VISAKHAPATNAM PORT TRUST

ENGINEERING DEPARTMENT
==

No.of this Certificate:CCXXV&PartSub-Division: AE(Env)Division: E.E(Env)

Name of work : Comprehensive Environmental Management System for Civil works


for a Period of 2years.

Name of Contractor: M/s.SriPavaniConstructionswithJVpartner of Sri K Koteswara Reddy

Authority ofwork:W.O.No;26(CP)/EE(East) of 2015-2016; Dt:02-07-2015.

No. of last certificate granted for this work: CC-XXIV& Part

Total quantity of work executed up to: Work is in progress up to 31.12.2017.

TI Unit Quantity Quantity Item Rate Amount


No. executed executed Upto
since last upto date Since
certificate as per Date
last
measure-
ment Certificate

1. 2. 3. 4. 5. 6. 7. 8.

1. 1 km Keep clean the port operational roads by sweeping


manually 3days in a week and in 1 shift in a day zone
wise having and in a day zone wise having 8kms length
of roads covering on area 80000M2 including cleaning
scraping of muck mounds etc., if any on the road/road
margins beams , foot paths cross drains by engaging a
minimum of 52 nos of workers and 2nos of supervisors
for 8km length of road and removing unwanted
vegetations on berms collection of debris spill over
materials dust rubbish over burden materials etc with
necessary tools and plants etc., as required and as
directed by the Engineer in charge complete. All labour
and materials.
- 6691.10 2750.75 18405543.32

193.05 193.05 3025.82 584134.55 584134.55


2. 1m3 Transportation of debris /sweeped materials up to a
lead of 5km including loading unloading and stacking
and leveling at the place of unloading etc., as required
and as directed by the EIC complete. All labour and
materials.

123.97

3. . Plain cement Concrete M20 mix(using 320kgs cement


per m3 of finished concrete using 12mm graded granite
metal of approved quality as coarse aggregate and river
sand as fine aggregate including mixing depositing in
position vibrating or tamping, finishing, curing etc., as
required and as directed by the Engineer-in-charge
complete. All labour and materials.

0.00

4. Sweeping (dust/muck/spilled cargo either in dry or wet


condition) the identified roads of Vishakhapatnam port
trust i.e for a total length of about 17.0kms and an
average width about 9.8 mtrs. Covering entire area in a
day by using mechanical sweeping machines to keep
the identified the roads in dust free condition including
hire charges of machines cost of fuel, consumables like
brushes, oil, lubricants, 5liters major and minor repairs
to the machine etc., and payments of salaries to the
same at a place shown by the port including all
labour/staff/equipment and materials etc., and as
directed by the Engineer-in-charge complete

0.00
5. Desiltation of drains including removing silt slush
pebbles.Garbage iron ore, iron ore fines etc., including
removing the sand from under water if existing within a
lead of 10M and lift of 2M and transportation of the same
after drying upto 4kmand leveling the same etc., as
required and as directed by the Engineer-in-charge
complete. All labour and materials
0.00

6. 1 m3 Desiltation of drains using excavator (EX-200) or


equivalent machinery for removing silt /slush/pebbles
,garbage, floating materials etc including sand under or
above water in the drains/Geddas (slurry/marine clay
soil to the drain bed) within a lead of 30m and lift up to
4.00 as directed by the engineer-in-charge, the rates
inclusive of the machinery including fuel, transportation
of equipment to the site of work and idle charges etc., as
required and as directed by the engineer-in-charge
complete. All labour and materials.

45013.22 32.00 1440423.04

1525.78 1525.78 35.20 53707.46 53707.46

7. 1 m3 Desiltation of drains including removing silt, slush


pebbles, garbage, iron ore fines etc; including removing
sand from under water if existing within a lead of 10m
and lift of 2m and transportation of 10m and lift of 2m
and transportation of the same after drying up to1/2 km
and leveling the same etc., as required and as directed
by the Engineer-in-charge. Alllabour andmaterials.

302.00
8. 1 Supplying and fixing of fishnet with 2mm thick nylon
m2 rope and 46mm aperture at site of work as required
include tying with rope at upstream and downstream
side of culvert etc., as required and as directed by
engineer in charge complete. All labour materials
3566.70 181.30 646642.71

9. 1 Transportation of floating matter like garbage,


m3 polythene Bags, coconut, shells and other foreign
materials etc., to GVMC dumping yard at
KAPPULAUPPADA up to lead of 24kms whenever
required, once a month including stacking, loading,
un loading transporting with proper coverage etc.,
as required and as directed by the Engineer-in-
charge complete. All labour& materials.

