Assumption Matrix :
Project Timelines
Door to Door Tenor 13 Years ( 6yrs+1yrs+6yrs)
Project Implementation Period 6 Years 6 years from 1st disbursement
1st disbursement assumed in April 2017
Estimated COD of the project Mar 2023 after 72 months from 1st Disburment
Moratorium Period 1 Year 12 Months after Construction period o
Repayment period 6 Years 72 Monthly instalments Commencing
Apr' 2024 after Construction period
of 6 years moratorium of 1 year
Detail of Total Project Cost :
Means of Finance
Promoters Contribution 311.78
Construction Loan 623.55
Total Means of Finance 935.33
Debt-Equity Ratio
Debt 2:1
Promoters' Margin 33.33%
Term Loan Repayment Schedule
Source of repayment Rs. Crore Tenure
Repayment / Conversion through/to LRD 623.55 In 72 monthly instalment after
Total Loan Component 623.55 moratorium of 1 year post COD
Other Items
Rate of Interest on Construction Loan 11.50%
Rate of Interest on LRD 9.00%
Income Tax Rate 33.99%
Details of Expenses
Municpal Taxes, etc 5% of gross income
Increament p.a on above three items 5% p.a. on above three items
Rate of Interest on Construction Loan 11.50% p.a.
Rate of Interest on LRD Loan 9.00% p.a.
Depreciation as per Companies Act
Buildings 1.58%
Plant & Machinery 6.33%
Furnitures & Fittings 9.50%
Financial Indicator's
Average DSCR 1.40
Minimum DSCR 1.00
IRR 12.84%
DETAILS OF AVAILABLE AREA
Means of Finance
1 Promoters Contribution 311.78
2 Construction Loan 623.55
935.33
A Civil Works:
1 Sub-Structure & Basement* - - 2,900
2 Superstructure** 1,092 104.11 1,050
3 Brickwork/ Plaster 120 11.44 40
4 Waterproofing 60 5.72 80
5 Allied Structure 105 10.01 30
Sub-Total of “A” 1,377 131 4,100
B Finishes***
1 Door 15
2 Interior 20
180 17.16
3 Flooring 100
1.21
1.61
All toilets interior work , Any
type column cladding ,
Escalator Clading , all staircase
work , Interior work in
Multiplex Floor common area ,
All types of painting , Fire &
159 28.01
Flush doors , any kind veneer /
8.04 laminate cladding work not
included here. Budget
representated as per
parametric study was 46
Crores.
- 168 29.56
43 7.53
10.85 457 80.40
- - -
12.06 394 69.27
5.23 73 12.85
3.22 67 11.80
4.02 296 52.02
24.52 830.38 145.95
4.02 80 14.03
- 20 3.44
- 212 37.30
- 100 17.57
- 1,038 182.45
A Civil Works:
1 Sub-Structure & Basement* - - 2,103
2 Superstructure* 1,092 104.11 289
3 Brickwork/ Plaster 120 11.44 40
4 Waterproofing 60 5.72 80
5 Allied Structure 105 10.01 30
Sub-Total of “A” 1,377 131 2,542
B Finishes
1 Door & Window 75 7.15 15
2 Interior 170 16.21 20
3 Flooring 54 5.15 100
4 Elevation 400 38.14 -
5 Landscaping & Road Works 310 29.56 -
6 Land Development Works 79 7.53
Sub-Total of “B” 1,088 103.75 135
1.21 48 8.36
1.61 101 17.82
8.04 75 13.19
- 217 38.14
- 168 29.56
43 7.53
10.85 652.07 114.61
- - -
12.06 394 69.27
5.23 73 12.85
3.22 67 11.80
4.02 296 52.02
24.52 830.38 145.95
4.02 80 14.03
- 20 3.44
- 212 37.30
- 110 19.28
25.98 367 64.54
- 1,038 182.45
A Civil Works:
1 Sub-Structure & Basement - - 2,900
2 Superstructure 1,092 104.11
3 Brickwork/ Plaster 120 11.44 40
4 Waterproofing 60 5.72 80
5 Allied Structure 105 10.01 30
Sub-Total of “A” 1,377 131 3,050
B Finishes
1 Door & Window 75 7.15 15
2 Interior 170 16.21 20
3 Flooring 183 17.40 150
4 Elevation 400 38.14 -
5 Landscaping & Road Works 310 29.56 -
6 Land Development Works 79 7.53
Sub-Total of “B” 1,217 116.00 185
169.11 - -
1,050 23.20 724 127.30
3.22 83 14.66
6.43 69 12.15
2.41 71 12.42
35.26 948 166.54
1.21 48 8.36
1.61 101 17.82
12.06 168 29.46
- 217 38.14
- 168 29.56
43 7.53
14.87 744.63 130.88
- - -
12.06 394 69.27
5.23 84 14.76
3.22 67 11.80
4.02 296 52.02
24.52 841.23 147.86
4.02 80 14.03
- 20 3.44
- 212 37.30
- 114 19.99
9.48 281 49.45
- 1,038 182.45
A.1 All charges for doing excavation in required profile in all type of soils in dry
and wet condition for foundation , raft or any other sub structure portion of
the proposed structure as per drawings or direction of E.I.C / Owner
including dismantling of foundation (if any) made with brick, PCC , R.C.C
(To be done with mechanical excavator) , dressing of side, bottom,
ramming of bottom, shoring, strutting, diverting underground sewer line,
water line, electrical line (if any) barricading the area providing caution
board maintaining required slopes including all labour, materials,
machinery, tools & tackles for all lead & lift to the entire satisfaction of
E.I.C / Owner. If necessary the contractor shall submit a dewatering plan for
approval by the authorities.
A.2 All charges for providing and laying single brick flat soling of picked, jhama Sqm 20000
bricks below foundation floor, pile cap, tie beam etc.or any other location till
Plinth level including ramming dressing and bringing to proper level and
filling joints with sand including all materials, labour, tools and plants etc.
complete as per specification, drawing and direction below foundation.
A.3 Removal of rubbish earth etc from the working site and disposal of the Cum 351000
same beyond the compound in conformity with the municipal/ corporation
rules for such disposal, loading into truck and cleaning the site in all respect
as direction of Engineers.
A.4 All charges for providing & laying 1:3:6 plain cement concrete (PCC) of Cum 3000
required thickness below footings or any other location as specified in the
drawing till Plinth level using 20 mm nominal size well-graded approved
quality aggregate including vibrating / compacting, scaffolding as required
establishing dewatering system by pumping / bailing out water, cleaning,
preparing surfaces, junctions etc. excluding shuttering, with curing complete
to the entire satisfaction of E.I.C / Owner.
BOQ 21
SL. NO. DESCRIPTION OF ITEM UNIT QTY
A.6 Providing and laying 250 mm thick brick work of class designation 100 , Cum 270
upto plinth level in cement mortar (1:6) including all materials , lead & lifts.
(Brick shuttering in raft)
A.7 Same as above but for Raft concreting (Quantity as per sheet received from Cum 18000
M.N Consultant ) , However as Bhubaneswar Structure cost considered in
Summary , so proportionalisation made & a 500 mm thickness considered
in that structural cost portion ommitted from here)
A.7 Reinforcement Steel for the for (100 Kg / Cum) ( For Raft ) However as MT 1800
Bhubaneswar Structure cost considered in Summary , so
proportionalisation made & a 500 mm thickness considered in that
structural cost portion ommitted from here)
BOQ 22
P.C CHANDRA MALL
SUB STRUCTURE CIVIL WORKS
300.00 117000000.00
20000000.00
500.00 10000000.00
150.00 52650000.00
6500.00 19500000.00
250.00 9750000.00
BOQ 23
RATE IN AMOUNT IN Rs.
Rs.
8000.00 2160000.00
11000.00 198000000.00
70000.00 126000000.00
BOQ 24
CONSTRUCTION OF P.C CHANDRA MALL
SUMMARY OF CIVIL WORKS IN SUB STRUCTURE
SL. NO. DESCRIPTION OF ITEM
BOQ 25
TION OF P.C CHANDRA MALL
CIVIL WORKS IN SUB STRUCTURE
AMOUNT IN Rs.
