1. Geographical Features
Population : 35,13,934
Mandals : 64 Nos.
Ayacut
SNo Name of Project Nos
(acres)
I Major Irrigation Projects
a. Priyadarshini Jurala Project 1 102200
b. Rajoli banda diversion scheme 1 87500
Total 2 189700
II Medium Irrigation Projects
a. Koilsagar Project 1 12000
b. Sarala Sagar Project 1 4186
Total 2 16186
III. Minor Irrigation
I&CAD. tanks (above 100 acres ayacut) 679 150624
P.R. tanks (below 100 Acres ayacut) 5374 103073
Total 311703
Total of Completed Schemes (I+II+III) 517589
/conversion/tmp/scratch/457550028.doc
3. Completed projects after 01-04-2004
I. Major Nil
II. Medium Nil
Total ayacut under completed projects upto 03/2009 (2+3) = 517589 Acres
B Ongoing Projects
I Major Irrigation
a. Mahathma Gandi (Kalwakurthy) LI Scheme 1 340000
b. Jawahar (Nettampadu) LI Scheme 1 200000
c. Rajiv (Bheema) LI Scheme 1 203000
d. Koilsagar LIS 1 38250
Total 3 781250
II Medium Irrigation Nil
Total of Ongoing schemes (I +II) 781250
Total Irrigation Potential in the district after completion of the Ongoing Major
and Meidum Irrigation Projects under Jalayagnam
517589 Acres
IP Created under Completed Projects upto 03/2009
IP Contemplated under Ongoing Projects (after
781250 Acres
01.04.2004)
Total IP 1298839 Acres
/conversion/tmp/scratch/457550028.doc
NALGONDA DISTRICT
1. Geographical Features
Population : 32,47,982
Mandals : 59 Nos
/conversion/tmp/scratch/457550028.doc
3. Completed projects after 01-04-2004
I. Major Nil
II. Medium Nil
Total ayacut under completed projects upto 03/2009 (2+3) = 764685 Acres
B Ongoing Projects
I. Major Irrigation
a. AMR Project(SLBC) 1 3,70,000
b. SRSP Stage-II 1 2,57,000
c. Flood Flow Canal 1 30,000
d. JCR – DLIS 1 1,50,000
e. Pranahitha Chevella 1 2,29,832
Total 3 10,36,832
II Medium Irrigation Nil
Total Ongoing Projects (I+II+III) 10,36,832
Total Irrigation Potential in the district after completion of the Ongoing Major
and Meidum Irrigation Projects under Jalayagnam
/conversion/tmp/scratch/457550028.doc
RANGA REDDY DISTRICT
1. Geographical Features
Population : 35,75,064
Mandals : 37 Nos.
/conversion/tmp/scratch/457550028.doc
3. Completed projects after 01-04-2004
I. Major Nil
II. Medium Nil
Total ayacut under completed projects upto 03/2009 (2+3) = 196740 Acres
B. On going projects
Total Irrigation Potential in the district after completion of the Ongoing Major
and Meidum Irrigation Projects under Jalayagnam
/conversion/tmp/scratch/457550028.doc
KHAMMAM DISTRICT
1. Geographical Features
Population : 25,78,927
Mandals : 46 Nos.
