Unit IG2: Risk assessment

Part 1: Background

Include in here the organisation’s name* and location* and number of workers. You must then go on to give a description of the main
activities/products/services carried out. You must also describe the area to be risk assessed eg, whole site, and anything else that you
consider relevant (approximately 150 to 200 words):
My organisation is ZENITH ERECTORS LTD. located in cochin which consist of 84 employees.

ZENITH ERECTORS LTD. is a reputed firm in the field of boiler erection, piping related engineering industrial projects, maintenance shutdown project related to
oil field engineering. company focuses their projects in south India.

Presently an ongoing project of 16Ton boiler plant is constructing in pondichery India. The total area of the site is around 20 acres and almost 45 workers are
involved in this project including technicians, supervisors, engineers and other staffs.

Project includes activities such as erection of package type boiler which probably includes lifting and installation of equipments, piping erection which includes
cutting, grinding, welding operations. also underground pipelines where installing for water supply which is done by excavation for trenches.There is a material
yard provided nearby of the site where different equpiments, materials, pipes of different grades and sizes, Mild steel columns, angles are arranged for work. The
working time is from 8.00 am to 5.00 pm on weekdays and provide holidays at weekends. Sometimes have overtime work after scheduled working time for some
important activities. The project manager is responsible for Health and Safety and Safety incharge personal give direction for achieving good health and safety
culture.

The risk assessment will cover the area of boiler unit area, maintenance department and material yard.

You must now give a brief outline on how you completed the risk assessment (approximately 200 words):
I started internet surfing for information about ILO had any codes of practice related to occupational safety and health at work in the mechanical as well as oil and
gas field. The British HSE website (http://www.hse.gov.uk/search/constuction)had adequate sources of information for example, site safety, working at height and
guidance for health and safety in the construction industry. Refered books published such as International Health and Safety at work(Third edition from Phil
Hughes MBE and Ed Ferrett) and prepare notes from these information and consulted with the project manager to know the different process.

With the knowledge that I occured from the information and my studies, I visited the site where the work is going on. I walk through the working area and gathered
information of the activies carryout there by visual inspection. From the permission granted by the site engineer I got a chance to interact with some workers at
rest brake. From my enquiries I found how much they where aware about risk perception and hazards in there work place, precautions to prevent accident, ill
health conditions. procedures to comply with emergency situation etc. Also checked accident records and sickness absence records to understand the causes of
accidents and accident rates, ill health conditions.

Learner number: Learner name: Page 1 of 17


* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.

Learner number: Learner name: Page 2 of 17


Part 2: Risk Assessment

Organisation name: Zenith Erectors


Date of assessment:
Scope of risk assessment: Boiler unit area, Maintenance department and material yard.

Hazard category Who might be harmed What are you already doing? What further controls/actions are Timescalesfor Responsible
and hazard and how? required? further actions person’s job
to be completed title
(within …)
Work at height Erection gang, supervisors, 1.Scaffolding is provided. 1.Instruction,information, training should 1 week Project
other employees, or anyone be given regularly. manager(2, 8,
Risk of fall from who where at the place of 2.PPE's such as safety belt with 13)
height while erection ongoing erection area. fall arrester, safety helmet, safety 2.A safe system of work to be develop 1 week
of steel columns, shoes etc are given to the for the most risky erection work. Safety
beams, Chances of fall from height workers. incharge(10, 9,
Horizontal and if they worked in unsafe 3.possible safety nets should be 2 weeks 12)
vertical bracings, method or improper use of 3.Permit to work system to introduced below the workplace to
istallation of safety harness. inadequate carryout work. prevent falling of objects. Project co-
equipment. control measures will ordinator(1, 3,
increase the risk level and 3.Temprory handrails are 4. horizontal life line should be 1 week 6, 11)
dangerous occurance. implemented. introduced for anchoring.
Project
4.works carryout under 5.Check the handrails, ladders, gratings 2 days engineer/super
supervison and instructions from are fixed properly and firmly. visor(4, 5, 7)
foreman.
6.provide assistants and regular
communication system for lone working
people who might worked at 1 day
height.(example: some grinding ,cutting
welding work activites will done by
individuals at height)

7.Regular checking the control measures


like scaffolding, safety equipments,for Daily
safe work.

