Sunteți pe pagina 1din 18

PT.

SURYA SAKTI SUKSES

FINAL REPORT
REPAIR BEARING LP TURBINE NO #3 & #4

CUSTOMER : PT. PJB UBJ O&M (PLTU REMBANG)

PART NAME : BEARING NO #3 & #4


EQUIPMENT : STEAM TURBINE
DESCRIPTION : REBABBIT BEARING NO #3 & #4
JOB NUMBER : 17004
PO NO. : EH883.SPK/612/UJRBG/2017, DATE : OCTOBER 5, 2017

APPROVAL:

PREPARED BY : CHECKED BY: APPROVED BY:


PT. SURYA SAKTI SUKSES PT. PJB UBJ O&M REMBANG PT. PJB UBJ O&M REMBANG

DODI SUHENDRA I KETUT SUARDANA ANDEREAS SUBAGIYO


(PROJECT MANAGER) (SVPS. MANAGEMENT OUTAGE) (MAINTENANCE MANAGER)
DATE: OCTOBER 18,2017 DATE: OCTOBER 18,2017 DATE: OCTOBER 18,2017
LIST OF CONTENT

NON-DESTRUCTIVE TEST (NDT)


1. Penetrant inspection (Final) bearing 3 & 4 ....................................................... 1
2. Ultrasonic test inspection (Final) bearing 3 & 4 ................................................ 4

DIMENSIONAL INSPECTION REPORT


1. Dimensional inspection report (As receive radial) bearing #3 ......................... 7
2. Dimensional inspection report (As receive axial) bearing #3 ........................... 8
3. Dimensional inspection report (As receive radial) bearing #4 ......................... 9
4. Dimensional inspection report (As receive axial) bearing #4 ......................... 10
5. Dimensional inspection report (Final radial) bearing #3 ................................ 11
6. Dimensional inspection report (Final axial) bearing #3 .................................. 12
7. Dimensional inspection report (Final radial) bearing #4 ................................ 13
8. Dimensional inspection report (Final axial) bearing #4 .................................. 14
9. Dimensional inspection report (Bearing journal shaft) ................................. 15
10. Photograph activity .............................................................................................. 16
PT. SURYA SAKTI SUKSES
Turbomachinery & Rotating equipment Product & Services
The Excelis No. 18 Lippo Karawaci Office Park Tangerang 15811
Email : Customer.services@suryasaktisukses.com
: Sales@suryasaktisukses.com
Website : www.suryasaktisukses.com

Penetrant Inspection Report

Report No. 001/NDT-PT/SSS/X/2017 Project No. 17004


Date of Inspection. October 7 - 17, 2017 Customer Name. PJB UBJ O&M PLTU REMBANG
Equipment MFG. ST ROTOR / DONGFANG End User.

Model & Type N/A / 330MW Location. REMBANG

NO. ITEM DESCRIPTION QTY

1 Bearing # 3 1 Set
2 Bearing # 4 1 Set

TEST AREA :
On Babbit Surface

DOCUMENT / PROCEDURE NO :
ISO 4386-3

TEST PERFORMED : PENETRANT TYPE : PENETRANT MATERIAL :

Incoming Red Dye (Visible) Magnaflux SKL-SP (Visible)


Repair Fluorescent Dye Ardrox 98 P145 (Fluorescent)
Final
PENETRANT REMOVAL: DEVELOPER TYPE : DWELL TIME :
Solvent Removable Non Aquoes Developer 30 Minutes
Water Washable Aquoes Developer 60 Minutes

INSPECTION RESULT :

1. Bearing # 3 : Upper & Lower


2. Bearing # 4 : Upper & Lower

ENGINEERING / QC / NDT Level III Comment :

Acceptable

Inspected by : Approved by : Aknowleged by Approved on : Page :


NDT Inspector Level I/II PT. SURYA SAKTI SUKSES PT. PJB (PLTU REMBANG)

