Sunteți pe pagina 1din 1

12 CAMRY

M OVERALL ELECTRICAL WIRING DIAGRAM


∗ 1 : 2GR–FE
∗ 2 : 2AZ–FE
H e a d lig h t B e a m L e v e l C o n tro l (A u to m a tic ) ∗ 3 : Before Jan. 2009 Production
∗ 4 : From Jan. 2009 Production

1 2 3 4
(IG) (BAT) (IG) (BAT)

7. 5A 10A 7. 5A 10A
H–LP DOME GAUGE MPX–B
LVL NO. 2

Combination Meter System


V(LHD)
2

2 IP 12 IG V(RHD) 3 1A
1

< 27–2>

GR
LG

(RHD)
(LHD)
13 ID 12 3L 2 3G 1 3D

SB

SB
LG

7 IF 1 3Q 9 3Q 12 3Q 2 EA1 2 AE1
A12 A33
Headlamp Leveling Motor (LH) Headlamp Leveling Motor (RH) V(LHD)
Main Body ECU

GR
R

V
11 NA1 V(RHD)
CAMRY (EM0263E)

M M
F1(A), F2(B)
< 2–8>

12 B Combination Meter 2 A 13 A 1 A
+S B2 IG+ B
LHB1 LHM+ LH E RHB1 RHM+ RH E IG2 IG2 +B(DOME)
3 2 1 3 2 1

Beam Level

Speedometer

Warning
Headlamp
Power Supply

Master
Multi LCD
Circuit
GR

GR

LG

Buzzer
W

R
P

1 3 11 18 24 10 17 23 Micro Computer Drive IC

IG B2 LH+ LHE LH– RH+ RHE RH–


A20 IG2
Headlamp Leveling ECU

E1 SGR SHRL SBR SPDL SPDR WNG


9 21 19 12 5 16 6

LVWG SI E2 ES
W
G

P
L

5 B 14 B 12 A 24 A
GR

BR
(∗4 RHD ∗1)
GR

W–B
L

7 OA1 15 OA1 16 OA1 11 AE2 5 3Q (∗3 ∗1)

17 A

A41(A), A42(B)
Combination Meter

TRC System< 18–4>


VSC System< 18–4>
< 18–4> < 19–4>
< 8–1>
V

B
L

(∗3 ∗1)
DLC3

Connector
10 3D

GR
Junction
ABS System
W

18 B
< 27–1>

1 2 3 10 3P 7 3Q
15
SHG SHRR SHB BR BR(∗3 RHD ∗1)
AE1
(RHD)
GR(RHD ∗2) 4 CA3

2 3J 2 3U BR(∗3 LHD ∗1)

15
BR GR(∗4 LHD ∗1)

W–B
O23

(∗1)
EA1

Junction Connector
Height Control Sensor (LHD)
GR(LHD ∗2)
SB W–B
2 3
A44 4 CA3
Junction Connector

C57
W–B
(∗2)
A5 F1 C6 C7

S-ar putea să vă placă și