic and corrosive chemicals
k. Display of warning boards
l. Training to persons handling toxic and corrosive chemicals
5. Workplace Monitoring Plan
• It is proposed that a Workplace Monitoring Plan to be prepared & implemented in
consultation with FMO and industrial hygienists.
• Each workplace must be evaluated to identify potential hazards from toxic
substances or harmful physical agents. Air-borne concentration of toxic chemicals
will be measured and record will be kept.
• The current state-of-the-art exposure measurement model is as follows: For
purposes of measuring worker exposure across a single shift it is sufficient to place a
reasonably accurate exposure measuring device on the worker , within t he worker ’s
breathing zone, and have it operate for nearly the full shift. Client has been proposed
to study the exposure data when the plant is operative.
2. Workers will be checked for physical fitness with special reference to the possible
health hazards likely to be present where he/she is being expected to work before
being employed for that purpose. Basic examinations like Liver Function tests, chest
x ray, Audiometry, Spirometry Vision testing (Far & Near vision, color vision and any
other ocular defect) ECG, etc. will be carried out. However, the parameters and
frequency of such examination will be decided in consultation with Factory Medical
Officer and Industrial Hygienists.
3. While in work, all the workers will be periodically examined for the health with
specific reference to the hazards which they are likely to be exposed to during work.
Health evaluation will be carried out considering the bodily functions likely to be
affected during work. The parameters and frequency of such examination will be
decided in consultation with Factory Medical Officer and Industrial Hygienists. Plan
of monthly and yearly report of the health status of workers with special reference to
Occupational Health and Safety.
1. Chest X-ray
2. Cardiogram
3. Audiometry
4. Hematological Examination:- CBC, SGOT, SGPT, Cholesterol, Blood Sugar etc
5. Urine Examination
6. Vision test
7. Colour blindness test
8. Lung function test- Spirometry
• Spread of fire in horizontal direction would be checked by providing fire stops for
cable shafts;
• Reliable and dependable type of fire detection system with proper zoning and
interlocks for alarms are effective protection methods for conveyor galleries;
• Housekeeping of high standard helps in eliminating the causes of fire and regular fire
watching system strengthens fire prevention and fire fighting; and
Training shall be given to regular employees and contract personnel also. Effective and latest
teaching aids will be used to train workers and supervisory staff. Such training courses shall
be conducted once in a year and co-ordination with offsite personnel shall be sought during
such training. Records will be maintained for training.
M/s. Iconic Pharmachem shall carry out the regular monitoring in future as well as ensure
that pollution is limited below prescribed limits and shall take corrective action by providing
new pollution control equipment if required. In case the monitored results of environment
pollution are found to exceed the prescribed limits, remedial actions are taken through the
concerned plant authorities. The actual operation and maintenance of pollution control
equipment of each department is under respective department heads.
The environmental department shall also look after preparation and submission of Water
Cess Return, Environmental statement and Consolidated Consent & Authorization
application/ renewal under water (Prevention and Control of Pollution) Act, 1974, Air
(Prevention and Control of Pollution) Act, 1981, Ambient Air Quality as per NAAQS Standards,
2009 and Hazardous & Other Wastes (Management and Transboundary Movement) Rules,
2016 under Environment Protection Act, 1986.
The Environment Management plan is meant for mitigation/ management of the adverse
impacts and the strengthening positive impacts during proposed project. Environment
Management Plan is tabulated in Table:-7.1
• Sanitation
The site should be provided with adequate and suitable sanitary facilities to maintain proper
standard of hygiene for construction workers. These facilities should include water supply,
sanitary toilets, rest room, etc.
• Noise Environment
Noise effect on the nearly habitation during construction activities will be negligible as the
nearest habitat is more than 4 km from the plant. However, construction labor would be
provided with noise protection devises like ear muffs and occupational safety ware, as per
requirement. And noise generating equipment shall be stopped during night hours.
TABLE - 8.1
Construction Phase
• The drinking water and sanitation facilities at the project site shall be available to the
construction work force. This is necessary to reduce pollution of any receiving water body
and also to prevent hazards due to water borne vectors.
Operation Phase
Total water requirement will be 30.0 KL/Day which will be met through GIDC water supply.
The wastewater generation will be 17.5 KL/Day. The industrial effluent (15.7 KL/Day) will be
sent to Common MEE of M/s. ACPTCL, Ankleshwar
Domestic waste water (1.8 KL/Day) will be disposed by septic tank & soak pit.
Adequate spares for effluent collection, handling treatment and disposal system should be
maintained.
The baseline ambient air quality monitoring is carried out during study period (March, 2017 to
May, 2017) around Project site (within the study area), clearly reveals that the concentrations
of PM10, PM2.5, SO2, NOX, O3, Pb, CO, NH3, C6H6, Benzo (a) Pyrene (BaP), Arsenic (As), Nickel
(Ni), HCl & VOCs are well within the prescribed limits as per the National Ambient Air Quality
Standards for residential & Industrial.
• The major sources of air emission from the proposed project are:
1. Non point sources emissions
2. Point source emissions
3. Fugitive emissions
8.4.3.1 ACTION PLAN TO CONTROL AMBIENT AIR QUALITY AS PER NAAQES STANDARDS:
Construction Phase (Non point sources emissions)
Generation of suspended particulate matter is a common phenomenon due to transportation
of constructions materials. This would be mitigated by allowing the vehicles entering the
premises under cover. Emission of fugitive dust due to movement of heavy vehicles etc. shall
be controlled by spraying water in the affected zone. Hosing down the wheels of the vehicles
with water and providing washing troughs for them would further mitigate the amount of
dust generated. In addition, emission of other pollutants from construction machinery using
diesel driven prime movers, will be controlled by proper maintenance.
Operation Phase (Point sources emissions)
In-plant Control Measures: Some of the mitigation measures, which can reduce the impact on
air environment, are as follows:
• Ensuring the operations of various process units as per specified operating guidelines/
operating manuals.
• Strict adherence to maintenance schedule including lubrication for various machinery/
equipment.
