Sunteți pe pagina 1din 251

#REF!

#REF!
#REF!
#REF!
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
MEASUREMENT SHEET Document Number
(Turbin HP-LP)
#REF!
Issued #REF!
Task No. : #REF! Revision : 00 Section : #REF!
WO No. : 200569 Page : Date : 20 Maret 2019

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
#REF!
#REF!
#REF!
#REF!
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
TEST SHEET Document Number
(Turbin HP-LP)
#REF!
Issued #REF!
Task No. : #REF! Revision : 00 Section : #REF!
WO No. : 200569 Page : Date : 20 Maret 2019

VISIBLE DYE PENETRANT TESTING RECORD

Name of Part Customer PLTU NAGAN RAYA

Material Quantity
Thermometer
Product Family Surface Temp. Control / Serial
No.
Maker Lot No.

Penetrant √ Magnaflux OTHER Penetrant Time 15 - 20 Min

Remover Magnaflux √ THINNER Developing Time 15 - 20 Min

Developer √ Magnaflux OTHER

Penetrant Application Methode √ Aerosol Cans Brushing Dipping

Developer Application Methode √ Aerosol Cans

Test Area Procedure No. ASME SEC V art. 6

Place of Test PLTU NAGAN RAYA Acceptance Std. ASME SEC V art. 6

Time of Test Inspection Date

Rest Result

Foto Foto

Note :

PT. PLN UPK NAGAN RAYA PT. PJB SERVICES


Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION PLTU NAGAN RAYA UNIT 2
TAHUN 2019
Description ALIGNMENT ROTOR HP-LP
Equipment
MEASUREMENT SHEET Document Number
Issued
Task No. : Revision : Section : Mechanic
WO No. : Page : Date : 30 Desember 2019

MEASUREMENT
R A

LP Turbine HP Turbine

Axial Radial

0 0

(-0,04)
A (-0,05) (+0,02)
R (+0,02)

(-0,09) (+0,04)

Standard : *Radial : - Left and Right = 0,02 ± 0,02 Note : satuan mm


- Up and Down = 0,02 ± 0,02 Tools : Dial Gauge, Bore Gauge

*Axial : - Left and Right = 0,02 ± 0,02


- Up and Down = 0,08 ± 0,02
*Bottom Open

Note :

RECOMMENDATION ACCEPTED / REWORK / REPLACE


(by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Rizki Anggiansyah Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION PLTU NAGAN RAYA UNIT 2
TAHUN 2019
Description ALIGNMENT ROTOR LP-GENERATOR
Equipment
MEASUREMENT SHEET Document Number
Issued
Task No. : Revision : Section : Mechanic
WO No. : Page : Date : 02 Januari 2020

MEASUREMENT
R A

Generator LP Turbine

Axial Radial

0 0

(+0,01)
A (-0,02) (+0,01)
R (+0,01)

(-0,01) (+0,02)

Standard : *Radial : - Left and Right = 0,02 ± 0,03 Note : satuan mm


- Up and Down = 0,02 ± 0,03 Tools : Dial Gauge

*Axial : - Left and Right = 0,02 ± 0,03


- Up and Down = 0,02 ± 0,03
*Bottom Open

Note :

RECOMMENDATION ACCEPTED / REWORK / REPLACE


(by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Rizki Anggiansyah Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 2
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
INSPECTION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Maret 2019

FOTO

No Item Pekerjaan Kondisi Aktual Tindak Lanjut Keterangan

Inspeksi dan
1 Pengambilan data clearance inner part Baik Selesai
cleaning

2 Cek Alignment poros turbin serta generator dan Realigment dan di


Bagus Selesai
cek rotor position adjust
Visual Inspeksi dan
3 Bongkar dan periksa turning gear Baik Selesai
di cleaning
Inspeksi dan
4 Bongkar dan periksa bearing nomor: 1,2,3,4,5 Masuk Toleransi Selesai
cleaning
Tidak Terdapat
- Lakukan NDT Test dan cek radial clearance Normal Selesai
Crack
Inspeksi dan
5 Bongkar dan periksa Main Oil Pump (MOP) Baik Selesai
cleaning
Tidak Terdapat
- Lakukan NDT Test Normal Selesai
Crack
Inspeksi dan
6 Bongkar dan periksa thrust bearing Baik Selesai
cleaning
Tidak Terdapat
- Lakukan NDT Test dan cek axial clereance Normal Selesai
Crack
Ada beberapa Dilakukan welding
7 Bongkar dan periksa diaphragma (stationary diaphragm yang (repair) dan Selesai
blade): crack Cleaning

Note :

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
INSPECTION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Maret 2019

FOTO

No Item Pekerjaan Kondisi Aktual Tindak Lanjut Keterangan

Inspeksi dan
- Periksa baut - baut pengikat Baik Selesai
Cleaning

Terdapat beberapa dilakukan repair


- Periksa Seal Strip (repair apabila diperlukan) & yang rubbing dan Selesai
maksimalkan cleareance on site
rusak

Banyak yang Cleaning dan


- Penggantian spring labyrinth rubbing, macet Selesai
dilakukan adjust
dan kotor

Tidak Terdapat
- Cleaning dan lakukan NDT Test Normal Selesai
Crack
Inspeksi dan
8 Bongkar rotor turbin dan periksa: Baik Selesai
Cleaning
- Cek centering rotor turbin terhadap casing dan cleaning dan
Baik Selesai
adjust bila perlu. adjust
data masih masuk
- Lakukan run-out rotor turbin Bagus Selesai
dalam standar

Tidak Terdapat
- Cleaning dan Lakukan NDT Test Normal Selesai
Crack

Note :

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
INSPECTION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Maret 2019

FOTO

No Item Pekerjaan Kondisi Aktual Tindak Lanjut Keterangan


dilakukan
Ada satu yang
9 Periksa Rupture Disk Turbine (safety device) penggantian Selesai
sobek packing
Inspeksi dan
10 Lakukan pemeriksaan sistem pendukungnya : Normal Selesai
Cleaning
Ada beberapa dilakukan
- Baut - Baut casing Selesai
baut yang rusak penggantian baru
inspeksi dan
- Kebocoran minyak pelumas Normal Selesai
cleaning
Dilakukan Sesuai
11 Assembly kembali Baik Selesai
IK
dilakukan adjust
12 Pengecekan levelling bearing turbin-generator Baik Selesai
kembali

Data Realigment
13 Alignment poros turbin dan generator Baik sesuai dengan Selesai
standar

Ada beberapa Dilakukan


14 Adjust clearance oil seal (seal strip) yang over penggantian seal Selesai
clearance strip oil deflektor

Note :

