Project NAME Issue
07.09.2018
Date:
Pages: 1/21
Tabla de contenido
Revision history ............................................................................................................... 2
Document Approval ......................................................................................................... 2
Introduction ...................................................................................................................... 3
Treated water (process) .................................................................................................. 4
Treated water (services) .................................................................................................. 6
Ammonia .......................................................................................................................... 8
Natural gas ....................................................................................................................... 9
CIP (Cleaning-In-Place) ................................................................................................. 10
Condensate return ......................................................................................................... 14
Buildings ........................................................................................................................ 15
Stairs and platforms ...................................................................................................... 20
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 2/21
Revision history
Document Approval
Prepared by
Approved
by
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 3/21
Introduction
Aim of The aim of this document is to define how is going to be the characteristics of the
document expansion at the second plant.
Scope This document will define how should the characteristics at second plant be inside
Sello Rojo.
Gezer A. Núñez
Eduardo Paredes
Sebastián Jiménez
Francisco Aguilar
Basic This document is based on done projects and the good experiences with this
document system.
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 4/21
Water speed:
• No more than 3 m/s.
Operation pressure:
• No more than10 bar (145 psi).
Soportería:
• Diamond type installation.
Where:
Q-Flow.
v-Speed inside the pipe
A-Transverse area of the pipe
(𝜋 ∗ 𝑑2 )⁄
𝐴= 4
Where:
A- Transverse area of the pipe
d-Diameter of the pipe
𝜋-Pi number
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 5/21
CHARACTERISTICS TO IMPLEMENT
𝑚𝑚
Diameter of the pipe 39.1485
𝑖𝑛
Recommended diameter of the pipe at wanted flow 1.54
Water speed:
• No more than 3 m/s.
Operation pressure:
• No more than10 bar (145 psi).
Soportería:
• Production area - diamond type installation.
• Exterior area – Standard.
Where:
Q-Flow.
v-Speed inside the pipe
A-Transverse area of the pipe
(𝜋 ∗ 𝑑2 )⁄
𝐴= 4
Where:
A- Transverse area of the pipe
d-Diameter of the pipe
𝜋-Pi number
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 7/21
CHARACTERISTICS TO IMPLEMENT
𝑚𝑚
Diameter of the pipe 39.1485
𝑖𝑛
Recommended diameter of the pipe at wanted flow 1.54
Ammonia
Speed:
• At liquid - No more than 0.3 m/s.
• At gas – No more than 30 m/s.
Pipe unions:
• Forged couple
• Forged tee´s or
• Elbows forged and welded in 3 steps.
Note: The first 2 steps should be in TIG process and the last one with
electrical welding 7018E.
Insulator:
• Nomalock with thickness from 1 to 1.5 in, it will depend on the diameter.
Stainless steel:
• Qualified staff must clean and install the insulator.
• At Nomalock’s joins and cuts in addition to the closing adhesive, install the
aluminum adhesive.
Carbon steel:
• Prepare with “First anticorrosive” and install with qualified staff.
• At Nomalock’s joins and cuts in addition to the closing adhesive, install the
aluminum adhesive.
Cut process Tee’s cuts, elbows and curves must be like the imagines.
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 9/21
Natural gas
• NOM-002-SECRE-Valid
• NOM-003-SECRE-Valid
• NOM-004-SECRE Valid
• NOM-005-SECRE-Valid
• NOM-006-SECRE-Valid
• NOM-007-SECRE-Valid
CIP (Cleaning-In-Place)
Speed:
• Range from 1.5 to 3 m/s.
Turbulence:
• Re ≈ 140,000, it was getting from this table.
Pressure:
• 10 bars (145 psi).
Soportería:
• Diamond type installation.
Fig 1 Fig 2
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 11/21
Installation
- A secure separator between CIP and products line, so it should never be
installed a valve with just one stamp between CIP and product. (Just one
double sit valve).
- Pipelines and equipment capable of draining, the inclination of the pipe must
be 1-2%.
Fig 3 Fig 4
- Avoid leaving dead points, (Recommendations).
Fig 5
Fig 6
- A proper tank design and in order to the design, cleaning devices must be
selected (Static, rotary or orbital spray ball).
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 12/21
(ρ ∗ 𝜈 ∗ 𝑑)⁄
𝑄 = 𝜈∗𝐴 𝑅𝑒 = µ
Where: Where:
Q-Flow. Re-Reynolds number
v-Speed inside the pipe ρ-Density
A-Transverse area of the pipe v-Speed
d-Diameter
(𝜋 ∗ 𝑑2 )⁄ µ-Friction coefficient
𝐴= 4
where:
A-Transverse area of the pipe
d-Pipe´s diameter
𝜋-Pi number
Condensate return
Recommendation System:
Seed:
Pressure:
Note: it’s possibillity to install a bomb trap if we want to avoid forcing the steam
tramp in standar operation, it’ll depend on the distance between trap and
number of these that are installed in common lines to return, as well as the
differents pressures of discharge, then it’s necessary a thorough analysis to
choose the air eliminator. (Annex link)
Buildings
Recommendation Walls:
- The end of the grip must be polished, and the coating must be agreed
with multidisciplinary group to analyze the operation conditions from the
area; Thanks of this, choose normal or epoxy paint. (Make URS).
• Panel
- It must be class 1 (Fire retardant) and the thickness will depend from the
application and function. It will have to be supported by a block or
concrete muffle as shown in the image, and it won’t be installed at floor
level.
Fig 1
Floors:
• It must be built from a solid base to be able to coat this with tapetate and
gravel-sand as a fine base, it will avoid the break.
• Install a steam barrier between fine base and lean concrete. It will avoid or
minimize the steam transmission between floor to concrete.
• The termination must be with inclination toward 1-2% drainage and coated
with mortar and epoxy paint.
• The joints with walls should not end in corner, they must have health curve
with a radius of 5 cm.
• The joints between slabs will depend on the use that is offered to the floor.
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 16/21
Fig 2
Fig 3
Fig 4
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 17/21
Fig 5
Fig 6
Fig 7
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 18/21
Fig 8
Roof:
Fig 9
Fig 10
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 19/21
Recommendation
Fig 11
Illumination:
• Possibility of not using any lamp and according to this have viable
alternatives to disposition of our needs, in that case it could be dome
windows and/or sun tubes.
• A lighting study will be necessary to determine the type of lamp and the
installation height.
Ventilation:
• Spiral
• Marinera
• Extension
Note: Do not lose objectivity towards a hygienic construction within the process.
Fig 1
Fig 2
Doc. :
Project NAME Issue
07.09.2018
Date:
Pages: 21/21
Recommendation
Fig 3
Fig 4