Fugitive emissions will be expected to be generated during construction and operation stages
of the proposed project. During construction stage, main source of fugitive emission will be
dust which is expected mainly due to movement of vehicles carrying construction material
and vehicles used for construction. During operation stage, leakage through valves, pumps,
emission from open drum containing chemicals, open feeding; storage tanks, etc. will be the
major sources of fugitive emissions of organic chemicals and VOCs. Adequate dust collector
will be installed for control of fugitive emission during loading of raw material and product.
Condensers will be provided to trap VOC. All the Flange joints of the pipe lines which carry
solvents will be covered with flange guards. All the rotating equipments like pumps will be
installed with Mechanical Seals to arrest any sort of emissions. VOC detectors will be installed
at various places to identify any fugitive emissions. Proper gland packing will be always
maintained for pumps and valves and to the extent possible pumps will be with mechanical
However, due to the attenuation of noise level within the factory and due to the fact that the
project site is situated in a well developed industrial estate and not in the immediate vicinity
of human settlement, significant impact is not expected in the nearest present human
settlement. The volume of transport vehicles to be handled is very low. The company shall
1. Total PV Module 5 Kw
A) Natural Resource Management – The main focus of this program will be to maximize the
yield returns of the farmers through efficient management of existing resources & extension
of new agricultural practices.
1) Integrated Agricultural Growth Project – For improvement and use of the modern
techniques and thereby would certainly contribute to prosperity in the agriculture
sector and reduce the rural poverty by programs like Farmers Training, Nursery
Growing Trainings, Modern agriculture equipment distribution programs etc.
2) Animal Husbandry Projects – Various programs like health checkups & treatment,
vaccination program, Anti sterility camps, breed improvement etc. will be carried out.
B) Income Generation Program -
1) Establishment of Self help groups
2) Rural Entrepreneurship Development Program
3) Handcrafts Development Program
4) Vocational Training
5) Business process outsourcing
C) Health, Education & Infrastructure
1) Aids Awareness Program
2) General Health Camps
3) Innovative Teaching Methods
4) Adult Education
5) Sanitation
6) Infrastructure Development Projects
TABLE 8.2 FUND FOR CSR ACTIVITIES
CSR Activities Year Fund (Rs.)
2018-2019
Kosamdi Village :Scholarship of 02 2018-2019 1,00,000
students
Kosamdi Village :Books and uniform 2018-2019 1,00,000
distribution to School student
2019-2020
• All the solvents shall be directly distilled from high COD effluent with the help of
Solvent Stripper and Distillation.
• Pure solvent, crude solvent and distilled (recovered) solvent shall be stored only in
storage tanks.
• Wherever required, the solvents shall be directly pumped into day tanks from the
storage tanks and shall be charged into the reactors without involving any manual
handling.
• All the pumps shall be mechanical seal type to avoid any leakage of solvent.
• All necessary fire fighting systems shall be provided with alarm system. Flame proof
wiring and flame proof electrical accessories shall be provided to avoid any mishap.
• All the storage tank and day tank shall be connected to a vent system through cooling
water and chilled brine condensers to prevent loss of solvents in the atmosphere.
• All the distillation column vents are also connected to cooling water/ chilled brine
condensers for maximum possible recovery of the solvents.
• All the vents will be connected to a common carbon Adsorber for removing traces of
solvent from vent gases.
• Coolant to be used
FIG.8.2
The solvent distillation system shall be designed so as to achieve minimum 96.00 % recovery
of solvent.
Two condenser will install with cooling water and chilled brine to recover the solvent.
Primary Condenser HE-01: Cooling Tower water or Chilled water (at 10 0C) will be used to
condense the solvents depend on the vapor pressure at its operating conditions and the non
condensed vapors will be condensed in a Secondary Condenser
VOC Trap Condenser HE-02: Chilled Brine at -5 0C will be used to trap any traces of Solvent
which is slipped from Secondary condenser
In order to prevent leakage from Pump, Seals, Valves etc, preventive maintenance shall be
carried out periodically as per plan. Regular maintenance of valves, pumps, flanges, joints and
other equipment will be done to prevent leakages and thus minimizing the fugitive emissions
of VOCs.
Environment
Their respect for the environment is reflected in their commitment & common objectives for
continuous efforts by ensuring environmentally sound practices followed at all levels. They not
only adhere to the statutory norms but have a holistic approach towards environmental
protection. The major environmental issues addressed are:
o Proposed manufacturing processes are studied in detail with a view to minimize
generation of liquid/gaseous waste streams as a part of continuous improvement.
o Company will be not aimed at just pollution minimization but also to conserve energy,
improve process yields and product quality.
o Company will use natural gas/Diesel/FO in boiler and THF as a fuel.
o No Additional effluent will generate for expansion project, so environment cost is not
required more.
o No additional Flue gas emission (Stack) require for expansion project, so environment
cost is not required more
CHEPTER-10
EXECUTIVE SUMMARY & CONCLUSION
10.1 Subject
Panoli site – Strengthening the Synthetic Organic Chemicals business – Dyes intermediates -
Located in the largest chemicals industrial parks in India (in the state of Gujarat).
Iconic Pharmachem has embraced the goals of the chemical industry’s voluntary
“Responsible Care Initiative.
The minimum concentration of SPM (118.5 µg/m3), PM10 (75.36 µg/m3), PM2.5 (43.98 µg/m3),
SO2 (16.87 µg/m3), minimum concentration of NOx (19.03 µg/m3), minimum concentration
of O3 (10.46 µg/m3), minimum concentration of CO (1.20 µg/m3), minimum concentration of
VOC (0.3 ppm), was recorded in study area.
The PM10 and PM2.5 concentrations at all the AAQM locations were primarily caused by local
phenomena including industrial & vehicular activities and natural dust getting air borne due
to manmade activities and blowing wind. PM10 and PM2.5 concentrations were observed
below stipulated standards of CPCB for Industrial, Residential, Rural and Other Area at all air
quality monitoring locations during the monitoring period.
