FINAL BILL OF QUANTITY PEKERJAAN PENGADAAN DAN PEMASANGAN CENTRAL BOILER

PROYEK : PROYEK PANGADAAN DAN PEMASANGAN FEED DEAERATION PLANT, PENGADAAN DAN PEMASANGAN CENTRAL BOILER & CHIMNEY, PENGADAAN DAN PEMASANGAN STEAM & CONDENSATE LINE, PENGADAAN DAN PEMASANGAN LINE FEED DEAER
PENGADAAN DAN PEMASANGAN FUEL LINE, PENGADAAN DAN PEMASANGAN WATER SOFTENER, PENGADAAN DAN PEMASANGAN SEPARATOR BLOWDOWN, PENGADAAN DAN PEMASANGAN FUEL LINE, PENGADAAN DAN PEMASANGAN WATER SO

NO. PO : 9130023468/9130011449/LGU
TANGGAL : 25/01/2016
NO. NPB : 0001/GG-32.D/I-16

HARGA SAT. HARGA TOT.


VOLUME KERJA KERJA
NO URAIAN PEKERJAAN KONTRAK SATUAN REAL MT'L
KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH

A. PENGADAAN DAN PEMASANGAN FEED DEAERATION PLANT CENTRAL BOILER


A.1. PENGADAAN FEED DEAERATION PLANT CENTRAL BOILER
1 DAERATOR TANK TYPE : FT 20 BY GG 1 UN - - -
2 SUPPORT TANK FT 20 BY GG 1 UN - - -
3 OPERATING PLATFORM BY GG 1 UN - - -
4 RAIL FOR OPERATING PLATFORM BY GG 1 UN - - -
5 LADDER BY GG 1 UN - - -
6 2ND FLOOR OPERATING PLATFORM COMPLETE WITH ACCESSORIES BY GG 1 UN - - -
7 TRICKLE DAERATOR MODULE TYPE : DM 50 BY GG 1 UN - - -
8 FLAT PACKING TYPE : ED 840, ID 800 X 3 BY GG 1 PC - - -
9 ANCHOR SCREW M 16 X 30 L : 153 BY GG 18 PC - - -
10 FLANGE DN150 PN 16 BY GG 4 PC - - -
11 FLAT PACKING DN150 BY GG 4 PC - - -
12 FLANGE DN40 PN40 BY GG 1 PC - - -
13 FLAT PACKING DN40 BY GG 1 PC - - -
14 FLANGE SHOCKET DN200 PN16 M.A.Z.1/2" BY GG 1 PC - - -
15 FLANGE DN200 PN16 BY GG 2 PC - - -
16 FLAT PACKING DN200 BY GG 2 PC - - -
17 FLAT PACKING DN125 BY GG 2 PC - - -
18 FLANGE DN125 PN16 BY GG 1 PC - - -
19 FLANGE DN65 PN40 BY GG 1 PC - - -
20 FLAT PACKING DN65 BY GG 1 PC - - -
21 SAFETY VALVE DN150 PN16 BY GG 2 PC - - -
22 DISK CHECK VALVE TYPE : RK 86, DN 200 PN16 BY GG 1 PC - - -
23 BALL VALVE DN50 PN16 (G 2") BY GG 4 PC - - -
24 SOLENOID VALVE TYPE : 82540 (G 2") BY GG 1 PC - - -
25 MOTORIZD VALVE STEAM HEATING DN65 PN16 BY GG 1 UN - - -
26 DISK CHECK VALVE TYPE : RK 86, DN 125 PN16 BY GG 1 PC - - -
27 HEX SCREW DIN 931 M16X70 BY GG 32 PC - - -
28 HEX NUT DIN 934 M16 BY GG 32 PC - - -
29 HEX SCREW DIN 931 M20X80 BY GG 24 PC - - -
30 HEX NUT DIN 934 M20 BY GG 24 PC - - -
31 HEX SCREW DIN 931 M20X220 BY GG 12 PC - - -
1 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
32 HEX NUT DIN 934 M20 BY GG 12 PC - - -
33 HEX NUT DIN 931 M20X70 BY GG 32 PC - - -
34 HEX NUT DIN 934 M20 BY GG 32 PC - - -
35 HEX SCREW DIN 931 M16X60 BY GG 4 PC - - -
36 HEX NUT DIN 934 M16 BY GG 4 PC - - -
A.2. PEMASANGAN FEED DEAERATION PLANT CENTRAL BOILER
1 DAERATOR TANK TYPE : FT 20 1 UN 1 - - 15,000,000 - -
2 SUPPORT TANK FT 20 1 UN 1 - - 7,000,000 - -
3 OPERATING PLATFORM 1 UN 1 - - 5,000,000 - -
4 RAIL FOR OPERATING PLATFORM 1 UN 1 - - 4,000,000 - -
5 LADDER 1 UN 1 - - 1,886,667 - -
6 2ND FLOOR OPERATING PLATFORM COMPLETE WITH ACCESSORIES 1 UN 1 - - 7,143,333 - -
7 TRICKLE DAERATOR MODULE TYPE : DM 50 1 UN 1 - - 4,755,556 - -
8 FLAT PACKING TYPE : ED 840, ID 800 X 3 1 PC 1 - - 232,778 - -
9 ANCHOR SCREW M 16 X 30 L : 153 18 PC 16 2 - 75,556 - -
10 FLANGE DN150 PN 16 4 PC 4 - - 480,000 - -
11 FLAT PACKING DN150 4 PC 4 - - 46,556 - -
12 FLANGE DN40 PN40 1 PC 1 - - 120,000 - -
13 FLAT PACKING DN40 1 PC 1 - - 46,556 - -
14 FLANGE SHOCKET DN200 PN16 M.A.Z.1/2" 1 PC 1 - - 640,000 - -
15 FLANGE DN200 PN16 2 PC 2 - - 640,000 - -
16 FLAT PACKING DN200 2 PC 2 - - 46,556 - -
17 FLAT PACKING DN125 2 PC 2 - - 36,278 - -
18 FLANGE DN125 PN16 1 PC 1 - - 400,000 - -
19 FLANGE DN65 PN40 1 PC 1 - - 200,000 - -
20 FLAT PACKING DN65 1 PC 1 - - 33,111 - -
21 SAFETY VALVE DN150 PN16 2 PC 2 - - 469,498 - -
22 DISK CHECK VALVE TYPE : RK 86, DN 200 PN16 1 PC 1 - - 480,000 - -
23 BALL VALVE DN50 PN16 (G 2") 4 PC 4 - - 120,000 - -
24 SOLENOID VALVE TYPE : 82540 (G 2") 1 PC 1 - - 74,444 - -
25 MOTORIZD VALVE STEAM HEATING DN65 PN16 1 UN 1 - - 74,444 - -
26 DISK CHECK VALVE TYPE : RK 86, DN 125 PN16 1 PC 1 - - 300,000 - -
27 HEX SCREW DIN 931 M16X70 32 PC 32 - - 3,889 - -
28 HEX NUT DIN 934 M16 32 PC 32 - - 694 - -
29 HEX SCREW DIN 931 M20X80 24 PC 24 - - 4,089 - -
30 HEX NUT DIN 934 M20 24 PC 24 - - 756 - -
31 HEX SCREW DIN 931 M20X220 12 PC 12 - - 4,089 - -
32 HEX NUT DIN 934 M20 12 PC 12 - - 756 - -
33 HEX NUT DIN 931 M20X70 32 PC 32 - - 4,089 - -
34 HEX NUT DIN 934 M20 32 PC 32 - - 756 - -
35 HEX SCREW DIN 931 M16X60 4 PC 4 - - 3,889 - -
36 HEX NUT DIN 934 M16 4 PC 4 - - 694 - -

B. PENGADAAN DAN PEMASANGAN BOILER CENTRAL BOILER DAN CHIMNEY


B.1. PENGADAAN BOILER LOOS S/N 120315 & 120316 CAP 16 T/Hr (NEW BOILER)
1 BOILER UNIVERSAL TYPE : UL-S 16000X16 BY GG 2 UN - - -
2 OPERATION PLATFORM COMPLETE WITH RAIL AND LADDER BY GG 2 UN - - -
3 FLUE GAS EXCHANGER TYPE : ECO 1 BY GG 2 PC - - -
2 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
4 ADAPTER PIECE ECO-WE DN65 PN40-M.EL BY GG 2 PC - - -
5 ADAPTER PIECE ECO-WA DN65 PN-40-M.TA1/2";AZ.DN65 BY GG 2 PC - - -
6 HEX SCREW DIN931 M20X45 BY GG 32 PC - - -
7 STUD DIN 939 M20X45 BY GG 32 PC - - -
8 HEX NUT DIN934 M20 BY GG 32 PC - - -
9 FLANGE DN150 PN16 BY GG 4 PC - - -
10 SHUT OFF VALVE 22.013 DN150 PN16 BY GG 4 PC - - -
11 DIRT TRAP DN150 PN16 BY GG 4 PC - - -
12 HEX SCREW DIN931 M20X70 BY GG 32 PC - - -
13 HEX NUT DIN934 M20 BY GG 32 PC - - -
14 FLAT PACKING DN150 PN16 BY GG 4 PC - - -
15 HEX SCREW DIN931 M16X60 BY GG 48 PC - - -
16 HEX NUT DIN934 M16 BY GG 48 PC - - -
17 FLAT PACKING DN50 PN40 BY GG 8 PC - - -
18 DISK CHECK VALVE TYPE : RK76 DN65 PN40 BY GG 4 PC - - -
19 HEX SCREW DIN931 M16X120 BY GG 32 PC - - -
20 HEX NUT DIN934 M16 BY GG 32 PC - - -
21 FLAT PACKING DN65 PN40 BY GG 28 PC - - -
22 SHUT OFF VV TYPE : 35.046 WITH CONE DN65 PN40 BY GG 2 PC - - -
23 FLANGE DN65 PN40 BY GG 10 PC - - -
24 HEX SCREW DIN 931 M16X70 BY GG 176 PC - - -
25 HEX NUT DIN 934 M16 BY GG 176 PC - - -
26 PRESSURE GAUGE WITH GLYCERINE;0-40 BAR; DN65 BY GG 4 PC - - -
27 PACKING RING TYPE : 97-D8 X D14, 8X4,2 BY GG 4 PC - - -
28 REDUCING FIT 1/2" X 1/4" BY GG 4 PC - - -
29 PLATE 87X100 SK BY GG 4 PC - - -
30 POMPA CR15-20 BY GG 4 PC - - -
31 HEX SCREW DIN 934 M12 BY GG 16 PC - - -
32 HEX NUT DIN 934 M12 BY GG 16 PC - - -
33 SPRING WASHER DIN 127 GR.12 BY GG 16 PC - - -
34 ANCHOR SCREW M1630 L:153 MM BY GG 16 PC - - -
35 BEARING FOR FLANGE DN150 PN16, CR 15 BY GG 4 PC - - -
36 BEARING F.CR10-CR64;C60,C80 BY GG 4 PC - - -
37 HEX SCREW DIN 931 M12X30 BY GG 8 PC - - -
38 HEX NUT DIN 934 M12 BY GG 8 PC - - -
39 SET ANTI VIBRATION DEVICE BY GG 8 SE - - -
40 RING 50X20X12MM SR 220 FOR M16 BY GG 16 PC - - -
41 FEED WATER REGULATION MODULE BY GG 2 UN - - -
42 PRESSURE INCEASE STATION BY GG 2 UN - - -
43 SHUT OFF VV.23.046 DN150 PN 25 BY GG 2 PC - - -
44 HEX SCREW DIN 931 M24X90 BY GG 64 PC - - -
45 HEX NUT DIN 934 M24 BY GG 64 PC - - -
46 FLAT PACKING DN150 PN16 BY GG 8 PC - - -
47 FLANGE DN150 PN40 BY GG 2 PC - - -
48 SAFETY VALVE DN65 PN 40 BY GG 4 UN - - -
49 FLANGE DN100 PN16 BY GG 4 PC - - -
50 FLAT PACKING DN40 PN40 BY GG 2 PC - - -
51 SHUT OFF VV.35.046 ITH CONE DN65 PN40 BY GG 2 PC - - -
3 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
52 SHUT OFF VV.35.046 ITH CONE DN40 PN40 BY GG 2 PC - - -
53 FLAT PACKING DN40 PN 40 BY GG 2 PC - - -
54 REFLECTION INDIC SZ7-MIE340;DN25;3/8";A BY GG 4 UN - - -
55 HEX SCREW DIN 931 M12X60 BY GG 88 PC - - -
56 HEX NUT DIN 934 M12 BY GG 88 PC - - -
57 FLAT PACKING DN25 PN40 BY GG 24 PC - - -
58 STRAIGHT WAY COCK FIG.111E:M18;A:3/8" AG BY GG 2 PC - - -
59 SCREWING EVGE12 LR 3/8" DN10 PN250 BY GG 2 PC - - -
60 PACKING RING DIN 7603/A 17X23X1.5 BY GG 4 PC - - -
61 REACTOMAT BAE 46 DN25 PN40 BY GG 2 UN - - -
62 CORN SHUT OFF VV.23.047 WITH CONE DN25 PN25 BY GG 2 UN - - -
63 FLANGE DN25 PN40 BY GG 4 PC - - -
64 STRAIGHT SCREWING GAI10-LR/3/8"/IG BY GG 2 PC - - -
65 PACKING RING DIN 7603/A 17X21X1,5 BY GG 2 PC - - -
66 BLOWDOWN VALVE MPA 46 DN 40 PN40 BY GG 2 UN - - -
67 STUD DIN 939 M16X60 BY GG 8 PC - - -
68 HEX NUT DIN 934 M16 BY GG 16 PC - - -
69 FLAT PACKING DN40 PN40 BY GG 4 PC - - -
70 FLANGE DN40 PN40 BY GG 2 PC - - -
71 SCREWED JOINT EVW12-PLR 3/8"AG BY GG 2 PC - - -
72 TUBE SEAMLESS DIN 2391/A-12X1,5 BY GG 0.15 MT - - -
73 STRAIGHT SCREWING GE12-PLR 1/4"AG BY GG 2 PC - - -
74 SOLNOID VALVE 340-C-8-B G1/4" BY GG 2 PC - - -
75 HOSE PROTECTION DN6- R 3/8" BY GG 2 PC - - -
76 SHUT OFF VV 35.046 WITH CONE DN20 PN40 BY GG 2 PC - - -
77 FLAT PACKING DN20 PN40 BY GG 8 PC - - -
78 FLANGE DN20 PN40 BY GG 4 PC - - -
79 SHUT OFF VALVE VV.35.046 WITH CONE DN20 PN40 BY GG 2 UN - - -
80 STUD DIN939 M12X55 BY GG 8 PC - - -
81 HEX NUT DIN 934 M12 BY GG 16 PC - - -
82 THERMOMETER PT100;1/2";200LG;D-400⁰C BY GG 2 UN - - -
83 PACKING RING DIN 7603/A 21X26X1,5 BY GG 6 PC - - -
84 MOTORIZED VV.3-35.450 DN65 PN40 KVS;63 BY GG 2 UN - - -
85 THERMOMETER.PT100;400LG;0-400⁰C BY GG 4 UN - - -
86 GAS RELATION MODULE GRM BY GG 2 UN - - -
87 ANCHOR SCREWM12X15 L;113 MM BY GG 6 PC - - -
88 FEED WATER QUANTITY CNTROL VALVE BY GG 2 UN - - -
89 FEED WATER REGULATION MODULE BY GG 2 UN - - -
B.2. PEMASANGAN BOILER LOOS S/N 120315 & S/N 120316 CAP 16 T/Hr (NEW BOILER)
1 BOILER UNIVERSAL TYPE : UL-S 16000X16 2 UN 2 - - 16,000,000 - -
2 OPERATION PLATFORM COMPLETE WITH RAIL AND LADDER 2 UN 2 - - 6,000,000 - -
3 FLUE GAS EXCHANGER TYPE : ECO 1 2 UN 2 - - 5,000,000 - -
4 ADAPTER PIECE ECO-WE DN65 PN40-M.EL 2 PC 2 - - 97,667 - -
5 ADAPTER PIECE ECO-WA DN65 PN-40-M.TA1/2";AZ.DN65 2 PC 2 - - 97,667 - -
6 HEX SCREW DIN931 M20X45 32 PC 32 - - 4,089 - -
7 STUD DIN 939 M20X45 32 PC 32 - - 4,089 - -
8 HEX NUT DIN934 M20 32 PC 32 - - 756 - -
9 FLANGE DN150 PN16 4 PC 4 - - 480,000 - -
4 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
10 SHUT OFF VALVE 22.013 DN150 PN16 4 PC 4 - - 90,833 - -
11 DIRT TRAP DN150 PN16 4 PC 4 - - 90,833 - -
12 HEX SCREW DIN931 M20X70 32 PC 32 - - 4,089 - -
13 HEX NUT DIN934 M20 32 PC 32 - - 756 - -
14 FLAT PACKING DN150 PN16 4 PC 4 - - 8,533 - -
15 HEX SCREW DIN931 M16X60 48 PC 48 - - 1,667 - -
16 HEX NUT DIN934 M16 48 PC 48 - - 694 - -
17 FLAT PACKING DN50 PN40 8 PC 8 - - 4,800 - -
18 DISK CHECK VALVE TYPE : RK76 DN65 PN40 4 PC 4 - - 150,000 - -
19 HEX SCREW DIN931 M16X120 32 PC 32 - - 3,889 - -
20 HEX NUT DIN934 M16 32 PC 32 - - 694 - -
21 FLAT PACKING DN65 PN40 28 PC 28 - - 33,111 - -
22 SHUT OFF VV TYPE : 35.046 WITH CONE DN65 PN40 2 PC 2 - - 108,161 - -
23 FLANGE DN65 PN40 10 PC 10 - - 200,000 - -
24 HEX SCREW DIN 931 M16X70 176 PC 176 - - 3,889 - -
25 HEX NUT DIN 934 M16 176 PC 176 - - 694 - -
26 PRESSURE GAUGE WITH GLYCERINE;0-40 BAR; DN65 4 PC 4 - - 147,771 - -
27 PACKING RING TYPE : 97-D8 X D14, 8X4,2 4 PC 4 - - 33,111 - -
28 REDUCING FIT 1/2" X 1/4" 4 PC 4 - - 147,771 - -
29 PLATE 87X100 SK 4 PC 4 - - 33,111 - -
30 POMPA CR15-20 4 PC 4 - - 2,500,000 - -
31 HEX SCREW DIN 934 M12 16 PC 16 - - 3,856 - -
32 HEX NUT DIN 934 M12 16 PC 16 - - 667 - -
33 SPRING WASHER DIN 127 GR.12 16 PC 16 - - 667 - -
34 ANCHOR SCREW M16X30 L:153 MM 16 PC 16 - - 57,222 - -
35 BEARING FOR FLANGE DN150 PN16, CR 15 4 PC 4 - - 253,179 - -
36 BEARING F.CR10-CR64;C60,C80 4 PC 4 - - 253,179 - -
37 HEX SCREW DIN 931 M12X30 8 PC 8 - - 3,856 - -
38 HEX NUT DIN 934 M12 8 PC 8 - - 667 - -
39 SET ANTI VIBRATION DEVICE 8 SE 8 - - 1,020,000 - -
40 RING 50X20X12MM SR 220 FOR M16 16 PC 16 - - 2,889 - -
41 FEED WATER REGULATION MODULE 2 UN 2 - - 1,020,000 - -
42 PRESSURE INCEASE STATION 2 UN 2 - - 2,888,889 - -
43 SHUT OFF VV.23.046 DN150 PN 25 2 PC 2 - - 469,498 - -
44 HEX SCREW DIN 931 M24X90 64 PC 64 - - 4,978 - -
45 HEX NUT DIN 934 M24 64 PC 64 - - 817 - -
46 FLAT PACKING DN150 PN16 8 PC 8 - - 4,800 - -
47 FLANGE DN150 PN40 2 PC 2 - - 480,000 - -
48 SAFETY VALVE DN65 PN 40 4 UN 4 - - 313,942 - -
49 FLANGE DN100 PN16 4 PC 4 - - 320,000 - -
50 FLAT PACKING DN40 PN40 2 PC 2 - - 33,111 - -
51 SHUT OFF VV.35.046 ITH CONE DN65 PN40 2 PC 2 - - 290,677 - -
52 SHUT OFF VV.35.046 ITH CONE DN40 PN40 2 PC 2 - - 260,322 - -
53 FLAT PACKING DN40 PN 40 2 PC 2 - - 33,111 - -
54 REFLECTION INDIC SZ7-MIE340;DN25;3/8";A 4 UN 4 - - 97,979 - -
55 HEX SCREW DIN 931 M12X60 88 PC 88 - - 3,856 - -
56 HEX NUT DIN 934 M12 88 PC 88 - - 667 - -
57 FLAT PACKING DN25 PN40 24 PC 24 - - 30,778 - -
5 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
58 STRAIGHT WAY COCK FIG.111E:M18;A:3/8" AG 2 PC 2 - - 52,111 - -
59 SCREWING EVGE12 LR 3/8" DN10 PN250 2 PC 2 - - 52,111 - -
60 PACKING RING DIN 7603/A 17X23X1.5 4 PC 4 - - 30,778 - -
61 REACTOMAT BAE 46 DN25 PN40 2 UN 2 - - 52,111 - -
62 CORN SHUT OFF VV.23.047 WITH CONE DN25 PN25 2 UN 2 - - 60,000 - -
63 FLANGE DN25 PN40 4 PC 4 - - 80,000 - -
64 STRAIGHT SCREWING GAI10-LR/3/8"/IG 2 PC 2 - - 30,778 - -
65 PACKING RING DIN 7603/A 17X21X1,5 2 PC 2 - - 30,778 - -
66 BLOWDOWN VALVE MPA 46 DN 40 PN40 2 UN 2 - - 260,322 - -
67 STUD DIN 939 M16X60 8 PC 8 - - 7,778 - -
68 HEX NUT DIN 934 M16 16 PC 16 - - 694 - -
69 FLAT PACKING DN40 PN40 4 PC 4 - - 33,111 - -
70 FLANGE DN40 PN40 2 PC 2 - - 120,000 - -
71 SCREWED JOINT EVW12-PLR 3/8"AG 2 PC 2 - - 7,778 - -
72 TUBE SEAMLESS DIN 2391/A-12X1,5 0.15 MT 0.15 - - 90,188 - -
73 STRAIGHT SCREWING GE12-PLR 1/4"AG 2 PC 2 - - 30,778 - -
74 SOLNOID VALVE 340-C-8-B G1/4" 2 PC 2 - - 73,333 - -
75 HOSE PROTECTION DN6- R 3/8" 2 PC 2 - - 7,778 - -
76 SHUT OFF VV 35.046 WITH CONE DN20 PN40 2 PC 2 - - 77,778 - -
77 FLAT PACKING DN20 PN40 8 PC 8 - - 33,111 - -
78 FLANGE DN20 PN40 4 PC 4 - - 60,000 - -
79 SHUT OFF VALVE VV.35.046 WITH CONE DN20 PN40 2 UN 2 - - 224,010 - -
80 STUD DIN939 M12X55 8 PC 8 - - 7,778 - -
81 HEX NUT DIN 934 M12 16 PC 16 - - 667 - -
82 THERMOMETER PT100;1/2";200LG;D-400⁰C 2 UN 2 - - 218,007 - -
83 PACKING RING DIN 7603/A 21X26X1,5 6 PC 6 - - 32,000 - -
84 MOTORIZED VV.3-35.450 DN65 PN40 KVS;63 2 UN 2 - - 185,556 - -
85 THERMOMETER.PT100;400LG;0-400⁰C 4 UN 4 - - 218,007 - -
86 GAS RELATION MODULE GRM 2 UN 2 - - 2,576,667 - -
87 ANCHOR SCREWM12X15 L;113 MM 6 PC 6 - - 123,889 - -
88 FEED WATER QUANTITY CNTROL VALVE 2 UN 2 - - 212,778 - -
89 FEED WATER REGULATION MODULE 2 UN 2 - - 2,576,667 - -
B.3. PEMBONGKARAN BOILER LOOS (EX CLOVE PROCESSING)
1 BOILER UNIVERSAL TYPE : UL-S 16000X16 WITH ACCESSORIES 1 UN 1 - - 10,000,000 - -
2 BOILER UNIVERSAL TYPE : UL-S 16000X10 WITH ACCESSORIES 1 UN 1 - - 8,000,000 - -
B.4. PEMASANGAN BOILER LOOS (EX CLOVE PROCESSING)
1 BOILER UNIVERSAL TYPE : UL-S 16000X16 WITH ACCESSORIES 1 UN 1 - - 15,000,000 - -
2 BOILER UNIVERSAL TYPE : UL-S 16000X10 WITH ACCESSORIES 1 UN 1 - - 12,000,000 - -
B.5. PENGADAAN CHIMNEY
1 CHIMNEY Ø900MM, H=23500MM BY GG 3 UN
2 CHIMNEY Ø700MM, H=23500MM BY GG 1 UN
B.6. PEMASANGAN CHIMNEY
1 CHIMNEY Ø900MM, H=23500MM 3 UN 3 - - 27,000,000 - -
2 CHIMNEY Ø700MM, H=23500MM 1 UN 1 - - 24,000,000 - -

C. PENGADAAN DAN PEMASANGAN LINE STEAM DAN CONDENSAT CENTRAL BOILER


C.1. PENGADAAN STEAM LINE BOILER TO STEAM HEADER CENTRAL BOILER
1 BALL VALVE M10S DN25 PN0 "SPIRAX SARCO" BY GG 1 PC - - -
6 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
2 DISK CHECK VALVE RK86 DN25 PN40 "GESTRA" BY GG 1 PC - - -
3 DISK CHECK VALVE TPE : RK 86, DN150 PN16 BY GG 1 PC - - -
4 DISK CHECK VALVE TYPE : RK 86, DN200 PN16 BY GG 3 PC - - -
5 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN150 BY GG 2 PC - - -
6 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN200 BY GG 11 PC - - -
7 EXPANTION JOINT 150-DHEB-FF-1000-L DN150 PN16 BY GG 1 PC - - -
8 EXPANTION JOINT 200-DHEB-FF-1000-L DN200 PN16 BY GG 6 PC - - -
9 EXPANTION JOINT 200-UEB-FF-1000-L DN200 PN16 BY GG 2 PC - - -
10 GLOBE VALVE TYPE : GAV54F;DN100.PN16 "GESTRA" BY GG 1 PC - - -
11 GLOBE VALVE TYPE : GAV54F;DN150.PN16 "GESTRA" BY GG 2 PC - - -
12 GLOBE VALVE TYPE : GAV54F;DN200.PN16 "GESTRA" BY GG 4 PC - - -
13 GLOBE VALVE TYPE : GAV54F;DN25.PN16 "GESTRA" BY GG 3 PC - - -
14 GLOBE VALVE TYPE : GAV54F;DN250.PN16 "GESTRA" BY GG 3 PC - - -
15 PIPE SEAMLESS SCH40;A106 GR.B. DN150X6MT BY GG 42 PC - - -
16 PIPE SEAMLESS SCH40;A106 GR.B. DN200X6MT BY GG 150 MT - - -
17 PIPE SEAMLESS SCH40;A106 GR.B. DN25X6MT BY GG 24 MT - - -
18 SIGH GLASS SG253 DN25 PN40 "SPIRAX SARCO" BY GG 1 PC - - -
19 STEAM TRAP TD3F DN25 PN40 "SPIRAX SARCO" BY GG 1 PC - - -
20 BLIND FLANGE DN200 PN16 2 PC - 2 - 506,220 1,012,439 -
21 BOLT+NUT+PLAT WASHER M12X60-8,8 20 SE - 20 - 2,700 54,000 -
22 BOLT+NUT+PLAT WASHER M12X90-8,8 4 SE - 4 - 3,744 14,978 -
23 BOLT+NUT+PLAT WASHER M12X140-8,8 44 SE - 44 - 4,722 207,778 -
24 BOLT+NUT+PLAT WASHER M12X90-8,8 260 SE - 260 - 3,744 973,556 -
25 CONCRENTRIC REDUCER SEAMLESS SCH40 DN200XXDN150 2 PC 2 - - 193,559 - -
26 DRAIN DISCHARGE SAFETY VALVE DN15 4 UN - 4 - 163,043 652,173 -
27 ECCENTRIC REDUCER SEAMLESS SCH40 DN200XDN100 4 PC 4 - - 836,000 - -
28 ECCENTRIC REDUCER SEAMLESS SCH40 DN200XDN125 2 PC - 2 - 881,889 1,763,778 -
29 ELBOW 45 SEAMLESS SCH40;DN200 2 PC 2 - - 377,360 - -
30 ELBOW 90 SEAMLESS SCH40;DN150 5 PC 3 2 - 307,893 615,787 -
31 ELBOW 90 SEAMLESS SCH40;DN200 18 PC 24 - 6 954,604 - 5,727,622
32 FIX SHOES SUPPORT FIR PIPE DN200 4 PC 12 - 8 721,617 - 5,772,933
33 FLANGE DN150 PN16 6 PC 7 - 1 209,266 - 209,266
34 FLANGE DN200 PN16 25 PC 19 6 - 305,106 1,830,637 -
35 FLANGE DN25 PN16 4 PC - 4 - 40,335 161,341 -
36 INSULATION ROCKWOLL PIPE STEAM THICKNESS 30MM, FOR PIPE DN25 24 MT - 24 - 72,062 1,729,490 -
37 INSULATION ROCKWOLL PIPE STEAM THICKNESS 80MM, FOR PIPE DN150 24 MT 36 - 12 415,743 - 4,988,914
38 INSULATION ROCKWOLL PIPE STEAM THICKNESS 80MM, FOR PIPE DN200 96 MT 150 - 54 518,847 - 28,017,738
39 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 30MM, FOR PIPE DN25 24 MT - 24 - 35,804 859,288 -
40 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 80MM, FOR PIPE DN150 24 MT 36 - 12 130,578 - 1,566,937
41 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 80MM, FOR PIPE DN200 96 MT 150 - 54 151,639 - 8,188,507
42 PACKING NON ASBESTOS THINKNESS 5 MM 1 LO 1 - - 1,227,778 - -
43 STEAM HEADER COMPLETE WITH ASSESORIES 1 UN 1 - - 39,000,000 - -
44 SUPPORT DISCHANGE SAFETY VALVE 4 UN - 4 - 1,866,667 7,466,667 -
45 SUPPORT PIPA UNP120X55 6 UN 6 - - 5,389,889 - -
46 TEE WELD SEAMLESS SCH40;DN25XDN25 2 PC - 2 - 139,721 279,442 -
C.2. PEMASANGAN STEAM LINE BOILER TO STEAM HEADER CENTRAL BOILER
1 BALL VALVE M10S DN25 PN0 "SPIRAX SARCO" 1 PC - 1 - 60,000 - -
2 DISK CHECK VALVE RK86 DN25 PN40 "GESTRA" 1 PC - 1 - 60,000 - -
7 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
3 DISK CHECK VALVE TPE : RK 86, DN150 PN16 1 PC - 1 - 360,000 - -
4 DISK CHECK VALVE TYPE : RK 86, DN200 PN16 3 PC 3 - - 480,000 - -
5 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN150 2 PC 1 1 - 207,067 - -

6 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN200 11 PC 14 - 3 222,178 - -

7 EXPANTION JOINT 150-DHEB-FF-1000-L DN150 PN16 1 PC 2 - 1 324,499 - -


8 EXPANTION JOINT 200-DHEB-FF-1000-L DN200 PN16 6 PC 6 - - 351,166 - -
9 EXPANTION JOINT 200-UEB-FF-1000-L DN200 PN16 2 PC 2 - - 351,166 - -
10 GLOBE VALVE TYPE : GAV54F;DN100.PN16 "GESTRA" 1 PC - 1 - 240,000 - -

11 GLOBE VALVE TYPE : GAV54F;DN150.PN16 "GESTRA" 2 PC 4 - 2 360,000 - -

12 GLOBE VALVE TYPE : GAV54F;DN200.PN16 "GESTRA" 4 PC 3 1 - 480,000 - -

13 GLOBE VALVE TYPE : GAV54F;DN25.PN16 "GESTRA" 3 PC - 3 - 60,000 - -


14 GLOBE VALVE TYPE : GAV54F;DN250.PN16 "GESTRA" 3 PC - 3 - 600,000 - -
15 PIPE SEAMLESS SCH40;A106 GR.B. DN150X6MT 42 MT 36 6 - 160,000 - -
16 PIPE SEAMLESS SCH40;A106 GR.B. DN200X6MT 150 MT 150 - - 213,333 - -
17 PIPE SEAMLESS SCH40;A106 GR.B. DN25X6MT 24 MT - 24 - 26,667 - -
18 SIGH GLASS SG253 DN25 PN40 "SPIRAX SARCO" 1 PC - 1 - 64,792 - -
19 STEAM TRAP TD3F DN25 PN40 "SPIRAX SARCO" 1 PC - 1 - 87,203 - -
20 BLIND FLANGE DN200 PN16 2 PC - 2 - 341,890 - -
21 BOLT+NUT+PLAT WASHER M12X60-8,8 20 SE - 20 - 1,350 - -
22 BOLT+NUT+PLAT WASHER M12X90-8,8 4 SE - 4 - 1,872 - -
23 BOLT+NUT+PLAT WASHER M12X140-8,8 44 SE - 44 - 2,361 - -
24 BOLT+NUT+PLAT WASHER M12X90-8,8 260 SE - 260 - 1,872 - -
25 CONCRENTRIC REDUCER SEAMLESS SCH40 DN200XXDN150 2 PC 2 - - 720,000 - -
26 DRAIN DISCHARGE SAFETY VALVE DN15 4 UN - 4 - 65,217 - -
27 ECCENTRIC REDUCER SEAMLESS SCH40 DN200XDN100 4 PC 4 - 480,000 - -
28 ECCENTRIC REDUCER SEAMLESS SCH40 DN200XDN125 2 PC - 2 - 520,000 - -
29 ELBOW 45 SEAMLESS SCH40;DN200 2 PC 2 - - 640,000 - -
30 ELBOW 90 SEAMLESS SCH40;DN150 5 PC 3 2 - 480,000 - -

