Acknowledgement
This analysis based report is done for the readers of my previous report 1MW Utility
Scale SPV Power Plant, mainly for the readers from South region of INDIA as they are
asking repeatedly about the probability and feasibility-technical & Financial-of a SPV
power plant in their region. At the same time it’s not possible for me to design a report
for each and every state from South India, so I took Chennai city. Also the previous
report was not so detail, was very basic and meant to the readers who want to get an
overview on how a utility scale power plant works. Now, in this report, I discuss about in
depth. From panel’s selection to CB sizing all are presented in very detail. Hope, this
time you get a strong knowledge on designing and estimation of 1MW solar PV power
plant. Unlike the previous report, the financial aspect discussed at the end of the paper.
In this paper, the financial assessment has done in very detail and considering the
current scenario of SPV market including the cost of solar PV modules, inverters’ cost,
cable, transformer etc. prices and the funding, interest rate. And if you
have any queries or need clarification, please contact at info@renewpowerzone.in or
amrit.mandal0191@gmail.com .
Disclaimer
The presented data here are NOT TAKEN from any copyright materials and not
showing under my name. The meteo data collected from NASA website and NREL
database which is free over the internet. Designing of PV system is totally based on
the practical experience of the author.
www.renewpowerzone.i Page 1
n
Detail Project
1MWReport p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Site consideration: this design has been done by considering the PV modules & array will be
ground-mounted and the site-elevation angle taken 30 .
Cost Estimation: 1MW Solar PV power plant cost estimation has done considering the
current PV market scenario (Sept-Dec 2013), so after few months the cost may vary
according the market.
CAD design & layout: I have not uploaded/attached the CAD design. If anybody
interested in setting up the plant then only contact at the given e-mail ids to get the
design file.
Transmission & wheeling losses: Here, in this report, while doing the technical
assessment, the distance from nearest substation to the 1MW solar PV power plant
taken within 1.5 KM and so the wheeling losses considered as 3% of total power
transmission. And in the financial assessment, no wheeling charges have been
considered.
Design Criteria: While designing & estimating the technical components & solutions, all
the required/applicable standard design codes have been considered. Mainly the IEC
(International Electrotechnical Commission) Codes, IS codes from BIS have been
considered thoroughly.
www.renewpowerzone.i Page 2
n
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Contents
1) Introduction 4
2) Project details 5
3) Location metrological details 6
4) Determination of optimum tilt angle 7
5) Solar power plant overview 8
6) Module selection & sizing 9
7) Inverter selection & sizing 11
8) Transformer selection 12
9) Other protective devices including switch gear details 13
10) Cable sizing & selection 14
11) Civil works details 16
12) Performance analysis & simulation 17
13) Timeline of the project 21
14) Operation & maintenance structure of the plant 22
15) Financial calculation, estimation of NCF, Payback period23
16) Guide on selection of various components 27
17) Conclusion 28
18) About the Author 28
www.renewpowerzone.i Page 3
n
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Introduction
India is densely populated and has high solar insolation, an ideal combination for using solar
power in India. India is already a leader in wind power generation. In the solar energy sector,
some large projects have been proposed, and a 35,000 km2 area of the Thar Desert has been
set aside for solar power projects, sufficient to generate 700 GW to 2,100 GW. Also India's
Ministry of New and Renewable Energy has released the JNNSM Phase 2 Draft Policy, by
which the Government aims to install 10GW of Solar Power and of this 10 GW target, 4 GW
would fall under the central scheme and the remaining 6 GW under various State specific
schemes.
The Electricity Act, 2003, paves way for an innovative approach to solve our country’s power
problems. It has paved the way for a competitive environment; open access to existing
transmission and distribution network to transmit electricity across regions; de-licensing of
generation, captive power and dedicated transmission lines; licensing of distribution and supply
companies and the restructuring of State Electricity Boards.
The Ministry of Power has mandated to promote cogeneration and renewable sources for
Power generation under Nodal agencies and hence it will play a major role in mainstreaming
renewable energy sector. The advantage or renewable resources includes their capacity to
produce energy without producing carbon-based warming and polluting agents into the
atmosphere. The financial cost of its applications is not always cheap but if the environmental
costs of using fossil are accounted for, renewable energy wins hands-down. There are also
indirect savings on health and its costs as there are no harmful emissions.
In the above backdrop, YOUR COMPANY NAME has decided to set up a 1/1000 MW/KW
Solar Power Plant. This Detailed Project Report (DPR) brings out all technical details and
overall costs justifying the selection of the project. The total power generation is envisaged to
be 1050KW from Solar Photovoltaic Cell. It is a very important document that is required for
Environmental Impact Assessment (EIA) studies, fixation of tariff, finalizing Power Purchase
Agreement (PPA) and also for submission to Financial Institutions for obtaining project funding.
