NOTE PE PLAN

CONDITII MINIME PENTRU CARE COMPARTIMENTUL DE INCEDNIU ESTE INCADRAT IN GRADUL II DE


PASARELA TRANSPORT MARFA DEPOZIT HIGH-BAY REZISTENTA LA FOC:
PRODUCT DELIVERY BRIDGE HIGHBAY WAREHOUSE
· stalpi, coloane pereti portanti - clasa de combustibilitate C0 cu rezistenta la foc 120 minute;
· pereti interiori neportanti - clasa de combustibilitate C1 cu rezistenta la foc 30 minute;
· pereti exteriori neportanti - clasa de combustibilitate C1 cu rezistenta la foc 15 minute;
CLADIRE SOCIALA - CLADIRE TEHNICA ZONA LIVRARE · grinzi, plansee, nervuri, acoperisuri terasa - clasa de combustibilitate C0 cu rezistenta la foc 45 minute;
SOCIAL - TECHNICAL MARSHALLING · acoperisuri autoportante fara pod (inclusiv contravantuirile), sarpanata acoperisurilor fara pod - C1 cu
rezistenta la foc 30 minute;
· panouri de invelitoare si suportul continuu al invelitorii combustibile - clasa de combustibilitate C1.

PERETE ANTIFOC
· peretele antifoc va fi realizat integral din componente cu clasa de reactie la foc C0/A1/A2s1d0;
· toate elementele componente ale peretelui vor avea rezistenta la foc a peretelui antifoc;
3140,5 1394 7665 303 · pentru realizarea peretelui antifoc se vor folosi solutii si detalii speciale recomandate de catre furnizorul de

B
67,5 232,5 45 692 635 800 635 33,5 41,5 570 469 201 112,5 45,5 7574 45,5 303 sistem care va verifica si garanta executia corecta a peretelui;
Scara acces acoperis · structura din beton de care se fixeaza peretele va avea rezistenta la foc a peretelui antifoc;
Receptor de atic cu burlan ø110, intrare in burlan cu preaplin · rosturile dintre peretii antifoc si pereti interiori si/sau exteriori, acoperis se etanseaza cu materiale cu clasa de
entrance to the roof: ladder with safecage
burlan pluviala burlan pluviala roof outlet with a downspout ø110 with emergency outlet reactie la foc C0/A1/A2s1d0 si care sa asigure o rezistenta la foc cel putin 90 minute;
substructure according to the construction · golurile din jurul elementelor metalice care stapung peretele antifoc se vor realiza astfel incat sa permita
downspout ø90 downspout ø90 execution design dilatarea acestora si se etanseaza cu materiale din clasa de reactie la foc C0/A1/A2s1d0 rezistente la foc 90
R1 R2 R3 R4 R5 R6 R7 1 2 3' 3 H1 H2 minute;
· spatiile libere din jurul conductelor, cablurilor si conductoarelor electrice (inclusiv cele pozate in canale) se

39,55
inchid cu materiale C0/A1/A2s1d0 cu rezistenta la foc egala cu cea a peretelui;
gutter ø100 gutter ø100 gutter ø100 gutter ø100

39,55
· la trecerea canalelor de ventilare (daca este cazul) se vor respecta prescriptiile din normativ.

9,12

45,5
54

HB
37,5
65

65
RC

CONDITII GENERALE

39,72

39,72
· elementele de constructie cu rol de protectie la foc vor fi executate conform cu prescriptiile producatorului
3% 3% care va furniza detaliile de executie si va verifica si garanta executia corecta a peretelui;

PLACA
Scara tehnica acces pe acoperis
Pasarela cu balustrada

13x17,2
PL

technical staircase - access to roof NOTA:


306,5

AC

crossover bridge with handrails 1,1m high

27
/ CEILIN
acc. to detailed design - PL G.C. Informatiile referitoare la performantele privind "securitatea la incendiu" ale cladirii sunt detaliate in
A

acc. to detailed design - PL G.C.