587,450,374.00
518,335,895.00
117,000,000.00
20,000,000.00
29,500,000.00
52,650,000.00
2,160,000.00
198,000,000.00
126,000,000.00
40,000,000.00
1,691,096,269.00
BOQ 26
APPROX COST SHEET FOR SUPER STRUCTURE
Area of Superstructure Mall in Sqft : 953572
Consumption ratio
Quantity Unit
Concrete 0.4 Cum / Sqm 35436 Cum
Reinforcement 6 Kg / Sqft 5721 MT
Times of
Shuttering 2.5 221473 Sqm
Superstructure area
Structural Steel Work 200 MT
Consumption ratio
Quantity Unit
Concrete 0.4 Cum / Sqm 8212 Cum
Reinforcement 6 Kg / Sqft 1326 MT
Times of
Shuttering 2.5 51322 Sqm
Superstructure area
URE
1 Civil Works 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 6.71 6.71 6.71 6.71 6.71
1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 2.0% 2.0% 2.0% 2.0% 2.0%
a) Sub-Structure & Basement 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 3.38 3.38 3.38 3.38 3.38
b) Superstructure 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 2.55 2.55 2.55 2.55 2.55
c) Brickwork/ Plaster 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.29 0.29 0.29 0.29 0.29
d) Waterproofing 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.24 0.24 0.24 0.24 0.24
e) Allied Structure 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.25 0.25 0.25 0.25 0.25
5 Architect & Consultancy 3.52 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41 0.70 0.70 0.70 0.70 0.70 0.53 0.53 0.53
10.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 2.0% 2.0% 2.0% 2.0% 2.0% 1.5% 1.5% 1.5%
3.52 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41 0.70 0.70 0.70 0.70 0.70 0.53 0.53 0.53
6 Total Bare Cost (1 to5) 11.36 9.25 9.25 9.25 7.84 7.84 6.44 6.44 6.44 5.74 5.74 5.74 9.60 9.60 9.43 9.43 9.43
100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Year-1
Sl. Heads 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th
7 Land Cost / Development Rights 3.44 - - - - - - - - - - - - - - - -
10 Contingencies (5%) - - - - - - - - - - - - - - - - -
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
- - - - - - - - - - - - - - - - -
11 Pre - Operative Expenses (10%) 1.14 0.92 0.92 0.92 0.78 0.78 0.64 0.64 0.64 0.57 0.57 0.57 0.96 0.96 0.94 0.94 0.94
Administrative & Overhead Expenses 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0%
11.36 9.25 9.25 9.25 7.84 7.84 6.44 6.44 6.44 5.74 5.74 5.74 9.60 9.60 9.43 9.43 9.43
TOTAL (6 to 11) 43.27 10.17 10.17 10.17 8.63 8.63 7.08 7.08 7.08 6.31 6.31 6.31 10.56 10.56 10.37 10.37 10.37
12 Interest During Construction @ 11.50% 0.26 0.31 0.35 0.40 0.45 0.49 0.53 0.57 0.62 0.65 0.69 0.73 0.79 0.86 0.92 0.98 1.05
GRAND TOTAL (11 to 12) 43.53 10.48 10.53 10.58 9.08 9.12 7.62 7.66 7.70 6.96 7.00 7.04 11.36 11.42 11.29 11.35 11.42
MEANS OF FINANCE
Sl. Heads 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th
1 Promoters Contribution 13.39 2.54 2.56 2.57 2.33 2.35 2.11 2.12 2.13 1.94 1.96 1.97 3.32 3.34 3.31 3.33 3.35
2 Term Loan from Banks @ 11.50% 26.79 5.08 5.11 5.15 4.67 4.69 4.21 4.24 4.27 3.89 3.91 3.94 6.64 6.68 6.63 6.67 6.71
GRAND TOTAL 40.18 7.62 7.67 7.72 7.00 7.04 6.32 6.36 6.40 5.83 5.87 5.91 9.96 10.02 9.94 10.00 10.06
COST PHASING
Year-2 Year-3
Sl. Heads 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st 32nd
1 Civil Works 6.71 6.71 6.71 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03
2.0% 2.0% 2.0% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5%
a) Sub-Structure & Basement 3.38 3.38 3.38 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54
b) Superstructure 2.55 2.55 2.55 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91
c) Brickwork/ Plaster 0.29 0.29 0.29 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
d) Waterproofing 0.24 0.24 0.24 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
e) Allied Structure 0.25 0.25 0.25 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19
2 Finishes 0.73 0.73 0.73 0.73 0.73 0.73 0.73 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5%
a) Door & Window 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42
b) Interior - - - - - - - - - - - - - - -
c) Flooring - - - - - - - - - - - - - - -
d) Elevation 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23
e) Landscaping 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44
3 Utility & Services 1.46 1.46 1.46 1.46 1.46 1.46 1.46 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5%
a) Lift & Escaltors - - - - - - - - - - - - - - -
b) Electric , ELV Works , BMS & Light fixtures 0.69 0.69 0.69 0.69 0.69 0.69 0.69 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04
c) Firefighting 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19
d) Plumbing & Sanitary 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
e) HVAC Works 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78
4 Mobilisation - - - - - - - - - - - - - - -
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
- - - - - - - - - - - - - - -
5 Architect & Consultancy 0.53 0.70 0.70 0.70 0.70 0.70 0.70 0.35 0.35 0.35 0.35 0.18 0.18 0.18 0.18
1.5% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 1.0% 1.0% 1.0% 1.0% 0.5% 0.5% 0.5% 0.5%
0.53 0.70 0.70 0.70 0.70 0.70 0.70 0.35 0.35 0.35 0.35 0.18 0.18 0.18 0.18
6 Total Bare Cost (1 to5) 9.43 9.60 9.60 7.93 7.93 7.93 7.93 8.67 8.67 8.67 8.67 8.49 8.49 8.49 8.49
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Year-2 Year-3
Sl. Heads 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st 32nd
7 Land Cost / Development Rights - - - - - - - - - - - - - - -
9 Marketing Expenses (5%) - - - - - - - 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
- - - - - - - 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
10 Contingencies (5%) - - - - - - - - - - - - - - -
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
- - - - - - - - - - - - - - -
11 Pre - Operative Expenses (10%) 0.94 0.96 0.96 0.79 0.79 0.79 0.79 0.87 0.87 0.87 0.87 0.85 0.85 0.85 0.85
Administrative & Overhead Expenses 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0%
9.43 9.60 9.60 7.93 7.93 7.93 7.93 8.67 8.67 8.67 8.67 8.49 8.49 8.49 8.49
TOTAL (6 to 11) 10.37 10.56 10.56 8.72 8.72 8.72 8.72 9.71 9.71 9.71 9.71 9.52 9.52 9.52 9.52
12 Interest During Construction @ 11.50% 1.11 1.18 1.24 1.30 1.36 1.42 1.48 1.54 1.61 1.67 1.74 1.81 1.88 1.94 2.01
GRAND TOTAL (11 to 12) 11.48 11.74 11.81 10.02 10.08 10.14 10.19 11.25 11.32 11.39 11.45 11.33 11.39 11.46 11.53
MEANS OF FINANCE
Sl. Heads 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st 32nd
1 Promoters Contribution 3.38 3.45 3.47 2.98 3.00 3.02 3.04 3.44 3.46 3.48 3.50 3.48 3.50 3.52 3.54
2 Term Loan from Banks @ 11.50% 6.75 6.90 6.94 5.97 6.00 6.04 6.08 6.87 6.92 6.97 7.01 6.95 6.99 7.04 7.09
GRAND TOTAL 10.13 10.35 10.41 8.95 9.00 9.06 9.12 10.31 10.38 10.45 10.51 10.43 10.49 10.56 10.63
COST PHASING
Year-3 Year-4