The total project cost is expected to be Rs Crores and
the average cost of generation is expected to be Rs. 7.5/kWh (ASSUMED).
For this project, poly-crystalline technology based 3rd generation Solar PV modules will be
used. Along with this, highly efficient, photon-tested string inverters going to be integrated to
the system. These technologies are the best in the industry. So, It’s clear that our project is
not compromising with the quality of the materials and or the components which obviously led
this project to success.
www.renewpowerzone.i Page 4
n
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Client’
details
Country India
Location CHENNAI
Contact id ABC@XYZ.COM
Contact abc
Person
company ABCXYZ
Purpose Power generation &
distribution to State utility
grid
www.renewpowerzone.i Page 5
n
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Solar
7 Irradiation
6
5 Solar
Irradiation
KWh/m2/da
3
y
3
Air & earth temperature-
1 monthly
3
0
2
9
Air temperature
2
8 earth
temperature
2
2
6
7
2
5
2
4
2
3
www.renewpowerzone.i Page 6
n
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant
Optimum Tilt Angles For Solar PV Array Adjusted by Months
n
On the 21st December, the sun will rise 87° east of due south and set 87° west of due south.
On the 21st March/21st September, the sun will rise 91° east of due south and set 91° west of due
south.
On the 21st June, the sun will rise 95° east of due south and set 95° west of due south.
www.renewpowerzone.i Page 7
n
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
PlantSolar PV System Design n
System Overview
SPV Array Peak Power 1082KWp
No. of SPV strings 206
Connection of PV modules in each Series
string
Inverter 20KW MPPT based 3 phase string
Inverter
Inverter Type/Topology MPPT & Transformer Less
Total no. of Inverters 53
Strings/Inverter 4/1
Modular Components
www.renewpowerzone.i Page 8
n
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Cables
Plant
DC Side= 10 mm2
n
www.renewpowerzone.i Page 9
n
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Solar PV Module Specification & Array Sizing Details
Required Electrical Characteristics of SPV
Modules
Design criteria IEC-61853-1 Required Operating Condition
Watt Peak 250Wp Details:
Maximum System 1000V
VOC 37.20V Voltage (IEC)
VMPP 30.10V Maximum Fuse 15A
Rating
ISC 8.87A 15A
Limiting
IMPP 8.30A Reverse (-10 to 60)0C
Current
Module 15%
Operating
Efficiency/module area Temp Range
5500PA
Power Tolerance ±2% Max Static Load-
front(Snow+Wind) 2500PA
Technology Si-Poly
Max Static Load-
No. of cells 60 cells in series Rear(wind)
Model design
parameters
Required Temperature Co-efficient R 250
shunt ohm
Characteristics R shunt 2100
@ (G=0) ohm
STC R series 0.29
NOCT (oC) 45 ± 2 oC model ohm
R series 0.37
Module Efficiency (%/oC) -0.07 ± 0.01 max ohm
Temp. Co-Eff. Of Pmax -0.43 ± 0.05 R series apparent 0.47
ohm
(%/oC)
Temp. Co-Eff. Of Voc (%/oC) -0.34 ± 0.05
PV Module
Temp Co-Eff. ofIsc (%/oC)
Behavior at different
0.065± 0.05irradiance level
PV Parameters @ 1000W/m2 @800 W/m2 @ 400 W/m2
PMPP 249.8.2W 200.6 W 100.00
VOC 37.2V 36.8 V 35.8V
VMPP 30.1V 30.2 V 30.1V
ISC 8.87A 6.64A 3.55A
IMPP 8.31A 7.10A 3.33A
Module efficiency 15.54% 15.32% 15.27%
Temperature co-eff -0.43%/0C -0.43%/0C -0.44%/0C
www.renewpowerzone.i Page
n 10
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
www.renewpowerzone.i Page
n 11
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant
Detail Solar Inverter Specification & Design Details
n
www.renewpowerzone.i Page
n 12
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant
Transformer Sizing
n
Protective devices
components Specification Quantity
DC Disconnects String to inverter= 1000V, 15A; 2 206
pole (As per IEC-60947)
www.renewpowerzone.i Page
n 13
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Cable Sizing
DC Side Cables (strings to inverter)
Design criteria IEC-60811 & IEC-60216
Cable material Copper
Single cable length per string to inverter 70 ft
Cross section per string 4 mm2
Voltage drop 0.18V
Relative power loss reference to Max DC 0.07%
power
Max withstand temp. Normal condition Short-
circuited
condition
900 2500C
C
Max withstand current capacity 42KA/1sec
Conductor type Stranded
Insulation material XLPE
LT Cables (Inverters to busbur/distribution panel)