/C

39,55
9,55
SCENARIU DE SECURITATE LA INCENDIU, parte integranta a documentatiilor de
EIL
I

G - C0
NG

13x17,2
execiutie/avizare/autorizare (proiect tehnic, DTAC, detalii de executie), unde sunt detaliate toate elementele

slab without holes and the hidro must be protected by a cement armed layer (C0 material)
10%
-C

27
de conformare la foc ale constructiei (pereti, plansee, grinzi, scari etc). Atat Partile scrise cat si Partile
0/A

/A1
1
RB

desenate aferente spacialitatii Arhitectura se vor citi obligatoriu impreuna cu Scenariu de securitate la
732

zona demontabila pentru acces la macara


:R

: REI 6
682,5
EI

667
service opening for stacker crane incendiu (stamplilat spre neschimbare de catre avizator ISU). Executantul are obligatia sa cunoasca atat
60

placă fără găuri iar hidro trebuie protejat de un strat armat cu ciment (material C0)

38,00
SISTEM ANCORAJ IMPOTRIVA CADERII coloane sistem refrigerare conf. proiect instalatii partea desenata si scrisa necesara executie cat si Scenariu de securitate la incendiu.

3%
:m

marimea si localizarea conf. proiect logiscica si

0 : min
in 6

FALL ARREST SYSTEM piping for Refrigeration engineering acc. to PF conf. furnizor macara / size and localisation acc.
3140,5 1247,5 77,5
.00

69 54 7557 54
m

to PL G.C. and stacker crane supplier NOTES ON THE PLAN

6.00m
306

INVELITOARE PANOURI
MINIMUM CONDITIONS FOR WHICH THE INQUIRY COMPARTMENT IS CONTAINED IN THE SECOND DEGREE
TERMOIZOLANTE Echipament climatizare OF RESISTANCE TO FIRE:
SISTEM ANCORAJ IMPOTRIVA CADERII
CLASA - C0/A1- REI 60 Evaporativ condenser acc. to PF
DIMENSIONS wrong direction

9,12
RA

FALL ARREST SYSTEM · Pillars, columns bearing walls - fuel class C0 with fire resistance 120 minutes;
54,5

· Non-load-bearing interior walls - fuel grade C1 with 30 minutes fire resistance;

5,5
· External non-loadable walls - fuel grade C1 with 15 minutes fire resistance;

J
ZONA TEHNICA REFRIGERARE
REFRIGERATION MACHINERY
· Beams, planes, ribs, terrace roofs - fuel class C0 with fire resistance 45 minutes;
· Self-supporting roofs without bridge (incl. Overhangs), roofless roofless roofing - C1 with fire resistance 30
minutes;
Structura suport Unitate exterioara clima · Cladding panels and continuous fuel cell support - Fuel grade C1.
sub-construction for Evaporativ condenser is in scope of GC acc. to guidlines from equipment supplier
· ANTI-FIRE WALL
· The fire wall shall be entirely made of components with the fire reaction class C0 / A1 / A2s1d0;

HIGHBAY WAREHOUSE
· All wall elements will have fire resistance on the fire wall;

DEPOZIT HIGH-BAY
ZONA TEHNICA · For the firewall design, special solutions and specials recommended by the system vendor will be used to
check and guarantee the proper wall construction;
TEHNICAL AREA INVELITOARE MEMBRANA HIDROIZOLANTA INVELITOARE MEMBRANA HIDROIZOLANTA INVELITOARE MEMBRANA HIDROIZOLANTA
zona demontabila pentru acces la macara

5%

5%

5%

5%
· The concrete structure to which the wall is fixed will have fire resistance of the fire wall;

2157

2174
2265

2265
Evacuare aer camera refrigerare service opening for stacker crane
· The joints between the fire walls and the inner and / or outer walls, the roof is sealed with materials with the
PRODUCTION BUILDING acc. to drawings:

PE SUPORT CONTINUU (TABLA TRAPEZOIDALA+ VATA PE SUPORT CONTINUU (TABLA TRAPEZOIDALA+ VATA PE SUPORT CONTINUU (TABLA TRAPEZOIDALA+ VATA marimea si localizarea conf. proiect logiscica si
FLOOR LAYOUT and LI_BAK_AP_TD_01

Refrigeration engineering exhaust acc. to PF reaction class C0 / A1 / A2s1d0 and which provide a fire resistance of at least 90 minutes;
conf. furnizor macara / size and localisation acc.
LI_PAS_AP_TD_01 PASTRY GROUND

MINERALA RIGIDA) CLASA C1 MINERALA RIGIDA) CLASA C1 MINERALA RIGIDA) CLASA C1 to PL G.C. and stacker crane supplier
· The gaps around the metallic elements that stand against the fire wall shall be designed so as to allow their
BAKERY GROUND FLOOR LAYOUT

expansion and shall be sealed with materials from the fire resistance class C0 / A1 / A2s1d0 resistant to fire for 90
COMPARTIMENT: C3
minutes;

1100
TIPUL CLADIRII: PRODUCTIE/DEPOZITARE
PRODUCTION BUILDING (PASTRY AND BAKERY)

· The free spaces around the pipes, cables and conductors (including those in the channels) are closed with
REGIM INALTIME: P+1
ARIA CONSTRUITA: Ac=530mp
A C0 / A1 / A2s1d0 materials with fire resistance equal to that of the wall;
· When passing ventilation ducts (if applicable) the prescriptions should be observed.

ARIA CONSTUITA DESFASURATA: Acd=530+750 = 1280mp GENERAL CONDITIONS


SISTEM ANCORAJ IMPOTRIVA CADERII
VOLUMUL: V=2120+3000= 5120mc FALL ARREST SYSTEM 600 · Fire protection building elements will be executed according to the manufacturer's prescriptions that will
GRADUL DE REZISTENTA LA FOC: II provide the execution details and will verify and guarantee the correct execution of the wall;

2%
Receptor terasa - urgenta Receptor terasa
CATEGORIA DE PERICOL DE INCENDIU: C emergency vacuum inlet NOTE:
vacuum inlet Receptor de atic cu burlan ø110, intrare in burlan cu preaplin Receptor de atic cu burlan ø110, intrare in burlan cu preaplin Receptor de atic cu burlan ø110, intrare in burlan cu preaplin Receptor de atic cu burlan ø110, intrare in burlan cu preaplin Receptor de atic cu burlan ø110, intrare in burlan cu preaplin
DENSITATEA SARCINII TERMICE: qi < 420 MJ/mp Information on the "fire safety" performance of the building is detailed in the FIRE SAFETY SCENARIO, an integral
roof outlet with a downspout ø110 - outlet basket with emergency overflow roof outlet with a downspout ø110 - outlet basket with emergency overflow roof outlet with a downspout ø110 - outlet basket with emergency overflow roof outlet with a downspout ø110 - outlet basket with emergency overflow roof outlet with a downspout ø110 - outlet basket with emergency overflow
part of the Executing / Approval / Authorization Documents (Technical Design, DTAC, Execution Details), where all
Evacuare aer camera refrigerare Sistem pluvial incalzit electric / Roof outlet with heating cable Sistem pluvial incalzit electric / Roof outlet with heating cable Sistem pluvial incalzit electric / Roof outlet with heating cable Sistem pluvial incalzit electric / Roof outlet with heating cable Roof
Sistemoutlet
pluvial
withincalzit
heatingelectric
cable/ Roof outlet with heating cable
the Compliance Components are detailed building fire (walls, planes, beams, stairs, etc.). Both the Written Parts and
Refrigeration engineering exhaust the Architectural Space Parts will be read together with the Fire Safety Scenario (stamped unchanged by the ISU
Fire compartment : C3 Advisor). The Executor has the obligation to know both the written and written part of the required execution and the
SISTEM ANCORAJ IMPOTRIVA CADERII
Building type: production / deposit Evacuare aer camera refrigerare Fire Safety Scenario.
FALL ARREST SYSTEM
Refrigeration engineering exhaust
Height regime: P+1 zona demontabila pentru acces la macara
3%
I