Sl. Heads 33rd 34th 35th 36th 37th 38th 39th 40th 41st 42nd 43rd 44th 45th 46th 47th
1 Civil Works 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03
1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5%
a) Sub-Structure & Basement 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54
b) Superstructure 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91
c) Brickwork/ Plaster 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
d) Waterproofing 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
e) Allied Structure 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19
2 Finishes 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.82 1.82 1.82
1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 2.5% 2.5% 2.5%
a) Door & Window 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.70 0.70 0.70
b) Interior - - - - - - - - - - - - - - -
c) Flooring - - - - - - - - - - - - - - -
d) Elevation 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.38 0.38 0.38
e) Landscaping 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.74 0.74 0.74
3 Utility & Services 2.19 2.19 2.19 2.19 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65
1.5% 1.5% 1.5% 1.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5%
a) Lift & Escaltors - - - - - - - - - - - - - - -
b) Electric , ELV Works , BMS & Light fixtures 1.04 1.04 1.04 1.04 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73
c) Firefighting 0.19 0.19 0.19 0.19 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32
d) Plumbing & Sanitary 0.18 0.18 0.18 0.18 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29
e) HVAC Works 0.78 0.78 0.78 0.78 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30
4 Mobilisation - - - - - - - - - - - - - - -
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
- - - - - - - - - - - - - - -
5 Architect & Consultancy 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5%
0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
6 Total Bare Cost (1 to5) 8.49 8.49 8.49 8.49 9.95 9.95 9.95 9.95 9.95 9.95 9.95 9.95 10.68 10.68 10.68
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Year-3 Year-4
Sl. Heads 33rd 34th 35th 36th 37th 38th 39th 40th 41st 42nd 43rd 44th 45th 46th 47th
7 Land Cost / Development Rights - - - - - - - - - - - - - - -
9 Marketing Expenses (5%) 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
10 Contingencies (5%) - - - - - - - - - - - - - - -
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
- - - - - - - - - - - - - - -
11 Pre - Operative Expenses (10%) 0.85 0.85 0.85 0.85 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.07 1.07 1.07
Administrative & Overhead Expenses 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0%
8.49 8.49 8.49 8.49 9.95 9.95 9.95 9.95 9.95 9.95 9.95 9.95 10.68 10.68 10.68
TOTAL (6 to 11) 9.52 9.52 9.52 9.52 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.92 11.92 11.92
12 Interest During Construction @ 11.50% 2.08 2.15 2.22 2.29 2.37 2.44 2.52 2.60 2.69 2.77 2.85 2.93 3.02 3.11 3.20
GRAND TOTAL (11 to 12) 11.60 11.67 11.73 11.80 13.49 13.57 13.65 13.73 13.81 13.89 13.97 14.05 14.95 15.04 15.13
MEANS OF FINANCE
Sl. Heads 33rd 34th 35th 36th 37th 38th 39th 40th 41st 42nd 43rd 44th 45th 46th 47th
1 Promoters Contribution 3.57 3.59 3.61 3.64 4.11 4.14 4.16 4.19 4.22 4.25 4.27 4.30 4.70 4.73 4.76
2 Term Loan from Banks @ 11.50% 7.13 7.18 7.23 7.27 8.23 8.27 8.33 8.38 8.44 8.49 8.55 8.60 9.41 9.47 9.53
GRAND TOTAL 10.70 10.77 10.84 10.91 12.34 12.41 12.49 12.57 12.66 12.74 12.82 12.90 14.11 14.20 14.29
COST PHASING
Year-4 Year-5
Sl. Heads 48th 49th 50th 51th 52nd 53rd 54th 55th 56th 57th 58th 59th 60th 61st 62nd
1 Civil Works 5.03 5.03 5.03 3.36 3.36 3.36 3.36 3.36 3.36 3.36 3.36 3.36 3.36 3.36 3.36
1.5% 1.5% 1.5% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
a) Sub-Structure & Basement 2.54 2.54 2.54 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69
b) Superstructure 1.91 1.91 1.91 1.27 1.27 1.27 1.27 1.27 1.27 1.27 1.27 1.27 1.27 1.27 1.27
c) Brickwork/ Plaster 0.22 0.22 0.22 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
d) Waterproofing 0.18 0.18 0.18 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12
e) Allied Structure 0.19 0.19 0.19 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12
2 Finishes 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.09 1.09
2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 1.5% 1.5%
a) Door & Window 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.42 0.42
b) Interior - - - - - - - - - - - - - - -
c) Flooring - - - - - - - - - - - - - - -
d) Elevation 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.23 0.23
e) Landscaping 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.44 0.44
3 Utility & Services 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 2.19 2.19 1.46 1.46
2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 1.5% 1.5% 1.0% 1.0%
a) Lift & Escaltors - - - - - - - - - - - - - - -
b) Electric , ELV Works , BMS & Light fixtures 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.73 1.04 1.04 0.69 0.69
c) Firefighting 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.19 0.19 0.13 0.13
d) Plumbing & Sanitary 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.18 0.18 0.12 0.12
e) HVAC Works 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 0.78 0.78 0.52 0.52
4 Mobilisation - - - - - - - - - - - - - - -
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
- - - - - - - - - - - - - - -
5 Architect & Consultancy 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5%
0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
6 Total Bare Cost (1 to5) 10.68 10.68 10.68 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 7.54 7.54 6.08 6.08
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Year-4 Year-5
Sl. Heads 48th 49th 50th 51th 52nd 53rd 54th 55th 56th 57th 58th 59th 60th 61st 62nd
7 Land Cost / Development Rights - - - - - - - - - - - - - - -
9 Marketing Expenses (5%) 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.67 0.90 0.90
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 3.8% 5.1% 5.1%
0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.67 0.90 0.90
10 Contingencies (5%) - - - - - - - - - - - - - - -
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
- - - - - - - - - - - - - - -
11 Pre - Operative Expenses (10%) 1.07 1.07 1.07 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.75 0.75 0.61 0.61
Administrative & Overhead Expenses 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0%
10.68 10.68 10.68 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 7.54 7.54 6.08 6.08
TOTAL (6 to 11) 11.92 11.92 11.92 10.08 10.08 10.08 10.08 10.08 10.08 10.08 10.08 8.47 8.97 7.59 17.55
12 Interest During Construction @ 11.50% 3.30 3.39 3.48 3.56 3.65 3.73 3.82 3.91 3.99 4.08 4.17 4.25 4.33 4.40 4.54
