Documente Academic
Documente Profesional
Documente Cultură
PROJET HÔTEL NOVOTEL ALGER AÉROPORT
RAPPORT D'ANALYSE STRUCTURELLE MURS 30cm
HÔTEL NOVOTEL BAB EZZOUAR
ALGER
Janvier 2018
Janvier-2018
SENDARRUBIAS & HERNÁNDEZ, ARCHITECTURE AND ENGINEERING, S.L. Page 1 sur 4
PROJET HÔTEL NOVOTEL ALGER AÉROPORT
INDEX
1. OBJET ............................................................................................................................................................................. 3
2. DONNÉES GÉNERALES.............................................................................................................................................. 3
Janvier-2018
SENDARRUBIAS & HERNÁNDEZ, ARCHITECTURE AND ENGINEERING, S.L. Page 2 sur 4
PROJET HÔTEL NOVOTEL ALGER AÉROPORT
1. OBJET
Le bureau d’étude Share, SENDARRUBIAS & HERNÁNDEZ, ARCHITECTURE AND ENGINEERING, S.L. donne
l’ordre a DEVELOPMENT REMARK de la réalisation d’un rapport sur la structure, avec des murs de 30
cm d'épaisseur, de l'hôtel NOVOTEL localisé réalisation à Bab Ezzouar, Alger.
2. DONNÉES GÉNERALES
Janvier-2018
SENDARRUBIAS & HERNÁNDEZ, ARCHITECTURE AND ENGINEERING, S.L. Page 3 sur 4
INDEX
3.2.- Vent
R.N.V.99 D.T.R. C 2-4.7
Zone: 1
Catégorie du terrain: Catégorie IV
Orographie du terrain: Plane
Largeurs de bande
Largeur de bande Y Largeur de bande X
Niveaux
(m) (m)
R+16 et R+17 13.00 9.30
RDC, R+1, R+2, R+3, R+4, R+5, R+6, R+7, R+8,
18.50 55.50
R+9, R+10, R+11, R+12, R+13, R+14 et R+15
SS1 0.00 42.60
Page 2
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Charge de vent
Vent X Vent Y
Niveau
(t) (t)
R+17 2.161 1.191
R+16 3.569 1.999
R+15 3.581 19.603
R+14 4.361 23.449
R+13 4.154 22.381
R+12 4.044 21.787
R+11 3.926 21.152
R+10 3.800 20.471
R+9 3.663 19.735
R+8 3.514 18.934
R+7 3.351 18.054
R+6 3.170 17.077
R+5 2.965 15.975
R+4 2.832 15.256
R+3 2.832 15.256
R+2 4.877 23.208
R+1 5.923 28.186
RDC 0.000 0.000
SS1 0.000 0.000
3.3.- Séisme
Page 3
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Caractérisation de l'emplacement
Sismicité (zone) (RPA 99 / v 2003, 3.1 et Fig 3.1): Élevée (III)
Type de sol (RPA 99 / v 2003, 3.3): Meuble (S3)
Système structural
ξ: Pourcentage d’amortissement (RPA 99 / v 2003, Tableau 4.2) ξ : 10.00 %
RX: Coefficient de comportement (X) (RPA 99 / v 2003, Tableau 4.3) RX : 3.50
RY: Coefficient de comportement (Y) (RPA 99 / v 2003, Tableau 4.3) RY : 3.50
Q: Facteur de qualité (RPA 99 / v 2003, 4.2.3 et Tableau 4.4) Q : 1.10
Période fondamentale approximative
Système structural (X): III
Système structural (Y): III
h: Hauteur du bâtiment h : 56.95 m
Importance de l'ouvrage (RPA 99 / v 2003, 3.2): Groupe 1B
Paramètres de calcul
Nombre de modes de vibration qui interviennent dans l'analyse: Selon la norme
Fraction de charge d'exploitation : 0.20
Facteur multiplicateur du spectre : 1.00
Effets de la composante sismique verticale
Ne sont pas considérés
Vérification de la condition de cisaillement de base: Selon la norme
L'analyse des effets du 2nd ordre n'est pas réalisée
Critère de ferraillage à appliquer pour la ductilité: Selon RPA 99 / v 2003, Chapitre VII
Directions d'analyse
Action sismique selon X
Action sismique selon Y
Axe Y
Axe X
Page 4
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
- Situations sismiques
- Où:
Page 5
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Gk Action permanente
Pk Action de précontrainte
Qk Action variable
AE Action sismique
γG Coefficient partiel de sécurité des actions permanentes
γP Coefficient partiel de sécurité de l'action de précontrainte
γQ,1 Coefficient partiel de sécurité de l'action variable principale
γQ,i Coefficient partiel de sécurité des actions variables d'accompagnement
γAE Coefficient partiel de sécurité de l'action sismique
ψp,1 Coefficient de combinaison de l'action variable principale
ψa,i Coefficient de combinaison des actions variables d'accompagnement
Durable ou transitoire
Coefficients partiels de sécurité (γ) Coefficients de combinaison (ψ)
Favorable Défavorable Principal (ψp) Accompagnement (ψa)
Charge permanente (G) 1.000 1.350 - -
Surcharge (Q - Utilisation B) 0.000 1.500 1.000 0.670
Surcharge (Q - Utilisation D) 0.000 1.500 1.000 0.780
Vent (Q) 0.000 1.500 1.000 0.670
Sismique
Coefficients partiels de sécurité (γ) Coefficients de combinaison (ψ)
Favorable Défavorable Principal (ψp) Accompagnement (ψa)
Charge permanente (G) 1.000 1.000 - -
Surcharge (Q - Utilisation B) 0.000 1.000 0.650 0.400
Surcharge (Q - Utilisation D) 0.000 1.000 0.750 0.650
Vent (Q) 0.000 1.000 0.200 0.000
(1)
Séisme (E) -1.000 1.000 1.000 0.300
Notes:
Fraction des sollicitations sismiques à prendre en compte dans la direction orthogonale: Les sollicitations obtenues des résultats de l'analyse dans
(1)
Durable ou transitoire
Coefficients partiels de sécurité (γ) Coefficients de combinaison (ψ)
Favorable Défavorable Principal (ψp) Accompagnement (ψa)
Charge permanente (G) 1.000 1.350 - -
Surcharge (Q - Utilisation B) 0.000 1.500 1.000 0.700
Surcharge (Q - Utilisation D) 0.000 1.500 1.000 0.700
Vent (Q) 0.000 1.500 1.000 0.600
Page 6
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Sismique
Coefficients partiels de sécurité (γ) Coefficients de combinaison (ψ)
Favorable Défavorable Principal (ψp) Accompagnement (ψa)
Charge permanente (G) 1.000 1.000 - -
Surcharge (Q - Utilisation B) 0.000 1.000 0.300 0.300
Surcharge (Q - Utilisation D) 0.000 1.000 0.300 0.300
Vent (Q) 0.000 1.000 0.000 0.000
Séisme (E) -1.000 1.000 1.000 0.000
Situation 1
Coefficients partiels de sécurité (γ) Coefficients de combinaison (ψ)
Favorable Défavorable Principal (ψp) Accompagnement (ψa)
Charge permanente (G) 1.000 1.000 - -
Surcharge (Q - Utilisation B) 0.000 1.000 1.000 0.770
Surcharge (Q - Utilisation D) 0.000 1.000 1.000 0.900
Vent (Q) 0.000 1.000 1.000 0.770
Déplacements
Sismique
Coefficients partiels de sécurité (γ)
Favorable Défavorable
Charge permanente (G) 1.000 1.000
Surcharge (Q - Utilisation B) 0.000 1.000
Surcharge (Q - Utilisation D) 0.000 1.000
Vent (Q)
Séisme (E) -1.000 1.000
Page 7
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
4.2.- Combinaisons
Noms des hypothèses
PP Poids propre
G Charges permanentes
Qa (B) Surcharge (Utilisation Locaux avec places assises et dortoirs)
Qa (D) Surcharge (Utilisation Parcs de stationnement)
V(+X exc.+) Vent +X exc.+
V(+X exc.-) Vent +X exc.-
V(-X exc.+) Vent -X exc.+
V(-X exc.-) Vent -X exc.-
V(+Y exc.+) Vent +Y exc.+
V(+Y exc.-) Vent +Y exc.-
V(-Y exc.+) Vent -Y exc.+
V(-Y exc.-) Vent -Y exc.-
SX Séisme X
SY Séisme Y
Page 8
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
1 1.000 1.000
2 1.350 1.350
3 1.000 1.000 1.500
4 1.350 1.350 1.500
5 1.000 1.000 1.500
6 1.350 1.350 1.500
7 1.000 1.000 1.005 1.500
8 1.350 1.350 1.005 1.500
9 1.000 1.000 1.500 1.170
10 1.350 1.350 1.500 1.170
11 1.000 1.000 1.500
12 1.350 1.350 1.500
13 1.000 1.000 1.005 1.500
14 1.350 1.350 1.005 1.500
15 1.000 1.000 1.170 1.500
16 1.350 1.350 1.170 1.500
17 1.000 1.000 1.005 1.170 1.500
18 1.350 1.350 1.005 1.170 1.500
19 1.000 1.000 1.500 1.005
20 1.350 1.350 1.500 1.005
21 1.000 1.000 1.500 1.005
22 1.350 1.350 1.500 1.005
23 1.000 1.000 1.005 1.500 1.005
24 1.350 1.350 1.005 1.500 1.005
25 1.000 1.000 1.500 1.170 1.005
26 1.350 1.350 1.500 1.170 1.005
27 1.000 1.000 1.500
28 1.350 1.350 1.500
29 1.000 1.000 1.005 1.500
30 1.350 1.350 1.005 1.500
31 1.000 1.000 1.170 1.500
32 1.350 1.350 1.170 1.500
33 1.000 1.000 1.005 1.170 1.500
34 1.350 1.350 1.005 1.170 1.500
35 1.000 1.000 1.500 1.005
36 1.350 1.350 1.500 1.005
37 1.000 1.000 1.500 1.005
38 1.350 1.350 1.500 1.005
39 1.000 1.000 1.005 1.500 1.005
40 1.350 1.350 1.005 1.500 1.005
41 1.000 1.000 1.500 1.170 1.005
42 1.350 1.350 1.500 1.170 1.005
43 1.000 1.000 1.500
44 1.350 1.350 1.500
45 1.000 1.000 1.005 1.500
46 1.350 1.350 1.005 1.500
47 1.000 1.000 1.170 1.500
48 1.350 1.350 1.170 1.500
49 1.000 1.000 1.005 1.170 1.500
50 1.350 1.350 1.005 1.170 1.500
51 1.000 1.000 1.500 1.005
52 1.350 1.350 1.500 1.005
53 1.000 1.000 1.500 1.005
54 1.350 1.350 1.500 1.005
55 1.000 1.000 1.005 1.500 1.005
56 1.350 1.350 1.005 1.500 1.005
57 1.000 1.000 1.500 1.170 1.005
58 1.350 1.350 1.500 1.170 1.005
59 1.000 1.000 1.500
60 1.350 1.350 1.500
61 1.000 1.000 1.005 1.500
62 1.350 1.350 1.005 1.500
63 1.000 1.000 1.170 1.500
64 1.350 1.350 1.170 1.500
65 1.000 1.000 1.005 1.170 1.500
66 1.350 1.350 1.005 1.170 1.500
67 1.000 1.000 1.500 1.005
68 1.350 1.350 1.500 1.005
69 1.000 1.000 1.500 1.005
70 1.350 1.350 1.500 1.005
71 1.000 1.000 1.005 1.500 1.005
72 1.350 1.350 1.005 1.500 1.005
73 1.000 1.000 1.500 1.170 1.005
Page 9
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
74 1.350 1.350 1.500 1.170 1.005
75 1.000 1.000 1.500
76 1.350 1.350 1.500
77 1.000 1.000 1.005 1.500
78 1.350 1.350 1.005 1.500
79 1.000 1.000 1.170 1.500
80 1.350 1.350 1.170 1.500
81 1.000 1.000 1.005 1.170 1.500
82 1.350 1.350 1.005 1.170 1.500
83 1.000 1.000 1.500 1.005
84 1.350 1.350 1.500 1.005
85 1.000 1.000 1.500 1.005
86 1.350 1.350 1.500 1.005
87 1.000 1.000 1.005 1.500 1.005
88 1.350 1.350 1.005 1.500 1.005
89 1.000 1.000 1.500 1.170 1.005
90 1.350 1.350 1.500 1.170 1.005
91 1.000 1.000 1.500
92 1.350 1.350 1.500
93 1.000 1.000 1.005 1.500
94 1.350 1.350 1.005 1.500
95 1.000 1.000 1.170 1.500
96 1.350 1.350 1.170 1.500
97 1.000 1.000 1.005 1.170 1.500
98 1.350 1.350 1.005 1.170 1.500
99 1.000 1.000 1.500 1.005
100 1.350 1.350 1.500 1.005
101 1.000 1.000 1.500 1.005
102 1.350 1.350 1.500 1.005
103 1.000 1.000 1.005 1.500 1.005
104 1.350 1.350 1.005 1.500 1.005
105 1.000 1.000 1.500 1.170 1.005
106 1.350 1.350 1.500 1.170 1.005
107 1.000 1.000 1.500
108 1.350 1.350 1.500
109 1.000 1.000 1.005 1.500
110 1.350 1.350 1.005 1.500
111 1.000 1.000 1.170 1.500
112 1.350 1.350 1.170 1.500
113 1.000 1.000 1.005 1.170 1.500
114 1.350 1.350 1.005 1.170 1.500
115 1.000 1.000 1.500 1.005
116 1.350 1.350 1.500 1.005
117 1.000 1.000 1.500 1.005
118 1.350 1.350 1.500 1.005
119 1.000 1.000 1.005 1.500 1.005
120 1.350 1.350 1.005 1.500 1.005
121 1.000 1.000 1.500 1.170 1.005
122 1.350 1.350 1.500 1.170 1.005
123 1.000 1.000 1.500
124 1.350 1.350 1.500
125 1.000 1.000 1.005 1.500
126 1.350 1.350 1.005 1.500
127 1.000 1.000 1.170 1.500
128 1.350 1.350 1.170 1.500
129 1.000 1.000 1.005 1.170 1.500
130 1.350 1.350 1.005 1.170 1.500
131 1.000 1.000 1.500 1.005
132 1.350 1.350 1.500 1.005
133 1.000 1.000 1.500 1.005
134 1.350 1.350 1.500 1.005
135 1.000 1.000 1.005 1.500 1.005
136 1.350 1.350 1.005 1.500 1.005
137 1.000 1.000 1.500 1.170 1.005
138 1.350 1.350 1.500 1.170 1.005
139 1.000 1.000 -0.300 -1.000
140 1.000 1.000 0.650 -0.300 -1.000
141 1.000 1.000 0.750 -0.300 -1.000
142 1.000 1.000 0.400 0.750 -0.300 -1.000
143 1.000 1.000 0.650 0.650 -0.300 -1.000
144 1.000 1.000 0.200 -0.300 -1.000
145 1.000 1.000 0.400 0.200 -0.300 -1.000
146 1.000 1.000 0.650 0.200 -0.300 -1.000
147 1.000 1.000 0.400 0.650 0.200 -0.300 -1.000
Page 10
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
148 1.000 1.000 0.200 -0.300 -1.000
149 1.000 1.000 0.400 0.200 -0.300 -1.000
150 1.000 1.000 0.650 0.200 -0.300 -1.000
151 1.000 1.000 0.400 0.650 0.200 -0.300 -1.000
152 1.000 1.000 0.200 -0.300 -1.000
153 1.000 1.000 0.400 0.200 -0.300 -1.000
154 1.000 1.000 0.650 0.200 -0.300 -1.000
155 1.000 1.000 0.400 0.650 0.200 -0.300 -1.000
156 1.000 1.000 0.200 -0.300 -1.000
157 1.000 1.000 0.400 0.200 -0.300 -1.000
158 1.000 1.000 0.650 0.200 -0.300 -1.000
159 1.000 1.000 0.400 0.650 0.200 -0.300 -1.000
160 1.000 1.000 0.200 -0.300 -1.000
161 1.000 1.000 0.400 0.200 -0.300 -1.000
162 1.000 1.000 0.650 0.200 -0.300 -1.000
163 1.000 1.000 0.400 0.650 0.200 -0.300 -1.000
164 1.000 1.000 0.200 -0.300 -1.000
165 1.000 1.000 0.400 0.200 -0.300 -1.000
166 1.000 1.000 0.650 0.200 -0.300 -1.000
167 1.000 1.000 0.400 0.650 0.200 -0.300 -1.000
168 1.000 1.000 0.200 -0.300 -1.000
169 1.000 1.000 0.400 0.200 -0.300 -1.000
170 1.000 1.000 0.650 0.200 -0.300 -1.000
171 1.000 1.000 0.400 0.650 0.200 -0.300 -1.000
172 1.000 1.000 0.200 -0.300 -1.000
173 1.000 1.000 0.400 0.200 -0.300 -1.000
174 1.000 1.000 0.650 0.200 -0.300 -1.000
175 1.000 1.000 0.400 0.650 0.200 -0.300 -1.000
176 1.000 1.000 0.300 -1.000
177 1.000 1.000 0.650 0.300 -1.000
178 1.000 1.000 0.750 0.300 -1.000
179 1.000 1.000 0.400 0.750 0.300 -1.000
180 1.000 1.000 0.650 0.650 0.300 -1.000
181 1.000 1.000 0.200 0.300 -1.000
182 1.000 1.000 0.400 0.200 0.300 -1.000
183 1.000 1.000 0.650 0.200 0.300 -1.000
184 1.000 1.000 0.400 0.650 0.200 0.300 -1.000
185 1.000 1.000 0.200 0.300 -1.000
186 1.000 1.000 0.400 0.200 0.300 -1.000
187 1.000 1.000 0.650 0.200 0.300 -1.000
188 1.000 1.000 0.400 0.650 0.200 0.300 -1.000
189 1.000 1.000 0.200 0.300 -1.000
190 1.000 1.000 0.400 0.200 0.300 -1.000
191 1.000 1.000 0.650 0.200 0.300 -1.000
192 1.000 1.000 0.400 0.650 0.200 0.300 -1.000
193 1.000 1.000 0.200 0.300 -1.000
194 1.000 1.000 0.400 0.200 0.300 -1.000
195 1.000 1.000 0.650 0.200 0.300 -1.000
196 1.000 1.000 0.400 0.650 0.200 0.300 -1.000
197 1.000 1.000 0.200 0.300 -1.000
198 1.000 1.000 0.400 0.200 0.300 -1.000
199 1.000 1.000 0.650 0.200 0.300 -1.000
200 1.000 1.000 0.400 0.650 0.200 0.300 -1.000
201 1.000 1.000 0.200 0.300 -1.000
202 1.000 1.000 0.400 0.200 0.300 -1.000
203 1.000 1.000 0.650 0.200 0.300 -1.000
204 1.000 1.000 0.400 0.650 0.200 0.300 -1.000
205 1.000 1.000 0.200 0.300 -1.000
206 1.000 1.000 0.400 0.200 0.300 -1.000
207 1.000 1.000 0.650 0.200 0.300 -1.000
208 1.000 1.000 0.400 0.650 0.200 0.300 -1.000
209 1.000 1.000 0.200 0.300 -1.000
210 1.000 1.000 0.400 0.200 0.300 -1.000
211 1.000 1.000 0.650 0.200 0.300 -1.000
212 1.000 1.000 0.400 0.650 0.200 0.300 -1.000
213 1.000 1.000 -1.000 -0.300
214 1.000 1.000 0.650 -1.000 -0.300
215 1.000 1.000 0.750 -1.000 -0.300
216 1.000 1.000 0.400 0.750 -1.000 -0.300
217 1.000 1.000 0.650 0.650 -1.000 -0.300
218 1.000 1.000 0.200 -1.000 -0.300
219 1.000 1.000 0.400 0.200 -1.000 -0.300
220 1.000 1.000 0.650 0.200 -1.000 -0.300
221 1.000 1.000 0.400 0.650 0.200 -1.000 -0.300
Page 11
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
222 1.000 1.000 0.200 -1.000 -0.300
223 1.000 1.000 0.400 0.200 -1.000 -0.300
224 1.000 1.000 0.650 0.200 -1.000 -0.300
225 1.000 1.000 0.400 0.650 0.200 -1.000 -0.300
226 1.000 1.000 0.200 -1.000 -0.300
227 1.000 1.000 0.400 0.200 -1.000 -0.300
228 1.000 1.000 0.650 0.200 -1.000 -0.300
229 1.000 1.000 0.400 0.650 0.200 -1.000 -0.300
230 1.000 1.000 0.200 -1.000 -0.300
231 1.000 1.000 0.400 0.200 -1.000 -0.300
232 1.000 1.000 0.650 0.200 -1.000 -0.300
233 1.000 1.000 0.400 0.650 0.200 -1.000 -0.300
234 1.000 1.000 0.200 -1.000 -0.300
235 1.000 1.000 0.400 0.200 -1.000 -0.300
236 1.000 1.000 0.650 0.200 -1.000 -0.300
237 1.000 1.000 0.400 0.650 0.200 -1.000 -0.300
238 1.000 1.000 0.200 -1.000 -0.300
239 1.000 1.000 0.400 0.200 -1.000 -0.300
240 1.000 1.000 0.650 0.200 -1.000 -0.300
241 1.000 1.000 0.400 0.650 0.200 -1.000 -0.300
242 1.000 1.000 0.200 -1.000 -0.300
243 1.000 1.000 0.400 0.200 -1.000 -0.300
244 1.000 1.000 0.650 0.200 -1.000 -0.300
245 1.000 1.000 0.400 0.650 0.200 -1.000 -0.300
246 1.000 1.000 0.200 -1.000 -0.300
247 1.000 1.000 0.400 0.200 -1.000 -0.300
248 1.000 1.000 0.650 0.200 -1.000 -0.300
249 1.000 1.000 0.400 0.650 0.200 -1.000 -0.300
250 1.000 1.000 -1.000 0.300
251 1.000 1.000 0.650 -1.000 0.300
252 1.000 1.000 0.750 -1.000 0.300
253 1.000 1.000 0.400 0.750 -1.000 0.300
254 1.000 1.000 0.650 0.650 -1.000 0.300
255 1.000 1.000 0.200 -1.000 0.300
256 1.000 1.000 0.400 0.200 -1.000 0.300
257 1.000 1.000 0.650 0.200 -1.000 0.300
258 1.000 1.000 0.400 0.650 0.200 -1.000 0.300
259 1.000 1.000 0.200 -1.000 0.300
260 1.000 1.000 0.400 0.200 -1.000 0.300
261 1.000 1.000 0.650 0.200 -1.000 0.300
262 1.000 1.000 0.400 0.650 0.200 -1.000 0.300
263 1.000 1.000 0.200 -1.000 0.300
264 1.000 1.000 0.400 0.200 -1.000 0.300
265 1.000 1.000 0.650 0.200 -1.000 0.300
266 1.000 1.000 0.400 0.650 0.200 -1.000 0.300
267 1.000 1.000 0.200 -1.000 0.300
268 1.000 1.000 0.400 0.200 -1.000 0.300
269 1.000 1.000 0.650 0.200 -1.000 0.300
270 1.000 1.000 0.400 0.650 0.200 -1.000 0.300
271 1.000 1.000 0.200 -1.000 0.300
272 1.000 1.000 0.400 0.200 -1.000 0.300
273 1.000 1.000 0.650 0.200 -1.000 0.300
274 1.000 1.000 0.400 0.650 0.200 -1.000 0.300
275 1.000 1.000 0.200 -1.000 0.300
276 1.000 1.000 0.400 0.200 -1.000 0.300
277 1.000 1.000 0.650 0.200 -1.000 0.300
278 1.000 1.000 0.400 0.650 0.200 -1.000 0.300
279 1.000 1.000 0.200 -1.000 0.300
280 1.000 1.000 0.400 0.200 -1.000 0.300
281 1.000 1.000 0.650 0.200 -1.000 0.300
282 1.000 1.000 0.400 0.650 0.200 -1.000 0.300
283 1.000 1.000 0.200 -1.000 0.300
284 1.000 1.000 0.400 0.200 -1.000 0.300
285 1.000 1.000 0.650 0.200 -1.000 0.300
286 1.000 1.000 0.400 0.650 0.200 -1.000 0.300
287 1.000 1.000 0.300 1.000
288 1.000 1.000 0.650 0.300 1.000
289 1.000 1.000 0.750 0.300 1.000
290 1.000 1.000 0.400 0.750 0.300 1.000
291 1.000 1.000 0.650 0.650 0.300 1.000
292 1.000 1.000 0.200 0.300 1.000
293 1.000 1.000 0.400 0.200 0.300 1.000
294 1.000 1.000 0.650 0.200 0.300 1.000
295 1.000 1.000 0.400 0.650 0.200 0.300 1.000
Page 12
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
296 1.000 1.000 0.200 0.300 1.000
297 1.000 1.000 0.400 0.200 0.300 1.000
298 1.000 1.000 0.650 0.200 0.300 1.000
299 1.000 1.000 0.400 0.650 0.200 0.300 1.000
300 1.000 1.000 0.200 0.300 1.000
301 1.000 1.000 0.400 0.200 0.300 1.000
302 1.000 1.000 0.650 0.200 0.300 1.000
303 1.000 1.000 0.400 0.650 0.200 0.300 1.000
304 1.000 1.000 0.200 0.300 1.000
305 1.000 1.000 0.400 0.200 0.300 1.000
306 1.000 1.000 0.650 0.200 0.300 1.000
307 1.000 1.000 0.400 0.650 0.200 0.300 1.000
308 1.000 1.000 0.200 0.300 1.000
309 1.000 1.000 0.400 0.200 0.300 1.000
310 1.000 1.000 0.650 0.200 0.300 1.000
311 1.000 1.000 0.400 0.650 0.200 0.300 1.000
312 1.000 1.000 0.200 0.300 1.000
313 1.000 1.000 0.400 0.200 0.300 1.000
314 1.000 1.000 0.650 0.200 0.300 1.000
315 1.000 1.000 0.400 0.650 0.200 0.300 1.000
316 1.000 1.000 0.200 0.300 1.000
317 1.000 1.000 0.400 0.200 0.300 1.000
318 1.000 1.000 0.650 0.200 0.300 1.000
319 1.000 1.000 0.400 0.650 0.200 0.300 1.000
320 1.000 1.000 0.200 0.300 1.000
321 1.000 1.000 0.400 0.200 0.300 1.000
322 1.000 1.000 0.650 0.200 0.300 1.000
323 1.000 1.000 0.400 0.650 0.200 0.300 1.000
324 1.000 1.000 -0.300 1.000
325 1.000 1.000 0.650 -0.300 1.000
326 1.000 1.000 0.750 -0.300 1.000
327 1.000 1.000 0.400 0.750 -0.300 1.000
328 1.000 1.000 0.650 0.650 -0.300 1.000
329 1.000 1.000 0.200 -0.300 1.000
330 1.000 1.000 0.400 0.200 -0.300 1.000
331 1.000 1.000 0.650 0.200 -0.300 1.000
332 1.000 1.000 0.400 0.650 0.200 -0.300 1.000
333 1.000 1.000 0.200 -0.300 1.000
334 1.000 1.000 0.400 0.200 -0.300 1.000
335 1.000 1.000 0.650 0.200 -0.300 1.000
336 1.000 1.000 0.400 0.650 0.200 -0.300 1.000
337 1.000 1.000 0.200 -0.300 1.000
338 1.000 1.000 0.400 0.200 -0.300 1.000
339 1.000 1.000 0.650 0.200 -0.300 1.000
340 1.000 1.000 0.400 0.650 0.200 -0.300 1.000
341 1.000 1.000 0.200 -0.300 1.000
342 1.000 1.000 0.400 0.200 -0.300 1.000
343 1.000 1.000 0.650 0.200 -0.300 1.000
344 1.000 1.000 0.400 0.650 0.200 -0.300 1.000
345 1.000 1.000 0.200 -0.300 1.000
346 1.000 1.000 0.400 0.200 -0.300 1.000
347 1.000 1.000 0.650 0.200 -0.300 1.000
348 1.000 1.000 0.400 0.650 0.200 -0.300 1.000
349 1.000 1.000 0.200 -0.300 1.000
350 1.000 1.000 0.400 0.200 -0.300 1.000
351 1.000 1.000 0.650 0.200 -0.300 1.000
352 1.000 1.000 0.400 0.650 0.200 -0.300 1.000
353 1.000 1.000 0.200 -0.300 1.000
354 1.000 1.000 0.400 0.200 -0.300 1.000
355 1.000 1.000 0.650 0.200 -0.300 1.000
356 1.000 1.000 0.400 0.650 0.200 -0.300 1.000
357 1.000 1.000 0.200 -0.300 1.000
358 1.000 1.000 0.400 0.200 -0.300 1.000
359 1.000 1.000 0.650 0.200 -0.300 1.000
360 1.000 1.000 0.400 0.650 0.200 -0.300 1.000
361 1.000 1.000 1.000 0.300
362 1.000 1.000 0.650 1.000 0.300
363 1.000 1.000 0.750 1.000 0.300
364 1.000 1.000 0.400 0.750 1.000 0.300
365 1.000 1.000 0.650 0.650 1.000 0.300
366 1.000 1.000 0.200 1.000 0.300
367 1.000 1.000 0.400 0.200 1.000 0.300
368 1.000 1.000 0.650 0.200 1.000 0.300
369 1.000 1.000 0.400 0.650 0.200 1.000 0.300
Page 13
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
370 1.000 1.000 0.200 1.000 0.300
371 1.000 1.000 0.400 0.200 1.000 0.300
372 1.000 1.000 0.650 0.200 1.000 0.300
373 1.000 1.000 0.400 0.650 0.200 1.000 0.300
374 1.000 1.000 0.200 1.000 0.300
375 1.000 1.000 0.400 0.200 1.000 0.300
376 1.000 1.000 0.650 0.200 1.000 0.300
377 1.000 1.000 0.400 0.650 0.200 1.000 0.300
378 1.000 1.000 0.200 1.000 0.300
379 1.000 1.000 0.400 0.200 1.000 0.300
380 1.000 1.000 0.650 0.200 1.000 0.300
381 1.000 1.000 0.400 0.650 0.200 1.000 0.300
382 1.000 1.000 0.200 1.000 0.300
383 1.000 1.000 0.400 0.200 1.000 0.300
384 1.000 1.000 0.650 0.200 1.000 0.300
385 1.000 1.000 0.400 0.650 0.200 1.000 0.300
386 1.000 1.000 0.200 1.000 0.300
387 1.000 1.000 0.400 0.200 1.000 0.300
388 1.000 1.000 0.650 0.200 1.000 0.300
389 1.000 1.000 0.400 0.650 0.200 1.000 0.300
390 1.000 1.000 0.200 1.000 0.300
391 1.000 1.000 0.400 0.200 1.000 0.300
392 1.000 1.000 0.650 0.200 1.000 0.300
393 1.000 1.000 0.400 0.650 0.200 1.000 0.300
394 1.000 1.000 0.200 1.000 0.300
395 1.000 1.000 0.400 0.200 1.000 0.300
396 1.000 1.000 0.650 0.200 1.000 0.300
397 1.000 1.000 0.400 0.650 0.200 1.000 0.300
398 1.000 1.000 1.000 -0.300
399 1.000 1.000 0.650 1.000 -0.300
400 1.000 1.000 0.750 1.000 -0.300
401 1.000 1.000 0.400 0.750 1.000 -0.300
402 1.000 1.000 0.650 0.650 1.000 -0.300
403 1.000 1.000 0.200 1.000 -0.300
404 1.000 1.000 0.400 0.200 1.000 -0.300
405 1.000 1.000 0.650 0.200 1.000 -0.300
406 1.000 1.000 0.400 0.650 0.200 1.000 -0.300
407 1.000 1.000 0.200 1.000 -0.300
408 1.000 1.000 0.400 0.200 1.000 -0.300
409 1.000 1.000 0.650 0.200 1.000 -0.300
410 1.000 1.000 0.400 0.650 0.200 1.000 -0.300
411 1.000 1.000 0.200 1.000 -0.300
412 1.000 1.000 0.400 0.200 1.000 -0.300
413 1.000 1.000 0.650 0.200 1.000 -0.300
414 1.000 1.000 0.400 0.650 0.200 1.000 -0.300
415 1.000 1.000 0.200 1.000 -0.300
416 1.000 1.000 0.400 0.200 1.000 -0.300
417 1.000 1.000 0.650 0.200 1.000 -0.300
418 1.000 1.000 0.400 0.650 0.200 1.000 -0.300
419 1.000 1.000 0.200 1.000 -0.300
420 1.000 1.000 0.400 0.200 1.000 -0.300
421 1.000 1.000 0.650 0.200 1.000 -0.300
422 1.000 1.000 0.400 0.650 0.200 1.000 -0.300
423 1.000 1.000 0.200 1.000 -0.300
424 1.000 1.000 0.400 0.200 1.000 -0.300
425 1.000 1.000 0.650 0.200 1.000 -0.300
426 1.000 1.000 0.400 0.650 0.200 1.000 -0.300
427 1.000 1.000 0.200 1.000 -0.300
428 1.000 1.000 0.400 0.200 1.000 -0.300
429 1.000 1.000 0.650 0.200 1.000 -0.300
430 1.000 1.000 0.400 0.650 0.200 1.000 -0.300
431 1.000 1.000 0.200 1.000 -0.300
432 1.000 1.000 0.400 0.200 1.000 -0.300
433 1.000 1.000 0.650 0.200 1.000 -0.300
434 1.000 1.000 0.400 0.650 0.200 1.000 -0.300
Page 14
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 15
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
1 1.000 1.000
2 1.350 1.350
3 1.000 1.000 1.500
4 1.350 1.350 1.500
5 1.000 1.000 1.500
6 1.350 1.350 1.500
7 1.000 1.000 1.050 1.500
8 1.350 1.350 1.050 1.500
9 1.000 1.000 1.500 1.050
10 1.350 1.350 1.500 1.050
11 1.000 1.000 1.500
12 1.350 1.350 1.500
13 1.000 1.000 1.050 1.500
14 1.350 1.350 1.050 1.500
15 1.000 1.000 1.050 1.500
16 1.350 1.350 1.050 1.500
17 1.000 1.000 1.050 1.050 1.500
18 1.350 1.350 1.050 1.050 1.500
19 1.000 1.000 1.500 0.900
20 1.350 1.350 1.500 0.900
21 1.000 1.000 1.500 0.900
22 1.350 1.350 1.500 0.900
23 1.000 1.000 1.050 1.500 0.900
24 1.350 1.350 1.050 1.500 0.900
25 1.000 1.000 1.500 1.050 0.900
26 1.350 1.350 1.500 1.050 0.900
27 1.000 1.000 1.500
28 1.350 1.350 1.500
29 1.000 1.000 1.050 1.500
30 1.350 1.350 1.050 1.500
31 1.000 1.000 1.050 1.500
32 1.350 1.350 1.050 1.500
33 1.000 1.000 1.050 1.050 1.500
34 1.350 1.350 1.050 1.050 1.500
35 1.000 1.000 1.500 0.900
36 1.350 1.350 1.500 0.900
37 1.000 1.000 1.500 0.900
38 1.350 1.350 1.500 0.900
39 1.000 1.000 1.050 1.500 0.900
40 1.350 1.350 1.050 1.500 0.900
41 1.000 1.000 1.500 1.050 0.900
42 1.350 1.350 1.500 1.050 0.900
43 1.000 1.000 1.500
44 1.350 1.350 1.500
45 1.000 1.000 1.050 1.500
46 1.350 1.350 1.050 1.500
47 1.000 1.000 1.050 1.500
48 1.350 1.350 1.050 1.500
49 1.000 1.000 1.050 1.050 1.500
50 1.350 1.350 1.050 1.050 1.500
51 1.000 1.000 1.500 0.900
52 1.350 1.350 1.500 0.900
53 1.000 1.000 1.500 0.900
54 1.350 1.350 1.500 0.900
55 1.000 1.000 1.050 1.500 0.900
56 1.350 1.350 1.050 1.500 0.900
57 1.000 1.000 1.500 1.050 0.900
58 1.350 1.350 1.500 1.050 0.900
59 1.000 1.000 1.500
60 1.350 1.350 1.500
61 1.000 1.000 1.050 1.500
62 1.350 1.350 1.050 1.500
63 1.000 1.000 1.050 1.500
64 1.350 1.350 1.050 1.500
65 1.000 1.000 1.050 1.050 1.500
66 1.350 1.350 1.050 1.050 1.500
67 1.000 1.000 1.500 0.900
68 1.350 1.350 1.500 0.900
69 1.000 1.000 1.500 0.900
70 1.350 1.350 1.500 0.900
71 1.000 1.000 1.050 1.500 0.900
72 1.350 1.350 1.050 1.500 0.900
73 1.000 1.000 1.500 1.050 0.900
Page 16
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
74 1.350 1.350 1.500 1.050 0.900
75 1.000 1.000 1.500
76 1.350 1.350 1.500
77 1.000 1.000 1.050 1.500
78 1.350 1.350 1.050 1.500
79 1.000 1.000 1.050 1.500
80 1.350 1.350 1.050 1.500
81 1.000 1.000 1.050 1.050 1.500
82 1.350 1.350 1.050 1.050 1.500
83 1.000 1.000 1.500 0.900
84 1.350 1.350 1.500 0.900
85 1.000 1.000 1.500 0.900
86 1.350 1.350 1.500 0.900
87 1.000 1.000 1.050 1.500 0.900
88 1.350 1.350 1.050 1.500 0.900
89 1.000 1.000 1.500 1.050 0.900
90 1.350 1.350 1.500 1.050 0.900
91 1.000 1.000 1.500
92 1.350 1.350 1.500
93 1.000 1.000 1.050 1.500
94 1.350 1.350 1.050 1.500
95 1.000 1.000 1.050 1.500
96 1.350 1.350 1.050 1.500
97 1.000 1.000 1.050 1.050 1.500
98 1.350 1.350 1.050 1.050 1.500
99 1.000 1.000 1.500 0.900
100 1.350 1.350 1.500 0.900
101 1.000 1.000 1.500 0.900
102 1.350 1.350 1.500 0.900
103 1.000 1.000 1.050 1.500 0.900
104 1.350 1.350 1.050 1.500 0.900
105 1.000 1.000 1.500 1.050 0.900
106 1.350 1.350 1.500 1.050 0.900
107 1.000 1.000 1.500
108 1.350 1.350 1.500
109 1.000 1.000 1.050 1.500
110 1.350 1.350 1.050 1.500
111 1.000 1.000 1.050 1.500
112 1.350 1.350 1.050 1.500
113 1.000 1.000 1.050 1.050 1.500
114 1.350 1.350 1.050 1.050 1.500
115 1.000 1.000 1.500 0.900
116 1.350 1.350 1.500 0.900
117 1.000 1.000 1.500 0.900
118 1.350 1.350 1.500 0.900
119 1.000 1.000 1.050 1.500 0.900
120 1.350 1.350 1.050 1.500 0.900
121 1.000 1.000 1.500 1.050 0.900
122 1.350 1.350 1.500 1.050 0.900
123 1.000 1.000 1.500
124 1.350 1.350 1.500
125 1.000 1.000 1.050 1.500
126 1.350 1.350 1.050 1.500
127 1.000 1.000 1.050 1.500
128 1.350 1.350 1.050 1.500
129 1.000 1.000 1.050 1.050 1.500
130 1.350 1.350 1.050 1.050 1.500
131 1.000 1.000 1.500 0.900
132 1.350 1.350 1.500 0.900
133 1.000 1.000 1.500 0.900
134 1.350 1.350 1.500 0.900
135 1.000 1.000 1.050 1.500 0.900
136 1.350 1.350 1.050 1.500 0.900
137 1.000 1.000 1.500 1.050 0.900
138 1.350 1.350 1.500 1.050 0.900
139 1.000 1.000 -1.000
140 1.000 1.000 0.300 -1.000
141 1.000 1.000 0.300 -1.000
142 1.000 1.000 0.300 0.300 -1.000
143 1.000 1.000 1.000
144 1.000 1.000 0.300 1.000
145 1.000 1.000 0.300 1.000
146 1.000 1.000 0.300 0.300 1.000
147 1.000 1.000 -1.000
Page 17
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
148 1.000 1.000 0.300 -1.000
149 1.000 1.000 0.300 -1.000
150 1.000 1.000 0.300 0.300 -1.000
151 1.000 1.000 1.000
152 1.000 1.000 0.300 1.000
153 1.000 1.000 0.300 1.000
154 1.000 1.000 0.300 0.300 1.000
Page 18
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 19
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
1 1.000 1.000
2 1.000 1.000 1.000
3 1.000 1.000 1.000
4 1.000 1.000 0.770 1.000
5 1.000 1.000 1.000 0.900
6 1.000 1.000 1.000
7 1.000 1.000 0.770 1.000
8 1.000 1.000 0.900 1.000
9 1.000 1.000 0.770 0.900 1.000
10 1.000 1.000 1.000 0.770
11 1.000 1.000 1.000 0.770
12 1.000 1.000 0.770 1.000 0.770
13 1.000 1.000 1.000 0.900 0.770
14 1.000 1.000 1.000
15 1.000 1.000 0.770 1.000
16 1.000 1.000 0.900 1.000
17 1.000 1.000 0.770 0.900 1.000
18 1.000 1.000 1.000 0.770
19 1.000 1.000 1.000 0.770
20 1.000 1.000 0.770 1.000 0.770
21 1.000 1.000 1.000 0.900 0.770
22 1.000 1.000 1.000
23 1.000 1.000 0.770 1.000
24 1.000 1.000 0.900 1.000
25 1.000 1.000 0.770 0.900 1.000
26 1.000 1.000 1.000 0.770
27 1.000 1.000 1.000 0.770
28 1.000 1.000 0.770 1.000 0.770
29 1.000 1.000 1.000 0.900 0.770
30 1.000 1.000 1.000
31 1.000 1.000 0.770 1.000
32 1.000 1.000 0.900 1.000
33 1.000 1.000 0.770 0.900 1.000
34 1.000 1.000 1.000 0.770
35 1.000 1.000 1.000 0.770
36 1.000 1.000 0.770 1.000 0.770
37 1.000 1.000 1.000 0.900 0.770
38 1.000 1.000 1.000
39 1.000 1.000 0.770 1.000
40 1.000 1.000 0.900 1.000
41 1.000 1.000 0.770 0.900 1.000
42 1.000 1.000 1.000 0.770
43 1.000 1.000 1.000 0.770
44 1.000 1.000 0.770 1.000 0.770
45 1.000 1.000 1.000 0.900 0.770
46 1.000 1.000 1.000
47 1.000 1.000 0.770 1.000
48 1.000 1.000 0.900 1.000
49 1.000 1.000 0.770 0.900 1.000
50 1.000 1.000 1.000 0.770
51 1.000 1.000 1.000 0.770
52 1.000 1.000 0.770 1.000 0.770
53 1.000 1.000 1.000 0.900 0.770
54 1.000 1.000 1.000
55 1.000 1.000 0.770 1.000
56 1.000 1.000 0.900 1.000
57 1.000 1.000 0.770 0.900 1.000
58 1.000 1.000 1.000 0.770
59 1.000 1.000 1.000 0.770
60 1.000 1.000 0.770 1.000 0.770
61 1.000 1.000 1.000 0.900 0.770
62 1.000 1.000 1.000
63 1.000 1.000 0.770 1.000
64 1.000 1.000 0.900 1.000
65 1.000 1.000 0.770 0.900 1.000
66 1.000 1.000 1.000 0.770
67 1.000 1.000 1.000 0.770
68 1.000 1.000 0.770 1.000 0.770
69 1.000 1.000 1.000 0.900 0.770
Page 20
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Déplacements
Comb. PP G Qa (B) Qa (D) V(+X exc.+) V(+X exc.-) V(-X exc.+) V(-X exc.-) V(+Y exc.+) V(+Y exc.-) V(-Y exc.+) V(-Y exc.-) SX SY
1 1.000 1.000
2 1.000 1.000 1.000
3 1.000 1.000 1.000
4 1.000 1.000 1.000 1.000
5 1.000 1.000 1.000
6 1.000 1.000 1.000 1.000
7 1.000 1.000 1.000 1.000
8 1.000 1.000 1.000 1.000 1.000
9 1.000 1.000 1.000
10 1.000 1.000 1.000 1.000
11 1.000 1.000 1.000 1.000
12 1.000 1.000 1.000 1.000 1.000
13 1.000 1.000 1.000
14 1.000 1.000 1.000 1.000
15 1.000 1.000 1.000 1.000
16 1.000 1.000 1.000 1.000 1.000
17 1.000 1.000 1.000
18 1.000 1.000 1.000 1.000
19 1.000 1.000 1.000 1.000
20 1.000 1.000 1.000 1.000 1.000
21 1.000 1.000 1.000
22 1.000 1.000 1.000 1.000
23 1.000 1.000 1.000 1.000
24 1.000 1.000 1.000 1.000 1.000
25 1.000 1.000 1.000
26 1.000 1.000 1.000 1.000
27 1.000 1.000 1.000 1.000
28 1.000 1.000 1.000 1.000 1.000
29 1.000 1.000 1.000
30 1.000 1.000 1.000 1.000
31 1.000 1.000 1.000 1.000
32 1.000 1.000 1.000 1.000 1.000
33 1.000 1.000 1.000
34 1.000 1.000 1.000 1.000
35 1.000 1.000 1.000 1.000
36 1.000 1.000 1.000 1.000 1.000
37 1.000 1.000 -1.000
38 1.000 1.000 1.000 -1.000
39 1.000 1.000 1.000 -1.000
40 1.000 1.000 1.000 1.000 -1.000
41 1.000 1.000 1.000
42 1.000 1.000 1.000 1.000
43 1.000 1.000 1.000 1.000
44 1.000 1.000 1.000 1.000 1.000
45 1.000 1.000 -1.000
46 1.000 1.000 1.000 -1.000
47 1.000 1.000 1.000 -1.000
48 1.000 1.000 1.000 1.000 -1.000
49 1.000 1.000 1.000
50 1.000 1.000 1.000 1.000
51 1.000 1.000 1.000 1.000
52 1.000 1.000 1.000 1.000 1.000
Page 22
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 23
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 24
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 25
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 26
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 27
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 28
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 30
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 31
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 32
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 33
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 34
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 37
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 38
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 39
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 40
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 41
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Semelle du mur
Référence Semelle du mur
VA1 Longrine: 0.300 x 1.500
Débords: gch.:0.00 drt.:0.00 haut.:1.50
Contrainte admissible aux ELU: 3.06 kgf/cm²
Rapport contraintes admissibles ELS/ELU: 0.67
Module de réaction: 5096.84 t/m³
VA1-c Longrine: 0.300 x 1.500
Débords: gch.:0.00 drt.:0.00 haut.:1.50
Contrainte admissible aux ELU: 3.06 kgf/cm²
Rapport contraintes admissibles ELS/ELU: 0.67
Module de réaction: 5096.84 t/m³
VA8b Longrine: 0.300 x 1.500
Débords: gch.:0.00 drt.:0.00 haut.:1.50
Contrainte admissible aux ELU: 3.06 kgf/cm²
Rapport contraintes admissibles ELS/ELU: 0.67
Module de réaction: 5096.84 t/m³
Page 42
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 43
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 44
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 45
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 46
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 47
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 48
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 49
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 50
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 51
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 52
Récapitulatif des données de l'ouvrage
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
fyk
Élément Acier γs
(kgf/cm²)
Tous Fe E500 5097 1.00 a 1.15
Page 53
PROJET HÔTEL NOVOTEL ALGER AÉROPORT
3. ANALYSE DE LA STRUCTURE DU BÂTIMENT AVEC DES MURS DE 30 CM D'EPAISSEUR
Après l’étude des documents reçus du projet, la graphique et l’écrite, et en partant des données
relatives à la géométrie, typologie structurelle proposée et charges considérées, on a réalisé un
model de calcul du bâtiment qui nous permet de étudier la structure proposée.
Le programme utilisé pour le calcul est CYPECAD, CYPE Ingenieros, vers.2019 d.