Built area: Ac=530mp 3% service opening for stacker crane


marimea si localizarea conf. proiect logiscica si
Total Built area: Acd=530+750 = 1280mp conf. furnizor macara / size and localisation acc.
Volume : V=2120+3000= 5120mc to PL G.C. and stacker crane supplier
RANK OF RESISTANCE TO FIRE: II A
FIRE DANGER CATEGORY: C
Tubulatura ventilatie
FIRE LOAD DENSITY : qi <420 MJ /mp ventilation duct acc. to PIV
3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3%

2%

39,55

39,55

HA
750

45,5
54
SISTEM ANCORAJ IMPOTRIVA CADERII rezerva - Echipament climatizare
FALL ARREST SYSTEM reserve for extension - Kondensator

175
MB
9,55
Unitate exterioara AC
air conditionning unit acc. to PIV

Step over access


H

Pasarela trecere

9,55
Tubulatura ventilatie Pasarela trecere
ventilation duct acc. to PIV access in between the buildings ZONA LIVRARE + DEPOZIT HIGHBAY
substructure according to the construction execution design
MARSHALLING AREA + HIGHBAY
Tubulatura ventilatie
CLADIRE TEHNICA

550

ventilation duct acc. to PIV


Unitate exterioara AC COMPARTIMENT: C5
TECHNICAL

air conditionning unit acc. to PIV TIPUL CLADIRII: PRODUCTIE/DEPOZITARE


REGIM INALTIME: P
D Platforma mentenanta cu balustrada 1,10m
service platform with reiling 1,10m;
SISTEM ANCORAJ IMPOTRIVA CADERII
FALL ARREST SYSTEM
ARIA CONSTRUITA: Ac=2760mp
ARIA CONSTUITA DESFASURATA: Acd=2760mp
PT-DDE in scopul GC, in conf. cu specificatiile furnizorului
detail design in scope of G.C. executive design acc to supplier specifications VOLUMUL: V=76706mc
G

Echipament climatizare
GRADUL DE REZISTENTA LA FOC: II
Echipament climatizare INVELITOARE MEMBRANA HIDROIZOLANTA CATEGORIA DE PERICOL DE INCENDIU: E
ventilation unit
ventilation unit acc to PIV

2%
PE SUPORT CONTINUU (TABLA TRAPEZOIDALA+ VATA DENSITATEA SARCINII TERMICE: qi= 15 MJ/mp
6473

Receptor terasa - urgenta MINERALA RIGIDA) CLASA C1


emergency vacuum inlet D ADDITIONAL REMARKS:
450

Platforma mentenanta cu balustrada 1,10m 1. Fall arrest system on each building must be designed at the executive design stage in accordance with the guides
service platform with reiling 1,10m; of the selected supplier. For High-bay warehouse it is necessary to provide also roof fixed anchorage points to

2377
Ventilator evacuare fum Receptor terasa PT-DDE in scopul GC, in conf. cu ensure possibility of maintenance works on building elevation .

2436
smoke extract fan

3%

3%

3%
vacuum inlet specificatiile furnizorului 2. System of roof dreinage for High-bay warehouse and Marshaling building needs to be recalculated according to
Fire compartment : C5
ZONA LIVRARE MARSHALLING

detail design in scope of G.C. executive guides of selected supplier and romanian regulations.