GRAND TOTAL (11 to 12) 15.22 15.31 15.41 13.64 13.73 13.81 13.90 13.98 14.07 14.16 14.25 12.72 13.30 11.99 22.09
MEANS OF FINANCE
Sl. Heads 48th 49th 50th 51th 52nd 53rd 54th 55th 56th 57th 58th 59th 60th 61st 62nd
1 Promoters Contribution 4.79 4.82 4.86 4.38 4.40 4.43 4.46 4.49 4.52 4.55 4.58 4.15 4.37 3.88 7.25
2 Term Loan from Banks @ 11.50% 9.59 9.65 9.71 8.75 8.81 8.87 8.92 8.98 9.03 9.09 9.15 8.31 8.73 7.76 14.49
GRAND TOTAL 14.38 14.47 14.57 13.13 13.21 13.30 13.38 13.47 13.55 13.64 13.73 12.46 13.10 11.64 21.74
COST PHASING
Year-6
Sl. Heads 63th 64th 65th 66th 67th 68th 69th 70th 71st 72nd Total
1 Civil Works 3.36 3.36 3.36 3.36 3.36 3.36 3.36 3.36 3.36 - 335.65
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 0.0% 100%
a) Sub-Structure & Basement 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 - 169.11
b) Superstructure 1.27 1.27 1.27 1.27 1.27 1.27 1.27 1.27 1.27 - 127.30
c) Brickwork/ Plaster 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 - 14.66
d) Waterproofing 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 - 12.15
e) Allied Structure 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 - 12.42
2 Finishes 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 72.87
1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 100%
a) Door & Window 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 28.01
b) Interior - - - - - - - - - - -
c) Flooring - - - - - - - - - - -
d) Elevation 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 15.30
e) Landscaping 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 29.56
3 Utility & Services 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 145.95
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 100%
a) Lift & Escaltors - - - - - - - - - - -
b) Electric , ELV Works , BMS & Light fixtures 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 69.27
c) Firefighting 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 12.85
d) Plumbing & Sanitary 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 11.80
e) HVAC Works 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 52.02
4 Mobilisation - - - - - - - - - - 14.03
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
- - - - - - - - - - 14.03
5 Architect & Consultancy 0.18 0.18 0.18 0.35 0.35 0.39 0.39 0.39 0.39 0.39 35.15
0.5% 0.5% 0.5% 1.0% 1.0% 1.1% 1.1% 1.1% 1.1% 1.1% 100%
0.18 0.18 0.18 0.35 0.35 0.39 0.39 0.39 0.39 0.39 35.15
6 Total Bare Cost (1 to5) 6.08 6.08 6.08 6.26 6.26 6.30 6.30 6.30 6.30 2.94 603.65
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100%
Year-6
Sl. Heads 63th 64th 65th 66th 67th 68th 69th 70th 71st 72nd Total
7 Land Cost / Development Rights - - - - - - - - - - 3.44
9 Marketing Expenses (5%) 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 17.57
5.1% 5.1% 5.1% 5.1% 5.1% 5.1% 5.1% 5.1% 5.1% 5.1%
0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
10 Contingencies (5%) 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 30.56
10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0%
3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06
11 Pre - Operative Expenses (10%) 0.61 0.61 0.61 0.63 0.63 0.63 0.63 0.63 0.63 0.29 60.37
Administrative & Overhead Expenses 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0%
6.08 6.08 6.08 6.26 6.26 6.30 6.30 6.30 6.30 2.94
TOTAL (6 to 11) 10.65 10.65 10.65 10.84 10.84 10.88 10.88 10.88 10.88 7.18 752.88
12 Interest During Construction @ 11.50% 4.64 4.73 4.82 4.92 5.02 5.11 5.21 5.31 5.41 5.49 182.45
GRAND TOTAL (11 to 12) 15.28 15.38 15.47 15.76 15.86 15.99 16.09 16.19 16.29 12.67 935.33
MEANS OF FINANCE
Sl. Heads 63th 64th 65th 66th 67th 68th 69th 70th 71st 72nd Total
1 Promoters Contribution 4.85 4.88 4.91 5.00 5.03 5.07 5.10 5.14 5.17 4.18 286.40
2 Term Loan from Banks @ 11.50% 9.70 9.77 9.83 9.99 10.06 10.14 10.21 10.27 10.34 8.36 572.79
GRAND TOTAL 14.55 14.65 14.74 14.99 15.09 15.21 15.31 15.41 15.51 12.54 859.19
Quarterly Phasing of Fund Requirement and Means of Finance ANNEXURE-D
(Rs. in Crores)
Sl. Heads Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Total
7 Architect & Consultancy 16.87 7.73 2.81 2.11 2.11 3.52 35.15
8 Total Bare Cost ( 2 to 7) 122.10 107.83 102.62 122.34 108.47 81.03 644.39
9 Pre - Operative Expenses (10%) 9.13 10.78 10.26 12.23 10.85 7.11 60.37
Administrative & Overhead Expenses 9.13 10.78 10.26 12.23 10.85 7.11 60.37
13 Interest During Construction @ 11.50% 6.06 13.68 22.93 33.81 46.36 59.61 182.45
GRAND TOTAL (12 TO 13) 137.29 132.30 137.92 170.49 168.28 189.05 935.33
MEANS OF FINANCE
Sl. Heads Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Total
2 Term Loan from Banks 75.95 78.00 84.65 105.27 108.01 120.91 572.79
Quarterly Phasing of Fund Requirement and Means of Finance ANNEXURE-D
(Rs. in Crores)
Sl. Heads Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Total
GRAND TOTAL (1 TO 2) 113.92 117.00 126.98 157.91 162.01 181.37 859.19
DEPRECIATION AS PER CO'S ACT
(Rs. in Crores)
Sl. Block of Asset Gross Block WDV Rate Moratorium Repayment Period
Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12
1 Land - - - - - - - - -
2 Buildings
Opening 2.82 5.59 8.32 11.00 13.65 16.25
During the Year 178.31 1.58% 2.82 2.77 2.73 2.69 2.64 2.60 2.56
Closing 2.82 5.59 8.32 11.00 13.65 16.25 18.81
Total depreciation for the year 437.69 22.23 20.67 19.24 17.92 16.70 15.58 14.54
Cumulative Depreciation 22.23 42.90 62.14 80.06 96.76 112.34 126.88
DEPRECIATION AS PER IT ACT
(Rs. in Crores)
Sl. Block of Asset Gross Block WDV Rate Moratorium Repayment Period
Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12
1 Land - - - - - - - -
2 Building
Opening 178.31 10.00% - 17.83 33.88 48.32 61.32 73.02 83.55
During the Year 17.83 16.05 14.44 13.00 11.70 10.53 9.48
Closing 17.83 33.88 48.32 61.32 73.02 83.55 93.02
44
CAR PARKING
Area in Sqft
Total Car Parking Area in (Sq.ft.) 457,526
No of Car Parking 1,355
Area per Car (Sq.ft.) 337.66
Motor Car
Weekdays Weekends & Hol
Per Car Park (2/3) (1/3)
Occupancy assumptions
Anchor Store 85% 90% 95% 100% 100%
Retail & luxury 85% 90% 95% 95% 95%
Multiplex 100% 100% 100% 100% 100%
Food Court 85% 90% 95% 100% 100%
Entertainment 85% 90% 95% 100% 100%
Avg Occupancy for the year 87% 91% 96% 97% 97%
Mall Promotion :
Month 12 12 12 12 12
Monthly Collection (Rs in Lacs) 15 15 15 20 20
Yearly Collection (in Crores) 1.80 1.80 1.80 2.40 2.40
Repayment Period
Year 12 Year 13
115 132
299 344
115 132
150 172
115 132
175 202
100% 100%
95% 95%
100% 100%
100% 100%
100% 100%
97% 97%
220.37 253.42
50.98 58.63
111.31 128.00
23.05 26.51
25.17 28.95
9.86 11.34
12 12
20 20
2.40 2.40
PROJECTED PROFIT & LOSS ACCOUNT FOR 7 YEARS (INCLUDING MORATORIUM PERIOD OF 1 YEAR)
Moratorium Repayment Period
Heads of Account Year 7 Year 8 Year 9 Year 10 Year 11 Year 12