Image du model en étude
Janvier-2018
SENDARRUBIAS & HERNÁNDEZ, ARCHITECTURE AND ENGINEERING, S.L. Page 4 sur 4
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Page 1
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA1: Longueur: 904 cm [Noeud initial: 5.92;46.37 -> Noeud final: 5.92;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. drt. 599.98 60.21 246.15 44.98 1.21 2.87 0.90 --- ---
Arm. vert. gch. 179.57 63.43 239.30 44.93 0.00 1.93 0.63 --- ---
Arm. horz. gch. 499.83 60.72 247.85 45.21 0.00 1.89 0.63 --- ---
Béton 47.70 -40.28 -20.09 52.64 0.81 -2.65 -1.07 --- ---
Arm. transve. 18.32 -13.50 8.25 -32.76 --- --- --- 3.29 7.86
R+9
Arm. vert. drt. 204.48 53.06 242.64 42.57 1.18 1.88 0.62 --- ---
(e=30.0 cm)
Arm. horz. drt. 603.02 46.45 245.07 41.17 1.15 3.47 1.04 --- ---
Arm. vert. gch. 150.39 53.06 242.64 42.57 0.00 1.88 0.62 --- ---
Arm. horz. gch. 324.79 47.10 252.02 41.98 0.00 1.93 0.64 --- ---
Béton 49.25 -65.16 -17.90 47.12 1.30 -5.02 -1.68 --- ---
Arm. transve. 16.90 -11.32 10.99 -37.70 --- --- --- 3.17 7.76
R+8
Arm. vert. drt. 179.38 32.70 250.52 37.90 1.21 3.69 1.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 546.55 32.70 250.52 37.90 1.21 3.69 1.10 --- ---
Arm. vert. gch. 145.68 87.74 6.58 -19.58 0.00 0.35 -0.19 --- ---
Arm. horz. gch. 442.78 30.89 253.86 37.75 0.00 1.87 0.63 --- ---
Béton 54.18 -80.73 -21.78 51.96 1.61 -4.77 -1.59 --- ---
Arm. transve. 63.53 -6.77 13.89 -42.07 --- --- --- 2.92 7.36
R+7
Arm. vert. drt. 165.78 96.53 7.58 -20.33 1.56 0.32 -0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 396.95 14.85 249.82 33.04 1.17 3.12 0.96 --- ---
Arm. vert. gch. 81.47 -174.10 52.97 -20.29 3.48 -0.10 0.30 --- ---
Arm. horz. gch. 324.98 12.22 253.35 32.52 0.00 1.81 0.61 --- ---
Béton 71.45 -159.44 41.51 -1.08 -3.19 -0.15 0.32 --- ---
Arm. transve. 59.59 -3.16 16.90 -45.75 --- --- --- 2.08 6.00
R+6
Arm. vert. drt. 103.93 108.28 8.90 -21.42 1.49 0.31 -0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 383.86 -8.61 247.72 26.22 1.15 3.22 0.96 --- ---
Arm. vert. gch. 94.88 -200.46 52.83 -19.70 4.01 -0.07 0.30 --- ---
Arm. horz. gch. 316.22 -9.99 250.35 26.02 -0.20 1.73 0.59 --- ---
Béton 82.25 -183.19 39.60 -0.83 -3.66 -0.15 0.32 --- ---
Arm. transve. 49.09 6.13 20.05 -48.78 --- --- --- 1.47 5.01
R+5
Arm. vert. drt. 112.57 115.75 9.46 -22.81 1.74 0.35 -0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 359.96 -32.98 233.81 17.83 1.01 3.37 1.01 --- ---
Arm. vert. gch. 110.64 -232.25 55.18 -18.24 4.65 -0.05 0.28 --- ---
Arm. horz. gch. 304.34 -35.97 244.62 18.15 -0.72 1.61 0.55 --- ---
Béton 94.76 -211.05 40.14 1.11 4.22 -0.15 0.32 --- ---
Arm. transve. 19.58 -156.57 49.27 61.26 --- --- --- 0.07 2.08
R+4
Arm. vert. drt. 120.89 144.28 12.22 -27.00 2.12 0.41 -0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 384.06 -61.48 229.53 9.51 1.23 2.89 0.86 --- ---
Arm. vert. gch. 119.89 -267.19 56.41 -17.08 5.34 -0.02 0.24 --- ---
Arm. horz. gch. 325.07 -65.48 234.53 8.80 -1.31 1.39 0.48 --- ---
Béton 109.24 -240.49 36.14 2.56 4.81 -0.15 0.26 --- ---
Arm. transve. 12.77 28.71 3.49 -36.38 --- --- --- -1.14 -1.08
R+3
Arm. vert. drt. 121.90 -303.09 63.41 -20.63 -6.06 0.05 0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 400.38 -83.30 254.31 5.39 1.67 1.77 0.58 --- ---
Arm. vert. gch. 121.79 -303.09 63.41 -20.63 6.06 0.05 0.07 --- ---
Arm. horz. gch. 353.18 -90.79 253.96 2.99 -1.82 1.36 0.48 --- ---
Page 2
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA1: Longueur: 904 cm [Noeud initial: 5.92;46.37 -> Noeud final: 5.92;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 123.65 -270.77 38.68 2.41 5.42 -0.15 0.25 --- ---
Arm. transve. 30.39 32.73 15.88 -24.82 --- --- --- -2.41 -1.74
R+2
Arm. vert. drt. 128.24 214.75 19.62 -34.28 1.54 0.27 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 315.43 -101.13 239.75 2.63 2.02 0.23 0.21 --- ---
Arm. vert. gch. 94.45 -317.42 59.19 -22.46 6.35 0.10 0.07 --- ---
Arm. horz. gch. 309.15 -101.13 239.75 2.63 2.02 0.23 0.21 --- ---
Béton 129.26 -287.37 41.70 -1.39 -5.75 -0.16 0.42 --- ---
Arm. transve. 36.58 47.69 27.62 -40.69 --- --- --- -2.47 -2.15
R+1
Arm. vert. drt. 127.08 -423.09 49.03 -33.55 -8.46 0.22 -0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 264.72 -185.91 167.38 -30.91 3.72 0.41 0.24 --- ---
Arm. vert. gch. 127.49 -423.09 49.03 -33.55 8.46 0.22 -0.20 --- ---
Arm. horz. gch. 257.47 -185.91 167.38 -30.91 -3.72 0.41 0.24 --- ---
Béton 78.13 -580.60 -44.38 103.85 -11.61 0.54 0.23 --- ---
Arm. transve. 22.98 289.99 28.61 33.94 --- --- --- 2.80 0.33
RDC
Arm. vert. drt. 99.73 289.26 72.25 -18.48 0.48 0.14 -0.32 --- ---
(e=30.0 cm)
Arm. horz. drt. 240.64 -222.81 28.79 189.41 4.46 -0.24 -0.24 --- ---
Arm. vert. gch. 111.08 299.60 31.26 4.60 -4.01 -1.07 -0.79 --- ---
Arm. horz. gch. 252.11 -222.80 28.80 189.40 -4.46 -0.24 -0.24 --- ---
Béton 121.46 -219.24 21.22 189.14 4.38 -0.31 -0.42 --- ---
Arm. transve. 22.08 242.39 28.33 9.09 --- --- --- -2.63 0.64
SS1
Arm. vert. drt. 49.73 142.94 15.85 19.31 0.00 -0.59 -0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 106.40 -12.39 0.07 92.38 1.70 0.63 -0.03 --- ---
Arm. vert. gch. 58.76 142.75 15.85 19.32 -2.31 -0.59 -0.17 --- ---
Arm. horz. gch. 104.89 -125.26 -21.28 -122.09 -2.51 -0.54 -0.15 --- ---
Béton 76.42 -172.60 -30.71 -124.17 3.45 -0.54 -0.19 --- ---
Arm. transve. 51.16 88.92 17.07 3.43 --- --- --- -4.57 -0.12
Mur VA1-c: Longueur: 877.3 cm [Noeud initial: 9.77;46.63 -> Noeud final: 9.77;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 262.37 48.60 138.19 51.59 4.84 0.71 0.88 --- ---
(e=30.0 cm)
Arm. horz. drt. 551.88 48.60 138.19 51.59 4.84 0.71 0.88 --- ---
Arm. vert. gch. 168.04 48.60 138.19 51.59 0.00 0.71 0.88 --- ---
Arm. horz. gch. 468.52 48.60 138.19 51.59 0.00 0.71 0.88 --- ---
Béton 49.34 -84.85 -80.33 -84.31 -6.39 -0.71 -0.16 --- ---
Arm. transve. 21.93 -0.97 4.13 -9.64 --- --- --- -4.56 -4.66
R+14
Arm. vert. drt. 231.15 4.20 5.68 -12.30 10.99 6.76 -3.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 328.23 21.07 127.89 42.28 4.95 0.76 0.79 --- ---
Arm. vert. gch. 186.34 -8.82 15.12 -13.79 -12.20 -2.01 -0.06 --- ---
Arm. horz. gch. 420.54 34.39 126.62 41.98 0.00 0.59 0.64 --- ---
Béton 68.45 -24.89 -8.94 -35.76 0.50 -9.75 -5.73 --- ---
Arm. transve. 430.00 -22.63 -9.17 -30.46 --- --- --- -30.50 -40.41
R+13
Arm. vert. drt. 256.11 2.66 7.88 -11.94 12.26 8.46 -3.82 --- ---
(e=30.0 cm)
Arm. horz. drt. 354.20 4.04 7.18 9.53 6.78 15.86 3.32 --- ---
Page 3
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA1-c: Longueur: 877.3 cm [Noeud initial: 9.77;46.63 -> Noeud final: 9.77;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 202.28 -33.59 -11.16 -32.05 -12.90 -18.01 -6.81 --- ---
Arm. horz. gch. 345.58 -33.59 -11.16 -32.05 -12.90 -18.01 -6.81 --- ---
Béton 63.79 -25.37 -8.68 -45.93 0.51 -6.18 -4.17 --- ---
Arm. transve. 549.89 -34.18 -11.49 -37.82 --- --- --- -42.83 -60.33
R+12
Arm. vert. drt. 256.21 1.26 7.77 -9.87 12.38 9.01 -4.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 454.67 6.67 10.25 18.38 8.29 19.99 3.92 --- ---
Arm. vert. gch. 203.72 -44.54 -13.87 -42.10 -14.41 -21.76 -7.40 --- ---
Arm. horz. gch. 396.88 -44.61 -13.92 -42.20 -14.42 -21.78 -7.40 --- ---
Béton 91.08 -41.18 -13.82 -49.93 0.82 -17.96 -7.02 --- ---
Arm. transve. 643.87 -43.34 -14.01 -45.62 --- --- --- -49.10 -70.48
R+11
Arm. vert. drt. 268.12 5.07 11.29 25.38 9.10 21.78 4.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 505.53 5.07 11.29 25.38 9.10 21.78 4.21 --- ---
Arm. vert. gch. 216.37 -10.69 27.52 -28.18 -14.30 -2.77 -1.08 --- ---
Arm. horz. gch. 268.30 -52.27 -15.19 -51.08 -15.12 -23.32 -7.65 --- ---
Béton 54.33 -0.05 11.17 29.93 -0.00 18.87 3.93 --- ---
Arm. transve. 665.11 -45.79 -15.60 -52.68 --- --- --- -50.54 -72.42
R+10
Arm. vert. drt. 292.10 1.51 14.48 36.13 9.40 22.06 4.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 490.68 1.51 14.48 36.13 9.40 22.06 4.29 --- ---
Arm. vert. gch. 225.18 -11.42 27.75 -29.00 -14.53 -2.95 -1.46 --- ---
Arm. horz. gch. 211.38 -56.38 -16.00 -59.49 -15.30 -23.39 -7.69 --- ---
Béton 106.55 -52.35 -15.90 -61.97 1.05 -21.12 -7.46 --- ---
Arm. transve. 683.88 -51.44 -15.95 -61.86 --- --- --- -51.18 -73.22
R+9
Arm. vert. drt. 285.18 -4.94 16.06 44.75 9.58 22.33 4.40 --- ---
(e=30.0 cm)
Arm. horz. drt. 389.09 -4.94 16.06 44.75 9.58 22.33 4.40 --- ---
Arm. vert. gch. 239.12 -5.74 33.29 -34.28 -14.61 -2.94 -1.37 --- ---
Arm. horz. gch. 268.70 -58.21 -16.84 -66.81 -15.40 -23.54 -7.76 --- ---
Béton 110.35 -56.31 -16.51 -67.48 1.13 -22.03 -7.60 --- ---
Arm. transve. 806.29 -54.35 -16.67 -68.62 --- --- --- -51.74 -74.13
R+8
Arm. vert. drt. 299.99 -11.33 17.75 54.44 9.80 22.58 4.45 --- ---
(e=30.0 cm)
Arm. horz. drt. 409.42 -11.33 17.75 54.44 9.80 22.58 4.45 --- ---
Arm. vert. gch. 286.27 17.45 42.23 -41.70 -14.75 -2.86 -1.05 --- ---
Arm. horz. gch. 149.03 -60.05 -17.81 -75.48 -15.55 -23.71 -7.77 --- ---
Béton 119.34 -61.99 -17.80 -76.07 1.24 -23.67 -7.79 --- ---
Arm. transve. 833.71 -53.43 -17.57 -77.19 --- --- --- -50.73 -72.14
R+7
Arm. vert. drt. 265.27 -19.83 19.11 64.18 9.55 21.43 4.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 401.86 -19.85 19.11 64.17 9.55 21.43 4.25 --- ---
Arm. vert. gch. 269.10 28.04 46.70 -45.45 -14.59 -2.74 -0.78 --- ---
Arm. horz. gch. 147.06 -58.14 -18.53 -84.58 -15.17 -22.55 -7.50 --- ---
Béton 122.53 -62.08 -18.37 -84.97 1.24 -22.50 -7.57 --- ---
Arm. transve. 790.44 -48.81 -17.96 -84.75 --- --- --- -48.65 -68.41
R+6
Arm. vert. drt. 190.97 -32.24 19.61 71.87 8.60 18.46 3.78 --- ---
(e=30.0 cm)
Arm. horz. drt. 362.98 -32.27 19.61 71.86 8.60 18.46 3.78 --- ---
Arm. vert. gch. 220.16 40.38 50.85 -48.58 -14.11 -2.53 -0.37 --- ---
Arm. horz. gch. 134.75 -53.84 -18.25 -91.48 -14.18 -19.62 -7.00 --- ---
Béton 122.59 -58.28 -18.06 -91.83 1.17 -19.59 -7.08 --- ---
Page 4
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA1-c: Longueur: 877.3 cm [Noeud initial: 9.77;46.63 -> Noeud final: 9.77;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 831.69 -45.20 -17.82 -89.95 --- --- --- -43.64 -60.02
R+5
Arm. vert. drt. 181.30 58.30 -8.17 -32.57 10.51 1.65 -2.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 307.74 -46.42 20.30 72.76 7.20 14.75 3.17 --- ---
Arm. vert. gch. 206.92 53.86 53.72 -50.23 -13.30 -2.22 0.12 --- ---
Arm. horz. gch. 197.62 -50.80 -18.00 -91.88 -12.85 -16.05 -6.44 --- ---
Béton 115.74 -52.73 -17.88 -91.82 1.05 -16.01 -6.46 --- ---
Arm. transve. 718.73 -41.80 -17.08 -94.28 --- --- --- -38.77 -51.89
R+4
Arm. vert. drt. 108.17 82.19 -5.13 -32.14 9.75 1.08 -1.80 --- ---
(e=30.0 cm)
Arm. horz. drt. 247.96 -59.92 20.36 76.98 5.72 10.66 2.44 --- ---
Arm. vert. gch. 184.48 67.95 54.23 -49.43 -12.33 -1.90 0.55 --- ---
Arm. horz. gch. 168.45 66.74 54.71 -49.98 -12.35 -1.91 0.55 --- ---
Béton 112.60 -83.08 -14.14 -105.67 1.66 -7.12 -4.64 --- ---
Arm. transve. 502.05 -34.32 -15.64 -93.74 --- --- --- -32.71 -42.11
R+3
Arm. vert. drt. 112.17 146.97 22.17 -20.70 6.02 1.03 -0.47 --- ---
(e=30.0 cm)
Arm. horz. drt. 260.03 117.92 -0.17 -1.34 -0.58 0.02 0.20 --- ---
Arm. vert. gch. 123.12 79.98 51.33 -44.97 -11.33 -1.61 0.87 --- ---
Arm. horz. gch. 120.21 -3.05 56.16 -55.30 -10.45 -1.49 0.81 --- ---
Béton 111.45 -73.81 -14.01 -104.05 -8.01 -4.92 -4.20 --- ---
Arm. transve. 235.08 -73.99 -13.88 -103.42 --- --- --- -24.57 -29.28
R+2
Arm. vert. drt. 129.34 260.45 20.52 12.28 0.87 0.48 -0.28 --- ---
(e=30.0 cm)
Arm. horz. drt. 117.40 -278.76 85.45 20.17 5.58 0.46 0.58 --- ---
Arm. vert. gch. 127.69 260.44 20.52 12.30 0.00 0.48 -0.28 --- ---
Arm. horz. gch. 180.53 -278.76 85.45 20.17 -5.58 0.46 0.58 --- ---
Béton 146.65 -324.14 63.67 6.74 6.48 0.61 0.75 --- ---
Arm. transve. 55.95 104.98 11.25 -41.81 --- --- --- -4.88 2.59
R+1
Arm. vert. drt. 185.70 474.72 66.16 62.67 5.30 0.81 -0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 252.67 429.90 78.41 100.54 1.61 0.73 -0.21 --- ---
Arm. vert. gch. 169.93 429.90 78.41 100.54 0.00 0.73 -0.21 --- ---
Arm. horz. gch. 239.79 429.90 78.41 100.54 0.00 0.73 -0.21 --- ---
Béton 95.88 -758.27 -104.47 -109.93 15.17 -0.77 0.38 --- ---
Arm. transve. 58.49 227.99 43.69 37.78 --- --- --- -7.16 0.50
RDC
Arm. vert. drt. 148.20 440.88 20.51 45.77 0.00 -0.23 -0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 151.07 180.51 92.66 72.74 1.04 1.00 -0.29 --- ---
Arm. vert. gch. 156.01 440.88 20.51 45.77 -1.37 -0.23 -0.24 --- ---
Arm. horz. gch. 208.13 180.10 91.63 73.85 0.00 0.94 -0.28 --- ---
Béton 133.27 -330.10 -4.47 -166.57 6.60 0.52 -0.03 --- ---
Arm. transve. 45.59 119.30 -12.05 53.49 --- --- --- 8.33 5.71
SS1
Arm. vert. drt. 71.02 185.54 8.64 -30.21 0.89 0.22 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 287.37 -161.88 62.44 179.51 3.24 0.54 0.01 --- ---
Arm. vert. gch. 65.97 185.54 8.64 -30.21 0.00 0.22 -0.25 --- ---
Arm. horz. gch. 274.39 -161.80 62.37 179.51 -3.24 0.53 0.01 --- ---
Béton 113.70 -161.88 62.44 179.51 -3.24 0.54 0.01 --- ---
Arm. transve. 8.39 25.10 -0.64 -57.54 --- --- --- 1.02 0.15
Page 5
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA8b: Longueur: 372.9 cm [Noeud initial: 17.28;49.98 -> Noeud final: 17.28;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 101.24 0.11 -15.44 1.77 6.44 0.81 0.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 56.33 -12.75 1.45 -3.48 6.01 1.24 -0.24 --- ---
Arm. vert. gch. 108.28 -1.21 -13.14 1.47 -6.99 -0.88 -0.70 --- ---
Arm. horz. gch. 53.91 -13.22 1.68 -3.83 -5.49 -1.14 0.20 --- ---
Béton 16.88 -14.67 -24.54 -22.08 3.92 0.71 -0.01 --- ---
Arm. transve. 1.93 -21.73 4.20 -12.19 --- --- --- -2.45 1.30
R+14
Arm. vert. drt. 4.43 -24.15 -33.97 -10.55 -5.20 -1.06 -0.50 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.23 -32.85 -48.80 -14.98 -3.27 -0.67 -0.29 --- ---
Arm. vert. gch. 4.43 -24.79 0.13 -1.40 5.13 1.04 -0.22 --- ---
Arm. horz. gch. 2.81 -40.33 -61.09 -18.63 0.81 -0.16 -0.04 --- ---
Béton 10.45 -24.79 0.13 -1.40 5.13 1.04 -0.22 --- ---
Arm. transve. 1.69 -31.41 3.84 -8.84 --- --- --- -2.09 1.22
R+13
Arm. vert. drt. 5.08 -32.12 -32.63 -9.82 -5.51 -1.13 -0.52 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.86 -48.84 -59.19 -17.60 0.98 -0.16 -0.03 --- ---
Arm. vert. gch. 5.28 -36.87 -1.19 -0.28 5.39 1.09 -0.22 --- ---
Arm. horz. gch. 2.73 -48.84 -59.19 -17.60 0.98 -0.16 -0.03 --- ---
Béton 12.45 -36.87 -1.19 -0.28 5.39 1.09 -0.22 --- ---
Arm. transve. 1.69 -39.67 -3.80 -10.32 --- --- --- -2.41 -0.18
R+12
Arm. vert. drt. 5.87 -44.27 -33.27 -10.52 -5.66 -1.16 -0.53 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.01 -49.00 -41.97 -13.14 -5.00 -1.03 -0.45 --- ---
Arm. vert. gch. 6.07 -48.65 -2.48 0.66 5.58 1.13 -0.22 --- ---
Arm. horz. gch. 2.77 -58.54 -60.24 -18.52 1.17 -0.17 -0.03 --- ---
Béton 14.33 -48.65 -2.48 0.66 5.58 1.13 -0.22 --- ---
Arm. transve. 2.19 -48.13 -16.64 -15.02 --- --- --- -3.13 0.13
R+11
Arm. vert. drt. 6.66 -56.27 -34.09 -11.30 -5.82 -1.20 -0.55 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.94 -67.85 -60.66 -18.79 -1.36 -0.17 -0.04 --- ---
Arm. vert. gch. 6.80 -59.40 -3.64 1.44 5.76 1.16 -0.23 --- ---
Arm. horz. gch. 2.79 -67.85 -60.66 -18.79 1.36 -0.17 -0.04 --- ---
Béton 18.45 -77.12 0.46 -7.01 -1.54 0.08 -0.01 --- ---
Arm. transve. 2.19 -60.14 -17.12 -15.04 --- --- --- -3.14 0.13
R+10
Arm. vert. drt. 6.92 -63.88 -3.95 1.76 -5.51 -1.12 0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.99 -76.89 -61.65 -19.92 -1.54 -0.18 -0.04 --- ---
Arm. vert. gch. 7.53 -70.43 -4.86 2.35 5.91 1.19 -0.24 --- ---
Arm. horz. gch. 2.83 -76.89 -61.65 -19.92 1.54 -0.18 -0.04 --- ---
Béton 19.94 -103.75 -0.17 -7.92 -2.07 0.05 -0.00 --- ---
Arm. transve. 2.66 -75.57 0.11 -6.99 --- --- --- -3.32 1.89
R+9
Arm. vert. drt. 7.65 -75.20 -5.21 2.74 -5.64 -1.14 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.01 -82.42 -62.11 -20.55 1.65 -0.19 -0.04 --- ---
Arm. vert. gch. 8.21 -80.88 -6.01 3.21 6.04 1.22 -0.24 --- ---
Arm. horz. gch. 2.85 -82.42 -62.11 -20.55 1.65 -0.19 -0.04 --- ---
Béton 22.79 -119.64 -1.55 -6.88 -2.39 0.05 -0.00 --- ---
Arm. transve. 2.70 -84.85 -0.73 -6.56 --- --- --- -3.37 1.90
R+8
Arm. vert. drt. 8.64 -95.56 -7.94 5.01 -5.32 -1.07 0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.02 -86.95 -62.23 -21.07 -1.74 -0.19 -0.04 --- ---
Page 6
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA8b: Longueur: 372.9 cm [Noeud initial: 17.28;49.98 -> Noeud final: 17.28;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 8.81 -90.85 -7.13 4.05 6.09 1.22 -0.24 --- ---
Arm. horz. gch. 2.86 -86.95 -62.23 -21.07 1.74 -0.19 -0.04 --- ---
Béton 25.69 -114.38 -9.27 -0.24 2.29 -0.02 -0.03 --- ---
Arm. transve. 2.67 -92.91 -1.55 -6.06 --- --- --- -3.34 1.87
R+7
Arm. vert. drt. 9.21 -132.51 -16.23 -0.13 -2.65 0.02 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.01 -90.19 -62.00 -21.47 1.80 -0.19 -0.04 --- ---
Arm. vert. gch. 9.39 -100.68 -8.25 4.93 6.10 1.22 -0.24 --- ---
Arm. horz. gch. 2.84 -90.19 -62.00 -21.47 1.80 -0.19 -0.04 --- ---
Béton 29.07 -129.42 -10.44 -0.12 2.59 -0.02 -0.03 --- ---
Arm. transve. 2.65 -98.87 -2.22 -5.59 --- --- --- -3.32 1.84
R+6
Arm. vert. drt. 10.62 -152.77 -18.74 0.01 -3.06 0.02 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.99 -91.18 -61.47 -21.76 1.82 -0.20 -0.05 --- ---
Arm. vert. gch. 10.62 -152.77 -18.74 0.01 3.06 0.02 -0.02 --- ---
Arm. horz. gch. 2.82 -91.18 -61.47 -21.76 1.82 -0.20 -0.05 --- ---
Béton 33.26 -152.77 -18.74 0.01 -3.06 0.02 -0.02 --- ---
Arm. transve. 2.61 -108.80 -3.21 -5.23 --- --- --- -3.28 1.81
R+5
Arm. vert. drt. 11.62 -167.07 -20.52 0.08 -3.34 0.01 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.94 -90.18 -60.57 -21.95 1.80 -0.20 -0.05 --- ---
Arm. vert. gch. 11.62 -167.07 -20.52 0.08 3.34 0.01 -0.01 --- ---
Arm. horz. gch. 2.78 -90.18 -60.57 -21.95 1.80 -0.20 -0.05 --- ---
Béton 36.37 -166.99 -20.51 0.04 -3.34 0.04 -0.02 --- ---
Arm. transve. 2.53 -115.63 -4.03 -4.92 --- --- --- -3.19 1.73
R+4
Arm. vert. drt. 12.54 -180.30 -22.18 0.15 -3.61 0.03 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.88 -87.35 -59.24 -22.05 1.75 -0.19 -0.05 --- ---
Arm. vert. gch. 12.54 -180.30 -22.18 0.15 3.61 0.03 -0.02 --- ---
Arm. horz. gch. 2.72 -87.35 -59.24 -22.05 -1.75 -0.19 -0.05 --- ---
Béton 39.28 -174.87 -14.00 -0.22 3.50 -0.02 -0.03 --- ---
Arm. transve. 2.35 -119.53 -4.66 -4.79 --- --- --- -2.97 1.58
R+3
Arm. vert. drt. 13.08 -188.12 -15.34 -0.00 -3.76 -0.01 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.80 -81.52 -57.59 -21.99 1.63 -0.20 -0.05 --- ---
Arm. vert. gch. 13.08 -188.12 -15.34 -0.00 3.76 -0.01 -0.02 --- ---
Arm. horz. gch. 2.64 -91.14 -54.28 -20.75 -1.82 0.18 0.11 --- ---
Béton 42.20 -188.12 -15.34 -0.00 3.76 -0.01 -0.02 --- ---
Arm. transve. 2.42 -110.65 -4.08 -5.74 --- --- --- -3.11 1.54
R+2
Arm. vert. drt. 15.28 -272.97 -26.20 15.68 -5.46 -0.08 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.59 -84.29 -53.74 -21.25 -1.69 -0.12 -0.07 --- ---
Arm. vert. gch. 45.70 -118.93 38.98 -11.22 -2.38 -0.01 0.01 --- ---
Arm. horz. gch. 119.71 -118.93 38.99 -11.22 -2.38 -0.01 0.01 --- ---
Béton 45.37 -202.43 -16.83 0.33 4.05 -0.02 -0.04 --- ---
Arm. transve. 1.06 -122.06 -4.01 -1.68 --- --- --- -1.26 0.84
R+1
Arm. vert. drt. 88.91 58.14 -0.89 -3.75 0.10 0.03 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 51.90 47.64 9.06 -7.65 0.20 0.01 0.06 --- ---
Arm. vert. gch. 88.33 58.14 -0.89 -3.75 0.00 0.03 0.05 --- ---
Arm. horz. gch. 54.79 47.66 9.06 -7.65 0.00 0.00 0.06 --- ---
Béton 53.61 -243.41 -25.92 0.25 -4.87 0.02 0.06 --- ---
Page 7
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA8b: Longueur: 372.9 cm [Noeud initial: 17.28;49.98 -> Noeud final: 17.28;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 0.84 -223.60 -11.66 9.72 --- --- --- 1.07 -0.56
RDC
Arm. vert. drt. 21.86 -390.37 -41.86 -28.56 -7.81 0.17 0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.86 -256.69 -62.26 -28.40 5.13 0.19 0.29 --- ---
Arm. vert. gch. 21.86 -390.37 -41.86 -28.56 7.81 0.17 0.25 --- ---
Arm. horz. gch. 3.02 -256.69 -62.26 -28.40 -5.13 0.19 0.29 --- ---
Béton 54.61 -243.54 -19.92 0.31 4.87 -0.01 0.10 --- ---
Arm. transve. 0.53 -248.03 -11.59 -20.66 --- --- --- 0.69 -0.32
SS1
Arm. vert. drt. 19.50 -348.19 -47.61 50.90 -6.96 0.03 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.26 -341.62 -47.68 46.79 -6.83 -0.03 0.01 --- ---
Arm. vert. gch. 19.50 -348.19 -47.61 50.90 6.96 0.03 0.00 --- ---
Arm. horz. gch. 2.27 -339.77 -47.37 47.33 6.80 0.09 0.01 --- ---
Béton 61.35 -348.19 -47.61 50.90 -6.96 0.03 0.00 --- ---
Arm. transve. 0.69 -215.16 -11.55 34.16 --- --- --- -0.99 -0.11
Mur VA6: Longueur: 235.4 cm [Noeud initial: 24.87;53.05 -> Noeud final: 24.87;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+17
Arm. vert. drt. 238.20 86.17 146.81 50.29 0.50 0.16 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 539.04 86.10 146.79 50.27 0.49 0.17 0.04 --- ---
Arm. vert. gch. 230.38 86.11 146.94 50.29 0.00 0.13 0.02 --- ---
Arm. horz. gch. 529.93 86.11 146.94 50.29 0.00 0.13 0.02 --- ---
Béton 31.95 86.10 146.79 50.27 0.00 0.17 0.04 --- ---
Arm. transve. 13.27 6.12 69.29 14.75 --- --- --- 0.10 1.43
R+16
Arm. vert. drt. 110.05 58.02 93.14 22.04 0.00 -0.97 -0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 196.50 57.98 93.25 22.06 0.00 -0.97 -0.14 --- ---
Arm. vert. gch. 73.61 57.98 93.25 22.06 -0.57 -0.97 -0.14 --- ---
Arm. horz. gch. 227.98 57.98 93.25 22.06 -0.57 -0.97 -0.14 --- ---
Béton 19.43 -32.95 -3.94 -3.03 -10.89 -1.31 0.16 --- ---
Arm. transve. 19.72 37.92 11.53 14.60 --- --- --- -2.43 0.58
R+15
Arm. vert. drt. 103.18 87.87 50.95 24.47 1.76 0.31 0.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 192.35 86.89 52.49 24.93 1.76 0.31 0.30 --- ---
Arm. vert. gch. 96.33 43.91 5.73 -14.14 -7.18 -0.84 0.18 --- ---
Arm. horz. gch. 119.16 86.89 52.49 24.93 0.00 0.31 0.30 --- ---
Béton 25.58 -18.83 13.47 -34.38 -2.52 -0.94 -0.09 --- ---
Arm. transve. 19.67 45.16 17.09 29.31 --- --- --- -2.43 0.41
R+14
Arm. vert. drt. 178.08 141.84 203.25 83.51 0.96 0.69 0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 213.65 139.69 205.42 83.18 0.94 0.68 0.21 --- ---
Arm. vert. gch. 111.81 142.24 203.36 83.69 0.00 0.66 0.20 --- ---
Arm. horz. gch. 196.13 140.09 205.53 83.36 0.00 0.65 0.20 --- ---
Béton 51.06 141.93 204.36 83.80 0.00 0.65 0.20 --- ---
Arm. transve. 32.42 42.90 -13.65 30.99 --- --- --- 2.90 -1.78
R+13
Arm. vert. drt. 127.72 134.47 207.50 74.76 1.07 0.76 0.32 --- ---
(e=30.0 cm)
Arm. horz. drt. 511.50 131.00 208.16 74.12 1.07 0.75 0.32 --- ---
Arm. vert. gch. 110.59 134.47 207.50 74.76 0.00 0.76 0.32 --- ---
Page 8
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA6: Longueur: 235.4 cm [Noeud initial: 24.87;53.05 -> Noeud final: 24.87;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 313.71 134.47 207.50 74.76 0.00 0.76 0.32 --- ---
Béton 52.08 134.47 207.50 74.76 0.00 0.76 0.32 --- ---
Arm. transve. 28.94 61.06 9.18 -13.74 --- --- --- 3.34 -1.42
R+12
Arm. vert. drt. 131.58 140.66 216.65 78.93 1.07 0.76 0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 480.33 137.23 218.05 78.43 1.07 0.76 0.33 --- ---
Arm. vert. gch. 121.74 140.60 217.00 79.01 0.00 0.76 0.32 --- ---
Arm. horz. gch. 448.57 137.23 218.05 78.43 0.00 0.76 0.33 --- ---
Béton 54.01 140.60 217.00 79.01 0.00 0.76 0.32 --- ---
Arm. transve. 13.05 31.89 -15.87 26.85 --- --- --- 1.30 -0.97
R+11
Arm. vert. drt. 133.39 140.45 225.77 80.85 1.05 0.76 0.32 --- ---
(e=30.0 cm)
Arm. horz. drt. 498.81 136.93 227.70 80.45 1.06 0.76 0.33 --- ---
Arm. vert. gch. 113.85 140.45 225.77 80.85 0.00 0.76 0.32 --- ---
Arm. horz. gch. 272.02 139.49 227.16 80.96 0.00 0.76 0.32 --- ---
Béton 55.54 139.49 227.16 80.96 0.00 0.76 0.32 --- ---
Arm. transve. 10.41 42.78 7.27 28.69 --- --- --- -1.29 0.03
R+10
Arm. vert. drt. 132.83 141.20 236.26 83.57 1.04 0.76 0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 441.43 138.61 237.13 83.15 1.04 0.76 0.33 --- ---
Arm. vert. gch. 122.94 141.20 236.26 83.57 0.00 0.76 0.33 --- ---
Arm. horz. gch. 413.65 138.61 237.13 83.15 0.00 0.76 0.33 --- ---
Béton 56.12 141.20 236.26 83.57 0.00 0.76 0.33 --- ---
Arm. transve. 5.50 -56.03 8.48 -33.48 --- --- --- 6.99 -3.15
R+9
Arm. vert. drt. 132.81 138.15 244.28 84.78 1.04 0.77 0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 454.90 135.75 245.89 84.57 1.03 0.76 0.33 --- ---
Arm. vert. gch. 122.92 137.89 245.15 84.92 0.00 0.76 0.33 --- ---
Arm. horz. gch. 427.07 135.75 245.89 84.57 0.00 0.76 0.33 --- ---
Béton 57.21 137.89 245.15 84.92 0.00 0.76 0.33 --- ---
Arm. transve. 5.62 -8.91 12.66 -36.96 --- --- --- 7.17 -3.15
R+8
Arm. vert. drt. 131.00 132.12 251.24 85.08 1.05 0.78 0.34 --- ---
(e=30.0 cm)
Arm. horz. drt. 464.27 130.33 252.62 85.00 1.02 0.76 0.33 --- ---
Arm. vert. gch. 120.94 132.12 251.24 85.08 0.00 0.78 0.34 --- ---
Arm. horz. gch. 436.51 130.33 252.62 85.00 0.00 0.76 0.33 --- ---
Béton 57.62 131.91 251.57 85.12 0.00 0.77 0.33 --- ---
Arm. transve. 7.83 25.04 11.58 -30.47 --- --- --- 6.58 -2.88
R+7
Arm. vert. drt. 126.38 122.27 255.59 83.99 1.03 0.77 0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 467.81 120.37 256.56 83.77 1.02 0.77 0.33 --- ---
Arm. vert. gch. 126.11 87.12 10.78 -13.60 -14.48 -1.78 0.94 --- ---
Arm. horz. gch. 439.89 120.37 256.56 83.77 0.00 0.77 0.33 --- ---
Béton 57.22 122.27 255.59 83.99 0.00 0.77 0.33 --- ---
Arm. transve. 10.58 36.81 16.53 -39.96 --- --- --- 7.05 -3.04
R+6
Arm. vert. drt. 119.63 109.94 253.38 80.83 1.08 0.79 0.35 --- ---
(e=30.0 cm)
Arm. horz. drt. 465.20 107.06 257.21 81.04 1.03 0.77 0.34 --- ---
Arm. vert. gch. 137.27 111.20 13.78 -15.01 -14.26 -1.75 0.92 --- ---
Arm. horz. gch. 286.31 107.06 257.21 81.04 0.00 0.77 0.34 --- ---
Béton 60.47 -132.56 35.97 -0.80 2.65 -0.59 -0.22 --- ---
Arm. transve. 16.00 14.83 -3.73 -56.00 --- --- --- 2.52 0.66
Page 9
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA6: Longueur: 235.4 cm [Noeud initial: 24.87;53.05 -> Noeud final: 24.87;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+5
Arm. vert. drt. 109.91 92.79 252.55 76.94 1.07 0.78 0.34 --- ---
(e=30.0 cm)
Arm. horz. drt. 455.57 91.03 254.15 76.88 1.05 0.77 0.34 --- ---
Arm. vert. gch. 148.42 142.14 17.66 -15.84 -13.63 -1.67 0.88 --- ---
Arm. horz. gch. 279.55 91.03 254.15 76.88 0.00 0.77 0.34 --- ---
Béton 83.45 -182.95 33.53 -0.94 3.66 -0.57 -0.21 --- ---
Arm. transve. 45.83 90.52 20.68 -44.51 --- --- --- 6.87 -2.89
R+4
Arm. vert. drt. 80.99 -266.56 40.56 -14.02 -5.33 -0.07 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 433.30 70.24 246.94 70.65 1.07 0.77 0.35 --- ---
Arm. vert. gch. 109.16 175.78 21.89 -17.39 -13.23 -1.63 0.86 --- ---
Arm. horz. gch. 264.42 70.24 246.94 70.65 0.00 0.77 0.35 --- ---
Béton 105.63 -231.56 29.69 -1.73 4.63 -0.52 -0.18 --- ---
Arm. transve. 58.37 140.99 25.27 -45.35 --- --- --- 6.59 -2.69
R+3
Arm. vert. drt. 87.77 152.23 -11.43 -2.18 10.84 1.45 0.92 --- ---
(e=30.0 cm)
Arm. horz. drt. 408.84 46.73 235.15 62.63 1.20 0.82 0.38 --- ---
Arm. vert. gch. 94.22 200.25 25.13 -16.94 -7.37 -0.91 0.34 --- ---
Arm. horz. gch. 246.78 46.73 235.15 62.63 0.00 0.82 0.38 --- ---
Béton 54.62 -326.89 -1.18 22.91 6.54 -0.22 0.22 --- ---
Arm. transve. 41.26 232.90 22.28 -26.59 --- --- --- 3.95 -3.11
R+2
Arm. vert. drt. 108.44 -357.27 46.98 18.33 -7.15 0.09 0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 212.69 -15.71 118.60 34.86 1.13 0.65 0.35 --- ---
Arm. vert. gch. 108.72 -357.27 46.98 18.33 7.15 0.09 0.13 --- ---
Arm. horz. gch. 122.33 -15.71 118.60 34.86 -0.31 0.65 0.35 --- ---
Béton 66.62 -395.66 -0.57 43.12 -7.91 -0.10 0.05 --- ---
Arm. transve. 31.80 281.13 23.13 -16.26 --- --- --- 3.07 -2.37
R+1
Arm. vert. drt. 102.26 317.95 -2.30 -6.64 0.54 -0.11 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 314.37 -43.76 188.92 32.94 1.22 1.00 0.36 --- ---
Arm. vert. gch. 75.66 302.13 41.85 5.88 -6.45 -1.68 0.71 --- ---
Arm. horz. gch. 183.88 -39.96 189.61 34.14 -0.80 0.87 0.31 --- ---
Béton 76.98 -486.64 -45.97 -1.14 -9.73 0.89 -0.13 --- ---
Arm. transve. 29.66 294.18 32.85 4.82 --- --- --- 3.61 -0.01
RDC
Arm. vert. drt. 68.62 334.58 -1.42 19.76 0.00 -1.04 -0.50 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.86 -110.55 89.61 1.95 2.21 0.75 0.46 --- ---
Arm. vert. gch. 74.51 334.50 -1.42 19.80 -1.57 -1.04 -0.50 --- ---
Arm. horz. gch. 80.93 -110.55 89.61 1.95 -2.21 0.75 0.46 --- ---
Béton 72.94 -565.61 3.33 -21.65 -11.31 1.61 0.95 --- ---
Arm. transve. 5.08 49.32 6.03 7.42 --- --- --- 0.60 -0.00
SS1
Arm. vert. drt. 42.48 182.40 8.22 25.44 0.53 0.10 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 91.62 -190.33 13.21 -110.81 3.81 -0.32 0.18 --- ---
Arm. vert. gch. 41.26 182.40 8.22 25.44 0.00 0.10 -0.01 --- ---
Arm. horz. gch. 99.64 -190.33 13.21 -110.81 -3.81 -0.32 0.18 --- ---
Béton 86.28 -205.34 -34.99 -140.84 4.11 0.41 -0.19 --- ---
Arm. transve. 4.52 44.27 0.56 38.88 --- --- --- -0.47 0.24
Page 10
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA6b: Longueur: 235.5 cm [Noeud initial: 29.99;53.05 -> Noeud final: 29.99;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+17
Arm. vert. drt. 144.26 56.84 5.52 -17.11 2.95 -0.25 0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 222.85 36.72 63.03 21.72 0.00 -0.12 -0.15 --- ---
Arm. vert. gch. 109.19 27.82 53.47 16.82 -1.54 -0.78 -0.65 --- ---
Arm. horz. gch. 236.15 36.72 63.03 21.72 -0.36 -0.12 -0.15 --- ---
Béton 14.61 27.82 53.47 16.82 0.00 -0.78 -0.65 --- ---
Arm. transve. 1.84 7.70 -3.87 -12.12 --- --- --- 2.47 -0.92
R+16
Arm. vert. drt. 109.03 36.07 5.27 -20.02 1.96 0.99 -0.78 --- ---
(e=30.0 cm)
Arm. horz. drt. 118.90 36.07 5.27 -20.02 1.96 0.99 -0.78 --- ---
Arm. vert. gch. 106.57 45.43 3.27 -26.72 -1.08 -0.30 -0.01 --- ---
Arm. horz. gch. 97.96 45.43 3.27 -26.72 -1.08 -0.30 -0.01 --- ---
Béton 21.12 35.71 4.55 -21.79 0.00 0.93 -0.69 --- ---
Arm. transve. 17.03 40.41 2.60 -20.58 --- --- --- 1.80 0.40
R+15
Arm. vert. drt. 135.22 68.70 -3.31 -32.19 3.00 2.99 -0.88 --- ---
(e=30.0 cm)
Arm. horz. drt. 123.20 68.70 -3.31 -32.19 3.00 2.99 -0.88 --- ---
Arm. vert. gch. 103.59 93.48 9.37 -14.94 0.00 0.04 -0.05 --- ---
Arm. horz. gch. 133.56 -88.91 5.30 40.19 -2.62 -2.57 0.76 --- ---
Béton 34.86 -88.91 5.30 40.19 1.78 -2.57 0.76 --- ---
Arm. transve. 6.60 40.29 4.47 -13.49 --- --- --- 0.60 0.01
R+14
Arm. vert. drt. 138.56 77.09 -1.35 -29.07 3.13 2.59 -0.67 --- ---
(e=30.0 cm)
Arm. horz. drt. 159.83 26.52 73.56 17.63 0.00 -0.29 -0.05 --- ---
Arm. vert. gch. 105.92 95.91 5.93 -17.16 0.00 0.02 -0.07 --- ---
Arm. horz. gch. 171.09 26.52 73.56 17.63 -0.11 -0.29 -0.05 --- ---
Béton 32.25 -95.90 2.12 33.75 1.92 -2.82 0.72 --- ---
Arm. transve. 6.88 47.59 5.57 -16.06 --- --- --- -0.82 -0.17
R+13
Arm. vert. drt. 165.22 95.58 -1.78 -30.60 3.79 3.16 -0.82 --- ---
(e=30.0 cm)
Arm. horz. drt. 212.05 53.45 91.56 29.03 0.00 -0.33 -0.10 --- ---
Arm. vert. gch. 106.34 95.58 -1.78 -30.60 0.00 3.16 -0.82 --- ---
Arm. horz. gch. 225.84 53.45 91.56 29.03 -0.13 -0.33 -0.10 --- ---
Béton 38.47 -121.93 2.12 36.10 2.44 -3.49 0.90 --- ---
Arm. transve. 10.39 41.99 15.27 2.57 --- --- --- 1.26 0.08
R+12
Arm. vert. drt. 149.28 100.85 -0.20 -24.85 4.19 3.46 -0.89 --- ---
(e=30.0 cm)
Arm. horz. drt. 140.67 57.13 86.73 30.06 0.00 -0.26 -0.08 --- ---
Arm. vert. gch. 95.55 107.25 -6.02 0.01 0.00 -0.24 -0.65 --- ---
Arm. horz. gch. 148.35 57.13 86.73 30.06 -0.11 -0.26 -0.08 --- ---
Béton 38.30 -133.90 0.67 31.88 2.68 -3.75 0.96 --- ---
Arm. transve. 15.71 49.77 15.53 7.27 --- --- --- 1.42 0.03
R+11
Arm. vert. drt. 139.38 93.03 2.78 -18.04 4.34 3.34 -0.98 --- ---
(e=30.0 cm)
Arm. horz. drt. 155.30 48.53 102.75 26.50 0.00 -0.29 -0.07 --- ---
Arm. vert. gch. 91.77 99.36 -2.23 6.63 0.00 -0.30 -0.42 --- ---
Arm. horz. gch. 163.34 48.53 102.75 26.50 -0.12 -0.29 -0.07 --- ---
Béton 33.85 -116.15 -1.59 31.63 2.32 -3.41 0.98 --- ---
Arm. transve. 32.27 47.24 21.20 8.71 --- --- --- 2.12 -1.99
R+10
Arm. vert. drt. 132.09 84.68 3.14 -16.25 4.62 3.60 -1.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 114.02 53.16 109.73 29.04 0.00 -0.28 -0.07 --- ---
Page 11
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA6b: Longueur: 235.5 cm [Noeud initial: 29.99;53.05 -> Noeud final: 29.99;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 80.82 70.15 0.68 23.69 -0.43 -0.32 -0.12 --- ---
Arm. horz. gch. 119.42 53.20 109.70 29.05 -0.11 -0.29 -0.07 --- ---
Béton 36.11 -131.65 -3.18 25.58 2.63 -3.72 1.08 --- ---
Arm. transve. 24.97 38.13 27.60 10.40 --- --- --- 2.10 -2.15
R+9
Arm. vert. drt. 126.38 73.54 2.46 -19.67 4.47 3.55 -1.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 169.84 54.20 110.36 30.38 0.00 -0.25 -0.06 --- ---
Arm. vert. gch. 83.78 54.44 110.27 30.45 -0.09 -0.26 -0.06 --- ---
Arm. horz. gch. 176.96 54.26 110.35 30.40 -0.09 -0.26 -0.06 --- ---
Béton 36.10 -127.46 -2.47 30.22 2.55 -3.61 1.04 --- ---
Arm. transve. 3.92 7.57 49.06 4.33 --- --- --- 0.20 -0.29
R+8
Arm. vert. drt. 129.52 74.67 1.65 -16.29 4.98 4.20 -1.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 202.69 76.38 125.75 41.65 0.00 -0.28 -0.08 --- ---
Arm. vert. gch. 113.44 76.38 125.75 41.65 -0.09 -0.28 -0.08 --- ---
Arm. horz. gch. 210.77 74.15 126.51 40.98 -0.10 -0.28 -0.08 --- ---
Béton 50.47 -112.81 -4.90 11.48 2.26 -4.30 1.07 --- ---
Arm. transve. 7.84 -7.45 62.38 6.86 --- --- --- -0.22 -0.67
R+7
Arm. vert. drt. 114.40 58.71 2.30 -12.59 5.06 4.33 -1.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 212.65 77.75 132.34 43.14 0.00 -0.27 -0.08 --- ---
Arm. vert. gch. 116.51 77.75 132.34 43.14 -0.08 -0.27 -0.08 --- ---
Arm. horz. gch. 220.38 76.02 132.93 42.63 -0.09 -0.27 -0.08 --- ---
Béton 51.69 -115.53 -5.25 9.01 2.31 -4.21 1.04 --- ---
Arm. transve. 7.86 -28.92 69.22 7.25 --- --- --- -0.24 -0.67
R+6
Arm. vert. drt. 115.34 77.65 138.02 44.10 0.00 -0.25 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 220.79 77.65 138.02 44.10 0.00 -0.25 -0.07 --- ---
Arm. vert. gch. 117.83 77.65 138.02 44.10 -0.08 -0.25 -0.07 --- ---
Arm. horz. gch. 228.13 77.65 138.02 44.10 -0.08 -0.25 -0.07 --- ---
Béton 43.72 -97.74 -4.15 9.33 1.95 -4.30 1.06 --- ---
Arm. transve. 17.07 64.51 9.17 9.57 --- --- --- -1.52 -0.26
R+5
Arm. vert. drt. 108.38 76.13 139.06 43.97 0.00 -0.24 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 153.84 75.37 141.40 44.03 0.00 -0.24 -0.07 --- ---
Arm. vert. gch. 110.59 76.13 139.06 43.97 -0.08 -0.24 -0.07 --- ---
Arm. horz. gch. 158.66 75.37 141.40 44.03 -0.08 -0.24 -0.07 --- ---
Béton 41.83 -57.27 0.64 -53.93 -1.15 0.20 0.20 --- ---
Arm. transve. 17.25 48.66 11.73 -38.95 --- --- --- -2.01 -0.49
R+4
Arm. vert. drt. 82.06 93.89 18.86 -22.37 4.38 0.93 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 219.64 71.65 142.42 43.35 0.00 -0.23 -0.07 --- ---
Arm. vert. gch. 103.23 102.38 16.44 -36.81 0.00 0.56 0.15 --- ---
Arm. horz. gch. 134.46 71.71 142.42 43.38 -0.07 -0.23 -0.07 --- ---
Béton 78.40 -172.86 47.76 0.99 -3.46 -0.15 -0.10 --- ---
Arm. transve. 20.36 91.74 15.74 -38.53 --- --- --- -2.54 -0.38
R+3
Arm. vert. drt. 90.23 -223.07 45.96 4.51 -4.46 -0.21 -0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 202.04 60.90 140.97 40.96 0.00 -0.23 -0.07 --- ---
Arm. vert. gch. 94.98 -234.86 43.23 3.52 4.70 -0.20 -0.13 --- ---
Arm. horz. gch. 208.30 60.95 140.93 40.97 -0.07 -0.23 -0.07 --- ---
Béton 85.80 -234.86 43.23 3.52 -4.70 -0.20 -0.13 --- ---
Page 12
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA6b: Longueur: 235.5 cm [Noeud initial: 29.99;53.05 -> Noeud final: 29.99;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 27.95 5.88 -24.74 -52.52 --- --- --- -2.97 -1.38