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

disassembly enclosure Reassembly Enclosure

Disassembly Cross Over Pipe Reassembly Cross Over Pipe

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Disassembly Outer Casing LP Disassembly Outer Casing LP

Reassembly Outer Casing LP Reassembly Outer Casing LP

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Disassembly Inner Casing LP Disassembly Inner Casing LP

Disassembly Inner Casing LP Disassembly Inner Casing LP

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 20 Maret 2019

Reassembly Inner Casing HP Reassembly Inner Casing HP

Reassembly Inner Casing HP Reassembly Inner Casing HP

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 20 Maret 2019

Disassembly Outer Casing HP Disassembly Outer Casing HP

Disassembly Outer Casing HP Disassembly Outer Casing HP

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 20 Maret 2019

Reassembly Outer Casing HP Reassembly Outer Casing HP

Reassembly Outer Casing HP Reassembly Outer Casing HP

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 20 Maret 2019

Uncouple Copling LP - GEN Uncouple Copling LP - GEN

Pasang Copling LP - GEN Pasang Copling LP - GEN

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Uncouple Copling HP - LP Uncouple Copling HP - LP

Pasang Copling HP - LP Pasang Copling HP - LP

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 20 Maret 2019

Run Out Copling HP - LP Run Out Copling LP - GEN

Disassembly Gland Labyrinth Disassembly Gland Labyrinth

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Cleaning dan adjust gland labyrinth Cleaning dan adjust gland labyrinth

Cleaning dan adjust gland labyrinth Cleaning dan adjust gland labyrinth

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Cleaning dan adjust gland labyrinth Cleaning dan adjust gland labyrinth

Reassembly Gland Labyrinth Reassembly Gland Labyrinth

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Pengambilan Data Clearance Gland Labyrinth Pengambilan Data Clearance Gland Labyrinth

Pengambilan Data Clearance Gland Labyrinth Pengambilan Data Clearance Gland Labyrinth

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Pengambilan Data Rotor Pengambilan Data Rotor

Pengambilan Data Rotor Pengambilan Data Rotor

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Pengambilan Data Rotor Bore Pengambilan Data Rotor Bore

Pengambilan Data RunOut Rotor Pengambilan Data RunOut Rotor

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Cleaning Casing Cleaning Casing

Cleaning Casing Cleaning Casing

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Disassembly Stator Turbin Disassembly Stator Turbin

Reassembly Stator Turbin Reassembly Stator Turbin

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Cleaning Stator Turbin Cleaning Stator Turbin

Cleaning Stator Turbin PT Check Stator Turbin

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Cleaning dan Adjust Nozzle Gland Cleaning dan Adjust Nozzle Gland

Cleaning dan Adjust Nozzle Gland Cleaning dan Adjust Nozzle Gland

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 20 Maret 2019

Realigment Turbin Realigment Turbin

Realigment Turbin

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 18 Maret 2019

Lifting Rotor Lifting Rotor

Cleaning Rotor Cleaning Rotor

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin
MekanikHP-LP)
Turbin Utama
Equipment
DOCUMENTATION SHEET Document Number
(Turbin HP-LP)

Issued 08 Mei 2017


Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 24 Maret 2019

Pemasangan isolasi turbin Pemasangan isolasi turbin

Pemasangan isolasi turbin Pemasangan isolasi turbin

Note :
Tool Camera
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin HP-LP)
Equipment Alignment Coupling HP-LP
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section :
WO No. : 200569 Page : Date : 20 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a. Radial b. Axial
0 0

R A
- 0.04 + 0.04 - 0.04 - 0.04

- 0.01 - 0.08

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION PLTU NAGAN RAYA UNIT 2
TAHUN 2019
Description
Equipment
MEASUREMENT SHEET Document Number
Issued
Task No. : Revision : Section : Mechanic
WO No. : Page : Date :

MEASUREMENT

0° 180° Average

A A A

0° 180° Average

R R R

Note :

RECOMMENDATION ACCEPTED / REWORK / REPLACE


(by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Rizki Anggiansyah Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin HP-LP)
Equipment Run Out Rotor (Disassembly)
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 18 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a
b e
c f

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin HP-LP)
Equipment
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 18 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

0 90 180 270 360

coupling HP - LP 0 0.05 0.06 0.08 0.02

rotor turbin stage 21 0 0 0.04 0.04 0

rotor turbin stage 16-23 0 0.03 0.03 0.04 0.03

rotor stage turbin 27 0 0.03 0.05 0.05 0.04

rear gland 0 -0.01 -0.02 -0.03 -0.03

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin HP-LP)
Equipment Run Out Rotor (Reassembly)
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b
c
d e j
f g h i k

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin HP-LP)
Equipment Run Out Rotor HP turbin
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

0 90 180 270 360

shaft bearing MOP 0 0.02 0.05 0 0.01

front gland 0 0.02 0.01 0.02 0.03

shaft turbin 0 0.03 0 0.01 0.01

rear gland 0 0.01 0 0.01 0

coupling 0 0 -0.01 0.01 -0.01

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin HP-LP)
Equipment Run Out Coupling HP - LP
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Item #1 #2 #3 #4 #5 #6 #7 #8
Pengukuran
LP Turbine 1 0 0 0 1 1 1 1

HP Turbine -1 -1 0 -1 0 0 0 0

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin HP-LP)
Equipment Run Out Coupling HP - LP
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Item #9 #10 #11 #12 #13 #14 #15 #16


Pengukuran
LP Turbine 1 0 -1 0 0 0 2 2

Generator 0 -1 -1 -1 0 0 1 0

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin HP-LP)
Equipment Rotor Bore Turbine Before
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

L 140.06 140.45 R
Bearing #1
Bottom 139.7

L 110.05 110.09 R
Bearing #2
Bottom 110.28

L 117.53 117.61 R
Bearing #3
Bottom 117.52

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Mekanik Turbin Utama
Description (Turbin HP-LP)
Equipment HP Rotor Bore Before After
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

L 140.28 140.27 R
Bearing #1
Bottom 139.91

L 109.68 109.71 R
Bearing #2
Bottom 109.65

L 117.63 117.67 R
Bearing #3
Bottom 117.58

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g h i j

ROW 2
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f g h i j
1 LEFT 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55
0,55 ~ 0,65
2 RIGHT 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55

3 TOP 0.88
0,45 ~ 0,55
4 BOTTOM 0.79

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g h i j

ROW 2
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f g h i j
1 LEFT 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55
0,55 ~ 0,65
2 RIGHT 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55

