Sunteți pe pagina 1din 1

MUNICIPAL BUILDINGREHAB

pc/s of tile (1m


OFFICES, HALLWAYS & LOBBIES WITH TILES LENGTH (m) WIDTH (m) TOTAL AREA (sq. m.) x 1m) 1
LOBBY 1 (front door near DSWDO) 8.11 1.97 15.98 16
LOBBY 2 ( SIDE DOOR NEAR MCRO) 6.50 3.98 25.87 26
HALLWAY FRONT DESK 13.42 7.85 105.35 105
MCRO (RECEIVING AREA) 3.91 3.78 14.78 15
MCRO (HEAD) 3.91 3.91 15.29 15
MTO (RECEIVING AREA) 7.90 7.44 58.78 59
MTO (HEAD) 4.25 3.86 16.41 16
MTO (CHEQUE TYPING AREA) 4.15 3.13 12.99 13
HALLWAY BET. MTO AND MAO 5.92 2.26 13.38 13
MAO (RECEIVING AREA) 7.42 5.68 42.15 42
MAO (STORAGE) 4.17 3.31 13.80 14
MAO (HEAD) 5.95 4.40 26.18 26
DSWDO (TOTAL) 7.67 4.37 33.52 34
MEO 4.78 3.85 18.40 18
SBO (RECEIVING AREA) 5.28 3.71 19.59 20
SBO (SEC) 5.98 3.70 22.13 22
VMO 5.80 3.50 20.30 20
Macc.O 7.27 5.70 41.44 41
STORAGE RM 7.96 1.92 15.28 15
HALLWAY MMO 5.93 1.99 11.80 12
MPDCO 7.90 5.73 45.27 45
FAO 5.71 5.62 32.09 32
MMO (STAFFS) 7.81 5.95 46.47 46
MMO 7.11 5.82 41.38 41
MMO (KITCHEN) 7.48 5.80 43.38 43
SUB-TOTAL 751.99 752 775
OFFICES AND HALLWAYS WITHOUT TILES
HALLWAY @ DAO & DILGO 13.76 1.97 27.11 27
DAO 10.82 3.82 41.33 41
DILGO 3.83 2.88 11.03 11
HALLWAY @ ITO, DSWDO, & MARO 13.76 1.97 27.11 27
ITO 3.85 3.82 14.71 15
STORAGE RM (GF) 3.85 3.82 14.71 15
MARO 6.95 3.82 26.55 27
SUB-TOTAL 162.54 163 167
TOTAL 914.53 942
pc/s of tile
COMFORT ROOMS (FLOOR TILES) (0.60m x 0.36
0.60m)
MMO (C.R.) 2.99 1.68 5.02 14
VM COMFORT ROOM 2.00 2.00 4.00 11
PUBLIC AND EMPLOYEES COMFORT ROOM 3.17 5.76 18.26 51
1.93 2.16 4.17 12
PWD CR 1.81 3.40 6.15 17

TOTAL 27.28 104 108

pc/s of tile
COMFORT ROOMS (WALL TILES) HEIGHT (m) LENGTH (m) TOTAL AREA (sq. m.) (0.30m x 0.18
0.60m)
MMO (C.R.) 3 8.7 26 145
PUBLIC AND EMPLOYEES COMFORT ROOM 2.85 29.76 85 471

TOTAL 111 616 635

GRAND TOTAL (1M X 1M TILES) 942 PCS


GRAND TOTAL (0.60 M X 0.60 M TILES) 108 PCS
GRAND TOTAL (0.30 M X 0.60 M TILES) 635 PCS

S-ar putea să vă placă și