31 ELBOW 90 SEAMLESS SCH40;DN200 18 PC 24 - 6 640,000 - -

32 FIX SHOES SUPPORT FIR PIPE DN200 4 PC 12 - 8 288,647 - -

33 FLANGE DN150 PN16 6 PC 7 - 1 480,000 - -

8 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH

34 FLANGE DN200 PN16 25 PC 19 6 - 640,000 - -

35 FLANGE DN25 PN16 4 PC - 4 - 80,000 - -


36 INSULATION ROCKWOLL PIPE STEAM THICKNESS 30MM, FOR PIPE DN25 24 MT - 24 - 166,969 - -
37 INSULATION ROCKWOLL PIPE STEAM THICKNESS 80MM, FOR PIPE DN150 24 MT 36 - 12 196,399 - -
38 INSULATION ROCKWOLL PIPE STEAM THICKNESS 80MM, FOR PIPE DN200 96 MT 150 - 54 208,822 - -
39 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 30MM, FOR PIPE DN25 24 MT - 24 - 54,667 - -
40 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 80MM, FOR PIPE DN150 24 MT 36 - 12 143,556 - -
41 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 80MM, FOR PIPE DN200 96 MT 150 - 54 152,000 - -
42 PACKING NON ASBESTOS THINKNESS 5 MM 1 LO 1 - - 491,111 - -
43 STEAM HEADER COMPLETE WITH ASSESORIES 1 UN 1 - - 17,123,956 - -
44 SUPPORT DISCHANGE SAFETY VALVE 4 UN - 4 - 746,667 - -
45 SUPPORT PIPA UNP120X55 6 UN 6 - - 2,155,956 - -
46 TEE WELD SEAMLESS SCH40;DN25XDN25 2 PC - 2 - 120,000 - -
C.3. PENGADAAN STEAM LINE BOILER TO STEAM HEADER CENTRAL BOILER
1 ALIGNMENT GUIDE "LISEGA" DN250 BY GG 5 PC - - - - -
2 BALL VALVE M105 DN25 PN40 "SPIRAX SARCO" BY GG 2 PC - - - - -
3 DISK CHECK VALVE TYPE : RK 86 DN 15 PN 40 GESTRA" BY GG 2 PC - - - - -
4 DOUBLE CYLINDER ROLLER BEARING LISEGA" DN250 BY GG 12 PC - - - - -
5 EXPANTION JOINT 250-DHEB-FF-1000-L DN250 PN16 BY GG 1 PC - - - - -
6 EXPANTION JOINT 250-UEB-FF-1000-L DN250 PN16 BY GG 1 PC - - - - -
7 EXPANTION JOINT 250-UEB-FF-2000-L DN250 PN25 BY GG 4 PC - - - - -
8 GLOBE VALVE TYPE TYPE : GAV54F;DN15.PN25"GESTRA" BY GG 6 PC - - - - -
9 PIPE SEANLESS SCH40; A106 GR.B,DN15X6MT BY GG 24 MT - - - - -
10 PIPE SEANLESS SCH40; A106 GR.B,DN250X6MT BY GG 96 MT - - - - -
11 PIPE SEANLESS SCH40; A106 GR.B,DN25X6MT BY GG 6 MT - - - - -
12 PRESURE REDUCING STATION DN250 BY GG 1 UN - - - - -
13 SIGHT GLASS SG253 DN15 PN40 "SPIRAX SARCO" BY GG 2 PC - - - - -
14 STEAM TRAP FS5 DN15 PN25 "TLV" BY GG 2 PC - - - - -
15 BLIND FLANGE DN250 PN25 2 PC 1 1 - 1,039,398 1,039,398 -
16 BOLT+NUT+PLAT WASHER M12X60-8,8 64 SE 64 - - 2,700 - -
17 BOLT+NUT+PLAT WASHER M12X90-8,8 8 SE 8 - - 3,744 - -
18 BOLT+NUT+PLAT WASHER M12X100-8,8 228 SE - 228 - 4,722 1,076,667 -
19 ELBOW 45 SEAMLESS SCH40; DN250 1 PC 1 - - 710,799 - -
20 ELBOW 90 SEAMLESS SCH40;DN25 15 PC - 15 - 7,888 118,317 -
21 ELBOW 90 SEAMLESS SCH40;DN250 4 PC 6 - 2 1,962,988 - 3,925,976
22 FIX SHOES SUPPORT FIR PIPE DN250 8 PC 7 1 - 416,167 416,167 -
23 FLANGE DN15 PN25 16 PC - 16 - 24,432 390,907 -
24 FLANGE DN25 PN25 4 PC - 4 - 40,720 162,878 -
25 FLANGE DN250 PN16 5 PC 5 - - 423,807 - -
26 FLANGE DN250 PN25 12 PC 6 6 - 583,646 3,501,878 -
27 INSULATION ROCKWOLL PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 96 MT 85 11 - 844,789 9,292,683 -
28 INSULATION ROCKWOLL PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 24 MT 24 - - 144,124 - -
29 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 100MM,FOR PIPE DN250 96 MT 85 11 - 189,549 2,085,037 -
30 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 30MM,FOR PIPE DN15 24 MT 24 - - 31,591 - -

9 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH

31 MODIFIKASI SUPPORT LINE STEAM 19 UN 5 14 - 345,544 4,837,622 -

32 PACKING NON ASBESTOS THINKNESS 5 MM 1 LO 1 - - 1,006,000 - -


33 TEE WELD SEAMLESS SCH40;DN15XDN15XDN15 4 PC 2 2 - 11,921 23,843 -
34 TEE WELD SEAMLESS SCH40;DN250XDN250XDN250 2 PC - 2 - 977,012 1,954,024 -
C.4. PEMASANGAN STEAM LINE BOILER INTEC TO STEAM HEADER - -
1 ALIGNMENT GUIDE "LISEGA" DN250 5 PC 5 - - 203,474 - -
2 BALL VALVE M10S DN25 PN40 "SPIRAX SARCO" 2 PC 1 1 - 60,000 - -
3 DISC CHECK VALVE TYPE : RK 86 DN15 PN40 "GESTRA" 2 PC 1 1 - 30,000 - -
4 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN250 12 PC - 12 - 300,000 - -
5 EXPANTION JOINT 250-DHEB-FF-1000-L DN250 PN16 1 PC 1 - - 203,474 - -
6 EXPANTION JOINT 250-UEB-FF-1000-L DN250 PN16 1 PC 1 - - 203,474 - -
7 EXPANTION JOINT 250-UEB-FF-1000-L DN250 PN25 4 PC - 4 - 203,474 - -
8 GLOBE VALVE TYPE : GAV54F;DN15.PN25 "GESTRA" 6 PC - 6 - 30,000 - -
9 PIPE SEAMLESS SCH40;A106 GR.B, DN15X6MT 24 MT 24 - - 13,333 - -
10 PIPE SEAMLESS SCH40;A106 GR.B, DN250X6MT 96 MT 85 11 - 266,667 - -
11 PIPE SEAMLESS SCH40;A106 GR.B, DN25X6MT 6 MT 3 3 - 26,667 - -
12 PRESURE REDUCING STATION DN250 1 UN 1 - - 203,474 - -
13 SIGHT GLASS SG253 DN15 PN40 "SPIRAX SARCO" 2 PC 1 1 - 64,792 - -
14 STEAM TRAP FS5 DN15 PN25 "TLV" 2 PC 1 1 - 52,174 - -
15 BLIND FLANGE DN250 PN25 2 PC 1 1 - 503,373 - -
16 BOLT+NUT+PLAT WASHER M12X60-8,8 64 SE 64 - - 1,350 - -
17 BOLT+NUT+PLAT WASHER M12X90-8,8 8 SE 8 - - 1,872 - -
18 BOLT+NUT+PLAT WASHER M24X100-8,8 228 SE - 228 - 3,500 - -
19 ELBOW 45 SEAMLESS SCH40 ; DN250 1 PC 1 - - 800,000 - -
20 ELBOW 90 SEAMLESS SCH40 ; DN25 15 PC - 15 - 80,000 - -
21 ELBOW 90 SEAMLESS SCH40 ; DN250 4 PC 6 - 2 800,000 - -
22 FIX SHOES SUPPORT FOR PIPE DN250 8 PC 7 1 166,467 - -
23 FLANGE DN15 PN25 16 PC - 16 - 40,000 - -
24 FLANGE DN25 PN25 4 PC - 4 - 80,000 - -
25 FLANGE DN250 PN16 5 PC 5 - - 800,000 - -
26 FLANGE DN250 PN25 12 PC 6 6 - 800,000 - -
27 INSULATION ROCKWOLL PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 96 MT 85 11 - 302,156 - -
28 INSULATION ROCKWOLL PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 24 MT 24 - - 166,969 - -
29 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 96 MT 85 11 - 388,889 - -
30 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 24 MT 24 - - 99,111 - -

31 MODIFIKASI SUPPORT LINE STEAM 19 UN 5 14 - 138,218 - -

32 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 402,400 - -


33 TEE WELD SEAMLESS SCH40;DN15XDN15XDN15 4 PC 2 2 - 60,000 - -
34 TEE WELD SEAMLESS SCH40;DN250XDN250XDN250 2 PC - 2 - 1,200,000 - -
C.5. PENGADAAN CONDENSAT LINE BOILER INTEC
1 ALIGNMENT GUIDE "LISEGA" DN100 BY GG 4 PC - - - - -
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN100 BY GG 15 PC - - - - -
3 EXPANTION JOINT 100-UEB-FF-1000-L DN100 PN16 BY GG 1 PC - - - - -
4 EXPANTION JOINT HYSPAN SERIES 6500-140-8, DN100 BY GG 1 PC - - - - -
10 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
5 GRUNDFOS PUMP CR16-30 BY GG 1 UN - - - - -
6 PIPE SEAMLESS SCH40;A106 GR.B, DN100X6MT BY GG 114 MT - - - - -

7 BOLT+NUT+PLAT WASHER M16X80-8,8 90 SE 168 - 78 2,667 - 208,000

8 ELBOW 90 SEAMLESS SCH40; DN100 9 PC 14 - 5 121,813 - 609,064

9 FIX SHOES SUPPORT FOR PIPE DN100 5 PC 11 - 6 847,162 - 5,082,973

10 FLANGE ANSI150 DN100 2 PC 2 - - 244,317 - -

11 FLANGE DN100 PN16 18 PC 19 - 1 128,549 - 128,549

12 INSULATION ROCKWOLL PIPE CONDENSAT THICKNESS 50MM, FOR PIPE DN100 114 MT 123 - 9 159,645 - 1,436,807
13 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN100 114 MT 123 - 9 84,244 - 758,195
14 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 1,006,000 - -
C.6. PEMASANGAN CONDENSAT LINE BOILER INTEC - -
1 ALIGNMENT GUIDE "LISEGA" DN100 4 PC 4 - - 185,696 - -

2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN100 15 PC 17 - 2 185,696 - -

3 EXPANTION JOINT 100-UEB-FF-1000-L DN100 PN16 1 PC 2 - 1 185,696 - -

4 EXPANTION JOINT HYSPAN SERIES 6500-140-8, DN100 1 PC 1 - - 185,696 - -


5 GRUNDFOS PUMP CR16-30 1 UN 1 - - 2,355,556 - -

6 PIPE SEAMLESS SCH40;A106 GR.B, DN100X6MT 114 MT 123 - 9 106,667 - -

7 BOLT+NUT+PLAT WASHER M16X80-8,8 90 SE 168 - 78 2,500 - -

8 ELBOW 90 SEAMLESS SCH40; DN100 9 PC 14 - 5 320,000 - -

9 FIX SHOES SUPPORT FOR PIPE DN100 5 PC 11 - 6 338,865 - -

10 FLANGE ANSI150 DN100 2 PC 2 - - 320,000 - -

11 FLANGE DN100 PN16 18 PC 19 - 1 320,000 - -

12 INSULATION ROCKWOLL PIPE CONDENSAT THICKNESS 50MM, FOR PIPE DN100 114 MT 123 - 9 182,156 - -
13 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN100 114 MT 123 - 9 143,556 - -
14 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 402,400 - -
C.7. PENGADAAN STEAM LINE DISTILASI FROM STEAM HEADER
1 ALIGNMENT GUIDE "LISEGA" DN250 BY GG 4 PC - - -
2 BALL VALVE M10S DN25 PN40 "SPIRAX SARCO" BY GG 2 PC - - -
3 BALL VALVE TYPE : VO;DN15.PN16 "END ARMATUREN" BY GG 6 PC - - -
4 DISC CHECK VALVE TYPE : RK 86 DN15 PN40 "GESTRA" BY GG 2 PC - - -
5 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN250 BY GG 11 PC - - -
6 EXPANTION JOINT 250-DAEJ-FF-1400-FF DN250 PN16 BY GG 1 PC - - -
7 EXPANTION JOINT 250-UEB-FF-1000-L DN250 PN16 BY GG 2 PC - - -
8 PIPE SEAMLESS SCH40;A106 GR.B, DN15X6MT BY GG 24 MT - - -
9 PIPE SEAMLESS SCH40;A106 GR.B, DN250X6MT BY GG 90 MT - - -
10 PIPE SEAMLESS SCH40;A106 GR.B, DN25X6MT BY GG 6 MT - - -
11 SIGHT GLASS SG253 DN15 PN40 "SPIRAX SARCO" BY GG 2 PC - - -
11 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
12 STEAM TRAP FS5 DN15 PN25 "TLV" BY GG 2 PC - - -
13 BLIND FLANGE DN250 PN16 2 PC 2 - - 799,537 - -

14 BOLT+NUT+PLAT WASHER M12X60-8,8 64 SE 88 - 24 2,700 - 64,800

15 BOLT+NUT+PLAT WASHER M12X90-8,8 8 SE 8 - - 3,744 - -


16 BOLT+NUT+PLAT WASHER M24X100-8,8 120 SE - 120 - 4,722 566,667 -

17 ELBOW 90 SEAMLESS SCH40 ; DN15 15 PC 14 1 - 38,111 38,111 -

18 ELBOW 90 SEAMLESS SCH40 ; DN250 3 PC 3 - - 1,046,319 - -


19 FIX SHOES SUPPORT FOR PIPE DN250 6 PC - 6 - 971,722 5,830,333 -

20 FLANGE DN15 PN16 16 PC 20 - 4 81,818 - 327,273

21 FLANGE DN25 PN16 4 PC 4 - - 52,556 - -


22 FLANGE DN250 PN16 12 PC 15 - 3 1,162,706 - 3,488,119
23 INSULATION ROCKWOLL PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 90 MT 88 2 - 844,789 1,689,579 -
24 INSULATION ROCKWOLL PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 24 MT 24 - - 144,124 - -
25 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 90 MT 88 2 - 189,549 379,098 -
26 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 24 MT 24 - - 31,591 - -
27 MODIFIKASI SUPPORT LINE STEAM 17 UN 17 - - 422,056 - -
28 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 1,006,000 - -
29 TEE WELD SEAMLESS SCH40;DN15XDN15XDN15 4 PC 4 - - 139,721 - -
30 TEE WELD SEAMLESS SCH40;DN250XDN250XDN250 2 PC 1 1 - 1,237,349 1,237,349 -
C.8. PEMASANGAN STEAM LINE DISTILASI FROM STEAM HEADER - -
1 ALIGNMENT GUIDE "LISEGA" DN250 4 PC - 4 - 203,474 - -
2 BALL VALVE M10S DN25 PN40 "SPIRAX SARCO" 2 PC 2 - - 60,000 - -
3 BALL VALVE TYPE : VO;DN15.PN16 "END ARMATUREN" 6 PC 6 - - 30,000 - -
4 DISC CHECK VALVE TYPE : RK 86 DN15 PN40 "GESTRA" 2 PC 2 - - 30,000 - -
5 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN250 11 PC - 11 - 300,000 - -
6 EXPANTION JOINT 250-DAEJ-FF-1400-FF DN250 PN16 1 PC 1 - - 203,474 - -
7 EXPANTION JOINT 250-UEB-FF-1000-L DN250 PN16 2 PC 3 - 1 203,474 - -
8 PIPE SEAMLESS SCH40;A106 GR.B, DN15X6MT 24 MT 24 - - 13,333 - -
9 PIPE SEAMLESS SCH40;A106 GR.B, DN250X6MT 90 MT 88 2 - 266,667 - -
10 PIPE SEAMLESS SCH40;A106 GR.B, DN25X6MT 6 MT 6 - - 26,667 - -
11 SIGHT GLASS SG253 DN15 PN40 "SPIRAX SARCO" 2 PC 2 - - 64,792 - -
12 STEAM TRAP FS5 DN15 PN25 "TLV" 2 PC 2 - - 52,174 - -
13 BLIND FLANGE DN250 PN16 2 PC 2 - - 503,373 - -

14 BOLT+NUT+PLAT WASHER M12X60-8,8 64 SE 88 - 24 1,350 - -

15 BOLT+NUT+PLAT WASHER M12X90-8,8 8 SE 8 - - 1,872 - -


16 BOLT+NUT+PLAT WASHER M24X100-8,8 120 SE 120 - 3,500 - -

17 ELBOW 90 SEAMLESS SCH40 ; DN15 15 PC 14 1 - 40,000 - -

18 ELBOW 90 SEAMLESS SCH40 ; DN250 3 PC 3 - - 800,000 - -


19 FIX SHOES SUPPORT FOR PIPE DN250 6 PC 6 - 388,689 - -

20 FLANGE DN15 PN16 16 PC 20 - 4 40,000 - -

21 FLANGE DN25 PN16 4 PC 4 - 80,000 - -


22 FLANGE DN250 PN16 12 PC 15 - 3 800,000 - -
12 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
23 INSULATION ROCKWOLL PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 90 MT 88 2 - 124,378 - -
24 INSULATION ROCKWOLL PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 24 MT 24 - - 78,080 - -
25 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 90 MT 88 2 - 166,667 - -
26 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 24 MT 24 - - 54,667 - -
27 MODIFIKASI SUPPORT LINE STEAM 17 UN 17 - - 168,822 - -
28 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 402,400 - -
29 TEE WELD SEAMLESS SCH40;DN15XDN15XDN15 4 PC 4 - - 60,000 - -
30 TEE WELD SEAMLESS SCH40;DN250XDN250XDN250 2 PC 1 1 - 1,200,000 - -
C.9. PENGADAAN CONDENSATE LINE DISTILASI
1 ALIGNMENT GUIDE "LISEGA" DN100 BY GG 2 PC - - -
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN100 BY GG 10 PC - - -
3 EXPANTION JOINT 100-DAEJ-FF-1400-FF DN100 PN16 BY GG 1 PC - - -
4 PIPE SEAMLESS SCH40;A106 GR.B, DN100X6MT BY GG 66 MT - - -
5 BOLT+NUT+PLAT WASHER M16X80-8,8 48 SE 48 - - 2,667 - -
6 ELBOW 90 SEAMLESS SCH40 ; DN100 8 PC 2 6 - 324,472 1,946,833 -
7 FIX SHOES SUPPORT FOR PIPE DN100 2 PC - 2 - 402,718 805,436 -
8 FLANGE DN100 PN16 10 PC 10 - - 591,611 - -
9 INSULATION ROCKWOLL PIPE CONDENSATE THICKNESS 50MM, FOR PIPE DN100 66 MT 66 - - 159,645 - -
10 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN100 66 MT 66 - - 84,244 - -
11 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 783,778 - -
C.10. PEMASANGAN CONDENSATE LINE DISTILASI - -
1 ALIGNMENT GUIDE "LISEGA" DN100 2 PC - 2 - 185,696 - -
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN100 10 PC - 10 - 185,696 - -
3 EXPANTION JOINT 100-DAEJ-FF-1400-FF DN100 PN16 1 PC 1 - - 185,696 - -
4 PIPE SEAMLESS SCH40;A106 GR.B, DN100X6MT 66 MT 66 - - 106,667 - -
5 BOLT+NUT+PLAT WASHER M16X80-8,8 48 SE 48 - - 2,500 - -
6 ELBOW 90 SEAMLESS SCH40 ; DN100 8 PC 2 6 - 320,000 - -
7 FIX SHOES SUPPORT FOR PIPE DN100 2 PC - 2 - 161,087 - -
8 FLANGE DN100 PN16 10 PC 10 - - 320,000 - -
9 INSULATION ROCKWOLL PIPE CONDENSATE THICKNESS 50MM, FOR PIPE DN100 66 MT 66 - - 93,267 - -
10 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN100 66 MT 66 - - 99,111 - -
11 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 313,511 - -
C.11. PENGADAAN STEAM LINE CLOVE FROM STEAM HEADER
1 ALIGNMENT GUIDE "LISEGA" DN250 BY GG 8 PC - - -
2 BALL VALVE M10S DN25 PN40 "SPIRAX SARCO" BY GG 2 PC - - -
3 BALL VALVE TYPE : VO;DN15.PN16 "END ARMATUREN" BY GG 6 PC - - -
4 DISC CHECK VALVE TYPE : RK 86 DN15 PN40 "GESTRA" BY GG 2 PC - - -
5 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN250 BY GG 16 PC - - -
6 EXPANTION JOINT 250-DHEB-FF-1000-L DN250 PN16 BY GG 1 PC - - -
7 EXPANTION JOINT 250-UEB-FF-1000-L DN250 PN16 BY GG 6 PC - - -
8 PIPE SEAMLESS SCH40;A106 GR.B, DN15X6MT BY GG 30 MT - - -
9 PIPE SEAMLESS SCH40;A106 GR.B, DN250X6MT BY GG 132 MT - - -
10 PIPE SEAMLESS SCH40;A106 GR.B, DN25X6MT BY GG 6 MT - - -
11 SIGHT GLASS SG253 DN15 PN40 "SPIRAX SARCO" BY GG 2 PC - - -
12 STEAM TRAP FS5 DN15 PN25 "TLV" BY GG 2 PC - - -
13 BLIND FLANGE DN250 PN16 2 PC 2 - - 799,537 - -

14 BOLT+NUT+PLAT WASHER M12X60-8,8 64 SE 92 - 28 2,700 - 75,600

13 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH

15 BOLT+NUT+PLAT WASHER M12X90-8,8 8 SE 16 - 8 3,744 - 29,956

16 BOLT+NUT+PLAT WASHER M24X100-8,8 216 SE 216 - - 4,722 - -

17 ELBOW 45 SEAMLESS SCH40 ; DN250 3 PC 3 - - 1,046,319 - -


18 ELBOW 90 SEAMLESS SCH40 ; DN15 15 PC 7 8 - 38,111 304,889 -
19 ELBOW 90 SEAMLESS SCH40 ; DN250 4 PC 2 2 - 1,046,319 2,092,637 -
20 FIX SHOES SUPPORT FOR PIPE DN250 9 PC 9 - 416,167 - -
21 FLANGE DN15 PN16 16 PC 10 6 - 81,818 490,909 -

22 FLANGE DN25 PN16 4 PC 18 - 14 52,556 - 735,778

23 FLANGE DN250 PN16 22 PC 17 5 - 1,162,706 5,813,531 -

24 INSULATION ROCKWOLL PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 132 MT 128 4 - 844,789 3,379,157 -
25 INSULATION ROCKWOLL PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 30 MT 28 2 - 144,124 288,248 -
26 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 132 MT 128 4 - 189,549 758,195 -
27 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 30 MT 28 2 - 31,591 63,183 -
28 MODIFIKASI SUPPORT LINE STEAM 26 PC 26 - - 755,389 - -
29 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 1,006,000 - -
30 TEE WELD SEAMLESS SCH40;DN15XDN15XDN15 4 PC 2 2 - 139,721 279,442 -
31 TEE WELD SEAMLESS SCH40;DN250XDN250XDN250 2 PC 3 - 1 1,237,349 - 1,237,349
C.12. PEMASANGAN STEAM LINE CLOVE TO STEAM HEADER - -

1 ALIGNMENT GUIDE "LISEGA" DN250 8 PC 7 1 - 203,474 - -

2 BALL VALVE M10S DN25 PN40 "SPIRAX SARCO" 2 PC 3 - 1 90,000 - -

3 BALL VALVE TYPE : VO;DN15.PN16 "END ARMATUREN" 6 PC 3 3 - 30,000 - -


4 DISC CHECK VALVE TYPE : RK 86 DN15 PN40 "GESTRA" 2 PC 1 1 - 30,000 - -

5 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN250 16 PC 14 2 - 300,000 - -

6 EXPANTION JOINT 250-DHEB-FF-1000-L DN250 PN16 1 PC 1 - - 203,474 - -


7 EXPANTION JOINT 250-UEB-FF-1000-L DN250 PN16 6 PC 6 - - 203,474 - -
8 PIPE SEAMLESS SCH40;A106 GR.B, DN15X6MT 30 MT 28 2 - 13,333 - -

9 PIPE SEAMLESS SCH40;A106 GR.B, DN250X6MT 132 MT 128 4 - 266,667 - -

10 PIPE SEAMLESS SCH40;A106 GR.B, DN25X6MT 6 MT 17 - 11 26,667 - -

11 SIGHT GLASS SG253 DN15 PN40 "SPIRAX SARCO" 2 PC 2 - - 64,792 - -


12 STEAM TRAP FS5 DN15 PN25 "TLV" 2 PC 1 1 - 52,174 - -
13 BLIND FLANGE DN250 PN16 2 PC 2 - - 503,373 - -

14 BOLT+NUT+PLAT WASHER M12X60-8,8 64 SE 92 - 28 1,350 - -

15 BOLT+NUT+PLAT WASHER M12X90-8,8 8 SE 16 - 8 1,872 - -

16 BOLT+NUT+PLAT WASHER M24X100-8,8 216 SE 160 56 - 3,500 - -

17 ELBOW 45 SEAMLESS SCH40 ; DN250 3 PC 3 - - 800,000 - -


18 ELBOW 90 SEAMLESS SCH40 ; DN15 15 PC 7 8 - 40,000 - -
14 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
19 ELBOW 90 SEAMLESS SCH40 ; DN250 4 PC 2 2 - 800,000 - -
20 FIX SHOES SUPPORT FOR PIPE DN250 9 PC 9 - 166,467 - -
21 FLANGE DN15 PN16 16 PC 10 6 - 40,000 - -

22 FLANGE DN25 PN16 4 PC 18 - 14 80,000 - -

23 FLANGE DN250 PN16 22 PC 17 5 - 800,000 - -

24 INSULATION ROCKWOLL PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 132 MT 128 4 - 388,889 - -
25 INSULATION ROCKWOLL PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 30 MT 28 2 - 99,111 - -
26 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 100MM, FOR PIPE DN250 132 MT 128 4 - 255,556 - -
27 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM THICKNESS 30MM, FOR PIPE DN15 30 MT 28 2 - 55,888 - -
28 MODIFIKASI SUPPORT LINE STEAM 26 PC 26 - - 302,156 - -
29 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 402,400 - -
30 TEE WELD SEAMLESS SCH40;DN15XDN15XDN15 4 PC 2 2 - 60,000 - -
31 TEE WELD SEAMLESS SCH40;DN250XDN250XDN250 2 PC 3 - 1 1,200,000 - -
C.13. PENGADAAN CONDENSATE LINE CLOVE
1 ALIGNMENT GUIDE "LISEGA" DN150 BY GG 6 PC - - -
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN150 BY GG 11 PC - - -
3 EXPANTION JOINT 150-UEB-FF-1000-L DN150 PN16 BY GG 4 PC - - -
4 EXPANTION JOINT HYSPAN SERIES 6500-140-8, DN150 BY GG 1 PC - - -
5 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT BY GG 120 MT - - -

6 BOLT+NUT+PLAT WASHER M20X80-8,8 128 SE 72 56 - 3,178 177,956 -

7 ELBOW 45 SEAMLESS SCH40 ; DN150 1 PC 1 - 400,556 - -

8 ELBOW 90 SEAMLESS SCH40 ; DN150 8 PC 9 - 1 400,556 - 400,556

9 FIX SHOES SUPPORT FOR PIPE DN150 4 PC 6 - 2 402,718 - 805,436

10 FLANGE ANSI150 DN150 2 PC - 2 - 929,758 1,859,517 -

11 FLANGE DN150 PN16 14 PC 11 3 - 858,586 2,575,758 -

12 INSULATION ROCKWOLL PIPE CONDENSATE THICKNESS 50MM, FOR PIPE DN150 120 MT 120 - - 207,871 - -
13 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN150 120 MT 120 - - 105,305 - -
14 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 1,006,000 - -
C.14. PEMASANGAN CONDENSATE LINE CLOVE - -
1 ALIGNMENT GUIDE "LISEGA" DN150 6 PC 6 - - 207,067 - -

2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN150 11 PC 14 - 3 207,067 - -

3 EXPANTION JOINT 150-UEB-FF-1000-L DN150 PN16 4 PC 3 1 - 207,067 - -

4 EXPANTION JOINT HYSPAN SERIES 6500-140-8, DN150 1 PC - 1 - 207,067 - -


5 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT 120 MT 120 - - 160,000 - -

6 BOLT+NUT+PLAT WASHER M20X80-8,8 128 SE 72 56 - 3,000 - -

7 ELBOW 45 SEAMLESS SCH40 ; DN150 1 PC 1 - - 480,000 - -

8 ELBOW 90 SEAMLESS SCH40 ; DN150 8 PC 9 - 1 480,000 - -

15 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH

9 FIX SHOES SUPPORT FOR PIPE DN150 4 PC 6 - 2 161,087 - -

10 FLANGE ANSI150 DN150 2 PC - 2 - 480,000 - -

11 FLANGE DN150 PN16 14 PC 11 3 - 480,000 - -

12 INSULATION ROCKWOLL PIPE CONDENSATE THICKNESS 50MM, FOR PIPE DN150 120 MT 120 - - 213,222 - -
13 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN150 120 MT 120 - - 176,000 - -
14 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 402,400 - -
C.15. PENGADAAN STEAM LINE ABL FROM STEAM HEADER
1 ALIGNMENT GUIDE "LISEGA" DN200 BY GG 3 PC - - -
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN200 BY GG 8 PC - - -
3 EXPANTION JOINT 200-UEB-FF-1000-L DN200 PN16 BY GG 3 PC - - -
4 PIPE SEAMLESS SCH40;A106 GR.B, DN200X6MT BY GG 72 MT - - -
5 BOLT+NUT+PLAT WASHER M20X80-8,8 96 PC 72 24 - 3,178 76,267 -
6 ELBOW 45 SEAMLESS SCH40 ; DN200 2 PC - 2 - 1,162,706 2,325,412 -
7 ELBOW 90 SEAMLESS SCH40 ; DN200 2 PC 3 - 1 1,162,706 - 1,162,706
8 FIX SHOES SUPPORT FOR PIPE DN200 5 PC 5 - - 499,394 - -
9 FLANGE DN200 PN16 8 PC 8 - - 1,224,218 - -
10 INSULATION ROCKWOLL PIPE STEAM THICKNESS 80MM, FOR PIPE DN200 72 MT 68 4 - 518,847 2,075,388 -
11 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN200 72 MT 68 4 - 126,366 505,463 -
12 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 1,006,000 - -
C.16. PEMASANGAN STEAM LINE ABL FROM STEAM HEADER - -
1 ALIGNMENT GUIDE "LISEGA" DN200 3 PC 2 1 - 222,178 - -
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN200 8 PC 8 - - 222,178 - -
3 EXPANTION JOINT 200-UEB-FF-1000-L DN200 PN16 3 PC 3 - - 351,166 - -
4 PIPE SEAMLESS SCH40;A106 GR.B, DN200X6MT 72 MT 68 4 - 213,333 - -
5 BOLT+NUT+PLAT WASHER M20X80-8,8 96 PC 72 24 - 3,000 - -
6 ELBOW 45 SEAMLESS SCH40 ; DN200 2 PC - 2 - 640,000 - -
7 ELBOW 90 SEAMLESS SCH40 ; DN200 2 PC 3 - 1 640,000 - -
8 FIX SHOES SUPPORT FOR PIPE DN200 5 PC 5 - - 199,758 - -
9 FLANGE DN200 PN16 8 PC 8 - - 640,000 - -
10 INSULATION ROCKWOLL PIPE STEAM THICKNESS 80MM, FOR PIPE DN200 72 MT 68 4 - 208,822 - -
11 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN200 72 MT 68 4 - 152,000 - -
12 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 402,400 - -
C.17. PENGADAAN CONDENSATE LINE ABL
1 ALIGNMENT GUIDE "LISEGA" DN150 BY GG 3 PC - - -
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN150 BY GG 12 PC - - -
3 EXPANTION JOINT 150-UEB-FF-1000-L DN150 PN16 BY GG 3 PC - - -
4 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT BY GG 90 MT - - -
5 BOLT+NUT+PLAT WASHER M20X80-8,8 64 SE 56 8 - 3,178 25,422 -
6 ELBOW 45 SEAMLESS SCH40 ; DN150 2 PC 2 - - 400,556 - -
7 ELBOW 90 SEAMLESS SCH40 ; DN150 7 PC 6 1 - 400,556 400,556 -
8 FIX SHOES SUPPORT FOR PIPE DN150 5 PC 5 - - 736,051 - -
9 FLANGE DN150 PN16 7 PC 6 1 - 858,586 858,586 -
10 INSULATION ROCKWOLL PIPE STEAM THICKNESS 50MM, FOR PIPE DN150 90 MT 85 5 - 207,871 1,039,357 -
11 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN150 90 MT 85 5 - 105,305 526,524 -
12 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 1,006,000 - -
13 TEE WELD SEAMLESS SCH40;DN150XDN150XDN150 2 PC 1 1 - 533,951 533,951 -
16 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
C.18. PEMASANGAN CONDENSATE LINE ABL
1 ALIGNMENT GUIDE "LISEGA" DN150 BY GG 3 PC 2 1 - 204,356
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN150 BY GG 12 PC 10 2 - 204,356
3 EXPANTION JOINT 150-UEB-FF-1000-L DN150 PN16 BY GG 3 PC 3 - - 204,356
4 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT BY GG 90 MT 85 5 - 160,000
5 BOLT+NUT+PLAT WASHER M20X80-8,8 64 SE 56 8 - 3,000 - -
6 ELBOW 45 SEAMLESS SCH40 ; DN150 2 PC 2 - - 480,000 - -
7 ELBOW 90 SEAMLESS SCH40 ; DN150 7 PC 6 1 - 480,000 - -
8 FIX SHOES SUPPORT FOR PIPE DN150 5 PC 5 - - 294,420 - -
9 FLANGE DN150 PN16 7 PC 6 1 - 480,000 - -
10 INSULATION ROCKWOLL PIPE STEAM THICKNESS 50MM, FOR PIPE DN150 90 MT 85 5 - 213,222 - -
11 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN150 90 MT 85 5 - 176,000 - -
12 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 402,400 - -
13 TEE WELD SEAMLESS SCH40;DN150XDN150XDN150 2 PC 1 1 - 720,000
C.19. PENGADAAN STEAM LINE DIET PLANT FROM STEAM HEADER
1 ALIGNMENT GUIDE "LISEGA" DN150 BY GG 2 PC - - -
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN150 BY GG 4 PC - - -
3 EXPANTION JOINT 150-UEB-FF-1000-L DN150 PN16 BY GG 1 PC - - -
4 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT BY GG 42 MT - - -
5 BOLT+NUT+PLAT WASHER M20X80-8,8 40 SE 48 - 8 3,178 - 25,422
6 ELBOW 90 SEAMLESS SCH40 ; DN150 3 PC 3 - - 400,556 - -
7 FIX SHOES SUPPORT FOR PIPE DN150 2 PC 2 - - 400,556 - -
8 FLANGE DN150 PN16 6 PC 6 - - 1,402,718 - -
9 INSULATION ROCKWOLL PIPE STEAM THICKNESS 80MM, FOR PIPE DN150 42 MT 41 1 - 415,743 415,743 -
10 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM. THICKNESS 80MM, FOR PIPE DN150 42 MT 41 1 - 130,578 130,578 -
11 MODIFIKASI SUPPORT LINE STEAM 5 UN - 5 - 440,000 2,200,000 -
12 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 1,006,000 - -
C.20. PEMASANGAN STEAM LINE DIET PLANT FROM STEAM HEADER
1 FLANGE DN150 PN16 6 PC 6 - - 480,000 - -
2 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT 42 MT 41 1 - 160,000 - -
3 ELBOW 90 SEAMLESS SCH40 ; DN150 3 PC 3 - - 480,000 - -
4 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN150 4 PC 4 - - 207,067 - -
5 ALIGNMENT GUIDE "LISEGA" DN150 2 PC 2 - - 510,889 - -
6 FIX SHOES SUPPORT FOR PIPE DN150 2 PC 2 - - 344,389 - -
7 EXPANTION JOINT 150-UEB-FF-1000-L DN150 PN16 1 PC 1 - - 510,889 - -
8 INSULATION ROCKWOLL PIPE STEAM THICKNESS 80MM, FOR PIPE DN150 42 MT 41 1 - 426,444 - -
9 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE STEAM. THICKNESS 80MM, FOR PIPE DN150 42 MT 41 1 - 352,000 - -
10 BOLT+NUT+PLAT WASHER M20X80-8,8 40 SE 48 - 8 3,000 - -
11 MODIFIKASI SUPPORT LINE STEAM 5 UN - 5 - 355,556 - -
12 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 402,400 - -
C.21. PENGADAAN CONDENSATE LINE DIET PLANT
1 ALIGNMENT GUIDE "LISEGA" DN80 BY GG 1 PC - - -
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN80 BY GG 2 PC - - -
3 EXPANTION JOINT 150-UEB-FF-1000-L DN80 PN16 BY GG 1 PC - - -
4 PIPE SEAMLESS SCH40;A106 GR.B, DN80X6MT BY GG 24 MT - - -
5 BOLT+NUT+PLAT WASHER M16X70-8,8 24 PC 24 - - 2,667 - -
6 ELBOW 90 SEAMLESS SCH40 ; DN80 2 PC 2 - - 115,278 - -
7 FIX SHOES SUPPORT FOR PIPE DN80 2 PC 2 - - 357,989 - -
17 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
8 FLANGE DN80 PN16 4 PC 2 2 - 255,556 511,111 -
9 INSULATION ROCKWOLL PIPE CONDENSATE THICKNESS 50MM, FOR PIPE DN80 24 MT 24 - - 137,472 - -
10 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN80 24 MT 24 - - 75,820 - -
11 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 1,006,000 - -
C.22. PEMASANGAN CONDENSATE LINE DIET PLANT
1 ALIGNMENT GUIDE "LISEGA" DN80 1 PC 1 - - 176,889 - -
2 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN80 2 PC 2 - - 176,889 - -
3 EXPANTION JOINT 150-UEB-FF-1000-L DN80 PN16 1 PC 1 - - 176,889 - -
4 PIPE SEAMLESS SCH40;A106 GR.B, DN80X6MT 24 MT 24 - - 80,000 - -
5 BOLT+NUT+PLAT WASHER M16X70-8,8 24 PC 24 - - 2,500 - -
6 ELBOW 90 SEAMLESS SCH40 ; DN80 2 PC 2 - - 240,000 - -
7 FIX SHOES SUPPORT FOR PIPE DN80 2 PC 2 - - 143,196 - -
8 FLANGE DN80 PN16 4 PC 4 - - 240,000 - -
9 INSULATION ROCKWOLL PIPE CONDENSATE THICKNESS 50MM, FOR PIPE DN80 24 MT 24 - - 169,732 - -
10 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE COND. THICKNESS 50MM, FOR PIPE DN80 24 MT 24 - - 112,554 - -
11 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 402,400 - -