3 TOP 0.71 0.71 0.69 0.67 0.71 0.69 0.70 0.68 0.67 0.71
0,45 ~ 0,55
4 BOTTOM 0.60

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g

ROW 3
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f g
1 LEFT 0.45 0.50 0.50 0.50 0.45 0.50 0.50

2 RIGHT 0,45 ~ 0,55 0.45 0.45 0.50 0.45 0.45 0.50 0.50

3 TOP 0.89

4 BOTTOM 0,55 ~ 0,65 0.81

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g

ROW 3
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f g
1 LEFT 0.45 0.50 0.50 0.50 0.45 0.50 0.50

2 RIGHT 0,45 ~ 0,55 0.45 0.45 0.50 0.45 0.45 0.50 0.50

3 TOP 0.74 0.71 0.73 0.71 0.74 0.74 0.73

4 BOTTOM 0,55 ~ 0,65 0.67

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g

ROW 4
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f g
1 LEFT 0.50 0.45 0.50 0.50 0.50 0.45 0.50
0,45 ~ 0,55
2 RIGHT 0.45 0.45 0.45 0.50 0.45 0.50 0.50

3 TOP 0.85
0,55 ~ 0,65
4 BOTTOM 0.89

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g

ROW 4
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f g
1 LEFT 0.50 0.45 0.50 0.50 0.50 0.45 0.50

2 RIGHT 0,45 ~ 0,55 0.45 0.45 0.45 0.50 0.45 0.50 0.50

3 TOP 0.71 0.70 0.71 0.71 0.70 0.70 0.70

4 BOTTOM 0,55 ~ 0,65 0.65

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g

ROW 5
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f g
1 LEFT 0.50 0.50 0.50 0.50 0.55 0.55 0.50
0,45 ~ 0,55
2 RIGHT 0.50 0.50 0.50 0.50 0.50 0.50 0.50

3 TOP 0.86
0,55 ~ 0,65
4 BOTTOM 0.78

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g

ROW 5
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f g
1 LEFT 0.50 0.50 0.50 0.50 0.55 0.55 0.50

2 RIGHT 0,45 ~ 0,55 0.50 0.50 0.50 0.50 0.50 0.50 0.50

3 TOP 0.75 0.74 0.75 0.73 0.75 0.75 0.74

4 BOTTOM 0,55 ~ 0,65 0.69

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g

ROW 6
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f g
1 LEFT 0.45 0.45 0.45 0.45 0.45 0.50 0.50
0,45 ~ 0,55
2 RIGHT 0.45 0.45 0.45 0.50 0.45 0.50 0.50

3 TOP 0.98
0,55 ~ 0,65
4 BOTTOM 0.89

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g

ROW 6
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f g
1 LEFT 0.45 0.45 0.45 0.45 0.45 0.50 0.50

2 RIGHT 0,45 ~ 0,55 0.45 0.45 0.45 0.50 0.45 0.50 0.50

3 TOP 0.87 0.85 0.87 0.87 0.85 0.87 0.87

4 BOTTOM 0,55 ~ 0,65 0.70

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
HP Diaphragm Gland
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 7
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f
1 LEFT 0.55 0.55 0.50 0.50 0.60 0.55
0,55 ~ 0,65
2 RIGHT 0.55 0.55 0.50 0.50 0.50 0.50

3 TOP 0,50 ~ 0,60 1.10

4 BOTTOM 0,60 ~ 0,70 1.00

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 7
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f
1 LEFT 0.55 0.55 0.50 0.50 0.60 0.55
0,55 ~ 0,65
2 RIGHT 0.55 0.55 0.50 0.50 0.50 0.50

3 TOP 0,50 ~ 0,60 0.87 0.87 0.87 0.86 0.87 0.85

4 BOTTOM 0,60 ~ 0,70 0.88

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 8
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f
1 LEFT 0.60 0.60 0.60 0.55 0.55 0.60
0,55 ~ 0,65
2 RIGHT 0.60 0.60 0.60 0.55 0.55 0.60

3 TOP 0,50 ~ 0,60 0.99

4 BOTTOM 0,60 ~ 0,70 0.98

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 8
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f
1 LEFT 0.60 0.60 0.60 0.55 0.55 0.60
0,55 ~ 0,65
2 RIGHT 0.60 0.60 0.60 0.55 0.55 0.60

3 TOP 0,50 ~ 0,60 0.85 0.86 0.85 0.87 0.86 0.86

4 BOTTOM 0,60 ~ 0,70 0.89

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 9
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f
1 LEFT 0.60 0.60 0.55 0.55 0.60 0.60
0,55 ~ 0,65
2 RIGHT 0.60 0.60 0.55 0.55 0.60 0.60

3 TOP 0,50 ~ 0,60 1.03

4 BOTTOM 0,60 ~ 0,70 1.01

0
Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 9
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f
1 LEFT 0.60 0.60 0.55 0.55 0.60 0.60
0,55 ~ 0,65
2 RIGHT 0.60 0.60 0.55 0.55 0.60 0.60

3 TOP 0,50 ~ 0,60 0.88 0.87 0.87 0.86 0.88 0.85

4 BOTTOM 0,60 ~ 0,70 0.88

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 10
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f
1 LEFT 0.55 0.55 0.50 0.55 0.55 0.55
0,55 ~ 0,65
2 RIGHT 0.55 0.55 0.50 0.55 0.55 0.55

3 TOP 0,50 ~ 0,60 0.98

4 BOTTOM 0,60 ~ 0,70 0.99

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 10
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f
1 LEFT 0.55 0.55 0.50 0.55 0.55 0.55
0,55 ~ 0,65
2 RIGHT 0.55 0.55 0.50 0.55 0.55 0.55

3 TOP 0,50 ~ 0,60 0.80 0.81 0.80 0.82 0.79 0.81

4 BOTTOM 0,60 ~ 0,70 0.89

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 11
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f
1 LEFT 0.60 0.60 0.55 0.55 0.55 0.55
0,55 ~ 0,65
2 RIGHT 0.60 0.60 0.55 0.55 0.55 0.55

3 TOP 0,50 ~ 0,60 0.93

4 BOTTOM 0,60 ~ 0,70 0.91

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 11
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f
1 LEFT 0.60 0.60 0.55 0.55 0.55 0.55
0,55 ~ 0,65
2 RIGHT 0.60 0.60 0.55 0.55 0.55 0.55

3 TOP 0,50 ~ 0,60 0.85 0.85 0.83 0.85 0.84 0.85

4 BOTTOM 0,60 ~ 0,70 0.71

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 12
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f
1 LEFT 0.55 0.55 0.55 0.55 0.55 0.55
0,55 ~ 0,65
2 RIGHT 0.55 0.55 0.50 0.50 0.50 0.50

