Sunteți pe pagina 1din 9

CONTENTSS 

1. SC
COPE OF WO
ORK 

2. PU
URPOSE 

3. REESOURCES 

4. SEEQUENCE / M
METHOD OFF WORK 

5. QU
UALITY ASSU
URANCE 

6. HEEALTH AND SSAFETY 

7. EM
MERGENCY C
CONTACT NU
UMBERS 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 1
P
 
1. SC
COPE OF WO
ORK 

Th
he Scope of tthis method statement ccovers Laying & Fixing of Metal Deck Work for SSands 
Inffra build Privvate Limited
d at Kochi, Keerala.  
 
2. PU
URPOSE 

Th
he purpose o
of this metho
od statemen
nt is to set ou
ut the proceedures to be implementeed by 
project  metho
odology  to  carry 
c out  thee  deck  sheeeting  activities  in  a  prop
per  sequencce  for 
Strructural stee
el erection w
works. 
 
3. REESOURCES 
 
Th
he following resources (b
but not limitted to) shall be used 

3.1   M
Materials 

 Deck Sheets 
 Stud 
 Edge trim , Closure  
 Fasteners ‐SScrew 
 
3.2   M
Man power         

 Project Man nager    Fire w


watcher 
 Constructioon / Site Manaager   Fitter
 Safety Officcer   Weldeer 
 Logistics En
ngineer   Riggerr  
 QA/QC  Enggineer   Scaffo
older 
 Project Enggineer   Helper 
 Site Enginee er   
 QA/QC Engineer   
 Survey Engiineer   
 Erection Foreman   
 Charge Han nd/Leadsman   
 Crane operator   
 Signal Man   
Page 2
P
 
 
 
3.3   P
Plant & Equip
pment 
 
Th
he following plant &Equipments shall be used fo
or Metal Decck works. 

S.No. Tools
s & Tackles
s

1 Stud Welding machine


e

2 Arc/Manua
al Welding M
Machine

3 Sprit level

4 Measuring Tape

5 Hammers

6 U Clamp

7 Fire Exting
guishers

8 Total Statio
on with acce
essories

9 Mini prism with Stick

10 AG 7 Grind
ding Machine

11 Deck shee
et Screwing m
machine

4. SEEQUENCE / M
METHOD OFF WORK 

4.1  Siite Planning & Preparation 
 
     4.1.1   Material Reeceipts &Sto orage facilities: 
 
The levelled lay down n area for sto
orage / asseembly of matterials shall b be provided by client as    
per the aagreed locatiions. The tem mporary lay down area shall be barrricaded and fenced 
around w with signage for stackingg the materiaals. Limited materials on nly shall be kkept on the 
floor whe ere the conccrete column ns and beam ms located. 
 
 All 
A deck  sheeets  &  materrials  on  receeipt  at  site  by  trailers  sshall  be  unloaded  at  th
he 
designated loocation or att the erection location byy tower cran ne or hydra. 
 
 Materials 
M shaall  be  prope
erly  identifieed  and  stackked  on  woo oden  planks  clear  off  thhe 
ground. Stackking shall faccilitate easy identificatioon and inspeection. 
 

P
Page 3
 
 
4.1.2   Th
he sequence
e of installation of metal deck shall be followed
d as given be
elow: 

  Description of Activity

1  Unlo
oading and storing of deck sheets.

2  Liftin
ng and positioning of deck sheets on
n floor beam
ms

3  Instaallation or laying of deckking

4  Fixin
ng of deckingg by screws

5  Fixin
ng of edge trims / Closurre angles

5  Deckk stud weldin
ng

6  Testing of weldeed shear stud
ds.

7  Inspeection &Han
nd over to Co
oncrete worrks

 
4.1.3   Saafety Pre‐cau
utionary Me
ethod 

1. Tyypical  life  line  provision


ns  will  be  p
provided  and
d  ensured  prior 
p to  starrt  deck  sheeet 
laaying.  

2. D
During first flloor deck insstallation gro
ound level n
need to be b
barricaded 3M away from 
th
he deck slab boundary, aand any unaauthorized entry shall bee restricted bby a watcherr.  

3. Cutout openings will be cclosed by cattch net or m
metal planks.  

4.1.4   Se
equence of M
Metal deck installation

1. U
Upon  inspection  and  co ompletion  o
of  bolting  and 
a alignmeent  of  floorr  beams,  th
he 
reespective meetal deck sheet bundles shall be placed over thee beams.  

2. The  sheet  bu
undles  shall  be  opened  and  the  deck  sheets  sh
hall  be  placeed  adjacenttly 
one after anoother by rigggers manually.  