E. PENGADAAN DAN PEMASANGAN LINE FEED DAERATOR PLANT (WSM)


E.1. PENGADAAN LINE FEED DAERATOR PLANT (WSM)
1 BUTTERFLY VALVE DN150 BY GG 1 PC - - -
2 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN50 "SPINDO BY GG 18 MT - - -
3 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN65 BY GG 3 PC - - -
4 GLOBE VALVE TYPE : GAV54F;DN100.PN16 "GESTRA" BY GG 1 PC - - -
5 GLOBE VALVE TYPE : GAV54F;DN50.PN16 "GESTRA" BY GG 3 PC - - -
6 PIPE SEAMLESS SCH40;A106 GR.B, DN100X6MT BY GG 12 MT - - -
7 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT BY GG 48 MT - - -
8 PIPE SEAMLESS SCH40;A106 GR.B, DN250X6MT BY GG 18 MT - - -
9 PIPE SEAMLESS SCH40;A106 GR.B, DN25X6MT BY GG 12 MT - - -
10 PIPE SEAMLESS SCH40;A106 GR.B, DN50X6MT BY GG 60 MT - - -
11 PIPE SEAMLESS SCH40;A106 GR.B, DN65X6MT BY GG 78 MT - - -
12 PRESSURE GAUGE RANGE 0-10 BAR INCLUDE SHYPON BY GG 2 PC - - -
13 PRESSURE REDUCING VALVE DN50 BY GG 1 PC - - -
14 STRAINER DN100 PN16 BY GG 1 PC - - -
15 STRAINER DN50 PN16 BY GG 1 PC - - -
16 BLIND FLANGE DN100 PN16 1 PC - 1 - 176,579 176,579 -
17 BLIND FLANGE DN150 PN16 5 PC 4 1 - 328,061 328,061 -
18 BLIND FLANGE DN50 PN16 1 PC 2 - 1 94,116 - 94,116
19 BOLT+NUT+PLAT WASHER M16X70-8,8 88 SE 216 - 128 2,667 - 341,333
20 BOLT+NUT+PLAT WASHER M20X80-8,8 64 SE 88 - 24 3,178 - 76,267
21 CONCENTRIC REDUCER SEAMLESS SCH40 DN100XDN65 1 PC 1 - - 62,934 - -
22 CONCENTRIC REDUCER SEAMLESS SCH40 DN250XDN200 2 PC 2 - - 332,666 - -
23 ECCENTRIC REDUCER SEAMLESS SCH40 DN100XDN50 1 PC - 1 - 297,778 297,778 -
24 ECCENTRIC REDUCER SEAMLESS SCH40 DN150XDN65 3 PC 1 2 - 277,537 555,074 -
25 ECCENTRIC REDUCER SEAMLESS SCH40 DN65XDN50 2 PC 6 - 4 218,611 - 874,444
26 ELBOW 45 SEAMLESS SCH40; DN50 1 PC - 1 - 180,331 180,331 -
27 ELBOW 90 SEAMLESS SCH40; DN100 5 PC 5 - - 213,361 - -
28 ELBOW 90 SEAMLESS SCH40; DN150 9 PC 6 3 - 322,778 968,333 -
29 ELBOW 90 SEAMLESS SCH40; DN25 6 PC 2 4 - 38,111 152,444 -
18 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
30 ELBOW 90 SEAMLESS SCH40; DN250 2 PC 4 - 2 1,046,319 - 2,092,637
31 ELBOW 90 SEAMLESS SCH40; DN50 13 PC 8 5 - 180,331 901,656 -
32 ELBOW 90 SEAMLESS SCH40; DN65 16 PC 12 4 - 93,056 372,222 -
33 FLANGE DN100 PN16 2 PC 3 - 1 425,000 - 425,000
34 FLANGE DN150 PN16 12 PC 9 3 - 841,000 2,523,000 -
35 FLANGE DN25 PN16 2 PC 2 - - 163,667 - -
36 FLANGE DN50 PN16 10 PC 7 3 - 260,812 782,435 -
37 FLANGE DN65 PN16 4 PC 2 2 - 144,444 288,889 -
38 INSULATION ROCKWOLL PIPE CONDENSATE THICKNESS 30MM, FOR PIPE DN50 6 MT 54 - 48 113,636 - 5,454,545
39 INSULATION ROCKWOLL PIPE CONDENSATE THICKNESS 30MM, FOR PIPE DN65 24 MT 19 5 - 131,929 659,645 -
40 INSULATION ROCKWOLL PIPE CONDENSATE THICKNESS 50MM, FOR PIPE DN100 12 MT 13 - 1 159,645 - 159,645
41 INSULATION ROCKWOLL PIPE CONDENSATE THICKNESS 50MM, FOR PIPE DN150 6 MT 6 - - 207,871 - -
42 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE CONDENSAT THK'S 50MM, FOR PIPE DN50 6 MT 54 - 48 63,183 - 3,032,780
43 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE CONDENSAT THK'S 50MM, FOR PIPE DN65 24 MT 19 5 - 69,501 347,506 -
44 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE CONDENSAT THK'S 50MM, FOR PIPE DN100 12 MT 13 - 1 84,244 - 84,244
45 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE CONDENSAT THK'S 50MM, FOR PIPE DN150 6 MT 6 - - 105,305 - -
46 KNIE GALVANISED SCREWED DN50 5 PC - 5 - 29,920 149,598 -
47 PACKING NON ASBESTOS THICKNESS 5 MM 1 LO 1 - - 1,006,000 - -
48 TEE WELD SEAMLESS SCH40;DN150XDN150XDN100 3 PC - 3 - 350,000 1,050,000 -
49 TEE WELD SEAMLESS SCH40;DN150XDN150XDN150 7 PC 6 1 - 418,889 418,889 -
50 TEE WELD SEAMLESS SCH40;DN150XDN150XDN80 1 PC 1 - - 352,322 - -
51 TEE WELD SEAMLESS SCH40;DN65XDN65XDN50 2 PC - 2 - 160,694 321,389 -
52 U-BOLT DN100 5 PC - 5 - 6,000 30,000 -
53 U-BOLT DN150 10 PC - 10 - 7,000 70,000 -
54 U-BOLT DN50 10 PC 12 - 2 3,472 - 6,944
55 U-BOLT DN65 12 PC - 12 - 4,406 52,867 -
E.2. PEMASANGAN LINE FEED DAERATOR PLANT (WSM)
1 BUTTERFLY VALVE DN150 1 PC 3 - 2 360,000 - -
2 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN50 "SPINDO 18 MT - 18 - 60,000 - -
3 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN65 3 PC - 3 - 93,338 - -
4 GLOBE VALVE TYPE : GAV54F;DN100.PN16 "GESTRA" 1 PC 1 - - 240,000 - -
5 GLOBE VALVE TYPE : GAV54F;DN50.PN16 "GESTRA" 3 PC 2 1 - 120,000 - -
6 PIPE SEAMLESS SCH40;A106 GR.B, DN100X6MT 12 MT 13 - 1 106,667 - -
7 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT 48 MT 48 - - 160,000 - -
8 PIPE SEAMLESS SCH40;A106 GR.B, DN250X6MT 18 MT 18 - - 266,667 - -
9 PIPE SEAMLESS SCH40;A106 GR.B, DN25X6MT 12 MT 5 7 - 26,667 - -
10 PIPE SEAMLESS SCH40;A106 GR.B, DN50X6MT 60 MT 54 6 - 53,333 - -
11 PIPE SEAMLESS SCH40;A106 GR.B, DN65X6MT 78 MT 19 59 - 66,667 - -
12 PRESSURE GAUGE RANGE 0-10 BAR INCLUDE SHYPON 2 PC 2 - - 175,729 - -
13 PRESSURE REDUCING VALVE DN50 1 PC - 1 - 175,729 - -
14 STRAINER DN100 PN16 1 PC - 1 - 240,000 - -
15 STRAINER DN50 PN16 1 PC - 1 - 120,000 - -
16 BLIND FLANGE DN100 PN16 1 PC - 1 - 118,962 - -
17 BLIND FLANGE DN150 PN16 5 PC 4 1 - 152,876 - -
18 BLIND FLANGE DN50 PN16 1 PC 2 - 1 87,864 - -
19 BOLT+NUT+PLAT WASHER M16X70-8,8 88 SE 216 - 128 2,500 - -
20 BOLT+NUT+PLAT WASHER M20X80-8,8 64 SE 88 - 24 3,000 - -
21 CONCENTRIC REDUCER SEAMLESS SCH40 DN100XDN65 1 PC 1 - - 260,000 - -
19 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
22 CONCENTRIC REDUCER SEAMLESS SCH40 DN250XDN200 2 PC 2 - - 720,000 - -
23 ECCENTRIC REDUCER SEAMLESS SCH40 DN100XDN50 1 PC - 1 - 240,000 - -
24 ECCENTRIC REDUCER SEAMLESS SCH40 DN150XDN65 3 PC 1 2 - 340,000 - -
25 ECCENTRIC REDUCER SEAMLESS SCH40 DN65XDN50 2 PC 6 - 4 180,000 - -
26 ELBOW 45 SEAMLESS SCH40; DN50 1 PC - 1 - 160,000 - -
27 ELBOW 90 SEAMLESS SCH40; DN100 5 PC 5 - - 320,000 - -
28 ELBOW 90 SEAMLESS SCH40; DN150 9 PC 6 3 - 480,000 - -
29 ELBOW 90 SEAMLESS SCH40; DN25 6 PC 2 4 - 80,000 - -
30 ELBOW 90 SEAMLESS SCH40; DN250 2 PC 4 - 2 800,000 - -
31 ELBOW 90 SEAMLESS SCH40; DN50 13 PC 8 5 - 160,000 - -
32 ELBOW 90 SEAMLESS SCH40; DN65 16 PC 12 4 - 200,000 - -
33 FLANGE DN100 PN16 2 PC 3 - 1 320,000 - -
34 FLANGE DN150 PN16 12 PC 9 3 - 480,000 - -
35 FLANGE DN25 PN16 2 PC 2 - - 80,000 - -
36 FLANGE DN50 PN16 10 PC 7 3 - 160,000 - -
37 FLANGE DN65 PN16 4 PC 2 2 - 200,000 - -
38 INSULATION ROCKWOLL PIPE CONDESAT THINKNESS 30MM,FOR PIPE DN50 6 MT 54 - 48 85,600 - -
39 INSULATION ROCKWOLL PIPE CONDESAT THINKNESS 30MM,FOR PIPE DN65 24 MT 19 5 - 169,732 - -
40 INSULATION ROCKWOLL PIPE CONDESAT THINKNESS 50MM,FOR PIPE DN100 12 MT 13 - 1 182,156 - -
41 INSULATION ROCKWOLL PIPE CONDESAT THINKNESS 50MM,FOR PIPE DN150 6 MT 6 - - 196,399 - -
42 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE CONDENSAT THK'S 50MM, FOR PIPE DN50 6 MT 54 - 48 56,277 - -
43 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE CONDENSAT THK'S 50MM, FOR PIPE DN65 24 MT 19 5 - 74,499 - -
44 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE CONDENSAT THK'S 50MM, FOR PIPE DN100 12 MT 13 - 1 143,556 - -
45 JACKETING ALUMUNIUM SHEET 0,5MM, PIPE CONDENSAT THK'S 50MM, FOR PIPE DN150 6 MT 6 - - 163,556 - -
46 KNIE GALVANISED SCREWED DN50 5 PC - 5 - 70,000 - -
47 PACKING NON ASBESTOS THICKNESS 5MM 1 LO 1 - - 402,400 - -
48 TEE WELD SEAMLESS SCH40;DN150XDN150XDN100 3 PC - 3 - 640,000 - -
49 TEE WELD SEAMLESS SCH40;DN150XDN150XDN150 7 PC 6 1 - 720,000 - -
50 TEE WELD SEAMLESS SCH40;DN150XDN150XDN80 1 PC 1 - - 600,000 - -
51 TEE WELD SEAMLESS SCH40;DN65XDN65XDN50 2 PC - 2 - 280,000 - -
52 U-BOLT DN100 5 PC - 5 - 2,400 - -
53 U-BOLT DN150 10 PC - 10 - 2,800 - -
54 U-BOLT DN50 10 PC 12 - 2 1,389 - -
55 U-BOLT DN65 12 PC - 12 - 1,762 - -

F. PENGANDAAN DAN PEMASANGAN SEPARATOR BLOWDOWN CENTRAL BOILER


F1. PENGADAAN SEPARATOR BLOWDOWN CENTRAL BOILER
1 BALL VALVE "KITZ" DN25 BY GG 1 PC - - -
2 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN25 "SPINDO" BY GG 6 MT - - -
3 DISC CHECK VALVE TYPE : RK 86, DN80 PN16 BY GG 1 PC - - -
4 GLOBE VALVE TYPE : GAV54F;DN50.PN16 "GESTRA" BY GG 1 PC - - -
5 PIPE SEAMLESS SCH40;A106 GR.B, DN100X6MT BY GG 12 MT - - -
6 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT BY GG 42 MT - - -
7 PIPE SEAMLESS SCH40;A106 GR.B, DN20X6MT BY GG 18 MT - - -
8 PIPE SEAMLESS SCH40;A106 GR.B, DN250X6MT BY GG 12 MT - - -
9 PIPE SEAMLESS SCH40;A106 GR.B, DN25X6MT BY GG 18 MT - - -
10 PIPE SEAMLESS SCH40;A106 GR.B, DN40X6MT BY GG 6 MT - - -
11 PIPE SEAMLESS SCH40;A106 GR.B, DN50X6MT BY GG 6 MT - - -
20 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
12 PIPE SEAMLESS SCH40;A106 GR.B, DN65X6MT BY GG 30 MT - - -
13 SEPARATOR BLOWDOWN TYPE BEM 450 BY GG 1 UN - - -
14 BLIND FLANGE DN100 PN16 1 PC 1 - - 176,579 - -
15 BLIND FLANGE DN150 PN16 1 PC 1 - - 328,061 - -
16 BLIND FLANGE DN65 PN16 4 PC 2 2 - 94,116 188,232 -
17 BOLT+NUT+PLAT WASHER M16X80-8,8 104 SE 16 88 - 2,667 234,667 -
18 BOLT+NUT+PLAT WASHER M24X100-8,8 12 SE 12 - - 4,722 - -
19 ECCENTRIC REDUCER SEAMLESS SCH40;DN150XDN50 1 PC - 1 - 277,537 277,537 -
20 ECCENTRIC REDUCER SEAMLESS SCH40;DN150XDN80 1 PC - 1 - 333,170 333,170 -
21 ELBOW 45 SEAMLESS SCH40; DN20 4 PC - 4 - 22,222 88,889 -
22 ELBOW 45 SEAMLESS SCH40; DN25 4 PC 6 - 2 38,111 - 76,222
23 ELBOW 45 SEAMLESS SCH40; DN40 3 PC 2 1 - 52,667 52,667 -
24 ELBOW 90 SEAMLESS SCH40; DN100 4 PC 2 2 - 324,472 648,944 -
25 ELBOW 90 SEAMLESS SCH40; DN150 2 PC 2 - - 933,889 - -
26 ELBOW 90 SEAMLESS SCH40; DN20 4 PC - 4 - 22,222 88,889 -
27 ELBOW 90 SEAMLESS SCH40; DN25 4 PC 2 2 - 38,111 76,222 -
28 ELBOW 90 SEAMLESS SCH40; DN40 3 PC 2 1 - 52,667 52,667 -
29 ELBOW 90 SEAMLESS SCH40; DN50 2 PC - 2 - 69,220 138,440 -
30 ELBOW 90 SEAMLESS SCH40; DN65 4 PC 2 2 - 93,056 186,111 -
31 FLANGE DN100 PN16 1 PC 2 - 1 425,000 - 425,000
32 FLANGE DN150 PN16 5 PC 1 4 - 841,000 3,364,000 -
33 FLANGE DN250 PN16 1 PC 1 - - 1,162,706 - -
34 FLANGE DN50 PN16 2 PC 2 - - 144,444 - -
35 FLANGE DN65 PN16 4 PC 2 2 - 260,812 521,623 -
36 FLANGE DN80 PN16 1 PC - 1 - 255,556 255,556 -
37 KNIE GALVANISED SCREWED DN25 4 PC - 4 - 9,772 39,090 -
38 PACKING NON ASBESTOS THICKNESS 5MM 1 LO - 1 - 1,006,000 1,006,000 -
39 TEE WELD SEAMLESS SCH40;DN150XDN150XDN150 1 PC 1 - - 350,000 - -
40 U-BOLT DN150 5 PC 9 - 4 7,000 - 28,000
41 U-BOLD DN65 10 PC 4 6 - 4,406 26,433 -
F.2. PEMASANGAN SEPARATOR BLOWDOWN CENTRAL BOILER - -
1 BALL VALVE "KITZ" DN25 1 PC 1 - - 49,867 - -
2 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN25 "SPINDO" 6 MT - 6 - 30,000 - -
3 DISC CHECK VALVE TYPE : RK 86, DN80 PN16 1 PC 1 - - 180,000 - -
4 GLOBE VALVE TYPE : GAV54F;DN50.PN16 "GESTRA" 1 PC 1 - - 120,000 - -
5 PIPE SEAMLESS SCH40;A106 GR.B, DN100X6MT 12 MT 3 9 - 106,667 - -
6 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT 42 MT 38 4 - 160,000 - -
7 PIPE SEAMLESS SCH40;A106 GR.B, DN20X6MT 18 MT - 18 - 20,000 - -
8 PIPE SEAMLESS SCH40;A106 GR.B, DN250X6MT 12 MT 12 - - 266,667 - -
9 PIPE SEAMLESS SCH40;A106 GR.B, DN25X6MT 18 MT 6 12 - 26,667 - -
10 PIPE SEAMLESS SCH40;A106 GR.B, DN40X6MT 6 MT 1 5 - 40,000 - -
11 PIPE SEAMLESS SCH40;A106 GR.B, DN50X6MT 6 MT 6 - - 53,333 - -
12 PIPE SEAMLESS SCH40;A106 GR.B, DN65X6MT 30 MT 16 14 - 66,667 - -
13 SEPARATOR BLOWDOWN TYPE BEM 450 1 UN 1 - - 1,426,707 - -
14 BLIND FLANGE DN100 PN16 1 PC 1 - - 118,962 - -
15 BLIND FLANGE DN150 PN16 1 PC 1 - - 152,876 - -
16 BLIND FLANGE DN65 PN16 4 PC 2 2 - 101,198 - -
17 BOLT+NUT+PLAT WASHER M16X80-8,8 104 SE 16 88 - 2,500 - -
21 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
18 BOLT+NUT+PLAT WASHER M24X100-8,8 12 SE 12 - - 3,500 - -
19 ECCENTRIC REDUCER SEAMLESS SCH40 DN150XDN50 1 PC - 1 - 320,000 - -
20 ECCENTRIC REDUCER SEAMLESS SCH40 DN150XDN80 1 PC - 1 - 360,000 - -
21 ELBOW 45 SEAMLESS SCH40; DN20 4 PC - 4 - 60,000 - -
22 ELBOW 45 SEAMLESS SCH40; DN25 4 PC 6 - 2 80,000 - -
23 ELBOW 45 SEAMLESS SCH40; DN40 3 PC 2 1 - 120,000 - -
24 ELBOW 90 SEAMLESS SCH40; DN100 4 PC 2 2 - 320,000 - -
25 ELBOW 90 SEAMLESS SCH40; DN150 2 PC 2 - - 480,000 - -
26 ELBOW 90 SEAMLESS SCH40; DN20 4 PC - 4 - 60,000 - -
27 ELBOW 90 SEAMLESS SCH40; DN25 4 PC 2 2 - 80,000 - -
28 ELBOW 90 SEAMLESS SCH40; DN40 3 PC 2 1 - 60,000 - -
29 ELBOW 90 SEAMLESS SCH40; DN50 2 PC - 2 - 160,000 - -
30 ELBOW 90 SEAMLESS SCH40; DN65 4 PC 2 2 - 200,000 - -
31 FLANGE DN100 PN16 1 PC 2 - 1 320,000 - -
32 FLANGE DN150 PN16 5 PC 1 4 - 480,000 - -
33 FLANGE DN250 PN16 1 PC 1 - - 800,000 - -
34 FLANGE DN50 PN16 2 PC 2 - - 160,000 - -
35 FLANGE DN65 PN16 4 PC 2 2 - 200,000 - -
36 FLANGE DN80 PN16 1 PC - 1 - 240,000 - -
37 KNIE GALVANISED SCREWED DN25 4 PC - 4 - 35,000 - -
38 PACKING NON ASBESTOS THICKNESS 5MM 1 LO - 1 - 402,400 - -
39 TEE WELD SEAMLESS SCH40;DN150XDN150XDN150 1 PC 1 - - 720,000 - -
40 U-BOLD DN150 5 PC 9 - 4 2,800 - -
41 U-BOLD DN65 10 PC 4 6 - 1,762 - -

G. PENGADAAN DAN PEMASANGAN FUEL LINE CENTRAL BOILER UNIT V


G.1. PENGADAAN LINE CNG CENTRAL BOILER UNIT V
1 BALL VALVE "KITZ" DN25 BY GG 4 PC - - -
2 BALL VALVE FLANGE "KITZ" DN25 BY GG 5 PC - - -
3 PIPE SEAMLESS SCH40;A106 GR.B, DN100X6MT BY GG 60 MT - - -
4 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT BY GG 144 MT - - -
5 PIPE SEAMLESS SCH40;A106 GR.B, DN15X6MT BY GG 18 MT - - -
6 PRESURE GUAGE RANGE 0-10 BAR BY GG 4 PC - - -
7 BLIND FLANGE DN150 PN16 2 PC - 2 - 328,061 656,122 -
8 BOLT+NUT+PLAT WASHER M16X80-8,8 64 SE 16 48 - 2,667 128,000 -
9 BOLT+NUT+PLAT WASHER M20X80-8,8 160 SE 192 - 32 3,178 - 101,689
10 ELBOW 45 SEAMLESS SCH40; DN150 2 PC 8 - 6 933,889 - 5,603,333
11 ELBOW 90 SEAMLESS SCH40; DN100 8 PC - 8 - 324,472 2,595,778 -
12 ELBOW 90 SEAMLESS SCH40; DN15 4 PC 4 - 38,111 - -
13 ELBOW 90 SEAMLESS SCH40; DN150 5 PC 14 - 9 933,889 - 8,405,000
14 FLANGE DN100 PN16 8 PC 32 - 24 425,000 - 10,200,000
15 FLANGE DN150 PN16 24 PC 21 3 - 841,000 2,523,000 -
16 MODIFIKASI SUPPORT FOR PIPE 30 PC 30 - - 490,000 - -
17 PACKING NON ASBESTOS THICKNESS 5MM 1 LO 1 - - 1,000,000 - -
18 PAINTING OF PIPE LINE CNG 1 LO 1 - - 12,000,000 - -
19 SHOCK WELD DN15 8 PC 3 5 - 3,889 19,444 -
20 TEE WELD SEAMLESS SCH40;DN150XDN150XDN100 5 PC 5 - 350,000 1,750,000 -
21 TEE WELD SEAMLESS SCH40;DN150XDN150XDN150 1 PC 5 - 4 350,000 - 1,400,000
22 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
22 U-BOLD DN100 10 PC 10 - - 6,444 - -
23 U-BOLD DN150 30 PC 30 - - 7,000 - -
G.2. PEMASANGAN LINE CNG CENTRAL BOILER UNIT V - -
1 BALL VALVE "KITZ" DN15 4 PC 7 - 3 53,775 - -
2 BALL VALVE FLANGE"KITZ" DN100 5 PC - 5 - 240,000 - -
3 PIPE SEAMLESS SCH40;A106 GR.B, DN100X6MT 60 MT - 60 - 106,667 - -
4 PIPE SEAMLESS SCH40;A106 GR.B, DN150X6MT 144 MT 178 - 34 160,000 - -
5 PIPE SEAMLESS SCH40;A106 GR.B, DN15X6MT 18 MT 18 - - 13,333 - -
6 PRESURE GUAGE RANGE 0-10 BAR 4 PC 7 - 3 53,775 - -
7 BLIND FLANGE DN150 PN16 2 PC - 2 - 350,744 - -
8 BOLT+NUT+PLAT WASHER M16X80-8,8 64 SE 16 48 - 2,500 - -
9 BOLT+NUT+PLAT WASHER M20X80-8,8 160 SE 192 - 32 3,000 - -
10 ELBOW 45 SEAMLESS SCH40; DN150 2 PC 8 - 6 480,000 - -
11 ELBOW 90 SEAMLESS SCH40; DN100 8 PC - 8 - 320,000 - -
12 ELBOW 90 SEAMLESS SCH40; DN15 4 PC 4 - - 40,000 - -
13 ELBOW 90 SEAMLESS SCH40; DN150 5 PC 14 - 9 480,000 - -
14 FLANGE DN100 PN16 8 PC 32 - 24 320,000 - -
15 FLANGE DN150 PN16 24 PC 21 3 - 480,000 - -
16 MODIFIKASI SUPPORT FOR PIPE 30 PC 30 - - 435,556 - -
17 PACKING NON ASBESTOS THICKNESS 5MM 1 LO 1 - - 402,400 - -
18 PAINTING OF PIPE LINE CNG 1 LO 1 - - 5,000,000 - -
19 SHOCK WELD DN15 8 PC 3 5 - 40,000 - -
20 TEE WELD SEAMLESS SCH40;DN150XDN150XDN100 5 PC - 5 - 640,000 - -
21 TEE WELD SEAMLESS SCH40;DN150XDN150XDN150 1 PC 5 - 4 720,000 - -
22 U-BOLD DN100 10 PC 10 - - 2,800 - -
23 U-BOLD DN150 30 PC 30 - - 2,800 - -
G.3. PENGADAAN LINE SOLAR CENTRAL BOILER UNIT V
1 BALL VALVE "KITZ" DN50 BY GG 10 PC - - -
2 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN25 "SPINDO" BY GG 142 MT - - -
3 PRESURE GUAGE RANGE 0-16 BAR BY GG 1 PC - - -
4 PRESURE REDUCING VALVE BY GG 1 PC - - -
5 PRESURE SWITCH SAUTER BY GG 1 PC - - -
6 PUMP STATION "KRAL" BY GG 1 UN - - -
7 STRAINER DN50 BY GG 1 PC - - -
8 BOLT+NUT+PLAT WASHER M16X60-8,8 56 SE 88 - 32 2,667 - 85,333
9 ELBOW 90 GALVANIZED DN50 15 PC 37 - 22 232,541 - 5,115,907
10 FLANGE DN50 PN16 24 PC 38 - 14 144,444 - 2,022,222
11 MODIFIKASI SUPPORT FOR PIPE 10 PC 10 - - 366,667 - -
12 PACKING NON ASBESTOS THICKNESS 5MM 1 LO 1 - - 450,444 - -
13 PAINTING OF PIPE LINE SOLAR 1 LO 1 - - 9,000,000 - -
14 SHOCK WELD DN15 2 PC - 2 - 3,889 7,778 -
15 U-BOLD DN50 20 PC 30 - 10 6,444 - 64,444
G.4 PEMASANGAN LINE SOLAR CENTRAL BOILER UNIT V - -
1 BALL VALVE "KITZ" DN50 10 PC 9 1 - 69,689 - -
2 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN50 "SPINDO" 142 MT 336 - 194 60,000 - -
3 PRESSURE GAUGE RANGE 0-16 BAR 1 PC 1 - - 70,292 - -
4 PRESSURE REDUCING VALVE 1 PC 1 - - 70,292 - -
5 PRESSURE SWITCH SAUTER 1 PC 1 - - 70,292 - -
23 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
6 PUMP STATION "KRAL" 1 UN 1 - - 1,444,444 - -
7 STRAINER DN50 1 PC 1 - - 120,000 - -
8 BOLT+NUT+PLAT WASHER M16X60-8,8 56 SE 88 - 32 2,500 - -
9 ELBOW 90 GALVANIZED DN50 15 PC 37 - 22 70,000 - -
10 FLANGE DN50 PN16 24 PC 38 - 14 160,000 - -
11 MODIFIKASI SUPPORT FOR PIPE 10 PC 10 - - 146,667 - -
12 PACKING NON ASBESTOS THICKNESS 5MM 1 LO 1 - - 180,178 - -
13 PAINTING OF PIPE LINE SOLAR 1 LO 1 - - 3,728,898 - -
14 SHOCK WELD DN15 2 PC - 2 - 40,000 - -
15 U-BOLD DN50 20 PC 30 - 10 2,578 - -

H. PENGADAAN DAN PEMASANGAN WATER SOFTENER


H.1. PENGADAAN WATER SOFTENER
1 BALL VALVE "KITZ" DN15 BY GG 2 PC - - -
2 BALL VALVE "KITZ" DN50 BY GG 3 PC - - -
3 BUTTERFLY VALVE DN100 BY GG 1 PC - - -
4 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN100 "SPINDO" BY GG 24 MT - - -
5 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN15 "SPINDO" BY GG 12 MT - - -
6 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN50 "SPINDO" BY GG 24 MT - - -
7 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN80 "SPINDO" BY GG 6 MT - - -
8 GRUNDFOS PUMP CRE 32-4 BY GG 1 UN - - -
9 PRESSURE GAUGE RANGE 0-10 BAR BY GG 1 PC - - -
10 SOFTENER SENSOTROL 2900 BY GG 1 UN - - -
11 SOLENOID VALVE TYPE : 82540 (G 2") BY GG 1 PC - - -
12 BLIND FLANGE DN100 PN16 1 PC 1 - - 176,579 - -
13 BOLT+NUT+PLAT WASHER M16X140-8,8 8 SE 32 - - 3,556 - -
14 BOLT+NUT+PLAT WASHER M16X70-8,8 16 SE 68 - 52 2,667 - 138,667
15 ELBOW 90 GALVANIZED DN100 4 PC 5 - 1 123,222 - 123,222
16 ELBOW 90 GALVANIZED DN50 6 PC 2 4 - 63,111 252,444 -
17 ELBOW 90 GALVANIZED DN80 1 PC 2 - 1 79,946 - 79,946
18 FLANGE DN100 PN16 5 PC 5 - - 425,000 - -
19 KNIE GALVANISED SCREWED DN15 6 PC - 6 - 9,772 58,635 -
20 MODIFIKASI SUPPORT FOR PIPE 6 PC - 6 - 543,333 3,260,000 -
21 PACKING NON ASBESTOS THICKNESS 5MM 1 LO - 1 - 1,006,000 1,006,000 -
22 PAINTING OF PIPE LINE WATER 1 LO - 1 - 2,012,607 2,012,607 -
23 TEE WELD GALVANIZED;DN100XDN100XDN80 1 PC 1 - - 148,648 - -
24 TEE WELD GALVANIZED;DN50XDN50XDN50 2 PC 1 1 - 129,371 129,371 -
25 U-BOLD DN100 5 PC - 5 - 7,000 35,000 -
26 U-BOLD DN15 2 PC - 2 - 3,333 6,667 -
27 U-BOLD DN50 4 PC - 4 - 6,444 25,778 -
28 U-BOLD DN80 2 PC - 2 - 3,333 6,667 -
29 UNION SCREW GALVANIZED DN15 2 PC - 2 - 24,322 48,644 -
H.2 PEMASANGAN WATER SOFTENER - -
1 BALL VALVE "KITZ" DN15 2 PC - 2 - 53,775 - -
2 BALL VALVE "KITZ" DN50 3 PC - 3 - 69,689 - -
3 BUTTERFLY VALVE DN100 1 PC 1 - - 240,000 - -
4 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN100 "SPINDO" 24 MT 24 - - 106,667 - -
5 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN15 "SPINDO" 12 MT - 12 - 15,000 - -
24 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
6 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN50 "SPINDO" 24 MT 2 22 - 60,000 - -
7 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN80 "SPINDO" 6 MT 2 4 - 80,000 - -
8 GRUNDFOS PUMP CRE 32-4 1 UN 1 - - 1,653,333 - -
9 PRESSURE GAUGE RANGE 0-10 BAR 1 PC 1 - - 70,292 - -
10 SOFTENER SENSOTROL 2900 1 UN 1 - - 70,292 - -
11 SOLENOID VALVE TYPE : 82540 (G 2") 1 PC 1 - - 74,444 - -
12 BLIND FLANGE DN100 PN16 1 PC 1 - - 118,962 - -
13 BOLT+NUT+PLAT WASHER M16X140-8,8 8 SE 32 - - 2,500 - -
14 BOLT+NUT+PLAT WASHER M16X70-8,8 16 SE 68 - 52 2,500 - -
15 ELBOW 90 GALVANIZED DN100 4 PC 5 - 1 320,000 - -
16 ELBOW 90 GALVANIZED DN50 6 PC 2 4 70,000 - -
17 ELBOW 90 GALVANIZED DN80 1 PC 2 - 1 240,000 - -
18 FLANGE DN100 PN16 5 PC 5 - - 320,000 - -
19 KNIE GALVANIZED SCREWED DN15 6 PC - 6 - 17,500 - -
20 MODIFIKASI SUPPORT FOR PIPE 6 PC - 6 - 217,333 - -
21 PACKING NON ASBESTOS THICKNESS 5MM 1 LO - 1 - 402,400 - -
22 PAINTING OF PIPE LINE WATER 1 LO - 1 - 805,043 - -
23 TEE WELD GALVANIZED;DN100XDN100XDN80 1 PC 1 - - 440,000 - -
24 TEE WELD GALVANIZED;DN50XDN50XDN50 2 PC 2 - - 360,000 - -
25 U-BOLD DN100 5 PC - 5 - 2,800 - -
26 U-BOLD DN15 2 PC - 2 - 1,333 - -
27 U-BOLD DN50 4 PC - 4 - 2,578 - -
28 U-BOLD DN80 2 PC - 2 - 1,333 - -
29 UNION SCREW GALVANIZED DN15 2 PC - 2 - 9,729 - -
H.3. PENGADAAN LINE COMPRESSOR
1 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN40 "SPINDO" BY GG 42 MT - - -
2 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN25 "SPINDO" BY GG 24 MT - - -
3 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN15 "SPINDO" BY GG 24 MT - - -
4 BALL VALVE DN40 BY GG 1 PC - - -
5 BALL VALVE DN25 BY GG 2 PC - - -
6 BALL VALVE DN15 BY GG 5 PC - - -
7 TEE VERLOOP GALVANIZED DN80X80X40 1 PC 1 - - 129,371 - -
8 TEE VERLOOP GALVANIZED DN80X80X25 2 PC 2 - - 129,371 - -
9 TEE VERLOOP GALVANIZED DN80X80X15 4 PC 1 3 - 129,371 388,112 -
10 KNIE GALVANIZED DN25 12 PC 7 5 - 19,333 96,667 -
11 KNIE GALVANIZED DN15 10 PC 6 4 - 19,294 77,178 -
12 SOCK GALVANIZED DN40 4 PC 2 2 - 51,333 102,667 -
13 SOCK GALVANIZED DN25 4 PC - 4 - 42,556 170,222 -
14 SOCK GALVANIZED DN15 2 PC - 2 - 26,556 53,111 -
15 PAINTING OF PIPE LINE COMP. INCL'D SIGN FLOW DIRECTION, CLR SIGNAL GREY TYPE RAL 7004 1 LO 1 - - 16,000,000 - -
H.4. PEMASANGAN LINE COMPRESSOR - -
1 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN40 "SPINDO" 42 MT 36 6 - 45,000 - -
2 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN25 "SPINDO" 24 MT 27 - 3 30,000 - -
3 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN15 "SPINDO" 24 MT 18 6 - 15,000 - -
4 BALL VALVE DN40 1 PC 1 - - 90,000 - -
5 BALL VALVE DN25 2 PC 1 1 - 60,000 - -
6 BALL VALVE DN15 5 PC 7 - 2 30,000 - -
7 TEE VERLOOP GALVANIZED DN80X80X40 1 PC 1 - - 51,748 - -
25 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
8 TEE VERLOOP GALVANIZED DN80X80X25 2 PC 2 - - 51,748 - -
9 TEE VERLOOP GALVANIZED DN80X80X15 4 PC 1 3 - 51,748 - -
10 KNIE GALVANIZED DN25 12 PC 7 5 - 35,000 - -
11 KNIE GALVANIZED DN15 10 PC 6 4 - 17,500 - -
12 SOCK GALVANIZED DN40 4 PC 2 2 - 52,500 - -
13 SOCK GALVANIZED DN25 4 PC - 4 - 35,000 - -
14 SOCK GALVANIZED DN15 2 PC - 2 - 17,500 - -
PAINTING OF PIPE LINE COMPRESSOR INCLUDING SIGN FLOW DIRECTION, CLR SIGNAL GREY TYPE
15 1 LO 1 - - 5,000,000 - -
RAL 7004

