Documente Academic
Documente Profesional
Documente Cultură
= 20.365 mts
D D D D D D D DD
Since Drain bed level of 32.24 is above T B L of canal i.e 32.477
super passage is proposed for this crossing. The bottom of end beam is proposed as FSL+0.450
Top level of trough =
(FSL+0.45M) + thickness of wearing coat + thickness of bottom member
31.927 + 0.04 + 0.2
= 32.267 M
____________________________________________________________________________________
______
MLN ASSOCIATES
HYDERABAD