Incomes
Rental 170.22 179.05 187.89 220.37 220.37 220.37
Mall Promotion 1.80 1.80 1.80 2.40 2.40 2.40
Car Parking 9.20 9.20 9.20 10.58 10.58 10.58
Expenses
Overhead Expenses 9.06 9.50 9.94 11.67 11.67 11.67
Interest on Loan 56.12 51.44 42.09 32.74 23.38 14.03
Operating expense 65.18 60.95 52.03 44.40 35.05 25.70
PAT (EBT-Net Tax Payable ) 71.92 82.96 96.96 129.41 136.80 144.10
Free Cash Flow post Interest Payment 94.15 103.63 116.20 147.33 153.50 159.68
Cumulative Free Cash Flow Post Interest Payment 94.15 103.63 219.84 367.16 520.66 680.34
7 YEARS (INCLUDING MORATORIUM PERIOD OF 1 YEAR)
Repayment Period
Year 13
253.42
2.40
12.17
267.99
13.40
4.68
18.08
249.91
14.54
14.54
235.37
58.99
176.39
190.93
871.27
(Rs. in Crores)
PROJECTED CASH FLOW
Construction Period Moratorium Repayment Period
Heads of Account Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13
Source of Fund
Security Deposit from Tenants - - - - - - 42.55 2.21 2.21 8.12 - - 8.26
Rental Income - - - - - - 170.22 179.05 187.89 220.37 220.37 220.37 253.42
Mall Promotion - - - - - - 1.80 1.80 1.80 2.40 2.40 2.40 2.40
Car Parking - - - - - - 9.20 9.20 9.20 10.58 10.58 10.58 12.17
Promoters Contribution 37.97 39.00 42.33 52.64 54.00 60.46 - - - - - -
Increase in Loan 75.95 78.00 84.65 105.27 108.01 120.91 - - - - - -
Total Inflow 113.92 117.00 126.98 157.91 162.01 181.37 223.77 192.26 201.09 241.47 233.35 233.35 276.25
Application of Fund
Land Cost / Development Rights 3.44 - - - - -
Construction Cost 127.80 118.62 114.99 136.68 121.92 129.44 -
Interest During Construction 6.06 13.68 22.93 33.81 46.36 59.61 -
Maintenance incl O.H - - - - - - 9.06 9.50 9.94 11.67 11.67 11.67 13.40
Interest on Loan - - - - - - 56.12 51.44 42.09 32.74 23.38 14.03 4.68
Repayment of Loan - - - - - - - 103.93 103.93 103.93 103.93 103.93 103.93
Tax Payable - - - - - - 21.89 25.47 30.65 41.62 44.80 47.98 58.99
Total Outflow 137.29 132.30 137.92 170.49 168.28 189.05 87.07 190.34 186.61 189.95 183.77 177.60 180.99
Cash Surplus (Deficit ) (23.37) (15.30) (10.94) (12.58) (6.27) (7.68) 136.71 1.92 14.49 51.52 49.58 55.75 95.27
Cumulative Cash Balance 136.71 138.62 153.11 204.63 254.20 309.95 405.22
PROJECTED BALANCE SHEET
Sl. Heads of Account Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Moratorium Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
Construction Period Repayment Period
I. Source of Fund
(1) Shareholders Funds 37.97 76.97 119.30 171.94 225.94 286.40 358.32 441.28 538.24 667.65 804.45 948.55 1,124.94
Promoters Contribution 37.97 76.97 119.30 171.94 225.94 286.40 286.40 286.40 286.40 286.40 286.40 286.40 286.40
Reserves & Surplus - - - - - - 71.92 154.88 251.85 381.26 518.06 662.15 838.54
(2) Loan Funds 75.95 153.95 238.60 343.87 451.88 572.79 666.11 564.39 462.67 366.87 262.94 159.02 63.36
Term Loan from Bank 75.95 153.95 238.60 343.87 451.88 572.79 623.55 519.63 415.70 311.78 207.85 103.93 (0.00)
Long Term Deposit - - - - - 42.55 44.76 46.97 55.09 55.09 55.09 63.36
Total Source of Fund 113.92 230.92 357.90 515.81 677.82 859.19 1,024.42 1,005.67 1,000.92 1,034.52 1,067.40 1,107.57 1,188.29
Cash and Bank Balances - - - - - - 136.71 138.62 153.11 204.63 254.20 309.95 405.22
- - - - - - 136.71 138.62 153.11 204.63 254.20 309.95 405.22
Total Application of Fund 137.29 269.59 407.51 578.00 746.28 935.33 1,049.80 1,031.05 1,026.30 1,059.90 1,092.78 1,132.95 1,213.67
COMPUTATION OF TAX PAYABLE
Heads of Account Moratorium Repayment Period
Income from House Property Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13
Gross Lease Rentals 181.22 190.05 198.88 233.35 233.35 233.35 267.99
Less: Property Taxes Paid 9.06 9.50 9.94 11.67 11.67 11.67 13.40
Net Rental Income 172.16 180.55 188.94 221.68 221.68 221.68 254.59
Less: Deductions
Standard Deduction @ 30% of NAV 30% 51.65 54.16 56.68 66.50 66.50 66.50 76.38
Net Income After Dedcution 120.51 126.38 132.26 155.18 155.18 155.18 178.21
Without Discounting
Pay Back
Period = 6 Years 4 1/2 months
IRR = 12.84%
Cash Inflow (PAT +
Year Cash Outflow Net Flow
Interest + DEP)
ALL AMOUNT IN Rs CRORES
-6 - (137.29) (137.29)
-5 - (132.30) (132.30)
-4 - (137.92) (137.92)
-3 - (170.49) (170.49)
-2 - (168.28) (168.28)
-1 - (189.05) (189.05)
0 150.27 - 150.27
1 155.08 - 155.08
2 158.29 - 158.29
3 180.06 - 180.06
4 176.88 - 176.88
5 173.71 173.71
6 195.61 1,208.97 1,404.57
DEBT SERVICE COVERAGE RATIO
Total : 51,540,685.00
Sl No Description Unit L (m) B (m) H (m) Total Qty
1
CONSTRUCTION OF P C CHANDRA
1 Reinforced Concrete Works R.C.C 53130 Cum 3.23 Cft/ 22761 Cum
Sqft
2 Reinforcement with Thermo Mechanically Treated Bars (TMT) Reinforcement 5841 MT 10.06 Kg/ Sqft 2880 MT
3 Shuttering with centering (Multiplication Factor over B.U Area) Shuttering 86393 Sqm 1.60 Sqm/ 77076 Sqm
Sqm
B.U
Compare 1
N OF P C CHANDRA
0.85 1.76
3.05 5.72
0.88 1.15
Compare 1
PRELIMINARY PROJECT COST FOR P.C CHANDRA MALL Date : 19.02.2019
Retail Area sqft in Superstructure (Excl. FEC & Multiplex & 455,608
Basement Retail)
FEC incl. Multiplex in Super Parking (Basement + MLCP) Total (Retail +FEC+ Parking +
Retail in Super Structure Service Block
Structure +Part Retail in Basement Service)
A Civil Works:
1 Sub-Structure & Basement* - - Err:509 Err:509 500 1.05 Err:509 Err:509
2 Superstructure** 0 0.00 2,327 75.20 1,179 17.10 450 0.95 611 93.26
3 Brickwork/ Plaster 120 5.47 120 3.88 30 2.18 80 0.17 77 11.69
4 Waterproofing 60 2.73 75 2.42 85 6.17 40 0.08 75 11.41
5 Allied Structure & Other Anciliary Works 50 2.28 50 1.62 50 3.63 50 0.11 50 7.63
Sub-Total of “A” 230 10 2,572 83.12 Err:509 Err:509 1,120 2.35 Err:509 Err:509
1 Door 15 1.09
2 Interior 20 1.45
500 22.78 300 9.70 250 0.53 281 42.80
3 Flooring 100 7.26
Total of “C” 1,985 90.43 1,050 33.94 310 22.49 360 0.76 968 147.62
E Architect & Consultancy 175 7.97 175 5.66 100 7.26 100 0.21 138 21.10
Total Bare Cost (A+B+C+D+E) 4,045 184.29 5,252 169.74 Err:509 Err:509 2,450 5.15 Err:509 Err:509
Add Site Over Head @ 5.00% Err:509 Err:509
Total incl. Site Over Head Err:509 Err:509
* Sum of Substructure cost division done by Basement Parking & Basement Retail area only
** In Superstructure parking portion , area division done by SLCP area only.
In rate per sqft for Parking total Parking area cost division done by Total Parking in Basement + SLCP area+Retail in Basement
This Preliminary estimate has been prepared basis the concept drawings dated 01.02.2019
LIFT & ESCALATOR DETAILS
Qty in Nos Price Per Unit (Rs) Amount in Rs. Description
17 5,000,000.00 85,000,000.00 Lift
46 4,500,000.00 207,000,000.00 Normal Escalator
Total : 312,000,000.00
CONSTRUCTION OF P.C CHANDRA MALL
SUMMARY OF CIVIL WORKS IN SUB STRUCTURE
SL. NO. DESCRIPTION OF ITEM
BOQ 62
TION OF P.C CHANDRA MALL
CIVIL WORKS IN SUB STRUCTURE
AMOUNT IN Rs.