R+2
Arm. vert. drt. 108.26 149.53 7.68 9.50 4.92 1.25 0.53 --- ---
(e=30.0 cm)
Arm. horz. drt. 176.63 85.81 143.85 49.99 0.00 -0.07 -0.02 --- ---
Arm. vert. gch. 98.77 168.41 3.83 -37.29 0.00 0.23 -0.06 --- ---
Arm. horz. gch. 178.10 85.81 143.85 49.99 -0.02 -0.07 -0.02 --- ---
Béton 109.09 -238.89 35.48 3.68 4.78 -0.07 0.46 --- ---
Arm. transve. 33.28 156.60 22.16 -26.45 --- --- --- 0.77 3.03
R+1
Arm. vert. drt. 121.16 -405.17 44.94 7.02 -8.10 -0.24 -0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 187.27 17.38 142.74 30.80 0.00 -0.90 -0.18 --- ---
Arm. vert. gch. 158.47 -405.17 44.94 7.02 8.10 -0.24 -0.13 --- ---
Arm. horz. gch. 326.04 17.38 142.74 30.80 -0.67 -0.90 -0.18 --- ---
Béton 138.94 -388.21 45.66 5.95 -7.76 -0.19 -0.09 --- ---
Arm. transve. 39.60 118.02 -4.78 10.17 --- --- --- 4.57 1.39
RDC
Arm. vert. drt. 72.83 209.63 2.89 19.60 0.48 0.30 0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 113.26 30.71 69.16 23.34 0.00 -0.47 -0.20 --- ---
Arm. vert. gch. 69.76 209.63 2.89 19.60 0.00 0.30 0.18 --- ---
Arm. horz. gch. 129.87 30.71 69.16 23.34 -0.54 -0.47 -0.20 --- ---
Béton 62.79 -377.80 -3.11 -24.71 7.56 -0.57 -0.45 --- ---
Arm. transve. 3.08 54.09 -0.18 29.78 --- --- --- 0.38 0.03
SS1
Arm. vert. drt. 35.27 84.64 3.18 27.51 0.00 -0.08 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 97.08 -152.68 -11.21 -109.49 3.05 0.01 -0.04 --- ---
Arm. vert. gch. 36.56 84.43 3.09 27.59 -0.42 -0.08 0.01 --- ---
Arm. horz. gch. 95.96 -152.68 -11.21 -109.49 -3.05 0.01 -0.04 --- ---
Béton 80.89 -140.31 -40.42 -132.91 2.81 -0.15 0.01 --- ---
Arm. transve. 20.87 18.50 -8.67 38.37 --- --- --- 1.71 -0.75
Mur VA7b: Longueur: 477.5 cm [Noeud initial: 33.84;50.63 -> Noeud final: 33.84;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+17
Arm. vert. drt. 86.61 -5.86 -12.43 2.04 5.81 0.37 0.69 --- ---
(e=30.0 cm)
Arm. horz. drt. 77.84 -6.83 2.36 -43.15 0.41 -0.04 -0.19 --- ---
Arm. vert. gch. 71.14 27.09 3.76 -22.80 0.00 -0.11 -0.09 --- ---
Arm. horz. gch. 96.57 -6.83 2.36 -43.15 -0.14 -0.04 -0.19 --- ---
Béton 31.95 -3.08 0.64 -42.74 0.74 0.14 -0.01 --- ---
Arm. transve. 2.04 -5.84 -25.42 -18.94 --- --- --- 1.81 2.26
R+16
Arm. vert. drt. 161.73 144.99 23.78 -24.11 0.00 -0.11 -0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 154.82 -88.92 72.80 -40.55 1.78 -0.38 0.24 --- ---
Arm. vert. gch. 185.92 145.42 23.49 -24.06 -2.57 -0.21 -0.05 --- ---
Arm. horz. gch. 180.94 -91.62 73.20 -39.77 -3.10 -0.60 0.49 --- ---
Béton 35.51 -4.41 9.29 -44.20 -1.00 -0.25 -0.30 --- ---
Arm. transve. 12.17 37.78 17.92 -26.89 --- --- --- 0.65 1.30
R+15
Arm. vert. drt. 228.82 30.12 5.34 -19.65 15.44 2.77 -3.44 --- ---
(e=30.0 cm)
Arm. horz. drt. 179.40 0.66 43.65 52.15 1.74 0.37 0.87 --- ---
Arm. vert. gch. 139.09 116.33 -57.51 -11.66 -2.51 -0.51 -0.67 --- ---
Page 13
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA7b: Longueur: 477.5 cm [Noeud initial: 33.84;50.63 -> Noeud final: 33.84;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 211.75 0.65 43.75 51.46 0.00 0.23 0.64 --- ---
Béton 45.89 0.66 43.65 52.15 1.74 0.37 0.87 --- ---
Arm. transve. 70.76 -12.43 -42.64 -52.65 --- --- --- -7.18 -7.77
R+14
Arm. vert. drt. 247.20 26.92 6.65 -19.12 17.09 3.06 -3.58 --- ---
(e=30.0 cm)
Arm. horz. drt. 311.15 -13.24 3.81 25.12 11.00 3.83 5.87 --- ---
Arm. vert. gch. 219.73 -0.78 22.79 -14.80 -19.24 -2.66 1.72 --- ---
Arm. horz. gch. 227.17 -1.30 22.81 -14.86 -19.27 -2.67 1.72 --- ---
Béton 76.97 -12.31 -6.24 -35.20 0.25 -4.94 -7.17 --- ---
Arm. transve. 567.62 -12.31 -6.24 -35.20 --- --- --- -36.97 -41.77
R+13
Arm. vert. drt. 243.75 22.65 1.64 -14.26 17.60 3.19 -3.75 --- ---
(e=30.0 cm)
Arm. horz. drt. 314.32 -15.27 9.09 21.36 10.95 3.76 5.94 --- ---
Arm. vert. gch. 211.59 -10.40 17.00 -10.86 -19.77 -2.69 1.79 --- ---
Arm. horz. gch. 204.38 -17.95 -9.45 -31.02 -13.41 -4.95 -7.30 --- ---
Béton 75.02 -18.75 -9.40 -31.27 0.37 -4.96 -7.31 --- ---
Arm. transve. 581.45 -18.75 -9.40 -31.27 --- --- --- -37.80 -42.71
R+12
Arm. vert. drt. 248.10 21.07 0.88 -14.53 18.08 3.30 -3.85 --- ---
(e=30.0 cm)
Arm. horz. drt. 329.88 -14.33 12.01 24.00 11.15 3.75 6.01 --- ---
Arm. vert. gch. 208.76 -17.76 15.34 -10.40 -20.24 -2.75 1.82 --- ---
Arm. horz. gch. 201.80 -22.97 -10.36 -31.48 -13.55 -4.96 -7.36 --- ---
Béton 77.87 -26.80 -11.30 -33.78 0.54 -5.03 -7.45 --- ---
Arm. transve. 591.58 -26.80 -11.30 -33.78 --- --- --- -38.46 -43.35
R+11
Arm. vert. drt. 254.80 20.63 0.77 -15.67 18.57 3.41 -3.96 --- ---
(e=30.0 cm)
Arm. horz. drt. 341.22 -24.32 11.59 25.62 11.69 3.85 6.33 --- ---
Arm. vert. gch. 211.59 -22.20 16.31 -11.76 -20.75 -2.82 1.87 --- ---
Arm. horz. gch. 209.15 -22.20 16.31 -11.76 -20.75 -2.82 1.87 --- ---
Béton 82.03 -29.04 -11.25 -36.95 0.58 -5.13 -7.70 --- ---
Arm. transve. 611.79 -29.04 -11.25 -36.95 --- --- --- -39.69 -44.71
R+10
Arm. vert. drt. 261.74 21.90 0.83 -16.72 18.96 3.50 -4.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 352.32 -31.87 12.49 27.67 12.01 3.89 6.52 --- ---
Arm. vert. gch. 216.15 -20.83 17.04 -12.00 -21.02 -2.85 1.91 --- ---
Arm. horz. gch. 216.05 -23.83 17.17 -12.58 -21.14 -2.87 1.92 --- ---
Béton 84.74 -31.00 -11.17 -38.95 0.62 -5.20 -7.86 --- ---
Arm. transve. 625.45 -31.00 -11.17 -38.95 --- --- --- -40.52 -45.64
R+9
Arm. vert. drt. 266.30 24.54 1.03 -17.26 19.10 3.53 -4.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 355.99 -42.30 13.13 28.21 12.19 3.89 6.64 --- ---
Arm. vert. gch. 231.90 -13.09 18.95 -12.97 -21.69 -2.94 1.99 --- ---
Arm. horz. gch. 227.26 -13.09 18.95 -12.97 -21.69 -2.94 1.99 --- ---
Béton 86.28 -29.71 -10.78 -39.88 0.59 -5.23 -7.98 --- ---
Arm. transve. 635.00 -29.71 -10.78 -39.88 --- --- --- -41.08 -46.30
R+8
Arm. vert. drt. 267.83 27.29 1.07 -17.43 19.00 3.52 -4.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 358.80 -52.60 13.62 29.19 12.30 3.88 6.72 --- ---
Arm. vert. gch. 231.94 -11.15 19.32 -13.22 -21.49 -2.91 1.98 --- ---
Arm. horz. gch. 227.90 -11.15 19.32 -13.22 -21.49 -2.91 1.98 --- ---
Béton 87.30 -29.41 -11.20 -40.95 0.59 -5.24 -8.02 --- ---
Arm. transve. 637.69 -29.41 -11.20 -40.95 --- --- --- -41.23 -46.49
Page 14
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA7b: Longueur: 477.5 cm [Noeud initial: 33.84;50.63 -> Noeud final: 33.84;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+7
Arm. vert. drt. 271.36 31.15 0.69 -17.99 18.96 3.52 -4.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 359.41 -62.41 14.77 29.85 12.28 3.82 6.72 --- ---
Arm. vert. gch. 230.29 -8.84 19.50 -13.35 -21.10 -2.86 1.95 --- ---
Arm. horz. gch. 230.10 -14.44 19.89 -14.37 -21.21 -2.87 1.95 --- ---
Béton 87.75 -29.17 -11.76 -41.90 0.58 -5.20 -7.98 --- ---
Arm. transve. 634.18 -29.17 -11.76 -41.90 --- --- --- -41.02 -46.25
R+6
Arm. vert. drt. 269.46 35.66 0.73 -17.97 18.46 3.42 -3.90 --- ---
(e=30.0 cm)
Arm. horz. drt. 358.49 -73.88 15.31 30.95 12.21 3.75 6.71 --- ---
Arm. vert. gch. 233.19 -4.99 20.74 -14.62 -20.89 -2.83 1.93 --- ---
Arm. horz. gch. 232.25 -4.99 20.74 -14.62 -20.89 -2.83 1.93 --- ---
Béton 88.45 -27.27 -11.71 -43.29 0.55 -5.14 -7.93 --- ---
Arm. transve. 630.04 -27.27 -11.71 -43.29 --- --- --- -40.74 -46.00
R+5
Arm. vert. drt. 263.00 40.92 0.77 -18.21 17.85 3.30 -3.75 --- ---
(e=30.0 cm)
Arm. horz. drt. 234.63 -86.63 15.72 29.47 11.70 3.54 6.46 --- ---
Arm. vert. gch. 231.32 -3.17 21.44 -15.62 -20.23 -2.74 1.88 --- ---
Arm. horz. gch. 233.52 -3.17 21.44 -15.62 -20.23 -2.74 1.88 --- ---
Béton 85.75 -21.56 -10.93 -41.73 0.43 -4.96 -7.70 --- ---
Arm. transve. 607.28 -24.02 -11.47 -42.03 --- --- --- -39.22 -44.35
R+4
Arm. vert. drt. 256.15 45.74 3.27 -18.21 16.38 3.03 -3.43 --- ---
(e=30.0 cm)
Arm. horz. drt. 292.05 -100.81 16.44 30.11 11.22 3.36 6.26 --- ---
Arm. vert. gch. 228.35 6.79 21.61 -15.39 -19.07 -2.59 1.77 --- ---
Arm. horz. gch. 200.38 3.44 21.81 -15.83 -19.15 -2.60 1.78 --- ---
Béton 84.66 -19.35 -11.20 -42.59 0.39 -4.77 -7.38 --- ---
Arm. transve. 439.88 -19.35 -11.20 -42.59 --- --- --- -37.79 -42.91
R+3
Arm. vert. drt. 106.14 34.81 3.47 -13.02 11.61 2.33 -0.44 --- ---
(e=30.0 cm)
Arm. horz. drt. 188.01 -99.54 13.71 26.84 9.69 3.05 5.34 --- ---
Arm. vert. gch. 220.26 9.67 19.85 -13.63 -18.12 -2.45 1.68 --- ---
Arm. horz. gch. 211.68 9.67 19.85 -13.63 -18.12 -2.45 1.68 --- ---
Béton 79.56 -37.47 -10.01 -45.74 0.75 -4.29 -6.34 --- ---
Arm. transve. 513.47 -34.45 -10.12 -45.46 --- --- --- -33.69 -37.75
R+2
Arm. vert. drt. 55.82 36.56 4.62 -8.10 4.11 0.52 -0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 86.13 -15.44 0.26 -26.73 2.26 0.75 -0.14 --- ---
Arm. vert. gch. 91.15 11.96 0.07 -6.19 -12.64 -1.94 -0.51 --- ---
Arm. horz. gch. 105.11 -16.11 -3.12 -24.89 -2.23 -2.05 0.20 --- ---
Béton 40.82 -193.95 -14.37 7.76 10.58 1.63 0.26 --- ---
Arm. transve. 22.46 56.18 3.00 3.32 --- --- --- -1.74 1.27
R+1
Arm. vert. drt. 102.45 129.49 4.97 25.09 0.80 0.20 0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 131.33 67.73 14.53 30.44 1.08 0.39 -0.07 --- ---
Arm. vert. gch. 95.40 129.49 4.97 25.09 0.00 0.20 0.10 --- ---
Arm. horz. gch. 114.44 67.73 14.53 30.44 0.00 0.39 -0.07 --- ---
Béton 51.39 -364.61 -17.48 -54.98 -7.29 -0.07 -0.19 --- ---
Arm. transve. 18.72 106.50 9.20 2.88 --- --- --- -1.59 0.84
RDC
Arm. vert. drt. 86.41 111.36 1.27 33.68 0.00 0.00 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 86.47 -159.45 16.50 -95.62 3.19 0.12 -0.15 --- ---
Page 15
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA7b: Longueur: 477.5 cm [Noeud initial: 33.84;50.63 -> Noeud final: 33.84;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 89.50 111.36 1.27 33.68 -0.23 0.00 0.01 --- ---
Arm. horz. gch. 121.33 -159.47 16.48 -95.67 -3.19 0.11 -0.15 --- ---
Béton 67.68 -155.76 -3.24 -106.45 3.12 -0.12 -0.01 --- ---
Arm. transve. 3.49 10.91 -1.91 37.49 --- --- --- 0.35 -0.25
SS1
Arm. vert. drt. 54.84 12.70 -4.71 66.08 0.00 -0.09 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 112.94 3.63 11.95 62.61 0.37 0.20 -0.02 --- ---
Arm. vert. gch. 55.79 40.95 14.99 40.49 -0.11 -0.28 -0.02 --- ---
Arm. horz. gch. 107.68 3.63 11.95 62.61 0.00 0.20 -0.02 --- ---
Béton 65.98 -69.98 -45.75 -109.20 1.40 -0.36 0.06 --- ---
Arm. transve. 2.69 12.71 -4.70 65.98 --- --- --- -0.31 0.07
Mur VA7: Longueur: 200.1 cm [Noeud initial: 31.84;55.41 -> Noeud final: 33.84;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+17
Arm. vert. drt. 254.05 132.52 208.32 76.98 3.29 2.84 1.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 278.52 132.52 208.32 76.98 3.29 2.84 1.25 --- ---
Arm. vert. gch. 184.60 132.52 208.32 76.98 0.00 2.84 1.25 --- ---
Arm. horz. gch. 124.69 132.52 208.32 76.98 0.00 2.84 1.25 --- ---
Béton 53.21 132.52 208.32 76.98 0.00 2.84 1.25 --- ---
Arm. transve. 11.90 10.69 51.79 51.97 --- --- --- 1.03 -0.97
R+16
Arm. vert. drt. 85.81 41.61 24.30 52.65 0.00 -0.00 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 106.60 75.48 154.40 7.43 0.00 1.11 -0.08 --- ---
Arm. vert. gch. 91.38 41.61 24.30 52.65 -0.16 -0.00 -0.00 --- ---
Arm. horz. gch. 146.75 75.48 154.40 7.43 -0.14 1.11 -0.08 --- ---
Béton 31.47 41.61 24.30 52.65 0.00 -0.00 -0.00 --- ---
Arm. transve. 11.46 39.78 23.64 51.91 --- --- --- 1.25 -0.51
R+15
Arm. vert. drt. 104.56 81.83 128.45 23.12 0.00 -0.21 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 128.50 81.83 128.65 23.11 0.00 -0.21 0.02 --- ---
Arm. vert. gch. 105.86 81.83 128.65 23.11 -0.15 -0.21 0.02 --- ---
Arm. horz. gch. 131.49 81.83 128.65 23.11 -0.15 -0.21 0.02 --- ---
Béton 23.57 25.58 -3.87 39.22 0.14 0.16 0.02 --- ---
Arm. transve. 0.33 32.14 20.02 36.52 --- --- --- -0.45 -0.13
R+14
Arm. vert. drt. 93.86 72.69 146.39 16.64 0.00 -0.01 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 210.81 71.17 150.44 16.52 0.00 -0.00 0.01 --- ---
Arm. vert. gch. 93.89 72.69 146.39 16.64 -0.02 -0.01 0.01 --- ---
Arm. horz. gch. 210.74 71.17 150.44 16.52 -0.02 -0.00 0.01 --- ---
Béton 25.47 19.61 -20.18 42.28 0.02 0.02 0.04 --- ---
Arm. transve. 0.49 20.20 -19.87 41.63 --- --- --- 0.03 -0.03
R+13
Arm. vert. drt. 123.92 95.92 185.61 25.17 0.01 0.06 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 207.60 89.67 192.96 24.33 0.01 0.06 0.01 --- ---
Arm. vert. gch. 123.58 95.90 185.92 25.18 0.00 0.06 0.01 --- ---
Arm. horz. gch. 206.44 89.67 192.96 24.33 0.00 0.06 0.01 --- ---
Béton 28.01 22.40 -21.50 46.28 0.01 0.01 0.04 --- ---
Arm. transve. 0.52 32.88 37.78 42.99 --- --- --- -0.02 0.06
Page 16
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA7: Longueur: 200.1 cm [Noeud initial: 31.84;55.41 -> Noeud final: 33.84;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+12
Arm. vert. drt. 119.43 104.59 200.00 27.01 0.00 0.07 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 197.53 94.49 207.09 25.37 0.00 0.07 0.01 --- ---
Arm. vert. gch. 119.11 104.59 200.00 27.01 0.00 0.07 0.01 --- ---
Arm. horz. gch. 196.32 94.49 207.09 25.37 0.00 0.07 0.01 --- ---
Béton 30.57 20.41 -23.35 50.70 0.01 0.01 0.04 --- ---
Arm. transve. 0.53 36.75 40.71 47.09 --- --- --- -0.01 0.06
R+11
Arm. vert. drt. 122.03 105.62 218.34 27.94 0.00 0.07 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 212.13 97.51 223.17 26.67 0.00 0.07 0.01 --- ---
Arm. vert. gch. 121.72 105.62 218.34 27.94 -0.00 0.07 0.01 --- ---
Arm. horz. gch. 210.91 97.51 223.17 26.67 0.00 0.07 0.01 --- ---
Béton 34.76 -88.82 22.42 -52.86 -1.78 -0.04 -0.03 --- ---
Arm. transve. 0.48 29.21 43.61 52.23 --- --- --- -0.02 0.05
R+10
Arm. vert. drt. 120.27 102.28 232.00 28.18 0.00 0.06 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 225.89 100.31 238.13 28.13 0.00 0.07 0.01 --- ---
Arm. vert. gch. 119.95 102.28 232.00 28.18 -0.00 0.06 0.01 --- ---
Arm. horz. gch. 224.68 100.31 238.13 28.13 -0.00 0.07 0.01 --- ---
Béton 39.25 0.64 -6.08 52.32 -0.06 0.09 0.06 --- ---
Arm. transve. 0.45 26.88 45.27 54.21 --- --- --- -0.03 0.05
R+9
Arm. vert. drt. 120.39 100.82 245.55 28.81 0.00 0.06 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 236.94 93.29 251.99 27.73 0.00 0.06 0.02 --- ---
Arm. vert. gch. 120.07 100.82 245.55 28.81 -0.00 0.06 0.01 --- ---
Arm. horz. gch. 235.75 93.28 251.99 27.73 -0.00 0.06 0.01 --- ---
Béton 41.25 0.28 -6.41 55.02 -0.07 0.09 0.06 --- ---
Arm. transve. 0.44 17.24 46.78 57.06 --- --- --- -0.03 0.04
R+8
Arm. vert. drt. 119.59 98.97 253.77 29.10 0.00 0.05 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 244.81 86.91 261.98 27.38 0.00 0.06 0.02 --- ---
Arm. vert. gch. 119.31 98.97 253.77 29.10 -0.00 0.05 0.01 --- ---
Arm. horz. gch. 243.67 86.91 261.98 27.38 -0.00 0.06 0.02 --- ---
Béton 42.22 0.28 -6.63 56.33 -0.07 0.09 0.06 --- ---
Arm. transve. 0.44 9.30 48.17 60.31 --- --- --- -0.03 0.04
R+7
Arm. vert. drt. 116.58 73.71 151.86 -51.38 0.11 0.18 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 250.15 92.10 266.69 29.01 0.00 0.06 0.01 --- ---
Arm. vert. gch. 116.23 94.07 265.59 29.30 -0.01 0.05 0.01 --- ---
Arm. horz. gch. 249.05 80.28 268.95 27.01 -0.00 0.06 0.01 --- ---
Béton 45.54 0.05 47.91 60.69 -0.02 -0.01 0.04 --- ---
Arm. transve. 0.43 1.05 48.20 60.90 --- --- --- -0.03 0.04
R+6
Arm. vert. drt. 121.32 79.77 151.11 -51.40 0.12 0.20 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 255.30 80.63 274.33 27.92 0.00 0.06 0.01 --- ---
Arm. vert. gch. 118.89 79.77 151.11 -51.40 0.00 0.20 -0.07 --- ---
Arm. horz. gch. 254.25 80.63 274.33 27.92 -0.00 0.06 0.01 --- ---
Béton 41.36 -95.79 27.07 -64.34 -1.92 -0.05 -0.03 --- ---
Arm. transve. 0.45 -11.20 48.07 63.45 --- --- --- -0.03 0.04
R+5
Arm. vert. drt. 118.34 76.63 149.25 -50.81 0.12 0.23 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 250.22 67.69 270.57 26.03 0.00 0.05 0.01 --- ---
Page 17
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA7: Longueur: 200.1 cm [Noeud initial: 31.84;55.41 -> Noeud final: 33.84;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 115.74 76.63 149.25 -50.81 0.00 0.23 -0.07 --- ---
Arm. horz. gch. 249.27 67.69 270.57 26.03 -0.01 0.05 0.01 --- ---
Béton 41.57 -86.72 27.60 -65.75 -1.73 -0.05 -0.03 --- ---
Arm. transve. 0.46 -29.95 46.16 63.49 --- --- --- -0.03 0.04
R+4
Arm. vert. drt. 130.28 103.32 115.70 -44.08 0.09 0.19 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 247.16 48.31 269.94 23.62 0.00 0.04 0.00 --- ---
Arm. vert. gch. 128.06 103.32 115.70 -44.08 0.00 0.19 -0.07 --- ---
Arm. horz. gch. 246.44 48.31 269.94 23.62 -0.00 0.04 0.00 --- ---
Béton 39.79 -68.85 28.06 -64.14 -1.38 -0.05 -0.02 --- ---
Arm. transve. 0.49 -59.91 42.40 63.89 --- --- --- -0.00 0.06
R+3
Arm. vert. drt. 128.28 133.59 7.42 -24.28 0.00 -0.01 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 155.76 38.52 313.15 26.22 0.00 0.03 0.03 --- ---
Arm. vert. gch. 129.86 133.59 7.42 -24.28 -0.07 -0.01 -0.00 --- ---
Arm. horz. gch. 240.67 38.52 313.15 26.22 -0.01 0.03 0.03 --- ---
Béton 58.11 -120.39 -16.94 -97.25 -2.41 -0.03 -0.01 --- ---
Arm. transve. 0.71 -86.56 102.56 48.51 --- --- --- 0.05 -0.04
R+2
Arm. vert. drt. 115.20 104.00 65.90 -24.44 0.00 0.07 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 470.30 -22.53 239.15 9.89 0.45 -0.08 -0.05 --- ---
Arm. vert. gch. 116.28 104.00 65.90 -24.44 -0.17 0.07 -0.01 --- ---
Arm. horz. gch. 473.79 -22.53 239.15 9.89 -0.45 -0.08 -0.05 --- ---
Béton 42.48 -70.88 -0.19 -53.99 1.42 -0.03 -0.10 --- ---
Arm. transve. 0.97 -54.82 11.19 31.92 --- --- --- 0.94 1.04
R+1
Arm. vert. drt. 136.87 175.56 8.78 -12.98 0.38 0.05 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 172.07 -70.51 138.50 6.36 1.41 -0.19 -0.07 --- ---
Arm. vert. gch. 135.11 175.56 8.78 -12.98 0.00 0.05 0.03 --- ---
Arm. horz. gch. 276.81 -71.91 138.74 6.20 -1.44 -0.21 -0.07 --- ---
Béton 44.44 -85.33 -0.32 57.22 -1.71 -0.11 0.04 --- ---
Arm. transve. 2.53 51.40 7.22 -10.63 --- --- --- -0.30 0.10
RDC
Arm. vert. drt. 117.50 -248.86 36.75 -34.23 -4.98 0.67 0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 123.82 -209.10 58.41 -23.64 4.18 0.96 0.37 --- ---
Arm. vert. gch. 118.28 123.21 -11.14 27.28 -1.41 0.04 -0.39 --- ---
Arm. horz. gch. 110.70 40.63 30.56 -38.80 0.00 0.28 0.34 --- ---
Béton 54.49 -180.90 13.52 -49.40 -3.62 1.66 0.25 --- ---
Arm. transve. 3.68 37.05 1.00 13.07 --- --- --- -0.44 0.14
SS1
Arm. vert. drt. 60.13 39.42 10.96 35.94 0.00 -0.41 0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 97.35 38.96 10.92 36.23 0.00 -0.41 0.08 --- ---
Arm. vert. gch. 63.36 39.42 10.96 35.94 -0.87 -0.41 0.08 --- ---
Arm. horz. gch. 82.05 38.96 10.92 36.23 -0.87 -0.41 0.08 --- ---
Béton 27.45 -123.42 -14.98 -3.27 -2.47 0.84 -0.34 --- ---
Arm. transve. 8.58 39.53 10.94 35.58 --- --- --- 1.07 -0.06
Page 18
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA9b: Longueur: 325.1 cm [Noeud initial: 37.69;50.46 -> Noeud final: 37.69;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 92.69 -22.85 0.32 -5.00 7.95 1.68 -0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 69.08 -24.19 0.31 -5.24 8.03 1.70 -0.19 --- ---
Arm. vert. gch. 153.02 -5.58 -22.13 -12.90 -10.90 -1.49 -1.31 --- ---
Arm. horz. gch. 86.39 -54.09 -13.12 -34.80 -5.50 -1.33 -0.03 --- ---
Béton 35.93 -200.43 -80.69 -72.74 -5.73 -0.72 -0.79 --- ---
Arm. transve. 7.29 -89.00 -46.16 -60.49 --- --- --- -9.42 -4.50
R+13
Arm. vert. drt. 78.06 -19.33 0.17 -1.71 6.86 1.41 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 53.08 -29.05 0.41 -2.55 6.82 1.39 -0.23 --- ---
Arm. vert. gch. 85.57 -19.11 -18.02 -7.08 -7.65 -1.13 -0.57 --- ---
Arm. horz. gch. 15.94 -15.70 -8.60 -1.86 -5.62 -1.06 -0.45 --- ---
Béton 13.69 -48.80 -1.18 -1.70 2.48 0.49 -0.09 --- ---
Arm. transve. 3.19 -35.95 -8.61 -15.05 --- --- --- -4.57 -0.03
R+12
Arm. vert. drt. 83.64 -19.16 0.01 -1.17 7.28 1.50 -0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 52.78 -22.81 -0.10 -1.24 7.42 1.53 -0.25 --- ---
Arm. vert. gch. 96.91 -18.26 -18.54 -7.50 -8.33 -1.22 -0.63 --- ---
Arm. horz. gch. 22.71 -14.49 -8.46 -1.29 -6.20 -1.16 -0.50 --- ---
Béton 14.68 -60.44 2.79 -9.99 1.21 0.36 0.04 --- ---
Arm. transve. 3.48 -37.11 -9.19 -15.04 --- --- --- -4.99 0.01
R+11
Arm. vert. drt. 78.47 -23.05 -0.39 -0.79 7.34 1.51 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 50.30 -25.55 -0.49 -0.81 7.44 1.53 -0.25 --- ---
Arm. vert. gch. 93.45 -20.78 -18.80 -7.65 -8.34 -1.22 -0.63 --- ---
Arm. horz. gch. 22.65 -18.68 -8.70 -1.18 -6.31 -1.18 -0.50 --- ---
Béton 17.32 -72.12 1.87 -9.04 -1.44 0.36 0.03 --- ---
Arm. transve. 3.52 -41.27 -9.32 -14.96 --- --- --- -5.05 0.00
R+10
Arm. vert. drt. 74.22 -27.72 -0.88 -0.42 7.53 1.55 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 48.50 -30.54 -1.01 -0.40 7.63 1.57 -0.26 --- ---
Arm. vert. gch. 89.23 -24.69 -19.33 -7.91 -8.44 -1.24 -0.63 --- ---
Arm. horz. gch. 22.54 -22.36 -8.90 -1.22 -6.41 -1.20 -0.51 --- ---
Béton 20.22 -84.57 0.92 -8.17 -1.69 0.35 0.03 --- ---
Arm. transve. 3.60 -46.04 -9.44 -15.12 --- --- --- -5.16 0.00
R+9
Arm. vert. drt. 68.47 -32.62 -1.38 -0.08 7.65 1.57 -0.26 --- ---
(e=30.0 cm)
Arm. horz. drt. 46.27 -32.62 -1.38 -0.08 7.65 1.57 -0.26 --- ---
Arm. vert. gch. 85.97 -29.29 -19.72 -8.17 -8.67 -1.27 -0.65 --- ---
Arm. horz. gch. 21.69 -26.53 -9.15 -1.32 -6.47 -1.21 -0.52 --- ---
Béton 23.22 -97.30 -0.01 -7.51 -1.95 0.35 0.03 --- ---
Arm. transve. 3.58 -47.61 2.81 -8.71 --- --- --- -4.80 1.81
R+8
Arm. vert. drt. 61.53 -37.61 -1.89 0.24 7.70 1.58 -0.26 --- ---
(e=30.0 cm)
Arm. horz. drt. 44.43 -41.23 -1.31 -0.59 7.32 1.50 -0.23 --- ---
Arm. vert. gch. 79.01 -34.16 -19.98 -8.37 -8.67 -1.27 -0.65 --- ---
Arm. horz. gch. 20.47 -29.16 -9.42 -1.38 -6.44 -1.21 -0.52 --- ---
Béton 21.32 -94.45 -8.98 -0.89 1.89 -0.23 -0.25 --- ---
Arm. transve. 3.60 -51.45 2.46 -8.52 --- --- --- -4.83 1.81
R+7
Arm. vert. drt. 52.90 -42.67 -2.42 0.58 7.64 1.56 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 40.17 -42.67 -2.42 0.58 7.64 1.56 -0.25 --- ---
Page 19
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA9b: Longueur: 325.1 cm [Noeud initial: 37.69;50.46 -> Noeud final: 37.69;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 70.49 -39.13 -20.38 -8.63 -8.57 -1.26 -0.65 --- ---
Arm. horz. gch. 2.49 -48.65 -25.42 -10.64 -8.07 -1.19 -0.60 --- ---
Béton 24.02 -106.48 -9.90 -0.88 2.13 -0.23 -0.25 --- ---
Arm. transve. 3.60 -55.02 2.11 -8.33 --- --- --- -4.83 1.80
R+6
Arm. vert. drt. 8.82 -123.74 -15.26 0.23 -2.85 -0.61 0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.52 -49.05 -31.97 -13.07 -8.19 -1.20 -0.60 --- ---
Arm. vert. gch. 60.13 -45.51 -20.19 -8.71 -8.50 -1.25 -0.64 --- ---
Arm. horz. gch. 4.98 -49.07 -31.96 -13.06 -8.18 -1.20 -0.60 --- ---
Béton 27.60 -124.72 -15.25 -0.91 -2.49 0.31 -0.11 --- ---
Arm. transve. 3.55 -58.38 1.76 -8.20 --- --- --- -4.76 1.76
R+5
Arm. vert. drt. 9.56 -137.56 -16.83 -0.87 -2.75 0.29 -0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.52 -52.00 -32.17 -13.33 -8.00 -1.18 -0.59 --- ---
Arm. vert. gch. 54.02 -44.72 -29.55 -12.19 -7.84 -1.15 -0.58 --- ---
Arm. horz. gch. 5.04 -49.10 -31.47 -13.00 -7.93 -1.17 -0.58 --- ---
Béton 30.36 -137.56 -16.83 -0.87 -2.75 0.29 -0.11 --- ---
Arm. transve. 3.46 -61.48 1.49 -8.35 --- --- --- -4.65 1.71
R+4
Arm. vert. drt. 10.37 -149.14 -18.29 -0.74 -2.98 0.29 -0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.49 -54.25 -32.33 -13.58 -7.60 -1.12 -0.57 --- ---
Arm. vert. gch. 10.76 -154.78 -6.79 -0.38 3.10 -0.62 -0.10 --- ---
Arm. horz. gch. 2.10 -97.91 -44.06 -18.96 1.96 0.05 0.06 --- ---
Béton 32.86 -149.14 -18.29 -0.74 -2.98 0.29 -0.10 --- ---
Arm. transve. 3.30 -63.70 1.15 -8.36 --- --- --- -4.44 1.60
R+3
Arm. vert. drt. 11.11 -159.74 -19.66 0.43 -3.19 0.33 -0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.47 -55.63 -32.36 -13.88 -7.20 -1.07 -0.51 --- ---
Arm. vert. gch. 11.11 -159.74 -19.66 0.43 3.19 0.33 -0.13 --- ---
Arm. horz. gch. 2.06 -99.49 -43.58 -19.33 -1.99 0.00 0.05 --- ---
Béton 35.21 -159.74 -19.66 0.43 -3.19 0.33 -0.13 --- ---
Arm. transve. 3.33 -65.70 0.80 -7.39 --- --- --- -4.46 1.69
R+2
Arm. vert. drt. 12.46 -179.20 0.10 -13.55 -3.58 -0.08 0.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.00 -72.77 -38.51 -15.27 1.46 -0.43 -0.27 --- ---
Arm. vert. gch. 11.94 -171.72 -21.16 1.89 3.43 0.32 -0.26 --- ---
Arm. horz. gch. 1.78 -106.65 -38.57 -15.84 2.13 -0.10 -0.01 --- ---
Béton 37.80 -171.72 -21.16 1.89 -3.43 0.32 -0.26 --- ---
Arm. transve. 1.86 -61.06 1.56 -7.18 --- --- --- -2.36 1.23
R+1
Arm. vert. drt. 13.79 -246.21 -22.55 14.54 -4.92 0.22 -0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.35 -184.69 -44.95 -19.67 3.69 -0.54 -0.39 --- ---
Arm. vert. gch. 13.79 -246.21 -22.55 14.54 4.92 0.22 -0.16 --- ---
Arm. horz. gch. 1.89 -184.69 -44.95 -19.67 3.69 -0.54 -0.39 --- ---
Béton 41.05 -188.06 -23.76 -0.99 -3.76 0.17 -0.21 --- ---
Arm. transve. 1.69 -79.77 -11.34 -3.24 --- --- --- -1.88 1.52
RDC
Arm. vert. drt. 99.50 -162.28 36.29 4.07 -3.25 -0.01 0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 127.13 -148.75 37.44 4.17 2.98 -0.02 0.26 --- ---
Arm. vert. gch. 66.15 -162.28 36.29 4.07 -3.25 -0.01 0.24 --- ---
Arm. horz. gch. 126.78 -148.75 37.44 4.17 -2.98 -0.02 0.26 --- ---
Béton 60.39 -162.28 36.29 4.07 3.25 -0.01 0.24 --- ---
Page 20
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA9b: Longueur: 325.1 cm [Noeud initial: 37.69;50.46 -> Noeud final: 37.69;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 1.88 -234.15 -19.74 -28.55 --- --- --- -2.47 0.74
SS1
Arm. vert. drt. 23.47 -419.17 -62.19 75.20 -8.38 0.02 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.51 -302.09 -73.91 111.96 6.04 -0.05 0.17 --- ---
Arm. vert. gch. 23.47 -419.17 -62.19 75.20 8.38 0.02 0.11 --- ---
Arm. horz. gch. 3.47 -302.09 -73.91 111.96 6.04 -0.05 0.17 --- ---
Béton 66.75 -378.03 -53.32 62.19 -7.56 0.05 0.12 --- ---
Arm. transve. 1.29 -166.92 -12.64 10.90 --- --- --- -1.84 0.25
Mur VA10b: Longueur: 438.2 cm [Noeud initial: 45.20;49.33 -> Noeud final: 45.20;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 86.42 -10.64 -44.10 -18.11 6.52 1.20 0.76 --- ---
(e=30.0 cm)
Arm. horz. drt. 87.74 -65.14 26.35 -3.57 1.30 -0.22 -0.48 --- ---
Arm. vert. gch. 61.02 -12.79 -38.68 -17.01 -4.66 -0.79 -0.20 --- ---
Arm. horz. gch. 95.56 -65.14 26.35 -3.57 -1.30 -0.22 -0.48 --- ---
Béton 30.30 -65.14 26.35 -3.57 1.30 -0.22 -0.48 --- ---
Arm. transve. 2.18 -25.35 2.93 -12.09 --- --- --- 2.93 -1.11
R+14
Arm. vert. drt. 4.76 -39.70 -1.55 -1.52 -4.22 -0.98 0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.54 -25.00 -37.43 -11.03 -3.24 -0.63 -0.14 --- ---
Arm. vert. gch. 4.04 -38.54 -1.22 -2.77 3.09 0.61 -0.10 --- ---
Arm. horz. gch. 2.52 -22.89 -34.22 -9.15 4.42 0.96 0.51 --- ---
Béton 11.17 -39.70 -1.55 -1.52 -4.22 -0.98 0.20 --- ---
Arm. transve. 2.01 -33.95 1.99 -9.01 --- --- --- 2.68 -1.03
R+13
Arm. vert. drt. 5.41 -48.83 -2.66 -0.38 -4.42 -1.03 0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.34 -29.74 -33.67 -9.22 -3.49 -0.68 -0.17 --- ---
Arm. vert. gch. 4.51 -40.17 -2.30 -0.99 3.74 0.77 -0.14 --- ---
Arm. horz. gch. 2.33 -29.26 -30.71 -7.76 4.63 1.00 0.51 --- ---
Béton 12.98 -66.15 2.13 -12.39 1.32 -0.13 0.03 --- ---
Arm. transve. 2.00 -43.91 0.80 -6.68 --- --- --- 2.68 -1.02
R+12
Arm. vert. drt. 6.05 -58.42 -3.81 0.53 -4.58 -1.06 0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.23 -43.27 -47.31 -12.31 -0.87 0.02 0.19 --- ---
Arm. vert. gch. 5.64 -81.10 0.53 -10.88 1.62 -0.13 0.03 --- ---
Arm. horz. gch. 2.37 -38.44 -31.12 -8.27 4.76 1.02 0.52 --- ---
Béton 19.54 -81.10 0.53 -10.88 1.62 -0.13 0.03 --- ---
Arm. transve. 2.08 -55.07 -0.40 -5.48 --- --- --- 2.78 -1.06
R+11
Arm. vert. drt. 6.72 -96.61 -1.07 -9.66 -1.93 -0.13 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.25 -52.84 -47.86 -13.00 -1.06 0.02 0.19 --- ---
Arm. vert. gch. 6.72 -96.61 -1.07 -9.66 1.93 -0.13 0.03 --- ---
Arm. horz. gch. 2.41 -48.27 -31.54 -8.84 4.91 1.06 0.54 --- ---
Béton 23.14 -96.61 -1.07 -9.66 1.93 -0.13 0.03 --- ---
Arm. transve. 2.18 -65.63 -1.50 -4.58 --- --- --- 2.92 -1.09
R+10
Arm. vert. drt. 7.36 -78.07 -6.19 2.22 -4.87 -1.12 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.27 -61.18 -48.31 -13.67 1.22 0.01 0.19 --- ---
Arm. vert. gch. 6.66 -95.84 -0.79 -10.12 1.92 -0.12 0.08 --- ---
Page 21
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA10b: Longueur: 438.2 cm [Noeud initial: 45.20;49.33 -> Noeud final: 45.20;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 2.42 -59.73 -46.16 -12.90 2.47 0.56 0.42 --- ---
Béton 21.38 -112.27 -2.67 -8.51 2.25 -0.13 0.03 --- ---
Arm. transve. 1.72 -78.61 -2.80 -3.76 --- --- --- 2.29 -0.88
R+9
Arm. vert. drt. 7.94 -86.95 -7.29 3.01 -4.98 -1.14 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.29 -68.79 -48.60 -14.30 1.38 0.01 0.19 --- ---
Arm. vert. gch. 7.40 -84.19 -7.59 2.77 4.32 0.89 -0.16 --- ---
Arm. horz. gch. 2.44 -67.81 -46.46 -13.54 -1.36 0.57 0.42 --- ---
Béton 24.12 -127.94 -4.29 -7.37 2.56 -0.13 0.03 --- ---
Arm. transve. 1.76 -90.25 -3.97 -2.99 --- --- --- 2.36 -0.90
R+8
Arm. vert. drt. 8.50 -122.21 -9.78 -0.29 -2.44 0.03 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.29 -75.25 -48.68 -14.86 1.51 0.01 0.19 --- ---
Arm. vert. gch. 8.04 -143.55 -5.93 -6.22 2.87 -0.12 0.03 --- ---
Arm. horz. gch. 2.44 -74.04 -46.53 -14.08 2.50 0.57 0.42 --- ---
Béton 27.47 -122.21 -9.78 -0.29 -2.44 0.03 0.04 --- ---
Arm. transve. 1.75 -92.55 -13.59 -14.08 --- --- --- 2.51 -0.05
R+7
Arm. vert. drt. 9.59 -137.94 -11.15 -0.22 -2.76 0.03 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.29 -82.02 -48.54 -15.38 1.64 0.01 0.18 --- ---
Arm. vert. gch. 9.17 -131.92 -10.67 -0.11 2.64 0.01 0.02 --- ---
Arm. horz. gch. 2.43 -79.22 -46.39 -14.57 -1.58 0.57 0.42 --- ---
Béton 31.00 -137.94 -11.15 -0.22 -2.76 0.03 0.04 --- ---
Arm. transve. 1.81 -100.32 -14.15 -7.36 --- --- --- 2.56 -0.39
R+6
Arm. vert. drt. 10.69 -153.78 -12.52 -0.25 -3.08 0.02 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.27 -86.61 -48.23 -15.84 -1.73 0.01 0.18 --- ---
Arm. vert. gch. 10.69 -153.78 -12.52 -0.25 3.08 0.02 0.03 --- ---
Arm. horz. gch. 2.41 -83.98 -46.04 -15.01 2.41 0.56 0.41 --- ---
Béton 34.52 -153.78 -12.52 -0.25 -3.08 0.02 0.03 --- ---
Arm. transve. 1.78 -111.70 -15.04 -7.51 --- --- --- 2.52 -0.39
R+5
Arm. vert. drt. 12.08 -173.74 -21.56 -0.02 -3.47 -0.07 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.25 -90.64 -47.69 -16.27 1.81 0.01 0.18 --- ---
Arm. vert. gch. 12.08 -173.74 -21.56 -0.02 3.47 -0.07 0.03 --- ---
Arm. horz. gch. 2.34 -81.13 -45.84 -15.34 -1.62 0.42 0.35 --- ---
Béton 37.87 -168.77 -13.80 -0.07 -3.38 0.02 0.03 --- ---
Arm. transve. 1.97 -127.83 -10.07 -7.14 --- --- --- 2.82 0.15
R+4
Arm. vert. drt. 13.02 -187.28 -23.26 0.19 -3.75 -0.04 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.22 -93.20 -46.87 -16.64 -1.86 -0.01 0.17 --- ---
Arm. vert. gch. 13.02 -187.28 -23.26 0.19 3.75 -0.04 0.02 --- ---
Arm. horz. gch. 2.30 -84.78 -45.09 -15.83 1.70 0.40 0.34 --- ---
Béton 41.19 -183.65 -15.09 0.05 -3.67 0.02 0.03 --- ---
Arm. transve. 2.09 -138.12 -14.98 -14.72 --- --- --- 2.99 -0.05
R+3
Arm. vert. drt. 13.68 -196.75 -16.67 0.12 -3.93 0.04 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.15 -94.54 -45.72 -16.76 -1.89 0.02 0.15 --- ---
Arm. vert. gch. 13.68 -196.75 -16.67 0.12 3.93 0.04 0.02 --- ---
Arm. horz. gch. 2.24 -187.30 -46.30 -19.03 3.75 0.13 0.15 --- ---
Béton 44.07 -196.75 -16.67 0.12 -3.93 0.04 0.02 --- ---
Arm. transve. 2.10 -154.51 -16.07 -15.00 --- --- --- 3.01 0.03
Page 22
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA10b: Longueur: 438.2 cm [Noeud initial: 45.20;49.33 -> Noeud final: 45.20;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 15.58 -224.07 -25.92 0.01 -4.48 -0.05 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.99 -207.16 -43.42 -18.13 -4.14 0.15 0.23 --- ---
Arm. vert. gch. 15.58 -224.07 -25.92 0.01 4.48 -0.05 0.04 --- ---
Arm. horz. gch. 2.11 -207.16 -43.42 -18.13 4.14 0.15 0.23 --- ---
Béton 49.05 -224.07 -25.92 0.01 4.48 -0.05 0.04 --- ---
Arm. transve. 1.19 -182.57 -11.95 10.04 --- --- --- 1.53 -0.75
R+1
Arm. vert. drt. 17.78 -255.67 -27.84 0.33 -5.11 -0.07 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.35 -222.57 -51.21 -20.72 -4.45 0.17 0.29 --- ---
Arm. vert. gch. 17.78 -255.67 -27.84 0.33 5.11 -0.07 0.06 --- ---
Arm. horz. gch. 2.49 -222.57 -51.21 -20.72 -4.45 0.17 0.29 --- ---
Béton 56.27 -255.67 -27.84 0.33 5.11 -0.07 0.06 --- ---
Arm. transve. 1.57 -215.06 -10.48 12.76 --- --- --- 2.06 -0.91
RDC
Arm. vert. drt. 86.43 -211.99 32.16 0.39 4.24 -0.19 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.78 -204.01 32.84 0.42 4.08 -0.19 -0.25 --- ---
Arm. vert. gch. 125.31 -204.01 32.84 0.42 4.08 -0.19 -0.25 --- ---
Arm. horz. gch. 116.63 -204.01 32.84 0.42 -4.08 -0.19 -0.25 --- ---
Béton 102.18 -219.64 31.48 0.36 -4.39 -0.19 -0.24 --- ---
Arm. transve. 1.58 -301.19 -7.34 9.12 --- --- --- 1.56 -1.51
SS1
Arm. vert. drt. 36.07 -644.15 -52.37 82.79 -12.88 -0.03 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 4.95 -370.35 -104.72 131.34 7.41 -0.02 -0.09 --- ---
Arm. vert. gch. 36.07 -644.15 -52.37 82.79 12.88 -0.03 -0.02 --- ---
Arm. horz. gch. 4.93 -370.35 -104.72 131.34 -7.41 -0.02 -0.09 --- ---
Béton 95.42 -523.86 -44.78 64.90 10.48 -0.09 -0.01 --- ---
Arm. transve. 1.31 -347.24 -23.42 2.26 --- --- --- 1.69 0.82
Mur VA2b: Longueur: 877.3 cm [Noeud initial: 52.71;46.63 -> Noeud final: 52.71;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 186.78 -27.08 -7.31 -12.03 15.09 3.16 0.90 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.48 1.42 23.27 9.26 3.20 0.36 0.18 --- ---
Arm. vert. gch. 198.43 8.03 1.13 -13.72 -9.08 -4.06 2.23 --- ---
Arm. horz. gch. 210.22 8.03 1.13 -13.72 -9.08 -4.06 2.23 --- ---
Béton 28.11 1.19 0.10 -32.35 -0.21 0.20 -0.54 --- ---
Arm. transve. 27.20 -10.26 -3.80 -10.41 --- --- --- -4.46 -5.89
R+14
Arm. vert. drt. 186.22 -22.17 -8.87 -20.68 10.42 11.04 5.74 --- ---
(e=30.0 cm)
Arm. horz. drt. 342.02 -22.17 -8.87 -20.68 10.42 11.04 5.74 --- ---
Arm. vert. gch. 238.41 2.76 5.58 -14.12 -10.73 -7.41 3.28 --- ---
Arm. horz. gch. 330.97 -2.31 10.14 -11.22 -7.24 -8.20 2.79 --- ---
Béton 62.79 -22.89 -9.39 -27.72 -0.46 10.15 5.75 --- ---
Arm. transve. 470.82 -22.89 -9.39 -27.72 --- --- --- 33.43 43.86
R+13
Arm. vert. drt. 222.01 -30.77 -10.14 -25.64 12.55 17.22 6.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 504.26 -30.77 -10.14 -25.64 12.55 17.22 6.63 --- ---
Arm. vert. gch. 252.67 -0.21 6.66 -13.81 -12.09 -8.34 3.76 --- ---
Arm. horz. gch. 312.68 -0.96 6.48 -1.34 -6.54 -15.28 -3.25 --- ---
Page 23
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA2b: Longueur: 877.3 cm [Noeud initial: 52.71;46.63 -> Noeud final: 52.71;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 56.35 -21.20 -7.28 -40.56 -0.42 4.64 3.67 --- ---
Arm. transve. 628.50 -32.40 -10.47 -31.79 --- --- --- 41.84 58.67
R+12
Arm. vert. drt. 224.07 -41.97 -12.35 -33.97 14.01 20.80 7.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 503.55 -41.97 -12.35 -33.97 14.01 20.80 7.19 --- ---
Arm. vert. gch. 258.80 -4.88 8.52 -12.41 -12.16 -8.91 3.94 --- ---
Arm. horz. gch. 536.50 0.70 9.06 7.45 -8.08 -19.30 -3.83 --- ---
Béton 41.33 -2.68 8.90 16.19 0.05 -15.04 -3.41 --- ---
Arm. transve. 617.53 -41.81 -12.50 -38.50 --- --- --- 47.15 67.18
R+11
Arm. vert. drt. 205.76 -14.96 22.66 -23.49 14.18 2.68 0.87 --- ---
(e=30.0 cm)
Arm. horz. drt. 402.98 -48.18 -13.38 -41.22 14.52 22.08 7.32 --- ---
Arm. vert. gch. 239.85 0.07 11.13 17.06 -8.86 -20.96 -4.10 --- ---
Arm. horz. gch. 472.84 0.07 11.13 17.06 -8.86 -20.96 -4.10 --- ---
Béton 48.06 -2.41 11.07 23.05 0.05 -17.76 -3.80 --- ---