Learner number: Learner name: Page 3 of 17


8.Stop the work if it includes any unsafe
conditions such as bad weather or in 1 month
emergency situation.(Develop an
emergency plan give training and
conduct mock drill for evacuation and
multiple casuality accident exercises
should be practised if they are
foreseeable.)

9.entry exit only through staircase.if find


improper pathway in use enclose the 1 week
area and take necessary action to the
workers after warning.(for same to
improper method of work)
Daily
10. ensure that PPE provided to the
workers are used in proper manner.

11.competency of the workers efficiency,


ability, experience should confirmed after 1 day
stringent checking when deployed to the
work.(example: fear of height, work skill,
physical and mental stability by task
analysis)

12. Improve workers awareness on Daily


health and safety issues by conducting
tool box talk or health awareness
program.
1 month
13. Tower scaffolding must be
implemented for the side structural work
which includes toe board, platform, cross
bracing, out triggers, locking wheel and
internal ladders.

Learner number: Learner name: Page 4 of 17


Fire welding workers, 1. Isolate the area and make 1. check the work equipment (welding Daily Safety
technicians, helpers who sure no combustible materials machine, grinding machine)and cables incharge(2, 4,
Hot work involved in the work and are nearby of the work. regularly before work is carried out. 5, 7)
Includes of pipes other persons who
welding, grinding accidently come in the 2.permit to work system to carry 2.Display sign boards should be placed 1 week Purchase
activities at different area.(may be staff, out activities. at work site. department(6)
places of the site. trespassers etc..) 1 day
3.Appoint competent person for 3.proper storage and handling of Project
Injuries and illness may be welding after welder testing combustible materials. supervisor(1, 3,
caused by burning, eye approval. 1 week 8)
damage from arc produced 4.Develop work plan procedure for safe
by the welding torch, skin 4.Personal protecting work.
injury and inhalation of equipments are adequate.
fumes and dust produced 5.Enure all safety precautions are 1 day
during the task. 5.Fire mock drill for fire undertaken and personal protective
prevention and protection should equipment are using in proper manner.
be carried out periodically.
6. Fire extinguisher 2-A:10-B:C must be 1 week
put in nearby of hot working zone.

7.workers should get training for 3 days


handling and storage of equipment, use
of PPE and to comply with proper work
procedures.
2 days
8.Good housekeeping should be ensure.
Lone working Work is carried out without 1.worker data is entered in the 1. supervision needed to monitoring the Safety
any supervision, so the logbook of yard. work, proper material stacking and giving 1 day incharge(2, 8,
Found worker worker may be in danger at direction to the worker. 11)
cutting pipes and anytime. 2. provide welfare facilities like
grinding at the edge drinking water and washing 2.provide first aid kit. 2 days Project co-
opening face in yard station is at nearby of the work. ordinator(4, 5,
area. He is a regular 3.Remove scraps and other waste 9, 10)
worker in yard. 2. communication through mobile occured during the work regularly.(house 1 day
phones with supervisor. keeping suggested). A helper should be Project
provided to the worker for work supervisor(1, 6,
3. Face mask and other relevant arrangement and for cleaning. 7)
PPE's like helmet, goggles etc
are provided. Yard
2 days supervisor(3)

Learner number: Learner name: Page 5 of 17


4.Sign boards are adequate and 4. consider physical and mental stabillity
location is well known to worker. of the worker and job rotation system
implemented in yard. 1 day
5.Worker knows the emergency
procedures and competent to do 5. Make sure that worker not involving in
the work. other activities.
1 day
6. Ensure proper use of ppe and clothing
should match the job profile. Ensure that
safety mask and goggles are using. Daily

7.Inspect the work area and ensure the


work arrangements are adequate.
3 days
8. Give training, Instruction , information
about the material movements,
locomotives and other activities in the
yard so that worker will be vigilant to
handle any situation.
5 days
9.Competency of the worker to comply
with health and safety procedures and
consider factors like health condition,
medical fitness, strength ability to do job,
experience etc.