-
-
144,523,200.00
20,000,000.00
33,258,000.00
-
2,295,000.00
375,960,000.00
260,280,000.00
Err:509
246,900,000.00
Err:509
BOQ 63
CONSTRUCTION OF P.C CHANDRA MALL
BILL OF QUANTITY FOR THE SUB STRUCTURE CIVIL WOR
1.1 Piling Works (Labour)(Rotary Rig ) 384 Nos ( 8 piles per grid X 48 grids, Rm
10 m empty borings) , 1000 mm Dia , then 16 m shaft length
2 Piling Concrete (20 m + 1 m for 808 piles & 16 m + 1 m for 384 nos piles ) Cum
A.1 All charges for doing excavation in required profile in all type of soils in dry
and wet condition for foundation , raft or any other sub structure portion of
the proposed structure as per drawings or direction of E.I.C / Owner
including dismantling of foundation (if any) made with brick, PCC , R.C.C
(To be done with mechanical excavator) , dressing of side, bottom,
ramming of bottom, shoring, strutting, diverting underground sewer line,
water line, electrical line (if any) barricading the area providing caution
board maintaining required slopes including all labour, materials,
machinery, tools & tackles for all lead & lift to the entire satisfaction of
E.I.C / Owner. If necessary the contractor shall submit a dewatering plan for
approval by the authorities.
A.1.1 Excavation for 6 metre over bypass & 10 m below bypass Cum 101025
A.1.2 Excavation below from 98.5 m Level (For Big contractor incl. Removing Cum 162152
earth)
A.1.3 Additional Cutting 10% for making ramps etc for material movement Cum
BOQ 64
SL. NO. DESCRIPTION OF ITEM UNIT QTY
A1.3 Supplying & providing dewatering system by providing Pump along with L.S
operator as per the instruction of the E.I.C. This item will be apllicable with
prior approval of the E.I.C & payment will be made on the basis of JMR
duly certified by E.I.C
A.2 All charges for providing and laying single brick flat soling of picked, jhama Sqm 20084
bricks below foundation floor, pile cap, tie beam etc.or any other location till
Plinth level including ramming dressing and bringing to proper level and
filling joints with sand including all materials, labour, tools and plants etc.
complete as per specification, drawing and direction below foundation.
A.3 Removal of rubbish earth etc from the working site and disposal of the Cum 210541
same beyond the compound in conformity with the municipal/ corporation
rules for such disposal, loading into truck and cleaning the site in all respect
as direction of Engineers.(Included in Excavation )
A.4 All charges for providing & laying 1:3:6 plain cement concrete (PCC) of Cum 2008.4
required thickness below footings or any other location as specified in the
drawing till Plinth level using 20 mm nominal size well-graded approved
quality aggregate including vibrating / compacting, scaffolding as required
establishing dewatering system by pumping / bailing out water, cleaning,
preparing surfaces, junctions etc. excluding shuttering, with curing complete
to the entire satisfaction of E.I.C / Owner.(150 mm Thick)
A.5 Plum concrete filling work over raft 500 mm av Cum 42108
A.5.1 CLSM (Controlled low strength material ) 1.5 m below raft Cum 0
A.6 Providing and laying 250 mm thick brick work of class designation 100 , Cum 154
upto plinth level in cement mortar (1:6) including all materials , lead & lifts.
(Brick shuttering in raft)
A.7 Same as above but for Raft concreting (1.0 m Raft) now 1.5 m Cum 14485
A.8 Reinforcement Steel (100 Kg / Cum) ( For Raft ) Revised 120 Kg / Cum MT 1449
BOQ 65
SL. NO. DESCRIPTION OF ITEM UNIT QTY
BOQ 66
L WORKS
RATE IN Rs. AMOUNT IN Rs. Rev Quantity RATE IN Rs. AMOUNT IN Rs.
(Rev) (Rev)
24240 3000.00 -
9984 3500.00
1400.00
2200.00
12628 7200.00
1262.84 50000.00
5268.21 1600.00
10.00 150000.00
1000000.00
658.82 4000.00
BOQ 67
RATE IN Rs. AMOUNT IN Rs. Rev Quantity RATE IN Rs. AMOUNT IN Rs.
(Rev) (Rev)
20000000.00 20,000,000
BOQ 68
RATE IN Rs. AMOUNT IN Rs. Rev Quantity RATE IN Rs. AMOUNT IN Rs.
(Rev) (Rev)
75000.00 14954625.00 660.96 75000.00 49,572,000.00
11000.00 19562400.00 3465 13000.00 45,045,000.00
11000.00 18979908.75 1929 13000.00 25,081,875.00
11000.00 112392500.00 11393.8 13000.00 148,119,075.00
11000.00 4115306.25 1485.0 13000.00 19,305,000.00
BOQ 69
CONSTRUCTION OF P.C CHANDRA MALL
BILL OF QUANTITY FOR THE SUB STRUCTURE CIVIL WOR
A.1 All charges for doing excavation in required profile in all type of soils in dry
and wet condition for foundation , raft or any other sub structure portion of
the proposed structure as per drawings or direction of E.I.C / Owner
including dismantling of foundation (if any) made with brick, PCC , R.C.C
(To be done with mechanical excavator) , dressing of side, bottom,
ramming of bottom, shoring, strutting, diverting underground sewer line,
water line, electrical line (if any) barricading the area providing caution
board maintaining required slopes including all labour, materials,
machinery, tools & tackles for all lead & lift to the entire satisfaction of
E.I.C / Owner. If necessary the contractor shall submit a dewatering plan for
approval by the authorities.
A.1.1 Excavation for 6 metre over bypass & 10 m below bypass Cum 101025
A1.3 Supplying & providing dewatering system by providing Pump along with L.S
operator as per the instruction of the E.I.C. This item will be apllicable with
prior approval of the E.I.C & payment will be made on the basis of JMR
duly certified by E.I.C
A.2 All charges for providing and laying single brick flat soling of picked, jhama Sqm 14485
bricks below foundation floor, pile cap, tie beam etc.or any other location till
Plinth level including ramming dressing and bringing to proper level and
filling joints with sand including all materials, labour, tools and plants etc.
complete as per specification, drawing and direction below foundation.
A.3 Removal of rubbish earth etc from the working site and disposal of the Cum 210541
same beyond the compound in conformity with the municipal/ corporation
rules for such disposal, loading into truck and cleaning the site in all respect
as direction of Engineers.
A.4 All charges for providing & laying 1:3:6 plain cement concrete (PCC) of Cum 1448.5
required thickness below footings or any other location as specified in the
drawing till Plinth level using 20 mm nominal size well-graded approved
quality aggregate including vibrating / compacting, scaffolding as required
establishing dewatering system by pumping / bailing out water, cleaning,
preparing surfaces, junctions etc. excluding shuttering, with curing complete
to the entire satisfaction of E.I.C / Owner.
BOQ 70
SL. NO. DESCRIPTION OF ITEM UNIT QTY
A.7 Same as above but for Raft concreting (1.0 m Raft) Cum 14485
A.8 Reinforcement Steel (100 Kg / Cum) ( For Raft ) MT 1449
A.8.1 Retaining Wall @ 350 mm Thick Cum 2215.5
A.8.2 Retaining Wall Reinforcement @ 90Kg / Cum MT 199
A.9 Column concreting Cum 1778
A.10 Column Capital concreting Cum 1725
A.11 Intermediate Slab Concreting Cum 10217.5
A.12 Intermediate Shear Wall (Not Diaphragm Wall) Concreting Cum 374.119
BOQ 71
P.C CHANDRA MALL
SUB STRUCTURE CIVIL WORKS
200.00 20204937.90
350.00 56753025.00
20000000.00
600.00 8691000.00
150.00 31581142.74
7500.00 10863750.00
BOQ 72
RATE IN Rs. AMOUNT IN Rs.
300.00 12632457.10
1700.00 17895980.89
8000.00 1232000.00
11000.00 159335000.00
75000.00 108637500.00
11000.00 24370500.00
75000.00 14954625.00
11000.00 19562400.00
11000.00 18979908.75
11000.00 112392500.00
11000.00 4115306.25
800.00 51558340.00
75000.00 28009800.00
75000.00 12940846.88
75000.00 4208835.94
75000.00 45978750.00
1000.00 40870000.00
30000000.00
BOQ 73
CONSTRUCTION OF P.C CHANDRA MALL
SUMMARY OF CIVIL WORKS IN SUB STRUCTURE
SL. NO. DESCRIPTION OF ITEM
1 Sheet Pilining Cost upto 10 M depth (on Contact Surface area of earth)
BOQ 74
TION OF P.C CHANDRA MALL
CIVIL WORKS IN SUB STRUCTURE
AMOUNT IN Rs.