Ayacut
SNo Name of Project Nos
in Acres
I Major Irrigation Projects
a. Nagarjunasagar Project 1 276633
II Medium Irrigation Projects
a. Wyra Project 1 17390
b. Lankasagar Project 1 7350
c. Peddavagu Project 1 16000
d. Bayyaram Tank 1 7200
e. Mukamamidi Project 1 3260
f. Taliperu Project 1 24700
Total 6 75900
III Minor Irrigation
I & CAD tanks (above 100 acres ayacut) 410 144043
PR & ITDA tanks (below 100 acres ayacut) 2479 71100
Mini LI Schemes SC Corporation 65 3576
Mini LI Schemes ITDA 304 14735
Total 3258 233454
IV LI Schemes (APSIDC) 312 44251
Total of completed Schemes (I+II+III+IV) 3577 630238
/conversion/tmp/scratch/457550028.doc
3. Completed projects after 01-04-2004
I. Major Nil
II. Medium Nil
Total ayacut under completed projects upto 03/2009 (2+3) = 630238 Acres
B Ongoing Projects
I Major Irrigation
a. S.R.S.P Stage – II 1 69000
b. Rajivsagar LI Scheme 1 200000
c. Indira Sagar LI Scheme 1 136100
d. P.V. Narasimha Rao Kanthanapally LIS 1 (750000) Stab
e. Dummugudem NS Tail Pond 1 (2200000) Stab
Total 5 405100 (new)
(2950000) (stab)
II Medium Irrigation
a. Palemvagu Project 1 10132
b. Modikuntavagu Project 1 13591
c. Kinnerasani Project 1 10000
Total 3 33723
Total of Ongoing Schemes (I+II) 438823Acres (New)
Total Irrigation Potential in the district after completion of the Ongoing Major
and Meidum Irrigation Projects under Jalayagnam
/conversion/tmp/scratch/457550028.doc
MEDAK DISTRICT
1. Geographical Features
Population : 26,70,097
Mandals : 46 Nos.
Percentage of total
Classification of Geographical area. Area (Acres)
Geographical area.
Total geographical area 23.99
Forest land 2.25 9.38
Cultivable area 17.27 71.99
Barren and un-cultivable land 1.48 6.17
Land put to non agricultural use 1.73 7.21
Sown area 12.26 51.10
Irrigated area 3.62 15.09
Normal average rainfall 873 mm
Ayacut
SNo Name of Project Nos.
(Acres)
I Major Irrigation Projects
(Drinking
Singur Project
water supply)
II Medium Irrigation Projects
a. Nallavagu Project 1 6030
b. Ghanpur Anicut 1 21625
Total 2 27655
III Minor Irrigation
I & CAD tanks (above 100 acres ayacut) 582 136129
PR tanks (below 100 acres ayacut) 6207 116275
Mini LI schemes 20 7598
Total 6809 260002
Total of Completed projects 6811 287657
/conversion/tmp/scratch/457550028.doc
3. Completed projects after 01-04-2004
I. Major Nil
II. Medium Nil
Total ayacut under completed projects upto 03/2009 (2+3) = 287657 Acres
B Ongoing Projects
I Major Irrigation
Singur Project 1 40000 Acres
Pranahitha Chevella LIS 519152 Acres
Total ongoing Schemes 559152 Acres
Total Irrigation Potential in the district after completion of the Ongoing Major
and Meidum Irrigation Projects under Jalayagnam
/conversion/tmp/scratch/457550028.doc
WARANGAL DISTRICT
1. Geographical Features
Population : 32,46,004
Mandals : 51 Nos.
SN Aaycut
Name of Project Nos.
o (Acres)
I MAJOR IRRIGATION PROJECTS
a) Sriramsagar Project Stage-I 1 316063
TOTAL 1 316063
II MEDIUM IRRIGATION PROJECTS
a) Pakhal Lake 1 18,192
b) Ramapalake 1 5,000
c) Laknavaaram Lake 1 8428
d) Malluruvagu Project 1 7500
e) Salivagu Project 1 3046
TOTAL 5 42166
III MINOR IRRIGATION
a) I&CAD Tanks ( above 100 acres 797 190010
ayacut)
b) P.R. Tanks (Below 100 acres ayacut) 2971 83909
c) Mini LI Schemes 153 8786
TOTAL 3921 282705
Total completed Schemes 6,40,934
/conversion/tmp/scratch/457550028.doc
I. Major Nil
II. Medium Nil
Total ayacut under completed projects upto 03/2009 (2+3) = 640934 Acres
Total Irrigation Potential in the district after completion of the Ongoing Major
and Meidum Irrigation Projects under Jalayagnam
/conversion/tmp/scratch/457550028.doc
NIZAMABAD DISTRICT
1. Geographical Features
Population : 23,45,685
Mandals : 36 Nos.