10.Ensure the condition of the


equipment used for working, check the Daily
grinding machine, guard is placed to
prevent from injury cut. ensure worker
aware about proper working method and
working as per suggestion made by
manufactures operational manual. Daily

11. Avoid lone working if possible.

Learner number: Learner name: Page 6 of 17


Vibration Jack hammer is a power 1. Men at work sign boards are 1.Anti vibration gloves and warm clothes 4 days Safety
tool.It produced continous placed nearby. should be provided to the incharge(4, 7)
Demolishing of vibration during its workers.(vibration gloves absorb
cement mortar floor operation. Workers who 2.Mask provided to prevent vibration energy produced from the Project co-
RCC(reinforced engaged with demolishing inhalation of dust. power tool) ordinator(5)
cement concrete) work using jackhammers
using 5 ton jack will effect hand vibration 3.Work carried out under 2.Regular maintenance of the power Purchase
hammer. Large also his whole body get supervision. tools(check oil level, cleaning, sufficient Daily department(1)
amount of vibrations vibrated. exposure to grease inside bit holder) for safe use and
is produced from the vibration will lead to Hand 4.Rest work brakes provided tool handling during work.
jack hammer Arm Vibration after regular time interval. Maintenance
Syndrome(HAVS), 3.maintenance documents are kept in Daily department(2,
Symptoms include muscle 5.Different pathways provided for record. 3)
weakening, joint damage, other workers.
numbness, tingling, and 4.Physical capability of the worker Project
loss of nerve sensitivity. 6.Entry of others like should be identified( Jackhammer is a supervisor(6, 8,
prolonged exposure that trespassers, other workers, staffs heavier equipment and operation is 2 days 9)
with whole body will lead to are prohibited by proper difficult so it needs special care to
whole body vibration barrication. handle during operation)
syndrome(WBVS) causes
headache, stomach 7. Welfare facilities are 5.Concrete waste produced during
problems and loss of provided.(drinking water, demolishing should be removed from
balance etc.. washing station are nearby) work place and damped in a proper 2 days
place and it will not disturb the power
8.cotton gloves provided. tool handling workers also others.

6. Ensure that not individual are carrying


out jack hammer work continously. job 1 day
rotation may be implemented.

7. Training should be provided for safe


use of equipment as well as the 1 week
importance of personal protectives.

8.Reduce the exposure time of worker. 2 days

9. Interact workers to ensure that they


have any any problem, ill health situation 1 week
with vibration exposure.

Learner number: Learner name: Page 7 of 17


Material/load The operator and other 1. Operator follows the 1. supervisor and operator must ensure 3 days Project
handling equipment. persons who where at the instruction of yard supervisor. that pick and carry crane always lift safe manager(3)
place of lifting or come load for loading into the truck.
Pick and carry crane across the crane path. 2. Locations details and Safety
used in the yard for idenfication number of the 2. Inspect the yard and find incharge(2)
loading the material Obstruct the visiblity of materials are provided by the obstucles/barriers that where in the 3 days
to truck and for operator while material is supervisor. pathway and immidietly remove or Yard
material stacking in lifted and carrying too much replace it. supervisor(1, 4,
the yard. yard load will causes accidents. 3.Details of the operator, truck 5, 6, 7, 8)
consist of 6 acres Immidiate reverse driver, supervisor, helpers are 3. provide better road(uneven ground
land area where movement of the crane at registered in the log book of should be cleared) for smooth operation 2 week
different types of turning inside yard will yard. of crane and truck.
materials are cause harm to others who
stacked in various came across. 4. Locations inside the yard is 4.Proper speed limit should be
location. A seprate separately numbered and implemented inside the yard (sign 1 week
pathway is provided identification sign boards are boards should be placed showing speed
inside the yard for placed in different places so that limit)
locomotive operators can easily pick up the
movements and for spot. 5. Nylon lifting sling belt used for lifting
material shifting. load should be checked 3 days
5.material stacking details are regularly.(visually inspect and verify it
kept in records. and ensure that does not have any
damage, also ensure the load barring
6.Reverse horn, hazard light of capacity of the belt.)
the crane are working properly. 1 day
6. Special care should be taken while
7.maintenance of Pick and carry loading in to the truck. Material may slip
crane and truck is done and fall down from the truck.
periodically by a trained 3 days
mechanic. 7. Ensure good housekeeping before
leaving the yard. Changed in location of
the material should be rearranged.
2 days
8.Only allow to load the truck as per the
load capacity of the vehicle and report
to the yard supervisor when the truck
carrying the load reached the site.