WATER ENVIRONMENT
BASELINE GROUND WATER QUALITY
pH of ground water samples varied from 7.15 to 8.02. Turbidity was found 0.06 to 0.70 NTU,
Total Dissolved Solids varied in the range of 576.0 to 2536.0 mg/L. DO and COD are found in
range of 4.60 to 6.67 mg/L, and 2.64 to 21.84 mg/L respectively. BOD3 was found to be BDL.
Total Hardness (as CaCO3) varied from 178.7 to 909.2 mg/L. Total Alkalinity varied from
178.2 to 628.7 mg/L. Chlorides and Sulfates are found in the range of 157.4 to 768.7 mg/L
and 45.32 to 542.8 mg/L respectively.
NOISE ENVIRONMENT
The objective of the noise pollution survey around the project site was to identify existing
noise sources and to measure background noise levels. The study was carried out in the
following steps:
Reconnaissance
• Identification of noise sources and measurement of noise levels
• Measurement of noise levels due to transportation
• Community noise levels
LAND ENVIRONMENT
Soil quality monitoring has been carried during pre-monsoon season at nine locations.
BASELINE STATUS
The porosity of soils varied from 37.29% to 58.07% and can be considered as moderate to
good for air and water movement in the soil. The Water Holding Capacity varied from
58.56% to 98.64%. Bulk Density varied from 1.11 to 1.25 g/cm3. The moisture content varied
from 3.86% to 15.33%.pH varied from 7.12 to 8.16. Calcium varied from 40.24 to 266.0
mg/kg. Total Hardness varied from 175.7 to 766 mg/kg. Magnesium varied from 1.35 to
79.04 mg/kg. Total Phosphorus varied from 18 to 219.0 mg/kg. Organic Matter varied from
5.78 to 7.46 mg/kg. Nitrate-Nitrogen varied from 0.62 to 15 mg/kg. Total Iron varied from
0.94 to 35.23 mg/kg.
Total water requirement will be 30.0 KL/Day which will be met through GIDC water supply.
The wastewater generation will be 17.5 KL/Day. The industrial effluent (15.7 KL/Day) will be
sent to Common MEE of M/s. ACPTCL, Ankleshwar
Domestic waste water (1.8 KL/Day) will be disposed by septic tank & soak pit.
Sr. Name of the Maximum Mode of Actual State & Possible type
No. Hazardous Storage Storage Storage Operating of Hazards
Substance pressure &
temperature
1 Methanol 5 MT Drum 200 Liter x NTP Flammable/
25 Toxic
2 Toluene 4 MT Drum 200 Liter x NTP Flammable/
20 Toxic
3 Acetone 3 MT Drum 200 Liter x NTP Flammable/
15 Toxic
4 Hydrochloric 5 MT Drum 250 Liter x NTP Corrosive
Acid 25
5 IPA (Isopropyl 5 MT Drum 250 Liter x NTP Flammable
Alcohol) 25
6 Acetic Acid 5 MT Drum 250 Liter x NTP Toxic
25
7 Sulphuric Acid 5 MT Drum 250 Liter x NTP Corrosive
4
8 Sodium 2 MT Bags 50 kg x 40 NTP Toxic
Hydroxide
9 Potassium 2 MT Bags 50 kg x 40 NTP Toxic
Carbonate
10 Aluminum 2 MT Bags 50 kg x 40 NTP Toxic
Chloride
10.11 Capital and recurring cost earmarked for environmental protection measures
Total costs of the project will Rs. 3.0 Crores
10.12 Conclusion
The EIA study of M/s. Iconic Pharmachem has been carried out with respect to the TORs awarded by
MoEFCC, New Delhi. All the impacts likely to have an effect on the environment have been
identified and efficient/adequate mitigation measures have been proposed for the same.
Adequate EMS is proposed & therefore pollution will remain within prescribed limit.
The proposed expansion project will provide quality product at lower cost to the
users.
There should be positive impact on the socio-economic condition of the area in terms
of direct and indirect employment due to the proposed project.
Country will save valuable foreign exchange as import of these products will be
reduced by corresponding amount.
CHAPTER - 11
PROJECT BENEFITS
11.1 BACKGROUND
M/s. ICONIC PHARMACHEM, has proposed for manufacturing of bulk drugs and bulk drug
Intermediate located at Plot No. 3202, Phase-III,GIDC Estate, Panoli-394 116, Tal: Ankleshwar,
Dist: Bharuch, Gujarat.
Total 1500 m2 land area is available at site; out of this 495 m2 (33.0 %) area is developed as
greenbelt and other forms of greenery.
11.2 ENVIRONMENT
Their respect for the environment is reflected in their commitment & common objectives for
continuous efforts by ensuring environmentally sound practices followed at all levels. They not
only adhere to the statutory norms but have a holistic approach towards environmental
protection. The major environmental issues addressed are:
o Proposed manufacturing processes are studied in detail with a view to minimize
generation of liquid/gaseous waste streams as a part of continuous improvement.
o Company will be not aimed at just pollution minimization but also to conserve energy,
improve process yields and product quality.
o Company will use natural gas & Briquettes/Bio Coal in boiler and THF as a fuel.
11.3 EXPORTS
• Country will gain forex through exporting products, an export oriented unit.
• Country will save valuable foreign exchange as import of these products will be reduced by
corresponding amount.
11.4 EMPLOYMENT GENERATION
As project will have considerable employment & trade opportunities with the commencement
of the production activities. This will increase the employment opportunity. Secondary jobs will
also bind to be generated to provide daily needs and services to the work force. This will also
temporarily increase the demand for essential daily utilities in the local market. The manpower
requirement for the proposed project will generate permanent and secondary jobs for the
operation and maintenance of plant. Proposed requirement of manpower is ~20 employees.
The project will benefit the people living in the neighboring villages by giving preference to
them in relation to direct employment associated with the various project activities.
Construction and operation phase of the proposed project will involve a certain number of
laborers. There is a possibility that local people for construction phase as well as a number of
local skilled and unskilled people will be engaged in the employment which will improve the
existing employment scenario of the region.