2205
3% 3% design acc to supplier specifications Building type: production / deposit
OBSERVATII (NOTE PE PLAN):
Height regime: P (ground)
F

SISTEM ANCORAJ IMPOTRIVA CADERII 1. Sistemul de ancoraj impotriva caderii, de pe toate cladirile) se va proiecta la faza PT-DDE in conformitate cu
FALL ARREST SYSTEM
Built area: Ac=2760mp legislatia in vigoare si conf. furnizorului de echipament. Pentru depozitul High-Bay va fi prevazut sistem de
69 1247,5 132,5 3599,5 56,5 Total Built area: Acd=2760mp ancoraj ( puncte de ancoraj) pentru posibilitatea mentenantei si a eventualelor reparatii la fatadele cladirii.
entrance glass canopy

Volume : V=76706mc 2. Sistemul de scurgere a apelor pluviale pentru depozitu High-bay si pentru zona de livrare se va recalcula in
3%

Tubulatura ventilatie conformitate cu legislatia in vigoare si conf. specificatiilor furnizorului.


ventilation duct acc. to PIV RANK OF RESISTANCE TO FIRE: II
FIRE DANGER CATEGORY: E
REMARKS:
FIRE LOAD DENSITY : qi ≈ 15MJ/mp
540

1. The site is located in the seismic area described by the ground acceleration ag=0,20g and corner period Tc=0,7 s,
according to P100-1/2013.
Step over access 2. Tender design documentation contains information for tender purpose only. It can not be used to conduct execution
Pasarela trecere works. Before execution, drawings must be multidisciplinary recoordinated.
Pasarela trecere 3. This documentation is protected by International Copyright Law. It is forbidden to distribute this study and the parts
Step over access in between the buildings thereof outside the scope of distribution specified in the agreement with the designer, to store this study in database
9,12

systems without the author's permission, to transfer this study in any form, including electronic copies, photocopies and
reproductions, and to introduce any changes to this study without the consent of the author.
E E'

4. Building systems and materials trade names used in the project are not mandatory. It is acceptable to use equivalent
solutions and technology. Prior to committing to alternative solution GC is required to submit data sheets, drawings and
documents for relevant replacements confirming solution equivalency and request and obtain DESIGNER's and
CLIENT's approval.
280

5. As far as fire safety is concerned it is mandatory to follow Romanian Fire Regulations (They are followed the "Fire
SISTEM ANCORAJ IMPOTRIVA CADERII
C C FALL ARREST SYSTEM
safetyNorms for buildingsP118-99"), but protection is to be no lower than marked on the drawings. All expansion joints
and connections in walls made of different technologies in the fire separation area must be sealed using approved
solutions. It is recommended to pay attention to the connection of non-bearing walls to the ceiling above.
6. All dimensions are to be verified in Execution Design and on site by the General Contractor prior to ordering
159 elements that are to be mounted.
Gargui de urgenta 7. Brick and reinforced concrete walls joints or brick walls disjointed with each other must be sealed with flexible mass such
Gargui de urgenta Gargui de urgenta e.g. acrylic.
roof outlet with a downspout ø160 - outlet basket with emergency overflow
670

roof outlet with a downspout ø160 - outlet basket with emergency overflow roof outlet with a downspout ø160 - outlet basket with emergency overflow 8. Openings in reinforced concrete elements (floors, walls) must be made according to the Structural Execution Design
Sistem pluvial incalzit electric / Roof outlet with heating cable Sistem pluvial incalzit electric / Roof outlet with heating cable Sistem pluvial incalzit electric / Roof outlet with heating cable drawings. Only openings of 100mm diameter or less may be done by drilling, all remaining openings are to be prepared
in formwork.
3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 9. Penetrations and openings in the walls and ceilings of the fire separation must be sealed to the EI resistance of the
partition, higher or equal to EI60.

MA
9,55
10. All technological and installation openings in structural elements are to be adjusted and coordinated by GC in Execution
Design, after the selection of supplier, according to manufacturer specifications of relevant equipment .