143,000,000.00
-
76,957,962.90
20,000,000.00
19,554,750.00
31,581,142.74
1,232,000.00
159,335,000.00
108,637,500.00
377,941,812.81
60,528,437.98
998,768,606.43
BOQ 75
APPROX COST COMPARISON OF STEEL VS CONCRETE STRUCTURE (TYPICAL ASSUMPTION AS PER INPUT)
Area of Superstructure in Sqm : 1
8.5 m Length
8.5 m Width
Quantity Unit Rate in Rs Amount in Rs
Column Concreting 3.888 Cum 11000 42768
Column Capita 3.99675 Cum 11000 43964.25
Slab 14.45 Cum 11000 158950
Shuttering 93.73 Sqm 900 84357
Reinforcement 2083.155 Kg 72 149987.16
PT Work 72.25 Sqm 600 43350
Total : 523376.41
For Bhubaneswar Leighton's cost for 90000 Sqft of common area in Mall is Rs 13
Crores , with 50% as OHP , Tax , prelims will become 19.5 cr. And per Sqft cost is
Rs 2167/- per Sqft
If we extrapolate in our common area of 229330 Sqft the Cost will become 49.69
Crores.
Retail Parkin
Rate / Sq
Sl No. Description of Items Rate / Sq Ft. Rs in Crores
Ft.
A Civil Works:
1 Sub-Structure & Basement* - - 1,713
2 Superstructure** 0 0.00 774
3 Brickwork/ Plaster 120 11.44 40
4 Waterproofing 60 5.72 70
B Finishes
1 Door 15
2 Interior 20
472 45.00
3 Flooring 100
2 Electric , ELV Works , BMS & Light fixtures 600 57.21 150
3 Firefighting 80 7.63 65
Rate / Sq Ft. on
Rs in Crores Rs in Crores
B.U Area
2.41 71 12.42
1.21
1.61
318 55.85
8.04
- 176 31.00
- 168 29.56
43 7.53
10.85 705 123.95
- - - -5 Cr
3.22 67 11.80
4.02 80 14.03
- 20 3.44
- 83 14.54
A.1 All charges for doing excavation in required profile in all type of soils in dry
and wet condition for foundation , raft or any other sub structure portion of
the proposed structure as per drawings or direction of E.I.C / Owner
including dismantling of foundation (if any) made with brick, PCC , R.C.C
(To be done with mechanical excavator) , dressing of side, bottom,
ramming of bottom, shoring, strutting, diverting underground sewer line,
water line, electrical line (if any) barricading the area providing caution
board maintaining required slopes including all labour, materials,
machinery, tools & tackles for all lead & lift to the entire satisfaction of
E.I.C / Owner. If necessary the contractor shall submit a dewatering plan for
approval by the authorities.
A.2 All charges for providing and laying single brick flat soling of picked, jhama Sqm 20817
bricks below foundation floor, pile cap, tie beam etc.or any other location till
Plinth level including ramming dressing and bringing to proper level and
filling joints with sand including all materials, labour, tools and plants etc.
complete as per specification, drawing and direction below foundation.
A.3 Removal of rubbish earth etc from the working site and disposal of the Cum 365338.35
same beyond the compound in conformity with the municipal/ corporation
rules for such disposal, loading into truck and cleaning the site in all respect
as direction of Engineers.
A.4 All charges for providing & laying 1:3:6 plain cement concrete (PCC) of Cum 3122.55
required thickness below footings or any other location as specified in the
drawing till Plinth level using 20 mm nominal size well-graded approved
quality aggregate including vibrating / compacting, scaffolding as required
establishing dewatering system by pumping / bailing out water, cleaning,
preparing surfaces, junctions etc. excluding shuttering, with curing complete
to the entire satisfaction of E.I.C / Owner.
BOQ 82
SL. NO. DESCRIPTION OF ITEM UNIT QTY
A.6 Providing and laying 250 mm thick brick work of class designation 100 , Cum 270
upto plinth level in cement mortar (1:6) including all materials , lead & lifts.
(Brick shuttering in raft)
A.7 Same as above but for Raft concreting (Quantity as per sheet received from Cum 24980.4
M.N Consultant ) , However as Bhubaneswar Structure cost considered in
Summary , so proportionalisation made & a 500 mm thickness considered
in that structural cost portion ommitted from here)
A.8 Reinforcement Steel for the for (100 Kg / Cum) ( For Raft ) However as MT 2498.04
Bhubaneswar Structure cost considered in Summary , so
proportionalisation made & a 500 mm thickness considered in that
structural cost portion ommitted from here)
BOQ 83
P.C CHANDRA MALL
SUB STRUCTURE CIVIL WORKS
300.00 121779450.00
20000000.00
500.00 10408500.00
150.00 54800752.50
6500.00 20296575.00
250.00 10148287.50
BOQ 84
RATE IN AMOUNT IN Rs.
Rs.
8000.00 2160000.00
11000.00 274784400.00
72000.00 179858880.00
9000.00 23479632.00
9000.00 36467442.00
9000.00 149882400.00
9000.00 13176000.00
800.00 83309252.00
72000.00 39445781.76
72000.00 29173953.60
72000.00 15811200.00
72000.00 71943552.00
600.00 49960800.00
30000000.00
BOQ 85
CONSTRUCTION OF P.C CHANDRA MALL
SUMMARY OF CIVIL WORKS IN SUB STRUCTURE
SL. NO. DESCRIPTION OF ITEM
1 Cost as given by leighton (As per Mr M B mail dated 14.06.17) incl. Sheet
Piling work
2 Cost as given by leighton (Rs 635/- Per Sqft of Basement area with Prelims
, Profit loading of 40% over leightons rate) (Not taken as cost detailed
below)
BOQ 86
TION OF P.C CHANDRA MALL
CIVIL WORKS IN SUB STRUCTURE
AMOUNT IN Rs.
587,450,374.00
121,779,450.00
20,000,000.00
30,705,075.00
54,800,752.50
2,160,000.00
274,784,400.00
179,858,880.00
512,650,013.36
40,148,287.50
1,824,337,232.36
BOQ 87
APPROX COST SHEET FOR SUPER STRUCTURE
Area of Superstructure Mall in Sqft : 791875.2
Consumption ratio
Quantity Unit
Concrete 0.4 Cum / Sqm 29427 Cum
Reinforcement 4 Kg / Sqft 3168 MT
Times of
Shuttering 1.2 88280 Sqm
Superstructure area
Structural Steel Work 200 MT
P T Work 73567 Sqm
Consumption ratio
Quantity Unit
Concrete 0.4 Cum / Sqm 8212 Cum
Reinforcement 6 Kg / Sqft 1326 MT
Times of
Shuttering 2 41058 Sqm
Superstructure area
URE
A Civil Works:
1 Sub-Structure & Basement* - - 2,450
2 Superstructure** 877 69.47 971
3 Brickwork/ Plaster 120 9.50 60
4 Waterproofing 60 4.75 50
5 Allied Structure 105 8.31 30
Sub-Total of “A” 1,162 92 3,560
B Finishes***
1 Door 15
2 Interior 45
187 14.81
3 Flooring 110
1.45
4.35
All toilets interior work , Any
type column cladding ,
Escalator Clading , all staircase
work , Interior work in
Multiplex Floor common area ,
All types of painting , Fire &
178 31.23
Flush doors , any kind veneer /
10.62 laminate cladding work not
included here. Budget
representated as per
parametric study was 46
Crores.
