PT PEMBANGKITAN JAWA BALI SERVICES

SIAP INTEGRATED MANAGEMENT SYSTEM


SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description G/T Unit Protection Relay Panel
Equipment HV Side Plant Use Transformer
TEST SHEET Document Number
Issued
Task No. : Revision : 00 Section : Electric
WO No. : 200659 Page : 18 of 25 Date : 19 February 2019
Proteksi Differential UAT Transformer

Pabrik : Beijing Sifang Automation CO.,LTD.


Type : CSC - 316A
Ratio CT (HV Side) : 5000/5A
Ratio CT (LV Side) : 4000/5A
Setting : Fast Diff Current : 7.32 A
Percentage Diff Cur : 0.49 A
Diff Res Slope : 0.45
TrpLog_Diff_Trip : 0F9F

Target : Trip Aux_Trans HV CB; Close Turbine; Trip Magnetic Switch; Trip Generator CB
Trip Branch_B CB; Trip Branch_A CB; Start CB Failure; Trip CB2; Trip CB1.

Phase Input Value Action Element Signal Indication


HV Side
IA 1.218 < 0°
IB 1.218 < 240°
IC 1.218 < 120°
Phase LV Side Input Value No Action No Action
IA 3.35 < 210°
IB 3.35 < 90°
IC 3.35 < 330°

Phase Input Value Calculated Value Action Element Signal Indication


HV Side
IA 0.547 < 0°
IB 0.547 < 240° Id = 0.54 A Ratio Diff Trip Trip 0.0416 s
IC 0.547 < 120°
Phase Input Value Calculated Value Action Element Signal Indication
LV Side
IA 1.489 < 0°
IB 1.489 < 240° Id = 0.53 A Ratio Diff Trip Trip 0.0458 s
IC 1.489 < 120°

Phase Input Value Calculated Value Action Element Signal Indication


HV Side
IA 7.32 A < 0°
IB 7.32 A < 240° Id = 7.344 A Fast Diff Trip Trip 0.0276 s
IC 7.32 A < 120°
Phase Input Value Calculated Value Action Element Signal Indication
LV Side
IA 20.15 A < 0°
IB 20.15 A < 240° Id = 7.344 A Fast Diff Trip Trip 0.0256 s
IC 20.15 A < 120°

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool DRTS - 66 ; FLUKE 116.

PT. PLN UPK NAGAN RAYA PT. PJB SERVICES


Description
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Achmad Fadli Ardhi Alvi Aulia Filer Pattipeiluhu

Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description G/T Unit Protection Relay Panel
Equipment HV Side Plant Use Transformer
TEST SHEET Document Number
Issued
Task No. : Revision : 00 Section : Electric
WO No. : 200659 Page : 19 of 25 Date : 19 February 2019
Proteksi Voltage Controlled Overcurrent UAT HV Side

Pabrik : Beijing Sifang Automation CO.,LTD.


Type : CSC - 316A
Ratio CT (HV Side) : 5000/5A
Setting : HV O/C Cur : 1.54 A
HV O/C T1 Time : 1.50 s
HV O/C T2 Time : 2.00 s
HV O/C Low Volt : 55.00 V
HV O/C Neg Volt : 8.00 V
TrpLog_HV O/C_Trip : 0F9F

Target : Trip Aux_Trans HV CB; Close Turbine; Trip Magnetic Switch; Trip Generator CB
Trip Branch_B CB; Trip Branch_A CB; Start CB Failure; Trip CB2; Trip CB1.

Phase Input Value Action Element Signal Indication


HV Side
IA 1.544 A < 0°
IB 1.544 A < 240° HV O/C T1 Trip Signal Only
IC 1.544 A < 120°

Phase Input Value Action Element Signal Indication


HV Side
IA 1.544 A < 0°
HV O/C T1 Trip
IB 1.544 A < 240° Trip 2.0984 s
HV O/C T2 Trip
IC 1.544 A < 120°
Phase
HV Side Input Value Action Element Signal Indication
IA 1.544 A < 0°
IB 1.544 A < 240°
IC 1.544 A < 120°
HV O/C T1 Trip
Phase LV Side Input Value Trip 2.0320 s
HV O/C T2 Trip
IA 31.75 V < 0°
IB 31.75 V < 240°
IC 31.75 V < 120°
Phase Input Value Action Element Signal Indication
HV Side
IA 1.544 A < 0°
IB 1.544 A < 240°
IC 1.544 A < 120°
HV O/C T1 Trip
Phase LV Side Input Value Trip 2.1104 s
HV O/C T2 Trip
IA 65.84 V < 0°
IB 54.146 V < 232.56°
IC 54.146 V < 127.44°

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool DRTS - 66 ; FLUKE 116.