Arm. transve. 639.47 -48.53 -13.54 -46.13 --- --- --- 49.00 69.85
R+10
Arm. vert. drt. 207.95 -15.74 25.28 -26.41 14.20 2.68 0.86 --- ---
(e=30.0 cm)
Arm. horz. drt. 251.75 -54.11 -14.55 -50.39 14.63 22.01 7.34 --- ---
Arm. vert. gch. 265.58 5.14 12.87 26.28 -8.99 -21.17 -4.08 --- ---
Arm. horz. gch. 500.24 -2.08 12.90 27.08 -9.12 -21.20 -4.18 --- ---
Béton 55.09 -3.74 12.81 29.90 0.07 -19.30 -3.99 --- ---
Arm. transve. 645.41 -54.07 -14.51 -54.00 --- --- --- 49.32 70.23
R+9
Arm. vert. drt. 223.76 -15.69 29.01 -30.36 14.35 2.73 0.90 --- ---
(e=30.0 cm)
Arm. horz. drt. 197.92 -56.66 -15.33 -57.95 14.67 21.98 7.39 --- ---
Arm. vert. gch. 285.08 2.73 14.43 36.05 -9.12 -21.14 -4.09 --- ---
Arm. horz. gch. 478.87 -7.38 14.66 35.87 -9.27 -21.40 -4.28 --- ---
Béton 101.72 -56.81 -14.73 -62.50 -1.14 18.32 7.01 --- ---
Arm. transve. 657.25 -57.32 -15.11 -60.11 --- --- --- 49.44 70.39
R+8
Arm. vert. drt. 254.84 11.69 31.47 -30.62 13.34 2.33 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 190.66 -58.08 -16.33 -66.47 14.83 22.14 7.42 --- ---
Arm. vert. gch. 291.00 -13.65 16.58 45.67 -9.53 -21.69 -4.35 --- ---
Arm. horz. gch. 501.91 -13.65 16.58 45.67 -9.53 -21.69 -4.35 --- ---
Béton 110.77 -60.15 -16.34 -67.21 -1.20 22.14 7.48 --- ---
Arm. transve. 646.10 -58.77 -15.79 -68.06 --- --- --- 48.83 69.11
R+7
Arm. vert. drt. 270.19 19.14 35.07 -34.31 13.55 2.46 0.48 --- ---
(e=30.0 cm)
Arm. horz. drt. 176.96 -60.03 -16.95 -75.51 14.70 21.13 7.30 --- ---
Arm. vert. gch. 290.65 -21.53 18.01 55.31 -9.36 -20.72 -4.20 --- ---
Arm. horz. gch. 500.82 -21.53 18.01 55.31 -9.36 -20.72 -4.20 --- ---
Béton 114.64 -61.44 -16.87 -75.72 -1.23 21.06 7.32 --- ---
Arm. transve. 645.50 -58.08 -16.06 -75.33 --- --- --- 46.55 65.07
R+6
Arm. vert. drt. 250.47 29.99 38.04 -36.46 13.11 2.28 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 214.88 -56.80 -16.60 -81.56 13.81 18.48 6.85 --- ---
Arm. vert. gch. 222.95 -32.40 18.51 62.80 -8.50 -17.99 -3.76 --- ---
Arm. horz. gch. 349.17 -32.40 18.51 62.80 -8.50 -17.99 -3.76 --- ---
Béton 112.70 -58.38 -16.52 -81.72 -1.17 18.42 6.87 --- ---
Arm. transve. 654.97 -51.64 -15.68 -79.06 --- --- --- 41.39 56.42
Page 24
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA2b: Longueur: 877.3 cm [Noeud initial: 52.71;46.63 -> Noeud final: 52.71;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+5
Arm. vert. drt. 202.92 42.56 40.08 -37.44 12.47 2.04 -0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 136.93 -51.74 -15.86 -80.12 12.48 15.19 6.27 --- ---
Arm. vert. gch. 196.46 44.96 -5.27 -28.58 -10.63 -1.85 2.13 --- ---
Arm. horz. gch. 386.11 -44.81 18.64 62.98 -7.17 -14.50 -3.17 --- ---
Béton 107.09 -53.50 -15.76 -80.25 -1.07 15.14 6.29 --- ---
Arm. transve. 513.25 -47.37 -14.81 -81.86 --- --- --- 36.79 48.75
R+4
Arm. vert. drt. 184.44 55.92 40.33 -36.38 11.54 1.75 -0.62 --- ---
(e=30.0 cm)
Arm. horz. drt. 148.93 30.04 45.93 -43.57 12.05 1.88 -0.51 --- ---
Arm. vert. gch. 176.06 52.91 0.25 -28.00 -10.47 -2.43 2.28 --- ---
Arm. horz. gch. 235.71 -60.80 18.03 62.91 -5.71 -10.50 -2.46 --- ---
Béton 99.01 -44.78 -14.22 -78.42 -0.90 11.50 5.61 --- ---
Arm. transve. 556.05 -39.25 -13.15 -79.47 --- --- --- 30.94 39.42
R+3
Arm. vert. drt. 183.03 67.79 36.98 -31.34 10.79 1.51 -0.90 --- ---
(e=30.0 cm)
Arm. horz. drt. 138.23 38.49 43.68 -40.27 11.29 1.61 -0.86 --- ---
Arm. vert. gch. 89.73 45.91 8.33 -29.57 -8.80 -2.05 1.47 --- ---
Arm. horz. gch. 189.87 -99.23 13.47 47.28 -3.53 -5.18 -1.44 --- ---
Béton 88.22 -26.97 -10.92 -74.04 8.68 5.31 4.51 --- ---
Arm. transve. 339.14 -26.97 -10.92 -74.04 --- --- --- 26.42 31.41
R+2
Arm. vert. drt. 70.05 123.54 11.76 -24.64 0.00 -1.01 0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 89.34 41.80 2.44 -35.61 0.64 1.48 -0.11 --- ---
Arm. vert. gch. 97.35 105.40 14.72 -17.83 -6.49 -1.41 1.04 --- ---
Arm. horz. gch. 106.53 101.12 14.14 -18.33 -6.59 -1.43 1.08 --- ---
Béton 48.14 -122.43 1.41 60.54 -2.45 -0.40 0.07 --- ---
Arm. transve. 46.98 112.18 10.81 -26.35 --- --- --- 4.89 -2.91
R+1
Arm. vert. drt. 119.15 208.43 33.93 33.93 0.00 -1.48 0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 116.31 192.37 31.18 38.77 0.00 -1.37 0.24 --- ---
Arm. vert. gch. 136.20 191.57 30.30 19.08 -6.90 -2.14 0.11 --- ---
Arm. horz. gch. 151.86 192.37 31.18 38.77 -3.16 -1.37 0.24 --- ---
Béton 51.16 -179.31 4.12 54.90 3.59 -1.98 0.42 --- ---
Arm. transve. 83.94 196.49 33.85 31.71 --- --- --- 10.11 1.12
RDC
Arm. vert. drt. 120.94 160.30 -18.71 92.63 0.03 -0.43 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 113.50 83.29 9.27 84.11 0.00 -0.12 0.08 --- ---
Arm. vert. gch. 123.59 195.13 -37.12 33.52 -2.47 -1.01 -1.24 --- ---
Arm. horz. gch. 75.94 -221.65 70.14 0.16 -4.43 -3.53 0.90 --- ---
Béton 105.94 -235.07 58.37 5.52 4.70 -3.31 0.80 --- ---
Arm. transve. 15.47 79.99 -0.80 71.50 --- --- --- -1.08 0.85
SS1
Arm. vert. drt. 72.19 46.64 -7.30 93.49 0.00 -0.16 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 117.42 21.44 3.14 97.51 0.48 0.22 -0.12 --- ---
Arm. vert. gch. 72.15 46.64 -7.30 93.49 -0.04 -0.16 0.05 --- ---
Arm. horz. gch. 115.10 21.44 3.14 97.51 0.00 0.22 -0.12 --- ---
Béton 73.49 -143.62 -23.32 -119.29 -2.87 0.02 -0.03 --- ---
Arm. transve. 11.29 8.43 0.67 90.90 --- --- --- -0.98 0.26
Page 25
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA2c: Longueur: 512.4 cm [Noeud initial: 56.56;50.28 -> Noeud final: 56.56;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 2.17 -12.34 -4.77 2.35 -2.49 -1.48 0.54 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.06 -12.34 -4.77 2.35 -2.49 -1.48 0.54 --- ---
Arm. vert. gch. 1.33 -3.08 0.28 3.34 1.97 0.25 -0.07 --- ---
Arm. horz. gch. 0.78 -6.71 0.47 25.14 -0.13 0.12 -0.10 --- ---
Béton 4.85 -9.63 0.21 23.59 0.19 0.05 -0.11 --- ---
Arm. transve. 1.05 -7.74 -3.50 -0.58 --- --- --- 1.23 -0.87
R+14
Arm. vert. drt. 55.12 -3.96 -4.66 9.86 1.71 2.47 1.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.25 -4.37 -3.59 7.91 1.80 2.68 1.09 --- ---
Arm. vert. gch. 65.46 -17.11 -4.97 2.77 -5.24 -2.76 1.15 --- ---
Arm. horz. gch. 80.18 -17.11 -4.97 2.77 -5.24 -2.76 1.15 --- ---
Béton 14.86 -3.96 -4.66 9.86 1.71 2.47 1.02 --- ---
Arm. transve. 2.82 -10.84 -5.95 6.88 --- --- --- 2.05 3.29
R+13
Arm. vert. drt. 78.52 -15.65 -8.48 26.64 2.14 3.23 1.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 174.57 -8.09 -0.63 11.03 2.52 4.54 1.62 --- ---
Arm. vert. gch. 72.95 -24.23 -7.24 3.60 -6.20 -3.47 1.44 --- ---
Arm. horz. gch. 96.77 -25.66 -7.66 3.27 -6.23 -3.49 1.45 --- ---
Béton 29.78 -15.65 -8.48 26.64 -0.31 3.23 1.20 --- ---
Arm. transve. 6.91 -15.65 -8.48 26.64 --- --- --- 4.98 8.56
R+12
Arm. vert. drt. 77.63 -13.87 0.36 12.41 2.84 5.61 1.87 --- ---
(e=30.0 cm)
Arm. horz. drt. 141.46 -13.87 0.36 12.41 2.84 5.61 1.87 --- ---
Arm. vert. gch. 71.55 -30.27 -9.27 2.92 -6.39 -3.71 1.56 --- ---
Arm. horz. gch. 126.99 -24.87 -5.46 -3.33 -0.52 -5.03 -1.26 --- ---
Béton 32.35 -21.79 -8.92 29.59 -0.44 3.71 1.31 --- ---
Arm. transve. 11.01 -1.92 5.10 -7.41 --- --- --- 3.38 4.55
R+11
Arm. vert. drt. 90.79 -25.61 -9.14 33.77 2.50 4.69 1.57 --- ---
(e=30.0 cm)
Arm. horz. drt. 194.60 -21.51 -1.35 17.98 2.86 5.79 1.89 --- ---
Arm. vert. gch. 70.27 -31.93 -10.40 1.76 -6.32 -3.72 1.57 --- ---
Arm. horz. gch. 122.74 -24.10 3.47 -24.43 -0.48 -4.19 -0.99 --- ---
Béton 38.45 -25.61 -9.14 33.77 -0.51 4.69 1.57 --- ---
Arm. transve. 13.99 -3.18 4.96 -6.65 --- --- --- 3.69 5.09
R+10
Arm. vert. drt. 79.41 -34.70 -12.21 37.27 2.26 4.30 1.44 --- ---
(e=30.0 cm)
Arm. horz. drt. 193.49 -31.64 -3.69 21.97 2.80 5.70 1.87 --- ---
Arm. vert. gch. 73.60 -31.37 -11.42 -0.26 -6.38 -3.78 1.59 --- ---
Arm. horz. gch. 92.25 -24.23 5.56 -27.99 -0.48 -3.95 -0.92 --- ---
Béton 40.49 -36.06 -12.12 36.91 -0.72 4.33 1.47 --- ---
Arm. transve. 8.79 -36.06 -12.12 36.91 --- --- --- 6.06 10.91
R+9
Arm. vert. drt. 64.40 -46.29 -14.43 41.26 2.24 4.26 1.42 --- ---
(e=30.0 cm)
Arm. horz. drt. 152.12 -45.95 -5.88 25.44 2.79 5.74 1.88 --- ---
Arm. vert. gch. 80.83 -27.57 -11.92 -1.83 -6.49 -3.88 1.63 --- ---
Arm. horz. gch. 113.57 -22.94 7.40 -32.20 -0.46 -3.98 -0.91 --- ---
Béton 42.88 -46.29 -14.43 41.26 -0.93 4.26 1.42 --- ---
Arm. transve. 11.22 -35.72 -9.11 -20.87 --- --- --- 3.62 4.48
R+8
Arm. vert. drt. 62.29 32.04 -0.49 11.35 0.14 0.44 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 151.91 -59.73 -7.16 27.11 2.76 5.90 1.89 --- ---
Page 26
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA2c: Longueur: 512.4 cm [Noeud initial: 56.56;50.28 -> Noeud final: 56.56;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 89.26 -18.13 -11.78 -2.92 -6.13 -3.74 1.58 --- ---
Arm. horz. gch. 123.55 -20.42 9.75 -36.21 -0.41 -3.84 -0.85 --- ---
Béton 45.80 -58.98 -17.08 45.00 -1.18 4.07 1.35 --- ---
Arm. transve. 10.39 -36.87 -9.10 -24.34 --- --- --- 3.65 4.16
R+7
Arm. vert. drt. 78.32 45.41 -0.49 9.20 0.16 0.44 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 143.24 -77.09 -9.50 30.01 2.73 5.70 1.80 --- ---
Arm. vert. gch. 106.21 29.94 -6.39 -3.20 -3.44 -1.74 0.82 --- ---
Arm. horz. gch. 130.20 -18.78 12.13 -39.98 -0.38 -3.44 -0.73 --- ---
Béton 48.02 -70.64 -19.70 48.36 -1.41 3.66 1.22 --- ---
Arm. transve. 7.75 -73.01 -19.52 47.73 --- --- --- 5.32 9.74
R+6
Arm. vert. drt. 69.26 55.35 -1.03 -36.60 0.30 0.69 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 117.02 -98.54 -13.05 33.71 2.44 4.84 1.53 --- ---
Arm. vert. gch. 114.51 55.35 -1.03 -36.60 0.00 0.69 0.15 --- ---
Arm. horz. gch. 133.70 -11.49 14.85 -43.36 -0.23 -2.75 -0.52 --- ---
Béton 49.50 -97.90 2.21 55.50 1.96 -1.28 -0.23 --- ---
Arm. transve. 10.50 1.97 1.83 38.37 --- --- --- 0.99 -0.89
R+5
Arm. vert. drt. 85.32 76.40 -0.83 -38.99 0.31 0.60 0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 93.69 8.17 -1.49 -50.26 0.35 1.00 0.24 --- ---
Arm. vert. gch. 84.09 76.40 -0.83 -38.99 0.00 0.60 0.16 --- ---
Arm. horz. gch. 130.94 -3.96 17.67 -46.02 -0.08 -2.05 -0.31 --- ---
Béton 49.14 -111.85 1.12 59.94 -2.24 -0.51 -0.17 --- ---
Arm. transve. 11.16 -0.26 0.82 41.93 --- --- --- 1.09 -0.90
R+4
Arm. vert. drt. 103.32 101.93 -0.27 -40.41 0.27 0.24 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.69 11.09 20.36 -46.07 0.91 -0.87 0.02 --- ---
Arm. vert. gch. 103.10 101.93 -0.27 -40.41 0.00 0.24 0.15 --- ---
Arm. horz. gch. 128.82 5.49 20.27 -47.58 0.00 -1.10 -0.03 --- ---
Béton 50.04 -124.54 0.49 60.77 -2.49 -0.34 -0.17 --- ---
Arm. transve. 12.76 -0.04 1.17 -39.40 --- --- --- 1.09 1.18
R+3
Arm. vert. drt. 110.95 117.16 1.16 -36.23 0.31 0.02 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 112.43 20.52 22.53 -45.58 1.20 -0.08 0.27 --- ---
Arm. vert. gch. 110.44 117.16 1.16 -36.23 0.00 0.02 0.11 --- ---
Arm. horz. gch. 126.05 12.72 22.19 -48.06 0.00 -0.31 0.21 --- ---
Béton 42.31 20.28 -0.34 -54.94 0.24 0.17 0.18 --- ---
Arm. transve. 20.53 21.02 16.47 -32.76 --- --- --- 2.16 1.43
R+2
Arm. vert. drt. 92.20 161.87 4.56 -21.95 0.36 -0.03 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 123.73 21.48 24.03 -45.04 0.57 0.08 0.14 --- ---
Arm. vert. gch. 89.46 161.87 4.56 -21.95 0.00 -0.03 0.04 --- ---
Arm. horz. gch. 76.25 21.48 24.03 -45.04 0.00 0.08 0.14 --- ---
Béton 43.96 -311.47 -5.95 16.74 -6.23 0.11 -0.02 --- ---
Arm. transve. 11.43 24.51 23.99 -40.25 --- --- --- 1.15 0.71
R+1
Arm. vert. drt. 161.30 288.94 35.90 38.90 7.17 1.30 -0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 176.99 271.20 42.01 78.73 1.05 0.60 -0.08 --- ---
Arm. vert. gch. 141.70 271.20 42.01 78.73 0.00 0.60 -0.08 --- ---
Arm. horz. gch. 164.54 271.20 42.01 78.73 0.00 0.60 -0.08 --- ---
Béton 68.38 -512.33 -64.96 -77.80 10.25 -1.62 0.41 --- ---
Page 27
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA2c: Longueur: 512.4 cm [Noeud initial: 56.56;50.28 -> Noeud final: 56.56;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 61.28 278.79 43.84 52.53 --- --- --- -7.48 0.24
RDC
Arm. vert. drt. 144.67 271.99 -12.74 42.77 4.45 1.22 1.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 127.95 -267.22 3.05 -179.09 5.34 0.27 0.19 --- ---
Arm. vert. gch. 125.41 275.32 -13.06 57.25 0.00 0.62 0.60 --- ---
Arm. horz. gch. 127.16 -267.22 3.05 -179.09 -5.34 0.27 0.19 --- ---
Béton 116.97 -223.12 1.06 -149.71 4.46 0.18 0.15 --- ---
Arm. transve. 104.67 201.52 -0.10 82.19 --- --- --- 10.11 7.21
SS1
Arm. vert. drt. 55.88 64.09 8.75 38.14 3.04 0.38 -0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.81 -7.43 12.82 51.61 0.30 1.83 0.22 --- ---
Arm. vert. gch. 56.88 53.25 1.77 60.63 -2.20 -0.89 -0.05 --- ---
Arm. horz. gch. 77.19 48.05 8.70 74.91 -0.41 -0.28 -0.15 --- ---
Béton 57.90 52.29 -1.18 75.89 0.00 -0.21 -0.20 --- ---
Arm. transve. 48.14 44.72 11.34 45.28 --- --- --- 5.84 -0.15
Mur VA11: Longueur: 501.8 cm [Noeud initial: 29.99;46.48 -> Noeud final: 29.99;51.50]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+17
Arm. vert. drt. 257.13 160.69 217.41 88.93 0.00 -0.05 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 381.83 160.69 217.41 88.93 0.00 -0.05 -0.02 --- ---
Arm. vert. gch. 258.48 160.68 217.41 88.93 -0.09 -0.05 -0.02 --- ---
Arm. horz. gch. 383.58 160.68 217.41 88.93 -0.09 -0.05 -0.02 --- ---
Béton 53.49 160.68 217.41 88.93 0.00 -0.05 -0.02 --- ---
Arm. transve. 5.29 50.52 9.36 24.43 --- --- --- -0.47 -0.08
R+16
Arm. vert. drt. 81.08 48.41 1.84 -0.41 0.60 0.13 -0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 40.23 31.38 -7.96 16.15 0.65 0.14 0.02 --- ---
Arm. vert. gch. 86.91 18.46 0.10 0.92 -4.00 -0.89 0.01 --- ---
Arm. horz. gch. 32.89 11.72 -2.95 5.24 -2.02 -0.56 -0.22 --- ---
Béton 12.64 -45.31 -2.03 -0.28 4.66 0.97 -0.10 --- ---
Arm. transve. 1.66 -23.21 -2.89 -5.40 --- --- --- -2.26 0.73
R+15
Arm. vert. drt. 82.01 18.54 27.77 30.47 0.00 -0.00 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 157.79 6.76 49.38 11.10 0.00 -0.11 -0.11 --- ---
Arm. vert. gch. 90.21 18.54 27.76 30.47 -0.48 -0.00 -0.07 --- ---
Arm. horz. gch. 168.00 6.76 49.38 11.10 -0.36 -0.11 -0.11 --- ---
Béton 18.96 16.93 28.16 30.47 0.00 -0.00 -0.06 --- ---
Arm. transve. 2.69 -28.64 -2.93 -13.76 --- --- --- -3.85 -0.07
R+14
Arm. vert. drt. 110.38 30.62 85.55 -24.19 1.08 0.62 -0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 222.77 34.13 96.95 -27.26 0.27 0.15 -0.04 --- ---
Arm. vert. gch. 113.26 34.15 98.09 -27.46 0.00 0.02 -0.01 --- ---
Arm. horz. gch. 338.01 33.60 97.63 -27.22 0.00 -0.08 0.00 --- ---
Béton 20.37 3.58 25.76 25.66 -0.41 0.02 -0.08 --- ---
Arm. transve. 3.26 -33.75 -2.00 -12.98 --- --- --- -4.66 -0.03
R+13
Arm. vert. drt. 135.45 41.71 126.88 -34.90 0.21 0.19 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 300.52 41.64 128.57 -35.12 0.06 0.03 -0.00 --- ---
Arm. vert. gch. 132.65 41.64 128.57 -35.12 0.00 0.03 -0.00 --- ---
Page 28
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA11: Longueur: 501.8 cm [Noeud initial: 29.99;46.48 -> Noeud final: 29.99;51.50]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 300.26 40.91 128.09 -34.78 -0.04 -0.09 0.02 --- ---
Béton 24.71 -29.47 15.42 -40.25 -0.59 0.01 0.03 --- ---
Arm. transve. 3.59 -37.77 -1.98 -13.05 --- --- --- -5.15 -0.02
R+12
Arm. vert. drt. 134.76 39.39 132.39 -35.42 0.23 0.20 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 311.38 39.14 134.09 -35.59 0.09 0.04 -0.01 --- ---
Arm. vert. gch. 131.16 39.14 134.09 -35.59 0.00 0.04 -0.01 --- ---
Arm. horz. gch. 310.27 38.25 133.53 -35.20 -0.02 -0.08 0.01 --- ---
Béton 25.99 -36.60 15.48 -42.15 -0.73 0.01 0.03 --- ---
Arm. transve. 3.79 -40.76 -2.06 -13.73 --- --- --- -5.43 -0.02
R+11
Arm. vert. drt. 135.57 37.85 138.72 -36.46 0.23 0.20 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 324.46 37.42 140.44 -36.60 0.08 0.04 -0.00 --- ---
Arm. vert. gch. 136.29 27.45 107.94 -26.97 -2.34 -1.60 0.42 --- ---
Arm. horz. gch. 323.08 36.40 139.80 -36.15 -0.03 -0.07 0.02 --- ---
Béton 26.91 -42.62 15.92 -43.45 -0.85 0.01 0.03 --- ---
Arm. transve. 4.00 -42.61 -2.09 -14.13 --- --- --- -5.73 -0.02
R+10
Arm. vert. drt. 136.75 38.45 145.81 -38.16 0.19 0.18 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 304.01 38.45 145.81 -38.16 0.19 0.18 -0.02 --- ---
Arm. vert. gch. 148.92 31.36 118.82 -30.12 -2.45 -1.65 0.44 --- ---
Arm. horz. gch. 303.31 37.80 147.52 -38.24 0.00 0.02 0.00 --- ---
Béton 28.59 -48.86 16.51 -46.29 -0.98 0.01 0.04 --- ---
Arm. transve. 4.26 -44.01 -2.09 -14.76 --- --- --- -6.03 -0.02
R+9
Arm. vert. drt. 137.96 37.28 153.01 -39.38 0.16 0.16 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 319.08 36.30 154.00 -39.40 0.19 0.19 -0.02 --- ---
Arm. vert. gch. 161.94 35.19 129.01 -33.06 -2.56 -1.71 0.45 --- ---
Arm. horz. gch. 318.00 35.44 155.69 -39.42 0.00 0.02 0.00 --- ---
Béton 31.02 -53.18 17.24 -48.60 1.06 0.01 0.03 --- ---
Arm. transve. 4.44 -42.11 -1.95 -15.21 --- --- --- -6.28 -0.03
R+8
Arm. vert. drt. 138.91 35.37 161.44 -40.67 0.14 0.16 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 332.51 35.37 161.44 -40.67 0.14 0.16 -0.02 --- ---
Arm. vert. gch. 172.89 38.43 140.77 -36.20 -2.56 -1.69 0.45 --- ---
Arm. horz. gch. 332.27 34.30 163.12 -40.63 -0.00 0.00 0.01 --- ---
Béton 41.61 -92.69 36.76 1.64 -1.85 -0.29 -0.20 --- ---
Arm. transve. 5.16 -26.15 -0.73 -5.78 --- --- --- -7.31 -0.06
R+7
Arm. vert. drt. 138.47 32.97 169.04 -41.78 0.11 0.15 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 345.93 32.95 169.07 -41.78 0.11 0.14 -0.01 --- ---
Arm. vert. gch. 182.71 41.56 148.11 -38.47 -2.62 -1.72 0.46 --- ---
Arm. horz. gch. 346.31 31.69 170.71 -41.69 -0.04 -0.02 0.02 --- ---
Béton 47.45 -105.68 35.59 1.19 -2.11 -0.28 -0.19 --- ---
Arm. transve. 5.25 -27.43 -0.65 -5.30 --- --- --- -7.43 -0.06
R+6
Arm. vert. drt. 132.21 45.47 154.16 -40.83 0.00 -1.56 0.43 --- ---
(e=30.0 cm)
Arm. horz. drt. 271.01 29.78 175.36 -42.46 0.08 0.13 -0.01 --- ---
Arm. vert. gch. 182.85 44.01 155.77 -40.68 -2.64 -1.72 0.46 --- ---
Arm. horz. gch. 273.24 43.97 155.80 -40.68 -2.64 -1.72 0.46 --- ---
Béton 53.19 -118.48 34.79 0.83 -2.37 -0.25 -0.18 --- ---
Arm. transve. 5.17 -26.11 -0.52 -5.03 --- --- --- -7.32 -0.07
Page 29
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA11: Longueur: 501.8 cm [Noeud initial: 29.99;46.48 -> Noeud final: 29.99;51.50]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+5
Arm. vert. drt. 137.29 47.56 157.14 -42.00 0.00 -1.53 0.42 --- ---
(e=30.0 cm)
Arm. horz. drt. 276.22 25.22 180.26 -42.55 0.04 0.10 -0.00 --- ---
Arm. vert. gch. 186.51 45.89 158.71 -41.79 -2.60 -1.69 0.44 --- ---
Arm. horz. gch. 277.90 45.82 158.74 -41.78 -2.60 -1.70 0.44 --- ---
Béton 68.01 -151.48 37.27 0.38 -3.03 0.03 -0.09 --- ---
Arm. transve. 5.04 -24.10 -0.39 -4.88 --- --- --- -7.14 -0.08
R+4
Arm. vert. drt. 134.18 45.72 155.18 -41.35 0.00 -1.47 0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 268.08 14.37 177.10 -39.62 0.08 0.12 -0.02 --- ---
Arm. vert. gch. 180.79 45.72 155.18 -41.35 -2.35 -1.47 0.39 --- ---
Arm. horz. gch. 273.17 43.73 156.73 -41.06 -2.50 -1.63 0.42 --- ---
Béton 77.00 -171.50 33.93 -0.47 3.43 0.04 -0.08 --- ---
Arm. transve. 4.81 -20.79 -0.29 -5.04 --- --- --- -6.80 -0.09
R+3
Arm. vert. drt. 97.48 15.78 1.99 -8.19 7.45 0.94 -0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 339.32 2.18 174.87 -36.68 0.06 0.08 0.01 --- ---
Arm. vert. gch. 156.24 38.16 147.77 -38.39 -2.12 -1.40 0.34 --- ---
Arm. horz. gch. 198.24 0.01 176.36 -36.33 -0.08 -0.08 0.03 --- ---
Béton 44.43 -138.05 27.09 0.12 2.76 -0.60 -0.27 --- ---
Arm. transve. 4.71 -17.05 -0.11 -4.94 --- --- --- -6.61 -0.13
R+2
Arm. vert. drt. 103.10 59.10 145.94 -40.41 0.00 -0.51 0.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 371.58 38.69 187.64 -40.05 0.07 0.23 -0.05 --- ---
Arm. vert. gch. 117.66 59.10 145.94 -40.41 -1.03 -0.51 0.63 --- ---
Arm. horz. gch. 211.62 37.03 189.31 -39.56 -0.03 0.10 -0.00 --- ---
Béton 38.21 -55.12 39.23 -59.73 -1.10 0.00 0.01 --- ---
Arm. transve. 1.57 27.31 8.66 -20.82 --- --- --- -2.16 0.43
R+1
Arm. vert. drt. 97.79 88.28 11.96 -9.82 0.77 0.09 0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 298.97 -65.09 95.87 -14.36 1.30 -0.41 0.15 --- ---
Arm. vert. gch. 91.52 88.29 11.97 -9.82 0.00 0.09 0.07 --- ---
Arm. horz. gch. 326.04 -65.09 95.87 -14.36 -1.30 -0.41 0.15 --- ---
Béton 40.36 -222.47 -0.41 20.47 4.45 -0.08 -0.04 --- ---
Arm. transve. 14.98 41.56 6.94 -11.55 --- --- --- -1.50 -0.01
RDC
Arm. vert. drt. 91.57 85.78 12.69 -10.94 0.13 0.02 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 172.42 -117.68 54.17 1.02 2.35 0.12 -0.03 --- ---
Arm. vert. gch. 90.16 95.60 -2.90 -2.03 0.00 -0.01 -0.02 --- ---
Arm. horz. gch. 167.40 -121.34 54.26 1.63 -2.43 0.08 -0.02 --- ---
Béton 48.13 -334.54 -8.25 30.16 -6.69 0.01 0.03 --- ---
Arm. transve. 2.39 44.34 0.68 0.26 --- --- --- 0.24 -0.04
SS1
Arm. vert. drt. 178.93 170.01 17.74 28.92 0.00 -0.19 -0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 148.86 -136.24 16.87 94.57 2.72 0.10 -0.06 --- ---
Arm. vert. gch. 194.30 170.01 17.74 28.92 -1.57 -0.19 -0.14 --- ---
Arm. horz. gch. 89.12 -136.24 16.87 94.57 -2.72 0.10 -0.06 --- ---
Béton 61.49 -136.48 16.80 94.54 -2.73 0.10 -0.06 --- ---
Arm. transve. 11.41 -16.27 -3.19 52.40 --- --- --- 0.99 -1.00
Page 30
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA4b: Longueur: 472 cm [Noeud initial: 24.86;46.63 -> Noeud final: 24.86;51.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+17
Arm. vert. drt. 219.64 171.08 258.87 98.92 2.17 2.59 0.89 --- ---
(e=30.0 cm)
Arm. horz. drt. 619.26 171.14 259.25 99.02 2.13 2.57 0.88 --- ---
Arm. vert. gch. 261.02 171.14 259.25 99.02 0.00 2.57 0.88 --- ---
Arm. horz. gch. 312.32 171.14 259.25 99.02 0.00 2.57 0.88 --- ---
Béton 68.98 171.08 258.87 98.92 0.00 2.59 0.89 --- ---
Arm. transve. 65.07 40.06 -2.94 -11.82 --- --- --- -7.73 -0.13
R+16
Arm. vert. drt. 107.66 80.17 8.19 -8.34 0.00 -0.52 0.37 --- ---
(e=30.0 cm)
Arm. horz. drt. 194.23 39.96 84.39 -13.11 0.20 0.65 -0.06 --- ---
Arm. vert. gch. 153.52 79.76 8.14 -8.34 -3.05 -0.53 0.38 --- ---
Arm. horz. gch. 171.29 39.88 84.51 -13.21 0.00 0.62 -0.06 --- ---
Béton 30.86 -27.37 -3.73 40.92 -0.92 -0.45 -0.02 --- ---
Arm. transve. 17.89 31.70 -3.12 -19.04 --- --- --- 2.12 0.81
R+15
Arm. vert. drt. 316.24 119.32 160.43 69.45 3.83 0.64 0.53 --- ---
(e=30.0 cm)
Arm. horz. drt. 454.99 113.71 162.67 70.09 3.91 0.65 0.54 --- ---
Arm. vert. gch. 258.36 120.52 160.74 69.62 0.00 0.62 0.50 --- ---
Arm. horz. gch. 411.99 114.91 162.99 70.26 0.00 0.63 0.51 --- ---
Béton 45.55 113.71 162.67 70.09 0.00 0.65 0.54 --- ---
Arm. transve. 27.97 83.86 56.80 64.50 --- --- --- 5.74 5.22
R+14
Arm. vert. drt. 121.31 37.39 122.79 41.16 0.34 0.23 0.17 --- ---
(e=30.0 cm)
Arm. horz. drt. 223.91 35.24 153.25 -35.84 0.00 -0.77 0.12 --- ---
Arm. vert. gch. 116.34 38.12 122.75 41.22 -0.17 0.14 0.09 --- ---
Arm. horz. gch. 244.18 34.88 153.05 -35.77 -0.03 -0.81 0.12 --- ---
Béton 32.83 -24.13 1.90 43.94 0.48 -0.21 0.01 --- ---
Arm. transve. 2.40 -31.48 -1.05 -10.77 --- --- --- 3.40 0.09
R+13
Arm. vert. drt. 114.43 27.93 118.58 38.59 0.29 0.26 0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 293.26 23.98 120.09 39.05 0.36 0.27 0.13 --- ---
Arm. vert. gch. 99.69 29.04 118.98 38.78 0.00 0.22 0.09 --- ---
Arm. horz. gch. 197.61 21.34 124.58 -28.61 -0.14 -1.09 0.41 --- ---
Béton 25.69 23.98 120.09 39.05 0.00 0.27 0.13 --- ---
Arm. transve. 2.44 -39.66 -4.98 -10.89 --- --- --- 3.50 -0.14
R+12
Arm. vert. drt. 105.31 21.41 116.04 37.75 0.25 0.24 0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 293.27 14.80 121.52 39.51 0.08 0.22 0.10 --- ---
Arm. vert. gch. 91.74 18.58 131.79 -32.75 -0.18 -1.12 0.42 --- ---
Arm. horz. gch. 210.78 18.58 131.79 -32.75 -0.18 -1.12 0.42 --- ---
Béton 30.38 7.46 111.20 35.87 0.86 0.36 0.21 --- ---
Arm. transve. 2.22 -36.22 -7.10 -14.85 --- --- --- 3.09 -0.79
R+11
Arm. vert. drt. 94.19 11.44 116.21 37.35 0.26 0.25 0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 288.94 1.43 121.27 38.76 0.01 0.20 0.09 --- ---
Arm. vert. gch. 92.55 18.94 132.54 -32.80 -0.22 -1.08 0.40 --- ---
Arm. horz. gch. 220.22 14.81 138.00 -34.33 -0.22 -1.17 0.43 --- ---
Béton 32.57 -0.99 120.84 38.50 0.20 0.24 0.11 --- ---
Arm. transve. 2.25 -41.99 -7.87 -17.02 --- --- --- 3.13 -0.80
R+10
Arm. vert. drt. 96.77 1.54 116.86 37.63 0.40 0.28 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 438.24 14.33 143.38 -36.31 0.00 -1.21 0.45 --- ---
Page 31
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA4b: Longueur: 472 cm [Noeud initial: 24.86;46.63 -> Noeud final: 24.86;51.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 96.20 14.33 143.38 -36.31 -0.27 -1.21 0.45 --- ---
Arm. horz. gch. 238.47 14.33 143.38 -36.31 -0.27 -1.21 0.45 --- ---
Béton 33.71 1.53 116.86 37.63 0.40 0.28 0.14 --- ---
Arm. transve. 2.30 -34.10 -6.80 -17.32 --- --- --- 3.19 -0.81
R+9
Arm. vert. drt. 99.21 -4.77 115.79 37.29 1.15 0.43 0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 453.55 11.85 148.29 -37.99 0.00 -1.25 0.46 --- ---
Arm. vert. gch. 99.50 16.16 142.34 -37.10 -0.30 -1.20 0.44 --- ---
Arm. horz. gch. 246.82 11.85 148.29 -37.99 -0.31 -1.25 0.46 --- ---
Béton 34.16 -4.78 115.80 37.29 1.15 0.43 0.25 --- ---
Arm. transve. 2.31 -15.18 6.09 -26.77 --- --- --- 3.12 1.08
R+8
Arm. vert. drt. 92.55 15.44 148.82 -39.04 0.00 -1.24 0.46 --- ---
(e=30.0 cm)
Arm. horz. drt. 318.92 11.40 153.25 -40.13 0.00 -1.29 0.47 --- ---
Arm. vert. gch. 104.73 27.12 4.21 -5.26 -4.64 -0.86 0.58 --- ---
Arm. horz. gch. 246.08 11.40 153.25 -40.13 -0.36 -1.29 0.47 --- ---
Béton 34.11 -43.78 31.87 -52.10 -0.88 0.50 -0.17 --- ---
Arm. transve. 2.40 7.99 3.84 -4.78 --- --- --- 3.29 1.02
R+7
Arm. vert. drt. 92.73 13.27 152.76 -40.37 0.00 -1.28 0.47 --- ---
(e=30.0 cm)
Arm. horz. drt. 323.37 8.58 155.40 -41.23 0.00 -1.33 0.49 --- ---
Arm. vert. gch. 110.08 31.39 4.91 -6.16 -4.57 -0.83 0.57 --- ---
Arm. horz. gch. 250.05 8.58 155.40 -41.23 -0.41 -1.33 0.49 --- ---
Béton 36.57 -82.17 37.61 -1.35 1.64 0.04 -0.16 --- ---
Arm. transve. 2.56 -0.55 2.34 5.73 --- --- --- 3.67 -0.09
R+6
Arm. vert. drt. 94.70 10.82 156.13 -43.16 0.00 -1.36 0.50 --- ---
(e=30.0 cm)
Arm. horz. drt. 327.23 10.82 156.13 -43.16 0.00 -1.36 0.50 --- ---
Arm. vert. gch. 127.10 43.64 6.86 -8.33 -4.52 -0.80 0.55 --- ---
Arm. horz. gch. 253.80 10.82 156.13 -43.16 -0.46 -1.36 0.50 --- ---
Béton 43.36 -97.43 35.69 -1.27 1.95 0.04 -0.15 --- ---
Arm. transve. 2.62 -4.76 4.67 15.93 --- --- --- 3.75 -0.06
R+5
Arm. vert. drt. 97.82 37.20 4.90 0.73 3.45 1.07 0.48 --- ---
(e=30.0 cm)
Arm. horz. drt. 208.07 2.38 153.23 -42.47 0.00 -1.39 0.51 --- ---
Arm. vert. gch. 84.11 58.82 8.36 -9.51 -4.29 -0.75 0.52 --- ---
Arm. horz. gch. 374.60 2.38 153.23 -42.47 -0.51 -1.39 0.51 --- ---
Béton 49.88 -111.88 33.57 -1.39 2.24 0.03 -0.15 --- ---
Arm. transve. 25.55 45.79 5.40 0.90 --- --- --- 3.14 -0.71
R+4
Arm. vert. drt. 74.91 43.72 24.75 -40.54 0.69 0.69 -0.26 --- ---
(e=30.0 cm)
Arm. horz. drt. 306.55 0.36 149.30 -42.97 0.00 -1.42 0.52 --- ---
Arm. vert. gch. 99.31 81.35 10.82 -12.22 -3.98 -0.69 0.43 --- ---
Arm. horz. gch. 368.28 0.36 149.30 -42.97 -0.57 -1.42 0.52 --- ---
Béton 55.89 -125.37 32.45 -0.71 2.51 0.02 -0.15 --- ---
Arm. transve. 24.92 62.78 8.08 0.69 --- --- --- 3.08 -0.65
R+3
Arm. vert. drt. 86.52 -192.50 83.74 24.59 -3.85 0.39 0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 290.87 -1.42 141.61 -41.05 0.03 -1.35 0.50 --- ---
Arm. vert. gch. 112.25 98.64 12.61 -12.80 -4.00 -0.70 0.43 --- ---
Arm. horz. gch. 349.71 -1.42 141.61 -41.05 -0.61 -1.35 0.50 --- ---
Béton 41.47 -191.40 85.69 25.38 -3.83 0.37 0.32 --- ---
Page 32
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA4b: Longueur: 472 cm [Noeud initial: 24.86;46.63 -> Noeud final: 24.86;51.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 26.39 79.34 11.53 3.81 --- --- --- 3.25 -0.72
R+2
Arm. vert. drt. 103.59 -222.96 71.78 19.87 -4.46 0.44 0.35 --- ---
(e=30.0 cm)
Arm. horz. drt. 316.57 -7.03 126.46 -35.03 0.14 -1.56 0.55 --- ---
Arm. vert. gch. 117.75 121.24 18.12 -18.10 -2.03 -0.26 0.17 --- ---
Arm. horz. gch. 594.43 105.82 0.06 -2.29 0.00 0.01 -0.33 --- ---
Béton 70.60 105.82 0.06 -2.29 0.00 0.01 -0.33 --- ---
Arm. transve. 19.83 40.91 6.93 15.36 --- --- --- 2.49 -0.08
R+1
Arm. vert. drt. 131.12 206.40 26.28 -3.24 0.00 -1.18 -0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 261.53 47.72 -0.13 0.13 0.00 0.02 0.03 --- ---
Arm. vert. gch. 121.54 206.40 26.28 -3.24 -9.12 -1.18 -0.24 --- ---
Arm. horz. gch. 125.59 -35.56 106.02 -30.62 -0.71 -1.83 0.64 --- ---
Béton 53.98 -404.31 -51.52 13.46 -8.09 1.29 0.21 --- ---
Arm. transve. 32.08 128.98 22.72 -27.50 --- --- --- 3.83 0.26
RDC
Arm. vert. drt. 75.58 162.15 -9.98 4.13 2.44 0.30 -0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.55 -52.84 61.31 13.16 1.06 -0.88 0.31 --- ---
Arm. vert. gch. 69.91 174.44 9.23 1.78 0.00 0.15 0.07 --- ---
Arm. horz. gch. 127.03 -55.87 60.75 14.00 -1.12 -0.97 0.33 --- ---
Béton 51.77 -371.40 2.10 -7.20 7.43 -0.21 0.17 --- ---
Arm. transve. 17.95 62.27 -6.56 -9.90 --- --- --- 2.02 -0.69
SS1
Arm. vert. drt. 55.37 -188.36 43.87 54.40 -3.77 0.56 0.55 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.41 -138.21 -27.74 152.32 2.76 -0.33 -0.01 --- ---
Arm. vert. gch. 62.03 -188.36 43.87 54.40 3.77 0.56 0.55 --- ---
Arm. horz. gch. 70.80 -138.21 -27.74 152.32 -2.76 -0.33 -0.01 --- ---
Béton 99.22 -189.45 -0.17 128.38 3.79 -0.35 -0.09 --- ---
Arm. transve. 4.73 -113.19 -13.48 85.62 --- --- --- -6.04 1.61
Mur VA4: Longueur: 295 cm [Noeud initial: 24.86;51.35 -> Noeud final: 27.82;51.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+16
Arm. vert. drt. 84.41 42.31 -1.09 23.35 0.00 -1.15 -0.37 --- ---
(e=30.0 cm)
Arm. horz. drt. 86.26 31.65 15.11 11.71 0.00 -0.13 0.52 --- ---
Arm. vert. gch. 118.93 42.31 -1.09 23.35 -1.28 -1.15 -0.37 --- ---
Arm. horz. gch. 109.94 41.83 -0.78 22.26 -1.39 -1.27 -0.41 --- ---
Béton 19.97 42.31 -1.09 23.35 -1.28 -1.15 -0.37 --- ---
Arm. transve. 1.96 27.81 13.90 11.57 --- --- --- -2.76 -0.52
R+15
Arm. vert. drt. 100.12 58.53 6.54 5.97 0.58 0.13 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 54.44 31.34 0.42 14.57 0.65 0.21 -0.02 --- ---
Arm. vert. gch. 111.62 39.07 -0.62 7.21 -3.53 -0.80 0.48 --- ---
Arm. horz. gch. 59.30 14.64 0.92 14.93 -1.27 -0.64 0.15 --- ---
Béton 11.44 4.11 -2.48 14.57 -2.21 -0.28 -0.09 --- ---
Arm. transve. 1.92 -27.50 -13.01 -18.16 --- --- --- 2.74 0.25
R+14
Arm. vert. drt. 97.90 90.59 7.42 6.19 0.92 0.16 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 54.79 41.65 3.13 15.08 0.19 0.04 0.01 --- ---
Arm. vert. gch. 138.20 90.59 7.41 6.18 0.00 0.16 -0.00 --- ---
Page 33
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA4: Longueur: 295 cm [Noeud initial: 24.86;51.35 -> Noeud final: 27.82;51.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 57.98 40.95 3.12 15.12 0.00 0.04 0.01 --- ---
Béton 16.87 -120.04 -9.85 -6.88 2.40 -0.20 0.02 --- ---
Arm. transve. 2.49 41.65 3.13 15.08 --- --- --- -0.21 0.16
R+13
Arm. vert. drt. 104.59 99.48 7.93 3.26 0.95 0.16 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 74.34 44.54 21.73 -4.06 0.00 -0.19 -0.06 --- ---
Arm. vert. gch. 95.23 99.57 7.93 3.27 0.00 0.16 -0.00 --- ---
Arm. horz. gch. 82.31 44.54 21.73 -4.06 -1.18 -0.19 -0.06 --- ---
Béton 19.53 -140.76 -11.53 -4.62 2.82 -0.20 0.02 --- ---
Arm. transve. 1.69 -12.87 -4.46 -8.76 --- --- --- -2.25 0.85
R+12
Arm. vert. drt. 95.80 91.00 6.91 1.46 0.99 0.16 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 91.98 69.44 25.36 -5.80 0.00 -0.19 -0.07 --- ---
Arm. vert. gch. 95.98 88.33 21.85 -4.54 -0.99 -0.16 -0.07 --- ---
Arm. horz. gch. 99.22 69.38 25.35 -5.83 -1.18 -0.19 -0.07 --- ---
Béton 19.89 -143.28 -11.60 -3.42 2.87 -0.20 0.02 --- ---
Arm. transve. 9.13 44.41 8.88 -9.06 --- --- --- -0.91 0.12
R+11
Arm. vert. drt. 82.28 75.92 5.39 1.16 1.06 0.17 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 106.96 60.67 29.17 -7.65 0.00 -0.18 -0.07 --- ---
Arm. vert. gch. 88.29 78.07 24.76 -5.53 -1.06 -0.17 -0.07 --- ---
Arm. horz. gch. 114.42 60.54 29.15 -7.68 -1.19 -0.19 -0.07 --- ---
Béton 19.41 -139.63 -11.23 -3.91 2.79 -0.21 0.01 --- ---
Arm. transve. 1.93 -30.03 -6.62 -13.13 --- --- --- -2.56 0.96
R+10
Arm. vert. drt. 71.49 68.02 4.70 1.62 0.70 0.11 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 113.96 45.30 31.75 -8.28 0.00 -0.19 -0.07 --- ---
Arm. vert. gch. 74.14 63.03 25.49 -4.67 -1.11 -0.17 -0.07 --- ---
Arm. horz. gch. 122.32 45.10 31.72 -8.30 -1.26 -0.19 -0.07 --- ---
Béton 19.77 -142.74 -11.64 -5.04 2.85 -0.15 0.02 --- ---
Arm. transve. 2.01 -28.39 -6.63 -14.52 --- --- --- -2.67 0.99
R+9
Arm. vert. drt. 66.91 63.50 4.14 0.43 0.73 0.11 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 106.93 13.62 32.07 -7.58 -1.32 -0.20 -0.07 --- ---
Arm. vert. gch. 66.68 54.85 26.32 -4.44 -1.13 -0.18 -0.07 --- ---
Arm. horz. gch. 122.41 16.81 32.92 -7.92 -1.34 -0.21 -0.07 --- ---
Béton 20.64 -149.07 -12.15 -4.53 2.98 -0.15 0.02 --- ---
Arm. transve. 2.12 -40.87 -8.25 -14.48 --- --- --- -2.83 1.03
R+8
Arm. vert. drt. 60.57 55.94 3.32 -0.90 0.78 0.11 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 113.72 11.88 34.07 -8.20 -1.37 -0.21 -0.07 --- ---
Arm. vert. gch. 65.58 56.38 27.43 -5.27 -0.77 -0.11 -0.07 --- ---
Arm. horz. gch. 125.97 11.88 34.07 -8.20 -1.37 -0.21 -0.07 --- ---
Béton 21.08 -152.26 -12.40 -3.88 3.05 -0.15 0.02 --- ---
Arm. transve. 2.15 -53.75 -9.70 -15.27 --- --- --- -2.87 1.04
R+7
Arm. vert. drt. 46.78 48.17 5.83 -0.85 0.10 0.02 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 116.24 6.07 34.97 -8.51 -1.37 -0.21 -0.07 --- ---
Arm. vert. gch. 48.62 26.79 11.38 -17.19 -0.44 -0.12 -0.04 --- ---
Arm. horz. gch. 128.61 6.07 34.97 -8.51 -1.37 -0.21 -0.07 --- ---
Béton 23.32 -11.31 -0.52 -29.17 -1.00 -0.74 0.11 --- ---
Arm. transve. 2.17 -65.56 -11.07 -16.40 --- --- --- -2.90 1.03
Page 34
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA4: Longueur: 295 cm [Noeud initial: 24.86;51.35 -> Noeud final: 27.82;51.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+6
Arm. vert. drt. 8.42 -122.45 3.09 9.93 -2.45 0.71 -0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.36 -97.68 -52.31 18.40 1.95 0.26 0.08 --- ---
Arm. vert. gch. 52.47 8.74 -12.47 -7.92 -3.79 -0.78 0.19 --- ---
Arm. horz. gch. 132.24 -17.18 36.50 -9.57 -1.36 -0.20 -0.07 --- ---
Béton 25.88 -15.89 -0.76 -32.42 -0.97 -0.73 0.11 --- ---
Arm. transve. 2.14 -72.20 -11.71 -18.34 --- --- --- -2.87 1.02
R+5
Arm. vert. drt. 40.89 -0.43 -0.43 -15.99 2.70 0.57 0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 54.50 -0.43 -0.43 -15.99 2.70 0.57 0.19 --- ---
Arm. vert. gch. 60.19 9.33 -14.46 -13.72 -3.96 -0.82 0.21 --- ---
Arm. horz. gch. 111.87 -4.02 0.41 -35.95 -0.95 -0.72 0.11 --- ---
Béton 28.84 -6.80 -0.07 -36.19 0.14 -0.73 0.11 --- ---
Arm. transve. 2.09 -88.63 -13.46 -19.97 --- --- --- -2.79 0.98
R+4
Arm. vert. drt. 59.98 51.92 6.03 -10.51 0.08 0.47 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 76.29 -3.11 0.14 -37.94 0.06 -0.70 0.11 --- ---
Arm. vert. gch. 69.14 21.99 -15.88 -15.06 -3.60 -0.77 0.22 --- ---
Arm. horz. gch. 115.81 -3.11 0.14 -37.94 -0.90 -0.70 0.11 --- ---
Béton 30.32 -6.13 -0.35 -38.18 0.12 -0.71 0.11 --- ---
Arm. transve. 2.01 -103.18 -14.92 -21.78 --- --- --- -2.68 0.97
R+3
Arm. vert. drt. 74.14 69.19 7.29 -8.96 0.09 0.58 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 82.88 7.61 -0.17 -38.66 0.00 -0.65 0.06 --- ---
Arm. vert. gch. 75.19 34.97 -15.39 -12.18 -3.31 -0.72 0.20 --- ---
Arm. horz. gch. 117.68 6.35 -0.03 -38.76 -0.80 -0.65 0.07 --- ---