Learner number: Learner name: Page 8 of 17


Slip and trip Maintenance staffs, vehicle 1.Displays are provided at 1.House keeping should be improved. 3 days Project
drivers, operators and other maintenance booth. manager(7)
Spilling of diesel and staffs who walk through the 2.Inspection carried out periodically,
oil at maintenance area chances to slip and 2.Amount of diesel kept in the Identify issues and work for improvement 1 week
area of vehicles, can causes minor injury, booth and regular maintenance such as disposal of wastages and for Maintenance
crane and other fractures etc.. work details are registered in the proper workplace arrangement. work
equipment. record book. incharge(1, 2,
3.Maintenance work is carried 3. Proper use of hand diesel pump and 2 days 3, 5, 6)
out using operation manual. PPE's

4.Regular reports are given to 4. spill kits must provided and absorbent Purchase
purchase department and the pads should be used for cleaning of oil 1 week department(4)
daily usage of diesel and oil are spills.
set and limited.
5. Supervision and monitoring of 1 day
5.Vehicle details are entered in activities.
separate log book.
6.Diesel barrels should be kept
6.Personal protective equipment separately from other tools and 1 week
such as hard gip safety shoes, equipment.
gloves and hand washing
facilities are provided. 7.5S methodology should be
implemented, which has done by,
7.Hand diesel pump is using to (a)sort
transfer fluid. (b)set in order
(c)shine
(d)standardize 1 week
(e)sustain
It gives idea about organizing a
workplace, identifying of storing items,
maintaining the area, sustaining the new
items and the employees understand
how should they can done the work in a
proper way.
Electricity Electrician, supervisor, 1.Danger signage sticker 1. Place a fire extinguisher near the 1 week Electical
other staff or employees provided panel board. engineer/super
Panel board and who operate panel board visor(1, 2, 3)11
cabling of different and maintenance 2.Seprate MCB are provided for 2. Provide training, instruction,
equipment, earthing, equipment such as water different circuit in the panel information to the employees dealing 1 week
equipment which run pump, dosing pump, blower board. with electricity.

Learner number: Learner name: Page 9 of 17


by electricity such as will likely to cause electric
water pump,dosing shock and may cause 2.Intermidiate 3pin industrial 3. Check the electrical connection
pump, for water death in worst socket and the main switch with periodically. 2 week
filter, blower for case.(electrocution) high amperage capacity(32A)
maintenance booth and RCB is provided.
station are checked.
4.Energy meter connected with
parallel circuit for knowing
regular power consuming rate.

3.Breaker switch with fuses are


given.

4.Indicating lights and operation


switches provided are adequate.

5.Armed cables(having double


insulation polyvinyl chloride
material within middle portion
steel wired armoured and after
second insulation inside which is
the electricity conducting copper
which may be solid or stranded)
provided for water pump and for
blower through cable tray which
is firmly fixed and did not
interfere anything in its pathway.

6.panel board, motor, blower are


well earthed and are well
maintained.

7.Panel board and other


electrical equipments are well
guarded and is placed far from
flammable substances.

Learner number: Learner name: Page 10 of 17


Movement of All employees on the site. 1. convex traffic safety 1.Improve road surface condition uneven 1 month Project co-
people and vehicles. mirror(road safety mirror) road surface must be repair. ordinator(1)
Over speed without installed at the entry of two way
Movement of following sign boards and road inside site premises. 2.Induction training must be given to the
different vehicles, harsh driving may leads to new employees which must includes 3 days Safety
trucks carrying load collision with pedastrians 2.sign boards are placed at instruction and information about incharge(2, 3)
to construction site. and with other vehicles. dangerous turnings and at the location, walkways, crossing etc...
over loading and different locations of the road.
overturning of the vehicles 3. Barrication provided at workplaces
may causes accident. 3.visitors vehicle parking area is and ensure that no obstacles are in the 2 weeks
Employees came across provided. pathways.
the moving vehicle may hit
and causes minor or major 4.Site speed limit is set at 15mph
injury and may leads to
death. 5.seperate site accessing entry
gate is provided for pedestrians
and vehicles.