PT. PLN UPK NAGAN RAYA PT. PJB SERVICES


Description
Reviewed & Approved by Checked by Inspected by
Signature

Name Achmad Fadli Ardhi Alvi Aulia Filer Pattipeiluhu

Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description G/T Unit Protection Relay Panel
Equipment HV Side Plant Use Transformer
TEST SHEET Document Number
Issued
Task No. : Revision : 00 Section : Electric
WO No. : 200659 Page : 20 of 25 Date : 19 February 2019
Proteksi Voltage Controlled Overcurrent UAT LV Branch 1

Pabrik : Beijing Sifang Automation CO.,LTD.


Type : CSC - 316A
Ratio CT (LV Side) : 4000/5A
Setting : Br_A Fast O/C Cur : 6.36 A
Br_A Fast O/C Time : 1.10 s
LV 3I0 O/C Stg1 Cur : 1.40 A
LV 3I0 O/C Stg1 Time : 0.80 s
Br_A Neut 3U0 Volt : 10.00 V
Br_A Neut 3U0 Time : 2.00 s
TrpLog_HV O/C_Trip : 0F9F

Target : Trip Aux_Trans HV CB; Close Turbine; Trip Magnetic Switch; Trip Generator CB
Trip Branch_B CB; Trip Branch_A CB; Start CB Failure; Trip CB2; Trip CB1.

Phase Input Value Action Element Signal Indication


LV Side
IA 6.37 A < 0°
IB 6.37 A < 240° Br_A Fast O/C Trip 1.1428 s
IC 6.37 A < 120°

Phase Input Value Action Element Signal Indication


LV Side

3I0 1.4 A < 0° LV 3I0 O/C Stg1 Trip 0.8410 s

Note : Stg1 bekerja Lebih dulu dari pada Stg2.

Phase Input Value Action Element Signal Indication


LV Side

3U0 10.1 V < 0° Br_A 3UO Alarm Alarm Only

Note : Analog Input Tidak Terpasang/Terpakai

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool DRTS - 66 ; FLUKE 116.

PT. PLN UPK NAGAN RAYA PT. PJB SERVICES


Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Achmad Fadli Ardhi Alvi Aulia Filer Pattipeiluhu


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description G/T Unit Protection Relay Panel
Equipment HV Side Plant Use Transformer
TEST SHEET Document Number
Issued
Task No. : Revision : 00 Section : Electric
WO No. : 200659 Page : 21 of 25 Date : 19 February 2019
Proteksi Overload UAT

Pabrik : Beijing Sifang Automation CO.,LTD.


Type : CSC - 316A
Ratio CT (HV Side) : 5000/5A
Setting : Start Air Stg1 Cur : 0.854 A
Start Air Stg1 Time : 6.00 s
Start Air Reset Coef : 0.85
HV Over Load Cur : 1.35 A
HV Over Load Time : 5.00 s

Target : Start PUT Air Cool

Phase Input Value Action Element Signal Indication


LV Side
IA 0.854 A < 0°
IB 0.854 A < 240° Startup Airing 1 Trip 6.0396 s
IC 0.854 A < 120°

Phase Input Value Action Element Signal Indication


LV Side
IA 1.36 A < 0°
IB 1.36 A < 240° HV OvrLoad Alm Alarm Only
IC 1.36 A < 120°

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool DRTS - 66 ; FLUKE 116.

PT. PLN UPK NAGAN RAYA PT. PJB SERVICES


Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Achmad Fadli Ardhi Alvi Aulia Filer Pattipeiluhu


Position
Approval Date