eNIT No. 16 of 2019-20 (Sl. No.-1) WESTERN HIGHWAY CIRCLE No.

-I

Validate Print Help Percentage BoQ


Tender Inviting Authority:-The Superintending Engineer, Western Highway Circle No.-I, P.W.(Roads)
Directt., Purta Bhavan, Burdwan.
Specific priced schedule (B.O.Q.) of probable items with approximate quantities for the
Work:-"Metadanga-Polempur Road from 0.00 kmp to 22.54 kmp, periodical repairing and maintenance
work under Burdwan South Highway Division in the district of Purba Bardhaman".
Ch. to.:- Plan Head (e-NIT No-16 of 2019-2020)
Contract No:-WBPW(R)D/NIT- 16 of SE/WHC-I/2019-2020/1
Bidd
er
Nam
e:

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the
bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )

NUM TEXT # NUMBER # TEXT NUMBE NUMBER # TEXT #


BER # R
#
Sl. Item Description Quantity Units Estimat TOTAL TOTAL AMOUNT
No. ed Rate AMOUNT In Words

1 2 4 5 6 53 55
1.00 Dismantling of flexible pavements and disposal of dismantled 12471.60 m³ 453.00 #VALUE! #VALUE!
materials upto a lead of 100 m, stacking serviceable and
unserviceable materials separately as per Technical Specifications
Clause 202 for Rural Roads of MORD.
By Manual Means
Granular Courses

2.00 Box cutting or filling in Road embankment in all sorts of soil 41572.00 m² 14.40 #VALUE! #VALUE!
including spreading the spoils properly over the flank as necessary or
on berm to approximate grade & camber and rolling the sub-grade with
power roller to proper camber and grade as per direction and
satisfaction of Engineer-in-charge including uprooting and removing
plants and jungles when and where necessary.
Depth up to 150 mm.

3.00 Construction of embankment with approved materials deposited at 8314.40 m³ 46.80 #VALUE! #VALUE!
site from roadway cutting and excavation from drain and foundation of
other structures graded and compacted to meet requirement of Tables
300.1 and 300.2 as per Technical Specification Clause 301.5 for Rural
Roads of MORD including carriage of material for a distance of 1 km.

4.00 Water Bound Macadam Sub Base by consolidating Jhama metal of 9353.70 m³ 1942.15 #VALUE! #VALUE!
specific size in hard crust to requisite thickness (measured after
compaction) in layers including screening of metals etc. as necessary,
hand packing, sweeping, watering and rolling in stages with power
roller to proper line, grade and camber, lighting, guarding & barricading
and making necessary earthen bundh of one metre width on each side
where necessary to protect edges and preparing the bed by necessary
cutting or filling and rolling all complete including the cost of all
materials and hire and labour charges of all men and machineries and
compacting to the required density, as per Clause 404 of
Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Construction of Sub Base by consolidating Jhama metal (63
mm to 45 mm) with moorum screening :
Using 0.26 m³ moorum /1.09 m³ of Jhama metal

Page 1 of 4
eNIT No. 16 of 2019-20 (Sl. No.-1) WESTERN HIGHWAY CIRCLE No.-I

5.00 GST @ 12% on Item no 1 to 4 #VALUE! % 12.00 #VALUE! #VALUE!

6.00 Labour Welfare Cess @ 1% on Item no 1 to #VALUE! % 1.00 #VALUE! #VALUE!

Total in Figures #VALUE! #VALUE!

Quoted Rate in Figures 0.00 #VALUE!

Selec
t

Quoted Rate in Words #VALUE!

Page 2 of 4
Please Enable Macros to View BoQ information
Q information