59

56
11. Door and window openings are given in gross size (rough openings), installation openings in architectural drawings are
given in rough size and located by geometric axis. Please refer to discipline designs for net dimensions.
109

12. The project defines the windows openings dimensions according to following rules:
· above the line: horizontal dimension of the rough opening
D

· below the line: the vertical dimension of the rough opening


Trapa evacuare fum · below the opening: sill finishing level height to the floor finishing near the wall.
364,5

smoke exhaust flap 130x180 (Smoke extraction active area 1,45m2) In case of doubt, ask the designer to clarify the project purpose on the building site.
389

406,5
gutter ø90

gutter ø90

gutter ø90

gutter ø90

gutter ø90

gutter ø90

431
13. Before placing an order for door and window joinery, the GC is required to verify opening dimensions on site and assure
8% 10% 10% 10% doors and windows of required net clear width and height can be mounted. If any discrepancy is discovered between the
280
2%

10% 10% project and the actual state, the GC is required to notify the CLIENT and Metroplan.
14. Before placing an order for building materials, finishing and equipment, which are to be used for construction, the GC is
required to request and obtain CLIENT's approval.
15. Supporting structures for technical equipment must be prepared strictly according to the device manufacturer
24,5

guidelines.
600

24,5
16. The space between the electrical meter boxes and the ceiling on the ground floor level should be enclosed in the
SISTEM ANCORAJ IMPOTRIVA CADERII Unitate exterioara AC plasterboard system.
CLADIRE SOCIALA

Receptor terasa air conditionning unit acc. to PIV


SOCIAL - OFFICE

FALL ARREST SYSTEM 17. The openings of ventilation ducts should be extended 5 cm on each side. The angle iron must be attached to the steel
vacuum inlet 126 545 127 449 79 96 449 127 449 79 92 449 131 449 135
ceilings to protect the opening.
Receptor terasa - urgenta
320

18. GC is required to deliver immovable equipment and fixed furniture of kitchenette and lockers in lockers rooms. Movable
emergency vacuum inlet equipment, like office furniture, is outside the scope of GC contract.
19. Locations and size of all shafts and roof perforations are indicative. The GC is responsible for the collision coordination
in all disciplines before erection. All costs must be included in bid.
3% 20. All openings, sizes and dimensions of technological equipment and ductwork are indicative only. Buffers for
3% technological installations are to be prepared. Coordination between technological, TB installations and structural
C

elements is solely in General Contractors scope of Executive Design and responsibility and subject to Investors
Tubulaturi ventilatie approval. All costs related are to be included in tender bid.
21. During execution openings and sillings for technological instalations are to be made acc. to technology supplier
Echipament climatizare ventilation duct acc. to PIV
guidelines. And where located in fire partitions acc. to relevant Romanian fire protection regulations.
ventilation unit Platforma mentenanta cu balustrada 1,10m 22. Lightning protection acc. to electrical documentation.

1764
23. Service paths and walkways on the roof is to be provided to all roof mounted equipment acc. to specification in
service platform with reiling 1,10m;
Performance Description Part C. Prior to construction GC is required to present pathway layout and request CLIENTS
PT-DDE in scopul GC, in conf. cu specificatiile furnizorului
approval
in scope of G.C. executive design acc to supplier specifications 24. Location , safety barriers, bumpers and safety bollards is indicative. Exact location should protect all TBA equipment
and building components which might be exposed to mechanical damage during building use.
600

600

25. The rain water roof drainage and catchment areas dimensions and size, are to be adjusted according to the relevant
instalation Execution Design. The position and dimensioning of inlets and other relevant equipment are to be adjusted
1375

1333
in GC Execution Design after the selection of supplier, according to manufacturers specifications.
26. Architectural drawings are to be considered together with descriptions and other branch designs.
B

Platforma mentenanta cu balustrada 1,10m


2%

Echipament climatizare service platform with reiling 1,10m;


ventilation unit PT-DDE in scopul GC, in conf. cu specificatiile furnizorului
in scope of G.C. executive design acc to supplier specifications
9,12

440
460

9,12
9,12
A

15

INCUBATOR BUILDING
33

9,12

INCUBATOR BUILDING: acc. to DRAWING KEY:


CLADIRE INCUBATOR + BIROURI DIN HIGHBAY LI_INC_AP_TD_03 'INCUBATOR Designed floor level
INCUBATOR BUILDING + OFFICE IN HB OFFICE ROOF LAYOUT' +6,00 Designed level of parapet wall
leb Lower edge of the beam
N
+6,00