Béton 32.64 -180.63 5.36 13.32 -3.61 0.69 -0.25 --- ---
Arm. transve. 1.97 -118.52 -16.29 -19.83 --- --- --- -2.68 0.79
R+2
Arm. vert. drt. 85.81 89.41 10.10 3.63 0.00 -0.19 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 76.86 27.72 -0.52 -26.96 0.08 -0.09 -0.18 --- ---
Arm. vert. gch. 99.37 89.41 10.10 3.63 -1.29 -0.19 -0.05 --- ---
Arm. horz. gch. 89.77 10.76 -0.01 -26.30 -0.81 -0.58 0.22 --- ---
Béton 37.91 -210.37 15.94 0.07 -4.21 -0.11 -0.01 --- ---
Arm. transve. 9.55 40.41 4.46 11.62 --- --- --- 0.95 -0.09
R+1
Arm. vert. drt. 139.33 203.17 26.21 22.31 0.00 -0.11 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.18 81.13 14.65 42.56 0.00 -0.11 0.07 --- ---
Arm. vert. gch. 142.76 203.17 26.21 22.31 -0.62 -0.11 0.05 --- ---
Arm. horz. gch. 105.74 81.13 14.65 42.56 -0.43 -0.11 0.07 --- ---
Béton 47.44 -361.58 -44.64 -31.64 -7.23 0.16 0.09 --- ---
Arm. transve. 8.53 49.66 -2.45 -45.71 --- --- --- -1.02 0.10
RDC
Arm. vert. drt. 91.77 198.61 21.92 -30.68 0.58 0.09 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 59.28 75.30 9.84 -68.31 0.42 0.21 -0.08 --- ---
Arm. vert. gch. 139.43 198.61 21.95 -30.69 0.00 0.09 -0.00 --- ---
Arm. horz. gch. 103.02 -44.31 -3.24 94.24 -0.89 -0.06 -0.08 --- ---
Béton 64.65 -12.31 -0.04 -86.43 0.25 0.12 0.00 --- ---
Arm. transve. 3.94 68.35 4.34 -32.37 --- --- --- 0.60 0.16
SS1
Arm. vert. drt. 27.82 55.21 5.47 13.66 0.10 0.02 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 93.45 -33.44 16.35 61.69 0.67 0.05 0.01 --- ---
Page 35
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA4: Longueur: 295 cm [Noeud initial: 24.86;51.35 -> Noeud final: 27.82;51.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 27.73 55.21 5.47 13.66 0.00 0.02 -0.04 --- ---
Arm. horz. gch. 92.01 -33.44 16.35 61.69 -0.67 0.05 0.01 --- ---
Béton 54.99 -78.21 -1.15 70.57 -1.56 -0.14 0.03 --- ---
Arm. transve. 0.71 -91.04 -18.04 -50.85 --- --- --- 0.99 -0.04
Mur VA4c: Longueur: 294.9 cm [Noeud initial: 24.86;47.28 -> Noeud final: 27.81;47.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+16
Arm. vert. drt. 62.79 0.15 1.30 3.18 3.70 0.51 0.35 --- ---
(e=30.0 cm)
Arm. horz. drt. 41.94 1.41 1.80 4.03 3.32 0.43 0.35 --- ---
Arm. vert. gch. 82.27 -0.37 -0.05 2.19 -5.33 -0.67 -0.19 --- ---
Arm. horz. gch. 58.02 13.90 3.80 7.57 -1.69 -0.32 -0.54 --- ---
Béton 9.40 13.90 3.80 7.57 -1.69 -0.32 -0.54 --- ---
Arm. transve. 4.06 -7.06 -0.74 -3.58 --- --- --- 5.81 0.34
R+15
Arm. vert. drt. 114.09 70.50 7.84 9.89 0.00 -0.08 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 79.53 36.94 4.25 22.77 0.00 -0.03 -0.03 --- ---
Arm. vert. gch. 117.66 70.50 7.84 9.89 -0.23 -0.08 0.00 --- ---
Arm. horz. gch. 82.45 36.94 4.25 22.77 -0.10 -0.03 -0.03 --- ---
Béton 20.03 10.15 0.48 26.52 0.00 0.08 0.04 --- ---
Arm. transve. 1.68 11.93 -3.70 0.92 --- --- --- 2.29 0.74
R+14
Arm. vert. drt. 136.70 101.58 8.01 6.38 0.00 -0.00 -0.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 53.43 39.19 3.68 13.74 0.00 -0.05 -0.00 --- ---
Arm. vert. gch. 139.67 101.58 8.01 6.38 -0.10 -0.00 -0.09 --- ---
Arm. horz. gch. 56.01 48.27 4.79 12.00 -0.11 -0.04 -0.02 --- ---
Béton 19.05 -137.39 -11.24 -8.49 2.75 -0.12 -0.03 --- ---
Arm. transve. 0.33 -6.29 -0.43 -15.46 --- --- --- 0.19 0.43
R+13
Arm. vert. drt. 138.87 111.58 8.66 4.32 0.00 0.02 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 97.50 41.27 29.09 -3.98 0.20 0.03 -0.10 --- ---
Arm. vert. gch. 139.75 111.56 8.66 4.32 -0.01 0.01 -0.05 --- ---
Arm. horz. gch. 91.36 41.27 29.09 -3.98 0.00 0.03 -0.10 --- ---
Béton 22.06 -159.07 -13.02 -6.85 3.18 -0.15 -0.06 --- ---
Arm. transve. 0.34 -1.67 1.98 -5.79 --- --- --- 0.40 0.28
R+12
Arm. vert. drt. 101.08 101.99 7.46 2.27 0.05 0.03 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 111.62 73.56 32.14 -6.02 0.10 0.01 -0.09 --- ---
Arm. vert. gch. 101.13 101.99 7.46 2.27 0.00 0.03 -0.05 --- ---
Arm. horz. gch. 106.88 73.56 32.14 -6.02 0.00 0.01 -0.09 --- ---
Béton 22.10 -160.38 -12.90 -5.43 3.21 -0.17 -0.06 --- ---
Arm. transve. 0.28 -28.38 -1.07 -12.26 --- --- --- 0.38 0.13
R+11
Arm. vert. drt. 87.59 83.87 30.83 -5.11 0.00 -0.02 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 126.19 71.93 36.14 -7.74 0.07 -0.00 -0.08 --- ---
Arm. vert. gch. 87.38 83.92 30.82 -5.09 -0.04 -0.03 -0.03 --- ---
Arm. horz. gch. 122.46 71.99 36.14 -7.71 0.00 -0.00 -0.08 --- ---
Béton 21.37 -154.93 -12.32 -5.77 3.10 -0.17 -0.06 --- ---
Arm. transve. 0.26 -26.74 -0.89 -9.51 --- --- --- 0.35 0.12
Page 36
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA4c: Longueur: 294.9 cm [Noeud initial: 24.86;47.28 -> Noeud final: 27.81;47.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+10
Arm. vert. drt. 79.24 79.55 5.15 2.15 0.07 0.04 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 131.82 45.69 38.84 -8.22 0.06 -0.00 -0.08 --- ---
Arm. vert. gch. 79.20 79.55 5.16 2.15 0.00 0.04 -0.05 --- ---
Arm. horz. gch. 128.89 45.80 38.85 -8.20 0.00 -0.01 -0.08 --- ---
Béton 22.00 -159.52 -12.74 -6.63 3.19 -0.17 -0.06 --- ---
Arm. transve. 0.27 -35.54 -1.13 -7.89 --- --- --- 0.36 0.13
R+9
Arm. vert. drt. 69.64 70.07 4.07 0.64 0.12 0.05 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 128.97 11.77 39.69 -7.59 0.05 -0.01 -0.08 --- ---
Arm. vert. gch. 68.94 70.07 4.07 0.64 0.00 0.05 -0.05 --- ---
Arm. horz. gch. 126.53 11.94 39.71 -7.57 0.00 -0.01 -0.08 --- ---
Béton 22.21 -160.91 -12.74 -5.82 3.22 -0.18 -0.06 --- ---
Arm. transve. 0.26 -42.74 0.19 19.32 --- --- --- 0.19 0.32
R+8
Arm. vert. drt. 62.06 61.18 9.06 -0.54 0.17 0.03 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 130.43 3.55 40.56 -7.69 0.04 -0.01 -0.08 --- ---
Arm. vert. gch. 60.72 60.15 4.69 1.01 -0.12 -0.02 -0.04 --- ---
Arm. horz. gch. 128.24 3.55 40.56 -7.69 0.00 -0.01 -0.08 --- ---
Béton 22.13 -162.00 -14.44 -6.89 3.24 -0.11 -0.07 --- ---
Arm. transve. 0.37 -91.72 -6.70 -4.92 --- --- --- 0.24 0.47
R+7
Arm. vert. drt. 53.39 51.49 5.66 -1.20 0.20 0.04 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 132.29 -3.74 41.36 -7.97 0.07 -0.01 -0.08 --- ---
Arm. vert. gch. 50.65 51.49 5.66 -1.20 0.00 0.04 -0.06 --- ---
Arm. horz. gch. 130.33 -3.74 41.36 -7.97 -0.07 -0.01 -0.08 --- ---
Béton 21.12 -157.39 -17.95 8.61 -3.15 0.10 -0.11 --- ---
Arm. transve. 0.35 -99.20 -7.53 -7.18 --- --- --- 0.23 0.44
R+6
Arm. vert. drt. 18.24 -40.56 40.62 -6.51 -0.81 -0.06 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 137.50 -23.42 44.15 -8.90 0.47 -0.06 -0.01 --- ---
Arm. vert. gch. 39.48 39.34 -0.35 0.89 -0.11 -0.01 0.06 --- ---
Arm. horz. gch. 140.30 -23.42 44.15 -8.90 -0.47 -0.06 -0.01 --- ---
Béton 21.45 -157.88 -15.02 -8.28 3.16 -0.07 -0.08 --- ---
Arm. transve. 0.36 -84.32 -1.66 21.23 --- --- --- 0.28 0.43
R+5
Arm. vert. drt. 45.24 42.87 1.98 3.19 0.00 -0.04 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 132.61 -69.50 43.70 -9.19 1.39 -0.07 -0.01 --- ---
Arm. vert. gch. 45.31 42.87 1.98 3.19 -0.25 -0.04 0.15 --- ---
Arm. horz. gch. 135.81 -69.50 43.70 -9.19 -1.39 -0.07 -0.01 --- ---
Béton 22.52 -160.51 -8.14 6.37 -3.21 0.08 -0.11 --- ---
Arm. transve. 0.36 -54.31 0.11 23.89 --- --- --- 0.29 0.42
R+4
Arm. vert. drt. 62.29 60.47 1.26 3.56 0.00 -0.04 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 124.94 -93.20 41.34 -9.65 1.86 -0.06 -0.01 --- ---
Arm. vert. gch. 62.43 60.47 1.26 3.56 -0.24 -0.04 0.15 --- ---
Arm. horz. gch. 128.13 -93.20 41.34 -9.65 -1.86 -0.06 -0.01 --- ---
Béton 26.64 -197.14 -20.36 -14.51 -3.94 0.02 -0.10 --- ---
Arm. transve. 0.36 -154.72 -12.24 4.93 --- --- --- 0.49 -0.15
R+3
Arm. vert. drt. 94.79 94.73 -0.39 3.20 0.00 -0.04 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 75.52 46.19 13.38 -15.14 0.00 -0.19 -0.02 --- ---
Page 37
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA4c: Longueur: 294.9 cm [Noeud initial: 24.86;47.28 -> Noeud final: 27.81;47.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 95.21 94.73 -0.39 3.20 -0.20 -0.04 0.14 --- ---
Arm. horz. gch. 83.12 46.21 13.38 -15.14 -0.06 -0.19 -0.02 --- ---
Béton 31.47 -234.05 -25.18 -15.55 -4.68 -0.01 -0.11 --- ---
Arm. transve. 0.38 -170.60 -13.83 2.39 --- --- --- 0.53 -0.13
R+2
Arm. vert. drt. 110.01 109.20 12.87 5.38 0.00 -0.11 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 54.65 109.20 12.87 5.38 0.00 -0.11 -0.05 --- ---
Arm. vert. gch. 115.06 109.20 12.87 5.38 -0.42 -0.11 -0.05 --- ---
Arm. horz. gch. 63.13 109.20 12.87 5.38 -0.42 -0.11 -0.05 --- ---
Béton 37.88 -283.09 -32.16 -15.71 5.66 -0.03 -0.12 --- ---
Arm. transve. 0.78 40.96 0.42 12.31 --- --- --- -0.07 0.00
R+1
Arm. vert. drt. 139.90 205.39 27.65 22.30 0.00 -0.08 -0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 107.46 111.73 16.37 40.64 0.00 -0.03 -0.02 --- ---
Arm. vert. gch. 143.12 205.38 27.65 22.29 -0.31 -0.08 -0.10 --- ---
Arm. horz. gch. 108.90 111.71 16.37 40.65 -0.01 -0.03 -0.02 --- ---
Béton 50.41 -385.65 -48.59 -33.57 7.71 -0.08 -0.12 --- ---
Arm. transve. 4.09 60.82 7.24 -3.27 --- --- --- -0.49 0.03
RDC
Arm. vert. drt. 118.91 205.19 19.43 -31.84 0.53 0.12 -0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 93.83 3.55 -2.20 106.86 0.00 -0.03 0.03 --- ---
Arm. vert. gch. 114.32 205.19 19.43 -31.84 0.00 0.12 -0.16 --- ---
Arm. horz. gch. 93.71 3.55 -2.20 106.86 0.00 -0.03 0.03 --- ---
Béton 64.08 -0.64 -2.55 107.24 -0.01 -0.03 0.03 --- ---
Arm. transve. 5.22 -30.42 -8.13 -58.60 --- --- --- 0.34 0.36
SS1
Arm. vert. drt. 47.14 72.33 9.03 11.61 1.03 0.18 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 92.35 -16.52 15.32 58.43 0.56 0.15 0.00 --- ---
Arm. vert. gch. 41.44 72.33 9.03 11.61 0.00 0.18 -0.03 --- ---
Arm. horz. gch. 90.31 -36.83 5.94 68.87 -0.74 0.03 -0.06 --- ---
Béton 54.03 -15.59 0.04 70.50 0.31 -0.01 -0.11 --- ---
Arm. transve. 8.38 45.79 8.85 25.60 --- --- --- -0.82 0.02
Mur VA13b: Longueur: 169.9 cm [Noeud initial: 5.92;41.43 -> Noeud final: 5.92;43.13]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 298.00 112.89 217.66 -65.08 0.00 0.60 0.49 --- ---
(e=30.0 cm)
Arm. horz. drt. 770.48 112.89 217.66 -65.08 0.00 0.60 0.49 --- ---
Arm. vert. gch. 312.06 112.58 217.38 -64.92 -1.52 0.57 0.51 --- ---
Arm. horz. gch. 504.94 112.89 217.66 -65.08 -1.48 0.60 0.49 --- ---
Béton 42.45 112.58 217.38 -64.92 0.00 0.57 0.51 --- ---
Arm. transve. 29.14 21.96 98.44 -21.52 --- --- --- 0.92 -2.99
R+14
Arm. vert. drt. 145.49 54.57 167.00 -32.72 0.00 0.14 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 331.03 54.48 167.30 -32.74 0.00 0.13 0.11 --- ---
Arm. vert. gch. 167.51 54.47 167.30 -32.74 -0.70 0.13 0.11 --- ---
Arm. horz. gch. 469.30 54.48 167.30 -32.74 -0.70 0.13 0.11 --- ---
Béton 22.27 54.48 167.30 -32.74 0.00 0.13 0.11 --- ---
Arm. transve. 4.52 -22.44 -36.05 -1.90 --- --- --- -1.36 -6.27
Page 38
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA13b: Longueur: 169.9 cm [Noeud initial: 5.92;41.43 -> Noeud final: 5.92;43.13]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+13
Arm. vert. drt. 166.72 63.76 207.26 -34.20 0.00 0.27 0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 450.61 63.76 207.26 -34.20 0.00 0.27 0.16 --- ---
Arm. vert. gch. 182.31 63.76 207.26 -34.20 -0.81 0.27 0.16 --- ---
Arm. horz. gch. 447.22 63.76 207.26 -34.20 -0.81 0.27 0.16 --- ---
Béton 24.16 -98.48 -226.89 45.84 -1.97 -1.01 0.25 --- ---
Arm. transve. 5.11 -36.03 -40.97 -1.72 --- --- --- -1.34 -7.19
R+12
Arm. vert. drt. 159.93 58.79 211.38 -33.57 0.00 0.28 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 457.29 58.79 211.38 -33.57 0.00 0.28 0.15 --- ---
Arm. vert. gch. 174.81 58.79 211.38 -33.57 -0.78 0.28 0.15 --- ---
Arm. horz. gch. 452.97 58.79 211.38 -33.57 -0.78 0.28 0.15 --- ---
Béton 24.53 -103.39 -230.68 46.90 2.07 -0.99 0.23 --- ---
Arm. transve. 5.31 -44.12 -42.12 -1.77 --- --- --- -1.39 -7.48
R+11
Arm. vert. drt. 154.25 55.25 212.77 -33.01 0.00 0.27 0.17 --- ---
(e=30.0 cm)
Arm. horz. drt. 459.62 54.90 213.49 -33.04 0.00 0.27 0.17 --- ---
Arm. vert. gch. 170.74 55.25 212.77 -33.01 -0.85 0.27 0.17 --- ---
Arm. horz. gch. 456.23 54.90 213.49 -33.04 -0.86 0.27 0.17 --- ---
Béton 24.70 -108.80 -232.30 47.79 -2.18 -0.99 0.21 --- ---
Arm. transve. 6.04 -54.16 -45.08 -2.16 --- --- --- -1.62 -8.50
R+10
Arm. vert. drt. 153.28 53.99 215.56 -33.23 0.00 0.27 0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 463.62 53.99 215.56 -33.23 0.00 0.27 0.18 --- ---
Arm. vert. gch. 170.59 53.99 215.56 -33.23 -0.89 0.27 0.18 --- ---
Arm. horz. gch. 460.44 53.99 215.56 -33.23 -0.89 0.27 0.18 --- ---
Béton 28.18 13.77 8.44 -37.85 -1.38 -0.11 0.01 --- ---
Arm. transve. 8.22 -26.99 30.98 -3.08 --- --- --- 1.78 8.51
R+9
Arm. vert. drt. 145.79 49.06 216.65 -32.49 0.00 0.27 0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 463.99 49.06 216.65 -32.49 0.00 0.27 0.18 --- ---
Arm. vert. gch. 163.30 49.06 216.65 -32.49 -0.90 0.27 0.18 --- ---
Arm. horz. gch. 460.88 49.06 216.65 -32.49 -0.90 0.27 0.18 --- ---
Béton 28.27 7.96 8.08 -37.93 -1.35 -0.11 0.02 --- ---
Arm. transve. 10.01 -34.60 31.36 -3.06 --- --- --- 1.81 8.74
R+8
Arm. vert. drt. 143.25 43.38 215.69 -31.44 0.00 0.26 0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 584.91 43.38 215.69 -31.44 0.00 0.26 0.19 --- ---
Arm. vert. gch. 151.72 43.38 215.69 -31.44 -0.92 0.26 0.19 --- ---
Arm. horz. gch. 407.99 43.38 215.69 -31.44 -0.92 0.26 0.19 --- ---
Béton 28.34 -0.30 7.48 -37.56 -1.37 -0.11 0.01 --- ---
Arm. transve. 11.74 -42.32 31.38 -2.96 --- --- --- 1.83 8.88
R+7
Arm. vert. drt. 137.64 35.35 172.01 -25.36 0.68 0.84 -0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 669.35 36.64 212.43 -29.94 0.00 0.24 0.19 --- ---
Arm. vert. gch. 142.25 36.64 212.43 -29.94 -0.94 0.24 0.19 --- ---
Arm. horz. gch. 431.06 36.64 212.43 -29.94 -0.94 0.24 0.19 --- ---
Béton 27.85 -109.03 31.97 -6.56 -2.18 0.89 0.20 --- ---
Arm. transve. 13.69 -50.63 30.77 -2.89 --- --- --- 1.83 8.94
R+6
Arm. vert. drt. 125.62 29.52 166.28 -23.68 0.66 0.82 -0.26 --- ---
(e=30.0 cm)
Arm. horz. drt. 646.94 28.39 206.54 -27.87 0.00 0.22 0.20 --- ---
Page 39
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA13b: Longueur: 169.9 cm [Noeud initial: 5.92;41.43 -> Noeud final: 5.92;43.13]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 140.13 28.39 206.54 -27.87 -0.96 0.22 0.20 --- ---
Arm. horz. gch. 643.90 28.39 206.54 -27.87 -0.96 0.22 0.20 --- ---
Béton 31.92 -125.36 31.83 -6.13 -2.51 0.89 0.20 --- ---
Arm. transve. 12.70 -59.01 29.50 -2.87 --- --- --- 1.81 8.86
R+5
Arm. vert. drt. 114.84 5.79 2.89 -7.25 6.21 0.70 -0.52 --- ---
(e=30.0 cm)
Arm. horz. drt. 614.59 18.98 197.65 -25.24 0.00 0.18 0.21 --- ---
Arm. vert. gch. 122.22 18.98 197.65 -25.24 -0.98 0.18 0.21 --- ---
Arm. horz. gch. 613.58 18.98 197.65 -25.24 -0.98 0.18 0.21 --- ---
Béton 36.16 -142.12 35.94 -5.76 -2.84 1.11 0.21 --- ---
Arm. transve. 10.74 -68.07 27.50 -2.87 --- --- --- 1.77 8.65
R+4
Arm. vert. drt. 104.23 -2.15 3.20 -6.74 6.19 0.81 -0.62 --- ---
(e=30.0 cm)
Arm. horz. drt. 570.55 7.49 185.42 -21.88 0.00 0.12 0.23 --- ---
Arm. vert. gch. 100.37 7.49 185.42 -21.88 -1.02 0.12 0.23 --- ---
Arm. horz. gch. 573.06 7.49 185.42 -21.88 -1.02 0.12 0.23 --- ---
Béton 40.34 -158.67 35.31 -5.10 -3.17 1.08 0.20 --- ---
Arm. transve. 6.56 -78.86 24.62 -2.88 --- --- --- 1.66 8.24
R+3
Arm. vert. drt. 108.08 24.25 7.29 -11.84 3.69 0.52 -0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 600.53 -0.39 198.16 -21.53 0.01 -0.05 0.29 --- ---
Arm. vert. gch. 97.04 -0.39 198.16 -21.53 -1.31 -0.05 0.29 --- ---
Arm. horz. gch. 613.89 -0.39 198.16 -21.53 -1.31 -0.05 0.29 --- ---
Béton 80.92 -181.50 31.28 -2.54 -3.63 0.97 0.29 --- ---
Arm. transve. 36.48 -92.76 23.04 -1.33 --- --- --- 0.20 12.24
R+2
Arm. vert. drt. 122.55 -200.23 33.54 -12.23 -4.00 0.71 0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 462.60 -14.71 163.44 -17.02 0.29 -1.05 0.53 --- ---
Arm. vert. gch. 73.43 -14.71 163.44 -17.02 -1.42 -1.05 0.53 --- ---
Arm. horz. gch. 534.50 -14.71 163.44 -17.02 -1.42 -1.05 0.53 --- ---
Béton 51.17 -200.23 33.54 -12.23 -4.00 0.71 0.08 --- ---
Arm. transve. 4.41 -102.56 4.63 -8.04 --- --- --- -0.96 6.24
R+1
Arm. vert. drt. 146.47 109.54 -1.22 -3.64 0.19 0.02 0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 356.52 -97.46 99.30 -22.63 2.62 2.19 1.06 --- ---
Arm. vert. gch. 145.09 109.56 -1.22 -3.64 0.00 0.02 0.07 --- ---
Arm. horz. gch. 317.14 -43.16 103.16 -8.33 -0.86 -0.29 0.14 --- ---
Béton 52.19 -388.40 -48.14 33.21 7.77 -0.19 0.00 --- ---
Arm. transve. 3.27 -142.65 11.94 4.34 --- --- --- -0.28 4.69
RDC
Arm. vert. drt. 74.91 -34.69 3.30 -100.33 0.69 0.00 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.66 -139.31 30.96 105.19 2.79 0.24 0.06 --- ---
Arm. vert. gch. 78.63 53.52 1.41 -26.68 -0.71 -0.22 0.10 --- ---
Arm. horz. gch. 60.79 -141.14 -18.66 147.59 -2.82 -0.16 -0.01 --- ---
Béton 89.03 -141.14 -18.66 147.59 -2.82 -0.16 -0.01 --- ---
Arm. transve. 2.93 -133.21 -12.53 50.49 --- --- --- 3.96 -0.02
SS1
Arm. vert. drt. 42.73 -6.69 2.34 -31.06 1.56 0.51 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 71.71 -26.43 -0.74 -41.57 1.45 0.49 0.05 --- ---
Arm. vert. gch. 12.28 -221.76 -28.01 48.28 4.44 -0.41 -0.08 --- ---
Arm. horz. gch. 2.26 -190.72 -29.18 95.90 -3.81 0.23 0.02 --- ---
Béton 34.24 -211.83 -32.38 84.99 -4.24 0.21 0.02 --- ---
Page 40
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA13b: Longueur: 169.9 cm [Noeud initial: 5.92;41.43 -> Noeud final: 5.92;43.13]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 3.57 -136.25 -8.83 30.60 --- --- --- -4.88 -0.06
Mur VA13: Longueur: 169.9 cm [Noeud initial: 9.77;41.43 -> Noeud final: 9.77;43.13]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 141.85 4.61 2.18 -3.49 8.18 1.15 -0.92 --- ---
(e=30.0 cm)
Arm. horz. drt. 278.88 47.85 75.10 -29.63 0.00 -0.18 -0.04 --- ---
Arm. vert. gch. 152.14 47.79 75.00 -29.60 -1.75 -0.18 -0.03 --- ---
Arm. horz. gch. 289.80 47.85 75.10 -29.63 -1.74 -0.18 -0.04 --- ---
Béton 39.81 -89.29 37.63 -0.67 1.79 0.01 -0.08 --- ---
Arm. transve. 11.47 34.51 26.19 -25.51 --- --- --- -0.82 -0.92
R+14
Arm. vert. drt. 104.18 -6.63 0.73 -1.76 6.98 1.02 -0.78 --- ---
(e=30.0 cm)
Arm. horz. drt. 175.10 47.03 48.10 -14.84 0.00 -0.03 -0.06 --- ---
Arm. vert. gch. 103.22 -21.91 -27.74 -8.78 -9.02 -1.26 -1.41 --- ---
Arm. horz. gch. 174.38 47.03 48.10 -14.84 -0.43 -0.03 -0.06 --- ---
Béton 14.86 -25.17 -30.07 -9.82 -9.15 -1.28 -1.43 --- ---
Arm. transve. 9.13 21.34 18.04 -21.09 --- --- --- -0.71 -0.68
R+13
Arm. vert. drt. 108.27 -10.64 0.30 -1.66 7.62 1.10 -0.83 --- ---
(e=30.0 cm)
Arm. horz. drt. 65.07 -10.64 0.30 -1.66 7.62 1.10 -0.83 --- ---
Arm. vert. gch. 90.48 -24.76 -21.23 -6.07 -8.34 -1.19 -1.22 --- ---
Arm. horz. gch. 79.25 8.44 12.94 -14.20 -1.33 -0.09 0.10 --- ---
Béton 20.13 -117.62 -10.53 -0.25 -2.35 0.02 0.03 --- ---
Arm. transve. 3.76 -29.03 1.73 -3.95 --- --- --- -4.94 2.16
R+12
Arm. vert. drt. 107.98 37.12 4.63 -6.08 3.02 0.37 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 55.63 37.12 4.63 -6.08 3.02 0.37 -0.23 --- ---
Arm. vert. gch. 81.48 -30.94 -20.42 -6.03 -8.29 -1.18 -1.28 --- ---
Arm. horz. gch. 84.74 12.31 13.67 -15.66 -1.29 -0.08 0.07 --- ---
Béton 30.14 -221.58 -27.64 27.57 4.43 -0.12 0.06 --- ---
Arm. transve. 3.22 -49.08 -7.66 -5.35 --- --- --- -4.23 -1.84
R+11
Arm. vert. drt. 143.62 63.42 76.94 -25.55 0.00 -0.04 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 281.26 63.09 76.97 -25.56 0.00 -0.04 -0.04 --- ---
Arm. vert. gch. 138.78 63.45 76.45 -25.40 -0.31 -0.04 -0.04 --- ---
Arm. horz. gch. 186.36 63.09 76.97 -25.56 -0.28 -0.04 -0.04 --- ---
Béton 24.83 -163.23 -24.62 54.63 3.26 -0.02 -0.09 --- ---
Arm. transve. 4.39 21.13 11.42 -27.89 --- --- --- -0.43 -0.20
R+10
Arm. vert. drt. 141.21 60.84 77.93 -26.10 0.00 -0.04 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 286.96 60.04 78.76 -26.35 0.00 -0.04 -0.03 --- ---
Arm. vert. gch. 136.50 60.84 77.93 -26.10 -0.28 -0.04 -0.03 --- ---
Arm. horz. gch. 190.64 60.04 78.76 -26.35 -0.28 -0.04 -0.03 --- ---
Béton 22.12 7.98 11.49 -29.44 -0.81 -0.05 0.03 --- ---
Arm. transve. 2.41 -42.56 -2.06 -4.78 --- --- --- -3.43 -0.38
R+9
Arm. vert. drt. 127.77 50.54 77.85 -25.88 0.00 -0.03 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 286.42 48.06 79.28 -26.31 0.00 -0.03 -0.04 --- ---
Arm. vert. gch. 129.86 50.54 77.85 -25.88 -0.26 -0.03 -0.04 --- ---
Page 41
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA13: Longueur: 169.9 cm [Noeud initial: 9.77;41.43 -> Noeud final: 9.77;43.13]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 286.65 48.35 79.23 -26.30 -0.27 -0.03 -0.04 --- ---
Béton 23.40 -6.95 11.75 -30.51 -0.81 -0.04 0.03 --- ---
Arm. transve. 2.56 -55.19 -2.37 -5.91 --- --- --- -3.65 -0.38
R+8
Arm. vert. drt. 113.28 39.40 77.60 -25.64 0.00 -0.03 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 282.71 35.78 78.98 -26.05 0.00 -0.03 -0.04 --- ---
Arm. vert. gch. 115.06 39.40 77.60 -25.64 -0.25 -0.03 -0.04 --- ---
Arm. horz. gch. 282.58 35.78 78.98 -26.05 -0.23 -0.03 -0.04 --- ---
Béton 20.30 -93.38 -12.74 0.07 -1.87 0.14 -0.03 --- ---
Arm. transve. 2.58 -67.00 -2.78 -6.87 --- --- --- -3.67 -0.38
R+7
Arm. vert. drt. 97.41 50.27 0.26 13.30 0.52 0.08 0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 275.48 22.14 77.80 -25.47 0.00 -0.02 -0.05 --- ---
Arm. vert. gch. 98.18 26.71 76.69 -25.16 -0.24 -0.03 -0.04 --- ---
Arm. horz. gch. 275.12 22.14 77.80 -25.47 -0.21 -0.02 -0.05 --- ---
Béton 21.37 -97.66 -12.38 -0.02 -1.95 0.13 -0.03 --- ---
Arm. transve. 2.65 -81.29 -3.02 -7.75 --- --- --- -3.78 -0.38
R+6
Arm. vert. drt. 94.58 50.95 0.70 12.78 0.32 0.05 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 264.24 7.13 75.58 -24.52 0.00 -0.02 -0.05 --- ---
Arm. vert. gch. 88.56 50.95 0.70 12.78 0.00 0.05 0.05 --- ---
Arm. horz. gch. 263.68 7.13 75.58 -24.52 -0.20 -0.02 -0.05 --- ---
Béton 22.74 -104.09 -13.17 -0.08 -2.08 0.11 -0.03 --- ---
Arm. transve. 2.62 -97.38 -3.28 -8.67 --- --- --- -3.73 -0.34
R+5
Arm. vert. drt. 93.39 52.32 1.41 12.05 0.18 0.03 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 248.73 -4.45 71.70 -23.05 0.09 -0.00 -0.06 --- ---
Arm. vert. gch. 89.91 52.32 1.41 12.05 0.00 0.03 0.03 --- ---
Arm. horz. gch. 247.72 -10.48 72.22 -23.15 -0.21 -0.02 -0.05 --- ---
Béton 24.07 -125.54 -0.26 -6.27 -2.51 0.03 -0.02 --- ---
Arm. transve. 2.56 -113.99 -3.48 -9.59 --- --- --- -3.66 -0.27
R+4
Arm. vert. drt. 93.62 54.79 2.29 11.38 0.03 0.00 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 228.96 -29.77 67.59 -21.33 0.60 -0.01 -0.05 --- ---
Arm. vert. gch. 92.94 54.79 2.29 11.38 0.00 0.00 0.01 --- ---
Arm. horz. gch. 227.44 -29.77 67.59 -21.33 -0.60 -0.01 -0.05 --- ---
Béton 26.61 -139.12 -0.96 -7.67 -2.78 0.02 -0.02 --- ---
Arm. transve. 2.38 -132.99 -3.84 -10.78 --- --- --- -3.40 -0.23
R+3
Arm. vert. drt. 78.97 48.69 3.45 7.33 0.00 -0.02 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 203.05 -52.36 61.58 -19.02 1.05 -0.03 -0.05 --- ---
Arm. vert. gch. 81.50 48.69 3.45 7.33 -0.15 -0.02 -0.02 --- ---
Arm. horz. gch. 202.94 -52.24 61.57 -19.02 -1.04 -0.03 -0.05 --- ---
Béton 30.55 -213.63 -10.50 -22.96 -4.27 0.06 0.03 --- ---
Arm. transve. 2.57 -152.79 -4.42 -12.31 --- --- --- -3.68 0.08
R+2
Arm. vert. drt. 75.56 50.93 0.13 1.73 0.00 -0.00 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 11.62 48.32 0.28 1.74 0.00 -0.00 -0.01 --- ---
Arm. vert. gch. 78.99 50.92 0.13 1.73 -0.22 -0.00 -0.01 --- ---
Arm. horz. gch. 13.18 47.71 0.33 1.75 -0.16 -0.00 -0.02 --- ---
Béton 34.15 -187.43 22.41 0.31 3.75 -0.10 -0.05 --- ---
Arm. transve. 0.91 -142.86 -20.43 -10.77 --- --- --- -1.28 0.26
Page 42
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA13: Longueur: 169.9 cm [Noeud initial: 9.77;41.43 -> Noeud final: 9.77;43.13]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+1
Arm. vert. drt. 116.20 111.88 15.95 9.18 0.00 -0.06 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 76.05 111.86 15.95 9.18 0.00 -0.06 -0.05 --- ---
Arm. vert. gch. 120.44 111.88 15.95 9.18 -0.34 -0.06 -0.05 --- ---
Arm. horz. gch. 81.77 111.88 15.95 9.18 -0.34 -0.06 -0.05 --- ---
Béton 43.73 -327.77 -41.20 -28.22 -6.56 0.17 0.02 --- ---
Arm. transve. 4.06 34.90 -0.43 16.18 --- --- --- -0.36 0.08
RDC
Arm. vert. drt. 120.39 121.26 -17.80 -5.95 0.00 -0.06 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 64.63 54.77 13.23 8.57 0.22 0.05 -0.01 --- ---
Arm. vert. gch. 123.34 121.26 -17.80 -5.95 -0.34 -0.06 -0.04 --- ---
Arm. horz. gch. 62.73 54.77 13.22 8.56 0.00 0.05 -0.02 --- ---
Béton 48.67 -339.29 -6.49 19.10 6.79 -0.11 -0.02 --- ---
Arm. transve. 3.68 42.62 4.65 1.38 --- --- --- -0.33 -0.02
SS1
Arm. vert. drt. 89.56 61.19 21.62 25.79 0.12 0.07 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 171.01 -116.12 14.90 -68.40 2.32 -0.05 -0.07 --- ---
Arm. vert. gch. 89.08 61.19 21.62 25.79 0.00 0.07 -0.04 --- ---
Arm. horz. gch. 170.14 -116.50 14.92 -68.44 -2.33 -0.06 -0.08 --- ---
Béton 48.08 -116.50 14.92 -68.44 -2.33 -0.06 -0.08 --- ---
Arm. transve. 0.50 -126.22 -2.37 -42.69 --- --- --- -0.72 -0.04
Mur VA3c: Longueur: 245 cm [Noeud initial: 26.97;42.28 -> Noeud final: 26.97;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+16
Arm. vert. drt. 96.07 -6.95 -0.88 0.33 6.93 0.88 -0.45 --- ---
(e=30.0 cm)
Arm. horz. drt. 42.94 -0.66 1.20 -0.53 3.58 0.88 -0.45 --- ---
Arm. vert. gch. 73.16 -12.73 -1.61 2.00 -6.15 -0.78 0.32 --- ---
Arm. horz. gch. 30.41 9.13 1.52 -3.05 -2.92 -0.48 0.03 --- ---
Béton 10.66 -7.23 -0.91 0.39 6.94 0.88 -0.45 --- ---
Arm. transve. 3.37 0.40 3.42 -5.11 --- --- --- 4.55 -1.63
R+15
Arm. vert. drt. 95.87 20.46 4.76 -34.17 0.70 0.22 -0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 116.40 20.46 4.76 -34.17 0.70 0.22 -0.13 --- ---
Arm. vert. gch. 91.24 29.50 2.87 -14.81 -1.72 -0.45 0.21 --- ---
Arm. horz. gch. 98.52 20.48 4.77 -34.14 0.00 0.21 -0.13 --- ---
Béton 22.83 -15.34 -1.42 30.82 -1.64 -0.46 0.04 --- ---
Arm. transve. 2.43 -5.68 2.66 14.76 --- --- --- -0.40 3.45
R+14
Arm. vert. drt. 92.65 30.09 5.80 -20.93 1.11 0.46 -0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 96.96 23.22 5.95 -23.16 1.06 0.44 -0.11 --- ---
Arm. vert. gch. 99.82 43.32 4.90 -9.43 -1.51 -0.41 0.22 --- ---
Arm. horz. gch. 76.28 32.18 5.06 -16.26 -0.91 -0.35 0.09 --- ---
Béton 15.95 24.31 3.47 -20.40 0.00 0.39 -0.11 --- ---
Arm. transve. 2.36 -40.29 -13.00 22.74 --- --- --- -3.38 0.05
R+13
Arm. vert. drt. 105.29 36.30 4.44 -6.18 3.20 0.40 0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 89.21 29.56 7.42 -17.75 1.17 0.48 -0.11 --- ---
Arm. vert. gch. 95.15 45.61 4.96 -1.89 -1.64 -0.43 0.23 --- ---
Arm. horz. gch. 59.30 36.93 5.76 -8.70 -0.98 -0.40 0.09 --- ---
Page 43
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3c: Longueur: 245 cm [Noeud initial: 26.97;42.28 -> Noeud final: 26.97;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 14.47 -82.08 -8.88 0.11 -1.64 0.55 -0.28 --- ---
Arm. transve. 2.36 -60.91 -14.84 19.88 --- --- --- -3.38 0.08
R+12
Arm. vert. drt. 110.19 44.70 8.87 -3.06 2.92 0.72 0.48 --- ---
(e=30.0 cm)
Arm. horz. drt. 83.09 24.89 21.61 1.24 1.49 0.45 0.19 --- ---
Arm. vert. gch. 86.41 29.22 3.69 -1.76 -2.78 -0.35 0.10 --- ---
Arm. horz. gch. 43.32 32.98 5.02 -3.60 -1.13 -0.45 0.11 --- ---
Béton 15.63 -69.84 -10.35 3.11 -4.57 -0.57 -0.34 --- ---
Arm. transve. 2.54 -73.49 -16.19 12.53 --- --- --- -3.63 0.13
R+11
Arm. vert. drt. 107.65 38.09 8.27 -0.09 3.13 0.77 0.53 --- ---
(e=30.0 cm)
Arm. horz. drt. 67.44 16.00 8.96 0.92 3.23 0.81 0.56 --- ---
Arm. vert. gch. 76.49 20.45 2.58 -2.08 -2.94 -0.37 0.11 --- ---
Arm. horz. gch. 39.75 28.53 1.21 3.08 -0.38 -0.87 -0.09 --- ---
Béton 17.53 -81.09 -12.49 1.20 -4.91 -0.62 -0.25 --- ---
Arm. transve. 2.67 -76.39 -16.78 8.43 --- --- --- -3.82 0.16
R+10
Arm. vert. drt. 93.07 23.52 4.91 0.62 3.82 0.48 0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 73.70 7.56 8.05 3.65 3.40 0.85 0.60 --- ---
Arm. vert. gch. 67.99 21.32 1.70 5.99 -2.25 -0.55 0.28 --- ---
Arm. horz. gch. 33.05 21.32 1.70 5.99 -2.25 -0.55 0.28 --- ---
Béton 17.74 -81.95 -12.46 1.63 -4.97 -0.63 -0.26 --- ---
Arm. transve. 2.71 -77.00 -17.02 7.74 --- --- --- -3.88 0.17
R+9
Arm. vert. drt. 93.77 20.13 5.45 4.97 3.40 0.83 0.61 --- ---
(e=30.0 cm)
Arm. horz. drt. 75.79 -5.60 6.77 6.11 3.49 0.88 0.63 --- ---
Arm. vert. gch. 6.18 -88.92 -19.87 0.52 1.78 -1.16 -0.84 --- ---
Arm. horz. gch. 1.66 -49.00 -35.04 2.59 0.98 -0.76 -0.41 --- ---
Béton 18.35 -84.23 -13.17 -1.90 -5.20 -0.66 -0.28 --- ---
Arm. transve. 2.83 -74.75 -17.24 2.77 --- --- --- -4.05 0.22
R+8
Arm. vert. drt. 63.10 -10.23 4.56 7.95 4.31 0.54 0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 64.45 -17.34 2.70 12.14 4.48 0.57 0.24 --- ---
Arm. vert. gch. 6.51 -93.62 -9.93 -0.21 1.87 -0.23 -0.02 --- ---
Arm. horz. gch. 1.64 -43.68 -34.81 2.40 0.87 -0.76 -0.41 --- ---
Béton 16.26 -70.55 -12.45 -2.76 -5.10 -0.64 -0.40 --- ---
Arm. transve. 2.88 -73.01 -17.30 1.44 --- --- --- -4.11 0.25
R+7
Arm. vert. drt. 7.20 -72.58 -12.84 -3.55 -5.14 -0.65 -0.40 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.40 -34.95 -34.09 2.02 -2.52 -0.75 -0.41 --- ---
Arm. vert. gch. 6.32 -90.87 -12.70 0.25 1.82 -0.21 -0.05 --- ---
Arm. horz. gch. 1.61 -34.93 -34.09 2.02 0.70 -0.75 -0.41 --- ---
Béton 16.58 -72.58 -12.84 -3.55 -5.14 -0.65 -0.40 --- ---
Arm. transve. 2.97 -53.08 -7.96 -16.62 --- --- --- -4.22 0.51
R+6
Arm. vert. drt. 7.10 -102.05 -14.73 -0.28 -2.04 -0.20 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.32 -25.35 -32.90 1.45 -2.43 -0.72 -0.40 --- ---
Arm. vert. gch. 7.10 -102.05 -14.73 -0.28 2.04 -0.20 0.04 --- ---
Arm. horz. gch. 1.55 -25.33 -32.90 1.45 -2.43 -0.72 -0.40 --- ---
Béton 16.97 -102.05 -14.73 -0.28 2.04 -0.20 0.04 --- ---
Arm. transve. 2.95 -60.48 -8.74 -19.84 --- --- --- -4.19 0.53
Page 44
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3c: Longueur: 245 cm [Noeud initial: 26.97;42.28 -> Noeud final: 26.97;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+5
Arm. vert. drt. 80.74 1.28 0.16 -6.85 4.68 0.59 -0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 73.58 1.69 2.08 -13.04 3.40 0.77 -0.31 --- ---
Arm. vert. gch. 7.50 -107.87 -15.26 -0.07 2.16 -0.46 0.16 --- ---
Arm. horz. gch. 1.49 -12.46 -31.28 1.21 -2.29 -0.69 -0.38 --- ---
Béton 18.25 -107.87 -15.26 -0.07 2.16 -0.46 0.16 --- ---
Arm. transve. 2.88 -48.33 -7.35 -23.88 --- --- --- -4.09 0.56
R+4
Arm. vert. drt. 106.08 20.30 4.35 -15.92 3.44 0.76 -0.28 --- ---
(e=30.0 cm)
Arm. horz. drt. 90.89 20.27 4.35 -15.93 3.44 0.76 -0.28 --- ---
Arm. vert. gch. 72.13 1.40 -7.12 -9.04 -4.34 -0.55 -0.28 --- ---
Arm. horz. gch. 71.70 20.22 4.21 -16.82 -0.11 -0.58 -0.05 --- ---
Béton 24.17 -130.45 -4.55 20.67 -2.61 0.61 -0.09 --- ---
Arm. transve. 2.74 -38.62 -5.82 -25.29 --- --- --- -3.88 0.57
R+3
Arm. vert. drt. 118.24 34.02 6.00 -10.69 3.46 0.78 -0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 93.71 -16.98 2.23 -30.48 1.92 0.62 0.16 --- ---
Arm. vert. gch. 91.38 15.12 -6.36 -11.54 -4.08 -0.51 -0.25 --- ---
Arm. horz. gch. 72.44 28.37 3.71 -16.66 -0.08 -0.60 -0.06 --- ---
Béton 28.72 -167.80 -22.61 -0.41 3.36 -0.87 0.33 --- ---
Arm. transve. 2.62 -35.67 -4.77 -25.79 --- --- --- -3.72 0.51
R+2
Arm. vert. drt. 78.85 71.22 10.14 0.05 1.19 0.32 -0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 68.61 42.69 6.26 -12.58 1.46 0.42 -0.10 --- ---
Arm. vert. gch. 105.20 71.22 10.14 0.05 0.00 0.32 -0.12 --- ---
Arm. horz. gch. 64.34 28.92 0.49 -17.06 0.00 0.08 0.44 --- ---
Béton 29.39 -200.50 -1.06 -7.81 4.01 -0.00 -0.03 --- ---
Arm. transve. 1.46 -25.03 -2.91 -24.33 --- --- --- -2.01 0.58
R+1
Arm. vert. drt. 129.31 95.77 12.54 4.28 3.96 0.95 -0.36 --- ---
(e=30.0 cm)
Arm. horz. drt. 112.91 70.73 16.24 14.37 1.70 0.71 -0.01 --- ---
Arm. vert. gch. 94.99 95.77 12.54 4.28 0.00 0.95 -0.36 --- ---
Arm. horz. gch. 76.31 70.73 16.24 14.37 0.00 0.71 -0.01 --- ---
Béton 35.55 -245.68 -2.99 -11.22 -4.91 0.04 -0.05 --- ---
Arm. transve. 23.48 73.43 17.57 9.87 --- --- --- -2.33 0.28
RDC
Arm. vert. drt. 70.96 100.55 2.69 13.45 0.61 0.05 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 108.67 53.47 3.72 43.79 0.55 0.06 -0.01 --- ---
Arm. vert. gch. 104.89 105.49 2.48 -9.62 0.00 -0.01 -0.01 --- ---
Arm. horz. gch. 115.04 53.46 3.71 43.79 0.00 0.06 -0.01 --- ---
Béton 36.23 -213.86 -22.75 0.20 4.28 -0.24 -0.12 --- ---
Arm. transve. 3.93 79.31 2.20 0.11 --- --- --- 0.47 0.00
SS1
Arm. vert. drt. 40.62 14.10 -1.36 45.52 0.00 -0.10 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.18 -8.05 8.04 48.71 0.16 -0.05 0.07 --- ---
Arm. vert. gch. 41.85 13.93 -1.44 45.57 -0.13 -0.10 -0.01 --- ---
Arm. horz. gch. 99.01 -9.62 8.08 48.88 -0.19 -0.08 0.07 --- ---
Béton 40.19 -19.24 0.53 51.99 -0.38 -0.11 0.05 --- ---
Arm. transve. 0.74 -7.50 5.01 44.48 --- --- --- 0.05 -0.05
Page 45
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3: Longueur: 210 cm [Noeud initial: 24.86;44.73 -> Noeud final: 26.97;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+16
Arm. vert. drt. 97.29 18.85 2.75 5.10 4.06 0.85 0.32 --- ---
(e=30.0 cm)
Arm. horz. drt. 62.33 12.07 1.91 5.30 4.47 0.95 0.39 --- ---
Arm. vert. gch. 63.17 -14.93 -1.89 1.72 -5.68 -0.72 0.05 --- ---
Arm. horz. gch. 45.25 -10.69 1.53 0.12 -4.28 -0.98 0.51 --- ---
Béton 11.57 -38.01 -1.79 2.59 -4.71 -1.04 -0.38 --- ---
Arm. transve. 2.78 -12.45 1.73 10.53 --- --- --- 3.95 -0.47
R+15
Arm. vert. drt. 92.10 15.84 0.42 -9.80 4.09 0.88 0.30 --- ---
(e=30.0 cm)
Arm. horz. drt. 82.43 20.90 5.85 17.12 0.23 0.71 0.06 --- ---
Arm. vert. gch. 148.38 35.14 2.40 5.53 -6.41 -1.42 0.76 --- ---
Arm. horz. gch. 82.93 -16.30 3.50 -43.03 -0.42 -0.29 0.01 --- ---
Béton 25.80 -16.30 3.50 -43.03 -0.42 -0.29 0.01 --- ---
Arm. transve. 4.52 -31.45 -23.47 -15.26 --- --- --- 6.46 0.10
R+14
Arm. vert. drt. 93.32 18.32 0.76 -9.99 3.96 0.87 0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 67.60 25.36 5.77 9.64 0.26 0.90 0.03 --- ---
Arm. vert. gch. 127.49 21.49 6.65 -5.89 -5.49 -1.31 0.61 --- ---
Arm. horz. gch. 95.46 17.73 7.05 -6.07 -5.60 -1.33 0.63 --- ---
Béton 13.27 -51.15 -1.41 12.13 -4.41 -1.03 -0.36 --- ---
Arm. transve. 3.31 -39.01 -19.96 -2.84 --- --- --- 4.73 0.29
R+13
Arm. vert. drt. 93.51 19.50 0.96 -8.32 4.00 0.89 0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 53.34 32.68 5.56 3.48 0.24 0.97 0.03 --- ---
Arm. vert. gch. 130.52 23.72 7.53 -5.38 -5.50 -1.31 0.63 --- ---
Arm. horz. gch. 100.53 15.28 8.26 -5.98 -5.82 -1.39 0.67 --- ---
Béton 14.51 -60.62 -2.61 11.34 -4.39 -1.02 -0.35 --- ---
Arm. transve. 3.42 -45.42 -20.91 1.73 --- --- --- 4.89 0.29
R+12
Arm. vert. drt. 89.23 17.22 0.75 -6.97 4.05 0.90 0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 52.72 33.18 5.28 -3.41 0.23 1.05 0.03 --- ---
Arm. vert. gch. 130.34 24.95 8.23 -3.13 -5.58 -1.33 0.63 --- ---
Arm. horz. gch. 108.99 2.60 8.72 -8.32 -6.09 -1.45 0.71 --- ---
Béton 15.34 -66.97 -3.45 10.53 -4.38 -1.02 -0.35 --- ---
Arm. transve. 3.64 -38.93 -21.53 10.64 --- --- --- 5.20 0.34
R+11
Arm. vert. drt. 68.06 -27.72 -33.79 11.00 7.21 1.79 -0.83 --- ---
(e=30.0 cm)
Arm. horz. drt. 66.17 27.98 5.34 -7.54 0.25 1.16 0.03 --- ---
Arm. vert. gch. 126.23 22.61 8.28 -2.25 -5.65 -1.35 0.64 --- ---
Arm. horz. gch. 73.31 -9.22 7.67 -9.34 -6.14 -1.46 0.71 --- ---
Béton 16.27 -60.09 -35.16 3.97 6.73 1.68 -0.76 --- ---
Arm. transve. 3.55 -41.43 -21.00 15.25 --- --- --- 5.05 0.35
R+10
Arm. vert. drt. 67.26 -27.76 -33.49 11.05 7.23 1.79 -0.83 --- ---
(e=30.0 cm)
Arm. horz. drt. 22.89 -32.35 -17.71 11.91 6.69 0.85 0.06 --- ---
Arm. vert. gch. 100.46 -5.46 9.17 -6.09 -6.07 -1.45 0.69 --- ---