PEKERJAAN TAMBAH DI LUAR BQ KONTRAK :

PENGADAAN MATERIAL
C. PENGADAAN DAN PEMASANGAN LINE STEAM DAN CONDENSAT CENTRAL BOILER
C.1. PENGADAAN STEAM LINE BOILER TO STEAM HEADER CENTRAL BOILER
1 CONCENTRIC REDUCER WELDED SCH20 DN150 X DN125 - PC 1 - 1 183,881 - 183,881
2 FLANGE CARBON STEEL DN150 PN16 PC 4 - 4 303,769 1,215,076
3 FLANGE CARBON STEEL DN100 PN16 - PCS 6 - 6 128,549 - 771,294
4 BOLT+NUT+PLAT WASHER M24 X 140-8,8 - PCS 8 - 8 25,155 - 201,236
5 BOLT+NUT+PLAT WASHER M20 X 90-8,8 - PCS 384 - 384 12,900 - 4,953,600
6 BOLT+NUT+PLAT WASHER M27 X 140-8,8 - PCS 36 - 36 59,091 - 2,127,273
7 BOLT+NUT+PLAT WASHER M16 X 60-8,8 - PCS 48 - 48 8,135 390,480
8 FLANGE DN200 PN40 - PCS 4 - 4 788,571 - 3,154,286
9 FLANGE DN150 PN40 - PCS 2 - 2 698,734 - 1,397,468
10 COCENTRIC REDUCER SEAMLESS SCH40 DN200XDN150 - PCS 2 - 2 193,559 - 387,117
11 SUPPORT - -
UNP 120 X 55 X 7 - MTR 31 - 31 97,778 - 3,031,111
FIXED SHOES SUPPORT DN150 - PCS 2 - 2 346,667 - 693,333
DYNA BOLT M16 X 100 MM - PCS 4 - 4 8,571 - 34,286
BASE PLATE 350 X 350 X 10 MM - PCS 1 - 1 253,333 - 253,333
HB 100X100X6X8 - MTR 42 - 42 196,190 - 8,240,000
UNP 100 X 50 X 5 - MTR 18 - 18 77,024 - 1,386,429
BOLT, NUT, WASHER M8 X 35 GRADE 8.8 - PCS 16 - 16 2,436 - 38,983
DYNA BOLT M12 X 100 MM - PCS 24 - 24 7,792 - 187,013
UNP 140 X 60 X 7 - MTR 22 - 22 122,222 - 2,688,889
- -
C.3. PENGADAAN STEAM LINE BOILER INTEC TO STEAM HEADER - -
1 PIPE SEAMLESS SCH40;A106 GR.B, DN200X6MT - MTR 32 - 32 673,333 - 21,546,667
2 FLANGE DN200 PN16 - PCS 4 - 4 305,106 - 1,220,424
3 FLANGE DN200 PN25 - PCS 4 - 4 581,154 - 2,324,618
4 BOLT+NUT+PLAT WASHER M20X90-8,8 - PCS 24 - 24 12,900 - 309,600
5 BOLT+NUT+PLAT WASHER M24X90-8,8 - PCS 24 - 24 21,285 - 510,831
6 BOLT+NUT+PLAT WASHER M24X100-8,8 - PCS 72 - 72 23,058 - 1,660,200
7 BOLT+NUT+PLAT WASHER M27X100-8,8 - PCS 84 - 84 54,167 - 4,550,000
8 ELBOW 90 SEAMLESS SCH40;DN200 - PCS 4 - 4 377,360 - 1,509,439
9 FIX SHOES SUPPORT F0R PIPE DN200 - PC 1 - 1 572,333 - 572,333
10 BOLT+NUT+PLAT WASHER M16X80-8,8 - PCS 112 - 112 9,818 - 1,099,636
11 PIPE SEAMLESS SCH40;A106 GR.B, DN80X6MT - MTR 61 - 61 185,000 - 11,285,000

26 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
12 ELBOW 90 SEAMLESS SCH40;DN80 - PCS 6 - 6 115,278 - 691,667
13 ELBOW 45 SEAMLESS SCH40;DN80 - PCS 2 - 2 115,278 - 230,556
14 EXC. REDUCER SEAMLESS SCH40; DN80 X DN50 - PCS 2 - 2 74,250 - 148,500
15 FLANGE DN80 PN25 - PC 1 - 1 486,772 - 486,772
16 FLANGE DN80 PN16 - PCS 2 - 2 255,556 - 511,111
17 FLANGE DN50 PN16 - PCS 2 - 2 260,812 - 521,623
18 FLANGE ANSI CLASS150 ; DN80 - PCS 2 - 2 319,444 - 638,889
19 FIX SHOES SUPPORT F0R PIPE DN80 - PCS 3 - 3 166,500 - 499,500
20 ELBOW 90 SEAMLESS SCH40;DN15 - PCS 7 - 7 6,310 - 44,172
21 FLANGE DN15 PN16 - PCS 10 - 10 24,432 - 244,317
22 FLANGE DN25 PN16 - PCS 2 - 2 40,720 - 81,439
23 PIPE SHOE DN15 - PCS 2 - 2 129,500 - 259,000
24 SUPPORT - -
BASE PLATE 100 X 100 X 10 MM - PCS 4 - 4 182,400 - 729,600
DYNA BOLT M10 X 70 - PCS 4 - 4 7,595 - 30,380
H-BEAM 100 X 100 X 6 X 8 - MTR 18 - 18 196,190 - 3,531,429
UNP 100 X 50 X 6 - MTR 57 - 57 77,024 - 4,390,357
UNP 80 X 45 X 5 - MTR 10 - 10 67,396 - 673,958
BASE PLATE 120 X 120 X 10 - PCS 24 - 24 194,043 - 4,657,021
UNP 50 X 38 X 5 - MTR 6 - 6 40,438 - 242,625
U-BOLT DN50 - PCS 4 - 4 6,000 - 24,000
H-BEAM 150 X 150 X 7 X 10 MM - MTR 6 - 6 297,222 - 1,783,333
UNP 120 X 55 X 6 MM - MTR 4 - 4 97,778 - 391,111
UNP 140 X 60 X 7 MM - MTR 18 - 18 122,222 - 2,200,000

25 PENGADAAN STEAM HEADER COMPLETE WITH ASSESORIES


PIPA BS DN300 SCH 80 SEAMLESS - MTR 4 - 4 2,504,464 - 10,017,857
PIPA BS SCH 40 DN250 - MTR 1 - 1 1,139,444 - 1,139,444
PIPA BS SCH 40 DN200 - MTR 1 - 1 673,333 - 673,333
FLANGE PN25 DN300 - PCS 2 - 2 2,666,667 - 5,333,333
FLANGE PN25 DN250 - PCS 2 - 2 2,266,667 - 4,533,333
FLANGE PN25 DN200 - PCS 2 - 2 1,973,333 - 3,946,667
FLANGE PN25 DN80 - PCS 1 - 1 866,667 - 866,667
FLANGE PN25 DN25 - PCS 2 - 2 592,105 - 1,184,211
END CAP DN300 SCH80 - PCS 3 - 3 1,414,286 - 4,242,857
UNP 120 X 55 X7 - MTR 3 - 3 97,778 - 293,333
UNP 100 X 50 X 5 - MTR 6 - 6 77,024 - 462,143
BASE PLATE 120 X 130 ; THK : 12MM ( BASE PLATE ) - PCS 4 - 4 242,553 - 970,213
PIPE SADDLE THK : 8 MM - PCS 2 - 2 1,947,917 - 3,895,833
BOLT, NUT, WASHER M12 X 50 MM - PCS 8 - 8 9,153 - 73,220
BOLT, NUT, WASHER M27 X 100 MM - PCS 16 - 16 54,167 - 866,667
DYNABOLT M16 X 120 MM - PCS 4 - 4 10,169 - 40,678

26 PENGADAAN STEAM TRAP AND DRAIN HEADER DN300


PIPE SEAMLESS SCH40 ; A106 GR.B DN25 - MTR 12 - 12 72,111 - 865,333
EL BOW 90 SEAMLESS SCH40 ; DN25 - PCS 6 - 6 7,888 - 47,327
FLANGE DN25 PN 16 - PCS 11 - 11 40,335 - 443,689
BOLT, NUT, WASHER M12 X 60 MM - 8.8 - PCS 44 - 44 9,643 - 424,286
27 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
BOLT, NUT, WASHER M12 X 90 MM - 8.8 - PCS 4 - 4 10,189 - 40,755
SUPPORT - - - -
UNP 100 X 50 X 5 MM - MTR 1 - 1 77,024 - 77,024
BASE PLATE 120 X 60 X 5 MM - PCS 4 - 4 177,872 - 711,489
DYNA BOLT M10 X 70 MM - PC 3 - 3 8,108 - 24,324
U-BOLT DN25 - PC 3 - 3 3,500 - 10,500

27 PENGADAAN PIPERACK GALERY INTEC TO DESTILASI


WF 200 X 100 X 5,5 X 8 MM - MTR 49 - 49 261,190 - 12,798,333
H - BEAM 100 X 75 X 5 X 7 MM - MTR 47 - 47 196,190 - 9,220,952
UNP 100 X 50 X 5 MM - MTR 5 - 5 77,024 - 385,119
UNP 80 X 45 X 5 - MTR 26 - 26 67,396 - 1,752,292
RIP PLATE 150 X 100 X 8 MM - PCS 8 - 8 177,872 - 1,422,979
RIP PLATE 250 X 125 X 8 MM - PCS 8 - 8 203,283 - 1,626,261
BASE PLATE 450 X 360 X 15 MM - PCS 4 - 4 370,588 1,482,353
PLATE 500 X 100 X 15 MM - PCS 4 - 4 370,588 - 1,482,353
PLATE 350 X 300 X 15 MM - PCS 2 - 2 240,196 - 480,392
DYNABOLT M16 - PCS 24 - 24 8,108 - 194,595
PAINTING - LOT 1 - 1 2,750,250 - 2,750,250
H - BEAM 200 X 200 X 5 X 7 MM - MTR 47 - 47 570,476 - 26,812,381
- -
28 PENGADAAN PIPERACK GALERY CENTRAL BOILER TO DESTILASI - -
WF 300 X 150 X 6,5 X 9 MM - MTR 4 - 4 642,857 - 2,571,429
WF 200 X 100 X 5,5 X 8 MM - MTR 50 - 50 261,190 - 13,059,524
H - BEAM 100 X 75 X 5 X 7 MM - MTR 45 - 45 196,190 - 8,828,571
UNP 100 X 50 X 5 MM - MTR 12 - 12 77,024 - 924,286
UNP 80 X 45 X 5 - MTR 26 - 26 67,396 - 1,752,292
RIP PLATE 150 X 100 X 8 MM - PCS 8 - 8 177,872 - 1,422,979
RIP PLATE 250 X 125 X 8 MM - PCS 16 - 16 203,283 - 3,252,523
BASE PLATE 500 X 100 X 15 MM - PCS 4 - 4 114,379 - 457,516
BASE PLATE 450 X 360 X 15 MM - PCS 4 - 4 370,588 - 1,482,353
PLATE 350 X 300 X 15 MM - PCS 4 - 4 240,196 - 960,784
DYNABOLT M16 - PCS 24 - 24 9,818 - 235,636
PAINTING - LOT 1 - 1 3,150,250 - 3,150,250
H - BEAM 200 X 200 X 5 X 7 MM - MTR 47 - 47 570,476 - 26,812,381
- -
C.5. PENGADAAN CONDENSAT LINE BOILER INTEC - -
1 PIPE SEAMLESS SCH40;A106 GR.B, DN150 - MTR 1 - 1 600,000 - 600,000
2 PIPE SEAMLESS SCH40;A106 GR.B, DN50 - MTR 2 - 2 200,000 - 400,000
3 TEE WELD SEAMLESS SCH40;DN100 X DN100 X DN100 - PC 2 - 2 212,354 - 424,708
4 FLANGE DN150 PN16 - PC 1 - 1 841,000 - 841,000
5 FLANGE DN50 PN25 - PCS 8 - 8 681,818 - 5,454,545
6 BOLT+NUT+PLAT WASHER M16X100-8,8 - PCS 8 - 8 12,764 - 102,109
7 BOLT+NUT+PLAT WASHER M20X80-8,8 - PCS 8 - 8 12,484 - 99,871
8 C. REDUCER SEAMLESS SCH 40; DN150 X DN100 - PC 1 - 1 174,203 - 174,203
9 SUPPORT - -
H-BEAM 100 X 100 X 6 X 8 - MTR 4 - 4 196,190 - 784,762
UNP 100 X 50 X 6 MM - MTR 4 - 4 77,024 - 308,095
28 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
UNP 80 X 45 X 5 MM - MTR 2 - 2 67,396 - 134,792
BASE PLATE 120 X 120 X 10 MM - PCS 4 - 4 207,273 - 829,091
UNP 50 X 39 X 5 MM - MTR 2 - 2 46,214 - 92,429
UNP 120 X 55 X 7 - MTR 41 - 41 97,778 - 4,008,889
BASE PLATE 150 X 150 X 10 MM - PCS 2 - 2 253,333 - 506,667
DYNA BOLT M12 X 100 MM - PCS 14 - 14 7,792 - 109,091
FULL DRAT M20 X 255 MM - PCS 8 - 8 28,063 - 224,500
RIP PLATE 200 X 115 X 204, THK : 8 MM - PCS 6 - 6 194,043 - 1,164,255
FULL DRAT, BOLT M20 X 555 MM - PCS 4 - 4 37,417 - 149,667
BASE PLATE 160 X 100 X 8 MM - PCS 5 - 5 177,872 - 889,362
UNP 140 X 60 X 7 - MTR 2 - 2 122,222 - 244,444
10 BOLT+NUT+PLAT WASHER M16X120-8,8 - PCS 8 - 8 10,169 - 81,356
- -
C.7. PENGADAAN STEAM LINE DISTILASI FROM STEAM HEADER - -
1 ELBOW 45 SEAMLESS SCH40 ; DN250 - PC 2 - 2 710,799 - 1,421,598
2 ELBOW 90 SEAMLESS SCH40;DN15 - PCS 8 - 8 38,111 - 304,889
3 PIPE SHOE DN15 - PCS 4 - 4 129,500 - 518,000
4 SUPPORT - -
UNP 100 X 50 X 5 MM - MTR 6 - 6 77,024 - 462,143
BASE PLATE 100 X 100 X 10 MM - PCS 8 - 8 193,220 - 1,545,763
DYNA BOLT M10 X 70 MM - PCS 8 - 8 8,108 - 64,865
- -
C.9. PENGADAAN CONDENSATE LINE DISTILASI - -
1 SUPPORT A - -
H-BEAM 100X100X6X8 - MTR 11 - 11 196,190 - 2,158,095
UNP 100X50X5 - MTR 56 - 56 77,024 - 4,313,333
RIP PLATE 204X200X6 - PCS 32 - 32 184,006 - 5,888,188
FULL DRAT M20 - MTR 40 - 40 42,762 - 1,710,476
BASE PLATE 230X160X10 - PCS 5 - 5 184,006 - 920,029
UNP 50X38X5 - MTR 5 - 5 40,438 - 202,188
2 JACKETING ,ALUMUNIUM TEBAL 0,5 MM - LOT 1 - 1 - -
- -
C.11. PENGADAAN STEAM LINE CLOVE TO STEAM HEADER - -
1 ELBOW 90 SEAMLESS SCH40 ; DN100 - PCS 3 - 3 121,813 - 365,438
2 ELBOW 90 SEAMLESS SCH40 ; DN25 - PCS 7 - 7 7,888 - 55,215
3 TEE WELDING SEAMLESS SCH40 ; DN25XDN25 - PCS 3 - 3 139,721 - 419,163
4 PIPE SHOE DN25 - PCS 2 - 2 259,000 - 518,000
5 PIPE SHOE DN15 - PCS 2 - 2 129,500 - 259,000
6 SUPPORT - -
UNP 100X50X5 MM - MTR 6 - 6 77,024 - 462,143
BASE PLATE 100X100X10 - PCS 8 - 8 193,220 - 1,545,763
DYNABOLT M10 X 70 MM - PCS 8 - 8 8,108 - 64,865
- -
C.13. PENGADAAN CONDENSATE LINE CLOVE - -
1 SUPPORT - -
UNP 120X55X6 - MTR 16 - 16 97,778 - 1,564,444
UNP 50X38X5 - MTR 2 - 2 46,214 - 92,429
HB 150X150X7X10 - MTR 3 - 3 297,222 - 891,667
29 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
BASE PLATE 180 X 100 X 6 MM - PCS 2 - 2 133,404 - 266,809
DYNABOLT M12 X 100 MM - PCS 4 - 4 7,792 - 31,169
2 ELBOW 45 SEAMLESS SCH40 ; DN100 - PC 1 - 1 121,813 - 121,813
3 TEE WELDING SEAMLESS SCH40 ; DN150XDN150XDN100 - PC 1 - 1 480,556 - 480,556
4 TEE WELDING SEAMLESS SCH40 ; DN150XDN150XDN150 - PC 1 - 1 533,951 - 533,951
5 CONC. REDUSER SEAMLESS SCH40 ; DN150XDN125 - PCS 2 - 2 346,921 - 693,842
6 FLANGE DN125 PN16 - PCS 2 - 2 188,339 - 376,679
7 FLANGE DN100 PN16 - PCS 2 - 2 128,549 - 257,098
8 BOLT+NUT+PLAT WASHER M16X120-8,8 - PCS 16 - 16 10,169 - 162,712
- -
C.15. PEMASANGAN STEAM LINE ABL FROM STEAM HEADER - -
1 BLIND FLANGE DN200 PN16 - PC 1 - 1 506,220 - 506,220
- -
C.19. PENGADAAN STEAM LINE DIET PLANT FROM STEAM HEADER - -
1 SUPPORT - -
H-BEAM 150 X 150 X 7 X 10 MM - MTR 1 - 1 297,222 - 297,222
UNP 120 X 55 X 6 MM - MTR 3 - 3 97,778 - 293,333
FULL DRAT M20 - MTR 1 - 1 42,762 - 42,762
- -
2 PENGADAAN PIPERACK GALERY DIET PLANT - -
WF 200 X 100 X 5,5 X 8 MM - MTR 36 - 36 261,190 - 9,402,857
WF 150 X 75 X 5 X 7 MM - MTR 36 - 36 385,714 - 13,885,714
H - BEAM 100 X 75 X 5 X 7 MM - MTR 3 - 3 196,190 - 588,571
UNP 100 X 50 X 5 MM - MTR 59 - 59 77,024 - 4,544,405
UNP 80 X 45 X 5 - MTR 30 - 30 67,396 - 2,021,875
RIP PLATE 150 X 100 X 8 MM - PCS 8 - 8 177,872 - 1,422,979
RIP PLATE 250 X 130 X 8 MM - PCS 16 - 16 203,283 - 3,252,523
BASE PLATE 500 X 100 X 15 MM - PCS 4 - 4 163,399 - 653,595
BASE PLATE 450 X 360 X 15 MM - PCS 4 - 4 370,588 - 1,482,353
PLATE 350 X 300 X 15 MM - PCS 4 - 4 240,196 - 960,784
- -
E. PENGADAAN DAN PEMASANGAN LINE FEED DAERATOR PLANT (WSM) - -
E.1. PENGADAAN LINE FEED DAERATOR PLANT (WSM) - -
1 TEE WELD SEAMLESS SCH40;DN150XDN150XDN100 - PCS 2 - 2 480,556 - 961,111
2 PIPE SEAMLESS SCH40;A106 GR.B, DN40X6MT - MTR 6 - 6 154,286 - 925,714
3 SUPPORT - -
UNP 140 X 60 X 7 MM - MTR 6 - 6 130,952 - 785,714
BASE PLATE 250 X 150 X 10 MM - PCS 2 - 2 239,208 - 478,415
BASE PLATE 150 X 150 X 10 MM - PCS 2 - 2 202,406 - 404,813
DYNA BOLT M12 X 100 MM - PCS 16 - 16 7,792 - 124,675
SIKU 50 X 50 X 5 - MTR 2 - 2 25,875 - 51,750
U - BOLT DN15 - PC 15 - 15 2,100 - 31,500
UNP 80 X 45 X 6 - MTR 5 - 5 67,396 - 336,979
U - BOLT DN100 - PC 2 - 2 14,350 - 28,700
U - BOLT DN50 - PC 3 - 3 7,350 - 22,050
U - BOLT DN65 - PC 2 - 2 9,100 - 18,200
UNP 100 X 50 X 5 MM - MTR 4 - 4 77,024 - 308,095
BASE PLATE 150 X 150 X 150 MM - PC 1 - 1 129,362 - 129,362
30 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
DYNA BOLT M10 X 100 MM - PCS 84 - 84 7,143 - 600,000
UNP 125 X 65 X 6 - MTR 7 - 7 104,762 - 733,333
BASE PLATE 150 X 150 X 5MM - PCS 18 - 18 129,362 - 2,328,511
U - BOLT DN150 - PCS 13 - 13 21,350 - 277,550
BASE PLATE 200 X 200 X 10 MM - PCS 4 - 4 220,807 - 883,228
BASE PLATE 100 X 80 X 5 MM - PCS 2 - 2 118,582 - 237,163
DYNA BOLT M10 X 70 MM - PCS 2 - 2 6,977 - 13,953
UNP 50 X 38 X 5 - MTR 1 - 1 46,214 - 46,214
4 PIPE SEAMLESS SCH40;A106 GR.B, DN20X6MT - MTR 8 - 8 45,250 - 362,000
5 UNION SCREW GALVANIZE MEDIUM A; DN15 - PC 4 - 4 24,322 - 97,289
6 PIPA PVC "AW", DN50 - MTR 1 - 1 47,525 - 47,525
7 PIPA SEAMLESS SCH20, DN50, STAINLESS STELL - MTR 1 - 1 273,333 - 273,333
8 ELBOW 90 SEAMLESS SCH20, DN50 STAINLESS STELL - PC 4 - 4 180,000 - 720,000
9 TEE SEAMLESS SCH20;DN100XDN100, STAINLESS STELL - PC 2 - 2 722,222 - 1,444,444
10 TEE SEAMLESS SCH20;DN100XDN100 - PC 1 - 1 335,111 - 335,111
11 FLANGE DN100 PN16, STAINLESS STELL - PC 2 - 2 270,667 - 541,333
12 FLANGE DN65 PN16, PVC "AW" - PC 1 - 1 55,250 - 55,250
13 UNION SCREW DN50, STAINLESS STELL - PC 5 - 5 178,929 - 894,643
14 UNION SCREW DN50, PVC "AW" - PC 1 - 1 47,500 - 47,500
15 DOUBLE NIPPEL SCH20 DN50, STAINLESS STELL - PC 12 - 12 87,500 - 1,050,000
16 C. REDUCER SEAMLESS SCH20, DN100 X DN50, STAINLESS STELL - PC 4 - 4 360,000 - 1,440,000
17 C. REDUCER SEAMLESS SCH40, DN100 X DN65 - PC 1 - 1 62,934 - 62,934
18 ELBOW 90 SCREW, GALVANIZE MEDIUM A DN25 - PC 1 - 1 7,888 - 7,888
19 FLANGE DN200 PN16 - PC 2 - 2 305,106 - 610,212
20 ELBOW 90 SEAMLESS SCH40, DN40 - PC 4 - 4 52,667 - 210,667
21 CON. REDUCER SEAMLESS SCH40 DN50 X DN40 - PC 1 - 1 37,761 - 37,761
22 ELBOW 90 SEAMLESS SCH40;DN20 - PC 4 - 4 7,099 - 28,396
23 ELBOW 45 SEAMLESS SCH40;DN20 - PC 2 - 2 7,099 - 14,198
24 FLANGE DN65 PN40 - PC 14 - 14 144,444 - 2,022,222
25 FLANGE DN40 PN16 - PC 3 - 3 115,556 - 346,667
26 FLANGE DN20 PN40 - PC 3 - 3 36,302 - 108,905
27 FLANGE DN50 PN40 - PC 6 - 6 130,000 - 780,000
28 FLANGE DN25 PN40 - PC 3 - 3 40,335 - 121,006
29 BOLT+NUT+PLAT WASHER M12X60-8,8 - PC 20 - 20 9,643 - 192,857
30 BOLT+NUT+PLAT WASHER M16X120-8,8 - PC 40 - 40 10,169 - 406,780
31 BOLT+NUT+PLAT WASHER M20X140-8,8 - PC 40 - 40 19,156 - 766,246
32 TEE WELD SEAMLESS SCH40;DN65XDN65XDN65 - PC 2 - 2 200,868 - 401,736
33 ECCENTRIC REDUCER SEAMLESS SCH40 DN32XDN25 - PC 1 - 1 31,467 31,467
34 CON. REDUCER SEAMLESS SCH40 DN65 X DN50 - PC 4 - 4 207,681 - 830,722
35 PIPA GALVANIZED MEDIUM A, DN15 - MT 15.75 - 15.75 40,725 - 641,419
36 ELBOW SCREW 90 GALVANIZE MEDIUM A; DN15 - PC 13 - 13 38,111 - 495,444
37 OVERLOOP SCREW GALVANIZE MEDIUM A; DN15 X DN10 - PC 4 - 4 34,300 - 137,200
38 PIPE CLAMP DN15 - PC 2 - 2 27,500 - 55,000
39 REDUCING NIPPLE GALVANIZED MEDIUM A, DN15 X DN10 - PC 2 - 2 34,300 - 68,600
40 DOUBLE NIPPEL GALVANIZED MEDIUM A, DN50 - PC 1 - 1 48,125 - 48,125
41 UNION SCREW GALVANIZE MEDIUM A; DN50 - PC 3 - 3 80,518 - 241,554
42 SHOCKED SCREW GALVANIZE MEDIUM A; DN50 - PC 2 - 2 76,600 - 153,200
- -
31 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
F. PENGADAAN DAN PEMASANGAN SEPARATOR BLOWDOWN CENTRAL BOILER - - -
F.1. PENGADAAN SEPARATOR BLOWDOWN CENTRAL BOILER - - -
1 DOUBLE NIPPLE GALVANIZE MED. A DN15 - PC 2 - 2 14,438 - 28,875
2 FLANGE DN25 PN16 - PC 2 - 2 40,335 - 80,671
3 FLANGE DN40 PN16 - PC 2 - 2 115,556 - 231,111
4 BOLT+NUT+PLAT WASHER M12X70-8,8 - PC 8 - 8 9,818 - 78,545
5 SUPPORT - -
UNP 50 X 38 X 5 - MTR 2 - 2 46,214 - 92,429
BASE PLATE 100 X 100 X 5MM - PCS 8 - 8 133,404 - 1,067,234
DYNA BOLT M8 X 70MM - PCS 32 - 32 6,234 - 199,481
UNP 125 X 65 X 6 - MTR 2 - 2 112,821 - 225,641
BASE PLATE 150 X 150 X 5MM - PCS 4 - 4 121,444 - 485,775
DYNA BOLT M10 X 100MM - PCS 16 - 16 8,108 - 129,730
UNP 140 X 60 X 7 MM - MTR 17 - 17 130,952 - 2,226,190
BASE PLATE 250 X 150 X 10MM - PCS 2 - 2 239,208 - 478,415
BASE PLATE 150 X 150 X 10MM - PCS 2 - 2 202,406 - 404,813
DYNA BOLT M12 X 100MM - PCS 16 - 16 7,792 - 124,675
6 ELBOW 45 SEAMLESS SCH40; DN50 - PC 2 - 2 95,271 - 190,542
7 BOLT+NUT+PLAT WASHER M16X70-8,8 - PC 16 - 16 - -
8 BOLT+NUT+PLAT WASHER M16X120-8,8 - PC 8 - 8 - -
9 BOLT+NUT+PLAT WASHER M20X80-8,8 - PC 8 - 8 - -
10 ELBOW 90 SEAMLESS SCH40; DN250 - PC 1 - 1 925,915 - 925,915
11 C. REDUCER SEAMLESS SCH40 DN150XDN100 - PC 1 - 1 237,283 - 237,283
12 C. REDUCER SEAMLESS SCH40 DN150XDN50 - PC 1 - 1 163,697 - 163,697
13 U-BOLD DN100 - PC 1 - 1 17,340 - 17,340
14 PIPA GALVANIZED MEDIUM A ; DN25 - MTR 3 - 3 127,891 - 383,673
15 ELBOW 90 SCREW, GALVANIZE MEDIUM A DN25 - PCS 3 - 3 29,326 - 87,978
16 DOUBLE NIPPLE GALVANIZE MED. A DN25 - PCS 2 - 2 15,238 - 30,476
17 UNION SCREW GALVANIZE MED. A DN25 - PCS 2 - 2 17,187 - 34,374
- -
G. PENGADAAN DAN PEMASANGAN FUEL LINE CENTRAL BOILER UNIT V - -
G.1. PENGADAAN LINE CNG CENTRAL BOILER UNIT V - -
1 FLANGE CLASS 150 ; DN150 - PCS 10 - 10 268,792 - 2,687,920
2 PIPA GALVANIZED MEDIUM A ; DN25 - MTR 12 - 12 127,891 - 1,534,692
3 PIPA GALVANIZED MEDIUM A ; DN20 - MTR 12 - 12 103,465 - 1,241,580
4 ELBOW 90 SCREW GALVANIZED MEDIUM A ;DN25 - PCS 4 - 4 29,326 - 117,304
5 ELBOW 90 SCREW GALVANIZED MEDIUM A ;DN20 - PCS 4 - 4 25,621 - 102,484
6 TEE SCREW GALVANIZED MEDIUM A ; DN25XDN25XDN25 - PC 4 - 4 25,621 - 102,484
7 TEE SCREW GALVANIZED MEDIUM A ; DN20XDN20XDN20 - PC 4 - 4 20,351 - 81,404
8 C. REDUCER SEAMLESS SCH40;DN200XDN150 - PCS 4 - 4 625,871 - 2,503,484
9 C. REDUCER SEAMLESS SCH40;DN125XDN100 - PCS 4 - 4 437,912 - 1,751,648
10 C. REDUCER SEAMLESS SCH40;DN100XDN50 - PCS 2 - 2 247,098 - 494,196
11 EXC. REDUCER SEAMLESS SCH40;DN150XDN50 - PCS 2 - 2 314,720 - 629,440
12 FLANGE DN125 PN16 - PCS 12 - 12 186,480 - 2,237,760
13 UNION DN25 - PCS 4 - 4 21,352 - 85,408
14 PIPE FLUG DN15 - PCS 7 - 7 - -
15 BOLT+NUT+PLAT WASHER M20X140-8,8 - PCS 120 - 120 9,243 - 1,109,160
16 TEE WELD SEAMLESS SCH40;DN150XDN150XDN150 - PC 4 - 4 260,333 - 1,041,332
32 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
17 PIPA GALVANIZED MEDIUM A ; DN15 - MTR 34 - 34 93,267 - 3,171,078
18 UNION GALVANIZED DN15 - PCS 3 - 3 12,476 - 37,428
19 FLANGE DN50 PN16 - PCS 8 - 8 65,721 - 525,768
20 ELBOW 90 SEAMLESS SCH40; DN125 - PCS 2 - 2 273,819 - 547,638
21 SUPPORT - -
SIKU 50 X 50 X 5 - MTR 1 - 1 - -
DYNA BOLT M8 X 70M - PCS 4 - 4 - -
WF 150 X 75 X 5 X 7 MM - MTR 18 - 18 - -
UNP 120 X 55 X 7 MM - MTR 7 - 7 - -
UNP 100 X 50 X 6 MM - MTR 8 - 8 - -
BASE PLATE 200 X 200 X 5 MM - PC 4 - 4 - -
UNP 140 X 60 X 7 MM - MTR 12 - 12 - -
BASE PLATE 150 X 150 X 5 MM - PCS 16 - 16 - -
DYNABOLT M10 X 70 MM - PCS 24 - 24 - -
UNP 80 X 45 X 5 MM - MTR 3 - 3 - -
BASE PLATE 100 X 100 X 5 MM - PCS 8 - 8 - -
BASE PLATE 140 X 140 X 8 MM - PCS 10 - 10 - -
- -
G.3. PENGADAAN LINE SOLAR CENTRAL BOILER UNIT V - -
1 PIPE CARBON STEEL SCH20;DN100 - MTR 2 - 2 823,130 - 1,646,260
2 PIPE GALVANIZED MEDIUM A;DN50 - MTR 132 - 132 91,660 - 12,099,081
3 EL BOW SCREW 90 GALVANIZED MEDIUM;DN50 - PCS 22 - 22 93,766 - 2,062,849
4 EL BOW SCREW 45 GALVANIZED MEDIUM;DN50 - PCS 2 - 2 93,766 - 187,532
5 UNION GALVANIZE MEDIUM A ;DN40 - PC 1 - 1 45,321 - 45,321
6 DOUBLE NIPPLE GALVANIZED MEDIUM A ; DN40 - PCS 2 - 2 51,783 - 103,566
7 FLANGE CARBON STEEL JIS10K;DN100 - PCS 2 - 2 - -
8 FLANGE CARBON STEEL PN16;DN65 - PCS 2 - 2 197,419 - 394,838
9 FLANGE CARBON STEEL PN16;DN32 - PC 1 - 1 94,390 - 94,390
10 BLIND FLANGE CARBON STEEL JIS10K;DN100 - PC 1 - 1 105,639 - 105,639
11 BOLT+NUT+PLAT WASHER M16X100-8,8 - PCS 4 - 4 2,953 - 11,812
12 SUPPORT - -
UNP 100 X 50 X 5 MM - MTR 11 - 11 - -
BASE PLATE 100 X 100 X 5MM - PCS 19 - 19 - -
DYNA BOLT M10 X 70 MM - PCS 4 - 4 - -
U - BOLT DN 100 - PCS 9 - 9 - -
PIPE GALV. MEDIUM A ; DN20 - MTR 5 - 5 - -
U-BOLT DN50 - PC 36 - 36 3,589 - 129,204
U-BOLT DN150 - PC 3 - 3 9,325 - 27,975
UNP 80 X 45 X 5 MM - MTR 6 - 6 - -
UNP 50 X 38 X 5 MM - MTR 4 - 4 - -
BASE PLATE 140 X 80 X 5 MM - MTR 7 - 7 - -
DYNA BOLT M10 X 100 MM - PCS 20 - 20 - -
13 FLANGE CARBON STEEL DN50 JIS10K - PC 1 - 1 - -
14 UNION GALVANIZED MEDIUM A; DN50 - PCS 1 - 1 53,750 - 53,750
15 SHOCK SCREW GALVANIZED MEDIUM A; DN50 - PCS 4 - 4 49,734 - 198,936
- -
H. PENGADAAN DAN PEMASANGAN WATER SOFTENER - -
H.1. PENGADAAN WATER SOFTENER - -
33 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
1 STAINLESS STEEL PIPE SCH20 DN100 - MTR 3 - 3 - -
2 STAINLESS STEEL PIPE SCH20 DN65 - MTR 1 - 1 - -
3 BLIND FLANGE STAINLESS STEEL DN100 PN16 - PC 2 - 2 - -
4 SUPPORT - -
UNP 100 X 50 X 5 MM - MTR 7 - 7 - -
BASE PLATE 110 X 110 X 5MM - PCS 11 - 11 - -
U-BOLT ø4'' - PCS 9 - 9 25,307 - 227,763
DYNA BOLT M10 X 100MM - PCS 18 - 18 - -
6 TEE WELD GALVANIZED;DN100XDN100XDN100 - PC 1 - 1 - -
7 FLANGE STAINLESS STEEL : DN100 PN16 - PCS 4 - 4 - -
8 ELBOW 90 STAINLESS STEEL DN50 - PC 1 - 1 - -
9 ELBOW 45 GALVANIZED DN80 - PC 1 - 1 - -
10 C. REDUCER WELD. GALVANIZED MEDIUM A: DN80 X DN50 - PC 1 - 1 - -
11 UNION GALVANIZED MEDIUM A: DN50 - PCS 4 - 4 - -
12 FLANGE DN80 PN16 - PCS 2 - 2 298,167 - 596,334
13 BLIND FLANGE DN80 PN16 - PC 1 - 1 - -
- -
H.3. PENGADAAN LINE COMPRESSOR - -
1 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN80 "SPINDO" - MTR 58 - 58 - -
2 ELBOW 90 GALVANIZED DN80 - PCS 8 - 8 - -
3 TEE GALVANIZED DN80X80X80 - PCS 2 - 2 - -
4 FLANGE DN80 PN16 - PCS 7 - 7 - -
5 BLIND FLANGE DN80 PN16 - PC 1 - 1 - -
6 BOLT+NUT+PLAT WASHER M16X70-8,8 - PCS 40 - 40 - -
7 U-BOLD DN80 - PCS 10 - 10 - -
8 ELBOW 90 GALVANIZED DN40 - PCS 4 - 4 - -
9 TEE GALVANIZED DN80X80X80 - PC 1 - 1 - -
10 TEE SCREW GALVANIZED DN25X25X15 - PCS 4 - 4 - -
11 CON. REDUSER SCREW; DN80X40 - PC 1 - 1 - -
12 CON. REDUSER SCREW; DN40X25 - PC 1 - 1 - -
13 CON. REDUSER SCREW; DN40X15 - PC 1 - 1 - -
14 OVERLOOP; DN15XDN8 - PCS 4 - 4 - -
15 UNION GALVANIZE MED. A DN40 - PC 1 - 1 - -
16 U-BOLD DN80 - PCS 3 - 3 - -
17 U-BOLD DN40 - PCS 8 - 8 - -
18 U-BOLD DN25 - PCS 8 - 8 - -
19 U-BOLD DN15 - PCS 2 - 2 - -
20 END CAP SCREW; DN25 - PCS 3 - 3 - -
21 SUPPORT - -
UNP 100 X 50 X 5 MM - MTR 1 - 1 - -
BASE PLATE 110 X 80 X 5 MM - PCS 2 - 2 - -
DYNA BOLT M10 X 100 MM - PCS 2 - 2 - -
UNP 50 X 38 X 5 MM - MTR 1 - 1 - -
DYNA BOLT M8 X 60 MM - PCS 8 - 8 - -
22 BOLT+NUT+PLAT WASHER M16X70-8,8 - PCS 8 - 8 - -
- -
AA PENGADAAN DAN PEMASANGAN PLATFORM DI LINE BY PASS - -
AA.1. PENGADAAN PLATFORM DI LINE BY PASS - -
34 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
1 UNP120 X 60 X 6M - LJR 7 - 7 - -
2 SIKU 70 X 70 X 6M - LJR 6 - 6 - -
3 PIPA MED.A GALV. DN40 X 6000 - LJR 6 - 6 - -
4 SENG ATAP ( 5315 X 3245 ) MM - PC 1 - 1 - -
5 PAINTING - LOT 1 - 1 - -
6 CLAMP GRATING - PC 30 - 30 - -

