City Of Ilagan Capus

SPECIALIZATION1

PRELIM EXAMINATION

Name: _________________________________________________Score:________________

TEST I True or False

1. _______________Project staking out is part of the preliminary things to consider before


constructing building
2. _______________Soil poisoning is needed after excavation
3. _______________ Two storey buiding need to have structural analysis
4. ______________ Soil Analysis is needed for 4 storey building
5. ______________ Sprinkler system is required for 3 storey above buildings
6. ______________ Compaction of loose soil shall be at every 6 inches
7. ______________ Notice to proceed is needed to mobilize the contractor
8. _______________RA 9184 is the Procurement Law of the Philippines
9. ______________ Board up is not needed in the preliminary construction activity
10. ______________ Bunkhouse will be used to safeguard properties.

Test II

Multiple Choice:

1._________________ he/she is in-charge in construction management and quality control of a


particular building and act as representative of the owner

a. architect b. building official c. DPWH d. DENR

2. _______________ is in charge of blue prints of floor plans and other allied services

a. architect b. PNP c. Building official d. engineer

3.________________ is in charge in signing the Electrical plans

a. PEE b. EE c. Building official d. engineer

4. ________________ a permit given to the owner when the building is yet to be erected

a. FSIC permit b. Occupancy permit c. Building Permit d. all of the above

5.________________ a notice given to the contractor to proceed to the construction

a. NTP b. NTP c. FSIC d. all of the above

6.__________________is the alignment of columns and properly measured according to the desired
distance on plan and details
a. staking out b. plumb bob c. concrete spacer d. all of the above

7.________________ is used to make the site free from rubbish roots

a. red oxide b. soil poisoning c. enamel d. all of the above

8. _______________ is used to demolished or break existing large concrete boulders in the site for
clearing

a. jack hammer b. hammer c. chipping hammer d. all of the above

9._____________ is the tool used to measure the 90 degrees of each side of the builidng

a. ruler b. l- squre c. triangle d. all of the above

10.____________ used to ensure that there are no landslide in the site especially to the sloping isdes

a. rip rapping b. harness c. canals d. all of the above

TEST III

Enumerate things to consider in site preparation for constructing buildings


1.
2.
3.
4.
5.

Enumerate at least five problems encountered in the construction site before construction

1.
2.
3.
4.
5.

Essay:

1. If ever that there will be site mobilization, what are the different things that you need to
consider to make your management effective and work smoothly so you can meet the timeline
with good quality of workmanship
2. The soil is adobe and the budget of the construction is very tight, what are you going to choose
to excavate the foundation manually or with machine? And Why?

3. What are you going to do if there are factory defects in the delivered materials in the site and
why?

4. Its raining and you need to pour concrete in the foundation , what are you going to do as a
project manager ?

5. What are you going to consider if you will mobilize in far flung places to construct buildings.
What are the things you need to consider to make your management effective