IWAN DODI SUHENDRA October 18, 2017 1 / 16

THIS MATERIAL IS EXLUCIVE PROPERTY OF PT. SURYA SAKTI SUKSES, COPY AND REPRODUCE IS PROHIBITED WITHOUT WRITTEN PERMISSION
PT. SURYA SAKTI SUKSES
Turbomachinery & Rotating equipment Product & Services
The Excelis No. 18 Lippo Karawaci Office Park Tangerang 15811
Email : Customer.services@suryasaktisukses.com
: Sales@suryasaktisukses.com
Website : www.suryasaktisukses.com

Penetrant Inspection Report

PHOTOGRAPHS :

Fig. 1: Penetrant application On bearing # 3 (Red dye ) Upper - Lower


PHOTOGRAPHS :

Fig. 2: Contrast Developed Application On Bearing # 3 Upper - Lower

Approved on : Page :

October 30, 2016 2 / 16


THIS MATERIAL IS EXLUCIVE PROPERTY OF PT. SURYA SAKTI SUKSES, COPY AND REPRODUCE IS PROHIBITED WITHOUT WRITTEN PERMISSION
PT. SURYA SAKTI SUKSES
Turbomachinery & Rotating equipment Product & Services
The Excelis No. 18 Lippo Karawaci Office Park Tangerang 15811
Email : Customer.services@suryasaktisukses.com
: Sales@suryasaktisukses.com
Website : www.suryasaktisukses.com

Penetrant Inspection Report

PHOTOGRAPHS :

Fig.3 Penetrant application On Bearing #4 (RedDye) Upper – Lower


PHOTOGRAPHS :

Fig. 4 Contrast Developed On Bearing # 4 Upper-Lower

Approved on : Page :

October 18, 2017 3 / 16

THIS MATERIAL IS EXLUCIVE PROPERTY OF PT. SURYA SAKTI SUKSES, COPY AND REPRODUCE IS PROHIBITED WITHOUT WRITTEN PERMISSION
PT. SURYA SAKTI SUKSES
Turbomachinery & Rotating equipment Product & Services
The Excelis No. 18 Lippo Karawaci Office Park Tangerang 15811
Email : Customer.services@suryasaktisukses.com
: Sales@suryasaktisukses.com
Website : www.suryasaktisukses.com

Ultrasonic Inspection Report

Report No. 001/NDT-UT/SSS/X/2017 Project No. 17004


Date of Inspection. October 7 - 17, 2017 Customer Name. PJB UBJ O&M PLTU REMBANG
Equipment MFG. ST ROTOR / DONGFANG End User.

Model & Type N/A / 330MW Location. REMBANG

NO. ITEM DESCRIPTION QTY

1 Bearing #3 1 Set
2 Bearing #4 1 Set
3
TEST AREA :
On Babbit Surface

DOCUMENT / PROCEDURE NO :
ISO 4386.1

TEST PERFORMED : CALIBRATION : SETTING :

Final IIW Standard Block V1 Frequency : 52 DBs


Repair IIW Standard Block V2 Amplitude : 100% FSH
Incoming Steel Step Wedge TRANSDUCER :
EQUIPMENT : Babbitt Step Wedge Diameter : 0.25 Inch
SIUI CTS 9005 Other : Reference Standard Frequency : 5 MHz
Gilardoni RDG2500-EU Angle o : 0 degree

INSPECTION RESULT :

1. Bearing # 3 Upper Lower (No Relevant Indication )


2. Bearing # 4 Upper Lower (No Relevant Indication )

ENGINEERING / NDT Level III Comment :

Acceptable

Inspected by : Approved by : Aknowleged by Approved on : Page :


NDT Inspector Level I/II PT. SURYA SAKTI SUKSES PT. PJB (PLTU REMBANG

October 18, 2017 4 / 16


IWAN DODI SUHENDRA
THIS MATERIAL IS EXLUCIVE PROPERTY OF PT. SURYA SAKTI SUKSES, COPY AND REPRODUCE IS PROHIBITED WITHOUT WRITTEN PERMISSION
PT. SURYA SAKTI SUKSES
Turbomachinery & Rotating equipment Product & Services
The Excelis No. 18 Lippo Karawaci Office Park Tangerang 15811
Email : Customer.services@suryasaktisukses.com
: Sales@suryasaktisukses.com
Website : www.suryasaktisukses.com