PEMASANGAN MATERIAL

C. PENGADAAN DAN PEMASANGAN LINE STEAM DAN CONDENSAT CENTRAL BOILER


C.2. PEMASANGAN STEAM LINE BOILER TO STEAM HEADER CENTRAL BOILER
1 PIPE GALVANIZE SCH20 MEDIUM A DN15 MT'L BY GG - MTR 27 - 27 30,000 - -
2 ELBOW SCREW 90 GALVANIZE SCH20 MEDIUM A DN15 MT'L BY GG - PCS 27 - 27 - -
3 UNION GALVANIZE SCH20 MEDIUM A DN15 MT'L BY GG - PC 9 - 9 - -
4 TEE SCREW 90 GALVANIZE DN15 X DN 15 X DN15 MT'L BY GG - PC 9 - 9 - -
5 CONCENTRIC REDUCER WELDED SCH20 DN150 X DN125 - PC 1 - 1 - -
6 FLANGE CARBON STEEL DN150 PN16 - PCS 4 - 4 480,000 - -
7 FLANGE CARBON STEEL DN100 PN16 - PCS 6 - 6 320,000 - -
8 BALL VALVE SCREW "KITZ" DN50 - PCS 3 - 3 - -
9 BOLT+NUT+PLAT WASHER M24 X 140-8,8 - PCS 8 - 8 - -
10 BOLT+NUT+PLAT WASHER M20 X 90-8,8 - PCS 384 - 384 - -
11 BOLT+NUT+PLAT WASHER M27 X 140-8,8 - PCS 36 - 36 - -
12 BOLT+NUT+PLAT WASHER M16 X 60-8,8 - PCS 48 - 48 - -
13 DISK CHECK VALVE TPE : RK 86, DN150 PN40 MT'L BY GG - PC 1 - 1 - -
14 PRESSURE SAFEGUARD VALVE, DN100 MT'L BY GG - PCS 2 - 2 - -
15 FLANGE DN200 PN40 - PCS 4 - 4 - -
16 FLANGE DN150 PN40 - PCS 2 - 2 - -
17 COCENTRIC REDUCER SEAMLESS SCH40 DN200XDN150 - PCS 2 - 2 - -
18 DOUBLE NIPPLE DN15, GALVANIZE MEDIUM A MT'L BY GG - PCS 3 - 3 - -
19 OVERLOOP f 1/2" X f 1/4" , GALVANIZE MEDIUM A MT'L BY GG - PCS 6 - 6 - -
20 PIPE SEAMLESS SCH40;A106 GR.B. DN150X6MT MT'L BY GG - MTR 21 - 21 - -
21 SUPPORT
SQUARE PIPE 150 X 150 MT'L BY GG - MTR 22 - 22 - -
RIP PLATE 150 X 150 X 212 MM, THK : 10MM MT'L BY GG - PCS 2 - 2 - -
FIXED SHOES SUPPORT DN150 - PCS 2 - 2 - -
BASE PLATE 350 X 350 X 10 MM - PCS 1 - 1 - -
DYNA BOLT M16 X 100 MM - PCS 4 - 4 - -
H-BEAM 100 X 100 X 6 X 8 MM - MTR 81 - 81 - -
UNP 100 X 50 X 5 MM - MTR 54 - 54 - -
UNP 50 X 38 X 5 MM MT'L BY GG - MTR 2 - 2 - -
RIP PLATE 290 X 125 X 8 MM MT'L BY GG - PCS 24 - 24 - -
RIP PLATE 212 X 150 X 8 MM MT'L BY GG - PCS 8 - 8 - -
BASE PLATE 350 X 350 X 15 MM MT'L BY GG - PCS 5 - 5 - -
BOLT, NUT, WASHER M8 X 35 GRADE 8.8 - PCS 16 - 16 - -
DYNABOLT M12 X 100 - PCS 24 - 24 - -

C.4. PEMASANGAN STEAM LINE BOILER INTEC TO STEAM HEADER


1 GLOBE VALVE TYPE : GAV54F;DN250.PN16 "GESTRA" MT'L BY GG - PC 1 - 1 - -
35 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
2 EXPANTION JOINT 250-DHEB-FF-2000-L DN250 PN25 MT'L BY GG - PC 1 - 1 - -
3 EXPANTION JOINT 250-UEB-FF-2000-L DN250 PN25 MT'L BY GG - PC 1 - 1 - -
4 GLOBE VALVE TYPE : GAV54F;DN250.PN25 "GESTRA" MT'L BY GG - PC 1 - 1 - -
5 PIPE SEAMLESS SCH40;A106 GR.B, DN200X6MT - MTR 32 - 32 - -
6 FLANGE DN200 PN16 - PCS 4 - 4 - -
7 FLANGE DN200 PN25 - PCS 4 - 4 - -
8 GLOBE VALVE TYPE : GAV54F;DN200.PN25 "GESTRA" MT'L BY GG - PCS 2 - 2 - -
9 BOLT+NUT+PLAT WASHER M20X90-8,8 - PCS 24 - 24 - -
10 BOLT+NUT+PLAT WASHER M24X90-8,8 - PCS 24 - 24 - -
11 BOLT+NUT+PLAT WASHER M24X100-8,8 - PCS 72 - 72 - -
12 BOLT+NUT+PLAT WASHER M27X100-8,8 - PCS 84 - 84 - -
13 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN250 MT'L BY GG - PCS 6 - 6 - -
14 ELBOW 90 SEAMLESS SCH40;DN200 - PCS 4 - 4 - -
15 EXPANTION JOINT 200-TUEB-FF-2000-L DN200 PN25 MT'L BY GG - PC 1 - 1 - -
16 FIX SHOES SUPPORT F0R PIPE DN200 - PC 1 - 1 - -
17 BOLT+NUT+PLAT WASHER M16X80-8,8 - PCS 112 - 112 - -
18 PIPE SEAMLESS SCH40;A106 GR.B, DN80X6MT - MTR 61 - 61 - -
19 ELBOW 90 SEAMLESS SCH40;DN80 - PCS 6 - 5 - -
20 ELBOW 45 SEAMLESS SCH40;DN80 - PCS 2 - 2 - -
21 EXC. REDUCER SEAMLESS SCH40; DN80 X DN50 - PCS 2 - 2 - -
22 FLANGE DN80 PN25 - PC 1 - 1 - -
23 FLANGE DN80 PN16 - PCS 2 - 2 240,000 - -
24 FLANGE DN50 PN16 - PCS 2 - 2 - -
25 FLANGE ANSI CLASS150 ; DN80 - PCS 2 - 2 - -
26 GLOBE VALVE TYPE ;DN50.PN16 MT'L BY GG - PC 1 - 1 - -
27 GLOBE VALVE TYPE ;DN80.PN16 MT'L BY GG - PC 1 - 1 - -
28 PRESSURE REDUCING VALVE PN16; DN50 MT'L BY GG - PC 1 - 1 - -
29 EXPANTION JOINT ANSI CLASS150; DN80 MT'L BY GG - PC 1 - 1 - -
30 DOUBLE CYLINDER ROLLER BEARING "LISEGA" DN80 MT'L BY GG - PCS 7 - 7 - -
31 FIX SHOES SUPPORT F0R PIPE DN80 - PCS 3 - 3 - -
32 ALIGNMENT GUIDE "LISEGA" DN80 MT'L BY GG - PCS 3 - 3 - -
33 ELBOW 90 SEAMLESS SCH40;DN15 - PCS 7 - 7 - -
34 FLANGE DN15 PN16 - PCS 10 - 10 - -
35 FLANGE DN25 PN16 - PCS 2 - 2 - -
36 PIPE SHOE DN15 - PCS 2 - 2 - -
37 BALL VALVE DN15 PN16 "END ARMATUREN" MT'L BY GG - PCS 3 - 3 - -
38 SUPPORT
BASE PLATE 100 X 100 X 10 MM - PCS 4 - 4 - -
DYNA BOLT M10 X 70 - PCS 4 - 4 - -
H-BEAM 100 X 100 X 6 X 8 - MTR 18 - 18 - -
UNP 100 X 50 X 6 - MTR 57 - 57 - -
UNP 80 X 45 X 5 - MTR 10 - 10 - -
BASE PLATE 120 X 120 X 10 - PCS 24 - 24 - -
UNP 50 X 38 X 5 - MTR 6 - 6 - -
U-BOLT DN50 - PCS 4 - 4 - -
H-BEAM 150 X 150 X 7 X 10 MM - MTR 6 - 6 - -
UNP 120 X 55 X 6 MM - MTR 4 - 4 - -
UNP 140 X 60 X 7 MM - MTR 18 - 18 - -
36 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH

39 PEMASANGAN STEAM HEADER COMPLETE WITH ASSESORIES


PIPA BS DN300 SCH 80 SEAMLESS - MTR 4 - 4 - -
PIPA BS SCH 40 DN250 - MTR 1 - 1 - -
PIPA BS SCH 40 DN200 - MTR 1 - 1 - -
FLANGE PN25 DN300 - PCS 2 - 2 - -
FLANGE PN25 DN250 - PCS 2 - 2 - -
FLANGE PN25 DN200 - PCS 2 - 2 - -
FLANGE PN25 DN80 - PCS 1 - 1 - -
FLANGE PN25 DN25 - PCS 2 - 2 - -
END CAP DN300 SCH80 - PCS 3 - 3 - -
UNP 120 X 55 X7 - MTR 3 - 3 - -
UNP 100 X 50 X 5 - MTR 6 - 6 - -
BASE PLATE 120 X 130 ; THK : 12MM ( BASE PLATE ) - PCS 4 - 4 - -
PIPE SADDLE THK : 8 MM - PCS 2 - 2 - -
BOLT, NUT, WASHER M12 X 50 MM - PCS 8 - 8 - -
BOLT, NUT, WASHER M27 X 100 MM - PCS 16 - 16 - -
DYNABOLT M16 X 120 MM - PCS 4 - 4 - -

40 PEMASANGAN STEAM TRAP AND DRAIN HEADER DN300


PIPE SEAMLESS SCH40 ; A106 GR.B DN25 - MTR 12 - 12 - -
EL BOW 90 SEAMLESS SCH40 ; DN25 - PCS 6 - 6 - -
FLANGE DN25 PN 16 - PCS 11 - 11 - -
GLOBE VALVE DN25 PN16 "SPIRAX SARCO" MT'L BY GG - PCS 3 - 3 - -
DISC CHECK VALVE DN25 PN40 MT'L BY GG - PCS 1 - 1 - -
SIGHT GLASS DN25 PN16 " GESTRA" MT'L BY GG - PCS 1 - 1 - -
STEAM TRAP FS5 DN25 PN16 " SPIRAX SARCO " MT'L BY GG - PCS 1 - 1 - -
BOLT, NUT, WASHER M12 X 60 MM - 8.8 - PCS 44 - 44 - -
BOLT, NUT, WASHER M12 X 90 MM - 8.8 - PCS 4 - 4 - -
FLEXIBLE HOSE WITH FLANGE PN16 - PCS 1 - 1 - -
SUPPORT
UNP 100 X 50 X 5 MM - MTR 1 - 1 - -
BASE PLATE 120 X 60 X 5 MM - PCS 4 - 4 - -
DYNA BOLT M10 X 70 MM - PC 3 - 3 - -
U-BOLT DN25 - PC 3 - 3 - -

41 PEMASANGAN PIPERACK GALERY INTEC TO DESTILASI


WF 200 X 100 X 5,5 X 8 MM - MTR 49 - 49 - -
H - BEAM 100 X 75 X 5 X 7 MM - MTR 47 - 47 - -
UNP 100 X 50 X 5 MM - MTR 5 - 5 - -
UNP 80 X 45 X 5 - MTR 26 - 26 - -
RIP PLATE 150 X 100 X 8 MM - PCS 8 - 8 - -
RIP PLATE 250 X 125 X 8 MM - PCS 8 - 8 - -
BASE PLATE 450 X 360 X 15 MM - PCS 4 - 4 - -
PLATE 500 X 100 X 15 MM - PCS 4 - 4 - -
PLATE 350 X 300 X 15 MM - PCS 2 - 2 - -
DYNABOLT M16 - PCS 24 - 24 - -
BOLT NUT WASHER M16 - PCS 32 - 32 - -
37 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
PAINTING - LOT 1 - 1 - -
H - BEAM 200 X 200 X 5 X 7 MM - MTR 6 - 6 - -

42 PEMASANGAN PIPERACK GALERY CENTRAL BOILER TO DESTILASI


WF 300 X 150 X 6,5 X 9 MM - MTR 4 - 4 - -
WF 200 X 100 X 5,5 X 8 MM - MTR 50 - 50 - -
H - BEAM 100 X 75 X 5 X 7 MM - MTR 45 - 45 - -
UNP 100 X 50 X 5 MM - MTR 12 - 12 - -
UNP 80 X 45 X 5 - MTR 26 - 26 - -
RIP PLATE 150 X 100 X 8 MM - PCS 8 - 8 - -
RIP PLATE 250 X 125 X 8 MM - PCS 16 - 16 - -
BASE PLATE 500 X 100 X 15 MM - PCS 4 - 4 - -
BASE PLATE 450 X 360 X 15 MM - PCS 4 - 4 - -
PLATE 350 X 300 X 15 MM - PCS 4 - 4 - -
DYNABOLT M16 - PCS 24 - 24 - -
PAINTING - LOT 1 - 1 - -
H - BEAM 200 X 200 X 5 X 7 MM - MTR 6 - 6 - -

C.6. PEMASANGAN CONDENSAT LINE BOILER INTEC


1 PIPE SEAMLESS SCH40;A106 GR.B, DN150 - MTR 1 - 1 - -
2 PIPE SEAMLESS SCH40;A106 GR.B, DN50 - MTR 2 - 2 - -
3 TEE WELD SEAMLESS SCH40;DN100 X DN100 X DN100 - PC 2 - 2 - -
4 BUTTERFLY VALVE DN100 MT'L BY GG - PC 1 - 1 - -
5 ELBOW 90 SEAMLESS SCH40; DN50 MT'L BY GG - PCS 2 - 2 - -
6 FLANGE DN150 PN16 - PC 1 - 1 - -
7 FLANGE DN50 PN25 - PCS 8 - 8 - -
8 BLIND FLANGE DN100 PN16 MT'L BY GG - PCS 3 - 3 - -
9 SHUT-OFF VALVE ; DN100 PN16 MT'L BY GG - PC 1 - 1 - -
10 SHUT-OFF VALVE ; DN50 PN25 MT'L BY GG - PCS 4 - 4 - -
11 BALL VALVE DN15 MT'L BY GG - PCS 2 - 2 - -
12 PRESSURE GAUGE 0 ~ 16 BAR MT'L BY GG - PCS 2 - 2 - -
13 NOT RETURN VALVE DN80 PN16 MT'L BY GG - PCS 2 - 2 - -
14 STRAINER DN100 PN16 MT'L BY GG - PC 1 - 1 - -
15 BOLT+NUT+PLAT WASHER M16X100-8,8 - PCS 8 - 8 - -
16 BOLT+NUT+PLAT WASHER M20X80-8,8 - PCS 8 - 8 - -
17 C. REDUCER SEAMLESS SCH 40; DN150 X DN100 - PC 1 - 1 - -
18 SUPPORT
H-BEAM 100 X 100 X 6 X 8 - MTR 4 - 4 - -
UNP 100 X 50 X 6 MM - MTR 4 - 4 - -
UNP 80 X 45 X 5 MM - MTR 2 - 2 - -
BASE PLATE 120 X 120 X 10 MM - PCS 4 - 4 - -
UNP 50 X 39 X 5 MM - MTR 2 - 2 - -
UNP 120 X 55 X 7 - MTR 41 - 41 - -
BASE PLATE 150 X 150 X 10 MM - PCS 2 - 2 - -
DYNA BOLT M12 X 100 MM - PCS 14 - 14 - -
FULL DRAT M20 X 255 MM - PCS 8 - 8 - -
RIP PLATE 200 X 115 X 204, THK : 8 MM - PCS 6 - 6 - -
FULL DRAT, BOLT M20 X 555 MM - PCS 4 - 4 - -
38 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
BASE PLATE 160 X 100 X 8 MM - PCS 5 - 5 - -
UNP 140 X 60 X 7 - MTR 2 - 2 - -
19 BOLT+NUT+PLAT WASHER M16X120-8,8 - PCS 8 - 8 - -

C.8. PEMASANGAN STEAM LINE DISTILASI FROM STEAM HEADER


1 GLOBE VALVE TYPE : GAV54F;DN250.PN16 "GESTRA" MT'L BY GG - PC 1 - 1 - -
2 ELBOW 45 SEAMLESS SCH40 ; DN250 - PC 2 - 2 - -
3 ELBOW 90 SEAMLESS SCH40;DN15 - PCS 8 - 8 - -
4 PIPE SHOE DN15 - PCS 4 - 4 - -
5 SUPPORT
UNP 100 X 50 X 5 MM - MTR 6 - 6 - -
BASE PLATE 100 X 100 X 10 MM - PCS 8 - 8 - -
DYNA BOLT M10 X 70 MM - PCS 8 - 8 - -

C.10. PEMASANGAN CONDENSATE LINE DISTILASI


1 SUPPORT
H-BEAM 100X100X6X8 - MTR 11 - 11 - -
UNP 100X50X5 - MTR 56 - 56 - -
RIP PLATE 204X200X6 - PCS 32 - 32 - -
FULL DRAT M20 - MTR 40 - 40 - -
BASE PLATE 230X160X10 - PCS 5 - 5 - -
UNP 50X38X5 - MTR 5 - 5 - -
2 PEMASANGAN PIPA CONDNSATE DN100 - MTR 60 - 60 - -
3 PEMASANGAN INSULATION ROCKWOLL PIPE CONDESAT THINKNESS 50MM,FOR PIPE DN100 - MTR 60 - 60 - -
4 JACKETING , ALUMUNIUM TEBAL 0,5 MM - LOT 1 - 1 - -

C.12. PEMASANGAN STEAM LINE CLOVE TO STEAM HEADER


1 ELBOW 90 SEAMLESS SCH40 ; DN100 - PCS 3 - 3 - -
2 GLOBE VALVE TYPE : GAV54F;DN250.PN16 "GESTRA" MT'L BY GG - PC 1 - 1 - -
3 FIX SHOES SUPPORT FOR PIPE DN250 MT'L BY GG - PCS 4 - 4 - -
4 ELBOW 90 SEAMLESS SCH40 ; DN25 - PCS 7 - 7 - -
5 TEE WELDING SEAMLESS SCH40 ; DN25XDN25 - PCS 3 - 3 - -
6 PIPE SHOE DN25 - PCS 2 - 2 - -
7 PIPE SHOE DN15 - PCS 2 - 2 - -
8 BALL VALVE TYPE : VO;DN25.PN16 "END ARMATUREN" MT'L BY GG - PCS 3 - 3 - -
9 DISC CHECK VALVE TYPE : RK 86 DN25 PN40 "GESTRA" MT'L BY GG - PCS 3 - 3 - -
10 SUPPORT
UNP 100X50X5 MM - MTR 6 - 6 - -
BASE PLATE 100X100X10 - PCS 8 - 8 - -
DYNABOLT M10 X 70 MM - 8 - 8 - -
11 SIGHT GLASS SG253 DN25 PN25 "SPIRAX SARCO" MT'L BY GG - PCS 1 - 1 - -

C.14. PEMASANGAN CONDENSATE LINE CLOVE


1 SUPPORT
UNP 120X55X6 - MTR 16 - 16 - -
UNP 50X38X5 - MTR 2 - 2 - -
HB 150X150X7X10 - MTR 3 - 3 - -
BASE PLATE 180 X 100 X 6 MM - PCS 2 - 2 - -
39 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
DYNABOLT M12 X 100 MM - PCS 4 - 4 - -
2 ELBOW 45 SEAMLESS SCH40 ; DN100 - PC 1 - 1 - -
3 TEE WELDING SEAMLESS SCH40 ; DN150XDN150XDN100 - PC 1 - 1 - -
4 TEE WELDING SEAMLESS SCH40 ; DN150XDN150XDN150 - PC 1 - 1 - -
5 CONC. REDUSER SEAMLESS SCH40 ; DN150XDN125 - PCS 2 - 2 - -
6 FLANGE DN125 PN16 - PCS 2 - 2 - -
7 FLANGE DN100 PN16 - PCS 2 - 2 - -
8 BLIND FLANGE DN150 PN16 MT'L BY GG - PC 1 - 1 - -
9 BUTTERFLY VALVE DN125 PN16 MT'L BY GG - PC 1 - 1 - -
10 BUTTERFLY VALVE DN100 PN16 MT'L BY GG - PC 1 - 1 - -
11 BOLT+NUT+PLAT WASHER M16X120-8,8 - PCS 16 - 16 - -

C.16. PEMASANGAN STEAM LINE ABL FROM STEAM HEADER


1 TEE SEAMLESS SCH20;DN200XDN200 MT'L BY GG - PC 2 - 2 - -
2 GLOBE VALVE TYPE : GAV54F;DN200.PN16 "GESTRA" MT'L BY GG - PC 1 - 1 - -
3 BLIND FLANGE DN200 PN16 - PC 1 - 1 - -

C.20. PEMASANGAN STEAM LINE DIET PLANT FROM STEAM HEADER


1 GLOBE VALVE TYPE : GAV54F;DN150.PN16 "GESTRA" MT'L BY GG - PC 1 - 1 - -
2 EXPANTION JOINT 150-DHEB-FF-1000-L DN150 PN16 MT'L BY GG - PC 1 - 1 - -
3 SUPPORT - -
H-BEAM 150 X 150 X 7 X 10 MM - MTR 1 - 1 - -
UNP 120 X 55 X 6 MM - MTR 3 - 3 - -
FULL DRAT M20 - MTR 1 - 1 - -

4 PEMASANGAN PIPERACK GALERY DIET PLANT


WF 200 X 100 X 5,5 X 8 MM - MTR 36 - 36 - -
WF 150 X 75 X 5 X 7 MM - MTR 36 - 36 - -
H - BEAM 100 X 75 X 5 X 7 MM - MTR 3 - 3 - -
UNP 100 X 50 X 5 MM - MTR 59 - 59 - -
UNP 80 X 45 X 5 - MTR 30 - 30 - -
RIP PLATE 150 X 100 X 8 MM - PCS 8 - 8 - -
RIP PLATE 250 X 130 X 8 MM - PCS 16 - 16 - -
BASE PLATE 500 X 100 X 15 MM - PCS 4 - 4 - -
BASE PLATE 450 X 360 X 15 MM - PCS 4 - 4 - -
PLATE 350 X 300 X 15 MM - PCS 4 - 4 - -

E. PENGADAAN DAN PEMASANGAN LINE FEED DAERATOR PLANT (WSM)


E.2. PEMASANGAN LINE FEED DAERATOR PLANT (WSM)
1 TEE WELD SEAMLESS SCH40;DN150XDN150XDN100 - PCS 2 - 2 - -
2 PIPE SEAMLESS SCH40;A106 GR.B, DN40X6MT - MTR 6 - 6 - -
3 SAFETY VALVE DN200 PN16 MT'L BY GG - PC 2 - 2 - -
4 SUPPORT - -
UNP 140 X 60 X 7 MM - MTR 6 - 6 - -
BASE PLATE 250 X 150 X 10 MM - PCS 2 - 2 - -
BASE PLATE 150 X 150 X 10 MM - PCS 2 - 2 - -
DYNA BOLT M12 X 100 MM - PCS 16 - 16 - -
SIKU 50 X 50 X 5 - MTR 2 - 2 - -
40 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
U - BOLT DN15 - PC 15 - 15 - -
UNP 80 X 45 X 6 - MTR 5 - 5 - -
U - BOLT DN100 - PC 2 - 2 - -
U - BOLT DN50 - PC 3 - 3 - -
U - BOLT DN65 - PC 2 - 2 - -
UNP 100 X 50 X 5 MM - MTR 4 - 4 - -
BASE PLATE 150 X 150 X 150 MM - PC 1 - 1 - -
DYNA BOLT M10 X 100 MM - PCS 84 - 84 - -
UNP 125 X 65 X 6 - MTR 7 - 7 - -
BASE PLATE 150 X 150 X 5MM - PCS 18 - 18 - -
U - BOLT DN150 - PCS 13 - 13 - -
BASE PLATE 200 X 200 X 10 MM - PCS 4 - 4 - -
BASE PLATE 100 X 80 X 5 MM - PCS 2 - 2 - -
DYNA BOLT M10 X 70 MM - PCS 2 - 2 - -
5 PIPE SEAMLESS SCH40;A106 GR.B, DN20X6MT - MTR 8 - 8 - -
6 UNION SCREW GALVANIZE MEDIUM A; DN15 - PC 4 - 4 - -
7 OVERLOOP SCREW GALVANIZE MEDIUM A; DN15 X DN10 - PC 4 - 4 - -
8 TEE SCREW GALVANIZE MEDIUM A; DN15 X DN15 MT'L BY GG - PC 3 - 3 - -
9 PIPA PVC "AW", DN50 - MTR 1 - 1 - -
10 PIPA SEAMLESS SCH20, DN50, STAINLESS STELL - MTR 1 - 1 - -
11 ELBOW 90 SEAMLESS SCH20, DN50 STAINLESS STELL - PC 4 - 4 - -
12 TEE SEAMLESS SCH20;DN100XDN100, STAINLESS STELL - PC 2 - 2 - -
13 TEE SEAMLESS SCH20;DN100XDN100 - PC 1 - 1 - -
14 FLANGE DN100 PN16, STAINLESS STELL - PC 2 - 2 - -
15 FLANGE DN65 PN16, PVC "AW" - PC 1 - 1 - -
16 UNION SCREW DN50, STAINLESS STELL - PC 5 - 5 - -
17 UNION SCREW DN50, PVC "AW" - PC 1 - 1 - -
18 DOUBLE NIPPEL SCH20 DN50, STAINLESS STELL - PC 12 - 12 - -
19 C. REDUCER SEAMLESS SCH20, DN100 X DN50, STAINLESS STELL - PC 4 - 4 - -
20 C. REDUCER SEAMLESS SCH40, DN100 X DN65 - PC 1 - 1 - -
21 BUTTERFLY VALVE DN100 MT'L BY GG - PC 1 - 1 - -
22 BALL VALVE DN50, STAINLESS STELL MT'L BY GG - PC 5 - 5 - -
23 SELENOID VALVE DN50 MT'L BY GG - PC 3 - 3 - -
24 FLOW METER DN65 MT'L BY GG - PC 1 - 1 - -
25 BALL VALVE DN15, KITZ MT'L BY GG - PC 1 - 1 - -
26 FLANGE DN200 PN16 - PC 2 - 2 - -
27 ELBOW 90 SEAMLESS SCH40, DN40 - PC 4 - 4 - -
28 CON. REDUCER SEAMLESS SCH40 DN50 X DN40 - PC 1 - 1 - -
29 FLANGE DN40 PN16 - PC 3 - 3 - -
30 GLOBE VALVE DN40 PN16 MT'L BY GG - PC 1 - 1 - -
31 ELBOW 90 SEAMLESS SCH40;DN20 - PC 4 - 4 - -
32 ELBOW 45 SEAMLESS SCH40;DN20 - PC 2 - 2 - -
33 FLANGE DN65 PN40 - PC 14 - 14 - -
34 FLANGE DN40 PN16 - PC 3 - 3 - -
35 FLANGE DN20 PN40 - PC 3 - 3 - -
36 FLANGE DN50 PN40 - PC 6 - 6 - -
37 FLANGE DN25 PN40 - PC 3 - 3 - -
38 SHUT-OFF VALVE DN65 PN40 MT'L BY GG - PC 6 - 6 - -
41 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
39 SHUT-OFF VALVE DN20 PN40 MT'L BY GG - PC 2 - 2 - -
40 SHUT-OFF VALVE DN25 PN40 MT'L BY GG - PC 1 - 1 - -
41 THREE-WAY REGULATOR VALVE (MOTORIZED) DN65 PN40 MT'L BY GG - PC 1 - 1 - -
42 NON RETURN VALVE DN65 PN40 MT'L BY GG - PC 3 - 3 - -
43 NON RETURN VALVE DN25 PN40 MT'L BY GG - PC 1 - 1 - -
44 BOLT+NUT+PLAT WASHER M12X60-8,8 - PC 20 - 20 - -
45 BOLT+NUT+PLAT WASHER M16X120-8,8 - PC 40 - 40 - -
46 BOLT+NUT+PLAT WASHER M20X140-8,8 - PC 40 - 40 - -
47 TEE WELD SEAMLESS SCH40;DN65XDN65XDN65 - PC 2 - 2 - -
48 CON. REDUCER SEAMLESS SCH40 DN65 X DN50 - PC 4 - 4 - -
49 ECCENTRIC REDUCER SEAMLESS SCH40 DN32XDN25 - PC 1 - 1 - -
50 CONTROL VALVE (MOTORIZED) DN50 PN40 MT'L BY GG - PC 1 - 1 - -
51 STRAINER DN65 PN40 MT'L BY GG - PC 1 - 1 - -
52 FEED PUMP, GRUNDFOSS CR20-14XK MT'L BY GG - UNIT 2 - 2 - -
53 PIPA GALVANIZED MEDIUM A, DN15 - MTR 25 - 25 - -
54 ELBOW SCREW 90 GALVANIZE MEDIUM A; DN15 - PC 22 - 22 - -
55 BALL VALVE "KITZ" DN15 - PC 4 - 4 - -
56 PIPE CLAMP DN15 - PC 2 - 2 - -
57 REDUCING NIPPLE GALVANIZED MEDIUM A, DN15 X DN10 - PC 2 - 2 - -
58 DOUBLE NIPPEL GALVANIZED MEDIUM A, DN50 - PC 1 - 1 - -
59 UNION SCREW GALVANIZE MEDIUM A; DN50 - PC 3 - 3 - -
60 SHOCKED SCREW GALVANIZE MEDIUM A; DN50 - PC 2 - 2 - -
61 BALL VALVE "KITZ" DN50 MT'L BY GG - PC 1 - 1 - -
62 STRAINER DN150 PN16 MT'L BY GG - PC 2 - 2 - -

F. PENGANDAAN DAN PEMASANGAN SEPARATOR BLOWDOWN CENTRAL BOILER


F.2. PEMASANGAN SEPARATOR BLOWDOWN CENTRAL BOILER
1 PIPE SEAMLESS SCH40;A106 GR.B, DN15X6MT MT'L BY GG - MTR 6 - 6 - -
2 ELBOW 90 SCREW, GALVANIZE MEDIUM A DN15 MT'L BY GG - PC 4 - 4 - -
3 ELBOW 45 SEAMLESS SCH40; DN15 MT'L BY GG - PC 6 - 6 - -
4 TEE SCREW GALVANIZE MEDIUM A; DN15 X DN15 MT'L BY GG - PC 2 - 2 - -
5 UNION SCREW GALVANIZE MED. A DN15 MT'L BY GG - PC 2 - 2 - -
6 OVERLOOP GALVANIZE MED. A DN15 X DN15 MT'L BY GG - PC 4 - 4 - -
7 DOUBLE NIPPLE GALVANIZE MED. A DN15 - PC 2 - 2 - -
8 FLANGE DN25 PN16 - PC 2 - 2 - -
9 FLANGE DN40 PN16 - PC 2 - 2 - -
10 BOLT+NUT+PLAT WASHER M12X70-8,8 - PC 8 - 8 - -
11 SUPPORT - - - -
UNP 50 X 38 X 5 - MTR 2 - 2 - -
BASE PLATE 100 X 100 X 5MM - PCS 8 - 8 - -
DYNA BOLT M8 X 70MM - PCS 32 - 32 - -
UNP 125 X 65 X 6 - MTR 2 - 2 - -
BASE PLATE 150 X 150 X 5MM - PCS 4 - 4 - -
DYNA BOLT M10 X 100MM - PCS 16 - 16 - -
UNP 140 X 60 X 7 MM - MTR 18 - 18 - -
BASE PLATE 250 X 150 X 10MM - PCS 2 - 2 - -
BASE PLATE 150 X 150 X 10MM - PCS 2 - 2 - -
DYNA BOLT M12 X 100MM - PCS 16 - 16 - -
42 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
12 ELBOW 45 SEAMLESS SCH40; DN50 - PC 2 - 2 - -
13 BOLT+NUT+PLAT WASHER M16X70-8,8 - PC 16 - 16 - -
14 BOLT+NUT+PLAT WASHER M16X120-8,8 - PC 8 - 8 - -
15 BOLT+NUT+PLAT WASHER M20X80-8,8 - PC 8 - 8 - -
16 ELBOW 90 SEAMLESS SCH40; DN250 - PC 1 - 1 - -
17 C. REDUCER SEAMLESS SCH40 DN150XDN100 - PC 1 - 1 - -
18 C. REDUCER SEAMLESS SCH40 DN150XDN50 - PC 1 - 1 - -
19 NON RETURN VALVE DN100 ; PN16 MT'L BY GG - PC 1 - 1 - -
20 U-BOLD DN100 - PC 1 - 1 - -
21 PIPA GALVANIZED MEDIUM A ; DN25 - MTR 3 - 3 - -
22 ELBOW 90 SCREW, GALVANIZE MEDIUM A DN25 - PCS 3 - 3 - -
23 DOUBLE NIPPLE GALVANIZE MED. A DN25 - PCS 2 - 2 - -
24 UNION SCREW GALVANIZE MED. A DN25 - PCS 2 - 2 - -
25 STRAINER SCREEW DN25 MT'L BY GG - PC 1 - 1 - -
26 SELENOIDE VALVE SCREEW DN25 MT'L BY GG - PC 1 - 1 - -