Arm. horz. gch. 104.01 -19.09 7.15 -9.60 -6.14 -1.46 0.70 --- ---
Béton 14.56 -43.11 -36.81 6.96 7.14 1.78 -0.82 --- ---
Arm. transve. 3.54 -40.05 -21.04 17.37 --- --- --- 5.06 0.37
R+9
Arm. vert. drt. 68.49 -28.99 -17.78 11.10 6.74 0.85 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 21.81 -28.99 -17.78 11.10 6.74 0.85 0.06 --- ---
Page 46
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3: Longueur: 210 cm [Noeud initial: 24.86;44.73 -> Noeud final: 26.97;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 85.22 -17.38 9.00 -6.61 -6.08 -1.45 0.70 --- ---
Arm. horz. gch. 100.78 -17.38 9.00 -6.61 -6.08 -1.45 0.70 --- ---
Béton 14.23 -39.98 -36.21 7.88 7.19 1.79 -0.83 --- ---
Arm. transve. 3.54 -39.81 -20.90 17.59 --- --- --- 5.06 0.40
R+8
Arm. vert. drt. 60.66 -33.86 -29.35 10.49 7.40 1.81 -0.83 --- ---
(e=30.0 cm)
Arm. horz. drt. 18.25 -37.23 -18.80 10.72 6.90 0.87 0.08 --- ---
Arm. vert. gch. 72.36 -31.73 2.91 -9.51 -6.29 -1.48 0.69 --- ---
Arm. horz. gch. 96.32 -31.95 8.64 -6.68 -6.03 -1.44 0.69 --- ---
Béton 14.93 -85.37 -10.13 -1.37 -1.71 0.58 0.21 --- ---
Arm. transve. 3.49 -48.42 -20.67 13.17 --- --- --- 4.99 0.35
R+7
Arm. vert. drt. 67.02 -25.23 -34.19 7.71 7.03 1.75 -0.82 --- ---
(e=30.0 cm)
Arm. horz. drt. 21.13 -32.45 -18.28 11.32 6.75 0.85 0.08 --- ---
Arm. vert. gch. 80.48 -8.32 3.23 10.46 -4.86 -1.12 -0.39 --- ---
Arm. horz. gch. 84.86 -44.57 1.74 -10.52 -6.12 -1.44 0.68 --- ---
Béton 16.15 -93.02 -10.72 1.64 -1.86 0.47 0.18 --- ---
Arm. transve. 3.43 -42.59 -20.14 14.72 --- --- --- 4.91 0.36
R+6
Arm. vert. drt. 79.74 -15.25 -32.89 7.50 6.83 1.70 -0.80 --- ---
(e=30.0 cm)
Arm. horz. drt. 75.46 -36.46 -1.03 -46.25 0.73 0.14 -0.09 --- ---
Arm. vert. gch. 97.28 5.35 4.63 9.37 -4.79 -1.10 -0.38 --- ---
Arm. horz. gch. 83.56 5.35 4.63 9.37 -4.79 -1.10 -0.38 --- ---
Béton 35.54 -38.88 -0.99 -46.34 0.78 0.14 -0.09 --- ---
Arm. transve. 3.35 -35.99 -19.42 16.09 --- --- --- 4.77 0.37
R+5
Arm. vert. drt. 118.91 12.64 -30.51 7.54 6.58 1.64 -0.77 --- ---
(e=30.0 cm)
Arm. horz. drt. 78.85 -38.53 -1.25 -51.29 0.77 0.15 -0.11 --- ---
Arm. vert. gch. 109.59 16.98 5.76 8.82 -4.55 -1.05 -0.37 --- ---
Arm. horz. gch. 96.84 -38.08 -1.14 -51.19 -0.76 0.13 -0.11 --- ---
Béton 39.88 -42.89 -1.20 -51.26 -0.86 0.15 -0.11 --- ---
Arm. transve. 3.24 -26.62 -18.47 17.59 --- --- --- 4.59 0.37
R+4
Arm. vert. drt. 110.44 24.21 -28.41 7.60 6.13 1.53 -0.72 --- ---
(e=30.0 cm)
Arm. horz. drt. 88.56 -42.91 -1.58 -53.71 0.86 0.15 -0.12 --- ---
Arm. vert. gch. 108.06 31.30 7.14 6.62 -4.45 -1.03 -0.36 --- ---
Arm. horz. gch. 81.26 -0.76 3.67 -39.89 -0.51 -0.30 -0.14 --- ---
Béton 37.91 -37.79 -0.31 -48.57 -0.76 0.04 -0.11 --- ---
Arm. transve. 3.05 -15.57 -17.27 18.80 --- --- --- 4.37 0.36
R+3
Arm. vert. drt. 95.76 37.74 -26.46 6.11 5.80 1.45 -0.68 --- ---
(e=30.0 cm)
Arm. horz. drt. 78.68 -37.38 -0.88 -53.08 0.75 0.11 -0.12 --- ---
Arm. vert. gch. 93.88 45.87 8.50 5.82 -4.08 -0.94 -0.33 --- ---
Arm. horz. gch. 97.02 -37.38 -0.88 -53.08 -0.75 0.11 -0.12 --- ---
Béton 41.61 -41.40 -1.01 -53.24 -0.83 0.13 -0.12 --- ---
Arm. transve. 2.91 -4.29 -15.88 17.02 --- --- --- 4.12 0.34
R+2
Arm. vert. drt. 101.27 50.60 -22.48 6.87 5.25 1.25 -0.60 --- ---
(e=30.0 cm)
Arm. horz. drt. 80.79 49.56 5.09 -16.88 0.19 0.82 0.07 --- ---
Arm. vert. gch. 118.83 81.39 11.73 3.53 -3.48 -0.78 -0.30 --- ---
Arm. horz. gch. 77.67 81.35 11.72 3.54 -3.47 -0.78 -0.30 --- ---
Béton 32.82 -193.85 -22.66 2.97 -3.88 0.77 0.33 --- ---
Page 47
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3: Longueur: 210 cm [Noeud initial: 24.86;44.73 -> Noeud final: 26.97;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 26.33 68.90 9.38 -0.63 --- --- --- 2.38 -0.20
R+1
Arm. vert. drt. 122.54 143.52 12.02 -10.58 0.32 1.48 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 120.67 99.08 12.78 -18.95 0.14 1.26 0.01 --- ---
Arm. vert. gch. 117.33 143.52 12.02 -10.58 0.00 1.48 -0.02 --- ---
Arm. horz. gch. 91.70 59.57 10.38 16.82 -0.96 -0.66 0.00 --- ---
Béton 41.18 -239.75 -18.24 0.30 -4.79 0.73 0.03 --- ---
Arm. transve. 18.10 92.98 13.23 1.12 --- --- --- 2.33 -0.05
RDC
Arm. vert. drt. 101.64 115.29 10.69 50.29 0.26 0.03 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.93 14.33 -2.66 104.30 0.01 0.11 0.02 --- ---
Arm. vert. gch. 99.78 115.29 10.69 50.29 0.00 0.03 0.01 --- ---
Arm. horz. gch. 93.90 14.33 -2.66 104.30 0.00 0.11 0.02 --- ---
Béton 65.24 -72.56 -5.03 107.68 -1.45 -0.06 0.08 --- ---
Arm. transve. 16.38 54.99 -4.15 16.20 --- --- --- 1.93 0.00
SS1
Arm. vert. drt. 60.83 51.41 -6.77 44.32 0.18 0.36 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 94.36 -28.74 -6.83 81.71 0.57 0.06 0.02 --- ---
Arm. vert. gch. 60.04 56.79 6.34 16.29 -2.40 -0.64 0.20 --- ---
Arm. horz. gch. 92.53 -28.51 -6.74 81.61 -0.57 0.05 0.02 --- ---
Béton 49.46 -32.39 -7.22 81.88 -0.65 0.06 0.02 --- ---
Arm. transve. 13.24 53.49 -0.20 22.78 --- --- --- 1.61 -0.22
Mur VA18: Longueur: 105.6 cm [Noeud initial: 9.77;37.35 -> Noeud final: 9.77;38.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 121.45 37.21 2.45 15.49 12.40 9.95 4.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 256.89 35.86 2.57 14.83 12.48 10.04 4.35 --- ---
Arm. vert. gch. 161.07 -10.05 6.58 -7.39 -14.71 -11.21 -5.07 --- ---
Arm. horz. gch. 400.75 -10.51 6.48 -7.56 -14.73 -11.23 -5.08 --- ---
Béton 46.53 37.21 2.45 15.49 0.00 9.95 4.31 --- ---
Arm. transve. 13.19 -7.92 -8.09 -3.78 --- --- --- -0.97 -18.69
R+14
Arm. vert. drt. 163.00 9.37 2.76 3.53 10.42 8.39 3.71 --- ---
(e=30.0 cm)
Arm. horz. drt. 316.29 9.37 2.76 3.53 10.42 8.39 3.71 --- ---
Arm. vert. gch. 92.50 -29.16 3.68 -9.88 -12.26 -9.74 -4.34 --- ---
Arm. horz. gch. 323.78 -29.16 3.68 -9.88 -12.26 -9.74 -4.34 --- ---
Béton 32.88 9.37 2.76 3.53 0.00 8.39 3.71 --- ---
Arm. transve. 5.84 -36.31 -5.60 1.06 --- --- --- -2.58 -7.94
R+13
Arm. vert. drt. 107.43 12.33 0.50 3.49 10.32 7.01 3.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 276.18 12.33 0.50 3.49 10.32 7.01 3.24 --- ---
Arm. vert. gch. 82.15 -41.00 1.45 -8.74 -12.05 -8.09 -3.74 --- ---
Arm. horz. gch. 286.68 -41.00 1.45 -8.74 -12.05 -8.09 -3.74 --- ---
Béton 30.69 12.33 0.50 3.49 0.00 7.01 3.24 --- ---
Arm. transve. 5.62 -69.33 -3.21 2.55 --- --- --- -7.68 -2.12
R+12
Arm. vert. drt. 109.73 13.18 0.51 3.87 10.47 7.15 3.30 --- ---
(e=30.0 cm)
Arm. horz. drt. 285.12 10.10 0.60 3.24 10.62 7.28 3.35 --- ---
Arm. vert. gch. 86.82 -37.65 2.45 -7.45 -12.15 -8.29 -3.82 --- ---
Page 48
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA18: Longueur: 105.6 cm [Noeud initial: 9.77;37.35 -> Noeud final: 9.77;38.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 300.55 -38.15 2.54 -7.52 -12.18 -8.31 -3.83 --- ---
Béton 31.54 10.10 0.60 3.24 0.00 7.28 3.35 --- ---
Arm. transve. 6.01 -93.99 -3.64 -2.26 --- --- --- -8.11 -2.61
R+11
Arm. vert. drt. 130.22 3.60 1.25 3.69 12.16 10.90 4.66 --- ---
(e=30.0 cm)
Arm. horz. drt. 411.40 3.60 1.25 3.69 12.16 10.90 4.66 --- ---
Arm. vert. gch. 110.29 -41.94 5.75 -10.88 -13.93 -12.51 -5.35 --- ---
Arm. horz. gch. 448.53 -42.91 5.96 -11.05 -13.97 -12.54 -5.37 --- ---
Béton 44.09 3.60 1.25 3.69 0.00 10.90 4.66 --- ---
Arm. transve. 14.87 -82.49 -9.39 -10.54 --- --- --- -7.13 -12.47
R+10
Arm. vert. drt. 130.93 -4.31 2.30 1.73 12.68 11.79 4.97 --- ---
(e=30.0 cm)
Arm. horz. drt. 444.37 -15.85 3.06 -3.18 13.01 12.19 5.13 --- ---
Arm. vert. gch. 128.56 -30.96 4.32 -8.55 -14.74 -13.78 -5.81 --- ---
Arm. horz. gch. 494.34 -31.70 4.49 -8.68 -14.78 -13.81 -5.82 --- ---
Béton 47.01 -31.70 4.49 -8.68 0.63 -13.81 -5.82 --- ---
Arm. transve. 36.56 -53.80 -7.93 -7.68 --- --- --- -8.29 -13.73
R+9
Arm. vert. drt. 123.25 -23.82 4.13 -5.05 13.54 12.64 5.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 459.55 -24.08 4.14 -5.19 13.56 12.65 5.34 --- ---
Arm. vert. gch. 131.72 -34.05 4.82 -9.31 -15.29 -14.21 -6.01 --- ---
Arm. horz. gch. 510.19 -35.03 5.03 -9.50 -15.33 -14.24 -6.02 --- ---
Béton 48.39 -35.03 5.03 -9.50 0.70 -14.24 -6.02 --- ---
Arm. transve. 41.52 -49.29 -8.00 -7.87 --- --- --- -8.55 -14.05
R+8
Arm. vert. drt. 122.98 -26.62 5.22 -2.95 13.51 12.49 5.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 472.64 -31.38 5.08 -6.88 13.95 13.07 5.50 --- ---
Arm. vert. gch. 133.91 -37.01 5.37 -9.72 -15.68 -14.63 -6.17 --- ---
Arm. horz. gch. 525.34 -38.21 5.61 -9.96 -15.71 -14.66 -6.19 --- ---
Béton 49.73 -38.20 5.61 -9.96 0.76 -14.66 -6.19 --- ---
Arm. transve. 41.65 -55.43 -8.23 -7.93 --- --- --- -8.56 -14.05
R+7
Arm. vert. drt. 124.26 -36.86 6.43 -5.07 14.35 13.29 5.62 --- ---
(e=30.0 cm)
Arm. horz. drt. 488.54 -36.86 6.43 -5.07 14.35 13.29 5.62 --- ---
Arm. vert. gch. 135.43 -39.19 5.84 -9.93 -15.95 -14.91 -6.28 --- ---
Arm. horz. gch. 536.10 -40.56 6.10 -10.20 -15.98 -14.94 -6.30 --- ---
Béton 50.71 -40.56 6.10 -10.20 0.81 -14.94 -6.30 --- ---
Arm. transve. 51.57 -54.48 -8.10 -8.46 --- --- --- -9.06 -14.85
R+6
Arm. vert. drt. 115.23 -45.87 6.84 -10.30 14.36 13.52 5.67 --- ---
(e=30.0 cm)
Arm. horz. drt. 485.21 -45.87 6.84 -10.30 14.36 13.52 5.67 --- ---
Arm. vert. gch. 136.35 -40.64 6.24 -9.93 -16.10 -15.09 -6.35 --- ---
Arm. horz. gch. 543.28 -42.18 6.52 -10.23 -16.14 -15.12 -6.36 --- ---
Béton 51.41 -42.18 6.52 -10.23 0.84 -15.12 -6.36 --- ---
Arm. transve. 37.41 -52.98 -6.51 -6.63 --- --- --- -8.33 -13.80
R+5
Arm. vert. drt. 108.23 -54.24 7.82 -12.26 14.29 13.51 5.65 --- ---
(e=30.0 cm)
Arm. horz. drt. 482.39 -54.24 7.82 -12.26 14.29 13.51 5.65 --- ---
Arm. vert. gch. 145.13 -15.66 2.76 -8.38 -15.50 -14.55 -6.11 --- ---
Arm. horz. gch. 544.22 -42.37 6.80 -9.97 -16.08 -15.11 -6.35 --- ---
Béton 51.55 -40.67 6.49 -9.63 0.81 -15.08 -6.33 --- ---
Arm. transve. 36.55 -50.04 -6.02 -6.67 --- --- --- -8.28 -13.78
Page 49
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA18: Longueur: 105.6 cm [Noeud initial: 9.77;37.35 -> Noeud final: 9.77;38.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+4
Arm. vert. drt. 98.41 -0.45 -0.08 0.05 14.19 2.42 -0.90 --- ---
(e=30.0 cm)
Arm. horz. drt. 468.54 -62.86 8.80 -14.27 13.89 13.19 5.51 --- ---
Arm. vert. gch. 147.50 -9.68 2.43 -6.48 -15.23 -14.36 -6.01 --- ---
Arm. horz. gch. 534.11 -42.05 7.03 -9.59 -15.69 -14.81 -6.20 --- ---
Béton 50.59 -39.97 6.67 -9.17 0.80 -14.77 -6.19 --- ---
Arm. transve. 41.19 -18.96 -4.36 -7.33 --- --- --- -8.46 -14.34
R+3
Arm. vert. drt. 68.20 8.64 0.86 0.43 14.19 2.37 -0.76 --- ---
(e=30.0 cm)
Arm. horz. drt. 183.29 -73.78 9.97 -16.85 13.26 12.68 5.26 --- ---
Arm. vert. gch. 153.59 1.48 1.35 -3.87 -14.44 -13.68 -5.70 --- ---
Arm. horz. gch. 531.69 -39.04 6.99 -8.33 -15.18 -14.42 -6.01 --- ---
Béton 51.13 -37.04 6.63 -7.93 0.74 -14.38 -6.00 --- ---
Arm. transve. 119.04 -9.05 -3.00 -6.60 --- --- --- -8.47 -13.80
R+2
Arm. vert. drt. 52.15 96.66 11.22 -3.77 2.73 0.50 -0.17 --- ---
(e=30.0 cm)
Arm. horz. drt. 135.73 -90.59 4.23 -13.04 7.44 6.46 2.94 --- ---
Arm. vert. gch. 57.43 8.69 0.39 -1.67 -8.55 -7.19 -3.29 --- ---
Arm. horz. gch. 168.11 -41.39 2.66 -5.16 -8.71 -7.39 -3.38 --- ---
Béton 39.67 -286.75 0.25 7.39 5.73 0.06 -0.23 --- ---
Arm. transve. 8.33 55.07 -0.48 -9.78 --- --- --- -0.96 -0.27
R+1
Arm. vert. drt. 76.19 154.43 17.95 -17.69 1.81 0.22 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.28 58.70 32.54 -23.66 0.69 0.12 -0.00 --- ---
Arm. vert. gch. 68.88 154.45 17.95 -17.69 0.00 0.22 0.04 --- ---
Arm. horz. gch. 123.98 26.08 0.10 -1.29 -6.35 -5.23 -2.47 --- ---
Béton 80.41 -178.94 7.36 -20.68 -3.58 4.63 2.16 --- ---
Arm. transve. 21.10 47.07 -0.51 -11.99 --- --- --- -2.40 -0.80
RDC
Arm. vert. drt. 75.28 121.91 -9.45 -64.75 0.49 0.32 -0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 89.12 -268.75 23.12 146.57 5.37 0.04 0.22 --- ---
Arm. vert. gch. 71.61 121.91 -9.45 -64.75 0.00 0.32 -0.31 --- ---
Arm. horz. gch. 127.99 -268.78 23.09 146.61 -5.38 0.03 0.22 --- ---
Béton 93.40 -268.78 23.09 146.61 -5.38 0.03 0.22 --- ---
Arm. transve. 59.38 136.08 26.19 -15.83 --- --- --- -5.72 3.90
SS1
Arm. vert. drt. 23.52 20.34 0.80 31.62 0.15 0.27 -0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 94.19 -56.48 8.26 -50.71 1.13 0.49 -0.06 --- ---
Arm. vert. gch. 23.96 20.38 0.60 31.62 0.00 0.25 -0.16 --- ---
Arm. horz. gch. 75.74 -22.24 6.96 -45.27 -0.44 0.20 -0.01 --- ---
Béton 36.87 -47.41 0.23 -47.22 0.95 0.14 -0.02 --- ---
Arm. transve. 3.52 16.22 4.52 16.57 --- --- --- -4.52 2.15
Mur VA21: Longueur: 220.1 cm [Noeud initial: 17.28;37.35 -> Noeud final: 17.28;39.55]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 143.75 23.02 1.17 10.04 17.15 15.86 6.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 365.45 22.49 1.14 9.81 17.18 15.89 6.33 --- ---
Arm. vert. gch. 231.29 9.68 2.76 3.53 -16.71 -15.37 -6.15 --- ---
Arm. horz. gch. 544.43 8.79 2.73 3.13 -16.76 -15.42 -6.17 --- ---
Page 50
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA21: Longueur: 220.1 cm [Noeud initial: 17.28;37.35 -> Noeud final: 17.28;39.55]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 58.94 23.02 1.17 10.04 0.00 15.86 6.31 --- ---
Arm. transve. 247.22 9.80 2.12 0.34 --- --- --- 3.41 30.35
R+14
Arm. vert. drt. 186.45 -3.78 4.81 -0.26 16.70 18.18 5.89 --- ---
(e=30.0 cm)
Arm. horz. drt. 597.53 -3.78 4.81 -0.26 16.70 18.18 5.89 --- ---
Arm. vert. gch. 272.06 -12.97 5.07 -5.06 -16.26 -17.68 -5.73 --- ---
Arm. horz. gch. 389.30 -12.97 5.07 -5.06 -16.26 -17.68 -5.73 --- ---
Béton 52.13 -3.78 4.81 -0.26 -0.08 18.18 5.89 --- ---
Arm. transve. 106.46 -15.68 -0.94 -2.54 --- --- --- -0.47 32.21
R+13
Arm. vert. drt. 183.75 -7.93 5.16 -1.26 17.00 17.89 5.85 --- ---
(e=30.0 cm)
Arm. horz. drt. 586.40 -8.00 5.17 -1.27 17.00 17.90 5.85 --- ---
Arm. vert. gch. 166.93 -18.38 5.70 -6.23 -16.57 -17.41 -5.70 --- ---
Arm. horz. gch. 561.33 -18.38 5.70 -6.23 -16.57 -17.41 -5.70 --- ---
Béton 51.04 -8.00 5.17 -1.27 -0.16 17.90 5.85 --- ---
Arm. transve. 84.08 -24.81 -1.18 -1.96 --- --- --- -1.04 29.78
R+12
Arm. vert. drt. 185.11 -14.14 6.24 -3.02 17.63 18.62 6.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 608.06 -14.14 6.24 -3.02 17.63 18.62 6.07 --- ---
Arm. vert. gch. 167.23 -25.90 7.16 -8.35 -17.22 -18.16 -5.93 --- ---
Arm. horz. gch. 583.99 -25.90 7.16 -8.35 -17.22 -18.16 -5.93 --- ---
Béton 52.08 -14.14 6.24 -3.02 -0.28 18.62 6.07 --- ---
Arm. transve. 121.77 -34.46 -1.20 -1.48 --- --- --- -1.15 33.84
R+11
Arm. vert. drt. 186.26 -18.61 7.02 -4.49 18.13 19.10 6.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 626.31 -20.80 7.64 -4.96 18.20 19.22 6.26 --- ---
Arm. vert. gch. 166.82 -33.20 8.47 -10.45 -17.81 -18.75 -6.13 --- ---
Arm. horz. gch. 601.86 -33.20 8.47 -10.45 -17.81 -18.75 -6.13 --- ---
Béton 52.84 -19.42 7.41 -4.63 -0.39 19.15 6.25 --- ---
Arm. transve. 103.12 -46.50 -1.81 -2.18 --- --- --- -1.12 31.83
R+10
Arm. vert. drt. 186.30 -24.85 8.14 -6.19 18.65 19.70 6.42 --- ---
(e=30.0 cm)
Arm. horz. drt. 642.66 -25.93 8.57 -6.41 18.69 19.75 6.43 --- ---
Arm. vert. gch. 166.12 -40.16 9.77 -12.40 -18.33 -19.32 -6.31 --- ---
Arm. horz. gch. 619.15 -40.16 9.77 -12.40 -18.33 -19.32 -6.31 --- ---
Béton 53.54 -25.93 8.57 -6.41 -0.52 19.75 6.43 --- ---
Arm. transve. 140.54 -53.97 -1.76 -1.64 --- --- --- -1.26 35.85
R+9
Arm. vert. drt. 184.40 -30.97 9.28 -7.99 18.99 20.11 6.54 --- ---
(e=30.0 cm)
Arm. horz. drt. 654.16 -32.36 9.77 -8.30 19.03 20.15 6.55 --- ---
Arm. vert. gch. 163.50 -47.42 11.14 -14.44 -18.70 -19.75 -6.44 --- ---
Arm. horz. gch. 631.99 -47.42 11.14 -14.44 -18.70 -19.75 -6.44 --- ---
Béton 53.64 -32.36 9.77 -8.30 -0.65 20.15 6.55 --- ---
Arm. transve. 147.27 -64.03 -2.07 -1.69 --- --- --- -1.30 36.57
R+8
Arm. vert. drt. 179.54 -37.63 10.48 -9.91 19.11 20.28 6.58 --- ---
(e=30.0 cm)
Arm. horz. drt. 658.16 -39.33 11.04 -10.31 19.15 20.32 6.60 --- ---
Arm. vert. gch. 158.92 -54.19 12.45 -16.37 -18.86 -19.96 -6.49 --- ---
Arm. horz. gch. 637.77 -54.19 12.45 -16.37 -18.86 -19.96 -6.49 --- ---
Béton 53.08 -37.63 10.48 -9.91 -0.75 20.28 6.58 --- ---
Arm. transve. 152.08 -74.68 -2.38 -1.69 --- --- --- -1.34 37.09
Page 51
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA21: Longueur: 220.1 cm [Noeud initial: 17.28;37.35 -> Noeud final: 17.28;39.55]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+7
Arm. vert. drt. 175.98 -42.26 11.32 -11.35 19.20 20.35 6.61 --- ---
(e=30.0 cm)
Arm. horz. drt. 659.50 -44.28 11.93 -11.84 19.23 20.39 6.63 --- ---
Arm. vert. gch. 152.20 -60.95 13.75 -18.29 -18.83 -19.97 -6.49 --- ---
Arm. horz. gch. 640.85 -63.07 14.12 -18.83 -18.99 -20.08 -6.54 --- ---
Béton 52.61 -42.26 11.32 -11.35 -0.85 20.35 6.61 --- ---
Arm. transve. 168.89 -89.86 -2.75 -1.47 --- --- --- -1.47 38.89
R+6
Arm. vert. drt. 162.64 -48.88 12.48 -13.31 18.56 19.75 6.40 --- ---
(e=30.0 cm)
Arm. horz. drt. 645.53 -53.69 13.60 -14.51 18.78 20.02 6.48 --- ---
Arm. vert. gch. 143.12 -67.64 15.05 -20.21 -18.59 -19.76 -6.40 --- ---
Arm. horz. gch. 629.70 -67.64 15.05 -20.21 -18.59 -19.76 -6.40 --- ---
Béton 50.15 -51.33 12.92 -13.92 -1.03 19.98 6.46 --- ---
Arm. transve. 162.50 -103.23 -3.16 -1.47 --- --- --- -1.45 38.20
R+5
Arm. vert. drt. 149.06 -58.68 14.20 -16.08 18.17 19.43 6.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 626.05 -61.36 14.93 -16.77 18.20 19.46 6.28 --- ---
Arm. vert. gch. 131.08 -74.10 16.31 -22.06 -18.06 -19.26 -6.23 --- ---
Arm. horz. gch. 613.13 -74.10 16.31 -22.06 -18.06 -19.26 -6.23 --- ---
Béton 47.47 -58.68 14.20 -16.08 -1.17 19.43 6.27 --- ---
Arm. transve. 139.60 -129.23 -3.90 -1.32 --- --- --- -1.43 35.73
R+4
Arm. vert. drt. 130.70 -66.13 15.48 -18.30 17.17 18.44 5.93 --- ---
(e=30.0 cm)
Arm. horz. drt. 592.85 -69.14 16.28 -19.09 17.19 18.47 5.94 --- ---
Arm. vert. gch. 114.39 -80.14 17.54 -23.82 -17.09 -18.32 -5.90 --- ---
Arm. horz. gch. 583.33 -80.56 17.61 -23.92 -17.12 -18.35 -5.91 --- ---
Béton 43.63 -66.13 15.48 -18.30 -1.32 18.44 5.93 --- ---
Arm. transve. 121.12 -119.99 -3.74 -1.65 --- --- --- -1.39 33.74
R+3
Arm. vert. drt. 107.61 -74.78 16.71 -20.77 15.88 17.13 5.46 --- ---
(e=30.0 cm)
Arm. horz. drt. 548.42 -78.13 17.57 -21.65 15.90 17.15 5.47 --- ---
Arm. vert. gch. 94.92 -85.72 18.70 -25.46 -15.88 -17.08 -5.45 --- ---
Arm. horz. gch. 543.52 -89.59 19.64 -26.48 -15.89 -17.09 -5.46 --- ---
Béton 45.33 -101.67 21.78 -28.05 -2.03 9.48 3.00 --- ---
Arm. transve. 98.05 -132.61 -4.00 -0.94 --- --- --- -1.11 31.28
R+2
Arm. vert. drt. 53.42 -132.00 26.15 -35.82 -2.64 2.51 0.78 --- ---
(e=30.0 cm)
Arm. horz. drt. 409.93 -88.63 19.20 -24.61 10.61 12.84 4.01 --- ---
Arm. vert. gch. 52.62 -135.59 28.98 -38.11 2.71 0.18 0.04 --- ---
Arm. horz. gch. 409.56 -94.81 19.84 -27.33 -10.72 -12.89 -4.04 --- ---
Béton 47.34 -253.81 1.10 2.14 5.08 0.00 -0.02 --- ---
Arm. transve. 11.14 -154.40 -5.50 -3.48 --- --- --- 1.44 -15.89
R+1
Arm. vert. drt. 62.50 -153.51 26.43 -41.08 -3.07 1.81 0.57 --- ---
(e=30.0 cm)
Arm. horz. drt. 294.66 -97.26 19.52 -27.21 7.53 9.01 2.92 --- ---
Arm. vert. gch. 58.49 -149.87 29.95 -42.28 3.00 -0.04 -0.02 --- ---
Arm. horz. gch. 310.12 -109.62 21.88 -31.67 -7.77 -9.29 -3.02 --- ---
Béton 51.07 -272.78 0.91 19.00 5.46 0.00 -0.02 --- ---
Arm. transve. 11.48 -172.23 -5.94 -0.98 --- --- --- 1.02 -16.42
RDC
Arm. vert. drt. 19.53 -358.04 -43.77 -42.23 -7.16 0.07 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.55 -271.61 -52.31 23.08 5.43 -0.18 0.26 --- ---
Page 52
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA21: Longueur: 220.1 cm [Noeud initial: 17.28;37.35 -> Noeud final: 17.28;39.55]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 19.53 -358.04 -43.77 -42.23 7.16 0.07 0.05 --- ---
Arm. horz. gch. 2.39 -271.61 -52.31 23.08 -5.43 -0.18 0.26 --- ---
Béton 61.82 -358.04 -43.77 -42.23 -7.16 0.07 0.05 --- ---
Arm. transve. 1.67 -243.68 -12.38 9.57 --- --- --- -0.74 2.28
SS1
Arm. vert. drt. 100.89 -242.13 6.30 -96.68 -4.84 -0.02 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 101.74 -181.91 17.50 -124.81 3.64 0.03 -0.00 --- ---
Arm. vert. gch. 100.25 -242.13 6.30 -96.68 4.84 -0.02 0.06 --- ---
Arm. horz. gch. 101.28 -181.91 17.50 -124.81 -3.64 0.03 -0.00 --- ---
Béton 78.57 -182.61 17.55 -124.77 -3.65 0.03 -0.00 --- ---
Arm. transve. 1.75 -233.63 5.82 -93.02 --- --- --- 0.07 0.21
Mur VA23b: Longueur: 287.818 cm [Noeud initial: 37.69;37.35 -> Noeud final: 37.69;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 234.53 1.29 0.80 3.27 15.79 13.85 5.81 --- ---
(e=30.0 cm)
Arm. horz. drt. 493.77 1.29 0.80 3.27 15.79 13.85 5.81 --- ---
Arm. vert. gch. 218.88 -1.25 -0.15 1.48 -15.03 -13.18 -5.53 --- ---
Arm. horz. gch. 463.45 -1.25 -0.15 1.48 -15.03 -13.18 -5.53 --- ---
Béton 50.27 1.29 0.80 3.27 0.00 13.85 5.81 --- ---
Arm. transve. 48.86 -18.12 5.86 2.08 --- --- --- 8.46 16.07
R+13
Arm. vert. drt. 234.16 -11.59 1.54 -1.43 12.65 11.09 3.87 --- ---
(e=30.0 cm)
Arm. horz. drt. 381.18 -12.23 1.63 -1.47 12.65 11.10 3.87 --- ---
Arm. vert. gch. 224.10 -10.57 0.63 -1.85 -12.10 -10.65 -3.72 --- ---
Arm. horz. gch. 362.29 -10.57 0.63 -1.85 -12.10 -10.65 -3.72 --- ---
Béton 31.10 -12.23 1.63 -1.47 -0.24 11.10 3.87 --- ---
Arm. transve. 6.33 -33.62 -4.50 6.10 --- --- --- 7.36 -5.30
R+12
Arm. vert. drt. 233.27 -18.96 1.97 -2.53 13.24 11.42 4.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 390.25 -19.92 2.08 -2.62 13.25 11.42 4.01 --- ---
Arm. vert. gch. 224.96 -15.87 0.93 -2.77 -12.63 -10.94 -3.84 --- ---
Arm. horz. gch. 370.74 -15.87 0.93 -2.77 -12.63 -10.94 -3.84 --- ---
Béton 31.96 -19.92 2.08 -2.62 -0.40 11.42 4.01 --- ---
Arm. transve. 6.79 -47.37 -6.23 6.97 --- --- --- 7.98 -5.57
R+11
Arm. vert. drt. 229.09 -27.00 2.43 -3.78 13.66 11.82 4.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 400.56 -27.00 2.43 -3.78 13.66 11.82 4.14 --- ---
Arm. vert. gch. 224.19 -20.97 1.18 -3.68 -13.01 -11.27 -3.95 --- ---
Arm. horz. gch. 380.83 -27.22 1.33 -5.26 -13.23 -11.44 -4.01 --- ---
Béton 32.91 -28.25 2.56 -3.92 -0.56 11.82 4.14 --- ---
Arm. transve. 6.93 -59.90 -7.68 7.38 --- --- --- 8.14 -5.68
R+10
Arm. vert. drt. 225.57 -34.28 2.83 -4.81 14.05 12.16 4.26 --- ---
(e=30.0 cm)
Arm. horz. drt. 409.78 -34.43 2.84 -4.86 14.06 12.17 4.26 --- ---
Arm. vert. gch. 219.56 -28.09 1.40 -5.59 -13.42 -11.62 -4.07 --- ---
Arm. horz. gch. 390.59 -31.45 1.56 -6.02 -13.61 -11.78 -4.13 --- ---
Béton 33.88 -35.78 2.97 -4.99 -0.72 12.17 4.26 --- ---
Arm. transve. 7.56 -78.10 -10.01 9.75 --- --- --- 8.88 -6.19
Page 53
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA23b: Longueur: 287.818 cm [Noeud initial: 37.69;37.35 -> Noeud final: 37.69;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+9
Arm. vert. drt. 219.66 -41.54 3.25 -5.87 14.32 12.42 4.35 --- ---
(e=30.0 cm)
Arm. horz. drt. 415.85 -41.62 3.24 -5.92 14.33 12.42 4.35 --- ---
Arm. vert. gch. 218.44 -31.72 1.60 -6.30 -13.66 -11.85 -4.15 --- ---
Arm. horz. gch. 400.42 -36.09 1.98 -5.77 -13.86 -12.03 -4.22 --- ---
Béton 34.65 -43.28 3.40 -6.10 -0.87 12.42 4.35 --- ---
Arm. transve. 7.69 -90.95 -11.65 11.20 --- --- --- 9.05 -6.28
R+8
Arm. vert. drt. 212.36 -46.80 3.38 -7.83 14.45 12.58 4.41 --- ---
(e=30.0 cm)
Arm. horz. drt. 416.26 -46.80 3.38 -7.83 14.45 12.58 4.41 --- ---
Arm. vert. gch. 213.44 -35.18 1.77 -7.06 -13.70 -11.90 -4.17 --- ---
Arm. horz. gch. 402.72 -42.08 2.29 -6.72 -13.99 -12.18 -4.27 --- ---
Béton 34.86 -55.70 4.07 -7.72 -1.11 12.31 4.31 --- ---
Arm. transve. 7.15 -95.89 -12.18 10.51 --- --- --- 8.42 -5.82
R+7
Arm. vert. drt. 204.32 -51.91 3.68 -8.65 14.45 12.60 4.42 --- ---
(e=30.0 cm)
Arm. horz. drt. 415.03 -51.98 3.69 -8.66 14.45 12.61 4.42 --- ---
Arm. vert. gch. 208.42 -37.75 1.93 -7.64 -13.66 -11.90 -4.17 --- ---
Arm. horz. gch. 400.75 -48.22 2.62 -7.70 -13.98 -12.19 -4.27 --- ---
Béton 35.40 -64.82 4.56 -9.00 -1.30 12.31 4.31 --- ---
Arm. transve. 7.07 -108.58 -13.74 11.53 --- --- --- 8.34 -5.74
R+6
Arm. vert. drt. 193.48 -56.77 3.97 -9.41 14.28 12.49 4.37 --- ---
(e=30.0 cm)
Arm. horz. drt. 409.05 -56.77 3.97 -9.41 14.28 12.49 4.37 --- ---
Arm. vert. gch. 198.92 -39.24 2.04 -8.11 -13.31 -11.63 -4.07 --- ---
Arm. horz. gch. 393.75 -54.65 2.96 -8.74 -13.80 -12.07 -4.23 --- ---
Béton 35.62 -75.87 5.18 -10.59 -1.52 12.02 4.20 --- ---
Arm. transve. 7.00 -121.95 -15.37 12.61 --- --- --- 8.26 -5.67
R+5
Arm. vert. drt. 178.48 -61.53 4.25 -10.14 13.89 12.19 4.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 396.87 -61.53 4.25 -10.14 13.89 12.19 4.27 --- ---
Arm. vert. gch. 189.65 -39.93 2.12 -8.45 -12.91 -11.31 -3.95 --- ---
Arm. horz. gch. 380.58 -60.96 3.29 -9.78 -13.41 -11.77 -4.12 --- ---
Béton 36.20 -86.47 5.73 -12.07 -1.73 11.70 4.09 --- ---
Arm. transve. 6.82 -135.93 -17.05 13.74 --- --- --- 8.09 -5.49
R+4
Arm. vert. drt. 156.84 -66.41 4.53 -10.85 13.16 11.61 4.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 375.06 -66.41 4.53 -10.85 13.16 11.61 4.06 --- ---
Arm. vert. gch. 180.83 -39.37 2.16 -8.59 -12.42 -10.93 -3.82 --- ---
Arm. horz. gch. 357.95 -67.02 3.63 -10.82 -12.68 -11.18 -3.91 --- ---
Béton 39.68 -124.32 7.35 -15.90 -2.49 2.90 1.01 --- ---
Arm. transve. 6.42 -150.48 -18.74 15.06 --- --- --- 7.62 -5.15
R+3
Arm. vert. drt. 129.21 -71.77 4.81 -11.58 12.19 10.84 3.75 --- ---
(e=30.0 cm)
Arm. horz. drt. 345.90 -71.77 4.81 -11.58 12.19 10.84 3.75 --- ---
Arm. vert. gch. 159.67 -44.02 2.48 -9.18 -11.73 -10.40 -3.59 --- ---
Arm. horz. gch. 334.37 -44.88 2.52 -9.25 -11.74 -10.40 -3.59 --- ---
Béton 52.05 -116.74 6.97 -16.08 -2.33 4.70 1.62 --- ---
Arm. transve. 6.10 -166.29 -21.21 17.46 --- --- --- 7.47 -4.52
R+2
Arm. vert. drt. 82.94 -135.34 7.14 -18.04 -2.71 3.59 1.35 --- ---
(e=30.0 cm)
Arm. horz. drt. 247.31 -114.53 6.28 -15.56 8.19 8.14 3.06 --- ---
Page 54
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA23b: Longueur: 287.818 cm [Noeud initial: 37.69;37.35 -> Noeud final: 37.69;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 93.67 -43.54 2.44 -9.33 -7.84 -7.79 -2.93 --- ---
Arm. horz. gch. 248.43 -43.54 2.44 -9.33 -7.84 -7.79 -2.93 --- ---
Béton 43.10 -135.34 7.14 -18.04 -2.71 3.59 1.35 --- ---
Arm. transve. 2.85 -227.23 -23.93 26.65 --- --- --- 3.23 -2.51
R+1
Arm. vert. drt. 104.60 86.43 11.78 -11.05 1.61 0.18 0.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 182.27 -149.87 7.79 -20.79 6.12 6.04 2.35 --- ---
Arm. vert. gch. 139.78 86.43 11.78 -11.05 0.00 0.18 0.09 --- ---
Arm. horz. gch. 177.49 -33.76 2.19 -9.48 -5.77 -5.67 -2.20 --- ---
Béton 67.30 -150.70 7.90 -20.98 -3.01 6.01 2.34 --- ---
Arm. transve. 4.78 44.55 11.99 -20.04 --- --- --- -0.51 0.05
RDC
Arm. vert. drt. 78.10 71.93 2.18 -14.62 0.00 0.01 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 221.25 -115.81 22.46 75.74 2.32 -0.09 0.18 --- ---
Arm. vert. gch. 82.19 71.93 2.18 -14.62 -0.14 0.01 0.14 --- ---
Arm. horz. gch. 217.01 -115.68 22.27 75.66 -2.31 -0.12 0.18 --- ---
Béton 53.36 -115.81 22.46 75.74 -2.32 -0.09 0.18 --- ---
Arm. transve. 0.51 -218.05 3.18 31.94 --- --- --- -0.53 0.49
SS1
Arm. vert. drt. 13.81 -200.46 -23.77 -0.25 -4.01 -0.09 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 91.85 -99.73 -1.08 -59.84 1.99 0.22 0.05 --- ---
Arm. vert. gch. 13.81 -200.46 -23.77 -0.25 4.01 -0.09 -0.05 --- ---
Arm. horz. gch. 1.71 -153.80 -12.56 -80.13 -3.08 0.03 0.04 --- ---
Béton 46.93 -99.73 -1.08 -59.84 1.99 0.22 0.05 --- ---
Arm. transve. 0.99 -109.30 -6.98 9.85 --- --- --- 1.37 0.29
Mur VA24: Longueur: 287.818 cm [Noeud initial: 45.20;37.35 -> Noeud final: 45.20;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 235.91 0.37 1.07 2.38 16.02 14.02 5.89 --- ---
(e=30.0 cm)
Arm. horz. drt. 498.78 0.06 1.04 2.15 16.04 14.04 5.90 --- ---
Arm. vert. gch. 221.53 0.58 -0.22 2.36 -15.03 -13.16 -5.53 --- ---
Arm. horz. gch. 465.67 0.09 -0.27 1.99 -15.09 -13.20 -5.55 --- ---
Béton 50.33 0.37 1.07 2.38 0.00 14.02 5.89 --- ---
Arm. transve. 16.41 -16.50 4.30 1.44 --- --- --- 7.09 13.45
R+13
Arm. vert. drt. 230.87 -16.87 1.84 -2.67 12.94 11.33 3.96 --- ---
(e=30.0 cm)
Arm. horz. drt. 386.08 -16.87 1.84 -2.67 12.94 11.33 3.96 --- ---
Arm. vert. gch. 219.47 -14.50 0.92 -2.47 -12.21 -10.68 -3.73 --- ---
Arm. horz. gch. 362.10 -14.50 0.92 -2.47 -12.21 -10.68 -3.73 --- ---
Béton 31.29 -16.87 1.84 -2.67 -0.34 11.33 3.96 --- ---
Arm. transve. 7.19 -33.14 -4.24 4.83 --- --- --- 8.46 -5.86
R+12
Arm. vert. drt. 231.64 -23.17 2.07 -3.53 13.54 11.63 4.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 396.22 -24.22 2.19 -3.60 13.59 11.67 4.10 --- ---
Arm. vert. gch. 219.14 -22.18 1.31 -3.51 -12.85 -11.03 -3.88 --- ---
Arm. horz. gch. 372.35 -22.18 1.31 -3.51 -12.85 -11.03 -3.88 --- ---
Béton 32.37 -24.22 2.19 -3.60 -0.48 11.67 4.10 --- ---
Arm. transve. 6.95 -44.59 -5.46 5.11 --- --- --- 8.23 -5.61
Page 55
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA24: Longueur: 287.818 cm [Noeud initial: 45.20;37.35 -> Noeud final: 45.20;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+11
Arm. vert. drt. 231.02 -28.37 2.34 -4.38 13.91 12.02 4.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 406.81 -29.71 2.48 -4.49 13.95 12.06 4.23 --- ---
Arm. vert. gch. 215.33 -29.83 1.67 -4.55 -13.23 -11.43 -4.01 --- ---
Arm. horz. gch. 382.86 -29.83 1.67 -4.55 -13.23 -11.43 -4.01 --- ---
Béton 33.30 -29.71 2.48 -4.49 -0.59 12.06 4.23 --- ---
Arm. transve. 7.07 -54.45 -6.52 5.37 --- --- --- 8.37 -5.69
R+10
Arm. vert. drt. 231.16 -33.29 2.61 -5.20 14.31 12.37 4.34 --- ---
(e=30.0 cm)
Arm. horz. drt. 416.73 -35.29 2.77 -5.40 14.36 12.41 4.35 --- ---
Arm. vert. gch. 212.84 -36.78 2.01 -5.54 -13.65 -11.80 -4.14 --- ---
Arm. horz. gch. 392.97 -36.78 2.01 -5.54 -13.65 -11.80 -4.14 --- ---
Béton 34.22 -35.29 2.77 -5.40 -0.71 12.41 4.35 --- ---
Arm. transve. 7.12 -64.17 -7.59 5.77 --- --- --- 8.44 -5.72
R+9
Arm. vert. drt. 229.01 -38.23 2.87 -6.02 14.59 12.64 4.43 --- ---
(e=30.0 cm)
Arm. horz. drt. 423.70 -40.13 3.04 -6.22 14.63 12.68 4.44 --- ---
Arm. vert. gch. 207.12 -44.33 2.37 -6.60 -13.95 -12.08 -4.24 --- ---
Arm. horz. gch. 399.70 -44.37 2.37 -6.61 -13.95 -12.08 -4.24 --- ---
Béton 34.89 -40.13 3.04 -6.22 -0.80 12.68 4.44 --- ---
Arm. transve. 7.35 -73.84 -8.66 6.11 --- --- --- 8.73 -5.88
R+8
Arm. vert. drt. 223.53 -43.13 3.13 -6.84 14.70 12.77 4.47 --- ---
(e=30.0 cm)
Arm. horz. drt. 425.55 -45.30 3.31 -7.09 14.74 12.80 4.48 --- ---
Arm. vert. gch. 199.61 -44.71 2.40 -6.89 -13.63 -11.80 -4.13 --- ---
Arm. horz. gch. 401.82 -51.61 2.72 -7.64 -14.08 -12.23 -4.28 --- ---
Béton 35.22 -45.30 3.31 -7.09 -0.91 12.80 4.48 --- ---
Arm. transve. 7.27 -83.44 -9.72 6.51 --- --- --- 8.65 -5.81
R+7
Arm. vert. drt. 215.28 -47.89 3.38 -7.66 14.66 12.76 4.47 --- ---
(e=30.0 cm)
Arm. horz. drt. 423.00 -50.33 3.57 -7.95 14.70 12.79 4.48 --- ---
Arm. vert. gch. 188.47 -49.75 2.67 -7.70 -13.47 -11.65 -4.08 --- ---
Arm. horz. gch. 399.70 -58.95 3.08 -8.69 -14.07 -12.25 -4.29 --- ---
Béton 35.23 -51.87 3.68 -8.13 -1.04 12.76 4.47 --- ---
Arm. transve. 7.17 -92.99 -10.79 6.91 --- --- --- 8.54 -5.72
R+6
Arm. vert. drt. 204.12 -52.39 3.61 -8.45 14.46 12.61 4.41 --- ---
(e=30.0 cm)
Arm. horz. drt. 415.55 -55.10 3.81 -8.78 14.49 12.64 4.42 --- ---
Arm. vert. gch. 172.41 -66.52 3.46 -9.75 -13.90 -12.13 -4.25 --- ---
Arm. horz. gch. 392.75 -66.52 3.46 -9.75 -13.90 -12.13 -4.25 --- ---
Béton 38.06 -85.36 4.74 -11.91 1.71 -3.32 -1.17 --- ---
Arm. transve. 7.23 -102.39 -11.82 7.10 --- --- --- 8.63 -5.72
R+5
Arm. vert. drt. 188.35 -57.07 3.84 -9.26 14.03 12.28 4.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 401.75 -60.05 4.05 -9.64 14.06 12.31 4.30 --- ---
Arm. vert. gch. 153.75 -73.83 3.83 -10.80 -13.52 -11.83 -4.14 --- ---
Arm. horz. gch. 379.84 -73.83 3.83 -10.80 -13.52 -11.83 -4.14 --- ---
Béton 42.81 -96.02 5.22 -13.35 1.92 -3.56 -1.25 --- ---
Arm. transve. 6.92 -111.43 -12.83 7.42 --- --- --- 8.28 -5.44
R+4
Arm. vert. drt. 166.86 -61.16 4.04 -10.01 13.26 11.66 4.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 378.43 -61.16 4.04 -10.01 13.26 11.66 4.08 --- ---
Page 56
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA24: Longueur: 287.818 cm [Noeud initial: 45.20;37.35 -> Noeud final: 45.20;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 128.16 -81.19 4.20 -11.85 -12.77 -11.23 -3.93 --- ---
Arm. horz. gch. 357.34 -81.58 4.22 -11.89 -12.80 -11.26 -3.94 --- ---
Béton 37.46 -172.78 -21.93 -0.01 -3.46 0.01 -0.00 --- ---
Arm. transve. 5.19 -120.29 -13.83 7.56 --- --- --- 6.22 -4.06
R+3
Arm. vert. drt. 140.58 -64.98 4.22 -10.72 12.26 10.87 3.76 --- ---
(e=30.0 cm)
Arm. horz. drt. 348.47 -64.98 4.22 -10.72 12.26 10.87 3.76 --- ---
Arm. vert. gch. 97.75 -88.84 4.61 -12.96 -11.83 -10.49 -3.62 --- ---
Arm. horz. gch. 328.29 -89.33 4.63 -13.02 -11.85 -10.51 -3.63 --- ---
Béton 47.21 -105.90 5.67 -15.09 2.12 -4.75 -1.64 --- ---
Arm. transve. 6.11 -129.05 -14.81 8.41 --- --- --- 7.58 -4.38
R+2
Arm. vert. drt. 62.46 -69.90 3.87 -10.88 8.03 7.98 3.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 251.85 -70.54 3.90 -10.95 8.06 8.01 3.01 --- ---
Arm. vert. gch. 72.29 -117.89 5.69 -16.15 2.36 -3.44 -1.29 --- ---
Arm. horz. gch. 235.26 -98.67 4.69 -13.88 -7.82 -7.76 -2.92 --- ---
Béton 49.72 -111.52 5.40 -15.44 2.23 -4.82 -1.81 --- ---
Arm. transve. 2.58 -168.24 -16.06 12.12 --- --- --- 2.96 -2.21
R+1
Arm. vert. drt. 75.28 -122.82 6.08 -18.14 -2.46 3.75 1.45 --- ---
(e=30.0 cm)
Arm. horz. drt. 171.46 -88.97 4.80 -14.95 5.92 5.79 2.25 --- ---
Arm. vert. gch. 67.49 -110.64 5.29 -15.31 2.21 -5.62 -2.19 --- ---
Arm. horz. gch. 167.44 -103.45 4.74 -14.45 -5.80 -5.68 -2.21 --- ---
Béton 48.52 -216.62 -18.21 0.14 4.33 -0.03 0.02 --- ---
Arm. transve. 1.61 -174.06 -9.63 2.67 --- --- --- -2.29 0.21
RDC
Arm. vert. drt. 13.74 -245.32 -17.12 -11.39 -4.91 0.07 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.39 -242.96 -30.04 -6.73 -4.86 0.07 0.03 --- ---
Arm. vert. gch. 13.74 -245.32 -17.12 -11.39 4.91 0.07 0.03 --- ---
Arm. horz. gch. 1.45 -243.03 -30.05 -6.74 4.86 0.07 0.03 --- ---
Béton 45.82 -239.02 -0.65 -11.55 -4.78 0.01 -0.03 --- ---
Arm. transve. 0.53 -140.32 2.55 -32.99 --- --- --- -0.65 0.39
SS1
Arm. vert. drt. 76.90 1.55 15.70 -50.24 0.17 0.44 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 88.96 -125.97 -19.29 -120.51 2.52 0.12 0.04 --- ---
Arm. vert. gch. 72.59 1.55 15.70 -50.24 0.00 0.44 -0.02 --- ---
Arm. horz. gch. 87.91 -125.97 -19.29 -120.51 -2.52 0.12 0.04 --- ---
Béton 74.07 -128.94 -19.71 -121.25 2.58 0.12 0.04 --- ---
Arm. transve. 0.77 -108.80 -8.19 -80.93 --- --- --- 1.07 0.13
Mur VA25: Longueur: 321.918 cm [Noeud initial: 52.71;37.01 -> Noeud final: 52.71;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 130.72 -25.30 1.06 -7.37 19.40 2.82 1.90 --- ---
(e=30.0 cm)
Arm. horz. drt. 111.10 -25.30 1.06 -7.37 19.40 2.82 1.90 --- ---
Arm. vert. gch. 257.06 -2.58 -3.02 -0.47 -19.64 -2.84 0.59 --- ---
Arm. horz. gch. 153.81 -6.89 -3.04 12.85 -15.78 -2.31 -1.75 --- ---
Béton 30.51 -25.81 1.02 -7.24 19.37 2.82 1.89 --- ---
Arm. transve. 127.09 13.68 -5.67 6.44 --- --- --- -20.80 4.61
Page 57
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA25: Longueur: 321.918 cm [Noeud initial: 52.71;37.01 -> Noeud final: 52.71;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+13
Arm. vert. drt. 232.92 -46.10 -2.05 -2.96 19.98 3.37 0.83 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.33 -46.10 -2.05 -2.96 19.98 3.37 0.83 --- ---
Arm. vert. gch. 260.08 3.83 -0.06 0.88 -16.68 -2.82 -0.75 --- ---
Arm. horz. gch. 109.31 3.83 -0.06 0.88 -16.68 -2.82 -0.75 --- ---
Béton 33.57 -46.50 -2.08 -2.97 19.94 3.36 0.83 --- ---
Arm. transve. 7.10 -29.96 -2.63 -2.85 --- --- --- 7.50 -6.86
R+12
Arm. vert. drt. 233.80 -56.14 -2.67 -3.74 21.06 3.56 0.88 --- ---
(e=30.0 cm)
Arm. horz. drt. 105.89 -56.14 -2.67 -3.74 21.06 3.56 0.88 --- ---
