a (assuming that the walls inside the barrel are plastered) 0.009060
b 0.030
MFL 282.820
6 .
282.820
281.500
282.638
279.610
6 .
2
1
3
TEL CALCULATIONS
BED LEVEL
o wrote this small program for TEL CALUCATIONS in UT. All you
required data below(blue in color). Then keep on changing the Depth
he TELs are getting tallied for each section. Mind you the 6th section
dition is submerged. Or else you go for Drowning.exe which is
thor in 'C'. ...ThanQ.
TEL
281.674 281.693 281.744 282.730 282.742
TEL CALCULATIONS
TEL CALCULATIONS
TEL wrt PREVIOUS TEL = PRE.TEL + EDDY LOSS +FRI.LOSS 237.333 -0.001 <------ Difference in TEL
TEL CALCULATIONS
TEL wrt PREVIOUS TEL = PRE.TEL + EDDY LOSS +FRI.LOSS 237.646 0.947 <------ Difference in TEL
18.849
a (assuming that the walls inside the barrel are plastered) 0.003000
b 0.01000
TEL wrt MFL = MFL + VEL HEAD 240.691 #VALUE! <------ Difference in TEL
TEL OBTAINED FROM PREVIOUS CAL.s WITH UNWIN's formula #VALUE! #VALUE!
TEL wrt PREVIOUS TEL = PRE.TEL + EDDY LOSS +FRI.LOSS 240.719 -42.127 <------ Difference in TEL
IF THE CONDITION IS
NOT OF SUBMERGED,
GO FOR MALIKAPUR
GRAPH (DROWNING
.EXE) --------->
TEL CALCULATIONS
IF THE CONDITION IS
NOT OF SUBMERGED,
FLOW CONDITION AT SECTION 6-6 (ie @ DROP) GO FOR MALIKAPUR
GRAPH (DROWNING
DISCHARGE (Q) ( in Cumecs) 67.990 .EXE) --------->
VEL. HEAD = V 2
/ 2g (in mtrs) 0.197
0.5
PERIMETRE (P) = B + 2D(1 + s )2 ( in mtrs) 19.049
6 .
284.510
282.000
240.691
233.065
6 .
2
1
3
TEL CALCULATIONS
BED LEVEL
o wrote this small program for TEL CALUCATIONS in UT. All you
required data below(blue in color). Then keep on changing the Depth
he TELs are getting tallied for each section. Mind you the 6th section
dition is submerged. Or else you go for Drowning.exe which is
thor in 'C'. ...ThanQ.
Difference in TELs
TEL CALCULATIONS
Difference in TELs
TEL CALCULATIONS
Difference in TELs
Difference in TELs
TEL
236.700 237.334 236.700 240.691 282.846 284.707
TEL CALCULATIONS