1) Integrated Agricultural Growth Project – For improvement and use of the modern
techniques and thereby would certainly contribute to prosperity in the agriculture sector
and reduce the rural poverty by programs like Farmers Training, Nursery Growing Trainings,
Modern agriculture equipment distribution programs etc.
2) Income Generation Program
1) Establishment of Self help groups
2) Rural Entrepreneurship Development Program
3) Vocational Training
4) Business process outsourcing
3) Health, Education & Infrastructure
M/s. Iconic Pharmachem 345
Aqua Air Environmental Engineers Pvt. Ltd.
M/S. ICONIC PHARMACHEM
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
NABL LABORATORY
ISO 9001:2008 Certified Company
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. TEL: +91 (261) 2460854/2461241/3987173/3048586 348
403, CENTER POINT, NR. KADIWALA SCHOOL, TELEFAX: +91 (261) 2707273/3987273
RING ROAD, SURAT – 395002 (GUJARAT) EMAIL: aquaair_surat@hotmail.com
WEBSITE: WWW.AQUA-AIR.CO.IN
COMPANY PROFILE
Aqua-Air Environmental Engineers Pvt. Ltd. is a Surat based company; one of the leading and
multidiscipline Environmental Management Consulting firms of the region.
Aqua-Air Environmental Engineers Pvt. Ltd. was founded by Mr. Jayesh S. Patel & Mrs. Archana J. Patel
on May 7, 2008 and Aqua-Air Environmental Engineers Pvt. Ltd. was registered under the companies
Act on May 7, 2008.
Office having 6,756 Sq. Ft. of area covering EC/EIA Department, R & D Centre (Environmental
Laboratory), Consent (CTE/CC&A) Department, ETP/Civil Department and Account Department,
Library, Conference room and Administration Department, etc. with experienced and qualified staff to
render services in the field of Environmental Management of various types of industries.
Aqua-Air Environmental Engineers Pvt. Ltd. has a well-established track record in monitoring legislation
and developing and implementing strategies for organizations that enable them to manage the impact
of environmental issues on their business.
The company has built a reputation for delivering innovative and practical solutions to environment
related business issues. These solutions help our clients to achieve successful business outcomes and
make sustainable environment serving improvements within their business operations.
Aqua-Air Environmental Engineers Pvt. Ltd. started the process for ISO/IEC 17025:2005 Accreditation
by NABL, New Delhi for the Competence Testing & Calibration Laboratories on June 24, 2008 and
submitted the application (Version No. 10) to NABL, New Delhi for ISO/IEC 17025:2005 registration on
October 7, 2008. After final assessment and Non-Conformances resolved and corrective actions taken
against the Non-Conformances, Laboratory Department, Aqua-Air Environmental Engineers Pvt. Ltd.
was accredited with the certification of ISO/IEC 17025:2005 on Oct. 15, 2010 and was valid up to Oct.
14, 2012. Re-accreditation of ISO/IEC 17025:2005 was received on June 5, 2013 and was valid up to
June 4, 2015. Re- accreditation of ISO/IEC 17025:2005 was received on Jan. 6, 2016 and was valid up to
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. TEL: +91 (261) 2460854/2461241/3987173/3048586 349
403, CENTER POINT, NR. KADIWALA SCHOOL, TELEFAX: +91 (261) 2707273/3987273
RING ROAD, SURAT – 395002 (GUJARAT) EMAIL: aquaair_surat@hotmail.com
WEBSITE: WWW.AQUA-AIR.CO.IN
Jan. 5, 2018. Re- accreditation of ISO/IEC 17025:2005 was received on May 28, 2018 and is valid up to
May 27, 2020.
Aqua-Air Environmental Engineers Pvt. Ltd. started the process for ISO 9001:2008 registration for
Quality Management System on December 1, 2009 and submitted the application for ISO 9001:2008
registration on March 4, 2010. After final assessment, Aqua-Air Environmental Engineers Pvt. Ltd. was
certified from ANAB by M/s. Intertek System Certification on May 4, 2010 and it was valid up to May 4,
2013. We were re-certified on May 4, 2013 and it was valid up to May 4, 2016. We were re-certified on
May 30, 2016 and it was valid up to Sept. 14, 2018.
Aqua-Air Environmental Engineers Pvt. Ltd. started the process for “EIA Consultant Organization”
accreditation under National Accreditation Board for Education And Training (NABET)/Quality Council
of India (QCI), New Delhi on January 7, 2010 and submitted the application (Rev. 06) for “EIA
Consultant Organization” accreditation under NABET, New Delhi on April 8, 2010. Office assessment
was done by external NABET/QCI auditors [Dr. L. Ramakrishnan & Mr. A. K. Gupta (B.Sc. Mechanical
Engg.)] on Feb. 3 & 4, 2011. NABET/QCI closed the application of Aqua-Air Environmental Engineers
Pvt. Ltd. on March 15, 2011. Aqua-Air Environmental Engineers Pvt. Ltd. filed SCA in Hon’ble High Court
of Gujarat against MoEF, QCI & NABET, New Delhi on April 13, 2012. Hon’ble High Court of Gujarat
issued stay order against operation of all OMs (related to NABET/QCI Scheme) of MoEF, New Delhi for
the company on Jan. 24, 2013. MoEFCC, New Delhi published Notification regarding mandatory
implementation accreditation scheme of NABET/QCI on March 3, 2016. Aqua-Air Environmental
Engineers P. Ltd. along with 11 EIA Consultants of Gujarat filed SCA No. 5312 of 2016 in Hon'ble High
Court of Gujarat. Hon'ble High Court of Gujarat gave Stay Order on Apr. 5, 2016 against
implementation of Notification dated March 3, 2016 of MoEFCC, New Delhi till further orders.
Aqua-Air Environmental Engineers Pvt. Ltd. received the Certificate of Registration of Trade Mark,
Section 23 (2), Rule 62 (1) from Trade Marks Registry, Govt. of India on January 18, 2011.