G. PENGADAAN DAN PEMASANGAN FUEL LINE CENTRAL BOILER UNIT V


G.2. PEMASANGAN LINE CNG CENTRAL BOILER UNIT V
1 BALL VALVE "GLT" CLASS 150 ; DN150 MT'L BY GG - PC 5 - 5 - -
2 FLANGE CLASS 150 ; DN150 - PCS 10 - 10 - -
3 PIPA GALVANIZED MEDIUM A ; DN25 - MTR 12 - 12 - -
4 PIPA GALVANIZED MEDIUM A ; DN20 - MTR 12 - 12 - -
5 ELBOW 90 SEAMLESS SCH40; DN125 - PCS 2 - 2 - -
6 ELBOW 90 SCREW GALVANIZED MEDIUM A ;DN25 - PCS 4 - 4 - -
7 ELBOW 90 SCREW GALVANIZED MEDIUM A ;DN20 - PCS 4 - 4 - -
8 TEE SCREW GALVANIZED MEDIUM A ; DN25XDN25XDN25 - PC 4 - 4 - -
9 TEE SCREW GALVANIZED MEDIUM A ; DN20XDN20XDN20 - PC 4 - 4 - -
10 C. REDUCER SEAMLESS SCH40;DN200XDN150 - PCS 4 - 4 720,000 - -
11 C. REDUCER SEAMLESS SCH40;DN125XDN100 - PCS 4 - 4 - -
12 C. REDUCER SEAMLESS SCH40;DN100XDN50 - PCS 2 - 2 - -
13 EXC. REDUCER SEAMLESS SCH40;DN150XDN50 - PCS 2 - 2 - -
14 FLANGE DN125 PN16 - PCS 12 - 12 - -
15 BLIND FLANGE DN150 PN16 MT'L BY GG - PC 1 - 1 - -
16 UNION DN25 - PCS 4 - 4 - -
17 SHUT-OFF VALVE PN16 ; DN125 MT'L BY GG - PCS 2 - 2 - -
18 FILTER VALVE PN16 ; DN125 MT'L BY GG - PCS 2 - 2 - -
19 GAS VOLUME INDICATOR PN16 ; DN150 MT'L BY GG - PCS 2 - 2 - -
20 PRESSURE REGULATOR VALVE PN16 ; DN50 MT'L BY GG - PCS 2 - 2 - -
21 PRESSURE REGULATOR VALVE PN16 ; DN100 MT'L BY GG - PCS 2 - 2 - -
22 EXSPANTION JOINT PN16 ; DN125 MT'L BY GG - PCS 2 - 2 - -
23 DOUBLE SHUT-OFF VALVE ( MAGNETIC) PN16 ; DN150 MT'L BY GG - PCS 2 - 2 - -
24 TEMPERATURE INDICATOR DN15 MT'L BY GG - PCS 2 - 2 - -
25 PIPE FLUG DN15 - PCS 7 - 7 - -
26 SAFETY VALVE MT'L BY GG - PCS 2 - 2 - -
27 BOLT+NUT+PLAT WASHER M20X80-8,8 - PCS 120 - 120 - -
28 TEE WELD SEAMLESS SCH40;DN150XDN150XDN150 - PC 4 - 4 - -
29 PIPA GALVANIZED MEDIUM A ; DN15 - MTR 34 - 34 - -
30 ELBOW 90 SCREW GALVANIZED MEDIUM A ;DN15 - PCS 13 - 13 - -
43 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
31 TEE SCREW GALVANIZED MEDIUM A ; DN15XDN15XDN15 MT'L BY GG - PC 1 - 1 - -
32 UNION GALVANIZED DN15 - PCS 3 - 3 - -
33 U-BOLD DN15 MT'L BY GG - PCS 8 - 8 - -
34 DYNABOLT M10 X 70 MM MT'L BY GG - PCS 4 - 4 - -
35 FLANGE DN50 PN16 - PCS 8 - 8 - -
36 SUPPORT
SIKU 50 X 50 X 5 - MTR 1 - 1 - -
DYNA BOLT M8 X 70M - PCS 4 - 4 - -
WF 150 X 75 X 5 X 7 MM - MTR 18 - 18 - -
UNP 120 X 55 X 7 MM - MTR 7 - 7 - -
UNP 100 X 50 X 6 MM - MTR 8 - 8 - -
BASE PLATE 200 X 200 X 5 MM - PC 4 - 4 - -
UNP 140 X 60 X 7 MM - MTR 12 - 12 - -
BASE PLATE 150 X 150 X 5 MM - PCS 16 - 16 - -
DYNABOLT M10 X 70 MM - PCS 24 - 24 - -
UNP 80 X 45 X 5 MM - MTR 3 - 3 - -
BASE PLATE 100 X 100 X 5 MM - PCS 8 - 8 - -
BASE PLATE 140 X 140 X 8 MM - PCS 10 - 10 - -

G.4 PEMASANGAN LINE SOLAR CENTRAL BOILER UNIT V


1 FUEL TANK,5000L MT'L BY GG - UNIT 1 - 1 - -
2 SECOND FLOOR & FUEL TANK SUPPORT - -
HB 150 X 150 X 6000MM MT'L BY GG - LJR 5 - 5 - -
UNP 100 X 50 X 5 X 6000MM MT'L BY GG - LJR 11 - 11 - -
WF 125 X 75 X 6000MM MT'L BY GG - LJR 2 - 2 - -
RIB PLATE MT'L BY GG - PCS 4 - 4 - -
STEEL GRATING (2400 X 1200) MT'L BY GG - PCS 33 - 33 - -
DYNABOLT M16 X 120MM MT'L BY GG - PCS 8 - 8 - -
3 PIPE CARBON STEEL SCH20;DN100 - MTR 2 - 2 - -
4 PIPE GALVANIZED MEDIUM A;DN50 - MTR 132 - 132 - -
5 EL BOW SCREW 90 GALVANIZED MEDIUM;DN50 - PCS 22 - 22 70,000 - -
6 EL BOW SCREW 45 GALVANIZED MEDIUM;DN50 - PCS 2 - 2 - -
7 EXC. REDUCER SCREW GALVANIZED MEDIUM A; DN50 X DN40 MT'L BY GG - PC 1 - 1 - -
8 EXC. REDUCER SCREW CARBON STEEL SCH20; DN65 X DN50 MT'L BY GG - PCS 2 - 2 - -
9 EXC. REDUCER SCREW CARBON STEEL SCH20; DN50 X DN32 MT'L BY GG - PC 1 - 1 - -
10 DOUBLE NIPPLE GALVANIZED MEDIUM A ; DN40 - PCS 2 - 2 - -
11 FLANGE CARBON STEEL JIS10K;DN100 - PCS 2 - 2 - -
12 FLANGE CARBON STEEL PN16;DN65 - PCS 2 - 2 - -
13 FLANGE CARBON STEEL PN16;DN40 MT'L BY GG - PC 1 - 1 - -
14 BLIND FLANGE CARBON STEEL JIS10K;DN100 - PC 1 - 1 - -
15 FLOW METER PN16;DN65 MT'L BY GG - PC 1 - 1 - -
16 DISK SHECK VALVE PN16;DN50 MT'L BY GG - PC 1 - 1 - -
17 STRAINER SCREW ;DN40 MT'L BY GG - PC 1 - 1 - -
18 BALL VALVE "KITZ" DN40 MT'L BY GG - PC 1 - 1 - -
19 PUMP SOLAR "TORISHIMA" MT'L BY GG - UNIT 1 - 1 - -
20 BOLT+NUT+PLAT WASHER M16X100-8,8 - PCS 4 - 4 - -
21 TEE SCREW DN50 MT'L BY GG - PCS 2 - 2 - -
22 DOUBLE NIPPLE GALVANIZED MEDIUM A ; DN50 MT'L BY GG - PCS 1 - 1 - -
44 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
23 BALL VALVE "KITZ" DN25 MT'L BY GG - PCS 1 - 1 - -
24 FLANGE CARBON STEEL PN16;DN25 MT'L BY GG - PCS 2 - 2 - -
25 BALL VALVE "KITZ" DN15 MT'L BY GG - PCS 2 - 2 - -
26 SUPPORT
UNP 100 X 50 X 5 MM - MTR 11 - 11 - -
BASE PLATE 100 X 100 X 5MM - PCS 19 - 19 - -
DYNA BOLT M10 X 70 MM - PCS 4 - 4 - -
U - BOLT DN 100 - PCS 9 - 9 - -
PIPE GALV. MEDIUM A ; DN20 - MTR 5 - 5 - -
U-BOLT DN50 - PC 21 - 21 - -
U-BOLT DN150 - PC 3 - 3 - -
UNP 80 X 45 X 5 MM - MTR 7 - 7 - -
U-BOLT ø2'' - PCS 15 - 15 - -
UNP 50 X 38 X 5 MM - MTR 4 - 4 - -
BASE PLATE 140 X 80 X 5 MM - PCS 7 - 7 - -
DYNA BOLT M10 X 100 MM - PCS 20 - 20 - -
27 FLANGE CARBON STEEL DN50 JIS10K - PC 1 - 1 - -
28 UNION GALVANIZED MEDIUM A; DN50 - PCS 1 - 1 - -
29 SHOCK SCREW GALVANIZED MEDIUM A; DN50 - PCS 4 - 4 - -

H. PENGADAAN DAN PEMASANGAN WATER SOFTENER


H.2 PEMASANGAN WATER SOFTENER
1 STAINLESS STEEL PIPE SCH20 DN100 - MTR 3 - 3 - -
2 STAINLESS STEEL PIPE SCH20 DN65 - MTR 1 - 1 - -
3 BLIND FLANGE STAINLESS STEEL DN100 PN16 - PC 2 - 2 - -
4 QUICK RIGID COUPLING DN100 MT'L BY GG - PC 1 - 1 - -
5 STRAINER DN100 PN16 MT'L BY GG - PC 1 - 1 - -
6 SUPPORT
UNP -100 - MTR 7 - 7 - -
BASE PLATE 110 X 110 X 5MM - PCS 11 - 11 - -
U-BOLT ø4'' - PCS 9 - 9 - -
DYNA BOLT M10 X 100MM - PCS 18 - 18 - -
7 TEE WELD GALVANIZED;DN100XDN100XDN100 - PC 1 - 1 - -
8 FLANGE STAINLESS STEEL : DN100 PN16 - PCS 4 - 4 - -
9 ELBOW 90 STAINLESS STEEL DN50 - PC 1 - 1 - -
10 ELBOW 45 GALVANIZED DN80 - PC 1 - 1 - -
11 C. REDUCER WELD. GALVANIZED MEDIUM A: DN80 X DN50 - PC 1 - 1 - -
12 UNION GALVANIZED MEDIUM A: DN50 - PCS 4 - 4 - -
13 FLANGE DN80 PN16 - PCS 2 - 2 - -
14 BLIND FLANGE DN80 PN16 - PC 1 - 1 - -
15 BUTTERFLY VALVE DN65 MT'L BY GG - PCS 4 - 4 - -
16 NOT RETURN VALVE DN65 MT'L BY GG - PCS 2 - 2 - -
17 BALL VALVE DN50 - PCS 5 - 5 - -
18 BALL VALVE DN15 - PCS 2 - 2 - -
19 PRESSURE GAUGE DN15 MT'L BY GG - PCS 2 - 2 - -
20 GRUNDFOS PUMP MT'L BY GG - UNIT 2 - 2 - -
21 FILTER MT'L BY GG - UNIT 2 - 2 - -

45 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
H.4. PEMASANGAN LINE COMPRESSOR
1 CARBON STEEL PIPE SNI 07-0039-87 GALVANIZED MEDIUM DN80 "SPINDO" - MTR 58 - 58 - -
2 ELBOW 90 GALVANIZED DN80 - PCS 8 - 8 - -
3 TEE GALVANIZED DN80X80X80 - PCS 2 - 2 - -
4 FLANGE DN80 PN16 - PCS 7 - 7 - -
5 BLIND FLANGE DN80 PN16 - PC 1 - 1 - -
6 BALL VALVE DN80 MT'L BY GG - PC 1 - 1 - -
7 BOLT+NUT+PLAT WASHER M16X70-8,8 - PCS 40 - 40 - -
8 U-BOLD DN80 - PCS 10 - 10 - -
9 ELBOW 90 GALVANIZED DN40 - PCS 4 - 4 - -
10 TEE GALVANIZED DN80X80X80 - PC 1 - 1 - -
11 TEE SCREW GALVANIZED DN25X25X15 - PCS 4 - 4 - -
12 CON. REDUSER SCREW; DN80X40 - PC 1 - 1 - -
13 CON. REDUSER SCREW; DN40X25 - PC 1 - 1 - -
14 CON. REDUSER SCREW; DN40X15 - PC 1 - 1 - -
15 CON. REDUSER SCREW; DN25X15 - PCS 2 - 2 - -
16 OVERLOOP; DN15XDN8 - PCS 4 - 4 - -
17 UNION GALVANIZE MED. A DN40 - PC 1 - 1 - -
18 PRESSURE REGULATOR "FIESTO" DN15 MT'L BY GG - PC 1 - 1 - -
19 U-BOLD DN80 - PCS 3 - 3 - -
20 U-BOLD DN40 - PCS 8 - 8 - -
21 U-BOLD DN25 - PCS 8 - 8 - -
22 U-BOLD DN15 - PCS 2 - 2 - -
23 END CAP SCREW; DN25 - PCS 3 - 3 - -
24 SUPPORT
UNP 100 X 50 X 5 MM - MTR 1 - 1 - -
BASE PLATE 110 X 80 X 5 MM - PCS 2 - 2 - -
DYNA BOLT M10 X 100 MM - PCS 2 - 2 - -
DYNA BOLT M8 X 60 MM - PCS 8 - 8 - -
27 BOLT+NUT+PLAT WASHER M16X70-8,8 - PCS 8 - 8 - -

46 of 94
HARGA SAT. HARGA TOT.
VOLUME SATUAN KERJA KERJA
NO URAIAN PEKERJAAN REAL MT'L
KONTRAK KURANG TAMBAH MT'L UPAH
KERJA KURANG KERJA TAMBAH
AA PENGADAAN DAN PEMASANGAN PLATFORM DI LINE BY PASS
AA.2. PEMASANGAN PLATFORM DI LINE BY PASS
1 UNP120 X 60 X 6M - LJR 7 - 7 - -
2 SIKU 70 X 70 X 6M - LJR 6 - 6 - -
3 PIPA MED.A GALV. DN40 X 6M - LJR 6 - 6 - -
4 SENG ATAP ( 5315 X 3245 ) MM - PC 1 - 1 - -
5 CLAMP GRATING - PC 30 - 30 - -
6 PAINTING - LOT 1 - 1 - -
7 GRATING ( 5175 X 1530 ) MM - PC 1 - 1 - -
8 GRATING ( 5175 X 920 ) MM - PC 1 - 1 - -
9 GRATING ( 875 X 920 ) MM - PC 1 - 1 - -

PEMASANGAN GRATING SS GUTTER CENTRAL BOILER MT'L BY GG


1 GRATING 500 X 600 MM - UNIT 76 - 76 - -
PLATE SS 600 X 40 X 4 MM, ( 20 PCS/UNIT ) - PCS 1520 - 1520 - -
ROD BAR SS ø 10MM ; PANJANG 499 MM, ( 4 PCS/UNIT ) - PCS 304 - 304 - -
- -
2 GRATING 500 X 700 MM - UNIT 15 - 15 - -
PLATE SS 900 X 40 X 4 MM, ( 20 PCS/UNIT ) - PCS 300 - 300 - -
ROD BAR SS ø 10MM ; PANJANG 499 MM, ( 4 PCS/UNIT ) - PCS 60 - 60 - -
- -
3 GRATING 500 X 900 MM - UNIT 61 - 61 - -
PLATE SS 900 X 40 X 4 MM, ( 20 PCS/UNIT ) - PCS 1220 - 1220 - -
ROD BAR SS ø 10MM ; PANJANG 499 MM, ( 6 PCS/UNIT ) - PCS 366 - 366 - -
- -
4 GRATING 700 X 500 MM - UNIT 41 - 41 - -
PLATE SS 500 X 40 X 4 MM, ( 28 PCS/UNIT ) - PCS 1148 - 1148 - -
ROD BAR SS ø 10MM ; PANJANG 699 MM, ( 4 PCS/UNIT ) - PCS 164 - 164 - -

PEMBONGKARAN MATERIAL
C.10. PEMASANGAN CONDENSATE LINE DISTILASI
1 PEMBONGKARAN PIPA CONDNSATE DN100 - MTR 60 - 60 - -
2 PEMBONGKARAN INSULATION ROCKWOLL PIPE CONDESAT THINKNESS 50MM,FOR PIPE DN100 - MTR 60 - 60 - -

T O T A L (Rp)

Disetujui oleh,
PT. GUDANG GARAM, Tbk

47 of 94
PEMASANGAN STEAM & CONDENSATE LINE, PENGADAAN DAN PEMASANGAN LINE FEED DEAERATOR PLANT, PENGADAAN DAN PEMASANGAN SEPARATOR BLOWDOWN,
OWN, PENGADAAN DAN PEMASANGAN FUEL LINE, PENGADAAN DAN PEMASANGAN WATER SOFTENER, PENGADAAN DAN PEMASANGAN LINE COMPRESSOR UNIT-V

HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

48 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
151,111 - (151,111)
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

49 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

50 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
51 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
52 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -

- - -
- - -

- - -
- - -

53 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

- - (1,012,439)
- - (54,000)
- - (14,978)
- - (207,778)
- - (973,556)
- - -
- - (652,173)
- - -
- - (1,763,778)
- - -
- - (615,787) ISO-SWG-GG.UV-CB-C.2-01,
ISO-SWG-GG.UV-CB-C.2-04ISO-
SWG-GG.UV-CB-C.2-02, ISO-
- - 5,727,622 SP-SWG-GG.UV-CB-C.2-01, SP-
SWG-GG.UV-CB-C.2-03, ISO-
- - 5,772,933 ISO-SWG-GG.UV-CB-C.2-01,
SWG-GG.UV-CB-C.2-03, ISO-
SP-SWG-
SWG-GG.UV-CB-C.2-05
SWG-GG.UV-CB-C.2-02,
GG.UV-CB-C.2-04 ISO-
- - 209,266 ISO-SWG-GG.UV-CB-C.2-01, ISO-
SWG-GG.UV-CB-C.2-03, ISO-
- - (1,830,637) SWG-GG.UV-CB-C.2-02,
SWG-GG.UV-CB-C.2-04ISO-
- - (161,341) SWG-GG.UV-CB-C.2-03
- - (1,729,490)
- - 4,988,914
- - 28,017,738
- - (859,288)
- - 1,566,937
- - 8,188,507
- - -
- - -
- - (7,466,667)
- - -
- - (279,442)

60,000 - (60,000)
60,000 - (60,000)
54 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
360,000 - (360,000)
- - -
207,067 - (207,067) SP-SWG-GG.UV-CB-C.2-01
SP-SWG-GG.UV-CB-C.2-01, SP-
SWG-GG.UV-CB-C.2-03, SP-SWG-
- 666,534 666,534 GG.UV-CB-C.2-04, SP-SWG-
GG.UV-CB-C.2-05
- 324,499 324,499 ISO-SWG-GG.UV-CB-C.2-04
- - -
- - -
240,000 - (240,000)
ISO-SWG-GG.UV-CB-C.2-01, ISO-
720,000 SWG-GG.UV-CB-C.2-02, ISO-
- 720,000 SWG-GG.UV-CB-C.2-03, ISO-
SWG-GG.UV-CB-C.2-04

ISO-SWG-GG.UV-CB-C.2-01, ISO-
480,000 - (480,000) SWG-GG.UV-CB-C.2-02, ISO-
SWG-GG.UV-CB-C.2-03
180,000 - (180,000)
1,800,000 - (1,800,000)
960,000 - (960,000) ISO-SWG-GG.UV-CB-C.2-04
- - -
640,000 - (640,000)
64,792 - (64,792)
87,203 - (87,203)
683,780 - (683,780)
27,000 - (27,000)
7,489 - (7,489)
103,889 - (103,889)
486,778 - (486,778)
- - -
260,869 - (260,869)
- - -
1,040,000 - (1,040,000)
- - -
960,000 - (960,000) ISO-SWG-GG.UV-CB-C.2-04
ISO-SWG-GG.UV-CB-C.2-01, ISO-
SWG-GG.UV-CB-C.2-02, ISO-
- 3,840,000 3,840,000 SWG-GG.UV-CB-C.2-03, ISO-
SWG-GG.UV-CB-C.2-05

SP-SWG-GG.UV-CB-C.2-01, SP-
- 2,309,173 2,309,173 SWG-GG.UV-CB-C.2-03, SP-SWG-
GG.UV-CB-C.2-04

ISO-SWG-GG.UV-CB-C.2-01, ISO-
480,000 SWG-GG.UV-CB-C.2-02, ISO-
- 480,000 SWG-GG.UV-CB-C.2-03, ISO-
SWG-GG.UV-CB-C.2-04

55 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

ISO-SWG-GG.UV-CB-C.2-01, ISO-
3,840,000 - (3,840,000) SWG-GG.UV-CB-C.2-02, ISO-
SWG-GG.UV-CB-C.2-03
320,000 - (320,000)
4,007,253 - (4,007,253)
- 2,356,784 2,356,784
- 11,276,400 11,276,400
1,312,000 - (1,312,000)
- 1,722,667 1,722,667
- 8,208,000 8,208,000
- - -
- - -
2,986,667 - (2,986,667)
- - -
240,000 - (240,000)

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - (1,039,398) ISO-SWG-GG.UV-CB-C.4-01
- - -
- - -
- - (1,076,667)
- - -
- - (118,317)
- - 3,925,976 ISO-SWG-GG.UV-CB-C.4-01
- - (416,167) ISO-SWG-GG.UV-CB-C.4-01
- - (390,907)
- - (162,878)
- - -
- - (3,501,878) ISO-SWG-GG.UV-CB-C.4-01
- - (9,292,683) ISO-SWG-GG.UV-CB-C.4-01
- - -
- - (2,085,037) ISO-SWG-GG.UV-CB-C.4-01
- - -

56 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

ISO-SWG-GG.UV-CB-C.4-01, SP-
- - (4,837,622) SWG-GG.UV-CB-C.4-05, SP-
SWG-GG.UV-CB-C.4-06
- - -
- - (23,843) ISO-SWG-GG.UV-CB-C.4-05
- - (1,954,024)
- - -
- - -
60,000 - (60,000) ISO-SWG-GG.UV-CB-C.4-05
30,000 - (30,000) ISO-SWG-GG.UV-CB-C.4-05
3,600,000 - (3,600,000)
- - -
- - -
813,894 - (813,894)
180,000 - (180,000)
- - -
2,933,333 - (2,933,333) ISO-SWG-GG.UV-CB-C.4-01
80,000 - (80,000) ISO-SWG-GG.UV-CB-C.4-05
- - -
64,792 - (64,792) ISO-SWG-GG.UV-CB-C.4-05
52,174 - (52,174) ISO-SWG-GG.UV-CB-C.4-05
503,373 - (503,373) ISO-SWG-GG.UV-CB-C.4-01
- - -
- - -
798,000 - (798,000)
- - - ISO-SWG-GG.UV-CB-C.4-01
1,200,000 - (1,200,000)
- 1,600,000 1,600,000 ISO-SWG-GG.UV-CB-C.4-01
166,467 - (166,467) ISO-SWG-GG.UV-CB-C.4-01
640,000 - (640,000)
320,000 - (320,000)
- - -
4,800,000 - (4,800,000) ISO-SWG-GG.UV-CB-C.4-01
3,323,711 - (3,323,711) ISO-SWG-GG.UV-CB-C.4-01
- - -
4,277,778 - (4,277,778) ISO-SWG-GG.UV-CB-C.4-01
- - -
ISO-SWG-GG.UV-CB-C.4-01, SP-
1,935,049 - (1,935,049) SWG-GG.UV-CB-C.4-05, SP-
SWG-GG.UV-CB-C.4-06
- - -
120,000 - (120,000) ISO-SWG-GG.UV-CB-C.4-05
2,400,000 - (2,400,000)

- - -
- - -
- - -
- - -
57 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - -
- - -

208,000 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- - SWG-GG.UV-CB-C.6-02

609,064 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- - SWG-GG.UV-CB-C.6-02

5,082,973 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- - SWG-GG.UV-CB-C.6-02
- - -

128,549 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- - SWG-GG.UV-CB-C.6-02
- - 1,436,807 ISO-SWG-GG.UV-CB-C.6-01
- - 758,195 ISO-SWG-GG.UV-CB-C.6-01
- - -
- - -
- - -

371,392 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- 371,392 SWG-GG.UV-CB-C.6-02

185,696 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- 185,696 SWG-GG.UV-CB-C.6-02
- - -
- - -

960,000 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- 960,000 SWG-GG.UV-CB-C.6-02

195,000 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- 195,000 SWG-GG.UV-CB-C.6-02

1,600,000 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- 1,600,000 SWG-GG.UV-CB-C.6-02

2,033,189 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- 2,033,189 SWG-GG.UV-CB-C.6-02
- - - ISO-SWG-GG.UV-CB-C.6-02

320,000 ISO-SWG-GG.UV-CB-C.6-01, ISO-


- 320,000 SWG-GG.UV-CB-C.6-02
- 1,639,400 1,639,400 ISO-SWG-GG.UV-CB-C.6-01
- 1,292,000 1,292,000 ISO-SWG-GG.UV-CB-C.6-01
- - - ISO-SWG-GG.UV-CB-C.6-01

58 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

- - -

64,800 ISO-SWG-GG.UV-CB-C.8-02, ISO-


- - SWG-GG.UV-CB-C.8-03
- - -
- - (566,667)

(38,111) ISO-SWG-GG.UV-CB-C.8-02, ISO-


- - SWG-GG.UV-CB-C.8-03
- - -
- - (5,830,333)

327,273 ISO-SWG-GG.UV-CB-C.8-02, ISO-


- - SWG-GG.UV-CB-C.8-03
- - -
- - 3,488,119 ISO-SWG-GG.UV-CB-C.8-01
- - (1,689,579) ISO-SWG-GG.UV-CB-C.8-01
- - -
- - (379,098) ISO-SWG-GG.UV-CB-C.8-01
- - -
- - -
- - -
- - -
- - (1,237,349) ISO-SWG-GG.UV-CB-C.8-01
- - -
813,894 - (813,894)
- - -
- - -
- - -
3,300,000 - (3,300,000)
- - -
- 203,474 203,474 ISO-SWG-GG.UV-CB-C.8-01
- - -
533,333 - (533,333) ISO-SWG-GG.UV-CB-C.8-01
- - -
- - -
- - -
- - -

32,400 ISO-SWG-GG.UV-CB-C.8-02, ISO-


- 32,400 SWG-GG.UV-CB-C.8-03
- - -
420,000 - (420,000)

(40,000) ISO-SWG-GG.UV-CB-C.8-02, ISO-


40,000 - SWG-GG.UV-CB-C.8-03
- - -
2,332,133 - (2,332,133)

160,000 ISO-SWG-GG.UV-CB-C.8-02, ISO-


- 160,000 SWG-GG.UV-CB-C.8-03
- - -
- 2,400,000 2,400,000 ISO-SWG-GG.UV-CB-C.8-01
59 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
248,756 - (248,756) ISO-SWG-GG.UV-CB-C.8-01
- - -
333,333 - (333,333) ISO-SWG-GG.UV-CB-C.8-01
- - -
- - -
- - -
- - -
1,200,000 - (1,200,000) ISO-SWG-GG.UV-CB-C.8-01

- - -
- - (1,946,833) ISO-SWG-GG.UV-CB-C.10-01
- - (805,436)
- - -
- - -
- - -
- - -
- - -
371,392 - (371,392)
1,856,958 - (1,856,958)
- - -
- - -
- - -
1,920,000 - (1,920,000) ISO-SWG-GG.UV-CB-C.10-01
322,174 - (322,174)
- - -
- - -
- - -
- - -

- - -
ISO-SWG-GG.UV-CB-C.12-03,
- - 75,600 ISO-SWG-GG.UV-CB-C.12-04
60 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
ISO-SWG-GG.UV-CB-C.12-03,
- - 29,956 ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-01,
- - - ISO-SWG-GG.UV-CB-C.12-02
- - - ISO-SWG-GG.UV-CB-C.12-01
- - (304,889) ISO-SWG-GG.UV-CB-C.12-04
- - (2,092,637) ISO-SWG-GG.UV-CB-C.12-01
- - -
- - (490,909) ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-03,
- - 735,778 ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-01,
- - (5,813,531) ISO-SWG-GG.UV-CB-C.12-02
- - (3,379,157)
- - (288,248)
- - (758,195)
- - (63,183)
- - -
- - -
- - (279,442) ISO-SWG-GG.UV-CB-C.12-04
- - 1,237,349 ISO-SWG-GG.UV-CB-C.12-02
- - -
ISO-SWG-GG.UV-CB-C.12-01,
203,474 - (203,474) ISO-SWG-GG.UV-CB-C.12-02
ISO-SWG-GG.UV-CB-C.12-03,
- 90,000 90,000 ISO-SWG-GG.UV-CB-C.12-04
90,000 - (90,000) ISO-SWG-GG.UV-CB-C.12-04
30,000 - (30,000) ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-01,
600,000 - (600,000) ISO-SWG-GG.UV-CB-C.12-02
- - -
- - -
26,667 - (26,667) ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-01,
1,066,667 - (1,066,667) ISO-SWG-GG.UV-CB-C.12-02
ISO-SWG-GG.UV-CB-C.12-03,
- 293,333 293,333 ISO-SWG-GG.UV-CB-C.12-04
- - -
52,174 - (52,174) ISO-SWG-GG.UV-CB-C.12-04
- - -
ISO-SWG-GG.UV-CB-C.12-03,
- 37,800 37,800 ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-03,
- 14,978 14,978 ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-01,
196,000 - (196,000) ISO-SWG-GG.UV-CB-C.12-02
- - -
320,000 - (320,000) ISO-SWG-GG.UV-CB-C.12-04
61 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
1,600,000 - (1,600,000) ISO-SWG-GG.UV-CB-C.12-01
- - -
240,000 - (240,000) ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-03,
- 1,120,000 1,120,000 ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-01,
4,000,000 - (4,000,000) ISO-SWG-GG.UV-CB-C.12-02
1,555,556 - (1,555,556)
198,222 - (198,222)
1,022,222 - (1,022,222)
111,777 - (111,777)
- - -
- - -
120,000 - (120,000) ISO-SWG-GG.UV-CB-C.12-04
- 1,200,000 1,200,000 ISO-SWG-GG.UV-CB-C.12-02

ISO-SWG-GG.UV-CB-C.14-01,
- - (177,956) ISO-SWG-GG.UV-CB-C.14-02
- - -
ISO-SWG-GG.UV-CB-C.14-01,
- - 400,556 ISO-SWG-GG.UV-CB-C.14-02
ISO-SWG-GG.UV-CB-C.14-01,
- - 805,436 ISO-SWG-GG.UV-CB-C.14-02
- - (1,859,517)
ISO-SWG-GG.UV-CB-C.14-01,
- - (2,575,758) ISO-SWG-GG.UV-CB-C.14-02
- - -
- - -
- - - ISO-SWG-GG.UV-CB-C.14-02
- - -
- - -
ISO-SWG-GG.UV-CB-C.14-01,
- 621,201 621,201 ISO-SWG-GG.UV-CB-C.14-02
ISO-SWG-GG.UV-CB-C.14-01,
207,067 - (207,067) ISO-SWG-GG.UV-CB-C.14-02
207,067 - (207,067)
- - -
ISO-SWG-GG.UV-CB-C.14-01,
168,000 - (168,000) ISO-SWG-GG.UV-CB-C.14-02
- - -
ISO-SWG-GG.UV-CB-C.14-01,
- 480,000 480,000 ISO-SWG-GG.UV-CB-C.14-02

62 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
ISO-SWG-GG.UV-CB-C.14-01,
- 322,174 322,174 ISO-SWG-GG.UV-CB-C.14-02
960,000 - (960,000)
ISO-SWG-GG.UV-CB-C.14-01,
1,440,000 - (1,440,000) ISO-SWG-GG.UV-CB-C.14-02
- - -
- - -
- - -

- - (76,267) ISO-SWG-GG.UV-CB-C.16-01
- - (2,325,412)
- - 1,162,706 ISO-SWG-GG.UV-CB-C.16-01
- - -
- - -
- - (2,075,388) ISO-SWG-GG.UV-CB-C.16-01
- - (505,463) ISO-SWG-GG.UV-CB-C.16-01
- - -
- - -
222,178 - (222,178) ISO-SWG-GG.UV-CB-C.16-01
- - -
- - -
853,333 - (853,333) ISO-SWG-GG.UV-CB-C.16-01
72,000 - (72,000) ISO-SWG-GG.UV-CB-C.16-01
1,280,000 - (1,280,000)
- 640,000 640,000 ISO-SWG-GG.UV-CB-C.16-01
- - -
- - -
835,289 - (835,289) ISO-SWG-GG.UV-CB-C.16-01
608,000 - (608,000) ISO-SWG-GG.UV-CB-C.16-01
- - -

- - (25,422) ISO-SWG-GG.UV-CB-C.18-01
- - -
- - (400,556) ISO-SWG-GG.UV-CB-C.18-01
- - -
- - (858,586) ISO-SWG-GG.UV-CB-C.18-01
- - (1,039,357) ISO-SWG-GG.UV-CB-C.18-01
- - (526,524) ISO-SWG-GG.UV-CB-C.18-01
- - -
- - (533,951) ISO-SWG-GG.UV-CB-C.18-01
63 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

ISO-SWG-GG.UV-CB-C.18-01
ISO-SWG-GG.UV-CB-C.18-01

ISO-SWG-GG.UV-CB-C.18-01
24,000 - (24,000) ISO-SWG-GG.UV-CB-C.18-01
- - -
480,000 - (480,000) ISO-SWG-GG.UV-CB-C.18-01
- - -
480,000 - (480,000) ISO-SWG-GG.UV-CB-C.18-01
1,066,111 - (1,066,111) ISO-SWG-GG.UV-CB-C.18-01
880,000 - (880,000) ISO-SWG-GG.UV-CB-C.18-01
- - -
ISO-SWG-GG.UV-CB-C.18-01

- - 25,422 ISO-SWG-GG.UV-CB-C.20-01
- - -
- - -
- - -
- - (415,743) ISO-SWG-GG.UV-CB-C.20-01
- - (130,578) ISO-SWG-GG.UV-CB-C.20-01
- - (2,200,000)
- - -

- - -
160,000 - (160,000) ISO-SWG-GG.UV-CB-C.20-01
- - -
- - -
- - -
- - -
- - -
426,444 - (426,444) ISO-SWG-GG.UV-CB-C.20-01
352,000 - (352,000) ISO-SWG-GG.UV-CB-C.20-01
- 24,000 24,000 ISO-SWG-GG.UV-CB-C.20-01
1,777,778 - (1,777,778)
- - - ISO-SWG-GG.UV-CB-C.20-01