Arm. vert. gch. 275.05 -14.29 -4.32 0.40 -19.83 -2.81 0.41 --- ---
Arm. horz. gch. 112.76 -4.40 -0.53 0.42 -17.75 -3.01 -0.80 --- ---
Béton 36.48 -56.75 -2.71 -3.77 21.02 3.56 0.87 --- ---
Arm. transve. 7.66 -38.72 -3.47 -2.75 --- --- --- 8.24 -7.24
R+11
Arm. vert. drt. 230.90 -65.77 -3.18 -4.38 21.83 3.69 0.91 --- ---
(e=30.0 cm)
Arm. horz. drt. 106.47 -65.77 -3.18 -4.38 21.83 3.69 0.91 --- ---
Arm. vert. gch. 266.87 -22.44 -5.32 1.10 -20.12 -2.85 0.42 --- ---
Arm. horz. gch. 115.23 -11.23 -0.90 0.04 -18.61 -3.15 -0.84 --- ---
Béton 38.96 -66.62 -3.23 -4.42 21.79 3.68 0.91 --- ---
Arm. transve. 8.54 -47.92 -4.49 -2.28 --- --- --- 8.60 -7.60
R+10
Arm. vert. drt. 228.70 -72.62 -3.62 -5.04 22.39 3.79 0.94 --- ---
(e=30.0 cm)
Arm. horz. drt. 106.18 -74.49 -3.73 -5.14 22.55 3.81 0.95 --- ---
Arm. vert. gch. 272.83 -29.03 -6.16 1.60 -21.19 -3.01 0.44 --- ---
Arm. horz. gch. 117.39 -18.80 -1.28 -0.33 -19.41 -3.29 -0.87 --- ---
Béton 41.22 -75.61 -3.79 -5.19 22.51 3.81 0.94 --- ---
Arm. transve. 11.71 -55.61 -5.35 -2.06 --- --- --- 8.89 -7.81
R+9
Arm. vert. drt. 225.41 -79.88 -4.08 -5.69 22.91 3.87 0.97 --- ---
(e=30.0 cm)
Arm. horz. drt. 105.32 -82.06 -4.20 -5.81 23.07 3.90 0.98 --- ---
Arm. vert. gch. 275.21 -34.64 -6.81 2.10 -21.93 -3.11 0.46 --- ---
Arm. horz. gch. 118.48 -26.88 -1.67 -0.69 -20.04 -3.39 -0.90 --- ---
Béton 43.05 -83.45 -4.28 -5.87 23.02 3.89 0.97 --- ---
Arm. transve. 14.70 -63.35 -6.21 -1.72 --- --- --- 9.16 -8.00
R+8
Arm. vert. drt. 218.42 -87.02 -4.53 -6.31 23.18 3.92 0.99 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.10 -87.02 -4.53 -6.31 23.18 3.92 0.99 --- ---
Arm. vert. gch. 268.76 -39.19 -7.40 2.62 -21.97 -3.13 0.45 --- ---
Arm. horz. gch. 118.06 -34.95 -2.06 -1.07 -20.44 -3.46 -0.92 --- ---
Béton 44.51 -91.17 -4.76 -6.53 23.28 3.94 0.99 --- ---
Arm. transve. 15.86 -71.32 -7.11 -1.39 --- --- --- 9.29 -8.07
R+7
Arm. vert. drt. 207.87 -93.68 -4.96 -6.92 23.16 3.91 0.99 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.39 -93.68 -4.96 -6.92 23.16 3.91 0.99 --- ---
Arm. vert. gch. 259.28 -44.20 -8.06 3.13 -21.86 -3.11 0.45 --- ---
Arm. horz. gch. 115.91 -43.49 -2.47 -1.48 -20.59 -3.49 -0.94 --- ---
Béton 45.56 -105.90 -5.58 -7.53 22.47 3.80 0.96 --- ---
Arm. transve. 14.76 -77.66 -7.86 -1.08 --- --- --- 9.27 -7.97
R+6
Arm. vert. drt. 192.47 -100.66 -5.39 -7.49 22.85 3.86 0.99 --- ---
(e=30.0 cm)
Arm. horz. drt. 93.99 -100.66 -5.39 -7.49 22.85 3.86 0.99 --- ---
Page 58
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA25: Longueur: 321.918 cm [Noeud initial: 52.71;37.01 -> Noeud final: 52.71;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 238.53 -43.55 -2.50 -1.53 -19.95 -3.38 -0.91 --- ---
Arm. horz. gch. 112.01 -51.58 -2.88 -1.91 -20.47 -3.47 -0.94 --- ---
Béton 46.69 -114.19 -6.07 -8.17 22.42 3.79 0.96 --- ---
Arm. transve. 12.99 -84.25 -8.59 -0.68 --- --- --- 9.17 -7.82
R+5
Arm. vert. drt. 168.93 -109.33 -5.82 -7.98 22.16 3.74 0.97 --- ---
(e=30.0 cm)
Arm. horz. drt. 86.66 -109.33 -5.82 -7.98 22.16 3.74 0.97 --- ---
Arm. vert. gch. 226.42 -50.13 -2.93 -2.10 -19.82 -3.35 -0.91 --- ---
Arm. horz. gch. 107.56 -50.72 -2.94 -2.10 -19.87 -3.36 -0.91 --- ---
Béton 47.55 -122.85 -6.50 -8.65 22.11 3.73 0.96 --- ---
Arm. transve. 8.30 -91.80 -9.15 0.06 --- --- --- 8.86 -7.47
R+4
Arm. vert. drt. 138.15 -120.07 -6.00 -7.73 21.17 3.58 0.89 --- ---
(e=30.0 cm)
Arm. horz. drt. 79.79 -120.07 -6.00 -7.73 21.17 3.58 0.89 --- ---
Arm. vert. gch. 206.01 -51.65 -3.42 -3.17 -18.72 -3.18 -0.83 --- ---
Arm. horz. gch. 94.48 -61.35 -3.83 -3.52 -19.25 -3.26 -0.86 --- ---
Béton 47.86 -137.25 -6.81 -8.50 20.76 3.51 0.87 --- ---
Arm. transve. 5.97 -113.08 -8.23 4.77 --- --- --- 6.91 -5.04
R+3
Arm. vert. drt. 142.82 51.36 -2.75 0.08 4.38 0.82 0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 86.34 -146.23 -4.23 -2.62 17.77 2.75 1.33 --- ---
Arm. vert. gch. 162.32 -54.95 -5.60 -7.78 -16.14 -2.49 -1.26 --- ---
Arm. horz. gch. 68.35 -55.96 -5.62 -7.75 -16.19 -2.50 -1.26 --- ---
Béton 52.02 -357.99 -15.95 26.96 7.16 -0.93 -0.56 --- ---
Arm. transve. 4.16 -165.55 -16.48 33.59 --- --- --- 5.82 1.28
R+2
Arm. vert. drt. 208.36 114.88 0.84 93.83 5.99 5.43 0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 140.22 112.39 0.72 94.68 6.02 5.48 0.38 --- ---
Arm. vert. gch. 219.67 220.79 15.34 13.43 -19.31 -1.90 -0.19 --- ---
Arm. horz. gch. 111.02 93.86 13.24 55.28 -13.41 -3.61 -1.89 --- ---
Béton 81.62 42.19 1.47 104.84 0.83 1.34 0.52 --- ---
Arm. transve. 268.82 112.39 0.72 94.68 --- --- --- -12.63 22.24
R+1
Arm. vert. drt. 172.58 430.02 28.36 -8.18 0.00 -2.73 0.36 --- ---
(e=30.0 cm)
Arm. horz. drt. 205.07 361.30 23.09 -5.74 0.00 -2.47 0.33 --- ---
Arm. vert. gch. 294.19 428.48 28.15 -7.97 -25.97 -2.74 0.36 --- ---
Arm. horz. gch. 143.75 200.70 24.74 5.26 -18.34 -4.39 -2.38 --- ---
Béton 93.43 -575.46 -41.82 18.95 25.85 2.72 -0.47 --- ---
Arm. transve. 307.27 120.99 19.51 50.96 --- --- --- 37.43 2.45
RDC
Arm. vert. drt. 104.02 174.52 20.15 -1.57 7.67 5.10 0.57 --- ---
(e=30.0 cm)
Arm. horz. drt. 135.78 174.52 20.15 -1.57 7.67 5.10 0.57 --- ---
Arm. vert. gch. 102.93 209.75 12.66 -4.99 -3.13 -1.89 1.08 --- ---
Arm. horz. gch. 89.99 209.75 12.66 -4.99 -3.13 -1.89 1.08 --- ---
Béton 55.31 -332.52 -27.21 -1.97 -6.65 2.10 -1.42 --- ---
Arm. transve. 363.56 172.61 19.94 -1.60 --- --- --- 42.11 11.51
SS1
Arm. vert. drt. 88.18 210.53 29.58 7.18 0.00 -0.90 0.56 --- ---
(e=30.0 cm)
Arm. horz. drt. 108.83 4.60 3.75 -97.48 0.00 -0.53 -0.15 --- ---
Arm. vert. gch. 109.32 210.46 29.57 7.07 -5.52 -0.91 0.56 --- ---
Arm. horz. gch. 76.31 -152.03 4.23 -111.99 -3.04 -1.08 -0.18 --- ---
Béton 88.85 -152.12 4.23 -112.18 -3.04 -1.06 -0.19 --- ---
Page 59
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA25: Longueur: 321.918 cm [Noeud initial: 52.71;37.01 -> Noeud final: 52.71;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 18.50 28.55 -6.47 -59.04 --- --- --- 2.68 1.13
Mur VA26b: Longueur: 105 cm [Noeud initial: 55.51;37.35 -> Noeud final: 56.56;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 101.37 40.85 81.79 21.79 0.00 -0.84 -0.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 254.79 40.85 81.79 21.79 0.00 -0.84 -0.29 --- ---
Arm. vert. gch. 123.30 40.85 81.79 21.79 -0.69 -0.84 -0.29 --- ---
Arm. horz. gch. 309.79 40.85 81.79 21.79 -0.69 -0.84 -0.29 --- ---
Béton 16.61 -81.79 -136.50 -43.13 1.71 1.98 0.71 --- ---
Arm. transve. 3.83 -25.21 -63.76 -11.79 --- --- --- 2.12 5.07
R+13
Arm. vert. drt. 125.46 54.57 81.94 24.85 0.00 -0.80 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 311.01 48.61 100.28 25.02 0.00 -0.97 -0.30 --- ---
Arm. vert. gch. 145.64 52.75 89.10 25.08 -0.69 -0.87 -0.27 --- ---
Arm. horz. gch. 373.08 48.61 100.28 25.02 -0.76 -0.97 -0.30 --- ---
Béton 18.96 -91.81 -165.12 -47.45 -1.84 1.86 0.59 --- ---
Arm. transve. 3.10 -42.62 -65.74 -7.65 --- --- --- 0.80 4.36
R+12
Arm. vert. drt. 133.79 58.42 85.44 26.40 0.00 -0.83 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 324.42 49.08 105.02 25.60 0.00 -1.00 -0.31 --- ---
Arm. vert. gch. 154.85 55.69 96.64 26.76 -0.73 -0.93 -0.28 --- ---
Arm. horz. gch. 388.79 49.08 105.02 25.60 -0.79 -1.00 -0.31 --- ---
Béton 19.31 -97.53 -166.53 -49.39 1.95 1.86 0.59 --- ---
Arm. transve. 3.12 -51.09 -66.70 -8.17 --- --- --- 0.76 4.40
R+11
Arm. vert. drt. 135.85 57.60 96.43 27.38 0.00 -0.93 -0.28 --- ---
(e=30.0 cm)
Arm. horz. drt. 347.91 48.80 113.73 26.48 0.00 -1.09 -0.33 --- ---
Arm. vert. gch. 158.35 57.60 96.43 27.38 -0.73 -0.93 -0.28 --- ---
Arm. horz. gch. 417.60 48.80 113.73 26.48 -0.85 -1.09 -0.33 --- ---
Béton 20.03 -101.94 -172.41 -51.47 2.04 1.92 0.61 --- ---
Arm. transve. 24.06 10.78 43.16 6.10 --- --- --- -0.32 -2.57
R+10
Arm. vert. drt. 130.40 53.36 104.18 26.90 0.00 -0.99 -0.30 --- ---
(e=30.0 cm)
Arm. horz. drt. 371.39 45.52 123.27 26.50 0.00 -1.17 -0.36 --- ---
Arm. vert. gch. 154.56 53.36 104.18 26.90 -0.78 -0.99 -0.30 --- ---
Arm. horz. gch. 446.52 45.52 123.27 26.50 -0.91 -1.17 -0.36 --- ---
Béton 20.63 -103.75 -178.38 -52.79 2.07 1.96 0.62 --- ---
Arm. transve. 28.00 -12.14 49.98 8.96 --- --- --- -0.42 -2.99
R+9
Arm. vert. drt. 122.17 47.95 109.54 25.84 0.00 -1.03 -0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 384.23 33.76 131.26 23.62 0.00 -1.24 -0.38 --- ---
Arm. vert. gch. 147.30 47.76 110.44 25.88 -0.81 -1.04 -0.32 --- ---
Arm. horz. gch. 463.43 33.76 131.26 23.62 -0.97 -1.24 -0.38 --- ---
Béton 20.80 -95.64 -182.83 -50.71 -1.91 1.98 0.63 --- ---
Arm. transve. 29.51 -26.71 52.31 10.01 --- --- --- -0.48 -3.14
R+8
Arm. vert. drt. 99.32 45.50 84.05 22.38 0.00 -0.75 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 386.58 20.11 135.90 19.78 0.00 -1.28 -0.39 --- ---
Arm. vert. gch. 71.26 34.72 121.94 22.94 -0.89 -1.14 -0.35 --- ---
Page 60
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA26b: Longueur: 105 cm [Noeud initial: 55.51;37.35 -> Noeud final: 56.56;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 462.03 20.11 135.90 19.78 -0.99 -1.28 -0.39 --- ---
Béton 20.71 -85.88 -183.23 -47.68 -1.72 1.96 0.62 --- ---
Arm. transve. 29.70 -50.02 52.08 10.65 --- --- --- -0.54 -3.16
R+7
Arm. vert. drt. 67.40 78.91 8.62 -13.94 0.00 -0.10 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 382.34 5.23 138.15 15.31 0.00 -1.29 -0.39 --- ---
Arm. vert. gch. 79.71 83.37 12.43 -9.30 -1.48 -0.16 0.17 --- ---
Arm. horz. gch. 460.63 5.23 138.15 15.31 -0.99 -1.29 -0.39 --- ---
Béton 23.87 -147.16 -19.17 -0.16 2.94 -0.22 0.07 --- ---
Arm. transve. 29.58 -69.68 51.39 11.69 --- --- --- -0.57 -3.13
R+6
Arm. vert. drt. 83.10 100.02 9.83 -14.66 0.00 -0.08 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 372.76 -11.76 137.09 9.79 0.24 -1.26 -0.38 --- ---
Arm. vert. gch. 93.17 102.78 14.77 -10.18 -1.33 -0.14 0.15 --- ---
Arm. horz. gch. 447.71 -11.76 137.09 9.79 -0.97 -1.26 -0.38 --- ---
Béton 28.49 -175.61 -22.88 -0.24 3.51 -0.27 0.09 --- ---
Arm. transve. 28.63 -89.32 49.53 12.71 --- --- --- -0.56 -3.03
R+5
Arm. vert. drt. 105.32 129.97 11.44 -15.59 0.00 -0.06 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 358.15 -38.96 132.58 0.83 0.78 -1.17 -0.36 --- ---
Arm. vert. gch. 112.54 130.91 18.20 -11.47 -1.09 -0.11 0.13 --- ---
Arm. horz. gch. 420.95 -38.96 132.58 0.83 -0.91 -1.17 -0.36 --- ---
Béton 34.17 -210.71 -27.40 -0.04 4.21 -0.31 0.11 --- ---
Arm. transve. 2.99 23.39 -64.67 -14.71 --- --- --- 0.51 4.25
R+4
Arm. vert. drt. 113.20 168.29 12.06 -14.59 0.00 -0.04 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 344.10 -78.84 121.74 -13.33 1.58 -0.98 -0.30 --- ---
Arm. vert. gch. 113.36 168.29 12.06 -14.59 -0.05 -0.04 -0.02 --- ---
Arm. horz. gch. 389.06 -78.84 121.74 -13.33 -1.58 -0.98 -0.30 --- ---
Béton 41.53 41.67 -102.13 2.13 0.00 1.09 0.35 --- ---
Arm. transve. 14.36 70.73 4.85 -14.52 --- --- --- 1.19 -0.51
R+3
Arm. vert. drt. 104.16 464.23 58.90 -59.69 0.00 -0.01 0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 94.57 331.45 48.63 -78.29 0.00 -0.26 0.07 --- ---
Arm. vert. gch. 105.46 464.23 58.90 -59.69 -0.40 -0.01 0.08 --- ---
Arm. horz. gch. 99.01 330.44 48.54 -78.37 -0.20 -0.26 0.07 --- ---
Béton 73.73 -611.66 -76.71 74.16 12.23 -0.16 0.10 --- ---
Arm. transve. 9.74 233.87 36.55 -63.38 --- --- --- 0.86 0.28
R+2
Arm. vert. drt. 84.01 335.07 31.82 -76.61 0.72 0.09 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.95 -229.63 27.04 144.59 4.59 0.09 0.06 --- ---
Arm. vert. gch. 80.84 335.07 31.82 -76.61 0.00 0.09 -0.07 --- ---
Arm. horz. gch. 69.08 -229.63 27.04 144.59 -4.59 0.09 0.06 --- ---
Béton 95.09 -95.35 2.70 158.34 1.91 -0.11 -0.07 --- ---
Arm. transve. 12.06 89.75 -6.48 -80.31 --- --- --- 0.86 1.67
R+1
Arm. vert. drt. 38.43 141.37 -9.82 51.23 0.00 -0.49 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 107.47 96.08 2.87 0.20 -0.15 -0.31 0.05 --- ---
Arm. vert. gch. 38.97 141.37 -9.82 51.23 -0.12 -0.49 0.02 --- ---
Arm. horz. gch. 92.23 -128.74 8.97 -111.71 -2.57 0.38 0.03 --- ---
Béton 68.77 -128.74 8.97 -111.71 2.57 0.38 0.03 --- ---
Arm. transve. 7.19 97.15 -20.92 46.61 --- --- --- -0.61 0.58
Page 61
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA26b: Longueur: 105 cm [Noeud initial: 55.51;37.35 -> Noeud final: 56.56;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
RDC
Arm. vert. drt. 49.56 158.73 -3.92 -82.90 0.22 0.09 0.14 --- ---
(e=50.0 cm)
Arm. horz. drt. 92.71 111.73 17.43 -88.69 0.74 0.10 -0.03 --- ---
Arm. vert. gch. 49.64 158.57 -3.94 -83.05 0.00 0.09 0.14 --- ---
Arm. horz. gch. 92.23 100.67 15.68 -91.42 0.00 0.01 -0.03 --- ---
Béton 33.02 95.53 14.92 -91.58 0.00 -0.03 -0.03 --- ---
Arm. transve. 10.55 188.50 -16.41 -41.20 --- --- --- -2.12 0.73
SS1
Arm. vert. drt. 53.12 90.22 16.44 -164.60 0.19 0.21 0.11 --- ---
(e=50.0 cm)
Arm. horz. drt. 86.11 86.43 16.12 -165.85 0.19 0.20 0.10 --- ---
Arm. vert. gch. 55.37 90.22 16.44 -164.60 0.00 0.21 0.11 --- ---
Arm. horz. gch. 126.48 86.43 16.12 -165.85 0.00 0.20 0.10 --- ---
Béton 73.15 -3.10 -19.82 -160.78 0.93 0.54 0.47 --- ---
Arm. transve. 13.57 45.08 7.83 -149.63 --- --- --- -2.11 -0.86
Mur VA15: Longueur: 125.3 cm [Noeud initial: 51.46;46.63 -> Noeud final: 52.71;46.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 115.68 170.36 21.14 -18.21 0.00 0.09 -0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 62.06 105.75 10.58 -33.58 0.16 0.05 -0.12 --- ---
Arm. vert. gch. 116.14 170.08 21.11 -18.16 -0.13 0.08 -0.11 --- ---
Arm. horz. gch. 83.97 103.17 10.87 -33.57 0.00 0.03 -0.12 --- ---
Béton 39.48 -296.34 -30.67 24.28 5.93 -0.13 0.23 --- ---
Arm. transve. 3.55 75.17 9.22 -28.29 --- --- --- 0.42 -0.06
R+1
Arm. vert. drt. 142.03 261.03 29.95 -19.22 0.55 -0.01 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 111.02 258.87 30.16 -19.62 0.46 -0.03 0.03 --- ---
Arm. vert. gch. 139.18 261.03 29.95 -19.22 0.00 -0.01 0.01 --- ---
Arm. horz. gch. 113.79 256.12 30.14 -19.74 0.00 -0.05 0.05 --- ---
Béton 55.41 -416.74 -41.70 22.73 8.33 -0.26 0.23 --- ---
Arm. transve. 15.60 46.66 -13.33 -14.11 --- --- --- -1.83 -0.28
RDC
Arm. vert. drt. 115.20 230.57 -25.05 -0.06 0.00 0.05 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 69.77 51.74 6.66 29.28 0.07 0.05 -0.02 --- ---
Arm. vert. gch. 116.15 230.57 -25.05 -0.06 -0.17 0.05 0.11 --- ---
Arm. horz. gch. 69.66 63.21 1.29 33.08 0.00 -0.03 -0.06 --- ---
Béton 56.42 -425.75 -44.02 -24.91 -8.51 0.19 0.19 --- ---
Arm. transve. 10.25 58.17 -7.40 3.35 --- --- --- -1.11 -0.49
SS1
Arm. vert. drt. 50.80 76.95 9.54 7.37 1.76 0.34 -0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 92.09 -97.75 0.81 70.47 1.96 0.14 -0.09 --- ---
Arm. vert. gch. 48.52 71.33 5.76 23.48 0.00 -0.50 -0.09 --- ---
Arm. horz. gch. 90.85 -97.75 0.81 70.47 -1.96 0.14 -0.09 --- ---
Béton 56.69 -97.75 0.81 70.47 1.96 0.14 -0.09 --- ---
Arm. transve. 2.74 -10.87 -0.50 57.02 --- --- --- 0.23 -0.13
Page 62
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA26c: Longueur: 279.8 cm [Noeud initial: 52.71;37.35 -> Noeud final: 55.51;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+1
Arm. vert. drt. 82.02 138.25 28.61 -125.34 0.00 -0.54 -0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 133.84 60.77 145.04 -141.48 0.00 -0.18 0.07 --- ---
Arm. vert. gch. 84.34 170.54 29.34 -96.50 -0.34 -1.94 0.12 --- ---
Arm. horz. gch. 136.14 60.77 145.04 -141.48 -0.00 -0.18 0.07 --- ---
Béton 88.71 -0.20 127.67 -117.45 -0.08 -0.21 0.05 --- ---
Arm. transve. 8.73 100.68 5.26 -79.98 --- --- --- 0.76 -0.27
RDC
Arm. vert. drt. 71.03 185.64 22.42 166.08 0.00 0.42 -0.21 --- ---
(e=50.0 cm)
Arm. horz. drt. 182.66 68.15 381.46 22.98 0.57 -0.57 -0.15 --- ---
Arm. vert. gch. 71.51 185.64 22.42 166.08 -0.12 0.42 -0.21 --- ---
Arm. horz. gch. 185.66 68.15 381.46 22.98 0.00 -0.57 -0.15 --- ---
Béton 69.39 -263.16 -50.22 -189.99 -6.58 -0.65 0.69 --- ---
Arm. transve. 6.62 139.46 11.72 -23.72 --- --- --- -1.82 0.39
SS1
Arm. vert. drt. 49.23 192.47 43.63 51.45 0.00 -0.09 0.07 --- ---
(e=50.0 cm)
Arm. horz. drt. 102.82 28.59 7.97 -173.92 0.39 0.13 0.14 --- ---
Arm. vert. gch. 49.84 192.51 43.40 51.34 -0.73 -0.09 0.06 --- ---
Arm. horz. gch. 102.84 28.59 7.97 -173.92 0.00 0.13 0.14 --- ---
Béton 83.09 1.92 -20.92 -185.86 0.51 0.07 0.01 --- ---
Arm. transve. 17.19 29.24 5.08 142.46 --- --- --- -3.58 0.58
Mur VA7c: Longueur: 229.9 cm [Noeud initial: 55.18;42.43 -> Noeud final: 55.18;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 97.64 75.34 10.39 11.86 2.18 0.48 0.25 --- ---
(e=20.0 cm)
Arm. horz. drt. 86.60 10.10 11.76 -14.71 2.83 0.68 -0.49 --- ---
Arm. vert. gch. 103.72 75.34 10.39 11.86 0.00 0.48 0.25 --- ---
Arm. horz. gch. 76.53 -5.63 0.57 -29.16 -0.58 -0.51 0.24 --- ---
Béton 41.93 -140.85 -18.35 0.56 2.82 -0.48 0.21 --- ---
Arm. transve. 19.10 62.56 8.58 10.62 --- --- --- -1.36 0.56
R+1
Arm. vert. drt. 126.22 121.83 14.81 -4.02 1.81 0.39 0.12 --- ---
(e=20.0 cm)
Arm. horz. drt. 97.49 110.03 18.46 10.56 0.43 0.24 0.01 --- ---
Arm. vert. gch. 98.73 121.83 14.81 -4.02 0.00 0.39 0.12 --- ---
Arm. horz. gch. 75.81 110.03 18.46 10.56 0.00 0.24 0.01 --- ---
Béton 57.40 -198.38 -23.27 -0.43 3.97 -0.29 -0.06 --- ---
Arm. transve. 25.42 68.22 -5.55 12.09 --- --- --- -1.90 -0.58
RDC
Arm. vert. drt. 109.85 109.54 8.34 -4.67 1.04 0.19 -0.27 --- ---
(e=20.0 cm)
Arm. horz. drt. 97.44 22.84 -0.10 32.94 0.24 0.28 -0.03 --- ---
Arm. vert. gch. 91.89 115.45 9.39 -0.22 0.00 0.13 -0.19 --- ---
Arm. horz. gch. 99.63 53.06 1.83 32.50 0.00 0.01 -0.08 --- ---
Béton 59.55 -201.09 -19.44 0.29 4.02 -0.22 0.29 --- ---
Arm. transve. 13.44 21.67 -1.92 13.32 --- --- --- 0.94 -0.24
SS1
Arm. vert. drt. 93.74 76.71 12.48 -9.11 1.44 0.33 -0.12 --- ---
(e=20.0 cm)
Arm. horz. drt. 102.03 -8.13 -2.61 -31.75 0.51 0.88 0.15 --- ---
Arm. vert. gch. 74.62 74.95 4.46 -20.92 0.00 -0.29 -0.07 --- ---
Arm. horz. gch. 99.37 -24.25 2.13 30.98 -0.49 -0.43 -0.08 --- ---
Page 63
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA7c: Longueur: 229.9 cm [Noeud initial: 55.18;42.43 -> Noeud final: 55.18;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 47.94 -28.60 -2.59 36.85 -0.57 0.48 -0.27 --- ---
Arm. transve. 10.20 43.88 16.22 -8.32 --- --- --- -0.71 0.21
Mur VA8c: Longueur: 246.7 cm [Noeud initial: 52.71;42.43 -> Noeud final: 55.18;42.43]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 93.17 -26.85 -15.30 -92.73 0.54 -0.19 0.01 --- ---
(e=20.0 cm)
Arm. horz. drt. 78.88 -25.20 -0.17 -86.55 0.50 0.10 -0.01 --- ---
Arm. vert. gch. 94.59 -26.85 -15.30 -92.73 -0.54 -0.19 0.01 --- ---
Arm. horz. gch. 77.43 -34.12 -5.31 -90.69 -0.68 -0.10 -0.03 --- ---
Béton 96.51 -25.20 -0.17 -86.55 0.50 0.10 -0.01 --- ---
Arm. transve. 8.09 -15.62 0.18 -75.24 --- --- --- 0.11 0.60
R+1
Arm. vert. drt. 119.68 81.83 3.38 15.45 0.00 -0.41 0.00 --- ---
(e=20.0 cm)
Arm. horz. drt. 83.73 54.30 11.87 -18.17 0.19 0.74 0.02 --- ---
Arm. vert. gch. 125.30 81.83 3.38 15.45 -0.16 -0.41 0.00 --- ---
Arm. horz. gch. 71.22 -16.03 0.61 -41.20 -0.32 0.04 -0.02 --- ---
Béton 47.08 -79.21 -0.40 -40.11 -1.58 -0.07 0.01 --- ---
Arm. transve. 3.69 44.55 -0.04 31.25 --- --- --- 0.28 0.01
RDC
Arm. vert. drt. 85.69 5.26 -2.38 83.91 0.00 0.05 -0.02 --- ---
(e=20.0 cm)
Arm. horz. drt. 81.40 -36.64 -1.26 87.40 0.73 -0.00 0.01 --- ---
Arm. vert. gch. 86.07 5.26 -2.38 83.91 -0.00 0.05 -0.02 --- ---
Arm. horz. gch. 83.41 -41.80 -0.02 87.51 -0.84 -0.07 -0.01 --- ---
Béton 98.80 -44.46 -0.26 87.69 0.89 -0.08 -0.02 --- ---
Arm. transve. 3.33 -41.80 -0.02 87.51 --- --- --- 0.22 -0.10
SS1
Arm. vert. drt. 79.05 -8.23 5.05 84.58 0.16 -0.05 -0.03 --- ---
(e=20.0 cm)
Arm. horz. drt. 84.67 -8.23 5.05 84.58 0.16 -0.05 -0.03 --- ---
Arm. vert. gch. 80.63 -8.23 5.05 84.58 -0.16 -0.05 -0.03 --- ---
Arm. horz. gch. 87.47 -8.23 5.05 84.58 -0.16 -0.05 -0.03 --- ---
Béton 87.67 -52.24 -8.59 97.67 1.04 0.01 -0.00 --- ---
Arm. transve. 5.76 -56.88 -3.04 86.33 --- --- --- 0.32 -0.25
Mur VP1: Longueur: 518.8 cm [Noeud initial: 7.43;37.35 -> Noeud final: 12.62;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
RDC
Arm. vert. drt. 148.52 190.13 36.37 41.87 1.48 0.15 -0.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.00 68.38 21.58 128.78 0.36 0.06 -0.01 --- ---
Arm. vert. gch. 138.96 190.16 36.39 41.83 0.00 0.15 -0.09 --- ---
Arm. horz. gch. 97.15 68.38 21.58 128.78 0.00 0.06 -0.01 --- ---
Béton 102.44 -45.75 -0.42 137.55 0.92 -0.13 -0.03 --- ---
Arm. transve. 5.25 -25.70 -17.98 134.00 --- --- --- 0.58 -0.19
SS1
Arm. vert. drt. 106.89 32.72 -1.03 56.34 0.00 -0.27 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 100.13 11.09 3.05 55.20 0.34 0.16 0.01 --- ---
Arm. vert. gch. 107.22 32.65 -1.14 56.38 -0.02 -0.30 0.04 --- ---
Arm. horz. gch. 101.53 32.65 -1.14 56.38 -0.02 -0.30 0.04 --- ---
Page 64
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VP1: Longueur: 518.8 cm [Noeud initial: 7.43;37.35 -> Noeud final: 12.62;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 46.92 -46.50 -0.74 61.29 0.93 0.15 -0.04 --- ---
Arm. transve. 8.22 10.69 0.25 54.23 --- --- --- 0.75 -0.23
Mur VP4: Longueur: 292.6 cm [Noeud initial: 21.94;37.35 -> Noeud final: 24.86;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 86.87 20.52 9.94 -39.00 0.27 0.18 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.57 -64.19 -15.84 96.82 1.28 0.11 -0.08 --- ---
Arm. vert. gch. 83.72 20.73 9.97 -38.94 0.00 0.17 0.03 --- ---
Arm. horz. gch. 98.35 -64.19 -15.84 96.82 -1.28 0.11 -0.08 --- ---
Béton 61.77 -115.35 -22.85 101.96 -2.31 0.29 -0.13 --- ---
Arm. transve. 6.98 -41.86 -10.47 70.62 --- --- --- -0.42 0.61
Mur VA28: Longueur: 222.1 cm [Noeud initial: 17.23;42.51 -> Noeud final: 17.23;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
RDC
Arm. vert. drt. 131.05 59.75 8.77 -9.57 0.16 0.01 -0.01 --- ---
(e=20.0 cm)
Arm. horz. drt. 93.34 19.21 4.49 27.98 0.02 -0.14 0.10 --- ---
Arm. vert. gch. 88.30 67.06 -1.89 1.83 -0.00 -0.03 0.21 --- ---
Arm. horz. gch. 88.04 19.21 4.49 27.98 0.00 -0.14 0.10 --- ---
Béton 33.92 -55.32 16.89 0.49 -1.11 0.15 0.05 --- ---
Arm. transve. 2.77 -4.72 -10.11 16.12 --- --- --- 1.10 2.17
SS1
Arm. vert. drt. 94.70 -40.87 6.16 86.09 0.82 -0.02 0.02 --- ---
(e=20.0 cm)
Arm. horz. drt. 90.92 -40.87 6.16 86.09 0.82 -0.02 0.02 --- ---
Arm. vert. gch. 93.80 -40.87 6.16 86.09 -0.82 -0.02 0.02 --- ---
Arm. horz. gch. 90.64 -40.91 6.16 86.09 -0.82 -0.02 0.02 --- ---
Béton 77.32 -40.91 6.16 86.09 -0.82 -0.02 0.02 --- ---
Arm. transve. 2.42 -70.31 11.77 57.65 --- --- --- -0.13 0.12
Mur VA27: Longueur: 176.5 cm [Noeud initial: 18.76;46.63 -> Noeud final: 20.52;46.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
RDC
Arm. vert. drt. 145.98 75.67 -1.08 4.37 0.00 -0.02 0.02 --- ---
(e=20.0 cm)
Arm. horz. drt. 79.18 1.95 1.42 29.41 0.02 -0.04 -0.05 --- ---
Arm. vert. gch. 155.66 63.39 6.78 -6.75 -0.80 -0.15 -0.00 --- ---
Arm. horz. gch. 87.89 -0.42 1.39 29.80 -0.01 -0.05 -0.06 --- ---
Béton 35.96 -150.10 -16.69 17.15 3.00 -0.15 0.03 --- ---
Arm. transve. 3.91 -19.90 -17.08 12.56 --- --- --- 1.40 -2.98
SS1
Arm. vert. drt. 102.26 66.58 7.82 26.35 3.05 0.40 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 88.76 -48.82 5.06 104.67 0.98 -0.02 -0.06 --- ---
Arm. vert. gch. 89.56 45.97 9.25 54.10 -0.86 -0.18 0.05 --- ---
Arm. horz. gch. 90.11 -48.82 5.06 104.67 -0.98 -0.02 -0.06 --- ---
Béton 64.59 -13.69 -5.72 108.81 -0.27 -0.10 0.00 --- ---
Arm. transve. 11.13 -9.49 -3.41 87.24 --- --- --- 0.47 -1.25
Page 65
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA29: Longueur: 215.7 cm [Noeud initial: 9.77;55.41 -> Noeud final: 11.93;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
RDC
Arm. vert. drt. 105.04 130.10 16.35 84.17 0.00 -1.68 0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.84 86.33 21.14 88.30 0.16 0.48 0.21 --- ---
Arm. vert. gch. 107.29 130.10 16.35 84.17 -0.29 -1.68 0.13 --- ---
Arm. horz. gch. 100.59 130.10 16.35 84.17 -0.29 -1.68 0.13 --- ---
Béton 90.70 -216.99 -35.61 -144.26 -4.34 3.28 -0.18 --- ---
Arm. transve. 34.22 83.48 20.05 86.53 --- --- --- 2.16 -2.43
SS1
Arm. vert. drt. 96.94 73.74 5.83 53.05 0.00 -0.06 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 108.21 -148.77 -20.72 -122.73 2.98 0.34 0.02 --- ---
Arm. vert. gch. 97.54 73.74 5.83 53.05 -0.12 -0.06 0.03 --- ---
Arm. horz. gch. 101.75 -148.77 -20.72 -122.73 -2.98 0.34 0.02 --- ---
Béton 75.85 -148.77 -20.72 -122.73 -2.98 0.34 0.02 --- ---
Arm. transve. 3.05 52.16 13.28 40.05 --- --- --- -0.13 0.37
Mur VP10: Longueur: 512.5 cm [Noeud initial: 24.87;55.41 -> Noeud final: 29.99;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+17
Arm. vert. drt. 199.61 76.43 242.87 -50.48 0.08 0.65 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 286.19 76.43 242.87 -50.48 0.08 0.65 -0.07 --- ---
Arm. vert. gch. 213.36 76.43 242.87 -50.48 0.00 0.65 -0.07 --- ---
Arm. horz. gch. 472.75 76.43 242.87 -50.48 0.00 0.65 -0.07 --- ---
Béton 40.30 -3.73 0.12 -52.90 -0.27 -0.15 -0.14 --- ---
Arm. transve. 18.08 17.80 19.26 -30.83 --- --- --- -0.83 -2.08
R+16
Arm. vert. drt. 70.94 80.06 9.55 -18.22 0.00 -0.38 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 341.58 27.67 166.10 -5.20 0.06 0.70 -0.21 --- ---
Arm. vert. gch. 137.64 80.06 9.55 -18.22 -1.23 -0.38 -0.06 --- ---
Arm. horz. gch. 314.40 27.67 166.10 -5.20 0.00 0.70 -0.21 --- ---
Béton 34.73 -11.03 0.06 -44.89 -0.22 0.03 -0.11 --- ---
Arm. transve. 3.88 47.81 6.12 -26.90 --- --- --- 0.49 0.03
R+15
Arm. vert. drt. 124.14 89.35 245.57 -38.57 0.08 0.41 -0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 672.46 89.35 245.57 -38.57 0.08 0.41 -0.12 --- ---
Arm. vert. gch. 120.26 89.35 245.57 -38.57 0.00 0.41 -0.12 --- ---
Arm. horz. gch. 650.68 89.35 245.57 -38.57 0.00 0.41 -0.12 --- ---
Béton 35.85 -0.04 -21.02 48.03 -0.01 -0.01 0.01 --- ---
Arm. transve. 7.26 11.77 70.03 2.17 --- --- --- -0.07 -0.91
R+14
Arm. vert. drt. 128.63 92.05 263.09 -40.75 0.02 0.28 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 714.62 92.05 263.09 -40.75 0.02 0.28 -0.06 --- ---
Arm. vert. gch. 126.77 92.05 263.09 -40.75 0.00 0.28 -0.06 --- ---
Arm. horz. gch. 700.60 92.05 263.09 -40.75 0.00 0.28 -0.06 --- ---
Béton 33.26 3.60 -0.14 43.64 0.15 0.05 -0.03 --- ---
Arm. transve. 4.56 12.83 102.92 -8.93 --- --- --- -0.07 -0.57
R+13
Arm. vert. drt. 157.30 116.69 306.57 -54.49 0.04 0.29 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 664.47 116.71 307.06 -54.48 0.04 0.29 -0.05 --- ---
Arm. vert. gch. 145.40 116.71 307.06 -54.48 0.00 0.29 -0.05 --- ---
Arm. horz. gch. 424.78 116.71 307.06 -54.48 0.00 0.29 -0.05 --- ---
Page 66
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VP10: Longueur: 512.5 cm [Noeud initial: 24.87;55.41 -> Noeud final: 29.99;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 38.20 116.69 306.57 -54.49 0.00 0.29 -0.05 --- ---
Arm. transve. 29.91 16.37 47.02 9.76 --- --- --- 0.71 -3.70
R+12
Arm. vert. drt. 165.23 125.52 333.16 -65.69 0.00 0.23 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 492.96 125.41 333.56 -65.58 0.00 0.22 -0.03 --- ---
Arm. vert. gch. 164.56 125.52 333.16 -65.69 -0.02 0.23 -0.03 --- ---
Arm. horz. gch. 487.38 125.41 333.56 -65.58 -0.02 0.22 -0.03 --- ---
Béton 42.63 125.52 333.16 -65.69 -0.02 0.23 -0.03 --- ---
Arm. transve. 35.78 26.14 60.15 -1.38 --- --- --- 0.67 -3.75
R+11
Arm. vert. drt. 170.15 129.26 355.96 -74.28 0.00 0.22 -0.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 402.88 129.26 355.96 -74.28 0.00 0.22 -0.09 --- ---
Arm. vert. gch. 168.76 129.26 355.96 -74.28 -0.07 0.22 -0.09 --- ---
Arm. horz. gch. 397.66 129.03 356.22 -74.07 -0.07 0.22 -0.09 --- ---
Béton 55.37 -15.38 0.81 -74.29 -0.31 0.16 -0.01 --- ---
Arm. transve. 31.04 20.11 71.73 -19.30 --- --- --- 0.63 -3.77
R+10
Arm. vert. drt. 171.89 126.03 382.41 -77.18 0.00 0.13 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 428.69 126.03 382.41 -77.18 0.00 0.13 -0.07 --- ---
Arm. vert. gch. 171.66 126.03 382.41 -77.18 -0.16 0.13 -0.07 --- ---
Arm. horz. gch. 425.46 126.03 382.41 -77.18 -0.16 0.13 -0.07 --- ---
Béton 61.56 -15.92 1.03 -82.64 -0.32 0.17 -0.01 --- ---
Arm. transve. 31.47 11.00 79.48 -27.18 --- --- --- 0.68 -3.82
R+9
Arm. vert. drt. 166.55 118.00 403.28 -75.93 0.00 0.04 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 445.69 118.00 403.28 -75.93 0.00 0.04 -0.04 --- ---
Arm. vert. gch. 167.61 118.00 403.28 -75.93 -0.24 0.04 -0.04 --- ---
Arm. horz. gch. 444.65 118.00 403.28 -75.93 -0.24 0.04 -0.04 --- ---
Béton 63.11 -21.08 0.18 -84.48 -0.42 0.17 -0.03 --- ---
Arm. transve. 31.56 -8.85 82.18 -31.25 --- --- --- 0.78 -3.81
R+8
Arm. vert. drt. 164.90 113.63 423.10 -77.31 0.00 -0.13 0.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 462.70 113.63 423.10 -77.31 0.00 -0.13 0.09 --- ---
Arm. vert. gch. 168.99 113.63 423.10 -77.31 -0.33 -0.13 0.09 --- ---
Arm. horz. gch. 467.00 109.29 426.69 -73.48 -0.34 -0.15 0.10 --- ---
Béton 67.72 -0.17 12.62 -90.98 -0.05 0.03 -0.01 --- ---
Arm. transve. 32.35 -23.14 90.21 -31.93 --- --- --- 0.94 -3.87
R+7
Arm. vert. drt. 158.24 107.28 433.16 -77.71 0.00 -0.23 0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 435.62 92.05 457.22 -74.34 0.00 -0.41 0.19 --- ---
Arm. vert. gch. 163.37 107.28 433.16 -77.71 -0.40 -0.23 0.13 --- ---
Arm. horz. gch. 444.75 92.05 457.22 -74.34 -0.54 -0.41 0.19 --- ---
Béton 68.84 -30.84 -0.83 -92.24 -0.62 0.18 -0.02 --- ---
Arm. transve. 31.93 -43.71 94.37 -39.09 --- --- --- 1.04 -3.84
R+6
Arm. vert. drt. 129.42 93.80 384.15 -79.41 0.00 -0.18 0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 423.05 73.57 453.45 -65.52 0.00 -0.53 0.23 --- ---
Arm. vert. gch. 133.31 93.80 384.15 -79.41 -0.39 -0.18 0.10 --- ---
Arm. horz. gch. 434.41 73.57 453.45 -65.52 -0.62 -0.53 0.23 --- ---
Béton 77.41 -29.79 -0.48 -103.67 -0.60 0.18 -0.02 --- ---
Arm. transve. 33.37 -54.42 102.81 -50.45 --- --- --- 1.10 -3.82
Page 67
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VP10: Longueur: 512.5 cm [Noeud initial: 24.87;55.41 -> Noeud final: 29.99;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+5
Arm. vert. drt. 96.64 80.12 377.59 -74.43 0.00 -0.29 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 421.01 60.43 455.69 -65.72 0.00 -0.72 0.29 --- ---
Arm. vert. gch. 92.14 148.10 14.27 -36.56 -0.88 -0.29 -0.11 --- ---
Arm. horz. gch. 249.36 60.43 455.69 -65.72 -0.75 -0.72 0.29 --- ---
Béton 83.72 -34.33 -1.03 -111.86 -0.69 0.18 -0.03 --- ---
Arm. transve. 41.48 -85.10 108.00 -62.72 --- --- --- 1.24 -3.71
R+4
Arm. vert. drt. 106.65 190.67 19.07 -42.97 0.00 -0.33 -0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 397.24 32.74 438.25 -55.14 0.00 -0.85 0.34 --- ---
Arm. vert. gch. 109.51 190.67 19.07 -42.97 -1.09 -0.33 -0.12 --- ---
Arm. horz. gch. 236.58 32.74 438.25 -55.14 -0.86 -0.85 0.34 --- ---
Béton 87.35 -193.07 52.69 0.03 -3.86 0.01 -0.04 --- ---
Arm. transve. 27.12 -71.99 104.35 -72.25 --- --- --- 0.92 -3.22
R+3
Arm. vert. drt. 99.23 181.21 22.65 -72.47 0.03 -0.08 -0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 190.20 -63.10 288.30 -42.39 1.26 -0.52 0.20 --- ---
Arm. vert. gch. 101.21 210.27 29.04 -35.67 -1.25 -0.32 -0.06 --- ---
Arm. horz. gch. 198.26 -63.30 288.70 -41.88 -1.27 -0.53 0.20 --- ---
Béton 93.05 0.02 -53.27 123.92 0.08 -0.09 0.14 --- ---
Arm. transve. 10.17 61.62 6.60 -21.01 --- --- --- -0.64 -0.99
R+2
Arm. vert. drt. 83.24 215.88 0.36 -51.90 0.00 -0.09 -0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 431.10 -44.25 337.36 -7.39 0.88 -0.74 0.28 --- ---
Arm. vert. gch. 82.93 215.88 0.36 -51.90 -0.10 -0.09 -0.10 --- ---
Arm. horz. gch. 451.02 -44.25 337.36 -7.39 -0.88 -0.74 0.28 --- ---
Béton 86.20 -239.11 74.31 -3.70 4.78 0.07 -0.15 --- ---
Arm. transve. 44.08 -101.07 77.68 -54.13 --- --- --- 0.66 -3.89
R+1
Arm. vert. drt. 92.08 224.55 36.17 -62.25 0.00 -0.12 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 212.06 -146.54 148.09 5.66 2.93 -0.43 0.02 --- ---
Arm. vert. gch. 91.84 224.55 36.17 -62.25 -0.04 -0.12 -0.07 --- ---
Arm. horz. gch. 223.64 -146.54 148.09 5.66 -2.93 -0.43 0.02 --- ---
Béton 63.83 -467.91 7.93 12.26 9.36 0.42 -0.16 --- ---
Arm. transve. 21.19 64.41 12.56 -13.60 --- --- --- -1.68 -1.99
RDC
Arm. vert. drt. 114.16 310.64 9.32 61.64 0.20 0.02 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 153.23 60.74 90.70 -138.14 0.00 -0.12 -0.12 --- ---
Arm. vert. gch. 113.10 310.65 9.31 61.62 0.00 0.03 0.05 --- ---
Arm. horz. gch. 153.24 60.69 90.71 -138.12 -0.34 -0.12 -0.12 --- ---
Béton 102.89 12.79 0.04 138.03 -0.14 -0.05 0.01 --- ---
Arm. transve. 21.83 -138.20 -11.35 96.74 --- --- --- -1.01 1.64
SS1
Arm. vert. drt. 65.95 174.36 43.57 26.26 1.08 0.22 -0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.86 24.99 11.83 103.61 0.19 0.05 -0.01 --- ---
Arm. vert. gch. 63.46 174.74 43.61 26.21 0.00 0.20 -0.17 --- ---
Arm. horz. gch. 99.19 24.99 11.83 103.61 0.00 0.05 -0.01 --- ---
Béton 80.47 -62.73 -2.76 105.34 1.25 0.30 -0.13 --- ---
Arm. transve. 20.99 87.97 17.55 -29.69 --- --- --- 2.11 1.29
Page 68
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA2d: Longueur: 539.3 cm [Noeud initial: 56.56;44.89 -> Noeud final: 56.56;50.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 1.87 -7.97 -1.19 3.01 -2.41 -0.31 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 0.74 -6.51 -9.55 14.65 0.66 0.13 0.03 --- ---
Arm. vert. gch. 2.09 -6.94 1.14 2.76 2.89 0.49 0.09 --- ---
Arm. horz. gch. 0.82 -5.65 -1.43 24.34 -0.11 0.17 -0.07 --- ---
Béton 5.10 -6.86 1.33 3.24 2.89 0.50 0.09 --- ---
Arm. transve. 2.00 -2.78 2.65 15.51 --- --- --- 2.33 -1.67
R+14
Arm. vert. drt. 2.14 -14.73 -1.86 -1.96 -2.20 -0.28 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 0.77 -11.73 -1.29 21.15 0.23 -0.53 -0.04 --- ---
Arm. vert. gch. 2.56 -16.58 -0.36 1.35 2.73 0.37 -0.00 --- ---
Arm. horz. gch. 0.78 -9.53 -0.95 22.55 -0.19 0.28 -0.09 --- ---
Béton 6.66 -14.45 -0.78 0.95 2.19 0.30 0.03 --- ---
Arm. transve. 1.14 -14.06 -1.98 0.84 --- --- --- 1.56 0.03
R+13
Arm. vert. drt. 2.41 -34.69 -2.91 11.06 -0.69 -0.74 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 0.89 -18.42 -2.14 25.52 0.37 -0.51 -0.06 --- ---
Arm. vert. gch. 3.09 -28.51 -0.99 4.84 2.47 0.40 -0.04 --- ---
Arm. horz. gch. 0.91 -14.99 -1.60 27.18 -0.30 0.25 -0.07 --- ---
Béton 7.60 -28.51 -0.99 4.84 2.47 0.40 -0.04 --- ---
Arm. transve. 1.09 -32.62 -5.93 10.74 --- --- --- 1.38 -0.72
R+12
Arm. vert. drt. 3.06 -44.01 -5.68 -0.41 -0.88 -0.02 0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.01 -23.56 -3.30 29.05 0.47 -0.51 -0.05 --- ---
Arm. vert. gch. 3.68 -36.77 -2.61 3.66 2.65 0.43 -0.05 --- ---
Arm. horz. gch. 0.92 -25.50 -1.36 28.69 -0.51 0.35 -0.05 --- ---
Béton 8.86 -36.77 -2.61 3.66 2.65 0.43 -0.05 --- ---
Arm. transve. 1.19 -40.10 -7.31 7.70 --- --- --- 1.54 -0.72
R+11
Arm. vert. drt. 3.55 -45.16 -5.77 2.01 -1.60 -0.36 0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.16 -30.70 -4.48 33.67 0.61 -0.52 -0.05 --- ---
Arm. vert. gch. 4.19 -44.40 -3.86 3.03 2.78 0.45 -0.06 --- ---
Arm. horz. gch. 1.05 -27.18 -1.73 33.73 -0.54 0.21 -0.03 --- ---
Béton 10.02 -44.40 -3.86 3.03 2.78 0.45 -0.06 --- ---
Arm. transve. 1.25 -49.08 -9.04 7.02 --- --- --- 1.65 -0.72
R+10
Arm. vert. drt. 4.15 -59.75 -7.65 -1.06 -1.20 -0.08 0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.02 -30.96 -6.40 38.61 0.62 -0.10 -0.03 --- ---
Arm. vert. gch. 4.51 -50.07 -6.27 -0.46 2.77 0.45 -0.05 --- ---
Arm. horz. gch. 1.08 -29.23 -8.91 -34.65 -0.58 0.47 0.04 --- ---
Béton 10.78 -50.02 -5.04 0.36 2.77 0.35 0.04 --- ---
Arm. transve. 1.29 -53.64 -9.52 -12.90 --- --- --- 1.80 0.40
R+9
Arm. vert. drt. 4.82 -61.44 -7.76 0.12 -2.17 -0.27 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.12 -35.85 -7.31 42.76 0.72 -0.09 -0.03 --- ---
