The IBM includes overhead charges and contractor’s profit as per erstwhile GoAP Revised
standard data and its amendments for analysis of rates.
Carriageway and Road way (Steel flyover):
4 lane bi-directional elevated corridor from Nalgonda ‘X’ road to Owaisi junction shall be
16.61 m in width (shall include 2x7.5m C/W + 2x0.50 m crash barriers + 0.61m median
crash barrier)
Down Ramp and Up Ramp : 2-lane Down Ramp & Up Ramp at IS Sadan junction shall be
7.0 m in width (shall include 6.0 m C/W and 2x0.50 m crash barriers)
Construction Methodology shall be adopted in execution :
a) Steel pier shaft with prefabricated hollow steel sections.
b) Prefabricated Steel pier cap
c) Prefabricated Steel Girders
d)Deck slab cast in situe
We may qualify for the above project, if we can get 0.516 mts length from Amar mahal project and BMRCL Puttanahalli for the year 2017-18. However, we
have to try and get the certificates before bid due date.