6. Visitor's purpose details are


scribbled in the registor book and
id card is provided.

Hazardous Maintenance staffs , 1. Eye washing facilities 1.Good housekeeping must ensured. 1 week Maintenance
substances technicians who handling provided. work
with these fluid substances 2.Reduce the time of exposure and incharge(1, 2,
Use of oil, paints daily are affected. 2.Safety goggles, safety shoes adequate rest brakes should be 3 days 3, 4)
and diesel in gloves and face mask, are provided.
maintenance Skin irritation may occur provided. Safety
workshop. with continous exposure of 3.Ensure safe disposal of the hazardous 4 days incharge(5)
diesel, Also irritating to 3.Dilution ventilation provided. substance.
eyes, causes dermatitis.
also badly affect respiratory 4.half mask respirator is provided 4.contaminated cloths and equipment
system (asthma, lung while spray painting. should be kept seperately and clean in 3 days
disease) and carcinogenic. regular basis.
5.sign boards are provided at
work area. 5.Health surveillance should be
conducted. 2 week

Learner number: Learner name: Page 11 of 17


Noise Mechanics and other 1. periodic check up is carried 1. Sign board should be placed near by. 1 week Maintenance
employees working near out such as oil level, cleaning of work
Exessive sound will be affected. physical filters, dust removal, allignment 2.check the operation manual for safe 1 day incharge(1, 2,
produced from the effects while exposing for a of motor belt etc.. working method of equipment. 3)
blower/compressor prolonged period will cause
room. temporary reduction in 2. ear muff is provided. 3.Noise absorbant screen should be Safety
hearing sensitivity, fixed in the wall. 2 week incharge(4)
temporary ringing in the 3.personal protectives like face
ears, noise induced hearing mask, hand gloves etc are using 4. give instruction, information about ill
loss, tinnitus etc.. and while checkup. health effects of noise in induction. 3 days
psychological effects may
be stress, difficult 4.silencer to reduce noise is
concentrating, increased inbuilted in the blower.
errors.
5.air hose are well fitted to the
out let of the blower.

6. blower is well anchored to the


concrete floor so vibration is
less.

7. control valve implemented in


the air flowing line and pressure
gauge is also installed in the
equipment so working procedure
is more easier and comfortable
to mechanic.

8. Only operational for a limited


time.

Health ,welfare and All employers working for 1.All employees are allowed for 1. job rotation for some activities which 2 days Project
work environment. prolonged time in day time. rest brake at periodic intervals. prolonged for long time such as workers supervisor(1)
who engaged with erection.
Workers daily According to Centre for 2.adequate toilet and washing
exposure of daylight. Disease Control and facilities are provided. 2.sunscreen with an SPF(sun protection
Prevention(CDC) increase factor) of minimum 30 will be provided 2 days Safety
in temperature may result in 3.chlorinted drinking water is to employees who engaged with work at incharge(2, 3)
excessive loss of water and stored in the water tank at work height for long time.
place.

Learner number: Learner name: Page 12 of 17


salt from the body usually 3.Health surveillance program should be
by sweating. 4.filtered drinking water and cool conducted which includes activities like 2 weeks
Symptoms may be water available nearby to the checking medical records, safety
headache, weakness, site. awareness, contamination, work stress,
nausea, irritability, thirst, environmental factors etc..
decreased urine output, 5. maintenance and good
heavy sweating etc.. also housekeeping is carrying out.
sun burn, heat rash, skin
cancer, head stroke,
wrinkles are the worst
scenario.

Hazardous Employees who deals with 1.Normal face mask and other 1.N95 air purifying respirator should be 3 days Safety
substances insulation material and who relevant PPE's provided.(safety provided. incharge(1)
engaged with the cladding goggles, hand gloves etc..)
Dust process(rockwool insulation 2. Full time supervision must ensure 1 day Project
Cutting and installing sheet fixing to the pipe and 2.workplace area properly supervisor(2,
of glass fibre and tied up with wire string) and barricaded. 3.give information to workers regarding 3)
mineral wool for visitors, other staff who dust effects to our body and advice them 1 day
piping insulation came there will be affected. 3.Welfare facitilies are provided. about the importance of hygiene.
produce hazardous drinking water.
substance Inhalation of high level dust
may cause inflammation to 4. work carried out under
nasal and result in cough, supervision.
sneezing, itchy nose, throat
infection. allergic dust may
result difficulty in breathing,
chest tightness, asthma etc.
Dust also may irritant to
eyes and skin allergies.

