1.0 DESIGN
1. Structural 1 lot -
2. As built Plan 1 lot -
Sub - Total
2.0 STRUCTURAL WORKS
A. FOOTING
1. Cement 481 bags 276.00
2. Sand 27 cu.m 1,476.00
3. Gravel 54 cu.m 1,740.00
4. 16mm dia. X 6.0m Deformed bars 353 pcs 498.00
5. Phenolic plywood 3/4" (4' x 8') 33 pcs 1,440.00
6. G.I tie wire no# 16 2 rolls 1,600.00
7. Miscellaneous for Formworks 1 lot -
Sub - Total
B. FOOTING TIE BEAM
1. Cement 55 bags 276.00
2. Sand 3.5 cu.m 1,476.00
3. Gravel 7 cu.m 1,740.00
4. 16mm dia. X 7.5m Deformed bars 20 pcs 498.00
5. 16mm dia. X 6.0m Deformed bars 44 pcs 498.00
6. 10mm dia. X 6.0m Deformed bars 126 pcs 144.56
7. Phenolic plywood 3/4" (4' x 8') 30 pcs 1,440.00
8. G.I tie wire no# 16 1 roll 1,600.00
9. Miscellaneous for Formworks 1 lot -
Sub - Total
C. COLUMN
1. Cement 190 bags 276.00
2. Sand 10 cu.m 1,476.00
3. Gravel 20 cu.m 1,740.00
4. 16mm dia. X 9.0m Deformed bars 165 pcs 594.60
6. 10mm dia. X 6.0m Deformed bars 310 pcs 144.56
7. Phenolic plywood 3/4" (4' x 8') 100 pcs 1,440.00
8. G.I tie wire no# 16 2 roll 1,600.00
9. Miscellaneous for Formworks 1 lot -
Sub - Total
D. SLAB ON GRADE
1. Cement 456 bags 276.00
2. Sand 26 cu.m 1,476.00
3. Gravel 51 cu.m 1,740.00
6. 12mm dia. X 6.0m Deformed bars 360 pcs 144.56
6. 12mm dia. X 12m Deformed bars 90 pcs 144.56
8. G.I tie wire no# 16 1 roll 1,600.00
Sub - Total
F. BEAM (2ND FLOOR)
1. Cement 128 bags 276.00
2. Sand 8 cu.m 1,476.00
3. Gravel 15 cu.m 1,740.00
4. 16mm dia. X 6.0m Deformed bars 36 pcs
5. 16mm dia. X 7.5m Deformed bars 31 pcs
6. 16mm dia. X 9.0m Deformed bars 10 pcs 594.60
7. 16mm dia. X 10.5m Deformed bars 11 pcs
8. 10mm dia. X 6.0m Deformed bars 229 pcs 144.56
9. 10mm dia. X 7.5m Deformed bars 223 pcs
10. 10mm dia. X 9.0m Deformed bars 1 pcs
11. Phenolic plywood 3/4" (4' x 8') 33 pcs 1,440.00
12 G.I tie wire no# 16 2 roll 1,600.00
13 Miscellaneous for Formworks lot -
Sub - Total
F. BEAM (3RD FLOOR)
1. Cement 115 bags 276.00
2. Sand 7 cu.m 1,476.00
3. Gravel 13 cu.m 1,740.00
4. 16mm dia. X 6.0m Deformed bars 36 pcs
5. 16mm dia. X 7.5m Deformed bars 31 pcs
6. 16mm dia. X 9.0m Deformed bars 10 pcs 594.60
7. 16mm dia. X 10.5m Deformed bars 11 pcs
8. 10mm dia. X 6.0m Deformed bars 229 pcs 144.56
9. 10mm dia. X 7.5m Deformed bars 223 pcs
10. 10mm dia. X 9.0m Deformed bars 1 pcs
11. Phenolic plywood 3/4" (4' x 8') 31 pcs 1,440.00
12 G.I tie wire no# 16 2 roll 1,600.00
13 Miscellaneous for Formworks lot -
Sub - Total
Prepared by :
- 45,000.00 - 45,000.00
- 25,000.00 - 25,000.00
70,000.00
FORMWORKS
B W H SQ. M
C1 0.25 8.1 2 8 32.4
0.45 8.1 2 8 58.32
C2 0.2 8.1 2 10 32.4
0.45 8.1 2 10 72.9
C3 0.25 8.1 2 1 4.05
0.5 8.1 2 1 8.1
C4 0.25 8.1 2 1 4.05
0.45 8.1 2 1 7.29
C5 0.2 8.1 2 3 9.72
0.45 8.1 2 3 21.87
PC1 and PC2 0.2 8.1 2 2 6.48
0.45 8.1 2 2 14.58
272.16 2.88
94.5
100 PCS
CONCRETING
2ND FLOOR BEAM
BEAM MARK B H L VOLUME
CU.M
B1 250 450 7050 ###
B2 250 450 7050
B3 200 450 5600
B4 250 450 3525
B5 250 450 3525
B6 200 450 5600
B7 200 450 1458
B8 200 450 2917
B9 200 450 3280
B10 200 450 3850
B11 200 450 800
B12 200 450 1458
B13 200 450 2917
B14 200 450 3280
B15 200 450 3850
B16 200 450 1000
B17 250 450 800
B18 250 450 2917
B19 250 450 1000
B20 200 450 3280
B21 200 450 3850
B22 200 450 1000
B23 200 450 3280
B24 200 450 3850
B25 200 450 1000
B26 250 450 3320
B27 250 450 3390
B28 250 450 3320
B29 250 450 1750
B30 250 450 450
B31 200 450 1875
B32 200 450 1163
B33 200 450 1875
B34 200 450 2755
B35 200 450 1695
B36 200 450 2755
B37 200 450 1695
B38 400 450 450
B39 250 450 5325
B40 250 450 4105
B41 400 450 450
B42 250 450 5325
B43 250 450 3905
B44 400 450 450
B45 250 450 2663
B46 250 450 2663
B47 250 450 3655
B48 200 450 450
B49 200 450 2013
B50 200 450 2013
B51 200 450 550
3RD FLOOR BEAM
BEAM MARK B H L
CU.M. TOTAL
CEMENT 50.569 9.00 455.121 bags
SAND 50.569 0.50 25.2845 cu.m
GRAVEL 50.569 1.00 50.569 cu.m
CU.M
2.7636
1.865
1.0388
4.757
5.9288
1.5094
17.8626
CONCRETING
2ND FLOOR BEAM 3RD FLOOR BEAM
CU.M TOTAL
CEMENT 14.117 9.00 127.053 bags
SAND 14.117 0.50 7.0585 cu.m
GRAVEL 14.117 1.00 14.117 cu.m
3RD FLOOR BEAM
H L VOLUME
CU.M
TOTAL
9.00 114.876 bags
0.50 6.382 cu.m
1.00 12.764 cu.m
FRAMING
2ND FLOOR FRAMING
BEAM MA B H L VOLUME
CU.M