The company’s work is spread all over Gujarat in India & Oman. Company have already prepared 382
Form-1, 283 EIA & EMP reports, 265 Risk Assessment & DMP reports, conducted 84 Public Hearings
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. TEL: +91 (261) 2460854/2461241/3987173/3048586 350
403, CENTER POINT, NR. KADIWALA SCHOOL, TELEFAX: +91 (261) 2707273/3987273
RING ROAD, SURAT – 395002 (GUJARAT) EMAIL: aquaair_surat@hotmail.com
WEBSITE: WWW.AQUA-AIR.CO.IN
and obtained 245 Environmental Clearances so far that includes Water related Projects / Pesticide
Industry Projects / Textile Industry Projects / Sugar Industry Projects / Chemical Industries / Specialty
Chemical Industry Projects / Bulk Drug (API) Industry Projects / Chemical Fertilizer Industry Projects /
Cement Plants / Thermal Power Plants / Mining Projects / Infrastructure Projects / Construction
Projects / Distilleries / Petrochemical Industry Projects/ SEZ Projects/ CRZ Projects, etc.
Company's NABL Accredited Testing Laboratory has conducted Environmental Monitoring & Analysis
with Environmental Institute and Gujarat Pollution Control Board in Industrial Estates of Ankleshwar,
Panoli & Jhagadia. Company is also doing Turnkey/Consulting Projects for M/s. BASF (Detail
Engineering for Effluent Treatment Plant) & M/s. Reva Proteins Ltd. (Design of Effluent Treatment
Plant, supply of mechanical items, Commissioning and operation of Effluent Treatment Plant).
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. TEL: +91 (261) 2460854/2461241/3987173/3048586 351
403, CENTER POINT, NR. KADIWALA SCHOOL, TELEFAX: +91 (261) 2707273/3987273
RING ROAD, SURAT – 395002 (GUJARAT) EMAIL: aquaair_surat@hotmail.com
WEBSITE: WWW.AQUA-AIR.CO.IN
2. ABOUT US
Aqua-Air Environmental Engineers Pvt. Ltd. has registered office in one of the top five fastest growing
cities of India – Surat. We are one of the most trusted and reliable environmental and engineering
consultancy service providers. With complete hold in the related domain and proficiency, we execute
our work all over Gujarat region.
In addition to engineering consultancy, we also execute turnkey projects for effluent treatment plants
at the client's site.
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. TEL: +91 (261) 2460854/2461241/3987173/3048586 352
403, CENTER POINT, NR. KADIWALA SCHOOL, TELEFAX: +91 (261) 2707273/3987273
RING ROAD, SURAT – 395002 (GUJARAT) EMAIL: aquaair_surat@hotmail.com
WEBSITE: WWW.AQUA-AIR.CO.IN
3. ACHIEVEMENTS
1. Registered under the companies Act on May 7, 2008.
2. Gujarat Pollution Control Board Recognized Schedule – II Environmental Auditor on Dec. 24,
2008.
3. Certificate of ISO 9001:2008 received on May 4, 2010. Import Export Licence received from
Government of India on May 31, 2010.
4. Solvency Certificate of Rs. 1,40,00,000/- received from Bank of India, Gopipura branch, Surat on
Sept. 3, 2010.
5. Certificate of National Accreditation Board for Testing and Calibration Laboratories (NABL)
received on Oct. 15, 2010.
6. Certificate of Registration of Trade Mark, Section 23 (2), Rule 62 (1) from Trade Marks Registry,
Govt. of India on Jan. 18, 2011.
7. Certificate of Authorization as dealer in India received from Spectrum Technologies, Inc., USA
on May 1, 2011.
8. Gujarat Pollution Control Board Recognized Schedule – II Environmental Auditor on May 04,
2011.
9. Certificate of ISO 9001:2008 received on April 01, 2013. (Reassessment). And Certificate is valid
upto May 04, 2016.
10. Certificate of National Accreditation Board for Testing and Calibration Laboratories (NABL)
received on June 05, 2013. (Reassessment). And Certificate of NABL is valid upto June 04,2015
11. Gujarat Pollution Control Board Recognized Schedule – II Environmental Auditor on January 4,
2014. (Reassessment). And Certificate of Gujarat Pollution Control Board Recognized Schedule –
II Environmental Auditor is valid upto January 17, 2017.
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. TEL: +91 (261) 2460854/2461241/3987173/3048586 353
403, CENTER POINT, NR. KADIWALA SCHOOL, TELEFAX: +91 (261) 2707273/3987273
RING ROAD, SURAT – 395002 (GUJARAT) EMAIL: aquaair_surat@hotmail.com
WEBSITE: WWW.AQUA-AIR.CO.IN
4. SERVICE PROVIDE
M/s. AQUA-AIR ENVIRONMENTAL ENGINEERS PVT. LTD. offers following specialized services in
Environmental Engineering, Water Supply Engineering and Civil Engineering.
4.1 TURN KEY/BOOT/BOO PROJECTS
Construction of
4.2 CONSULTING
4.2.1 ENVIRONMENTAL ENGINEERING
1. Complete study of the Pollution Problem in industries from wastes generation to disposal and
providing necessary technical knowledge like–
How including design Zero Discharge Plants (ZDPs)
Basic engineering, detailed engineering Recycling plants (RPs) for reuse of water upto
Water Treatment Plants (WTPs) maximum extent
Tender preparation for Effluent Treatment Incineration System Plants (ISPs) for various non-
Plants (ETPs) for industrial wastewater biodegradable or toxic industrial wastes on
Consulting basis
Sewage Treatment Plants (STPs) for residential Design of Hazardous waste Storage area and
wastewater Consultancy Services for Secured/ Sanitary Landfill
Facilities
Common Effluent Treatment Plants (CETPs) for Design and Consultancy Services for Bio – Medical
more than two industries Waste Treatment Facilities.