Design criteria IEC-60228 & IEC-60811
Cable material Copper
Max Single cable length per inverter to panel 60 ft
box
Cross section 16 mm2
Voltage drop (3phase) 0.46V
Relative power loss reference to Max AC 0.23%
nominal
power
Max withstand temp Normal condition Short-
circuited
condition
900 2500C
C
Max withstand current capacity 2KA/1sec
Conductor type Stranded
Insulation PVC
HT Cables (from distribution panel to feed-in point)
Design criteria IEC-60502
Cable material Al
Cable length from distribution panel to 25 ft
feed- in point
Cross section 185mm2
Voltage drop (total) L1 1.37
V
L2 1.37
V
L3 1.37
www.renewpowerzone.i Page
n 14
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant V
n
www.renewpowerzone.i Page
n 15
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Line Losses
DC Side AC Side Total
Total cable length 8120 ft 3070 ft 11180 ft
Cable cross section 4 mm2 16 mm2 +185 mm2 4 mm2 +16 mm2
+185
mm2
Power loss @ 35 KW 5 KW 40KW
nominal
operation
Relative power loss 0.07% 0.76% 0.83%
@
nominal operation
termination)
www.renewpowerzone.i Page
n 17
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
CIVIL WORKS
Live Loads estimation of control room + admin building (as per IS
875:1987)
parameters details Remarks
Roof load 1750 kg/ m2 As per IS-
456
Ground floor Control 18000kg/m As per IS-
room 2 456
load
Office 5000kg/ m2 IS-456
Piping load 50 kg/ As per IS-
m2 456
Electrical + 26 kg/ As per IS-
HVAC m2 456
Seismic load As per IS-
456
Roof drainage
Roof drain heads 6
Construction details
Interwall
Cement : Sand 1:6
Interwall 230mm
thickness
Parapet walls
Cement : Sand 1:4
thickness 115mm
Steel work Reinforced bars will be
provided as per IS
800:2007
www.renewpowerzone.i Page
n 19
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
www.renewpowerzone.i Page
n 20
Detail Project
Report 1MWp SPV Queries@ info@renewpowerzone.in
Power Plant
www.renewpowerzone.i Page
n 18
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant
Overall Power plant performance
n
Summery
Total no. of PV modules 4326 (250Wp)
Total nos. of Inverters 53 (20KW)
Max DC input per Inverter 21KW
Nominal PV power 1082 KW p
Max. PV power output 1027 KWdc
Nominal AC power 1060KWac
Max operating power @ STC 962KWac
Max operating power @Ambient 1027KWac
Temp.
Plant production 1655 MWh/year
Specific production 1526KWh/KWp/year
Normalized production 4.2 kWh/KWp/day
Array losses 0.87 KWh/Kp/day
Overall losses 0.22 KWh/KWp/day
Performance ratio 0.80
www.renewpowerzone.i Page
n 19
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Time line of the project
• Power Purchase Agreement(PPA) with private power purchaser need to be finalized at a feasible rate.
• Required time is 15 working days
PPA
• Preparation of Detailed Project Report including technical feasibility of the project prepared.
• Time required 6 working days.
DPR
• Arrangement of finance/fund for the project from nationalized or private financing agency with significant
interest rate and equity share will be finalized.
financ • Required time for this stage is 1 month.
e
• After finalizing PPA and arrangement of fund for the project, procurement work starts including preparation &
finalizing of vendor selection, BOM, BOQ, order placing, follow-ups of delivery to site/warehouse.
procureme • Estimated time for this step is 1 month.
nt
• After the processing of procurement, first civil construction at the site starts for PV mounting structure set-up and
control-room, administrative building. Finishing the civil works, PV installation & all electrical construction works
including the Grid Evacuation will be processed.
constructi n • Estimated time for this whole work is 2 months.
o
• Commissioning of the plant by authorized govt. body or certified 3 rd party will be done followed by Completion
of project execution.
commiss n • required time for this step is 6 working days.
io
ing
www.renewpowerzone.i Page
n 20
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Operation & Maintenance of Plant
Why do we need an O&M for Solar PV power plant?
As every plant needs a regular maintenance work to make it functional & in well-
condition, so in this case also, a PV power plant also requires a sound & efficient
operation & management team to perform all the work after plant commissioning.