3. Deck sheet sh
D hall be spreaad as per thee approved d
drawing and
d sequence.  

4. U
Upon placingg the sheets, the sheets shall be screewed to fix tthe sheets firmly over th
he 
stteel beams.  

5. The studs  shaall  be placed


d on to the  deck sheets as per thee spacing provided in th
he 
drawings andd welded by stud welding machine o or manual arrc welding m
machine  

6. The  edge  trim


ms  /  closuree  angles  shaall  be  installled  and  scrrewed  to  the  beams  an
nd 

P
Page 4
sh
heets, as sho
own in the d
drawings.  

7. U
Upon compleetion of stud d welding on n the floor / bay, the sam me shall be inspected an
nd 
handed  overr  to  the  further  activitiies  (fixing  of 
o reinforcem
ment  mesh  &  casting  of 
o
co
oncrete slab
b by others). 

4.1.5   Brrief Descripttion of proce
edure for Me
etal Deckingg installation

1. M
Metal deck sh o bundles and the sheets 
hall be delivvered to site normally ass packed into
are secured w
with metal sttraps. 

2. Each bundle  shall have aan identificattion tag (inccluding bund dle number // Floor level / 


le
ength  /  quantity).  The  information
n  on  each  taag  is  to  be  checked  en
nsured  for  its 
co
orrectness oof delivery uppon arrival.

3. Visual inspect
V tions shall be carried ou
ut for any damage. 

4. The bundle sh
hall be lifted
d from the trrailer using ttower craness or hydra. 

5. The  bundles  of  deck  she


eets  shall  b
be  unloaded
d  by  crane  using 
u proteccted  webbin
ng 
belts to avoid
d damage to deck sheetss. 

6. D
Decking  bund
dles  shall  be 
b stored  an
nd  placed  in
n  the  allocaated  area  on  the  timbeer 
packers. 

7. The  bundles  shall  be  plaaced  on,  beaarers  which  provide  a  ggentle  slope  to  allow  an
ny 
co
ondensationn or rain to d drain and freee flow of airr around thee bundle. 

8. The bundles  shall not be stored morre than 4 higgh (1.2m maax) and no o
other material 
sh
hall be place
ed over them
m. 

9. The identificaation tags sh
hall be used tto ensure po
ositioning th
he bundles on frame. 

10. The bundles  shall be placed in such  a way that  the interloccking side laps are on th


he 
saame side to avoid turnin
ng of sheets.. 

11. Prior to the lifting of bun
ndles, span o
orientation p
positions shall be checkked as per th
he 
drawings. 

12. The bundles sshall be opened only wh
hen all sheetts can be possitioned and
d secured. 

13. The sheet layying shall be carried out grid by grid,, as per the cconstruction
n sequence. 

14. Sheets  shall  be  provided


d  as  per  the  approved  drawing 
d withh  a  minimum
m  bearing  on 
o
stteel  supportt  beams  an
nd  ends  of  adjacent  shheets  shall  b
be  butted  together. 
t Th
he 
lo
ongitudinal eedges shall b
be overlappeed as specifieed. 

15. Decking shee
D ets must be ffixed to the  top of the ssteel beams.. All fixings sshall be mad
de 
th
hrough the ttroughs in th
he decking as given the ddrawings. 

P
Page 5
16. The surface o of the beamss, where decck sheets arre to be placced, shall be  ensured thaat 
it is free from
m water, dirt,, debris etc.  

17. The deck sheeets shall be  properly aliigned and fixed to the b


beams usingg Tack weld aat 
th
he required locations as per the spacing provideed in the deccking drawin
ngs. 

18. The sheet to  sheet (side  overlap fixin


ng) shall be  carried out  using self‐taapping screw
ws 
ass marked in the drawinggs.  

19. The  edge  trim


ms,  strips  an
nd  angle  clo
osures  shall  be  fixed  as  shown  in  decking  layou
ut 
and fixed sim
milar to decking.  

20. Once layout 
O and fixing ensured thorroughly, stud d welding sh
hall be carrieed out as peer 
th
he sequencee. The area u underneath  the stud we elding workss shall be baarricaded an
nd 
any unauthorrized entry sshall be restrricted by a w
watcher. 

21. In
nspection sh
hall be carrieed out for pro
oper welding of shear sttuds, as per the ITP. 

22. Bend tests sh
hall be carrieed out rando
omly, as per tthe approveed ITP. 

23. After comple
A tion of inspeection, the aarea shall be handed oveer to the clieent for furtheer 
sllab concretin
ng. 

4.1.6   Stud Welding 

1. The stud shall be weldedd at the disttance as sho own in the d drawings by  stud weldin ng 


m
machine withh gun. Whilee welding of studs, it shaall be ensureed that no gaap is betweeen 
deck sheet an
nd supportinng structure member.  

2. Ceramic ferruules shall be placed on b
bottom of the studs whille welding w
with stud gun
ns 
to
o serve as sh
hield to the aarc. 