18690.27 227.37 4249606.69

891.97 891.97 250.10 223081.70 223081.70

10. 1 Transportation of silt, slush, iron ore, fines etc., to


m2 VPT dumping yard at up to lead of 3kms whenever
required, once in a month including stacking,
loading, unloading etc., transporting with proper
coverage etc., as required and as directed by the
Engineer-in-charge complete. All labour&materials

114.62
11 1trip Sprinkling of water over stacking areas etc. with in
VPT areas by carrying 12KL of water in each trip by
means of water tanker which shall have a provision
of 5HP diesel pump rear side of tanker with suitable
hosepipe nozzle system to sprinkle water over the
stacks and firmly fixed 100mm (4’) dia. Slotted pipe
at rear end for sprinkling of water over stacking
areas for a period of 2years and daily/ trip basis
including supply of water tanker, drivers, cleaners /
helpers, fuel, lubricants, maintenance etc.,(water will
be supplied by VPT pump houses) as required and
as directed by the engineer-in-charge, Complete. All
labour and materials at north and south and s-4
conveyor areas R-11,R-2,R-7 stacking areas and
North and Eastern side of NALCO near OHC North
gate area.

154463 269.00 41550547.00

3503 3503 295.90 1036537.70 1036537.70

12 Per Supply of vehicle “Tata-sumo” including cost of fuel,


month/12hrs/day driver salary and incidental charges etc, as directed
by the Engineer in charge complete.

28.167 30088.00 847488.70

1 1 33096.80 33096.80 33096.80

SUBSTITUTE ITEMS

1. Transportation of debris/sweeped materials up to


a lead of. 12km including loading unloading and
stacking and leveling at the place
of unloading etc., as
required and directed by the EIC complete. All
labour And materials

12576.25 166.98 2099982.22


402.87 402.87 183.68 73999.16
73999.16

2. Transportation of silt , slush, iron ore , fines etc to


vpt dumping yard at up to lead of 12 kms
whenever required , once in amonth including
stacking loading unloading etc transporting with
proper coverage etc as required and as directed
by engineer in charge complete all labour&
materials
28747.20 166.98 4800220.81

633.81 633.81 183.68 116418.22


116418.22

3 Cleaning the sub-way from muck, coal, fertilizers,


silt, all types of cargo in wet and dry conditions,
exposing drain holes under traffic operational
conditions taking care of running water for men in
sun-ways with in a lead of 50mt and lift of 2.00mt
etc., All labour and tools as directed by the
Engineer-in- charge complete

302.00 818722.00 -
- 2711.00

EXTRAITEMS

1 1 m3 Dismantling brick or stone masonry in lime (or) C.M


and stacking within a lead of 50 m the useful
materials and removing the debris complete.
13.03 227.50 2964.33
2 1 m3 Providing random rubble masonry in C.M 1:6 in
plinth and foundations including necessary dressed
stones at corners and junctions, curing etc.,
complete. All labour and materials.

3205.35

3 100 Clearing jungle including uprooting of rank


m2 vegetation, grass, brushwood, trees and saplings of
girth upto 30cm measured at a height of 1m above
ground level and removal of rubbish upto a distance
of 50 m outside the periphery of the area cleared.

5060.63 679.60 34,392.04

4 1 m3 Earthwork in excavation in foundation trenches or


drains not exceeding 1.5 m in width and for wells,
manholes and the like not exceeding 10 m2 on plan
including dressing of sides and ramming of bottoms,
lift upto 1.5m including getting out the excavated
soil and disposal of surplus excavated soil as
directed within a lead of 50 m (a) soft/loose soil

148.45. 2,78,122.56
1873.51

5 1 Hr Supply of JCB (3D) Earth mover for excavation /


levelling and removing debris / earth etc., including
fuel, operator charges and incidental charges etc.,
as directed by the Engineer-in-Charge. All Labour
and equipment, spares etc., complete. (Payment
will be made for number of hours worked at site
only)

690.95 995658.95
1441
760.05 48642.56
64 64
48642.56
6. 1 m3 Supplying and stacking good earth, tank silt or
alluvial soil at site (at desired points as direct by the
Engineer-in-charge) good earth to be obtained from
the approved source and measured in stacks and
20% deduction will be made for voids to arrive net
quantity.

2096.55 396.60 8,31,491.73

7. 1 m3 Spreading sand or moorum or gravel or cinder in


layers compaction with hand roller and with
rammers, watering etc., complete. All labour and
materials but excluding cost of sand or moorum or
gravel or cinder.
2096.55
311.45 6,52,970.50

9 1m3 Supplying and placing the bags filled with a mixture


of crusher dust and cement (mixed in the proportion
of 1:15) across the canal / gedda to the required line
& level including mix materials in the said
proportion and filling in gunny / HDPE bags ,
required machinery oils, etc., as directed by
Engineer in-charge, complete all labour and
materials.
18.70
778.90 14,565.45

_________________________________________
_________

78076195.41 2169618.15