Ultrasonic Inspection Report

PHOTOGRAPHS :

Fig. 1 : UT Scanning On Bearing # 3 Lower

Fig. 2 : UT Scanning Bearing # 4 Lower

Approved on : Page :

October 18, 2017 5 / 16

THIS MATERIAL IS EXLUCIVE PROPERTY OF PT. SURYA SAKTI SUKSES, COPY AND REPRODUCE IS PROHIBITED WITHOUT WRITTEN PERMISSION
PT. SURYA SAKTI SUKSES
Turbomachinery & Rotating equipment Product & Services
The Excelis No. 18 Lippo Karawaci Office Park Tangerang 15811
Email : Customer.services@suryasaktisukses.com
: Sales@suryasaktisukses.com
Website : www.suryasaktisukses.com

Ultrasonic Inspection Report

PHOTOGRAPHS :

Fig. 3 UT Scanning Bearing # 3 Upper

Fig. 4 UT Scanning On Bearings # 4 Upper

Approved on : Page :

October 18, 2017 6 / 16

THIS MATERIAL IS EXLUCIVE PROPERTY OF PT. SURYA SAKTI SUKSES, COPY AND REPRODUCE IS PROHIBITED WITHOUT WRITTEN PERMISSION
PRODUCTION Form PT. Surya Sakti Sukses

MFG/MODEL : DONGFANG
S/N & EQUIP. NO : TBA
DIMENSIONAL INSPECTION REPORT CUSTOMER : PT. PJB (PLTU REMBANG)
BEARING #3 SSS PROJECT : P-17004
REPORT NO. : 001/AR/SSS/X/2017

INSPECTED BY: RIO DATE: OCTOBER 18, 2017

STATUS: AS RECEIVED FINAL SURFACE: RADIAL AXIAL UNITS: MM IN

Point 1 2 3 4
V Ø480.14 Ø480.10 Ø480.11
H1 Ø505 Ø480.75 Ø480.70 Ø480.74
H2 Ø481 Ø481.07 Ø481.03

Point 5 6
V Ø480.10
H1 Ø480.72 Ø505.05
H2 Ø481.05

Note : Inspected by: Approved by: Acknowledged by:

Scratch and heavy


rubbing
Rio Dodi Suhendra (Engineering Spv.) PJB UBJOM PLTU REMBANG
Date : Date : October 18, 2017 Date :

This material is the exclusive property of PT. Surya Sakti Sukses


PRO-01FR-SSS-001 Pages 7 of 16
PRODUCTION Form PT. Surya Sakti Sukses

MFG/MODEL : DONGFANG
S/N & EQUIP. NO : TBA
DIMENSIONAL INSPECTION REPORT CUSTOMER : PT. PJB (PLTU REMBANG)
BEARING #3 SSS PROJECT : P-17004
REPORT NO. : 002/AR/SSS/X/2017

INSPECTED BY: RIO DATE: OCTOBER 18, 2017

STATUS: AS RECEIVED FINAL SURFACE: RADIAL AXIAL UNITS: MM IN

Point 1 2 3 4 5 6
Dim. 416.04 10 29.9 335.93 29.7 21.44

Point 7 8 9
Dim. 293.3 111.86 114.5

Note : Inspected by: Approved by: Acknowledged by:

Rio Dodi Suhendra (Engineering Spv.) PJB UBJOM PLTU REMBANG


Date : Date : October 18, 2017 Date :

This material is the exclusive property of PT. Surya Sakti Sukses


PRO-01FR-SSS-001 Pages 8 of 16
PRODUCTION Form PT. Surya Sakti Sukses

MFG/MODEL : DONGFANG
S/N & EQUIP. NO : TBA
DIMENSIONAL INSPECTION REPORT CUSTOMER : PT. PJB (PLTU REMBANG)
BEARING #4 SSS PROJECT : P-17004
REPORT NO. : 003/AR/SSS/X/2017