3 TOP 0,50 ~ 0,60 0.91

4 BOTTOM 0,60 ~ 0,70 0.89

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f

ROW 12
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f
1 LEFT 0.55 0.55 0.55 0.55 0.55 0.55
0,55 ~ 0,65
2 RIGHT 0.55 0.55 0.50 0.50 0.50 0.50

3 TOP 0,50 ~ 0,60 0.77 0.77 0.75 0.76 0.76 0.77

4 BOTTOM 0,60 ~ 0,70 0.79

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g h

ROW 13
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f g h
1 LEFT 0.50 0.49 0.50 0.50 0.49 0.50 0.50 0.50
0,45 ~ 0,55
2 RIGHT 0.50 0.50 0.50 0.50 0.49 0.50 0.50 0.50

3 TOP 0,45 ~ 0,55 0.84

4 BOTTOM 0,55 ~ 0,65 1.10

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g h

ROW 13
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f g h
1 LEFT 0.50 0.49 0.50 0.50 0.49 0.50 0.50 0.50
0,45 ~ 0,55
2 RIGHT 0.50 0.50 0.50 0.50 0.49 0.50 0.50 0.50

3 TOP 0,45 ~ 0,55 0.79 0.79 0.77 0.78 0.78 0.79 0.76 0.77

4 BOTTOM 0,55 ~ 0,65 0.90

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g h

ROW 14
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f g h
1 LEFT 0.38 0.42 0.40 0.39 0.40 0.37 0.40 0.39
0,45 ~ 0,55
2 RIGHT 0.45 0.45 0.45 0.40 0.40 0.45 0.45 0.45

3 TOP 0,45 ~ 0,55 0.86

4 BOTTOM 0,55 ~ 0,65 0.95

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g h

ROW 14
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f g h
1 LEFT 0.38 0.42 0.40 0.39 0.40 0.37 0.40 0.39
0,45 ~ 0,55
2 RIGHT 0.45 0.45 0.45 0.40 0.40 0.45 0.45 0.45

3 TOP 0,45 ~ 0,55 0.69 0.70 0.67 0.69 0.69 0.70 0.68 0.70

4 BOTTOM 0,55 ~ 0,65 0.89

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g h

ROW 15
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f g h
1 LEFT 0.40 0.45 0.42 0.44 0.45 0.40 0.42 0.45
0,45 ~ 0,55
2 RIGHT 0.45 0.45 0.40 0.45 0.45 0.45 0.45 0.45

3 TOP 0,45 ~ 0,55 0.78

4 BOTTOM 0,55 ~ 0,65 0.97

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g h

ROW 15
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f g h
1 LEFT 0.40 0.45 0.42 0.44 0.45 0.40 0.42 0.45
0,45 ~ 0,55
2 RIGHT 0.45 0.45 0.40 0.45 0.45 0.45 0.45 0.45

3 TOP 0,45 ~ 0,55 0.52 0.52 0.50 0.51 0.50 0.52 0.51 0.52

4 BOTTOM 0,55 ~ 0,65 0.87

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g h

ROW 16
ITEM
NO PENGUKURAN DESIGN BEFORE
a b c d e f g h
1 LEFT 0.49 0.50 0.48 0.50 0.51 0.49 0.48 0.50
0,45 ~ 0,55
2 RIGHT 0.45 0.45 0.40 0.40 0.45 0.45 0.45 0.45

3 TOP 0,45 ~ 0,55 0.81

4 BOTTOM 0,55 ~ 0,65 0.94

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Diaphragm Gland
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d e f g h

ROW 16
ITEM
NO PENGUKURAN DESIGN AFTER
a b c d e f g h
1 LEFT 0.49 0.50 0.48 0.50 0.51 0.49 0.48 0.50
0,45 ~ 0,55
2 RIGHT 0.45 0.45 0.40 0.40 0.45 0.45 0.45 0.45

