Documente Academic
Documente Profesional
Documente Cultură
SPECIALIZATION1
PRELIM EXAMINATION
Name: _________________________________________________Score:________________
Test II
Multiple Choice:
2. _______________ is in charge of blue prints of floor plans and other allied services
4. ________________ a permit given to the owner when the building is yet to be erected
6.__________________is the alignment of columns and properly measured according to the desired
distance on plan and details
a. staking out b. plumb bob c. concrete spacer d. all of the above
8. _______________ is used to demolished or break existing large concrete boulders in the site for
clearing
9._____________ is the tool used to measure the 90 degrees of each side of the builidng
10.____________ used to ensure that there are no landslide in the site especially to the sloping isdes
TEST III
Enumerate at least five problems encountered in the construction site before construction
1.
2.
3.
4.
5.
Essay:
1. If ever that there will be site mobilization, what are the different things that you need to
consider to make your management effective and work smoothly so you can meet the timeline
with good quality of workmanship
2. The soil is adobe and the budget of the construction is very tight, what are you going to choose
to excavate the foundation manually or with machine? And Why?
3. What are you going to do if there are factory defects in the delivered materials in the site and
why?
4. Its raining and you need to pour concrete in the foundation , what are you going to do as a
project manager ?
5. What are you going to consider if you will mobilize in far flung places to construct buildings.
What are the things you need to consider to make your management effective