INSPECTED BY: RIO DATE: OCTOBER 18, 2017

STATUS: AS RECEIVED FINAL SURFACE: RADIAL AXIAL UNITS: MM IN

Point 1 2 3 4
V Ø480.32 Ø480.20 Ø480.15
H1 Ø505.09 Ø480.75 Ø480.76 Ø480.92
H2 Ø480.86 Ø481 Ø481.95

Point 5 6
V Ø480.10
H1 Ø480.88 Ø505
H2 Ø481.77

Note : Inspected by: Approved by: Acknowledged by:

Scratch and heavy


rubbing
Rio Dodi Suhendra (Engineering Spv.) PJB UBJOM PLTU REMBANG
Date : Date : October 18, 2017 Date :

This material is the exclusive property of PT. Surya Sakti Sukses


PRO-01FR-SSS-001 Pages 9 of 16
PRODUCTION Form PT. Surya Sakti Sukses

MFG/MODEL : DONGFANG
S/N & EQUIP. NO : TBA
DIMENSIONAL INSPECTION REPORT CUSTOMER : PT. PJB (PLTU REMBANG)
BEARING #4 SSS PROJECT : P-17004
REPORT NO. : 004/AR/SSS/X/2017

INSPECTED BY: RIO DATE: OCTOBER 18, 2017

STATUS: AS RECEIVED FINAL SURFACE: RADIAL AXIAL UNITS: MM IN

Point 1 2 3 4 5 6
Dim. 416 10 30.05 336.02 30.3 21.52

Point 7 8 9
Dim. 293 112.11 113.5

Note : Inspected by: Approved by: Acknowledged by:

Rio Dodi Suhendra (Engineering Spv.) PJB UBJOM PLTU REMBANG


Date : Date : October 18, 2017 Date :

This material is the exclusive property of PT. Surya Sakti Sukses


PRO-01FR-SSS-001 Pages 10 of 16
PRODUCTION Form PT. Surya Sakti Sukses

MFG/MODEL : DONGFANG
S/N & EQUIP. NO : TBA
DIMENSIONAL INSPECTION REPORT CUSTOMER : PT. PJB (PLTU REMBANG)
BEARING #3 SSS PROJECT : P-17004
REPORT NO. : 005/FNL/SSS/X/2017

INSPECTED BY: RIO DATE: OCTOBER 18, 2017


STATUS: AS RECEIVED FINAL SURFACE: RADIAL AXIAL UNITS: MM IN

Point 1 2 3 4
V Ø479.91 Ø479.93 Ø479.92
H1 Ø505 Ø480.89 Ø480.90 Ø480.89
H2 Ø48089 Ø480.90 Ø480.90

Point 5 6
V Ø479.92
H1 Ø480.89 Ø505
H2 Ø480.89

Note : Inspected by: Approved by: Acknowledged by:

Rio Dodi Suhendra (Engineering Spv.) PJB UBJOM PLTU REMBANG


Date : Date : October 18, 2017 Date :

This material is the exclusive property of PT. Surya Sakti Sukses


PRO-01FR-SSS-001 Pages 11 of 16
PRODUCTION Form PT. Surya Sakti Sukses

MFG/MODEL : DONGFANG
S/N & EQUIP. NO : TBA
DIMENSIONAL INSPECTION REPORT CUSTOMER : PT. PJB (PLTU REMBANG)
BEARING #3 SSS PROJECT : P-17004
REPORT NO. : 006/FNL/SSS/X/2017

INSPECTED BY: RIO DATE: OCTOBER 18, 2017

STATUS: AS RECEIVED FINAL SURFACE: RADIAL AXIAL UNITS: MM IN

Point 1 2 3 4 5 6
Dim. 416.01 10 30 336.02 29.99 21.52

Point 7 8 9
Dim. 293 112 112

Note : Inspected by: Approved by: Acknowledged by:

Rio Dodi Suhendra (Engineering Spv.) PJB UBJOM PLTU REMBANG


Date : Date : October 18, 2017 Date :