3. After comple
A tion of stud welding, thee ferrules sh
hall be brokeen free and ccleaned.  

4. M
Manual fillet  welding shaall be carrieed out at the e locations w
where stud  machine gu un 
does not reacch or not po ossible to weeld by stud ggun. When m manual weld ding is carrieed 
out, it shall b
be ensured that the stud d is directly w
welded to thhe supportin ng beams an nd 
of  equivalentt  to  the  we
eld  thicknesss  of  machine  welding  (Fillet  size  –as  per  ouur 
reequirement)). 

4.1.7   To
ouch‐up Pain
nt Procedure

The P
Primer touch
h up work sh
hall be carrieed out on the connections locationss, Welded an
nd 
damaaged areas.  

a) The approved d primer only shall be ussed for touch
h up work.
b) The surfaces  must be cleean and dry.. Using mechanical cleaning methods, dirt, dusst, 
oil and all oth
her contaminnations shall be removed prior to appply the prim
mer. 
c) The primer w will be handle
ed generallyy in accordannce with Maanufacturer’s instruction
ns 

P
Page 6
and project specification. 
d) Primer shall b
be applied bby brush / rooller and mu
ultiple coats  shall be applied in ordeer 
to
o achieve the required DDFT microns. 
e) In ed out as peer approved ITP. 
nspections shall be carrie
 
 
5. QU UALITY ASSU
URANCE 

he Quality Assurances enccompass of ffollowing. 
Th

1. ITP  Shall  be  followedd  and  coorddinated  accordingly  witth  the  Engiineers  site 
activities. 
2. Execution  of  work  shall  be  don ne  as  per  latest  “Issu
ued  for  Con
nstruction” 
drawings aand Specificaations. 
3. Ensure  materials  shaall  be  used d  as  per  approved  Material  and  Approval 
Submittalss  
4. Work Inspection Request forms (W WIR) will be raised and aapproval from m client.  
5. Conduct trraining to en ngineers andd workers for the awaren ness of proje
ect related 
quality and d process on
n each activitty. 
6. Daily pep ttalk for weldding supervissors. 
 
6. HEEALTH AND SSAFETY 

6.1 HSSE General P
Precautions & General M
Mitigation M
Measures/Co
ontrols

6.1.1  Before start aactivities toool box talk shhall be condu uct by conceern superviso or. 


6.1.2  Activity to be
A e adequatelyy supervised by compete ent staff (botth Constructtion & HSE)
6.1.3  All  Personnel/Workforce e  involved  in ducted,  and  received  th
n  the  activitty  to  be  ind he 
equired train
re ning/compettencies BEFO ORE commencing the acctivity 
6.1.4  Enngineer/Sup pervisor/Foreemen  In‐Charge  to  prepare  work  permit  p (including  Permits 
Liifting permitt / Hot workk permit / W Work at Heigght as appliccable)beforee commencing 
th
he activity (fform and disscussion to b be in the langguage underrstood by the workforcee) 
6.1.5  Updated Activity Responssible Person nal emergenccy contact n number will b be posted annd 
ubmitting to
su o HSE dept. 
6.1.6  HSE  Procedu ures  relevaant/applicable  to  the activity  to o  be  revieewed  by  th he 
Enngineer/Sup pervisor  In‐CCharge,  and d  specific  precautions 
p to  be  convveyed  to  the 
Fooreman/Chaarge‐Hand and Workforcce in the form of commu unications 
6.1.7  All Personnel//Workforce involved in the activity to fully com mply with PPEE requiremeent 
Personal Pro
(P otective Equiipment) 
6.1.8  Use adequate
U e and visiblee HSE signagee, posters an nd board to promote aw wareness 
6.1.9  Engineer/Sup pervisor/Foreeman/Chargge‐Hand  to o  be  familiiarized  with h  Emergen ncy 
Response Plan & Contactt Numbers. EEmergency ccontact num mbers to be p posted on sitte. 
 

P
Page 7
 

7.  EMERGENCY CONTACT N
NUMBERS 

Sl.No  Category  N
Name  Contact Name 
1  Project Maanager  Mr.Paramaaguru  7899130006 
2  Safety Offiicer North To
ower  Mr.Veereshh  8618235197 
3  Safety Offiicer South To
ower  Mr.Alex Thangaraj  9894917455 
4  Lifting Sup
pervisor Northh Tower  Mr. Gunaseekaran  9751965608 
5  Lifting Sup
pervisor Southh Tower  Mr. Binu Th
hankachan  9037124998 
6  Fire Service  Kerala  1011 
7  Ambulance e Service  Kerala  1088 
7  Police servvice  Kerala  1000 
 

P
Page 8

S-ar putea să vă placă și