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. TEL: +91 (261) 2460854/2461241/3987173/3048586 354
403, CENTER POINT, NR. KADIWALA SCHOOL, TELEFAX: +91 (261) 2707273/3987273
RING ROAD, SURAT – 395002 (GUJARAT) EMAIL: aquaair_surat@hotmail.com
WEBSITE: WWW.AQUA-AIR.CO.IN
2. Water Supply Distribution System
Analysis Tender preparation
Design
3. Laboratory Analysis of
Air Waste Water
Water Industrial Effluent
Sewage Industrial Sludge
4. Process Study
Reduce the pollution at source Reuse / Recycle effluent
6. Environment Management
Environmental Clearance from Environmental Impact Assessment Studies (EIAs)
• MoEF • Short term (Rapid)
• New Delhi or DoEF • Long term (Comprehensive)
• Gandhinagar
Environmental statements Environmental Auditing
15. As per requirements under Factory Act-1948 and Gujarat Factory Rules
Monitoring filling up Form-37
Analysis of Work Area Environment
16. Technical Consultation & assistance to ensure and assure compete Environ-Legal compliance
Liaison with statutory bodies in order to get the Clearance
required permits Consents
M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. TEL: +91 (261) 2460854/2461241/3987173/3048586 356
403, CENTER POINT, NR. KADIWALA SCHOOL, TELEFAX: +91 (261) 2707273/3987273
RING ROAD, SURAT – 395002 (GUJARAT) EMAIL: aquaair_surat@hotmail.com
WEBSITE: WWW.AQUA-AIR.CO.IN
LIST OF ANNEXURES
ANNEXURE TITLE PAGE
NO. NO.
1. National ambient air quality monitoring standards 358
2. CPCB recommendations for community noise exposure 360
3. CPCB standards classification of inland surface water 361
4. Indian standards specifications for drinking water 362
5. Indian standards for industrial and sewage effluents discharge 367
6. Membership of Common Environmental Infrastructure including the 370
CETP, TSDF / Common Hazardous Waste Incineration Facility
(CHWIF), Common MEE, MEE performance details
7. GIDC Plot Allotment Letter 376
8. Water Supply Letter/ No bore well undertaking 379
9. Hon'ble High Court of Gujarat's Stay Order against Notification of 381
MoEFCC, New Delhi dated March 3, 2016
10. Adequacy 385
11. Undertaking of Separate Energy Meter 393
12. Do’s & Don’ts 394
13. Various SOP to be prepare 397
14. Material Safety Data Sheet - CAS No./ RTECS No./DOT/UN etc to be 400
mentioned against each chemicals
357
ANNEXURE - 1
NATIONAL AMBIENT AIR QUALITY STANDARDS (NAAQS) (2009)
358
Sr. Pollutant Time Concentration in Ambient Air
No. Weighted Industrial Ecologically Methods of
Average Residential, Sensitive Area Measurement
Rural and (notified by
Other Area Central
Government)
(1) (2) (3) (4) (5) (6)
9 Benzene (C6H6) Annual* 05 05 • Gas chromatography
µg/m3 based continuous
analyzer
• Absorption and
Desorption followed
by GC analysis
10 Benzo (a) Annual* 01 01 • Solvent extraction
Pyrene (BaP) followed by HPCL/GC
particulate analysis
phase only,
mg/m3
11 Arsenic (AS), Annual* 06 06 • AAS/ICP method after
mg/m3 sampling on EPM
2000 or equivalent
filter paper
12 Nickel (Ni), Annual* 20 20 • AAS/ICP method after
mg/m3 sampling on EPM
2000 or equivalent
filter paper
Note: Whenever and wherever monitoring results on two consecutive days of monitoring
exceed the limits specified above for the respective category, it shall be considered
adequate reason to institute regular or continuous monitoring and further
investigation.
359
ANNEXURE - 2
CPCB RECOMMENDATIONS FOR COMMUNITY NOISE EXPOSURE
Commercial Area 65 55
Residential Area 55 45
Silence Zone 50 40
360
ANNEXURE - 3
CLASSIFICATION OF INLAND SURFACE WATER (CPCB STANDARDS)
*: If the Coliform count is found to be more than the prescribed tolerance limits, the criteria
for coliforms shall be satisfied if not more than 20 percent of samples show more than the
tolerance limits specified, and not more than 5 percent of samples show values more than 4
times the tolerance limit. Further, the feacal coliform should not be more than 20 percent
of the coliform.
361
ANNEXURE - 4
INDIAN STANDARDS/SPECIFICATIONS FOR DRIINKING WATER IS: 10500-1991
362
on domestic
use
363
(as Mn), mg/L ,taste 3025,1964
discoloration of
pipes, fittings
and utensils
will be caused
beyond this
14 Sulphate 200 Beyond this 400 24 of 3025, May be
(as SO4-2), causes 1986 extended
mg/L gastrointestinal upto 400
irritation when provided (as
magnesium or Mg) does not
sodium are exceed 30
present mg/l
364
mg/L water becomes relaxation when
toxic pollution
plumbosolven
cy is
suspected
24 Zinc (as Zn), 5 Beyond this 15 39 of To be tested
mg/L limit it can 3025,1964 when
cause pollution is
astringent suspected
taste and an
opalescence in
water
25 Anionic 0.2 Beyond this 1.0 Methylene To be tested
detergents limit blue extraction when
mg/L undesirable method pollution is
(as MBAS) taste and suspected
odour after
Chlorination
takes place
26 Chromium 0.01 May be 0.05 28 0f 3025 To be tested
(as Cr+6), mg/L carcinogenic when
above this limit pollution is
suspected
27 Polynuclear - May be - 28 of To be tested
aromatic carcinogenic 3025,1964 when
hydrocarbons, pollution is
mg/L suspected
28 Mineral Oil, 0.01 Beyond this 0.03 Gas To be tested
mg/L limit chromatograp when
undesirable hic method pollution is
taste and suspected
odour after
Chlorination
takes place
29 Pesticides Absent Toxic 0.001 58 of 3025, -
mg/L 1964
30 Radioactive
materials
a. Alpha - - 0.1 - -
emitters Bq/L
b. Beta - - 1.0 - -
emitters pci/L
31 Alkalinity 200 Beyond this 600 13 of -
(as CaCO3), limit taste 3025,1964
mg/L becomes
unpleasant
32 Aluminum 0.03 Cumulative 0.2 31 0f -
(as Al), mg/L effect is 3025,1964
reported to
cause
dementia
365
33 Boron (as B), 1 - 5 29 of -
mg/L 3025,1964
366
ANNEXURE - 5
INDIAN STANDARDS FOR INDUSTRIAL AND SEWAGE EFFLUENTS DISCHARGE IS: 2490-1982
SR.