This material is the exclusive property of PT. Surya Sakti Sukses


PRO-01FR-SSS-001 Pages 12 of 16
PRODUCTION Form PT. Surya Sakti Sukses

MFG/MODEL : DONGFANG
S/N & EQUIP. NO : TBA
DIMENSIONAL INSPECTION REPORT CUSTOMER : PT. PJB (PLTU REMBANG)
BEARING #4 SSS PROJECT : P-17004
REPORT NO. : 007/FNL/SSS/X/2017

INSPECTED BY: RIO DATE: OCTOBER 18, 2017

STATUS: AS RECEIVED FINAL SURFACE: RADIAL AXIAL UNITS: MM IN

Point 1 2 3 4
V Ø479.87 Ø479.88 Ø479.88
H1 Ø505 Ø480.85 Ø480.84 Ø480.84
H2 Ø480.84 Ø480.84 Ø480.84

Point 5 6
V Ø479.87
H1 Ø480.85 Ø505
H2 Ø480.85

Note : Inspected by: Approved by: Acknowledged by:

Rio Dodi Suhendra (Engineering Spv.) PJB UBJOM PLTU REMBANG


Date : Date : October 18, 2017 Date :

This material is the exclusive property of PT. Surya Sakti Sukses


PRO-01FR-SSS-001 Pages 13 of 16
PRODUCTION Form PT. Surya Sakti Sukses

MFG/MODEL : DONGFANG
S/N & EQUIP. NO : TBA
DIMENSIONAL INSPECTION REPORT CUSTOMER : PT. PJB (PLTU REMBANG)
BEARING #4 SSS PROJECT : P-17004
REPORT NO. : 008/FNL/SSS/X/2017

INSPECTED BY: RIO DATE: OCTOBER 18, 2017

STATUS: AS RECEIVED FINAL SURFACE: RADIAL AXIAL UNITS: MM IN

Point 1 2 3 4 5 6
Dim. 416 10 30.02 336.01 30 21.5

Point 7 8 9
Dim. 293 112 112

Note : Inspected by: Approved by: Acknowledged by:

Rio Dodi Suhendra (Engineering Spv.) PJB UBJOM PLTU REMBANG


Date : Date : October 18, 2017 Date :

This material is the exclusive property of PT. Surya Sakti Sukses


PRO-01FR-SSS-001 Pages 14 of 16
PRODUCTION Form PT. Surya Sakti Sukses

MFG/MODEL : DONGFANG
DIMENSIONAL INSPECTION REPORT S/N & EQUIP. NO : TBA
LP TURBINE ROTOR CUSTOMER : PT. PJB (PLTU REMBANG)
SSS PROJECT : P-17004
BEARING JOURNAL #3 & #4 REPORT NO. : 009/AR/SSS/X/2017

INSPECTED BY: DD/ENCIP DATE: OCTOBER 18, 2017

STATUS: AS RECEIVED FINAL SURFACE: RADIAL AXIAL UNITS: MM IN

POS DIAMETER SHAFT BEARING JOURNAL


BEARING JOURNAL #3 Ø479,26
BEARING JOURNAL #4 Ø479,21

Note : Inspected by: Approved by: Acknowledged by:

Exhibited light rubs


on bearing journal
shaft Encip/Dodi Dodi Suhendra (Engineering Spv.) PJB UBJOM PLTU REMBANG
Date : Date : October 18, 2017 Date :

This material is the exclusive property of PT. Surya Sakti Sukses


PRO-01FR-SSS-001 Pages 15 of 16
PRODUCTION Form PT. Surya Sakti Sukses

MFG/MODEL : DONGFANG
S/N & EQUIP. NO : TBA
PHOTOGRAPH ACTIVITY CUSTOMER : PT. PJB (PLTU REMBANG)
SSS PROJECT : P-17004
REPORT NO. : 010/PA/SSS/X/2017

As received condition have heavy rubbing

NDT Process

Inspection Process Welding Process

Machining Process

Note : Inspected by: Approved by: Acknowledged by:

Ade/Yayan Dodi Suhendra (Engineering Spv.) PJB UBJOM PLTU REMBANG


Date : Date : October 18, 2017 Date :

This material is the exclusive property of PT. Surya Sakti Sukses


PRO-01FR-SSS-001 Pages 16 of 16

S-ar putea să vă placă și