Minutes of Meeting HSBB BRAS Migration Security Level:

Attachment 2 – Task Force List

N Task Duty/Responsibilit Division/depa Contact person


o y rtment
1 Access node - To come out with 1. PPM, 1. Please fill up
selection & the concise 2. IPNOC, 2. Please fill up
schedule migration schedule 3. CID 3. Emran
with agreed Access
node selection
Access node criteria
- traffic
- commercial
launch
- which NPE node

2 Access node to table out in 1. SFC 1. Shahril & Pn.


vlan, circuit, detail all access 2. CID (B-RAS, Aminah
port collection node service vlans, 2. Emran &
Metro-E),
a-vlan, t-vlan for Kamarul
3. Huawei
direct reference and
4. Airstar 3. Huawei
usage during
migration 4. Airstar

Kick-off - Friday
Dec3 3pm
3 Pre & Post - Pre and post 1. ANOC, 1. Nur Azlina
migration migration checklist 2. ST Tukiman
testing: Test – highlighting test 2. Mohd Hisham
3. IPNOC
line + items to be tested
procedure + 4. CID, 3. Please fill up
and verified to
resources: 5. Huawei 4. Please fill up
ensure successful
migration 6. Airstar 5. Huawei
- To request and 6. Airstar
handle
resource/logistics of
ANOC/RNO/ST
personnel to be
present at the
Exchange/location
being migrated

Kick-off – Friday

2010-12-03 HUAWEI Confidential Page1, Total3


Minutes of Meeting HSBB BRAS Migration Security Level:

Dec 3 10.30am
4 Communication - Precise NOC HBC +
plan Communication of TUMC (Ansahari)
the migration plan
and activity, the
migration objective,
the expected
outage, no of
customers, location
etc to all NOCs &
TM Mgmt.
- Besides e-mail
notification, the
communication
plan and
notification of the
migration should
also be done via:
website
announcement
IPTV ticker via IPTV
NOC
NGN notification via
NGN NOC

5 Migration Ensure each 1. CID, 1. Emran


readiness & network element 2. IBMS, 2. Khairin
FUP (Access, NPE, B- 3. ST 3. Fadzli
RAS,PTS, EMS, SRP, 4. TS, 4. Edi
RM9k) and
migration 5. Huawei 5. Huawei
requirement/angle 6. Airstar 6. Airstar
is fit, ready and/or
catered for based
on output from Task
force 1-4.
To look into NPE
Vendor participation
in configuring
circuits especially
for locations where

2010-12-03 HUAWEI Confidential Page2, Total3


Minutes of Meeting HSBB BRAS Migration Security Level:

NPE is from a
vendor which SFC
has never migrated
before.
To gather all
required logical and
human resources
(TM and vendor)
required during
each migration
activity
To track and give
overall status on
migration readiness
Kick-off – Monday
Dec 6 10.30am