NO. INDUSTRIAL EFFLUENT
PARAMETERS INTO INLAND ON LAND INTO MARINE INTO
SURFACE WATER FOR COASTAL AREA PUBLIC
IRRIGATION SEWERS
1 Colour / odour - - - -
2 Suspended Solids 100 200 100 (for Process 600
(mg/L) Waste)
3 Particle Size Shall pass 850 - Floatable Solids -
Suspended Solids micron IS sieve Max 3 mm
Settable Solids
Max 850 micron
4 Dissolved Solids 2100 2100 - 2100
(Inorganic), mg/L
5 pH Value 5.5-9.0 5.5-9.0 5.5-9.0 5.5-9.0
6 Temperature °C Shall not exceed 40 - 45 at the point -
in any section of of discharge
the stream within
15 mts.
downstream from
the effluent outlet
7 Oil & Grease, mg/L, 10 10 20 20
Max.
8 Total Residual 1 - 1 -
Chlorine, mg/L,
Max
9 Ammonical 50 - 50 50
Nitrogen (as N)
mg/l max
10 Total Kjeldahl 100 - 100 -
Nitrogen (as N),
mg/L, Max
11 Free Ammonia (as 5 - 5 -
NH3) mg/L, Max.
12 Biochemical 30 100 100 350
Oxygen Demand,
5 Days at 20 ° C
13 Chemical Oxygen 250 - 250 -
Demand, mg/L,
Max.
14 Arsenic (as As), 0.2 0.2 0.2 0.2
mg/L, Max.
15 Mercury (as Hg) 0.01 - 0.01 0.01
mg/L
367
16 Lead (as Pb), mg/L, 0.1 - 1.0 1.0
Max
17 Cadmium (as Cd), 2 - 2 1
mg/L, Max
18 Hexavalent 0.1 - 1 2
Chromium (As
Cr+6), mg/L, Max.
19 Total Chromium 2 - 2 2
(as Cr) mg/L, Max
20 Copper (as Cu), 3 - 3 3
mg/L, Max
21 Zinc (as Zn), mg/L, 5 - 15 15
Max.
22 Selenium (as Se), 0.05 - 0.05 0.05
mg/L, Max
23 Nickel (as Ni), 3 - 5 3
mg/L, Max
24 Boron (as B), mg/L, 2 2 - 2
Max
25 Percent Sodium, - 60 60 -
Max
26 Residual Sodium - 50 - -
Carbonate, mg/L,
Max
27 Cyanide (as CN-), 0.2 0.2 0.2 0.2
mg/L, Max
28 Chloride (as Cl-), 1000 600 - 1000
mg/L, Max
29 Fluoride (as F-) 2 - 15 15
mg/L, Max
30 Dissolved 5 - - -
Phosphate (as P),
mg/l, Max
31 Sulphate (as SO4-2) 1000 1000 - 1000
mg/L, Max
32 Sulphide (as S-2) 2 - 5 -
mg/l, Max
33 Phenolic 1 - 5 6
Compounds
(as C6H5OH) Max
34 Radioactive
materials 10-7 10-8 10-7 10-7
a.) Alpha emitters
µc/mL, Max 10-6 10-7 10-6 10-6
b.) Beta emitters
µc/mL, Max
35 Manganese (as 2 2 - 2
368
Mn), mg/L
36 Iron (as Fe), mg/L 3 3 - 3
37 Vanadium (as V), 0.2 - 0.2 0.2
mg/L
38 Nitrate Nitrogen, 18 20 - 0.2
mg/L
369
ANNEXURE - 6
Membership of Common Environmental Infrastructure including the CETP, TSDF /
Common Hazardous Waste Incineration Facility (CHWIF)
370
371
Common Hazardous Waste Incineration Facility (CHWIF) / TSDF
372
MEE performance details
373
Sr. No. Particular Detail
1 Total capacity of the CF Total Granted Capacity is 3.0 MLD. Presently
installed capacity is 1. 4 MLD.
2 Copy of CC&A of the CF We have obtained the CC&A vide letter no.
GPCB/ANK/CCA-1360(2)/ID -32798. Copy of the
same is attached as annexure 1.
3 Actual load at present (Qualitative and Monthly 10,000 KL.
Quantitative – KL per day) Avg. Daily Acceptance: 333.33 KL.
Qualitative: Acceptance Characteristics: Waste
water with parameters above then the acceptance
limit of operative or proposed conventional CETP’s
4 Booked Quantity & Spare Capacity of CF Booked Quantity : 435 KLD
Spare Capacity : 2565 KLD
5 Copies of XGN generated Inspection reports Reports available with GPCB
with analysis reports of the
water/Air/Hazardous samples collected by
GPCB (Last 2 year). Copies of instructions
issued by GPCB in last 2 year and point wise
compliance thereof.
6 Copies of Show- cause notices, closure notices There is no closure issued to the unit, Copy of show
etc. served by the GPCB and its compliance cause notice and their compliance is attached here
with annexure 2.
7 Recommendations and suggestions of the last The 1st Audit report of the plant is under
two Environment Audit reports of CETP and its preparation by M/s. NG Patel Polytechnic, Bardoli as
compliance report per the recommendation of GPCB. As reported by
Auditor report will be completed by October.
8 Common Facility Up gradation scheme, if any Presently not applicable
Status of Compliance to Directions issued by the GPCB vide Show Cause Notices
Issued to M/s. Ankleshwar Cleaner Process Technology Centre Ltd. (ACPTCL)
374
necessary Air pollution Control devices
have also been installed to control
emissions.