A detailed structure of O&M team has been provided here in a hierarchy model to
demonstrate in a simpler way.
operatio
Plant n
manager manage
r
maintenanc
Maintenance e Supply Account
engineer(E&I chain s
Engineer
E) (Mech) executive executiv
e
control
Technician Technician room Skilled skilled
1 2 technician labour1 labour2
skilled skilled
labour1 labour2
www.renewpowerzone.i Page
n 21
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Financial Analysis & feasibility
Initial Investment in terms of components’ cost & service charges
Total expenses over the year for plant O&M and staffing = 2,000,000
This expense is considered for regular maintenance cleaning of PV array, checking the
status of inverter, cable-fault checking, emergency maintenance & replacement of
components and annual salaries of O&M team of the plant.
Loan Interest rate is @12% over 70% of total project cost which shall be completed
within next 7 years (the rest 30% as equity shares).
www.renewpowerzone.i Page
n 22
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Detailed Analysis of Installment, EMI, Interest of the 70%
project
finance/fund
Sl. Installments EMI Monthly principle Monthly Interest
No.
1) 0 0 0 0
2) 1 876,105 379,805 496,300
3) 2 876,105 383,603 492,502
4) 3 876,105 387,439 488,666
5) 4 876,105 391,314 484,792
6) 5 876,105 395,227 480,878
7) 6 876,105 399,179 476,926
8) 7 876,105 403,171 472,934
9) 8 876,105 407,203 468,903
10) 9 876,105 411,275 464,831
11) 10 876,105 415,387 460,718
12) 11 876,105 419,541 456,564
13) 12 876,105 423,737 452,369
14) 13 876,105 427,974 448,131
15) 14 876,105 432,254 443,851
16) 15 876,105 436,576 439,529
17) 16 876,105 440,942 435,163
18) 17 876,105 445,351 430,754
19) 18 876,105 449,805 426,300
20) 19 876,105 454,303 421,802
21) 20 876,105 458,846 417,259
22) 21 876,105 463,434 412,671
23) 22 876,105 468,069 408,036
24) 23 876,105 472,749 403,356
25) 24 876,105 477,477 398,628
26) 25 876,105 482,252 393,853
27) 26 876,105 487,074 389,031
28) 27 876,105 491,945 384,160
29) 28 876,105 496,864 379,241
30) 29 876,105 501,833 374,272
31) 30 876,105 506,851 369,254
32) 31 876,105 511,920 364,185
33) 32 876,105 517,039 359,066
34) 33 876,105 522,210 353,896
35) 34 876,105 527,432 348,674
36) 35 876,105 532,706 343,399
37) 36 876,105 538,033 338,072
38) 37 876,105 543,413 332,692
39) 38 876,105 548,847 327,258
40) 39 876,105 554,336 321,769
www.renewpowerzone.i Page
n 23
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
41)
Plant
40 876,105 559,879 316,226
n
www.renewpowerzone.i Page
n 24
Detail Project
Report 1MWp SPV Queries@ info@renewpowerzo
ne.i
n
100000
Power Plant
0
90000
0
80000
0
70000 Installment
0
EMI
60000 Monthly
0
Principle
50000
30000 Monthly Interest
0 0
40000
20000
0 0
10000
0
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76
79 82 85
0
www.renewpowerzone.i Page
n 25
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant
NET CASH FLOW & PAY BACK PERIOD
n
www.renewpowerzone.i Page
n 26
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
SCADA/RMS 1. Draker
Cables 1. Havells
2. Finolex cables
3. RR Kabels
4. Anchors
Isolator 1. ABB
2. Schneider Electric
3. Megawin
www.renewpowerzone.i Page
n 27
Detail Project
Report
1MW p SPV Power Queries@ info@renewpowerzo
ne.i
Plant n
Conclusion
I’d like to thank you for reading the whole paper. Hope you have got clear view on
design & estimation of 1MW utility scale Solar PV Power Plant. Though I have
discussed about the technical part as well as the financial part in detail, I might have
been forgot to add anything more important. So, you are most welcome to give your
valuable feedback & suggestion on this report. At the end, I discussed about some
companies for the components. I have chosen these companies because their products
are fulfilling my design criteria. It is not that I’m representing these companies and their
products.
About Myself: I’m a Solar PV professional currently working with a solar EPC company
as Project Engineer. I’ve done B.Tech in Electrical Engineering & holding a PG
certificate in Advanced Solar Energy from delft Technical University, Netherlands.
Personally I provide technical consulting including site survey, technical design, CAD
design, preparation of DPR, guide in procurement & Construction.
Read solar PV related articles & learn about new technologies at- www.renewpowerzone.in
THANK YOU