3 TOP 0,45 ~ 0,55 0.53 0.55 0.55 0.55 0.54 0.56 0.54 0.55

4 BOTTOM 0,55 ~ 0,65 0.83

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c

BEFORE
ITEM
NO PENGUKURAN DESIGN ROW 2 ROW 3
L R T B L R T B
1 Clearance "a" 1.10 1.00 1.39 1.31 1.00 0.90 1.16 1.25

2 Clearance "b" 0,80 ~ 1,20 1.10 1.00 1.36 1.32 1.00 0.90 1.17 1.26

3 Clearance "c" 1.10 1.00 1.35 1.31 1.00 0.90 1.19 1.25

4 Clearance "d" 8,00 ~ 8,30 8.70 8.70 N/A N/A 8.70 8.80 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c

AFTER
ITEM
NO PENGUKURAN DESIGN ROW 2 ROW 3
L R T B L R T B
1 Clearance "a" 1.10 1.00 1.29 1.29 1.00 0.90 1.15 1.22

2 Clearance "b" 0,80 ~ 1,20 1.10 1.00 1.27 1.29 1.00 0.90 1.17 1.22

3 Clearance "c" 1.10 1.00 1.31 1.29 1.00 0.90 1.15 1.22

4 Clearance "d" 8,00 ~ 8,30 8.70 8.70 N/A N/A 8.70 8.80 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c

BEFORE
ITEM
NO PENGUKURAN DESIGN ROW 4 ROW 5
L R T B L R T B
1 Clearance "a" 1.10 1.00 1.39 1.27 1.00 0.90 1.39 1.25

2 Clearance "b" 0,80 ~ 1,20 1.10 1.00 1.37 1.25 1.00 0.90 1.37 1.24

3 Clearance "c" 1.10 1.00 1.35 1.29 1.00 0.90 1.37 1.25

4 Clearance "d" 8,00 ~ 8,30 8.00 8.50 N/A N/A 8.50 8.20 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c

AFTER
ITEM
NO PENGUKURAN DESIGN ROW 4 ROW 5
L R T B L R T B
1 Clearance "a" 1.10 1.00 1.34 1.27 1.00 0.90 1.32 1.25

2 Clearance "b" 0,80 ~ 1,20 1.10 1.00 1.30 1.25 1.00 0.90 1.37 1.24

3 Clearance "c" 1.10 1.00 1.32 1.27 1.00 0.90 1.35 1.25

4 Clearance "d" 8,00 ~ 8,30 8.00 8.50 N/A N/A 8.50 8.20 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c

BEFORE
ITEM
NO PENGUKURAN DESIGN ROW 6 ROW 7
L R T B L R T B
1 Clearance "a" 1.00 0.90 0.82 1.17 1.00 1.10 1.15 1.25

2 Clearance "b" 0,80 ~ 1,20 1.00 0.90 0.80 1.15 1.00 1.10 1.12 1.23

3 Clearance "c" 1.00 0.90 0.83 1.14 1.00 1.10 1.14 1.24

4 Clearance "d" 8,00 ~ 8,30 8.50 8.40 N/A N/A 8.40 8.30 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c

AFTER
ITEM
NO PENGUKURAN DESIGN ROW 6 ROW 7
L R T B L R T B
1 Clearance "a" 1.00 0.90 0.82 1.15 1.00 1.10 1.14 1.25

2 Clearance "b" 0,80 ~ 1,20 1.00 0.90 0.79 1.14 1.00 1.10 1.12 1.23

3 Clearance "c" 1.00 0.90 0.81 1.16 1.00 1.10 1.14 1.25

4 Clearance "d" 8,00 ~ 8,30 8.50 8.40 N/A N/A 8.40 8.30 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c

BEFORE
ITEM
NO PENGUKURAN DESIGN ROW 8 ROW 9
L R T B L R T B
1 Clearance "a" 0.80 1.10 1.18 1.09 1.00 1.10 1.23 1.34

2 Clearance "b" 0,80 ~ 1,20 0.80 1.10 1.17 1.08 1.00 1.10 1.21 1.36

3 Clearance "c" 0.80 1.10 1.19 1.11 1.00 1.10 1.23 1.35

4 Clearance "d" 8,00 ~ 8,30 8.50 8.60 N/A N/A 8.70 8.40 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c

AFTER
ITEM
NO PENGUKURAN DESIGN ROW 8 ROW 9
L R T B L R T B
1 Clearance "a" 0.80 1.10 1.18 1.09 1.00 1.10 1.23 1.32

2 Clearance "b" 0,80 ~ 1,20 0.80 1.10 1.15 1.08 1.00 1.10 1.20 1.30

3 Clearance "c" 0.80 1.10 1.18 1.09 1.00 1.10 1.22 1.31

4 Clearance "d" 8,00 ~ 8,30 8.50 8.60 N/A N/A 8.70 8.40 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

BEFORE
ITEM
NO PENGUKURAN DESIGN ROW 10 ROW 11
L R T B L R T B
1 Clearance "a" 1.10 1.10 1.29 1.25 1.30 0.90 1.23 1.05

2 Clearance "b" 1.10 1.10 1.31 1.24 1.30 0.90 1.24 1.03
0,80 ~ 1,20
3 Clearance "c" 1.10 1.10 1.29 1.22 1.30 0.90 1.23 1.02

4 Clearance "d" 1.10 1.10 1.32 1.23 1.30 0.90 1.25 1.06

5 Clearance "e" 8,00 ~ 8,30 8.50 8.50 N/A N/A 8.40 8.40 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

AFTER
ITEM
NO PENGUKURAN DESIGN ROW 10 ROW 11
L R T B L R T B
1 Clearance "a" 1.10 1.10 1.29 1.25 1.30 0.90 1.21 1.05

2 Clearance "b" 1.10 1.10 1.27 1.24 1.30 0.90 1.19 1.03
0,80 ~ 1,20
3 Clearance "c" 1.10 1.10 1.26 1.25 1.30 0.90 1.21 1.05