- - -
- - -
- - -
64 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - (511,111) ISO-SWG-GG.UV-CB-C.22-01
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - (176,579)
- - (328,061) ISO-SWG-GG.UV-CB-E.2-01, ISO-
SWG-GG.UV-CB-E.2-02 ISO-
ISO-SWG-GG.UV-CB-E.2-02,
ISO-SWG-GG.UV-CB-E.2-04,
- - 94,116 SWG-GG.UV-CB-E.2-03, ISO-
SWG-GG.UV-CB-E.2-08
- - 341,333 SWG-GG.UV-CB-E.2-04, ISO-
ISO-SWG-GG.UV-CB-E.2-01, ISO-
- - 76,267 SWG-GG.UV-CB-E.2-07, ISO-
SWG-GG.UV-CB-E.2-02, ISO-
SWG-GG.UV-CB-E.2-08
SWG-GG.UV-CB-E.2-06
- - -
- - -
- - (297,778)
- - (555,074) ISO-SWG-GG.UV-CB-E.2-02
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - 874,444 SWG-GG.UV-CB-E.2-05
- - (180,331)
- - - ISO-SWG-GG.UV-CB-E.2-07
- - (968,333) ISO-SWG-GG.UV-CB-E.2-01
- - (152,444) ISO-SWG-GG.UV-CB-E.2-02
65 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - 2,092,637 ISO-SWG-GG.UV-CB-E.2-06
ISO-SWG-GG.UV-CB-E.2-04, ISO-
- - (901,656) SWG-GG.UV-CB-E.2-08, ISO-
ISO-SWG-GG.UV-CB-E.2-02,
SWG-GG.UV-CB-E.2-10 ISO-
- - (372,222) SWG-GG.UV-CB-E.2-03
- - 425,000 ISO-SWG-GG.UV-CB-E.2-07
ISO-SWG-GG.UV-CB-E.2-01, ISO-
- - (2,523,000) SWG-GG.UV-CB-E.2-02
- - - ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - (782,435) SWG-GG.UV-CB-E.2-05, ISO-
- - (288,889) SWG-GG.UV-CB-E.2-08 ISO-
ISO-SWG-GG.UV-CB-E.2-04,
ISO-SWG-GG.UV-CB-E.2-05
SWG-GG.UV-CB-E.2-07, ISO-
- - 5,454,545 SWG-GG.UV-CB-E.2-08, ISO-
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - (659,645) SWG-GG.UV-CB-E.2-10
SWG-GG.UV-CB-E.2-03
- - 159,645 ISO-SWG-GG.UV-CB-E.2-07
- - - ISO-SWG-GG.UV-CB-E.2-04, ISO-
- - 3,032,780 SWG-GG.UV-CB-E.2-07, ISO-
SWG-GG.UV-CB-E.2-08, ISO-
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - (347,506) SWG-GG.UV-CB-E.2-10
SWG-GG.UV-CB-E.2-03
- - 84,244 ISO-SWG-GG.UV-CB-E.2-07
- - -
- - (149,598)
- - -
- - (1,050,000)
- - (418,889) ISO-SWG-GG.UV-CB-E.2-01
- - -
- - (321,389)
- - (30,000)
- - (70,000)
ISO-SWG-GG.UV-CB-E.2-04, ISO-
- - 6,944 SWG-GG.UV-CB-E.2-10
- - (52,867)

ISO-SWG-GG.UV-CB-E.2-01, ISO-
- 720,000 720,000 SWG-GG.UV-CB-E.2-02
1,080,000 - (1,080,000)
280,013 - (280,013)
- - -
120,000 - (120,000) ISO-SWG-GG.UV-CB-E.2-05
- 106,667 106,667 ISO-SWG-GG.UV-CB-E.2-07
- - -
- - -
186,667 - (186,667) ISO-SWG-GG.UV-CB-E.2-04, ISO-
ISO-SWG-GG.UV-CB-E.2-02
320,000 - (320,000) SWG-GG.UV-CB-E.2-07, ISO-
SWG-GG.UV-CB-E.2-08, ISO-
ISO-SWG-GG.UV-CB-E.2-02, ISO-
3,933,333 - (3,933,333) SWG-GG.UV-CB-E.2-10
SWG-GG.UV-CB-E.2-03
- - -
175,729 - (175,729)
240,000 - (240,000)
120,000 - (120,000) ISO-SWG-GG.UV-CB-E.2-02
118,962 - (118,962)
ISO-SWG-GG.UV-CB-E.2-01, ISO-
152,876 - (152,876) SWG-GG.UV-CB-E.2-02 ISO-
ISO-SWG-GG.UV-CB-E.2-02,
ISO-SWG-GG.UV-CB-E.2-04,
- 87,864 87,864 SWG-GG.UV-CB-E.2-03, ISO-
SWG-GG.UV-CB-E.2-08
- 320,000 320,000 SWG-GG.UV-CB-E.2-04, ISO-
ISO-SWG-GG.UV-CB-E.2-01, ISO-
- 72,000 72,000 SWG-GG.UV-CB-E.2-07, ISO-
SWG-GG.UV-CB-E.2-02, ISO-
SWG-GG.UV-CB-E.2-08
SWG-GG.UV-CB-E.2-06
- - - ISO-SWG-GG.UV-CB-E.2-05
66 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - - ISO-SWG-GG.UV-CB-E.2-06
240,000 - (240,000)
680,000 - (680,000) ISO-SWG-GG.UV-CB-E.2-02
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- 720,000 720,000 SWG-GG.UV-CB-E.2-05
160,000 - (160,000)
- - - ISO-SWG-GG.UV-CB-E.2-07
1,440,000 - (1,440,000) ISO-SWG-GG.UV-CB-E.2-01
320,000 - (320,000) ISO-SWG-GG.UV-CB-E.2-02
- 1,600,000 1,600,000 ISO-SWG-GG.UV-CB-E.2-06
ISO-SWG-GG.UV-CB-E.2-04, ISO-
800,000 - (800,000) SWG-GG.UV-CB-E.2-08, ISO-
ISO-SWG-GG.UV-CB-E.2-02,
SWG-GG.UV-CB-E.2-10 ISO-
800,000 - (800,000) SWG-GG.UV-CB-E.2-03
- 320,000 320,000 ISO-SWG-GG.UV-CB-E.2-07
1,440,000 - (1,440,000) ISO-SWG-GG.UV-CB-E.2-01, ISO-
SWG-GG.UV-CB-E.2-02
- - - ISO-SWG-GG.UV-CB-E.2-02, ISO-
480,000 - (480,000) SWG-GG.UV-CB-E.2-05, ISO-
400,000 - (400,000) SWG-GG.UV-CB-E.2-08 ISO-
ISO-SWG-GG.UV-CB-E.2-04,
ISO-SWG-GG.UV-CB-E.2-05
- 4,108,800 4,108,800 SWG-GG.UV-CB-E.2-07, ISO-
SWG-GG.UV-CB-E.2-08, ISO-
ISO-SWG-GG.UV-CB-E.2-02, ISO-
848,660 - (848,660) SWG-GG.UV-CB-E.2-10
SWG-GG.UV-CB-E.2-03
- 182,156 182,156 ISO-SWG-GG.UV-CB-E.2-07
- - - ISO-SWG-GG.UV-CB-E.2-04, ISO-
SWG-GG.UV-CB-E.2-07, ISO-
- 2,701,307 2,701,307 SWG-GG.UV-CB-E.2-08, ISO-
ISO-SWG-GG.UV-CB-E.2-02, ISO-
372,497 - (372,497) SWG-GG.UV-CB-E.2-10
SWG-GG.UV-CB-E.2-03
- 143,556 143,556 ISO-SWG-GG.UV-CB-E.2-07
ISO-SWG-GG.UV-CB-E.2-01, ISO-
- - - SWG-GG.UV-CB-E.2-02
350,000 - (350,000)
- - -
1,920,000 - (1,920,000)
720,000 - (720,000) ISO-SWG-GG.UV-CB-E.2-01
- - -
560,000 - (560,000)
12,000 - (12,000)
28,000 - (28,000)
ISO-SWG-GG.UV-CB-E.2-04, ISO-
- 2,778 2,778 SWG-GG.UV-CB-E.2-10
21,147 - (21,147)

67 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

- - -
- - -
- - (188,232) ISO-SWG-GG.UV-CB-F.2-02
- - (234,667) ISO-SWG-GG.UV-CB-F.2-01
- - -
- - (277,537)
- - (333,170)
- - (88,889)
- - 76,222 ISO-SWG-GG.UV-CB-F.2-02
- - (52,667) ISO-SWG-GG.UV-CB-F.2-02
- - (648,944) ISO-SWG-GG.UV-CB-F.2-04
- - -
- - (88,889)
- - (76,222) ISO-SWG-GG.UV-CB-F.2-02
- - (52,667) ISO-SWG-GG.UV-CB-F.2-02
- - (138,440)
- - (186,111) ISO-SWG-GG.UV-CB-F.2-02
ISO-SWG-GG.UV-CB-F.2-01, ISO-
- - 425,000 SWG-GG.UV-CB-F.2-04
- - (3,364,000) ISO-SWG-GG.UV-CB-F.2-01
- - -
- - -
- - (521,623) ISO-SWG-GG.UV-CB-F.2-02
- - (255,556)
- - (39,090)
- - (1,006,000)
- - -
- - 28,000 ISO-SWG-GG.UV-CB-F.2-01
- - (26,433) ISO-SWG-GG.UV-CB-F.2-02
- - -
- - -
180,000 - (180,000)
- - -
- - -
931,200 - (931,200) ISO-SWG-GG.UV-CB-F.2-04
581,600 - (581,600) ISO-SWG-GG.UV-CB-F.2-01
360,000 - (360,000)
- - -
318,400 - (318,400) ISO-SWG-GG.UV-CB-F.2-02
186,800 - (186,800) ISO-SWG-GG.UV-CB-F.2-02
- - -
914,667 - (914,667) ISO-SWG-GG.UV-CB-F.2-02
- - -
- - -
- - -
202,395 - (202,395) ISO-SWG-GG.UV-CB-F.2-02
220,000 - (220,000) ISO-SWG-GG.UV-CB-F.2-01
68 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - -
320,000 - (320,000)
360,000 - (360,000)
240,000 - (240,000)
- 160,000 160,000 ISO-SWG-GG.UV-CB-F.2-02
120,000 - (120,000) ISO-SWG-GG.UV-CB-F.2-02
640,000 - (640,000) ISO-SWG-GG.UV-CB-F.2-04
- - -
240,000 - (240,000)
160,000 - (160,000) ISO-SWG-GG.UV-CB-F.2-02
60,000 - (60,000) ISO-SWG-GG.UV-CB-F.2-02
320,000 - (320,000)
400,000 - (400,000) ISO-SWG-GG.UV-CB-F.2-02
- 320,000 320,000 ISO-SWG-GG.UV-CB-F.2-01, ISO-
SWG-GG.UV-CB-F.2-04
1,920,000 - (1,920,000) ISO-SWG-GG.UV-CB-F.2-01
- - -
- - -
400,000 - (400,000) ISO-SWG-GG.UV-CB-F.2-02
240,000 - (240,000)
140,000 - (140,000)
402,400 - (402,400)
- - -
- 11,200 11,200 ISO-SWG-GG.UV-CB-F.2-01
10,573 - (10,573) ISO-SWG-GG.UV-CB-F.2-02

- - (656,122)
- - (128,000) ISO-SWG-GG.UV-CB-G.2-02
- - 101,689 ISO-SWG-GG.UV-CB-G.2-01, ISO-
SWG-GG.UV-CB-G.2-02
- - 5,603,333 ISO-SWG-GG.UV-CB-G.2-01
- - (2,595,778)
- - - ISO-SWG-GG.UV-CB-G.2-03
- - 8,405,000 ISO-SWG-GG.UV-CB-G.2-01, ISO-
SWG-GG.UV-CB-G.2-02
- - 10,200,000 ISO-SWG-GG.UV-CB-G.2-02
ISO-SWG-GG.UV-CB-G.2-01, ISO-
- - (2,523,000) SWG-GG.UV-CB-G.2-02
- - -
- - -
- - -
- - (19,444) ISO-SWG-GG.UV-CB-G.2-03
- - (1,750,000)
ISO-SWG-GG.UV-CB-G.2-01, ISO-
- - 1,400,000 SWG-GG.UV-CB-G.2-02
69 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - -
- - -
- - -
ISO-SWG-GG.UV-CB-G.2-03, ISO-
- 161,325 161,325 SWG-GG.UV-CB-G.2-04
1,200,000 - (1,200,000)
6,400,000 - (6,400,000)
ISO-SWG-GG.UV-CB-G.2-01, ISO-
- 5,440,000 5,440,000 SWG-GG.UV-CB-G.2-02
- - -
ISO-SWG-GG.UV-CB-G.2-02, ISO-
- 161,325 161,325 SWG-GG.UV-CB-G.2-03
701,489 - (701,489)
120,000 - (120,000) ISO-SWG-GG.UV-CB-G.2-02
ISO-SWG-GG.UV-CB-G.2-01, ISO-
- 96,000 96,000 SWG-GG.UV-CB-G.2-02
- 2,880,000 2,880,000 ISO-SWG-GG.UV-CB-G.2-01
2,560,000 - (2,560,000)
- - -
- 4,320,000 4,320,000 ISO-SWG-GG.UV-CB-G.2-01, ISO-
SWG-GG.UV-CB-G.2-02
- 7,680,000 7,680,000 ISO-SWG-GG.UV-CB-G.2-02
1,440,000 - (1,440,000) ISO-SWG-GG.UV-CB-G.2-01, ISO-
SWG-GG.UV-CB-G.2-02
- - -
- - -
- - -
200,000 - (200,000) ISO-SWG-GG.UV-CB-G.2-03
3,200,000 - (3,200,000)
ISO-SWG-GG.UV-CB-G.2-01, ISO-
- 2,880,000 2,880,000 SWG-GG.UV-CB-G.2-02
- - -
- - -

- - 85,333 ISO-SWG-GG.UV-CB-G.4-01, ISO-


ISO-SWG-GG.UV-CB-G.4-01 ,ISO-
SWG-GG.UV-CB-G.4-02
SWG-GG.UV-CB-G.4-02 ,ISO-
- - 5,115,907
SWG-GG.UV-CB-G.4-03 ,ISO-
ISO-SWG-GG.UV-CB-G.4-01, ISO-
- - 2,022,222 SWG-GG.UV-CB-G.4-04
SWG-GG.UV-CB-G.4-02
- - -
- - -
- - -
- - (7,778)
- - 64,444 ISO-SWG-GG.UV-CB-G.4-02
- - - ISO-SWG-GG.UV-CB-G.4-01 ,ISO-
SWG-GG.UV-CB-G.4-02 ,ISO-
ISO-SWG-GG.UV-CB-G.4-01 ,ISO-
69,689 - (69,689) SWG-GG.UV-CB-G.4-03
SWG-GG.UV-CB-G.4-02 ,ISO-
,ISO-
- 11,640,000 11,640,000 SWG-GG.UV-CB-G.4-04
SWG-GG.UV-CB-G.4-03 ,ISO-
- - - SWG-GG.UV-CB-G.4-04
- - -
- - -
70 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - -
- - -
80,000 ISO-SWG-GG.UV-CB-G.4-01, ISO-
ISO-SWG-GG.UV-CB-G.4-01 ,ISO-
- 80,000 SWG-GG.UV-CB-G.4-02
SWG-GG.UV-CB-G.4-02 ,ISO-
- 1,540,000 1,540,000 SWG-GG.UV-CB-G.4-03 ,ISO-
2,240,000 ISO-SWG-GG.UV-CB-G.4-01, ISO-
- 2,240,000 SWG-GG.UV-CB-G.4-04
SWG-GG.UV-CB-G.4-02
- - -
- - -
- - -
80,000 - (80,000)
- 25,778 25,778 ISO-SWG-GG.UV-CB-G.4-02

- - -
- - -
138,667 ISO-SWG-GG.UV-CB-H.2-01, ISO-
- - SWG-GG.UV-CB-H.2-02
- - 123,222 ISO-SWG-GG.UV-CB-H.2-01
- - (252,444) ISO-SWG-GG.UV-CB-H.2-02
- - 79,946 ISO-SWG-GG.UV-CB-H.2-02
- - -
- - (58,635)
- - (3,260,000)
- - (1,006,000)
- - (2,012,607)
- - -
- - (129,371) ISO-SWG-GG.UV-CB-H.2-02
- - (35,000)
- - (6,667)
- - (25,778)
- - (6,667)
- - (48,644)
- - -
107,550 - (107,550)
209,067 - (209,067)
- - -
- - -
180,000 - (180,000)
71 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
1,320,000 - (1,320,000) ISO-SWG-GG.UV-CB-H.2-02
320,000 - (320,000) ISO-SWG-GG.UV-CB-H.2-02
- - -
- - -
- - -
- - -
- - -
- - -
130,000 ISO-SWG-GG.UV-CB-H.2-01, ISO-
- 130,000 SWG-GG.UV-CB-H.2-02
- 320,000 320,000
280,000 - (280,000) ISO-SWG-GG.UV-CB-H.2-02
- 240,000 240,000 ISO-SWG-GG.UV-CB-H.2-02
- - -
105,000 - (105,000)
1,304,000 - (1,304,000)
402,400 - (402,400)
805,043 - (805,043)
- - - ISO-SWG-GG.UV-CB-H.2-02
- - - ISO-SWG-GG.UV-CB-H.2-02
14,000 - (14,000)
2,667 - (2,667)
10,311 - (10,311)
2,667 - (2,667)
19,458 - (19,458)

- - -
- - -
- - (388,112) ISO-SWG-GG.UV-CB-H.4-02
- - (96,667) ISO-SWG-GG.UV-CB-H.4-02
- - (77,178) ISO-SWG-GG.UV-CB-H.4-02
- - (102,667) ISO-SWG-GG.UV-CB-H.4-02
- - (170,222)
- - (53,111)
- - -
- - -
270,000 - (270,000) ISO-SWG-GG.UV-CB-H.4-02
- 90,000 90,000 ISO-SWG-GG.UV-CB-H.4-02
90,000 - (90,000) ISO-SWG-GG.UV-CB-H.4-02
- - -
60,000 - (60,000) ISO-SWG-GG.UV-CB-H.4-02
- 60,000 60,000 ISO-SWG-GG.UV-CB-H.4-02
- - -
72 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - -
155,245 - (155,245) ISO-SWG-GG.UV-CB-H.4-02
175,000 - (175,000) ISO-SWG-GG.UV-CB-H.4-02
70,000 - (70,000) ISO-SWG-GG.UV-CB-H.4-02
105,000 - (105,000) ISO-SWG-GG.UV-CB-H.4-02
140,000 - (140,000)
35,000 - (35,000)
- - -

- - 183,881 ISO-SWG-GG.UV-CB-C.2-04
1,215,076
- - 771,294 ISO-SWG-GG.UV-CB-C.2-05
- - 201,236 ISO-SWG-GG.UV-CB-C.2-01, ISO-
ISO-SWG-GG.UV-CB-C.2-04
- - 4,953,600 SWG-GG.UV-CB-C.2-02, ISO-
ISO-SWG-GG.UV-CB-C.2-01, ISO-
SWG-GG.UV-CB-C.2-03, ISO-
- - 2,127,273 SWG-GG.UV-CB-C.2-02, ISO-
SWG-GG.UV-CB-C.2-04
390,480 SWG-GG.UV-CB-C.2-03
- - 3,154,286 ISO-SWG-GG.UV-CB-C.2-01, ISO-
SWG-GG.UV-CB-C.2-02
- - 1,397,468 ISO-SWG-GG.UV-CB-C.2-04
ISO-SWG-GG.UV-CB-C.2-02, ISO-
- - 387,117 SWG-GG.UV-CB-C.2-03
- - -
- - 3,031,111 SP-SWG-GG.UV-CB-C.2-02
- - 693,333 SP-SWG-GG.UV-CB-C.2-06
- - 34,286 SP-SWG-GG.UV-CB-C.2-06
- - 253,333 SP-SWG-GG.UV-CB-C.2-06
- - 8,240,000 SP-SWG-GG.UV-CB-C.2-03
- - 1,386,429 SP-SWG-GG.UV-CB-C.2-03
SP-SWG-GG.UV-CB-C.2-03 , SP-
- - 38,983 SWG-GG.UV-CB-C.2-04, SP-SWG-
SP-SWG-GG.UV-CB-C.2-03
GG.UV-CB-C.2-05 , SP-
- - 187,013 SWG-GG.UV-CB-C.2-04
- - 2,688,889 SP-SWG-GG.UV-CB-C.2-05
- - -
- - -
ISO-SWG-GG.UV-CB-C.4-02, ISO-
- - 21,546,667 SWG-GG.UV-CB-C.4-03
- - 1,220,424 ISO-SWG-GG.UV-CB-C.4-02
- - 2,324,618 ISO-SWG-GG.UV-CB-C.4-02, ISO-
SWG-GG.UV-CB-C.4-03
- - 309,600 ISO-SWG-GG.UV-CB-C.4-02
- - 510,831 ISO-SWG-GG.UV-CB-C.4-02
- - 1,660,200 ISO-SWG-GG.UV-CB-C.4-01
- - 4,550,000 ISO-SWG-GG.UV-CB-C.4-01
- - 1,509,439 ISO-SWG-GG.UV-CB-C.4-02, ISO-
SWG-GG.UV-CB-C.4-03
- - 572,333 ISO-SWG-GG.UV-CB-C.4-03
ISO-SWG-GG.UV-CB-C.4-03, ISO-
- - 1,099,636 SWG-GG.UV-CB-C.4-04
- - 11,285,000 ISO-SWG-GG.UV-CB-C.4-04

73 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - 691,667 ISO-SWG-GG.UV-CB-C.4-04
- - 230,556 ISO-SWG-GG.UV-CB-C.4-04
- - 148,500 ISO-SWG-GG.UV-CB-C.4-04
- - 486,772 ISO-SWG-GG.UV-CB-C.4-04
- - 511,111 ISO-SWG-GG.UV-CB-C.4-04
- - 521,623 ISO-SWG-GG.UV-CB-C.4-04
- - 638,889 ISO-SWG-GG.UV-CB-C.4-04
ISO-SWG-GG.UV-CB-C.4-04, SP-
- - 499,500 SWG-GG.UV-CB-C.4-04
- - 44,172 ISO-SWG-GG.UV-CB-C.4-05
- - 244,317 ISO-SWG-GG.UV-CB-C.4-05
- - 81,439 ISO-SWG-GG.UV-CB-C.4-05
- - 259,000 ISO-SWG-GG.UV-CB-C.4-05
- - -
- - 729,600 ISO-SWG-GG.UV-CB-C.4-05
SP-SWG-GG.UV-CB-C.4-01, SP-
- - 30,380 SWG-GG.UV-CB-C.4-02, SP-SWG-
ISO-SWG-GG.UV-CB-C.4-05
SP-SWG-GG.UV-CB-C.4-01, SP-
- - 3,531,429 GG.UV-CB-C.4-03, SP-SWG-
SWG-GG.UV-CB-C.4-02, SP-SWG-
GG.UV-CB-C.4-04,SP-SWG-
GG.UV-CB-C.4-03, SP-SWG-
- - 4,390,357 SP-SWG-GG.UV-CB-C.4-01,
GG.UV-CB-C.4-05,ISO-SWG-
SP-SWG-SP-
GG.UV-CB-C.4-04,
SWG-GG.UV-CB-C.4-02, SP-SWG-
- - 673,958 GG.UV-CB-C.4-06 SP-
SP-SWG-GG.UV-CB-C.4-01,
GG.UV-CB-C.4-05,
GG.UV-CB-C.4-03, SP-SWG-
SWG-GG.UV-CB-C.4-02,SP-SWG-
SP-SWG-GG.UV-CB-C.4-01, SP-
SP-SWG-
- - 4,657,021 GG.UV-CB-C.4-07
GG.UV-CB-C.4-04
SWG-GG.UV-CB-C.4-02,
GG.UV-CB-C.4-03, SP-SWG-
SP-SWG-
- - 242,625 GG.UV-CB-C.4-03,SP-SWG-
GG.UV-CB-C.4-04
- - 24,000 GG.UV-CB-C.4-05, SP-SWG-
SP-SWG-GG.UV-CB-C.4-03
GG.UV-CB-C.4-06
ISO-SWG-GG.UV-CB-C.4-03, SP-
- - 1,783,333 SWG-GG.UV-CB-C.4-05
- - 391,111 SP-SWG-GG.UV-CB-C.4-05
- - 2,200,000 ISO-SWG-GG.UV-CB-C.4-02

- - 10,017,857 SD-SWG-GG.UV-CB-HD-01
- - 1,139,444 SD-SWG-GG.UV-CB-HD-01
- - 673,333 SD-SWG-GG.UV-CB-HD-01
- - 5,333,333 SD-SWG-GG.UV-CB-HD-01
- - 4,533,333 SD-SWG-GG.UV-CB-HD-01
- - 3,946,667 SD-SWG-GG.UV-CB-HD-01
- - 866,667 SD-SWG-GG.UV-CB-HD-01
- - 1,184,211 SD-SWG-GG.UV-CB-HD-01
- - 4,242,857 SD-SWG-GG.UV-CB-HD-01
- - 293,333 SD-SWG-GG.UV-CB-HD-01
- - 462,143 SD-SWG-GG.UV-CB-HD-01
- - 970,213 SD-SWG-GG.UV-CB-HD-01
- - 3,895,833 SD-SWG-GG.UV-CB-HD-01
- - 73,220 SD-SWG-GG.UV-CB-HD-01
- - 866,667 SD-SWG-GG.UV-CB-HD-01
- - 40,678 SD-SWG-GG.UV-CB-HD-01

- - 865,333 ISO-SWG-GG.UV-CB-HD-01
- - 47,327 ISO-SWG-GG.UV-CB-HD-01
- - 443,689 ISO-SWG-GG.UV-CB-HD-01
- - 424,286 ISO-SWG-GG.UV-CB-HD-01
74 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - 40,755 ISO-SWG-GG.UV-CB-HD-01
- - -
- - 77,024 ISO-SWG-GG.UV-CB-HD-01
- - 711,489 ISO-SWG-GG.UV-CB-HD-01
- - 24,324 ISO-SWG-GG.UV-CB-HD-01
- - 10,500 ISO-SWG-GG.UV-CB-HD-01