44 570 670 44 123,5 1200 1200 1200 56 3908,5 45,5 A Section line
COMPARTIMENT: C6
1328 3779,5 3954 Axis name
TIPUL CLADIRII: CIVILA

G
REGIM INALTIME: P+1 1% Slope angle tangent by % GENERAL REMARK:
ARIA CONSTRUITA: Ac=233mp+315mp= 548mp These drawing is for Refrigeration Functional Tender purposes only.
9,12

ARIA CONSTUITA DESFASURATA: Acd=466mp+630mp=1096mp Reinforced membrane service walkway Drawing shows only the functional layout of the building. Detailed solutions will be defined in further design stages.
Please do not consider the drawing as a final version.
VOLUMUL: V=1922mc+2600mc= 3696mc
Service platform acc. to GENERAL DESIGNER
GRADUL DE REZISTENTA LA FOC: II execution design INWESTOR

RISCUL DE INCENDIU: RISC MIC DE INCEDIU External ladder with


protective basket ul. Skarbowców 23a, bud. A1
DENSITATEA SARCINII TERMICE: qi<420MJ/mp 53 - 025 Wrocław
2%

Poland
Passage over the attic tel: +48 (0) 71 786 41 12
www.metroplan.com.pl

Fire compartment : C6 Roof vacuum inlets


DESIGN TEAM BUILDING QUALIFICATIONS NO. SIGNATURE
Building type: CIVIL Roof safety measures
Height regime: P+1 1 2 3 4 5 6 7 H2 MAIN DESIGNER:
Emergancy overflow arch. SWERHUN-BIENIEK Aleksandra -

ARCHITECTURE
Built area: Ac=233mp+315mp= 548mp
VERIFING DESIGNER:
Total Built area: Acd=466mp+630mp=1096mp arch. DROGA Barbara -
Volume : V=1922mc+2600mc= 3696mc Smoke extract fan
DESIGNER:
RANK OF RESISTANCE TO FIRE: II arch. HRISULIDIS Kostas -
FIRE RISK: SMALL FIRE RISK 3% 3% Smoke exhaust flap DATE
B

FIRE LOAD DENSITY : qi < 420MJ/mp ACCORDING TO:


G.C. GENERAL CONTRACTOR
PROJECT

PIV PROJECT'S VENTILATION INSTALATION DOCUMENTATION MEP instalations acc. to NEW PLANT AND WAREHOUSE FOR CONTROLLED TEMPERATURE
PC PROJECT'S CONSTRUCTION DOCUMENTATION PIV, PIS and PE PRODUCTS IN THE REGION OF TULCEA, ROMANIA 06.2019
PIS PROJECT'S SANITARY INSTALATION DOCUMENTATION
PE PROJECT'S ELECTRIC INSTALATION DOCUMENTATION Roof outlet with
external downpipe
PIT PROJECT'S TELETECHNIC INSTALATION DOCUMENTATION CLIENT LIDAS SRL
PR PROJECT'S ROAD DOCUMENTATION Mineri, Brailei Street 28; 827211 Tulcea, Romania DRAWING SCALE
PF PROJECT'S INSTALLATION OF FREEZ DOCUMENTATION
refrigeration piping on sub-construction - indicative layout, finall
PL PROJECT'S LOGISTICS DOCUMENTATION DRAWING HIGH-BAY
solution acc. to PF G.C. The GC is responsible for the collision
coordination before erection. All costs must be included in bid. The ROOF LAYOUT 1:100
2%

final loads from the installation and the sub-constructions must be STAGE REFRIGERATION FUNCTIONAL TENDER
taken into account in the calculation for the structure

PF scope INVESTMENT ADDRESS COM. FRECATEI , DRAWING NO.


INTRAVILAN SAT CATALOI,
JUDETUL TULCEA , T44, A705,L659,A703
NR. CADASTRAL 35121, 35122, 35123
LI_HBY_AP_TD_03r