4 Clearance "d" 1.10 1.10 1.27 1.25 1.30 0.90 1.20 1.05

5 Clearance "e" 8,00 ~ 8,30 8.50 8.50 N/A N/A 8.40 8.40 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

BEFORE
ITEM
NO PENGUKURAN DESIGN ROW 12
LEFT RIGHT TOP BOTTOM
1 Clearance "a" 1.20 0.80 1.32 1.09

2 Clearance "b" 1.10 0.80 1.31 1.12


0,80 ~ 1,20
3 Clearance "c" 1.20 0.80 1.30 1.12

4 Clearance "d" 1.10 0.80 1.32 1.10

5 Clearance "e" 10,00 ~ 10,30 10.60 10.30 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

AFTER
ITEM
NO PENGUKURAN DESIGN ROW 12
LEFT RIGHT TOP BOTTOM
1 Clearance "a" 1.20 0.80 1.27 1.09

2 Clearance "b" 1.10 0.80 1.25 1.09


0,80 ~ 1,20
3 Clearance "c" 1.20 0.80 1.27 1.10

4 Clearance "d" 1.10 0.80 1.36 1.08


10,00 ~
5 Clearance "e" 10.60 10.30 N/A N/A
10,30

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

BEFORE
ITEM
NO PENGUKURAN DESIGN ROW 13
LEFT RIGHT TOP BOTTOM
1 Clearance "a" 0.80 1.00 1.37 1.14

2 Clearance "b" 0.80 1.00 1.37 1.11


0,80 ~ 1,20
3 Clearance "c" 0.80 1.00 1.37 1.10

4 Clearance "d" 0.80 1.00 1.35 1.15

5 Clearance "e" 9,50 ~ 9,80 10.00 10.00 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

AFTER
ITEM
NO PENGUKURAN DESIGN ROW 13
LEFT RIGHT TOP BOTTOM
1 Clearance "a" 0.80 1.00 1.33 1.12

2 Clearance "b" 0.80 1.00 1.34 1.12


0,80 ~ 1,20
3 Clearance "c" 0.80 1.00 1.29 1.13

4 Clearance "d" 0.80 1.00 1.30 1.11

5 Clearance "e" 9,50 ~ 9,80 10.00 10.00 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

BEFORE
ITEM
NO PENGUKURAN DESIGN ROW 14
LEFT RIGHT TOP BOTTOM
1 Clearance "a" 0.90 0.90 1.23 1.21

2 Clearance "b" 0.90 0.90 1.20 1.21


0,80 ~ 1,20
3 Clearance "c" 0.90 0.90 1.22 1.21

4 Clearance "d" 1.00 0.90 1.21 1.20


11,50 ~
5 Clearance "e" 12.10 12.00 N/A N/A
11,80

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

AFTER
ITEM
NO PENGUKURAN DESIGN ROW 14
LEFT RIGHT TOP BOTTOM
1 Clearance "a" 0.90 0.90 1.24 1.23

2 Clearance "b" 0.90 0.90 1.21 1.23


0,80 ~ 1,20
3 Clearance "c" 0.90 0.90 1.22 1.23

4 Clearance "d" 1.00 0.90 1.22 1.21


11,50 ~
5 Clearance "e" 12.10 12.00 N/A N/A
11,80

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

BEFORE
ITEM
NO PENGUKURAN DESIGN ROW 15
LEFT RIGHT TOP BOTTOM
1 Clearance "a" 1.25 1.00 1.34 1.52

2 Clearance "b" 1.25 1.00 1.34 1.51


1,30 ~ 1,70
3 Clearance "c" 1.30 1.00 1.34 1.52

4 Clearance "d" 1.25 1.10 1.34 1.50


12,00 ~
5 Clearance "e" 12.70 12.60 N/A N/A
12,30

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

AFTER
ITEM
NO PENGUKURAN DESIGN ROW 15
LEFT RIGHT TOP BOTTOM
1 Clearance "a" 1.25 1.00 1.32 1.50

2 Clearance "b" 1.25 1.00 1.32 1.49


1,30 ~ 1,70
3 Clearance "c" 1.30 1.00 1.32 1.54

4 Clearance "d" 1.25 1.10 1.32 1.52


12,00 ~
5 Clearance "e" 12.70 12.60 N/A N/A
12,30

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 20 Februari 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

BEFORE
ITEM
NO PENGUKURAN DESIGN ROW 16
LEFT RIGHT TOP BOTTOM
1 Clearance "a" 1.25 1.00 1.30 1.50

2 Clearance "b" 1.30 1.00 1.35 1.55


1,30 ~ 1,70
3 Clearance "c" 1.00 1.00 1.30 1.50

4 Clearance "d" 1.25 1.00 1.29 1.53

5 Clearance "e" 8,00 ~ 8,30 8.80 8.40 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a b c d

AFTER
ITEM
NO PENGUKURAN DESIGN ROW 16
LEFT RIGHT TOP BOTTOM
1 Clearance "a" 1.25 1.00 1.27 1.48

2 Clearance "b" 1.30 1.00 1.27 1.48


1,30 ~ 1,70
3 Clearance "c" 1.00 1.00 1.27 1.48

4 Clearance "d" 1.25 1.00 1.26 1.48

5 Clearance "e" 8,00 ~ 8,30 8.80 8.40 N/A N/A

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

NO 1 2 3 4 5 6 7
ITEM "a" "b" "c" "d" "e" "f" "g"
PENGUKURAN
9,00 ~ 0,80 ~
DESIGN 0,80 ~ 1,20 9,30 1,20
L 0.90 0.90 0.90 0.90 0.90 10.50 1.10
BEFORE
R 0.92 0.92 0.92 0.92 0.92 10.10 1.00
L 0.93 0.93 0.93 0.93 0.93 10.50 1.10
AFTER
R 0.91 0.91 0.91 0.91 0.91 10.10 1.00

Note : f = "K" position


- Unit : mm
ACCEPTED / REWORK / REPLACE
RECOMMENDATION (by Quality Control)

Measuring Tool

PT. PLN UPK NAGAN RAYA PT. PJB SERVICES


Description
Reviewed & Approved by Checked by Inspected by

Signature
Name Riza El Fahruddin Ahmad Mushonnif Andrianto
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

C B

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 2 ROW 3 ROW 2 ROW 3
L R L R L R L R
1 Clearance "a" 8,00 ~ 8,30 8.40 8.50 8.40 8.60 8.35 8.35 8.25 8.20

2 Clearance "b" 0,80 ~ 1,20 1.10 1.20 1.00 1.00 1.13 1.14 1.10 1.08

3 Clearance "c" 8.00 8.20 8.00 8.00 8.10 8.10 8.00 8.00 8.10

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

C B

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 4 ROW 5 ROW 4 ROW 5
L R L R L R L R
1 Clearance "a" 8,00 ~ 8,30 8.40 8.40 8.30 8.10 8.35 8.40 8.10 8.15

2 Clearance "b" 0,80 ~ 1,20 0.90 1.00 1.10 1.10 0.95 1.02 1.00 1.00

3 Clearance "c" 8.00 8.10 7.90 8.30 8.10 8.00 7.90 8.00 8.10

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

C B

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 6 ROW 7 ROW 6 ROW 7
L R L R L R L R
1 Clearance "a" 8,00 ~ 8,30 8.30 8.30 8.60 8.60 8.30 8.30 8.40 8.35

2 Clearance "b" 0,80 ~ 1,20 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00

3 Clearance "c" 8.00 8.20 8.40 8.50 8.40 8.15 8.20 8.25 8.20

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

C B

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 8 ROW 9 ROW 8 ROW 9
L R L R L R L R
1 Clearance "a" 8,00 ~ 8,30 8.60 8.50 8.40 8.50 8.35 8.30 8.25 8.30

2 Clearance "b" 0,80 ~ 1,20 0.90 1.00 0.90 0.90 0.90 1.00 0.85 0.90

3 Clearance "c" 8.00 8.35 8.40 8.45 8.50 8.10 8.1 8.15 8.1

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

C B

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 10 ROW 11 ROW 10 ROW 11
L R L R L R L R
1 Clearance "a" 8,00 ~ 8,30 8.50 8.50 8.40 8.50 8.30 8.25 8.40 8.35

2 Clearance "b" 0,80 ~ 1,20 1.00 1.00 0.90 0.90 1.00 1.10 1.00 0.95

3 Clearance "c" 8.00 8.60 8.40 8.30 8.40 8.10 8.05 8.12 8.16

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

C B

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 12 ROW 13 ROW 12 ROW 13
L R L R L R L R
1 Clearance "a" 8,00 ~ 8,30 8.50 8.60 9.00 9.00 8.40 8.50 8.90 8.85

2 Clearance "b" 0,80 ~ 1,20 1.10 1.00 1.10 1.00 0.95 1.00 1.05 1.00

3 Clearance "c" 8.00 8.50 8.50 8.50 8.60 8.15 8.20 8.24 8.20

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

C B

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 14 ROW 14
LEFT RIGHT LEFT RIGHT
1 Clearance "a" 9,90 ~ 10,20 10.14 10.05 10.10 10.00

2 Clearance "b" 0,80 ~ 1,20 1.00 0.90 0.96 0.85

3 Clearance "c" 8.00 8.00 8.00 8.00 8.00

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

C B

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 15 ROW 15
LEFT RIGHT LEFT RIGHT
10,00 ~
1 Clearance "a" 10.37 10.39 10.40 10.35
10,30
2 Clearance "b" 0,80 ~ 1,20 1.20 1.30 1.15 1.20

3 Clearance "c" 8.00 8.00 8.00 8.00 8.00

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Radial Labyrinth
MEASUREMENT SHEET Document Number 30-Dec-99
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