- - 12,798,333 GLR-I.D-CB.V-SWG-001
- - 9,220,952 GLR-I.D-CB.V-SWG-001
- - 385,119 GLR-I.D-CB.V-SWG-001
- - 1,752,292 GLR-I.D-CB.V-SWG-001
- - 1,422,979 GLR-I.D-CB.V-SWG-001
- - 1,626,261 GLR-I.D-CB.V-SWG-001
1,482,353
- - 1,482,353 GLR-I.D-CB.V-SWG-001
- - 480,392 GLR-I.D-CB.V-SWG-001
- - 194,595 GLR-I.D-CB.V-SWG-001
- - 2,750,250 GLR-I.D-CB.V-SWG-001
- - 26,812,381 GLR-I.D-CB.V-SWG-001
- - -
- - -
- - 2,571,429 GLR-C.D-CB.V-SWG-001
- - 13,059,524 GLR-C.D-CB.V-SWG-001
- - 8,828,571 GLR-C.D-CB.V-SWG-001
- - 924,286 GLR-C.D-CB.V-SWG-001
- - 1,752,292 GLR-C.D-CB.V-SWG-001
- - 1,422,979 GLR-C.D-CB.V-SWG-001
- - 3,252,523 GLR-C.D-CB.V-SWG-001
- - 457,516 GLR-C.D-CB.V-SWG-001
- - 1,482,353 GLR-C.D-CB.V-SWG-001
- - 960,784 GLR-C.D-CB.V-SWG-001
- - 235,636 GLR-C.D-CB.V-SWG-001
- - 3,150,250 GLR-C.D-CB.V-SWG-001
- - 26,812,381 GLR-C.D-CB.V-SWG-001
- - -
- - -
- - 600,000 ISO-SWG-GG.UV-CB-C.6-01
- - 400,000 ISO-SWG-GG.UV-CB-C.6-01
- - 424,708 ISO-SWG-GG.UV-CB-C.6-01, ISO-
SWG-GG.UV-CB-C.6-02
- - 841,000 ISO-SWG-GG.UV-CB-C.6-01
- - 5,454,545 ISO-SWG-GG.UV-CB-C.6-01
- - 102,109 ISO-SWG-GG.UV-CB-C.6-01
- - 99,871 ISO-SWG-GG.UV-CB-C.6-01
- - 174,203 ISO-SWG-GG.UV-CB-C.6-01
- - -
784,762 SP-SWG-GG.UV-CB-C.6-01, SP-
- - SWG-GG.UV-CB-C.6-02
- - 308,095 SP-SWG-GG.UV-CB-C.6-01
75 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - 134,792 SP-SWG-GG.UV-CB-C.6-01
- - 829,091 SP-SWG-GG.UV-CB-C.6-01
SP-SWG-GG.UV-CB-C.6-01,
SP-SWG-GG.UV-CB-C.6-02, SP-
SP-
- - 92,429 SWG-GG.UV-CB-C.6-02
SWG-GG.UV-CB-C.6-03, SP-SWG-
- - 4,008,889 GG.UV-CB-C.6-04, SP-SWG-
- - 506,667 SP-SWG-GG.UV-CB-C.6-02
GG.UV-CB-C.6-05
SP-SWG-GG.UV-CB-C.6-02, SP-
- - 109,091 SWG-GG.UV-CB-C.6-05
- - 224,500 SP-SWG-GG.UV-CB-C.6-03
SP-SWG-GG.UV-CB-C.6-03, SP-
- - 1,164,255 SWG-GG.UV-CB-C.6-04
- - 149,667 SP-SWG-GG.UV-CB-C.6-04
- - 889,362 SP-SWG-GG.UV-CB-C.6-05
- - 244,444 SP-SWG-GG.UV-CB-C.6-05
- - 81,356 ISO-SWG-GG.UV-CB-C.6-02
- - -
- - -
- - 1,421,598 ISO-SWG-GG.UV-CB-C.8-01
- - 304,889 ISO-SWG-GG.UV-CB-C.8-02
- - 518,000 ISO-SWG-GG.UV-CB-C.8-02, ISO-
SWG-GG.UV-CB-C.8-03
- - -
- - 462,143 ISO-SWG-GG.UV-CB-C.8-02, ISO-
SWG-GG.UV-CB-C.8-03 ISO-
ISO-SWG-GG.UV-CB-C.8-02,
- - 1,545,763 SWG-GG.UV-CB-C.8-03 ISO-
ISO-SWG-GG.UV-CB-C.8-02,
- - 64,865 SWG-GG.UV-CB-C.8-03
- - -
- - -
- - -
- - 2,158,095 SP-SWQ-GG.UV-CB-C.10-01
- - 4,313,333 SP-SWQ-GG.UV-CB-C.10-01
- - 5,888,188 SP-SWQ-GG.UV-CB-C.10-01
- - 1,710,476 SP-SWQ-GG.UV-CB-C.10-01
- - 920,029 SP-SWQ-GG.UV-CB-C.10-01
- - 202,188 SP-SWQ-GG.UV-CB-C.10-01
- - -
- - -
- - -
- - 365,438 ISO-SWG-GG.UV-CB-C.12-02
- - 55,215 ISO-SWG-GG.UV-CB-C.12-03
- - 419,163 ISO-SWG-GG.UV-CB-C.12-03
- - 518,000 ISO-SWG-GG.UV-CB-C.12-03
- - 259,000 ISO-SWG-GG.UV-CB-C.12-04
- - -
- - 462,143 ISO-SWG-GG.UV-CB-C.12-03,
ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-03,
- - 1,545,763 ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-03,
- - 64,865 ISO-SWG-GG.UV-CB-C.12-04
- - -
- - -
- - -
SP-SWQ-GG.UV-CB-C.14-01, ISO-
- - 1,564,444 SWG-GG.UV-CB-C.14-02
- - 92,429 SP-SWQ-GG.UV-CB-C.14-01
- - 891,667 SP-SWQ-GG.UV-CB-C.14-01
76 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - 266,809 SP-SWQ-GG.UV-CB-C.14-01
- - 31,169 SP-SWQ-GG.UV-CB-C.14-01
- - 121,813 ISO-SWG-GG.UV-CB-C.14-02
- - 480,556 ISO-SWG-GG.UV-CB-C.14-02
- - 533,951 ISO-SWG-GG.UV-CB-C.14-01
- - 693,842 ISO-SWG-GG.UV-CB-C.14-02
- - 376,679 ISO-SWG-GG.UV-CB-C.14-02
- - 257,098 ISO-SWG-GG.UV-CB-C.14-02
- - 162,712 ISO-SWG-GG.UV-CB-C.14-02
- - -
- - -
- - 506,220 ISO-SWG-GG.UV-CB-C.16-01
- - -
- - -
- - -
- - 297,222 ISO-SWG-GG.UV-CB-C.20-01
- - 293,333 ISO-SWG-GG.UV-CB-C.20-01
- - 42,762 ISO-SWG-GG.UV-CB-C.20-01
- - -
- - -
- - 9,402,857 GLR-D.P-CB.V-SWG-001
- - 13,885,714 GLR-D.P-CB.V-SWG-001
- - 588,571 GLR-D.P-CB.V-SWG-001
- - 4,544,405 GLR-D.P-CB.V-SWG-001
- - 2,021,875 GLR-D.P-CB.V-SWG-001
- - 1,422,979 GLR-D.P-CB.V-SWG-001
- - 3,252,523 GLR-D.P-CB.V-SWG-001
- - 653,595 GLR-D.P-CB.V-SWG-001
- - 1,482,353 GLR-D.P-CB.V-SWG-001
- - 960,784 GLR-D.P-CB.V-SWG-001
- - -
- - -
- - -
- - 961,111 ISO-SWG-GG.UV-CB-E.2-01
- - 925,714 ISO-SWG-GG.UV-CB-E.2-04
- - -
- - 785,714 ISO-SWG-GG.UV-CB-E.2-06, ISO-
SWG-GG.UV-CB-E.2-06.1
- - 478,415 ISO-SWG-GG.UV-CB-E.2-06
- - 404,813 ISO-SWG-GG.UV-CB-E.2-06
- - 124,675 ISO-SWG-GG.UV-CB-E.2-06
ISO-SWG-GG.UV-CB-E.2-09, ISO-
- - 51,750 SWG-GG.UV-CB-E.2-11 ISO-
ISO-SWG-GG.UV-CB-E.2-09,
- - 31,500 SWG-GG.UV-CB-E.2-11
- - 336,979 ISO-SWG-GG.UV-CB-E.2-07
- - 28,700 ISO-SWG-GG.UV-CB-E.2-07
ISO-SWG-GG.UV-CB-E.2-07, ISO-
- - 22,050 SWG-GG.UV-CB-E.2-10
- - 18,200 ISO-SWG-GG.UV-CB-E.2-07
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - 308,095 SWG-GG.UV-CB-E.2-04, ISO-
- - 129,362 SWG-GG.UV-CB-E.2-10
ISO-SWG-GG.UV-CB-E.2-04
77 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - 600,000 SWG-GG.UV-CB-E.2-04
- - 733,333 ISO-SWG-GG.UV-CB-E.2-01
- - 2,328,511 ISO-SWG-GG.UV-CB-E.2-01
ISO-SWG-GG.UV-CB-E.2-01, ISO-
- - 277,550 SWG-GG.UV-CB-E.2-02
- - 883,228 ISO-SWG-GG.UV-CB-E.2-02
- - 237,163 ISO-SWG-GG.UV-CB-E.2-10
- - 13,953 ISO-SWG-GG.UV-CB-E.2-10
- - 46,214 ISO-SWG-GG.UV-CB-E.2-11
- - 362,000 ISO-SWG-GG.UV-CB-E.2-03
- - 97,289 ISO-SWG-GG.UV-CB-E.2-09
- - 47,525 ISO-SWG-GG.UV-CB-E.2-07
- - 273,333 ISO-SWG-GG.UV-CB-E.2-07
- - 720,000 ISO-SWG-GG.UV-CB-E.2-07
- - 1,444,444 ISO-SWG-GG.UV-CB-E.2-07
- - 335,111 ISO-SWG-GG.UV-CB-E.2-07
- - 541,333 ISO-SWG-GG.UV-CB-E.2-07
- - 55,250 ISO-SWG-GG.UV-CB-E.2-07
- - 894,643 ISO-SWG-GG.UV-CB-E.2-07
- - 47,500 ISO-SWG-GG.UV-CB-E.2-07
- - 1,050,000 ISO-SWG-GG.UV-CB-E.2-07
- - 1,440,000 ISO-SWG-GG.UV-CB-E.2-07
- - 62,934 ISO-SWG-GG.UV-CB-E.2-07
- - 7,888 ISO-SWG-GG.UV-CB-E.2-07
- - 610,212 ISO-SWG-GG.UV-CB-E.2-06
- - 210,667 ISO-SWG-GG.UV-CB-E.2-04
- - 37,761 ISO-SWG-GG.UV-CB-E.2-04
- - 28,396 ISO-SWG-GG.UV-CB-E.2-03
- - 14,198 ISO-SWG-GG.UV-CB-E.2-03
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - 2,022,222 SWG-GG.UV-CB-E.2-03
- - 346,667 ISO-SWG-GG.UV-CB-E.2-04
- - 108,905 ISO-SWG-GG.UV-CB-E.2-03
- - 780,000 ISO-SWG-GG.UV-CB-E.2-02
- - 121,006 ISO-SWG-GG.UV-CB-E.2-02
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - 192,857 ISO-SWG-GG.UV-CB-E.2-02,
SWG-GG.UV-CB-E.2-03 ISO-
- - 406,780 SWG-GG.UV-CB-E.2-03, ISO-
ISO-SWG-GG.UV-CB-E.2-01, ISO-
- - 766,246 SWG-GG.UV-CB-E.2-07
SWG-GG.UV-CB-E.2-02, ISO-
- - 401,736 SWG-GG.UV-CB-E.2-13
ISO-SWG-GG.UV-CB-E.2-02
31,467
- - 830,722 ISO-SWG-GG.UV-CB-E.2-02
- - 641,419 ISO-SWG-GG.UV-CB-E.2-11, ISO-
SWG-GG.UV-CB-E.2-12 ISO-
ISO-SWG-GG.UV-CB-E.2-11,
- - 495,444 SWG-GG.UV-CB-E.2-12 ISO-
ISO-SWG-GG.UV-CB-E.2-09,
- - 137,200 SWG-GG.UV-CB-E.2-12
- - 55,000 ISO-SWG-GG.UV-CB-E.2-12
- - 68,600 ISO-SWG-GG.UV-CB-E.2-11
- - 48,125 ISO-SWG-GG.UV-CB-E.2-10
- - 241,554 ISO-SWG-GG.UV-CB-E.2-10
- - 153,200 ISO-SWG-GG.UV-CB-E.2-10
- - -
78 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - -
- - -
- - 28,875 ISO-SWG-GG.UV-CB-F.2-02
- - 80,671 ISO-SWG-GG.UV-CB-F.2-02
- - 231,111 ISO-SWG-GG.UV-CB-F.2-02
- - 78,545 ISO-SWG-GG.UV-CB-F.2-02
- - -
- - 92,429 ISO-SWG-GG.UV-CB-F.2-02
- - 1,067,234 ISO-SWG-GG.UV-CB-F.2-02
- - 199,481 ISO-SWG-GG.UV-CB-F.2-02
ISO-SWG-GG.UV-CB-F.2-01, ISO-
- - 225,641 SWG-GG.UV-CB-F.2-04 ISO-
ISO-SWG-GG.UV-CB-F.2-01,
- - 485,775 SWG-GG.UV-CB-F.2-04 ISO-
ISO-SWG-GG.UV-CB-F.2-01,
- - 129,730
SWG-GG.UV-CB-F.2-04 ISO-
ISO-SWG-GG.UV-CB-F.2-03,
- - 2,226,190
SWG-GG.UV-CB-F.2-03.1
- - 478,415 ISO-SWG-GG.UV-CB-F.2-03
- - 404,813 ISO-SWG-GG.UV-CB-F.2-03
- - 124,675 ISO-SWG-GG.UV-CB-F.2-03
- - 190,542 ISO-SWG-GG.UV-CB-F.2-01
- - - ISO-SWG-GG.UV-CB-F.2-02
- - - ISO-SWG-GG.UV-CB-F.2-01
- - - ISO-SWG-GG.UV-CB-F.2-01
- - 925,915 ISO-SWG-GG.UV-CB-F.2-03
- - 237,283 ISO-SWG-GG.UV-CB-F.2-01
- - 163,697 ISO-SWG-GG.UV-CB-F.2-01
- - 17,340 ISO-SWG-GG.UV-CB-F.2-04
- - 383,673 ISO-SWG-GG.UV-CB-F.2-05
- - 87,978 ISO-SWG-GG.UV-CB-F.2-05
- - 30,476 ISO-SWG-GG.UV-CB-F.2-05
- - 34,374 ISO-SWG-GG.UV-CB-F.2-05
- - -
- - -
- - -
ISO-SWG-GG.UV-CB-G.2-01, ISO-
- - 2,687,920 SWG-GG.UV-CB-G.2-02
- - 1,534,692 ISO-SWG-GG.UV-CB-G.2-02
- - 1,241,580 ISO-SWG-GG.UV-CB-G.2-02
- - 117,304 ISO-SWG-GG.UV-CB-G.2-02
- - 102,484 ISO-SWG-GG.UV-CB-G.2-02
- - 102,484 ISO-SWG-GG.UV-CB-G.2-02
- - 81,404 ISO-SWG-GG.UV-CB-G.2-02
- - 2,503,484 ISO-SWG-GG.UV-CB-G.2-02
- - 1,751,648 ISO-SWG-GG.UV-CB-G.2-02
- - 494,196 ISO-SWG-GG.UV-CB-G.2-02
- - 629,440 ISO-SWG-GG.UV-CB-G.2-02
- - 2,237,760 ISO-SWG-GG.UV-CB-G.2-02
- - 85,408 ISO-SWG-GG.UV-CB-G.2-02
ISO-SWG-GG.UV-CB-G.2-02, ISO-
- - - SWG-GG.UV-CB-G.2-03
- - 1,109,160 ISO-SWG-GG.UV-CB-G.2-02
- - 1,041,332 ISO-SWG-GG.UV-CB-G.2-02
79 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - 3,171,078 ISO-SWG-GG.UV-CB-G.2-04
- - 37,428 ISO-SWG-GG.UV-CB-G.2-04
- - 525,768 ISO-SWG-GG.UV-CB-G.2-02
- - 547,638 ISO-SWG-GG.UV-CB-G.2-02
- - -
- - - ISO-SWG-GG.UV-CB-G.2-04
- - - ISO-SWG-GG.UV-CB-G.2-04
- - - SP-SWG-GG.UV-CB-G.2-01
- - - SP-SWG-GG.UV-CB-G.2-01
- - - SP-SWG-GG.UV-CB-G.2-01
- - - SP-SWG-GG.UV-CB-G.2-01
- - - SP-SWG-GG.UV-CB-G.2-01
- - - SP-SWG-GG.UV-CB-G.2-01
- - - SP-SWG-GG.UV-CB-G.2-01
- - - SP-SWG-GG.UV-CB-G.2-01
- - - SP-SWG-GG.UV-CB-G.2-01
- - - SP-SWG-GG.UV-CB-G.2-01
- - -
- - -
- - 1,646,260 ISO-SWG-GG.UV-CB-G.4-01
- - 12,099,081 ISO-SWG-GG.UV-CB-G.4-01
ISO-SWG-GG.UV-CB-G.4-01, ISO-
- - 2,062,849 SWG-GG.UV-CB-G.4-02
- - 187,532 ISO-SWG-GG.UV-CB-G.4-01
- - 45,321 ISO-SWG-GG.UV-CB-G.4-01
- - 103,566 ISO-SWG-GG.UV-CB-G.4-01
- - - ISO-SWG-GG.UV-CB-G.4-01
- - 394,838 ISO-SWG-GG.UV-CB-G.4-01
- - 94,390 ISO-SWG-GG.UV-CB-G.4-01
- - 105,639 ISO-SWG-GG.UV-CB-G.4-01
- - 11,812 ISO-SWG-GG.UV-CB-G.4-01
- - - ISO-SWG-GG.UV-CB-G.4-01, ISO-
SWG-GG.UV-CB-G.4-02, ISO-
- - - SWG-GG.UV-CB-G.4-03, ISO-
ISO-SWG-GG.UV-CB-G.4-01, ISO-
- - - SWG-GG.UV-CB-G.4-04
SWG-GG.UV-CB-G.4-03
- - - ISO-SWG-GG.UV-CB-G.4-01
- - - ISO-SWG-GG.UV-CB-G.4-01
- - - ISO-SWG-GG.UV-CB-G.4-01
ISO-SWG-GG.UV-CB-G.4-01, ISO-
- - 129,204 SWG-GG.UV-CB-G.4-03, ISO-
- - 27,975 SWG-GG.UV-CB-G.4-04
ISO-SWG-GG.UV-CB-G.4-01
- - - ISO-SWG-GG.UV-CB-G.4-01
- - - ISO-SWG-GG.UV-CB-G.4-03
- - - ISO-SWG-GG.UV-CB-G.4-04
ISO-SWG-GG.UV-CB-G.4-02, ISO-
- - - SWG-GG.UV-CB-G.4-04
- - - ISO-SWG-GG.UV-CB-G.4-02
- - 53,750 ISO-SWG-GG.UV-CB-G.4-02
- - 198,936 ISO-SWG-GG.UV-CB-G.4-02
- - -
- - -
- - -
80 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
ISO-SWG-GG.UV-CB-H.2-01, ISO-
- - - SWG-GG.UV-CB-H.2-02
- - - ISO-SWG-GG.UV-CB-H.2-02
ISO-SWG-GG.UV-CB-H.2-01, ISO-
- - - SWG-GG.UV-CB-H.2-02
- - -
ISO-SWG-GG.UV-CB-H.2-01,
- - - ISO-SWG-GG.UV-CB-H.2-02
ISO-SWG-GG.UV-CB-H.2-01,
- - - ISO-SWG-GG.UV-CB-H.2-02
ISO-SWG-GG.UV-CB-H.2-01,
- - 227,763 ISO-SWG-GG.UV-CB-H.2-02
ISO-SWG-GG.UV-CB-H.2-01,
- - - ISO-SWG-GG.UV-CB-H.2-02
- - - ISO-SWG-GG.UV-CB-H.2-01
ISO-SWG-GG.UV-CB-H.2-01, ISO-
- - - SWG-GG.UV-CB-H.2-02
- - - ISO-SWG-GG.UV-CB-H.2-02
- - - ISO-SWG-GG.UV-CB-H.2-02
- - - ISO-SWG-GG.UV-CB-H.2-02
- - - ISO-SWG-GG.UV-CB-H.2-02
- - 596,334 ISO-SWG-GG.UV-CB-H.2-02
- - - ISO-SWG-GG.UV-CB-H.2-02
- - -
- - -
- - - ISO-SWG-GG.UV-CB-H.4-01, ISO-
SWG-GG.UV-CB-H.4-02 ISO-
ISO-SWG-GG.UV-CB-H.4-01,
- - - SWG-GG.UV-CB-H.4-02 ISO-
ISO-SWG-GG.UV-CB-H.4-01,
- - - SWG-GG.UV-CB-H.4-02 ISO-
ISO-SWG-GG.UV-CB-H.4-01,
- - - SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
ISO-SWG-GG.UV-CB-H.4-01, ISO-
- - - SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-01
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - -
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - - ISO-SWG-GG.UV-CB-H.4-02
- - -
- - -
- - -
81 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - - ADD.PLF-CB-U.V-SWG-001
- - - ADD.PLF-CB-U.V-SWG-001
- - - ADD.PLF-CB-U.V-SWG-001
- - - ADD.PLF-CB-U.V-SWG-001
- - - ADD.PLF-CB-U.V-SWG-001
- - - ADD.PLF-CB-U.V-SWG-001

ISO-SWG-GG.UV-CB-C.2-06, ISO-
- 810,000 SWG-GG.UV-CB-C.2-08 ISO-
ISO-SWG-GG.UV-CB-C.2-06,
- -
SWG-GG.UV-CB-C.2-08 ISO-
ISO-SWG-GG.UV-CB-C.2-06,
- -
SWG-GG.UV-CB-C.2-08 ISO-
ISO-SWG-GG.UV-CB-C.2-06,
- -
SWG-GG.UV-CB-C.2-08
- - ISO-SWG-GG.UV-CB-C.2-04
- 1,920,000
- 1,920,000 ISO-SWG-GG.UV-CB-C.2-05
- - ISO-SWG-GG.UV-CB-C.2-04
- - ISO-SWG-GG.UV-CB-C.2-01, ISO-
ISO-SWG-GG.UV-CB-C.2-04
SWG-GG.UV-CB-C.2-02, ISO-
- - ISO-SWG-GG.UV-CB-C.2-01, ISO-
SWG-GG.UV-CB-C.2-03, ISO-
- - SWG-GG.UV-CB-C.2-02, ISO-
SWG-GG.UV-CB-C.2-04
- - SWG-GG.UV-CB-C.2-03
ISO-SWG-GG.UV-CB-C.2-05
- - ISO-SWG-GG.UV-CB-C.2-04
- - ISO-SWG-GG.UV-CB-C.2-05
ISO-SWG-GG.UV-CB-C.2-01, ISO-
- - SWG-GG.UV-CB-C.2-02
- - ISO-SWG-GG.UV-CB-C.2-04
ISO-SWG-GG.UV-CB-C.2-02, ISO-
- - SWG-GG.UV-CB-C.2-03 ISO-
ISO-SWG-GG.UV-CB-C.2-06,
- - SWG-GG.UV-CB-C.2-08 ISO-
ISO-SWG-GG.UV-CB-C.2-06,
- - SWG-GG.UV-CB-C.2-08
- -

- - SP-SWG-GG.UV-CB-C.2-06
- - SP-SWG-GG.UV-CB-C.2-06
- - SP-SWG-GG.UV-CB-C.2-06
- - SP-SWG-GG.UV-CB-C.2-06
- - SP-SWG-GG.UV-CB-C.2-06
- - SP-SWG-GG.UV-CB-C.2-03, SP-
SWG-GG.UV-CB-C.2-04 SP-
SP-SWG-GG.UV-CB-C.2-03,
- -
SWG-GG.UV-CB-C.2-04 SP-
SP-SWG-GG.UV-CB-C.2-03,
- - SWG-GG.UV-CB-C.2-04 SP-
SP-SWG-GG.UV-CB-C.2-03,
- - SWG-GG.UV-CB-C.2-04 SP-
SP-SWG-GG.UV-CB-C.2-03,
- - SWG-GG.UV-CB-C.2-04 SP-
SP-SWG-GG.UV-CB-C.2-03,
- - SP-SWG-GG.UV-CB-C.2-03
SWG-GG.UV-CB-C.2-04, SP-
- - SWG-GG.UV-CB-C.2-04, SP-SWG-
SP-SWG-GG.UV-CB-C.2-03,
GG.UV-CB-C.2-05 SP-
- - SWG-GG.UV-CB-C.2-04

- - ISO-SWG-GG.UV-CB-C.4-01
82 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - ISO-SWG-GG.UV-CB-C.4-01
- - ISO-SWG-GG.UV-CB-C.4-01
- - ISO-SWG-GG.UV-CB-C.4-01
ISO-SWG-GG.UV-CB-C.4-02, ISO-
- - SWG-GG.UV-CB-C.4-03
- - ISO-SWG-GG.UV-CB-C.4-02
ISO-SWG-GG.UV-CB-C.4-02, ISO-
- - SWG-GG.UV-CB-C.4-03 ISO-
ISO-SWG-GG.UV-CB-C.4-02,
- - SWG-GG.UV-CB-C.4-03
- - ISO-SWG-GG.UV-CB-C.4-02
- - ISO-SWG-GG.UV-CB-C.4-02
- - ISO-SWG-GG.UV-CB-C.4-01
- - ISO-SWG-GG.UV-CB-C.4-01
- - ISO-SWG-GG.UV-CB-C.4-01
- - ISO-SWG-GG.UV-CB-C.4-02, ISO-
SWG-GG.UV-CB-C.4-03
- - ISO-SWG-GG.UV-CB-C.4-03
- - ISO-SWG-GG.UV-CB-C.4-03
- - ISO-SWG-GG.UV-CB-C.4-03, ISO-
SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- 480,000 ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-04
ISO-SWG-GG.UV-CB-C.4-04, SP-
- - SWG-GG.UV-CB-C.4-04 SP-
ISO-SWG-GG.UV-CB-C.4-04,
- - SWG-GG.UV-CB-C.4-04
- - ISO-SWG-GG.UV-CB-C.4-05
- - ISO-SWG-GG.UV-CB-C.4-05
- - ISO-SWG-GG.UV-CB-C.4-05
- - ISO-SWG-GG.UV-CB-C.4-05
- - ISO-SWG-GG.UV-CB-C.4-05

- - ISO-SWG-GG.UV-CB-C.4-05
SP-SWG-GG.UV-CB-C.4-01, SP-
- - SWG-GG.UV-CB-C.4-02, SP-SWG-
ISO-SWG-GG.UV-CB-C.4-05
SP-SWG-GG.UV-CB-C.4-01, SP-
- - GG.UV-CB-C.4-03, SP-SWG-
SWG-GG.UV-CB-C.4-02, SP-SWG-
GG.UV-CB-C.4-04,SP-SWG-
GG.UV-CB-C.4-03, SP-SWG-
- - SP-SWG-GG.UV-CB-C.4-01,
GG.UV-CB-C.4-05, SP-SWG-SP-
GG.UV-CB-C.4-04, ISO-SWG-
SWG-GG.UV-CB-C.4-02, SP-SWG-
- - GG.UV-CB-C.4-06
SP-SWG-GG.UV-CB-C.4-01,
GG.UV-CB-C.4-05, SP-
GG.UV-CB-C.4-03, SP-SWG-
SWG-GG.UV-CB-C.4-02,SP-SWG-
SP-SWG-GG.UV-CB-C.4-01, SP-
SP-SWG-
- - GG.UV-CB-C.4-07
GG.UV-CB-C.4-04
SWG-GG.UV-CB-C.4-02,
GG.UV-CB-C.4-03, SP-SWG-
SP-SWG-
- - GG.UV-CB-C.4-03,SP-SWG-
GG.UV-CB-C.4-04
- - GG.UV-CB-C.4-05, SP-SWG-
SP-SWG-GG.UV-CB-C.4-03
GG.UV-CB-C.4-06
- - SP-SWG-GG.UV-CB-C.4-05
- - SP-SWG-GG.UV-CB-C.4-05
- - ISO-SWG-GG.UV-CB-C.4-02
83 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01
- - SD-SWG-GG.UV-CB-HD-01

- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01

- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01
- - ISO-SWG-GG.UV-CB-HD-01

- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001
84 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - GLR-I.D-CB.V-SWG-001
- - GLR-I.D-CB.V-SWG-001

- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001
- - GLR-C.D-CB.V-SWG-001

- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
ISO-SWG-GG.UV-CB-C.6-01, ISO-
- - SWG-GG.UV-CB-C.6-02
- - ISO-SWG-GG.UV-CB-C.6-02
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01
- - ISO-SWG-GG.UV-CB-C.6-01

- - SP-SWG-GG.UV-CB-C.6-01, SP-
SWG-GG.UV-CB-C.6-02
- - SP-SWG-GG.UV-CB-C.6-01
- - SP-SWG-GG.UV-CB-C.6-01
- - SP-SWG-GG.UV-CB-C.6-01
SP-SWG-GG.UV-CB-C.6-02, SP-
- - SP-SWG-GG.UV-CB-C.6-01
SWG-GG.UV-CB-C.6-03, SP-SWG-
- - GG.UV-CB-C.6-04, SP-SWG-
- - GG.UV-CB-C.6-04, SP-SWG-
SP-SWG-GG.UV-CB-C.6-02
GG.UV-CB-C.6-05 SP-
SP-SWG-GG.UV-CB-C.6-02,
- - SWG-GG.UV-CB-C.6-05
- - SP-SWG-GG.UV-CB-C.6-03
SP-SWG-GG.UV-CB-C.6-03, SP-
- - SWG-GG.UV-CB-C.6-04
- - SP-SWG-GG.UV-CB-C.6-04
85 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - SP-SWG-GG.UV-CB-C.6-05
- - SP-SWG-GG.UV-CB-C.6-05
- - ISO-SWG-GG.UV-CB-C.6-02

- - ISO-SWG-GG.UV-CB-C.8-01
- - ISO-SWG-GG.UV-CB-C.8-01
- - ISO-SWG-GG.UV-CB-C.8-02
ISO-SWG-GG.UV-CB-C.8-02, ISO-
- - SWG-GG.UV-CB-C.8-03
ISO-SWG-GG.UV-CB-C.8-02, ISO-
- - SWG-GG.UV-CB-C.8-03 ISO-
ISO-SWG-GG.UV-CB-C.8-02,
- - SWG-GG.UV-CB-C.8-03 ISO-
ISO-SWG-GG.UV-CB-C.8-02,
- -
SWG-GG.UV-CB-C.8-03

- - SP-SWG-GG.UV-CB-C.10-01
- - SP-SWG-GG.UV-CB-C.10-01
- - SP-SWG-GG.UV-CB-C.10-01
- - SP-SWG-GG.UV-CB-C.10-01
- - SP-SWG-GG.UV-CB-C.10-01
- - SP-SWG-GG.UV-CB-C.10-01
- -
- -
- -

- - ISO-SWG-GG.UV-CB-C.12-02
- - ISO-SWG-GG.UV-CB-C.12-01
- - ISO-SWG-GG.UV-CB-C.12-01
- - ISO-SWG-GG.UV-CB-C.12-03
- - ISO-SWG-GG.UV-CB-C.12-03
- - ISO-SWG-GG.UV-CB-C.12-03
- - ISO-SWG-GG.UV-CB-C.12-04
- - ISO-SWG-GG.UV-CB-C.12-03
- - ISO-SWG-GG.UV-CB-C.12-03

- - ISO-SWG-GG.UV-CB-C.12-03,
ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-03,
- -
ISO-SWG-GG.UV-CB-C.12-04
ISO-SWG-GG.UV-CB-C.12-03,
- - ISO-SWG-GG.UV-CB-C.12-04
- - ISO-SWG-GG.UV-CB-C.12-03

SP-SWQ-GG.UV-CB-C.14-01, ISO-
- - SWG-GG.UV-CB-C.14-02
- - SP-SWQ-GG.UV-CB-C.14-01
- - SP-SWQ-GG.UV-CB-C.14-01
- - SP-SWQ-GG.UV-CB-C.14-01
86 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - SP-SWQ-GG.UV-CB-C.14-01
- - ISO-SWG-GG.UV-CB-C.14-02
- - ISO-SWG-GG.UV-CB-C.14-02
- - ISO-SWG-GG.UV-CB-C.14-01
- - ISO-SWG-GG.UV-CB-C.14-02
- - ISO-SWG-GG.UV-CB-C.14-02
- - ISO-SWG-GG.UV-CB-C.14-02
- - ISO-SWG-GG.UV-CB-C.14-02
- - ISO-SWG-GG.UV-CB-C.14-02
- - ISO-SWG-GG.UV-CB-C.14-02
- - ISO-SWG-GG.UV-CB-C.14-02

- - ISO-SWG-GG.UV-CB-C.16-01
- - ISO-SWG-GG.UV-CB-C.16-01
- - ISO-SWG-GG.UV-CB-C.16-01

- - ISO-SWG-GG.UV-CB-C.20-01
- - ISO-SWG-GG.UV-CB-C.20-01
- -
- - ISO-SWG-GG.UV-CB-C.20-01
- - ISO-SWG-GG.UV-CB-C.20-01
- - ISO-SWG-GG.UV-CB-C.20-01

- - GLR-D.P-CB.V-SWG-001
- - GLR-D.P-CB.V-SWG-001
- - GLR-D.P-CB.V-SWG-001
- - GLR-D.P-CB.V-SWG-001
- - GLR-D.P-CB.V-SWG-001
- - GLR-D.P-CB.V-SWG-001
- - GLR-D.P-CB.V-SWG-001
- - GLR-D.P-CB.V-SWG-001
- - GLR-D.P-CB.V-SWG-001
- - GLR-D.P-CB.V-SWG-001

- - ISO-SWG-GG.UV-CB-E.2-01
- - ISO-SWG-GG.UV-CB-E.2-04
- - ISO-SWG-GG.UV-CB-E.2-06

ISO-SWG-GG.UV-CB-E.2-06, ISO-
- - SWG-GG.UV-CB-E.2-06.1
- - ISO-SWG-GG.UV-CB-E.2-06
- - ISO-SWG-GG.UV-CB-E.2-06
- - ISO-SWG-GG.UV-CB-E.2-06
ISO-SWG-GG.UV-CB-E.2-09, ISO-
- - SWG-GG.UV-CB-E.2-11
87 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
ISO-SWG-GG.UV-CB-E.2-09, ISO-
- - SWG-GG.UV-CB-E.2-11
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
ISO-SWG-GG.UV-CB-E.2-07, ISO-
- - SWG-GG.UV-CB-E.2-10
- - ISO-SWG-GG.UV-CB-E.2-07
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - SWG-GG.UV-CB-E.2-04, ISO-
- - SWG-GG.UV-CB-E.2-10
ISO-SWG-GG.UV-CB-E.2-04
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - SWG-GG.UV-CB-E.2-04
- - ISO-SWG-GG.UV-CB-E.2-01
- - ISO-SWG-GG.UV-CB-E.2-01
ISO-SWG-GG.UV-CB-E.2-01, ISO-
- - SWG-GG.UV-CB-E.2-02
- - ISO-SWG-GG.UV-CB-E.2-02
- - ISO-SWG-GG.UV-CB-E.2-10
- - ISO-SWG-GG.UV-CB-E.2-10
- - ISO-SWG-GG.UV-CB-E.2-03
- - ISO-SWG-GG.UV-CB-E.2-09
- - ISO-SWG-GG.UV-CB-E.2-09, ISO-
SWG-GG.UV-CB-E.2-12
- - ISO-SWG-GG.UV-CB-E.2-09
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
ISO-SWG-GG.UV-CB-E.2-07, ISO-
- - SWG-GG.UV-CB-E.2-10
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-07
- - ISO-SWG-GG.UV-CB-E.2-06
- - ISO-SWG-GG.UV-CB-E.2-04
- - ISO-SWG-GG.UV-CB-E.2-04
- - ISO-SWG-GG.UV-CB-E.2-04
- - ISO-SWG-GG.UV-CB-E.2-04
- - ISO-SWG-GG.UV-CB-E.2-03
- - ISO-SWG-GG.UV-CB-E.2-03
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - SWG-GG.UV-CB-E.2-03
- - ISO-SWG-GG.UV-CB-E.2-04
- - ISO-SWG-GG.UV-CB-E.2-03
- - ISO-SWG-GG.UV-CB-E.2-02
- - ISO-SWG-GG.UV-CB-E.2-02
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - SWG-GG.UV-CB-E.2-03
88 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - ISO-SWG-GG.UV-CB-E.2-03
- - ISO-SWG-GG.UV-CB-E.2-02
- - ISO-SWG-GG.UV-CB-E.2-03
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - SWG-GG.UV-CB-E.2-03
- - ISO-SWG-GG.UV-CB-E.2-02
ISO-SWG-GG.UV-CB-E.2-02, ISO-
- - ISO-SWG-GG.UV-CB-E.2-02,
SWG-GG.UV-CB-E.2-03 ISO-
- - SWG-GG.UV-CB-E.2-03, ISO-
ISO-SWG-GG.UV-CB-E.2-01, ISO-
- - SWG-GG.UV-CB-E.2-07
SWG-GG.UV-CB-E.2-02, ISO-
- - SWG-GG.UV-CB-E.2-13
ISO-SWG-GG.UV-CB-E.2-02
- - ISO-SWG-GG.UV-CB-E.2-02
- - ISO-SWG-GG.UV-CB-E.2-02
- - ISO-SWG-GG.UV-CB-E.2-02
- - ISO-SWG-GG.UV-CB-E.2-02
- - ISO-SWG-GG.UV-CB-E.2-02
ISO-SWG-GG.UV-CB-E.2-09, ISO-
- - SWG-GG.UV-CB-E.2-11, ISO-
ISO-SWG-GG.UV-CB-E.2-09, ISO-
- - SWG-GG.UV-CB-E.2-12
SWG-GG.UV-CB-E.2-11, ISO-
- - ISO-SWG-GG.UV-CB-E.2-11,
SWG-GG.UV-CB-E.2-12 ISO-
SWG-GG.UV-CB-E.2-12
- - ISO-SWG-GG.UV-CB-E.2-12
- - ISO-SWG-GG.UV-CB-E.2-11
- - ISO-SWG-GG.UV-CB-E.2-10
- - ISO-SWG-GG.UV-CB-E.2-10
- - ISO-SWG-GG.UV-CB-E.2-10
- - ISO-SWG-GG.UV-CB-E.2-10
- -

- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
- -
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-02
ISO-SWG-GG.UV-CB-F.2-01, ISO-
- - SWG-GG.UV-CB-F.2-04 ISO-
ISO-SWG-GG.UV-CB-F.2-01,
- - SWG-GG.UV-CB-F.2-04 ISO-
ISO-SWG-GG.UV-CB-F.2-01,
- - SWG-GG.UV-CB-F.2-04 ISO-
ISO-SWG-GG.UV-CB-F.2-03,
- - SWG-GG.UV-CB-F.2-03.1
- - ISO-SWG-GG.UV-CB-F.2-03
- - ISO-SWG-GG.UV-CB-F.2-03
- - ISO-SWG-GG.UV-CB-F.2-03
89 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - ISO-SWG-GG.UV-CB-F.2-01
- - ISO-SWG-GG.UV-CB-F.2-02
- - ISO-SWG-GG.UV-CB-F.2-01
- - ISO-SWG-GG.UV-CB-F.2-01
- - ISO-SWG-GG.UV-CB-F.2-03
- - ISO-SWG-GG.UV-CB-F.2-01
- - ISO-SWG-GG.UV-CB-F.2-01
- - ISO-SWG-GG.UV-CB-F.2-01
- - ISO-SWG-GG.UV-CB-F.2-04
- - ISO-SWG-GG.UV-CB-F.2-05
- - ISO-SWG-GG.UV-CB-F.2-05
- - ISO-SWG-GG.UV-CB-F.2-05
- - ISO-SWG-GG.UV-CB-F.2-05
- - ISO-SWG-GG.UV-CB-F.2-05
- - ISO-SWG-GG.UV-CB-F.2-05

- - ISO-SWG-GG.UV-CB-G.2-01, ISO-
SWG-GG.UV-CB-G.2-02 ISO-
ISO-SWG-GG.UV-CB-G.2-01,
- - SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- 2,880,000 ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
ISO-SWG-GG.UV-CB-G.2-02, ISO-
- - SWG-GG.UV-CB-G.2-03
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-02
- - ISO-SWG-GG.UV-CB-G.2-04
- - ISO-SWG-GG.UV-CB-G.2-04
90 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - ISO-SWG-GG.UV-CB-G.2-04
- - ISO-SWG-GG.UV-CB-G.2-04
- - ISO-SWG-GG.UV-CB-G.2-04
- - ISO-SWG-GG.UV-CB-G.2-04
- - ISO-SWG-GG.UV-CB-G.2-02

- - ISO-SWG-GG.UV-CB-G.2-04
- - ISO-SWG-GG.UV-CB-G.2-04
- - SP-SWG-GG.UV-CB-G.2-01
- - SP-SWG-GG.UV-CB-G.2-01
- - SP-SWG-GG.UV-CB-G.2-01
- - SP-SWG-GG.UV-CB-G.2-01
- - SP-SWG-GG.UV-CB-G.2-01
- - SP-SWG-GG.UV-CB-G.2-01
- - SP-SWG-GG.UV-CB-G.2-01
- - SP-SWG-GG.UV-CB-G.2-01
- - SP-SWG-GG.UV-CB-G.2-01
- - SP-SWG-GG.UV-CB-G.2-01

- - MFK/V/BO/001.01.8
- -
- - MFK/V/BO/001.01.8a
- - MFK/V/BO/001.01.8a
- - MFK/V/BO/001.01.8a
- - MFK/V/BO/001.01.8a
- - MFK/V/BO/001.01.8a
- - MFK/V/BO/001.01.8a
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
ISO-SWG-GG.UV-CB-G.4-01, ISO-
- 1,540,000 SWG-GG.UV-CB-G.4-02
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
ISO-SWG-GG.UV-CB-G.4-03 ,
- - ISO-SWG-GG.UV-CB-G.4-04
- - ISO-SWG-GG.UV-CB-G.4-03
91 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH
- - ISO-SWG-GG.UV-CB-G.4-03
- - ISO-SWG-GG.UV-CB-G.4-04
- - ISO-SWG-GG.UV-CB-G.4-03
ISO-SWG-GG.UV-CB-G.4-01, ISO-
SWG-GG.UV-CB-G.4-02, ISO-
- - SWG-GG.UV-CB-G.4-03, ISO-
ISO-SWG-GG.UV-CB-G.4-01, ISO-
- - SWG-GG.UV-CB-G.4-04
SWG-GG.UV-CB-G.4-03
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-01
- - ISO-SWG-GG.UV-CB-G.4-03, ISO-
SWG-GG.UV-CB-G.4-04
- - ISO-SWG-GG.UV-CB-G.4-03
- - ISO-SWG-GG.UV-CB-G.4-04
- - ISO-SWG-GG.UV-CB-G.4-02, ISO-
SWG-GG.UV-CB-G.4-04
- - ISO-SWG-GG.UV-CB-G.4-02
- - ISO-SWG-GG.UV-CB-G.4-02
- - ISO-SWG-GG.UV-CB-G.4-02

ISO-SWG-GG.UV-CB-H.2-01, ISO-
- - SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
ISO-SWG-GG.UV-CB-H.2-01, ISO-
- - SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-01
- - ISO-SWG-GG.UV-CB-H.2-01

ISO-SWG-GG.UV-CB-H.2-01, ISO-
- - SWG-GG.UV-CB-H.2-02 ISO-
ISO-SWG-GG.UV-CB-H.2-01,
- - SWG-GG.UV-CB-H.2-02 ISO-
ISO-SWG-GG.UV-CB-H.2-01,
- - SWG-GG.UV-CB-H.2-02 ISO-
ISO-SWG-GG.UV-CB-H.2-01,
- - SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-01
ISO-SWG-GG.UV-CB-H.2-01, ISO-
- - SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02
- - ISO-SWG-GG.UV-CB-H.2-02

92 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

ISO-SWG-GG.UV-CB-H.4-01, ISO-
- - SWG-GG.UV-CB-H.4-02 ISO-
ISO-SWG-GG.UV-CB-H.4-01,
- - SWG-GG.UV-CB-H.4-02 ISO-
ISO-SWG-GG.UV-CB-H.4-01,
- - SWG-GG.UV-CB-H.4-02 ISO-
ISO-SWG-GG.UV-CB-H.4-01,
- - SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-01
ISO-SWG-GG.UV-CB-H.4-01, ISO-
- - SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-01
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02

- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02
- - ISO-SWG-GG.UV-CB-H.4-02

93 of 94
HARGA TOT.
UPAH GRAND TOTAL KETERANGAN
KERJA KURANG KERJA TAMBAH

- - ADD.PLF-CB-U.V-SWG-001
- - ADD.PLF-CB-U.V-SWG-001
- - ADD.PLF-CB-U.V-SWG-001
- - ADD.PLF-CB-U.V-SWG-001
- - ADD.PLF-CB-U.V-SWG-001
- - ADD.PLF-CB-U.V-SWG-001
- - ADD.PLF-CB-U.V-SWG-001
- - ADD.PLF-CB-U.V-SWG-001
- - ADD.PLF-CB-U.V-SWG-001

- - MFK-038
- - MFK-038.01
- - MFK-038.02

- - MFK-039
- - MFK-039.01
- - MFK-039.02

- - MFK-040
- - MFK-040.01
- - MFK-040.02

- - MFK-041
- - MFK-041.01
- - MFK-041.02

- -
- -

391,477,448

Dibuat oleh,
PT. SWADAYA GRAHA

94 of 94