375
ANNEXURE -07
GIDC PLOT ALLOTMENT LETTER
376
377
378
ANNEXURE -08
GIDC WATER SUPPLY LETTER/ NO BOREWELL UNDERTAKING
379
NO BOREWELL UNDERTAKING
380
ANNEXURE - 9
HON'BLE HIGH COURT OF GUJARAT'S STAY ORDER AGAINST NOTIFICATION OF MoEFCC,
NEW DELHI DATED MARCH 3, 2016
381
382
383
384
ANNEXURE - 10
ADEQUECY
385
386
387
388
389
390
391
392
ANNEXURE - 11
UNDERTAKING OF SEPARATE ENERGY METER
393
ANNEXURE - 12
Do’s & Don’ts
DO’s and DON’Ts for Safer Operation
Do’s:
• All equipment, vessels, lines where hot work is envisaged shall be purged, flushed
thoroughly and positively isolated. Similar precautions should be taken for vessel
entry also.
• Back flow of materials from sewers, drains should be avoided by proper isolations.
• In case of confined space entry and other cleaning jobs etc. which are to be carried
out by the process department, vessel entry permit should be issued to immediate
supervising officer/operator by shift in charge. This permit should be renewed by
incoming shift in charge during every shift.
• Hoist, Platform, cages used for lifting persons or to send persons inside vessels by
such means must be of sound construction with wire ropes slings, etc. to avoid
failure.
• All steam, condensate, hot water connections should be made tight with clamps.
• All underground sewers shall be flushed, protected from sparks.
394
• Full PPEs like PVC suits, gum boots, face shield & other required shall be used while
draining, flushing and other reclaiming activities to avoid burn, poisoning etc.
• Wet asbestos cloth/metallic plate should be used to collect flying sparks.
• Water, steam flushing, nitrogen blanketing shall be continued where spontaneous
combustion takes place. Precautions should be taken for pyrophoric nature of
material.
• Temporary electrical connections, cords, boards and other electrical fixtures should
be of sound material to prevent electrical shock.
• Proper approach like aluminum ladder should be provided to reach to the platforms
of scaffolding and ladder must be tied.
• All clumps of scaffolding should be tightened properly and planks should be tied at
both ends and supported at proper distances along span to avoid sagging and
failure.
• Always use safety belt while working at height of more than 2 meters and ensure
tieing the life line of safety belt with firm support.
• Ensure area cordoning for hot work, X-ray, excavation, hazard material temporary
storage.
• Ensure proper tagging of valves, switches etc to prevent its use.
• Ensure proper guidance to workman and make him aware about local area hazards
before start of the job.
• All welding machines should be provided with power isolation switch of suitable
rating.
• Portable electrical appliances/tools earthing should be in good working condition.
Insulation portion should be free from damages.
• All electrical cables should be joints free and connection taken by using three pin
plugs.
• While inserting fuse all care should be taken so that no one touches conductor to
avoid the shock to the persons.
• During hydro jetting work workers should wear hand gloves, safety helmet goggles
and PVC suit.
Don’ts:
• The use of Radio Active Source within the plant shall not be allowed without
obtaining valid permission/work permit and intimation in the form of a circular to all
plant persons shall be given in advance.
395
• Sitting or walking on rail tracks, crossing between wagons, taking rest under stabled
wagons, crossing the rail through the openings underneath the stationary wagons
are strictly prohibited.
• Do not use gasket or other blinds as it can fail during job. All blinds should be
metallic.
• No toxic/corrosive/irritating materials should remain plants or sections where hot
work is to be carried out.
• No hot work should be permitted in battery limits near sewers till areas have been
cleaned flushed properly.
• No hot work irrespective of place of area shall be done without valid permit.
• No combustible material shall be there in flare line for taking up of flare line job.
Isolations shall be ensured.
396
ANNEXURE - 13
Details on various SOP to be prepared
Specify safety precautions to be taken for Chemical storage, process, handling &
transportation hazard.
1) Civil &Mechanical design of storage tanks will be approved from chartered engineer.
2) Distance between the tanks will be as per law of Factory inspector rules.
3) Minimum 1.2 wide stairs with landings and pathways with railings will be provided.
4) Toe guards will be provided.
5) All the tanks will be earthed at minimum two places.
6) Fire hydrant system will be laid around the Chemical storage.
7) Onsite emergency plan will be prepared.
8) Periodic safety reports and safety audited by DISH approved agencies as per law.
9) MSDS of chemicals will be displayed.
10) An indicator of material toxicity, flammability will be displayed over the storage tanks.
11) All the manpower will be given periodic trainings by competent personnel
12) All the pipelines for unloading, loading, transportation will be earthed by jumpers.
13) Safe entry and exit plans will be prepared and displayed.
14) PPE will be provided for safe handling.
b) Details on workers training before engaging work, periodical, in-house, outside etc.
397
B) The training calendar will include training for DISH approved persons, first aid etc.
C) Periodic skill matrix evaluation will be made to identify training needs and calendar will
be updated accordingly.
The following SOPs will be prepared for the safe & smooth functioning of operations –
Periodic Safety audit will be conducted as per law through competent person approved by
law. Periodic Compliance report of the same will be submitted to Factory inspector office.
e) Specific safety measures to be taken for general Public living in the vicinity.
398
f) Details on hazard identification i.e. HAZOP, HAZAN, Fault tree analysis, Event tree
analysis, Checklist,Audit etc. to be adopted for the safety operation of the plant.
The Hazop Study will be based on hazard analysis (Hazan) for the logical, systematic
examination of an item, process, condition, facility, or system to identify and analyze the
source, causes, and consequences of potential or real unexpected events which can occur.
The system of Fault tree analysis, Event tree Analysis and their check list will be prepared
and implemented through the recognized safety agency as approved by DISH. The
competent person will be enrolled to visit on regular periodicity and will interact with junior
most level of the plant workers.
Periodic safety audits will be done through the competent agency and the report with
compliance report will be submitted to DISH.
As such there is no gas emission from plant. To control and monitor the volatile organic
content, the VOC meter with Alarm will be provided near all the storage area and operations
areas. The data of the same will be recorded by safety departments and continual
improvement program system will be implemented to make the environment free from VOC
and odor.
399
ANNEXURE - 14
Material Safety Data Sheet - CAS No./ RTECS No./DOT/UN etc to be mentioned against each
chemicals
400