BEFORE AFTER
NO
ITEM PENGUKURAN DESIGN ROW 16 ROW 16
LEFT RIGHT LEFT RIGHT
1 Clearance "a" 8,00 ~ 8,30 8.50 9.20 8.50 9.00

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Cylinder Front Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Cylinder Front Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 1 ROW 2 ROW 3 ROW 4 ROW 1 ROW 2 ROW 3 ROW 4

1 LEFT 0.63 0.60 0.60 0.59 0.52 0.55 0.56 0.52


0,45 ~ 0,55
2 RIGHT 0.45 0.50 0.50 0.59 0.45 0.45 0.45 0.50

3 TOP 0,40 ~ 0,50 0.80 0.85 0.90 0.95 0.56 0.55 0.58 0.50

4 BOTTOM 0,50 ~ 0,60 0.75 0.85 0.92 0.87 0.42 0.45 0.54 0.52

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Cylinder Front Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 5 ROW 6 ROW 7 ROW 8 ROW 5 ROW 6 ROW 7 ROW 8

1 LEFT 0.69 0.69 0.67 0.65 0.60 0.55 0.61 0.58


0,45 ~ 0,55
2 RIGHT 0.67 0.74 0.71 0.69 0.45 0.65 0.55 0.50

3 TOP 0,40 ~ 0,50 0.85 0.79 0.87 0.92 0.52 0.49 0.45 0.45

4 BOTTOM 0,50 ~ 0,60 0.79 0.83 0.85 0.82 0.56 0.40 0.45 0.56

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Cylinder Front Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 9 ROW 10 ROW 11 ROW 12 ROW 9 ROW 10 ROW 11 ROW 12

1 LEFT 0.71 0.69 0.65 0.59 0.58 0.55 0.51 0.49


0,45 ~ 0,55
2 RIGHT 0.68 0.69 0.65 0.62 0.45 0.55 0.55 0.55

3 TOP 0,40 ~ 0,50 0.89 0.94 0.95 0.97 0.45 0.45 0.45 0.45

4 BOTTOM 0,50 ~ 0,60 0.90 0.89 0.94 0.95 0.59 0.64 0.50 0.56

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Cylinder Front Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Cylinder Front Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 1 ROW 2 ROW 3 ROW 4 ROW 1 ROW 2 ROW 3 ROW 4

1 LEFT 0.50 0.61 0.59 0.51 0.50 0.55 0.55 0.50


0,45 ~ 0,55
2 RIGHT 0.65 0.58 0.59 0.63 0.55 0.46 0.58 0.57

3 TOP 0,40 ~ 0,50 0.70 0.75 0.65 0.68 0.47 0.45 0.47 0.45

4 BOTTOM 0,50 ~ 0,60 0.55 0.62 0.60 0.59 0.45 0.53 0.47 0.50

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment HP Cylinder Front Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 5 RPW 6 ROW 7 ROW 5 RPW 6 ROW 7

1 LEFT 0.48 0.59 0.53 0.45 0.40 0.40


0,45 ~ 0,55
2 RIGHT 0.69 0.65 0.59 0.55 0.55 0.56

3 TOP 0,40 ~ 0,50 0.65 0.73 0.75 0.50 0.49 0.57

4 BOTTOM 0,50 ~ 0,60 0.72 0.67 0.68 0.46 0.53 0.50

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Cylinder Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Cylinder Front Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 1 ROW 2 ROW 3 ROW 4 ROW 1 ROW 2 ROW 3 ROW 4

1 LEFT 0.89 0.75 1.55 1.55 0.55 0.55 0.55 0.46


0,45 ~ 0,55
2 RIGHT 0.80 1.00 0.02 0.90 0.45 0.50 0.45 0.47

3 TOP 0,40 ~ 0,50 0.73 0.75 0.79 0.71 0.40 0.43 0.45 0.40

4 BOTTOM 0,50 ~ 0,60 0.63 0.58 0.61 0.64 0.48 0.50 0.53 0.49

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Cylinder Rear Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 5 RPW 6 ROW 7 ROW 8 ROW 5 RPW 6 ROW 7 ROW 8

1 LEFT 0.65 0.60 0.65 0.55 0.57 0.57 0.55 0.55


0,45 ~ 0,55
2 RIGHT 0.60 0.65 0.65 0.60 0.57 0.55 0.56 0.57

3 TOP 0,40 ~ 0,50 0.71 0.69 0.64 0.59 0.47 0.45 0.45 0.40

4 BOTTOM 0,50 ~ 0,60 0.60 0.65 0.67 0.71 0.46 0.52 0.50 0.49

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Diapraghm Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Andrianto


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 2
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Diapraghm Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : Section : Mechanic
WO No. : Page : Date :

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
LEFT RIGHT TOP BTTM LEFT RIGHT TOP BTTM
1 ROW 1
2 ROW 2
0,45 ~ 0,55
3 ROW 3
4 ROW 4

Note : Unit mm

RECOMMENDATION ACCEPTED / REWORK / REPLACE


(by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Rizki Anggiansyah Allbest Own Sagala


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 2
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Diapraghm Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : Section : Mechanic
WO No. : Page : Date :

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
LEFT RIGHT TOP BTTM LEFT RIGHT TOP BTTM
1 ROW 5
2 ROW 6
0,45 ~ 0,55
3 ROW 7
4 ROW 8

Note : Unit mm

RECOMMENDATION ACCEPTED / REWORK / REPLACE


(by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Rizki Anggiansyah Allbest Own Sagala


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 17 ROW 23 ROW 17 ROW 23
L 1.45 1.9 2.00 1.05
R 2.45 2.35 2.25 2.35
1 Clearance "a" 2,00 ~ 2,40
T 2.20 2.26 2.22 2.29
B 2.26 2.21 2.26 2.20
L 1.45 1.9 2.00 1.95
R 2.45 2.35 2.10 2.05
2 Clearance "b" 2,00 ~ 2,40
T 2.20 2.26 2.22 2.27
B 12,50 ~ 2.26 2.21 2.26 2.20
L 12,80 / 12.50 12.50 12.49 12.51
3 Clearance "c"
R 13,50 ̴ 12.55 12.55 12.56 12.55
13,80

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 18 ROW 24 ROW 18 ROW 24
L 1.95 2.6 1.99 2.55
R 2.1 1.2 2.10 2.00
1 Clearance "a" 2,00 ~ 2,40
T 2.15 2.45 2.13 2.35
B 2.17 2.32 2.16 2.30
L 1.9 1.9 2.10 2.15
R 2.1 2.1 2.13 2.20
2 Clearance "b" 2,00 ~ 2,40
T 2.15 2.45 2.18 2.29
B 2.17 2.32 2.16 2.31
L 13.6 13.6 13.6 13.6
3 Clearance "c" 13,50 ~ 13,80
R 13.55 13.55 13.55 13.55