Equipment handling Store keeper, employees, 1.Arrange material as per work 2 week Store
1. Material stacking record is well
staff who came in the store. order(example: welding related keeper(1)
maintained.
Working equipments kept separatly, grinding
equipments, welding Falling of object from the equipments such as grinding wheel,
2.provide proper labelling of
equipment, gas shelf may injured the grinding machine kept seperately.)
different objects in shelf.
cylinders used for person, inhalation of
welding, chemicals, hazardous chemicals will

Learner number: Learner name: Page 13 of 17


paint, PPE's, first cause damage to several 3.hazardous materials like 2.provide seprate provision for
aid kit, grinder etc in respiratory organs, dealing chemicals, paints are separately inflammable gas cylinders.(Do not 1 month Maintenance
the store room. with inflammable material kept. messd up with other things. Cylinders engineer(2)
such as hazardous paint, should be well chained and should
gas in improper way will 4.Material check list is available. placed in a properly fenzed cage.provide
lead to danger. a locking door for the cage and must be
5.some important material isolated.)
standards and hazardous
subtance details are displayed.

6.cctv camera installed for


surviallance.

7.only authorised person are


allowed to enter inside.

8.proper cleaning, ventilation are


provided.

Learner number: Learner name: Page 14 of 17


Part 3: Prioritise three actions and justification for the selection

You must pick the three highest priority/most urgent actions and justify your choice. Your justification must include moral, legal and financial arguments
(500 to 700 words); consideration of likelihood and probable severity of injury, ill-health and/or harm (150 to 250 words); description of how effective each
action is likely to be in controlling the risk (250 to 350 words)

The highest prioritised actions are,

1.Build a tower scaffolding tower near 2 tier structural of erection area which includes proper platform, toe board and proper handrail. Make sure access
and exit are appropriate while in emergency.(Hazard category 'work at height')

2.Purchase N-95 air purifying respiratory mask for those who dealing with rock wool insulation material.(Hazard category ' Toxic dust')

3.Provide separate provision for the storage of gas cylinders used for welding

Zenith Erectors Ltd has a policy, obligation and moral duty to ensure safety of their employees by all means. We know 'The first wealth is health.' It's our
moral and ethical reason to reduce accident, ill health and disease rate. Each and everyone in our organisation helps to achieving our goal and
they are our essential employees to fulfil it. Mental, stress, fatigue condition of an employee in a work condition with less facility will adversely
affect the work as well to the health of our workers. Injuries/ill health will create negative impact to staff morale and workers may lose the job in
some cases where the injuries may lead to a permenent disability and it will intern affect their family income too. To reduce this our organisation
must provide adiquate facility and provision to do work with in a standard health and safety management system.

Financial/economic issues faced by Zenith erectors Ltd includes work related illhealth/disease, direct and indirect cost followed by accidents(fall from height
with improper work method and avoidance of safety measures are at high alarming rate usually in construction erection work now a days.)Increased rate of
minor and major injuries causes high financial cost to the organisation which may happened by work pattern, work environment and work load. Avoidance
of certain basic safety arrangements will lead to severe consequences like fire blast occured from cumbustable material causing life threatening major
accident will be a huge financial problem to the firm. So proper equipment and provison should be allocated for safe working.

Enforcement action such as prohibition notice, warning letter would be recieved from the authority for not completing the safety requirement
അഅഅഅഅഅഅഅഅഅഅഅ with in certain time period.(sometimes not complying with safety regulation for

Learner number: Learner name: Page 15 of 17


Part 4: Review, communicate and check

You must now give a review date for your risk assessment and say why you have chosen this date (10 to 50 words).

You must now indicate how the risk assessment findings will be communicated (including who needs to know the information) (100 to 150 words).

You must now indicate how you will follow-up on the risk assessment to check that the actions have been carried out (100 to 150 words).

Learner number: Learner name: Page 16 of 17


Learner number: Learner name: Page 17 of 17