/conversion/tmp/scratch/457550028.doc
3. Completed projects after 01-04-2004
I. Major
Alisagar LIS 53792 Acres (Stab)
Guthpa LIS 38792 Acres (Stab)
Total 92584 Acres (Stab)
II. Medium Nil
Total of (I + II) 92584 Acres (Stab)
B Ongoing Projects
I Major Irrigation
a. Pranahitha Chevella LIS 304500
II Medium Irrigation
a. Chouthpally Hanumanth Reddy LI Scheme 1 11627
Total 3 316127
Total Irrigation Potential in the district after completion of the Ongoing Major
and Meidum Irrigation Projects under Jalayagnam
/conversion/tmp/scratch/457550028.doc
KARIMNAGAR DISTRICT
1. Geographical Features
Population : 34,91,822
Ayacut
SNo Name of Project Nos
(Acres)
I Major Irrigation Projects
Sri Ramsagar Project 1 542900
Total 1 542900
II Medium Irrigation Projects
a. Upper Manair Project 1 13088
b. Shanigaram Project 1 5100
c. Boggulavagu Project 1 5150
Total 3 23338
III. Minor Irrigation
I & CAD tanks (Above 100 acres ayacut) 637 173703
P.R. tanks (below 100 Acres ayacut) 4520 116374
Mini Lift Irrigation Schemes 30 6310
District water management agency works 1 8367
Total 5188 304754
Total Completed Projects 5192 870992
/conversion/tmp/scratch/457550028.doc
3. Completed projects after 01-04-2004
I. Major
Sri Ramsagar Project – I 82567 Acres
II. Medium Nil
Total of (I + II) 82567 Acres
Total ayacut under completed projects upto 03/2009 (2+3) = 953559 Acres
B ONGOING PROJECTS
I Major Irrigation
a. Flood Flow Canal of SRSP 1 130000 Acres
b. Sri Padasagar Project 1 265000 Acres
c. Sri J. Chokkarao GLI Scheme (Stage-I)
1 14100 Acres
(Devadula)
d. Pranahitha Chevella LIS 1 171449 Acres
Total 3 580549 Acres
II Medium Irrigation
-NIL -
Total of Ongoing schemes (I+II) 580549 Acres
Total Irrigation Potential in the district after completion of the Ongoing Major
and Meidum Irrigation Projects under Jalayagnam
/conversion/tmp/scratch/457550028.doc
ADILABAD DISTRICT
1. Geographical Features
Population : 24,88,003
S.N Ayacut
Name of the Project Nos
o (acres)
I. Major irrigation projects
a) Kaddam Narayan Reddy Project 1 68128
b) Saraswathi Canal 1 35735
Total 2 103863
II. Medium Irrigation Projects
a) Sadarmatt anicut 1 11848
b) Swarna project 1 8945
c) Vattivagu Project 1 24500
d) Sathnala project 1 24000
e) NTR Sagar 1 6000
Total 5 75293
III. Minor Irrigation
MI tanks above 100 acres 637 114376
PR tanks 1378 40503
LI Schemes 3 3965
Total 2018 158844
Total Completed Schemes 2025 338000
/conversion/tmp/scratch/457550028.doc
3. Completed projects after 01-04-2004
I. Major Nil
II. Medium Nil
Total ayacut under completed projects upto 03/2009 (2+3) = 338000 Acres
B Ongoing Projects
I Major Irrigation
a) Pranahitha Chevella LIS 1 156500
II Medium Irrigation
1) Mathadivagu Project 1 8500 Acres
2) Sri Komrambheem Project (Peddavagu-Ada) 1 24500 Acres
3) Peddavagu Diversion Scheme 1 15000 Acres
(Jagannadhapur)
4) Gollavagu Project 1 9500 Acres
5) Peddavagu Project (Neelwai) 1 13000 Acres
6) Ralivagu Project 1 6000 Acres
Total 7 76500 Acres
Total ongoing schemes (I+II) 233000 Acres
Total Irrigation Potential in the district after completion of the Ongoing Major
and Meidum Irrigation Projects under Jalayagnam