- 169 29.70
43 7.52
16.42 491 86.34
- - -
21.73 394 69.24
6.57 73 12.90
4.64 67 11.76
16.42 298 52.42
49.35 832.52 146.32
4.83 75 13.14
- 20 3.44
- 212 37.30
- 81 14.15
- 1,038 182.45
Cost in Rs
Total : 152,964,804.51
Total : 290,964,804.51
Nothing Considered
as Box Park
structure as per
Roof Portion Boss instruction
except Parapet wall
LIFT & ESCALATOR DETAILS
No Price Per Unit (Rs) Amount in Rs.
8 Pasenger 3,565,000.00 28,520,000.00
Total : 351,795,000.00
LIFT & ESCALATOR DETAILS
Description
Lift
Lift
Lift
Normal Escalator
Express escalator
15% to be added IN
Sl. No Description Rate Per Nos (A) Rate as advised by
Mr. RS (B)
Final Rate to Be
Considered in P C
Chandra Mall (A+B)
3565000
6785000
3680000
Electro - Mechanical Cost at (Tentative)
a) HT / SubStation
1.0 CESC Work 783.33 940.00
b) L T Side
1.0 Panels & DBs 462.50 555.00
Electro Mech 99
A Electrical : Cost in Lacs Projected Cost with 20 %
adding over Atmosphere /
Bhubaneswar rate & 50 %
over Rangoli rate
B. HVAC Works
a) Hi Side
Total of a) : 3,612.50
b) Low Side
Total of b) : 528.00
A.1 All charges for doing excavation in required profile in all type of soils in
dry and wet condition for foundation , raft or any other sub structure
portion of the proposed structure as per drawings or direction of
E.I.C / Owner including dismantling of foundation (if any) made with
brick, PCC , R.C.C (To be done with mechanical excavator) , dressing
of side, bottom, ramming of bottom, shoring, strutting, diverting
underground sewer line, water line, electrical line (if any) barricading
the area providing caution board maintaining required slopes including
all labour, materials, machinery, tools & tackles for all lead & lift to the
entire satisfaction of E.I.C / Owner. If necessary the contractor shall
submit a dewatering plan for approval by the authorities.
A.2 All charges for providing and laying single brick flat soling of picked, Sqm 5980
jhama bricks below foundation floor, pile cap, tie beam etc.or any other
location till Plinth level including ramming dressing and bringing to
proper level and filling joints with sand including all materials, labour,
tools and plants etc. complete as per specification, drawing and
direction below foundation.
A.3 Removal of rubbish earth etc from the working site and disposal of the Cum 46350
same beyond the compound in conformity with the municipal/
corporation rules for such disposal, loading into truck and cleaning the
site in all respect as direction of Engineers.
A.4 All charges for providing & laying 1:3:6 plain cement concrete (PCC) Cum 600
of required thickness below footings or any other location as specified
in the drawing till Plinth level using 20 mm nominal size well-graded
approved quality aggregate including vibrating / compacting,
scaffolding as required establishing dewatering system by pumping /
bailing out water, cleaning, preparing surfaces, junctions etc. excluding
shuttering, with curing complete to the entire satisfaction of E.I.C /
Owner.
BOQ 105
SL. NO. DESCRIPTION OF ITEM UNIT QTY
A.6 Providing and laying 250 mm thick brick work of class designation Cum 50
100 , upto plinth level in cement mortar (1:6) including all materials ,
lead & lifts.(Approx considered)
A.11 Pile Concreting Supply Only (For 50 m shaft + 1 m extra +5 % Cum 5469.75
wastage)
A.12 Steel Reinforcement in Pile Supply Only (70 kg per cum of concrete on Kg 357500
pile shaft portion only , no extra
A.13 Sheet piling Sqm 2000
A.14 Other Misc work related with Pile Like Testing , Providing Liner Etc
BOQ 106
OF P.C CHANDRA MALL
RE CIVIL WORKS IN ZONE A WORKS ( From A to K)
300.00 15,450,000.00
500.00 2,990,000.00
150.00 6,952,500.00
6500.00 3,900,000.00
250.00 1,287,500.00
BOQ 107
RATE IN Rs. AMOUNT IN Rs.
8000.00 400,000.00
11000.00 57,860,000.00
72000.00 40,579,200.00
600.00 3,588,000.00
3279.00 24,979,422.00
7000.00 38,288,250.00
45.00 16,087,500.00
19000.00 38,000,000.00
5,000,000.00
Total in Sub 255,362,372.00
Structure:
BOQ 108
CONSTRUCTION OF P.C CHANDRA MALL
BILL OF QUANTITY FOR THE SUB STRUCTURE CIVIL WORK
A.1 All charges for doing excavation in required profile in all type of soils in dry
and wet condition for foundation , raft or any other sub structure portion of
the proposed structure as per drawings or direction of E.I.C / Owner
including dismantling of foundation (if any) made with brick, PCC , R.C.C
(To be done with mechanical excavator) , dressing of side, bottom,
ramming of bottom, shoring, strutting, diverting underground sewer line,
water line, electrical line (if any) barricading the area providing caution
board maintaining required slopes including all labour, materials,
machinery, tools & tackles for all lead & lift to the entire satisfaction of
E.I.C / Owner. If necessary the contractor shall submit a dewatering plan for
approval by the authorities.
A.2 All charges for providing and laying single brick flat soling of picked, jhama Sqm 12000
bricks below foundation floor, pile cap, tie beam etc.or any other location till
Plinth level including ramming dressing and bringing to proper level and
filling joints with sand including all materials, labour, tools and plants etc.
complete as per specification, drawing and direction below foundation.
A.3 Removal of rubbish earth etc from the working site and disposal of the Cum 226800
same beyond the compound in conformity with the municipal/ corporation
rules for such disposal, loading into truck and cleaning the site in all respect
as direction of Engineers.
A.4 All charges for providing & laying 1:3:6 plain cement concrete (PCC) of Cum 1800
required thickness below footings or any other location as specified in the
drawing till Plinth level using 20 mm nominal size well-graded approved
quality aggregate including vibrating / compacting, scaffolding as required
establishing dewatering system by pumping / bailing out water, cleaning,
preparing surfaces, junctions etc. excluding shuttering, with curing complete
to the entire satisfaction of E.I.C / Owner.
BOQ 109
SL. NO. DESCRIPTION OF ITEM UNIT QTY
A.6 Providing and laying 250 mm thick brick work of class designation 100 , Cum 175.2
upto plinth level in cement mortar (1:6) including all materials , lead & lifts.
(Brick shuttering in raft)
BOQ 110
P.C CHANDRA MALL
SUB STRUCTURE CIVIL WORKS
300.00 75600000.00
20000000.00
500.00 6000000.00
150.00 34020000.00
6500.00 11700000.00
250.00 6300000.00
BOQ 111
RATE IN AMOUNT IN Rs.
Rs.
8000.00 1401600.00
11000.00 158400000.00
72000.00 103680000.00
11000.00 24171840.00
11000.00 41308327.50
11000.00 132000000.00
11000.00 15400000.00
800.00 64531840.00
72000.00 33225292.80
72000.00 27038178.00
72000.00 15120000.00
72000.00 51840000.00
600.00 36000000.00
20000000.00
Total : 877737078.30
BOQ 112
CONSTRUCTION OF P.C CHANDRA MALL
SUMMARY OF CIVIL WORKS IN SUB STRUCTURE
SL. NO. DESCRIPTION OF ITEM
1 Proportionate Cost of Diaphragm Wall incl. Sheet Piling Cost (As per Mr M
B mail dated 14.06.17)
BOQ 113
TION OF P.C CHANDRA MALL
CIVIL WORKS IN SUB STRUCTURE
AMOUNT IN Rs.
468,805,896.95
877,737,078.30
1,346,542,975.25
BOQ 114
Total Cost Compare in Sub Structure Works
Option A : Segregating Two Buildings
Sl No Description Amount in Rs.
1 Sub Structure Works from K to EE (With Diaphragm) 1346542975.24986
2 One Basement Cost incl Pile (From A to K ) (By Pile) 255362372
Total Amount : 1601905347.24986
Option B : Integrated Strucure with Diaphragm Wall
1 Sub Structure Works from A to GG Err:509
200000 40,000,000.00
600 78,820,200.00
Total : 1,261,717,304