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 19 ROW 25 ROW 19 ROW 25
L 2.3 1.5 2.3 2.00
R 1.6 1.9 2.10 2.0
1 Clearance "a" 2,00 ~ 2,40
T 2.10 2.35 2.09 2.33
B 2.28 2.20 2.26 2.19
L 2.3 1.5 2.3 2.10
R 1.6 1.9 2.00 2.00
2 Clearance "b" 2,00 ~ 2,40
T 2.10 2.35 2.11 2.33
B 2.28 2.20 2.32 2.19
L 13.1 13.1 13.1 13.15
3 Clearance "c" 13,00 ~ 13,30
R 13.25 13.25 13.25 13.25

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 20 ROW 26 ROW 20 ROW 26
L 1.6 1.65 1.90 2.00
R 1.8 2.1 2.00 2.1
1 Clearance "a" 2,00 ~ 2,40
T 2.20 2.35 2.10 2.20
B 2.34 2.17 2.25 2.20
L 1.6 1.65 2.00 2.10
R 1.8 2.1 2.10 2.15
2 Clearance "b" 2,00 ~ 2,40
T 2.20 2.35 2.15 2.34
B 2.34 2.17 2.30 2.17
L 19.80 19.80 19.81 19.80
3 Clearance "c" 20,00 ~ 20,30
R 20.10 20.10 20.10 20.10

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 21 ROW 27 ROW 21 ROW 27
L 3.1 2.2 3.05 2.2
R 1.8 3.3 2.50 2.75
1 Clearance "a" 2,50 ~ 2,90
T 2.79 2.85 2.64 2.77
B 2.95 2.80 2.88 2.73
L 3.1 2.2 2.89 2.2
R 1.8 3.3 2.55 3.00
2 Clearance "b" 2,50 ~ 2,90
T 2.86 2.89 2.64 2.77
B 2.90 2.80 2.88 2.73
L 27.00 27.00 27.00 27.00
3 Clearance "c" 27,00 ~ 27,30
R 27.15 27.15 27.15 27.15

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

a a

ITEM BEFORE AFTER


NO PENGUKURAN DESIGN
ROW 22 ROW 28 ROW 22 ROW 28
L 4.9 3.7 4.1 3.9
R 3.4 4.8 3.9 4.00
1 Clearance "a" 4,00 ~ 4,40
T 4.30 4.35 4.25 4.20
B 4.35 4.25 4.27 4.19

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Allbest Own S


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth &Running Clearance
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth &Running Clearance
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 17 ROW 23 ROW 17 ROW 23
L R L R L R L R
1 Clearance "c" 8,70 ~ 9,20 8.80 8.75 8.85 8.87 8.75 8.79 8.85 8.83

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth &Running Clearance
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 18 ROW 24 ROW 18 ROW 24
L R L R L R L R
1 Clearance "a" 1,80 ~ 2,20 1.78 1.97 2.47 1.82 1.80 1.95 2.09 1.99

2 Clearance "b" 13,00 ~ 13,30 12.00 13.00 13.00 14.00 32.00 13.00 13.00 13.10

3 Clearance "c" 10,80 ~ 11,30 10.30 10.30 10.40 10.50 10.90 11.00 11.10 11.15

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth &Running Clearance
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 19 ROW 25 ROW 19 ROW 25
L R L R L R L R
1 Clearance "a" 1,80 ~ 2,20 2.62 1.78 1.30 2.53 2.00 1.80 1.90 2.10

2 Clearance "b" 24,00 ~ 24,30 24.00 24.00 24.00 25.00 24.00 24.00 24.30 24.25

3 Clearance "c" 12,90 ~ 13,40 13.00 13.20 13.60 13.10 13.30 13.35 13.35 13.40

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth &Running Clearance
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 20 ROW 26 ROW 20 ROW 26
L R L R L R L R
1 Clearance "a" 1,80 ~ 2,20 1.77 2.33 1.53 2.53 2.10 2.15 1.80 1.85

2 Clearance "b" 13,00 ~ 13,30 12.00 13.00 14.00 13.50 12.90 13.00 13.20 13.25

3 Clearance "c" 12,80 ~ 13,80 13.20 13.00 13.70 13.80 13.25 13.00 13.65 13.75

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth &Running Clearance
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 21 ROW 27 ROW 21 ROW 27
L R L R L R L R
1 Clearance "a" 1,80 ~ 2,20 2.22 1.45 1.30 2.69 2.00 1.90 2.15 2.20

2 Clearance "b" 19,00 ~ 19,30 21.00 21.00 20.00 20.00 19.00 19.10 19.30 19.25

3 Clearance "c" 19,90 ~ 20,90 18.00 17.00 17.00 18.00 20.21 20.15 20.10 20.00

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 1
PLTU NAGAN RAYA 2019
Description Mekanik Turbin Utama (Turbin HP-LP)
Equipment LP Radial Labyrinth &Running Clearance
MEASUREMENT SHEET Document Number
Issued 08 Mei 2017
Task No. : Revision : 00 Section : Mechanic
WO No. : 200569 Page : Date : 14 Maret 2019

SPESIFIKASI PERALATAN
BRAND : NANJING TURBINE & ELECTRIC RATED SPEED : 3000 r/min
MACHINERY (GROUP) CO.,LTD. INLET STEAM TEMP. : 535o C
RATED POWER : 110 MW FEED WATER TEMPERATURE : 231,98o C
INLET STEAM PRES. : 8.83 Mpa MODEL : N110-8.83/535
EXHAUST PRESSURE : 8 KPa

MEASUREMENT

BEFORE AFTER
ITEM
NO PENGUKURAN DESIGN ROW 22 ROW 28 ROW 22 ROW 28
L R L R L R L R
1 Clearance "a" 2,30 ~ 2,70 3.15 1.90 1.99 2.51 2.39 2.35 2.30 2.35

2 Clearance "b" 21,50 ~ 21,80 21.00 21.00 22.00 21.00 21.55 21.50 21.54 21.50

3 Clearance "c" 12,00 ~ 13,00 13.90 13.50 13.40 13.60 13.15 13.00 12.55 12.45

Note : Unit mm

ACCEPTED / REWORK / REPLACE


RECOMMENDATION (by Quality Control)

Measuring Tool
PT. PLN UPK NAGAN RAYA PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name Riza El Fahruddin Ahmad Mushonnif Rahmansyah Fathoni


Position
Approval Date

S-ar putea să vă placă și