Arm. vert. gch. 5.05 -58.32 -6.95 0.25 2.86 0.47 -0.09 --- ---
Arm. horz. gch. 1.21 -34.13 -10.33 -39.28 -0.68 0.47 0.04 --- ---
Béton 12.75 -68.72 -7.97 10.71 1.37 -0.89 -0.00 --- ---
Arm. transve. 1.40 -58.50 -10.75 -14.63 --- --- --- 1.87 -0.71
R+8
Arm. vert. drt. 5.70 -81.98 -10.45 0.87 -1.64 -0.25 -0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.22 -39.79 -8.19 46.69 0.80 -0.07 -0.03 --- ---
Page 69
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA2d: Longueur: 539.3 cm [Noeud initial: 56.56;44.89 -> Noeud final: 56.56;50.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 55.10 -3.18 -2.11 32.37 -0.41 -0.11 -0.02 --- ---
Arm. horz. gch. 80.94 -3.21 -2.11 32.38 -0.41 -0.11 -0.02 --- ---
Béton 24.31 -3.21 -2.11 32.38 -0.41 -0.11 -0.02 --- ---
Arm. transve. 1.39 -70.27 -12.99 -16.11 --- --- --- 1.86 -0.72
R+7
Arm. vert. drt. 6.77 -97.40 -18.02 1.02 -1.95 -0.24 -0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.32 -40.99 -23.47 36.74 0.82 0.03 -0.07 --- ---
Arm. vert. gch. 62.65 0.91 -1.52 34.17 -0.36 -0.09 -0.01 --- ---
Arm. horz. gch. 88.22 0.59 -1.59 34.35 -0.36 -0.09 -0.01 --- ---
Béton 26.08 -2.14 -2.05 34.81 -0.39 -0.10 -0.01 --- ---
Arm. transve. 1.35 -77.92 -14.46 -17.90 --- --- --- 1.83 -0.65
R+6
Arm. vert. drt. 65.81 6.24 -0.69 35.24 0.00 -0.08 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 89.32 -2.44 -4.21 38.03 0.41 0.10 -0.04 --- ---
Arm. vert. gch. 70.62 6.24 -0.69 35.24 -0.31 -0.08 -0.01 --- ---
Arm. horz. gch. 94.31 6.20 -0.69 35.25 -0.31 -0.08 -0.01 --- ---
Béton 28.74 -2.44 -4.21 38.03 0.41 0.10 -0.04 --- ---
Arm. transve. 1.34 -92.06 -17.11 -20.96 --- --- --- 1.81 -0.66
R+5
Arm. vert. drt. 75.30 12.25 0.31 36.19 0.00 -0.07 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 96.62 11.93 0.26 36.38 0.00 -0.07 -0.01 --- ---
Arm. vert. gch. 79.10 12.25 0.31 36.19 -0.24 -0.07 -0.01 --- ---
Arm. horz. gch. 100.94 11.93 0.26 36.38 -0.24 -0.07 -0.01 --- ---
Béton 29.68 -0.85 -4.05 39.28 0.45 0.10 -0.04 --- ---
Arm. transve. 1.28 -100.98 -18.95 -22.58 --- --- --- 1.73 -0.60
R+4
Arm. vert. drt. 77.48 17.93 1.27 36.13 0.00 -0.06 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 71.30 7.25 -2.63 39.66 0.46 0.10 -0.04 --- ---
Arm. vert. gch. 85.83 17.93 1.27 36.13 -0.19 -0.06 -0.01 --- ---
Arm. horz. gch. 104.52 17.88 1.27 36.15 -0.19 -0.06 -0.01 --- ---
Béton 30.89 -2.08 -3.17 41.25 0.41 0.09 -0.00 --- ---
Arm. transve. 1.11 -115.53 -22.30 -26.68 --- --- --- 1.57 0.22
R+3
Arm. vert. drt. 82.25 48.33 7.52 -5.22 0.48 0.09 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 71.00 11.83 -1.64 38.00 0.53 0.11 -0.06 --- ---
Arm. vert. gch. 87.12 23.21 2.36 33.92 -0.07 -0.04 0.02 --- ---
Arm. horz. gch. 101.61 23.15 2.35 33.95 -0.07 -0.04 0.02 --- ---
Béton 29.81 -2.63 -3.14 39.77 0.49 0.10 -0.00 --- ---
Arm. transve. 1.87 -11.93 -3.08 25.06 --- --- --- -1.74 2.03
R+2
Arm. vert. drt. 94.64 53.38 16.24 -11.46 0.10 -0.03 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 107.44 16.53 8.89 -36.85 0.17 0.00 -0.01 --- ---
Arm. vert. gch. 93.10 53.38 16.24 -11.46 0.00 -0.03 -0.01 --- ---
Arm. horz. gch. 106.54 16.53 8.89 -36.85 0.00 0.00 -0.01 --- ---
Béton 29.93 -14.24 -0.76 39.76 -0.28 0.15 -0.01 --- ---
Arm. transve. 2.89 46.23 15.34 -10.08 --- --- --- 0.34 0.14
R+1
Arm. vert. drt. 96.14 48.34 18.94 10.47 0.83 0.24 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 91.04 12.65 6.82 43.86 0.66 0.21 -0.03 --- ---
Arm. vert. gch. 91.79 20.68 10.26 38.89 0.00 0.14 -0.02 --- ---
Arm. horz. gch. 113.87 12.65 6.82 43.86 0.00 0.21 -0.03 --- ---
Béton 33.42 5.49 5.42 44.38 0.72 0.22 -0.03 --- ---
Page 70
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA2d: Longueur: 539.3 cm [Noeud initial: 56.56;44.89 -> Noeud final: 56.56;50.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 3.07 -106.96 -42.16 8.11 --- --- --- -4.35 -0.17
RDC
Arm. vert. drt. 122.17 40.46 7.12 17.28 2.91 0.47 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.42 0.19 0.63 51.82 0.48 0.04 0.02 --- ---
Arm. vert. gch. 93.10 39.92 9.64 26.43 0.00 0.22 0.03 --- ---
Arm. horz. gch. 95.94 0.19 0.63 51.82 0.00 0.04 0.02 --- ---
Béton 39.19 -3.20 -0.22 52.54 0.50 0.05 0.02 --- ---
Arm. transve. 18.72 40.80 10.04 22.83 --- --- --- 2.36 -0.06
SS1
Arm. vert. drt. 144.27 139.66 18.00 13.88 0.00 -0.60 -0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 94.51 17.66 38.54 20.02 0.22 0.03 0.04 --- ---
Arm. vert. gch. 124.19 139.66 18.00 13.88 -4.50 -0.60 -0.15 --- ---
Arm. horz. gch. 64.33 50.48 10.51 38.78 -2.28 -1.26 -0.35 --- ---
Béton 40.05 -8.43 -3.94 50.78 0.17 -0.76 -0.30 --- ---
Arm. transve. 33.16 32.31 8.50 42.91 --- --- --- 3.91 -0.50
Mur VA26: Longueur: 465.882 cm [Noeud initial: 56.56;40.23 -> Noeud final: 56.56;44.89]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 92.34 -3.97 0.34 -0.16 6.03 1.06 0.81 --- ---
(e=30.0 cm)
Arm. horz. drt. 70.64 -3.39 0.20 -1.06 3.30 1.87 0.93 --- ---
Arm. vert. gch. 84.30 -0.55 2.34 0.69 -5.12 -0.79 -0.75 --- ---
Arm. horz. gch. 90.85 1.25 6.88 25.98 0.44 0.24 -0.60 --- ---
Béton 23.91 1.25 6.88 25.98 0.44 0.24 -0.60 --- ---
Arm. transve. 33.57 -6.13 -0.84 2.84 --- --- --- -2.71 9.50
R+14
Arm. vert. drt. 2.39 -14.33 -2.13 -1.02 -2.67 -0.30 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 0.82 -16.13 -12.60 22.24 0.32 -0.07 -0.07 --- ---
Arm. vert. gch. 2.40 -14.04 -1.57 0.18 2.71 0.34 -0.01 --- ---
Arm. horz. gch. 0.82 -16.13 -12.60 22.24 -0.32 -0.07 -0.07 --- ---
Béton 5.69 -14.04 -1.57 0.18 2.71 0.34 -0.01 --- ---
Arm. transve. 4.36 -0.75 10.05 -22.00 --- --- --- -0.18 6.24
R+13
Arm. vert. drt. 47.64 -0.28 10.80 -27.74 0.37 0.49 0.53 --- ---
(e=30.0 cm)
Arm. horz. drt. 96.17 -0.28 10.80 -27.74 0.37 0.49 0.53 --- ---
Arm. vert. gch. 52.67 -0.28 10.80 -27.74 0.37 0.49 0.53 --- ---
Arm. horz. gch. 97.59 -0.28 10.80 -27.74 0.37 0.49 0.53 --- ---
Béton 24.96 -0.72 10.75 -27.76 0.39 0.50 0.55 --- ---
Arm. transve. 2.98 -1.10 10.58 -27.44 --- --- --- -2.63 3.36
R+12
Arm. vert. drt. 55.19 -0.18 12.39 -31.86 0.32 0.46 0.50 --- ---
(e=30.0 cm)
Arm. horz. drt. 110.53 -0.18 12.39 -31.86 0.32 0.46 0.50 --- ---
Arm. vert. gch. 64.31 -0.18 12.39 -31.86 -0.00 0.46 0.50 --- ---
Arm. horz. gch. 123.51 -16.76 13.07 36.09 -0.34 0.18 -0.37 --- ---
Béton 28.75 -5.23 11.52 -31.77 0.52 0.57 0.64 --- ---
Arm. transve. 3.37 -5.77 11.28 -31.35 --- --- --- -3.03 3.76
R+11
Arm. vert. drt. 63.03 -0.47 14.09 -36.34 0.32 0.45 0.49 --- ---
(e=30.0 cm)
Arm. horz. drt. 135.35 -18.28 15.04 42.24 0.37 0.15 -0.27 --- ---
Arm. vert. gch. 72.57 -5.58 14.06 -38.36 -0.11 0.57 0.64 --- ---
Page 71
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA26: Longueur: 465.882 cm [Noeud initial: 56.56;40.23 -> Noeud final: 56.56;44.89]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 141.82 -18.28 15.04 42.24 -0.37 0.15 -0.27 --- ---
Béton 31.18 -1.22 14.00 -36.40 0.33 0.46 0.50 --- ---
Arm. transve. 3.48 -7.01 13.65 -37.86 --- --- --- -3.13 3.88
R+10
Arm. vert. drt. 70.50 -0.57 15.64 -40.42 0.32 0.45 0.48 --- ---
(e=30.0 cm)
Arm. horz. drt. 150.38 -22.68 16.21 47.32 0.45 0.14 -0.24 --- ---
Arm. vert. gch. 82.01 -6.53 16.12 -43.94 -0.13 0.59 0.65 --- ---
Arm. horz. gch. 155.96 -23.78 16.13 47.57 -0.48 0.15 -0.25 --- ---
Béton 34.30 -1.47 15.54 -40.53 0.34 0.46 0.50 --- ---
Arm. transve. 3.75 -21.43 8.79 -31.08 --- --- --- -3.56 4.01
R+9
Arm. vert. drt. 78.97 -7.69 18.29 -49.91 0.51 0.59 0.66 --- ---
(e=30.0 cm)
Arm. horz. drt. 167.92 -7.69 18.29 -49.91 0.51 0.59 0.66 --- ---
Arm. vert. gch. 91.81 -7.69 18.29 -49.91 -0.15 0.59 0.66 --- ---
Arm. horz. gch. 172.35 -28.66 17.58 53.38 -0.57 0.15 -0.24 --- ---
Béton 37.10 -1.15 17.06 -44.27 0.34 0.46 0.49 --- ---
Arm. transve. 3.88 -25.66 9.86 -35.64 --- --- --- -3.70 4.15
R+8
Arm. vert. drt. 89.36 -7.83 20.60 -55.76 0.50 0.59 0.65 --- ---
(e=30.0 cm)
Arm. horz. drt. 188.30 -7.83 20.60 -55.76 0.50 0.59 0.65 --- ---
Arm. vert. gch. 92.17 -7.83 20.60 -55.76 -0.16 0.59 0.65 --- ---
Arm. horz. gch. 132.79 -7.83 20.60 -55.76 -0.16 0.59 0.65 --- ---
Béton 38.57 -0.42 18.31 -47.18 0.31 0.44 0.47 --- ---
Arm. transve. 31.06 -16.16 5.06 -45.78 --- --- --- 1.92 2.72
R+7
Arm. vert. drt. 95.82 -7.43 22.88 -61.17 0.48 0.58 0.64 --- ---
(e=30.0 cm)
Arm. horz. drt. 181.39 -7.43 22.88 -61.17 0.48 0.58 0.64 --- ---
Arm. vert. gch. 108.41 -7.43 22.88 -61.17 -0.15 0.58 0.64 --- ---
Arm. horz. gch. 185.79 -7.43 22.88 -61.17 -0.15 0.58 0.64 --- ---
Béton 41.45 -40.25 19.99 64.99 0.80 0.14 -0.21 --- ---
Arm. transve. 26.42 -17.86 5.54 -49.46 --- --- --- 1.92 2.70
R+6
Arm. vert. drt. 99.22 -7.29 25.08 -66.43 0.46 0.56 0.62 --- ---
(e=30.0 cm)
Arm. horz. drt. 160.88 -8.80 25.11 -67.04 0.48 0.58 0.65 --- ---
Arm. vert. gch. 110.91 -7.29 25.08 -66.43 -0.15 0.56 0.62 --- ---
Arm. horz. gch. 165.26 -8.80 25.11 -67.04 -0.18 0.58 0.65 --- ---
Béton 44.30 -44.05 21.47 70.64 0.88 0.14 -0.19 --- ---
Arm. transve. 25.49 -19.10 6.23 -53.76 --- --- --- 1.88 2.61
R+5
Arm. vert. drt. 105.97 -7.59 26.90 -70.74 0.42 0.53 0.59 --- ---
(e=30.0 cm)
Arm. horz. drt. 171.95 -8.48 26.97 -71.30 0.42 0.54 0.60 --- ---
Arm. vert. gch. 117.53 -8.48 26.97 -71.30 -0.17 0.54 0.60 --- ---
Arm. horz. gch. 175.96 -8.48 26.97 -71.30 -0.17 0.54 0.60 --- ---
Béton 47.06 -49.23 22.21 75.26 0.98 0.13 -0.17 --- ---
Arm. transve. 24.67 -18.33 7.30 -57.27 --- --- --- 1.84 2.51
R+4
Arm. vert. drt. 99.54 30.50 5.32 -43.43 0.70 0.23 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 125.14 -10.55 28.32 -74.85 0.35 0.50 0.56 --- ---
Arm. vert. gch. 100.75 -10.55 28.32 -74.85 -0.21 0.50 0.56 --- ---
Arm. horz. gch. 128.60 -10.58 28.32 -74.85 -0.21 0.50 0.56 --- ---
Béton 48.31 -55.07 21.88 77.81 1.10 0.17 -0.20 --- ---
Arm. transve. 26.18 -19.81 7.88 -58.85 --- --- --- 1.60 2.29
Page 72
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA26: Longueur: 465.882 cm [Noeud initial: 56.56;40.23 -> Noeud final: 56.56;44.89]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+3
Arm. vert. drt. 96.78 30.44 7.69 -44.49 0.42 0.22 0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 115.83 -10.02 27.06 -71.17 0.40 0.48 0.48 --- ---
Arm. vert. gch. 64.56 -9.99 27.06 -71.16 -0.20 0.48 0.48 --- ---
Arm. horz. gch. 160.69 -10.02 27.06 -71.17 -0.20 0.48 0.48 --- ---
Béton 47.34 -60.29 20.24 75.74 1.21 -0.07 0.06 --- ---
Arm. transve. 25.87 -18.86 8.06 -57.53 --- --- --- 2.30 2.31
R+2
Arm. vert. drt. 63.28 64.19 5.23 -23.46 0.00 0.01 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 94.05 -19.13 8.23 45.19 1.25 0.40 0.29 --- ---
Arm. vert. gch. 65.77 64.19 5.23 -23.46 -0.04 0.01 0.02 --- ---
Arm. horz. gch. 112.32 21.59 4.95 -41.67 0.00 0.05 0.05 --- ---
Béton 32.56 -193.95 -18.95 0.00 3.88 -0.53 -0.31 --- ---
Arm. transve. 6.53 11.08 -0.77 -37.12 --- --- --- 0.58 0.40
R+1
Arm. vert. drt. 75.34 76.24 10.22 9.39 1.78 0.28 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 131.76 16.82 24.28 20.37 1.25 0.66 0.16 --- ---
Arm. vert. gch. 62.30 76.24 10.22 9.39 0.00 0.28 -0.02 --- ---
Arm. horz. gch. 103.09 16.79 17.80 28.82 0.00 0.43 0.01 --- ---
Béton 31.21 -196.43 -28.91 1.23 -3.93 0.08 -0.17 --- ---
Arm. transve. 9.58 38.36 12.15 -7.67 --- --- --- -0.96 -0.38
RDC
Arm. vert. drt. 78.29 71.15 12.90 -10.90 2.29 0.52 -0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 116.18 40.01 23.57 -12.75 0.76 0.54 -0.30 --- ---
Arm. vert. gch. 58.82 71.15 12.90 -10.90 0.00 0.52 -0.14 --- ---
Arm. horz. gch. 91.44 50.73 19.65 -19.42 0.00 0.32 -0.17 --- ---
Béton 31.04 -235.79 -35.74 28.71 4.72 -0.58 -0.02 --- ---
Arm. transve. 23.82 42.61 14.97 -8.16 --- --- --- 2.56 -0.10
SS1
Arm. vert. drt. 64.83 29.83 4.37 7.17 5.12 0.65 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 86.50 13.71 5.22 31.95 0.00 -0.09 -0.01 --- ---
Arm. vert. gch. 55.82 35.65 7.43 13.45 -2.55 -0.66 0.02 --- ---
Arm. horz. gch. 108.74 -42.90 -7.56 50.79 -1.27 -0.90 0.06 --- ---
Béton 39.20 -43.32 -7.61 50.83 -1.27 -0.90 0.06 --- ---
Arm. transve. 4.11 -217.67 -40.61 53.62 --- --- --- -5.89 -0.17
Mur VP18: Longueur: 184.9 cm [Noeud initial: 29.99;55.41 -> Noeud final: 31.84;55.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 89.80 41.87 14.08 52.14 0.00 -0.42 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 94.79 15.50 17.63 58.03 0.00 0.05 0.02 --- ---
Arm. vert. gch. 68.03 41.87 14.08 52.14 -0.99 -0.42 -0.07 --- ---
Arm. horz. gch. 88.25 15.50 17.63 58.03 -0.16 0.05 0.02 --- ---
Béton 66.61 -69.46 -68.74 -111.21 1.39 -0.41 -0.10 --- ---
Arm. transve. 13.53 41.87 14.08 52.14 --- --- --- 1.21 -0.05
Page 73
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VP21: Longueur: 323.6 cm [Noeud initial: 5.92;43.13 -> Noeud final: 5.92;46.37]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 80.74 53.46 14.29 -5.20 0.00 -0.48 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 66.76 -141.25 -29.88 122.55 2.83 0.78 0.11 --- ---
Arm. vert. gch. 108.37 53.46 14.29 -5.20 -1.52 -0.48 0.15 --- ---
Arm. horz. gch. 104.02 -133.58 -25.46 120.56 -2.67 0.14 -0.07 --- ---
Béton 75.45 -141.45 -29.93 122.52 -2.83 0.78 0.12 --- ---
Arm. transve. 3.45 -122.36 -13.76 46.21 --- --- --- -4.64 0.18
Mur VP23: Longueur: 408.1 cm [Noeud initial: 5.92;37.35 -> Noeud final: 5.92;41.43]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
RDC
Arm. vert. drt. 99.40 -43.87 -23.26 154.70 1.22 0.40 -0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 69.83 -43.87 -23.26 154.70 1.22 0.40 -0.08 --- ---
Arm. vert. gch. 105.89 -43.87 -23.26 154.70 -0.88 0.40 -0.08 --- ---
Arm. horz. gch. 110.44 -43.87 -23.26 154.70 -0.88 0.40 -0.08 --- ---
Béton 92.32 -43.87 -23.26 154.70 1.22 0.40 -0.08 --- ---
Arm. transve. 5.43 -64.42 -24.26 106.26 --- --- --- 0.54 -0.36
SS1
Arm. vert. drt. 81.96 9.66 1.47 -36.01 0.70 0.41 -0.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 108.96 -50.32 -3.87 -63.50 1.01 0.45 -0.24 --- ---
Arm. vert. gch. 72.77 10.52 1.68 -36.61 0.00 0.50 0.29 --- ---
Arm. horz. gch. 99.20 -49.49 0.11 -60.69 -0.99 0.35 0.27 --- ---
Béton 50.39 -52.86 -3.95 -63.61 -1.06 0.45 -0.24 --- ---
Arm. transve. 3.64 -100.24 -3.48 -12.57 --- --- --- -4.99 -0.08
Mur VA12: Longueur: 607.4 cm [Noeud initial: 29.99;37.35 -> Noeud final: 29.99;43.42]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 289.02 2.85 0.67 -1.63 17.82 2.94 -1.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 147.94 3.46 0.75 -1.68 17.75 2.93 -1.63 --- ---
Arm. vert. gch. 157.18 -4.45 -6.33 2.92 -15.70 -1.28 -1.39 --- ---
Arm. horz. gch. 227.86 0.98 -20.08 -0.02 -10.82 -8.28 -3.01 --- ---
Béton 25.85 -26.77 -3.76 3.44 -16.11 -2.62 1.68 --- ---
Arm. transve. 36.42 -0.50 -3.96 -3.61 --- --- --- -6.08 -5.39
R+14
Arm. vert. drt. 380.81 4.44 4.33 6.66 17.17 18.64 6.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 655.32 4.44 4.33 6.66 17.17 18.64 6.14 --- ---
Arm. vert. gch. 311.21 -14.36 -0.22 -8.20 -16.39 -17.56 -5.81 --- ---
Arm. horz. gch. 590.54 -22.50 1.05 -12.51 -17.24 -18.45 -6.11 --- ---
Béton 54.82 4.44 4.33 6.66 0.00 18.64 6.14 --- ---
Arm. transve. 246.78 -14.79 4.93 4.97 --- --- --- 1.07 34.86
R+13
Arm. vert. drt. 265.81 -7.57 2.76 2.23 13.73 11.76 4.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 417.80 -7.57 2.76 2.23 13.73 11.76 4.12 --- ---
Arm. vert. gch. 234.84 -21.40 -1.04 -7.80 -14.10 -11.87 -4.15 --- ---
Arm. horz. gch. 385.24 -22.02 -0.98 -7.88 -14.14 -11.89 -4.15 --- ---
Béton 35.50 -7.57 2.76 2.23 -0.15 11.76 4.12 --- ---
Arm. transve. 8.06 -14.87 0.03 -5.80 --- --- --- -10.06 5.67
Page 74
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA12: Longueur: 607.4 cm [Noeud initial: 29.99;37.35 -> Noeud final: 29.99;43.42]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+12
Arm. vert. drt. 266.21 -12.64 3.10 1.47 14.16 12.12 4.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 430.66 -13.92 3.18 1.31 14.22 12.20 4.27 --- ---
Arm. vert. gch. 240.68 -23.57 -0.99 -8.18 -14.57 -12.31 -4.29 --- ---
Arm. horz. gch. 398.95 -24.35 -0.92 -8.28 -14.60 -12.34 -4.30 --- ---
Béton 36.50 -13.92 3.18 1.31 -0.28 12.20 4.27 --- ---
Arm. transve. 8.27 -17.20 -0.13 -6.43 --- --- --- -10.31 5.81
R+11
Arm. vert. drt. 266.17 -21.23 3.64 0.10 14.85 12.73 4.45 --- ---
(e=30.0 cm)
Arm. horz. drt. 445.73 -21.23 3.64 0.10 14.85 12.73 4.45 --- ---
Arm. vert. gch. 251.14 -24.64 -1.00 -8.33 -15.19 -12.83 -4.47 --- ---
Arm. horz. gch. 416.35 -25.59 -0.92 -8.47 -15.22 -12.86 -4.48 --- ---
Béton 37.69 -21.23 3.64 0.10 -0.42 12.73 4.45 --- ---
Arm. transve. 8.58 -22.00 -0.82 -6.15 --- --- --- -10.69 6.06
R+10
Arm. vert. drt. 268.96 -27.18 4.01 -0.65 15.45 13.24 4.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 461.61 -27.18 4.01 -0.65 15.45 13.24 4.63 --- ---
Arm. vert. gch. 260.38 -25.77 -0.98 -8.66 -15.76 -13.33 -4.64 --- ---
Arm. horz. gch. 432.35 -26.84 -0.90 -8.81 -15.79 -13.35 -4.65 --- ---
Béton 39.11 -27.18 4.01 -0.65 -0.54 13.24 4.63 --- ---
Arm. transve. 8.92 -20.38 -0.66 -6.85 --- --- --- -11.14 6.27
R+9
Arm. vert. drt. 265.21 -29.96 4.16 -1.15 15.50 13.25 4.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 468.05 -35.51 4.49 -1.87 15.75 13.53 4.73 --- ---
Arm. vert. gch. 266.43 -25.18 -1.03 -8.66 -16.02 -13.57 -4.73 --- ---
Arm. horz. gch. 440.69 -26.40 -0.93 -8.84 -16.05 -13.60 -4.74 --- ---
Béton 39.81 -35.51 4.49 -1.87 -0.71 13.53 4.73 --- ---
Arm. transve. 9.01 -19.71 -0.65 -7.17 --- --- --- -11.25 6.31
R+8
Arm. vert. drt. 263.50 -37.81 4.62 -2.37 16.03 13.73 4.80 --- ---
(e=30.0 cm)
Arm. horz. drt. 473.76 -37.81 4.62 -2.37 16.03 13.73 4.80 --- ---
Arm. vert. gch. 270.86 -23.79 -1.09 -8.57 -16.13 -13.70 -4.77 --- ---
Arm. horz. gch. 444.99 -25.16 -0.99 -8.78 -16.17 -13.72 -4.78 --- ---
Béton 40.31 -44.70 4.99 -3.17 -0.89 13.70 4.78 --- ---
Arm. transve. 9.16 -20.40 -0.83 -7.42 --- --- --- -11.44 6.42
R+7
Arm. vert. drt. 249.11 -34.08 4.19 -3.20 15.13 12.97 4.53 --- ---
(e=30.0 cm)
Arm. horz. drt. 477.15 -54.53 5.53 -4.58 16.27 14.00 4.89 --- ---
Arm. vert. gch. 279.54 -21.72 -1.19 -8.37 -16.41 -13.94 -4.86 --- ---
Arm. horz. gch. 454.01 -23.24 -1.08 -8.61 -16.44 -13.97 -4.86 --- ---
Béton 41.31 -54.53 5.53 -4.58 -1.09 14.00 4.89 --- ---
Arm. transve. 9.18 -17.24 -0.57 -7.76 --- --- --- -11.48 6.40
R+6
Arm. vert. drt. 258.19 0.39 0.80 -2.73 16.67 4.06 -0.54 --- ---
(e=30.0 cm)
Arm. horz. drt. 471.14 -65.44 6.07 -6.14 16.14 13.93 4.86 --- ---
Arm. vert. gch. 188.53 -18.49 -1.30 -8.00 -16.20 -13.80 -4.80 --- ---
Arm. horz. gch. 438.07 -20.17 -1.18 -8.26 -16.23 -13.83 -4.81 --- ---
Béton 41.65 -67.12 6.19 -6.40 -1.34 13.91 4.85 --- ---
Arm. transve. 9.11 -13.32 -0.26 -8.08 --- --- --- -11.39 6.32
R+5
Arm. vert. drt. 172.12 5.66 1.47 -2.86 16.23 3.95 -0.51 --- ---
(e=30.0 cm)
Arm. horz. drt. 483.84 -73.03 6.40 -7.35 15.85 13.70 4.78 --- ---
Page 75
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA12: Longueur: 607.4 cm [Noeud initial: 29.99;37.35 -> Noeud final: 29.99;43.42]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 194.61 -14.43 -1.42 -7.50 -15.82 -13.52 -4.70 --- ---
Arm. horz. gch. 462.30 -16.26 -1.29 -7.79 -15.85 -13.54 -4.71 --- ---
Béton 43.23 -77.09 6.62 -7.81 -1.54 13.72 4.78 --- ---
Arm. transve. 33.10 37.21 -0.03 -11.91 --- --- --- -3.23 -0.71
R+4
Arm. vert. drt. 168.84 12.07 2.32 -3.07 15.31 3.73 -0.48 --- ---
(e=30.0 cm)
Arm. horz. drt. 465.12 -84.63 6.93 -9.01 15.29 13.28 4.63 --- ---
Arm. vert. gch. 190.14 -9.60 -1.56 -6.90 -15.12 -12.97 -4.51 --- ---
Arm. horz. gch. 444.20 -11.59 -1.42 -7.22 -15.15 -12.99 -4.52 --- ---
Béton 57.58 -128.25 7.75 -15.18 -2.56 4.64 1.62 --- ---
Arm. transve. 34.57 39.78 -0.11 -12.61 --- --- --- -3.38 -0.74
R+3
Arm. vert. drt. 173.52 17.55 2.99 -2.99 15.33 3.65 -0.42 --- ---
(e=30.0 cm)
Arm. horz. drt. 440.80 -96.77 7.46 -10.75 14.59 12.74 4.39 --- ---
Arm. vert. gch. 183.57 -4.09 -1.69 -6.12 -14.25 -12.29 -4.22 --- ---
Arm. horz. gch. 421.46 -12.08 -1.26 -7.17 -14.37 -12.38 -4.25 --- ---
Béton 65.75 -146.45 8.62 -17.77 -2.93 4.66 1.62 --- ---
Arm. transve. 35.84 54.00 0.15 -11.91 --- --- --- -3.50 -0.75
R+2
Arm. vert. drt. 144.48 103.17 13.53 -6.63 4.10 0.77 -0.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 339.16 -110.93 7.21 -12.44 10.26 9.89 3.78 --- ---
Arm. vert. gch. 137.42 1.21 -1.48 -5.26 -9.82 -9.27 -3.55 --- ---
Arm. horz. gch. 323.86 -6.40 -1.15 -6.16 -9.94 -9.37 -3.58 --- ---
Béton 46.69 -168.83 8.65 -20.22 -3.38 3.66 1.40 --- ---
Arm. transve. 19.78 86.39 8.48 -14.17 --- --- --- -1.68 1.05
R+1
Arm. vert. drt. 121.90 129.52 13.45 -10.87 1.79 0.31 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 239.46 -131.31 7.80 -16.42 8.06 7.77 3.08 --- ---
Arm. vert. gch. 109.61 107.86 0.75 -11.62 -2.22 -0.17 0.12 --- ---
Arm. horz. gch. 224.43 -1.76 -1.10 -5.83 -7.60 -7.07 -2.81 --- ---
Béton 67.15 -150.09 8.16 -19.47 -3.00 5.31 2.10 --- ---
Arm. transve. 8.12 65.80 9.71 -17.21 --- --- --- -1.04 0.01
RDC
Arm. vert. drt. 97.12 118.52 9.96 6.27 0.00 -0.19 0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.41 13.55 1.92 42.90 0.91 0.36 0.19 --- ---
Arm. vert. gch. 103.31 118.42 9.94 6.36 -1.00 -0.19 0.21 --- ---
Arm. horz. gch. 111.39 4.92 -1.89 46.76 0.00 0.05 -0.08 --- ---
Béton 49.23 -291.93 -24.22 -1.49 -5.84 0.02 -0.17 --- ---
Arm. transve. 8.35 76.06 -2.44 26.61 --- --- --- -1.00 0.06
SS1
Arm. vert. drt. 118.88 88.34 11.69 20.47 4.14 1.02 0.30 --- ---
(e=30.0 cm)
Arm. horz. drt. 66.41 61.75 5.52 41.26 0.89 0.51 -0.03 --- ---
Arm. vert. gch. 90.53 61.45 4.00 46.17 -0.49 -0.19 -0.02 --- ---
Arm. horz. gch. 107.70 61.45 4.00 46.17 -0.49 -0.19 -0.02 --- ---
Béton 41.32 -185.69 -15.79 0.19 3.71 -0.20 -0.04 --- ---
Arm. transve. 21.94 49.68 11.73 20.56 --- --- --- -2.54 0.54
Page 76
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VP: Longueur: 302.5 cm [Noeud initial: 26.97;37.35 -> Noeud final: 29.99;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
RDC
Arm. vert. drt. 111.85 107.08 -21.82 80.98 0.17 0.07 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 105.35 25.32 13.30 113.86 0.00 -0.26 0.05 --- ---
Arm. vert. gch. 111.24 107.08 -21.82 80.98 0.00 0.07 -0.05 --- ---
Arm. horz. gch. 108.44 27.59 15.71 111.49 -0.21 -0.27 0.05 --- ---
Béton 86.04 -56.96 -42.38 -143.87 -1.14 0.49 -0.08 --- ---
Arm. transve. 5.13 58.07 19.45 34.76 --- --- --- -0.61 0.06
SS1
Arm. vert. drt. 124.20 88.53 14.19 47.45 0.00 -0.77 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 88.34 -4.47 29.17 64.96 0.09 0.05 0.06 --- ---
Arm. vert. gch. 125.98 88.53 14.19 47.45 -0.02 -0.77 0.00 --- ---
Arm. horz. gch. 86.37 -4.47 29.17 64.96 -0.09 0.05 0.06 --- ---
Béton 68.19 -77.93 -59.32 -114.67 -1.56 -0.10 0.02 --- ---
Arm. transve. 6.11 43.00 18.43 9.94 --- --- --- 0.72 -0.01
Mur VA3f: Longueur: 493 cm [Noeud initial: 26.97;37.35 -> Noeud final: 26.97;42.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 85.49 0.61 -0.94 -10.63 4.67 0.59 -0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 78.08 0.40 0.27 -18.53 2.47 0.82 -0.16 --- ---
Arm. vert. gch. 87.93 -10.43 -3.73 15.31 -5.16 -0.62 -0.51 --- ---
Arm. horz. gch. 95.35 -12.95 -3.22 27.98 -2.75 -0.57 -0.56 --- ---
Béton 24.82 -12.95 -3.22 27.98 -2.75 -0.57 -0.56 --- ---
Arm. transve. 5.30 -12.95 -3.20 27.67 --- --- --- 0.85 -7.54
R+14
Arm. vert. drt. 76.07 20.11 -0.04 -3.38 2.88 0.36 -0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 67.12 8.35 1.66 -15.89 1.30 0.52 -0.17 --- ---
Arm. vert. gch. 86.65 39.20 4.95 -2.42 -1.93 -0.24 -0.16 --- ---
Arm. horz. gch. 56.11 24.96 5.95 -9.53 -1.27 -0.38 -0.05 --- ---
Béton 13.00 7.95 1.60 -15.92 1.26 0.51 -0.17 --- ---
Arm. transve. 2.14 -27.68 -4.32 15.09 --- --- --- -3.06 0.06
R+13
Arm. vert. drt. 111.71 50.39 -3.77 -5.44 2.03 0.50 -0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 81.68 3.20 4.46 -22.68 1.14 0.30 -0.06 --- ---
Arm. vert. gch. 103.04 44.69 5.64 -7.23 -2.14 -0.27 -0.16 --- ---
Arm. horz. gch. 68.08 26.98 7.32 -11.70 -1.31 -0.45 -0.03 --- ---
Béton 17.43 2.58 4.40 -22.77 1.13 0.29 -0.06 --- ---
Arm. transve. 20.48 38.13 7.69 -11.43 --- --- --- 2.19 0.26
R+12
Arm. vert. drt. 84.85 57.01 -4.15 -8.95 2.35 0.56 -0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 93.40 22.20 6.28 -25.85 1.25 0.32 -0.05 --- ---
Arm. vert. gch. 106.30 40.64 5.13 -10.76 -2.45 -0.31 -0.17 --- ---
Arm. horz. gch. 77.23 18.65 0.19 -24.06 -1.16 -0.46 -0.21 --- ---
Béton 19.76 -103.10 2.79 5.79 -3.20 -0.80 0.46 --- ---
Arm. transve. 20.41 40.95 6.27 -17.03 --- --- --- 2.16 0.35
R+11
Arm. vert. drt. 85.01 51.87 -4.84 -11.65 2.48 0.58 -0.35 --- ---
(e=30.0 cm)
Arm. horz. drt. 113.12 11.87 6.08 -32.62 1.29 0.34 -0.06 --- ---
Arm. vert. gch. 66.22 36.48 2.74 -22.69 -1.10 -0.45 -0.18 --- ---
Arm. horz. gch. 87.17 11.87 6.08 -32.62 1.29 0.34 -0.06 --- ---
Page 77
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3f: Longueur: 493 cm [Noeud initial: 26.97;37.35 -> Noeud final: 26.97;42.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 25.24 10.91 6.01 -32.74 1.28 0.33 -0.06 --- ---
Arm. transve. 23.18 35.64 6.02 -21.04 --- --- --- 2.29 0.37
R+10
Arm. vert. drt. 83.08 34.34 3.13 -14.10 3.52 0.47 -0.36 --- ---
(e=30.0 cm)
Arm. horz. drt. 112.40 -9.53 5.29 -35.30 1.32 0.34 -0.07 --- ---
Arm. vert. gch. 56.19 33.52 3.75 -21.18 0.00 -0.03 0.24 --- ---
Arm. horz. gch. 80.94 1.26 -2.74 -29.91 -1.49 -0.59 -0.22 --- ---
Béton 27.73 -10.64 5.21 -35.41 1.31 0.34 -0.07 --- ---
Arm. transve. 2.80 -62.78 -12.05 15.76 --- --- --- -3.96 -0.12
R+9
Arm. vert. drt. 66.62 12.14 4.01 -11.49 4.36 0.55 -0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 115.42 -16.20 5.21 -37.10 1.42 0.37 -0.06 --- ---
Arm. vert. gch. 6.94 -100.89 -14.06 0.15 2.02 -0.08 0.03 --- ---
Arm. horz. gch. 1.03 -99.95 -16.80 0.05 -2.00 0.07 0.03 --- ---
Béton 25.22 -16.58 2.02 -31.27 1.61 0.46 -0.16 --- ---
Arm. transve. 2.88 -58.13 -11.13 16.64 --- --- --- -4.08 -0.13
R+8
Arm. vert. drt. 57.03 -2.24 3.44 -13.00 4.51 0.57 -0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 108.63 -0.64 6.01 -31.88 1.42 0.37 -0.04 --- ---
Arm. vert. gch. 7.92 -115.25 -16.21 -0.16 2.30 -0.17 -0.05 --- ---
Arm. horz. gch. 1.04 -92.02 -17.35 0.18 1.84 0.03 -0.02 --- ---
Béton 26.57 -27.84 1.23 -32.68 1.62 0.47 -0.16 --- ---
Arm. transve. 2.92 -54.20 -10.79 17.21 --- --- --- -4.15 -0.13
R+7
Arm. vert. drt. 51.36 -9.81 3.29 -13.15 4.58 0.58 -0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 119.33 -17.86 5.55 -38.35 1.44 0.39 -0.06 --- ---
Arm. vert. gch. 8.27 -120.19 -16.82 0.61 2.40 -0.15 -0.07 --- ---
Arm. horz. gch. 1.10 -59.31 -4.86 37.20 -1.19 0.70 0.22 --- ---
Béton 33.27 -49.74 3.25 -41.16 1.36 0.37 -0.07 --- ---
Arm. transve. 2.93 -43.33 -8.66 17.61 --- --- --- -4.16 -0.13
R+6
Arm. vert. drt. 88.96 28.81 3.64 18.18 4.34 0.55 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 118.77 21.79 5.32 28.76 1.99 0.72 0.23 --- ---
Arm. vert. gch. 52.88 29.42 2.71 24.11 0.00 -0.33 0.08 --- ---
Arm. horz. gch. 80.72 29.41 2.71 24.11 0.00 -0.33 0.08 --- ---
Béton 36.48 -60.89 3.03 -44.75 1.37 0.38 -0.08 --- ---
Arm. transve. 2.92 -38.41 -8.32 17.83 --- --- --- -4.14 -0.13
R+5
Arm. vert. drt. 99.42 43.81 5.53 17.05 4.15 0.52 0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 123.99 -21.26 0.05 40.93 2.08 0.72 0.20 --- ---
Arm. vert. gch. 76.70 36.44 -4.73 31.75 -1.24 -0.38 0.09 --- ---
Arm. horz. gch. 87.94 36.44 -4.73 31.75 -1.24 -0.38 0.09 --- ---
Béton 34.17 -25.64 -0.49 41.35 -0.51 0.72 0.20 --- ---
Arm. transve. 7.50 45.38 4.94 -0.52 --- --- --- -0.74 -0.13
R+4
Arm. vert. drt. 120.82 69.51 11.04 21.09 3.35 0.82 0.46 --- ---
(e=30.0 cm)
Arm. horz. drt. 100.85 63.93 10.34 27.32 1.94 0.69 0.20 --- ---
Arm. vert. gch. 96.65 55.11 -4.11 35.73 -1.17 -0.36 0.10 --- ---
Arm. horz. gch. 103.48 55.11 -4.11 35.73 -1.17 -0.36 0.10 --- ---
Béton 31.91 -8.89 -7.86 42.84 -1.28 -0.40 0.05 --- ---
Arm. transve. 34.09 44.71 6.68 17.82 --- --- --- -3.38 -0.29
Page 78
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3f: Longueur: 493 cm [Noeud initial: 26.97;37.35 -> Noeud final: 26.97;42.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+3
Arm. vert. drt. 125.65 92.94 14.46 16.05 3.42 0.84 0.48 --- ---
(e=30.0 cm)
Arm. horz. drt. 210.49 62.01 0.84 -0.88 -0.70 -0.09 0.10 --- ---
Arm. vert. gch. 106.92 83.28 -1.32 32.04 -0.95 -0.31 0.07 --- ---
Arm. horz. gch. 99.85 81.90 -1.54 32.70 -0.97 -0.32 0.07 --- ---
Béton 33.34 62.01 0.84 -0.88 -0.70 -0.09 0.10 --- ---
Arm. transve. 36.83 41.23 7.35 6.84 --- --- --- -3.34 -0.18
R+2
Arm. vert. drt. 76.60 124.85 17.15 12.77 2.26 0.49 0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 74.98 39.12 4.53 34.68 1.51 0.47 0.15 --- ---
Arm. vert. gch. 102.78 114.80 2.23 24.10 -0.64 -0.20 0.32 --- ---
Arm. horz. gch. 91.11 34.23 0.71 33.60 0.00 0.10 -0.29 --- ---
Béton 45.98 -278.88 -31.90 0.91 5.58 -0.45 -0.18 --- ---
Arm. transve. 16.32 119.67 12.96 17.51 --- --- --- -1.53 -0.84
R+1
Arm. vert. drt. 150.62 257.55 31.75 -14.85 5.05 0.93 0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 133.52 187.58 37.52 -20.31 2.06 0.81 0.21 --- ---
Arm. vert. gch. 128.40 257.55 31.75 -14.85 0.00 0.93 0.39 --- ---
Arm. horz. gch. 111.56 187.58 37.52 -20.31 0.00 0.81 0.21 --- ---
Béton 55.45 -420.37 -51.76 37.26 8.41 -1.14 -0.45 --- ---
Arm. transve. 21.89 189.02 38.46 -16.84 --- --- --- -2.17 0.15
RDC
Arm. vert. drt. 111.01 224.99 24.45 -11.70 0.23 0.12 0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 144.07 -184.43 12.03 75.40 3.69 0.87 0.06 --- ---
Arm. vert. gch. 110.51 224.99 24.45 -11.70 0.00 0.12 0.08 --- ---
Arm. horz. gch. 95.57 108.95 -7.37 -51.47 0.00 -0.43 -0.07 --- ---
Béton 54.62 -342.89 -38.01 -0.12 -6.86 0.05 -0.02 --- ---
Arm. transve. 5.47 67.04 1.94 -30.37 --- --- --- -0.50 -0.21
SS1
Arm. vert. drt. 46.96 40.60 6.80 49.19 0.03 0.02 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.32 25.36 3.31 59.78 0.00 -0.03 0.02 --- ---
Arm. vert. gch. 46.53 40.60 6.80 49.19 0.00 0.02 0.02 --- ---
Arm. horz. gch. 103.37 -2.80 -3.53 69.23 -0.12 -0.03 -0.01 --- ---
Béton 42.43 -8.96 -4.30 69.76 0.18 -0.03 -0.01 --- ---
Arm. transve. 0.49 18.22 3.11 45.63 --- --- --- 0.05 -0.03
Mur VA3b: Longueur: 493 cm [Noeud initial: 24.86;37.35 -> Noeud final: 24.86;42.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 101.31 -15.00 -3.83 15.80 6.39 0.77 0.62 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.66 -30.95 -15.04 35.46 3.76 0.79 0.83 --- ---
Arm. vert. gch. 82.85 24.77 -2.50 24.31 -1.03 0.17 0.08 --- ---
Arm. horz. gch. 88.96 9.26 1.92 29.14 -0.65 -0.24 0.05 --- ---
Béton 32.22 -30.95 -15.04 35.46 3.76 0.79 0.83 --- ---
Arm. transve. 7.08 -27.20 -14.09 34.50 --- --- --- -0.91 10.10
R+14
Arm. vert. drt. 81.04 33.60 3.05 4.05 1.70 0.43 0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 72.82 14.32 -0.96 26.29 0.28 0.11 -0.04 --- ---
Arm. vert. gch. 81.47 27.26 -0.83 19.49 -1.05 -0.14 -0.00 --- ---
Arm. horz. gch. 82.10 8.49 3.19 22.90 -1.08 -0.36 -0.06 --- ---
Page 79
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3b: Longueur: 493 cm [Noeud initial: 24.86;37.35 -> Noeud final: 24.86;42.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 19.82 14.32 -0.96 26.29 0.28 0.11 -0.04 --- ---
Arm. transve. 2.23 -37.25 -6.28 -2.38 --- --- --- 3.20 0.08
R+13
Arm. vert. drt. 82.34 36.71 3.25 -3.48 1.86 0.48 0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 29.99 32.64 4.12 -2.88 1.71 0.22 0.02 --- ---
Arm. vert. gch. 97.93 39.29 -3.26 -0.52 -2.67 -0.52 0.11 --- ---
Arm. horz. gch. 42.45 37.23 8.20 -0.21 -1.05 -0.41 0.19 --- ---
Béton 17.12 -74.71 4.00 2.17 4.13 0.94 -0.40 --- ---
Arm. transve. 2.21 -60.68 -8.89 2.76 --- --- --- 3.15 0.36
R+12
Arm. vert. drt. 82.67 30.27 2.27 -10.83 1.91 0.50 0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 64.65 9.92 -1.73 -22.14 0.78 0.41 0.13 --- ---
Arm. vert. gch. 112.62 42.63 -4.77 -6.67 -2.91 -0.56 0.13 --- ---
Arm. horz. gch. 103.93 13.05 7.83 -24.00 -1.09 -0.44 0.25 --- ---
Béton 19.84 -89.39 4.95 7.56 4.35 0.99 -0.41 --- ---
Arm. transve. 2.35 -69.79 -10.69 10.11 --- --- --- 3.34 0.37
R+11
Arm. vert. drt. 70.34 5.90 -1.51 -19.31 2.61 0.67 0.30 --- ---
(e=30.0 cm)
Arm. horz. drt. 74.75 7.48 -2.42 -26.68 0.84 0.45 0.13 --- ---
Arm. vert. gch. 105.64 34.82 -6.47 -11.84 -2.77 -0.53 0.12 --- ---
Arm. horz. gch. 119.05 5.17 7.94 -30.45 -1.14 -0.46 0.26 --- ---
Béton 24.65 5.17 7.94 -30.45 -1.14 -0.46 0.26 --- ---
Arm. transve. 2.40 -72.45 -11.21 13.71 --- --- --- 3.42 0.37
R+10
Arm. vert. drt. 6.47 -93.06 5.87 10.56 -1.86 0.94 -0.41 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.09 -61.62 -3.64 38.27 1.23 -0.73 -0.22 --- ---
Arm. vert. gch. 90.59 25.29 -6.80 -11.11 -2.73 -0.52 0.11 --- ---
Arm. horz. gch. 124.06 -10.94 7.20 -35.10 -1.17 -0.48 0.27 --- ---
Béton 28.50 -10.94 7.20 -35.10 -1.17 -0.48 0.27 --- ---
Arm. transve. 2.49 -66.59 -10.96 17.85 --- --- --- 3.55 0.38
R+9
Arm. vert. drt. 6.53 -93.90 2.46 6.76 -1.88 0.28 -0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.18 -53.61 -2.45 40.21 1.07 -0.74 -0.22 --- ---
Arm. vert. gch. 72.83 11.93 2.84 10.76 -2.46 -0.59 -0.30 --- ---
Arm. horz. gch. 123.82 -23.98 6.00 -38.18 -1.12 -0.47 0.28 --- ---
Béton 25.04 -13.35 -1.06 -32.64 -0.89 -0.28 0.07 --- ---
Arm. transve. 2.51 -66.69 -11.14 19.60 --- --- --- 3.57 0.38
R+8
Arm. vert. drt. 65.64 21.75 0.24 -24.73 0.00 -0.03 0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 78.46 0.66 -1.56 -28.04 0.74 0.35 0.00 --- ---
Arm. vert. gch. 77.28 18.38 2.32 -7.05 -2.92 -0.37 -0.06 --- ---
Arm. horz. gch. 126.34 -28.15 5.71 -40.01 -1.11 -0.47 0.28 --- ---
Béton 26.16 -29.35 5.59 -39.96 -1.09 -0.47 0.28 --- ---
Arm. transve. 2.50 -68.65 -11.47 20.19 --- --- --- 3.57 0.39
R+7
Arm. vert. drt. 76.32 15.82 -1.98 -8.53 2.84 0.37 -0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 84.76 7.33 -0.73 -29.36 0.64 0.31 0.01 --- ---
Arm. vert. gch. 91.16 28.12 3.55 -5.59 -3.04 -0.38 -0.07 --- ---
Arm. horz. gch. 109.90 -2.76 4.62 26.55 -2.24 -0.88 -0.20 --- ---
Béton 36.60 -61.86 -3.62 45.03 -1.81 -0.70 -0.21 --- ---
Arm. transve. 2.53 -2.80 4.62 26.14 --- --- --- 3.62 0.10
Page 80
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3b: Longueur: 493 cm [Noeud initial: 24.86;37.35 -> Noeud final: 24.86;42.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+6
Arm. vert. drt. 99.37 37.50 -1.86 -4.21 2.63 0.56 -0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 92.81 -2.04 -2.39 -35.94 0.57 0.26 0.02 --- ---
Arm. vert. gch. 131.29 21.65 2.74 17.33 -5.17 -0.65 -0.13 --- ---
Arm. horz. gch. 134.92 -49.54 4.51 -47.76 -1.09 -0.49 0.29 --- ---
Béton 40.30 -52.83 4.27 -47.20 1.06 -0.48 0.30 --- ---
Arm. transve. 21.06 38.91 6.51 -12.31 --- --- --- 2.27 0.10
R+5
Arm. vert. drt. 109.27 54.90 -1.89 -3.55 2.60 0.55 -0.17 --- ---
(e=30.0 cm)
Arm. horz. drt. 101.33 -10.74 10.16 21.33 4.51 1.00 -0.38 --- ---
Arm. vert. gch. 126.66 34.23 4.32 16.70 -4.96 -0.63 -0.13 --- ---
Arm. horz. gch. 95.25 -41.36 -0.72 51.13 -1.92 -0.70 -0.19 --- ---
Béton 44.17 -69.59 2.89 -52.20 1.39 -0.47 0.30 --- ---
Arm. transve. 20.68 54.96 8.21 -12.50 --- --- --- 2.23 0.11
R+4
Arm. vert. drt. 101.53 76.39 -1.79 -2.94 2.42 0.50 -0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 91.59 7.13 10.53 22.87 4.23 0.95 -0.37 --- ---
Arm. vert. gch. 117.13 50.36 9.33 21.05 -4.51 -1.09 -0.48 --- ---
Arm. horz. gch. 88.41 -74.76 2.90 -55.44 -1.50 -0.48 0.30 --- ---
Béton 46.78 -76.42 2.76 -55.41 1.53 -0.47 0.30 --- ---
Arm. transve. 27.66 42.59 9.96 28.77 --- --- --- 3.32 0.03
R+3
Arm. vert. drt. 109.11 102.22 -1.88 -2.76 2.18 0.43 -0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 73.85 -28.25 0.07 45.23 0.57 -0.10 0.22 --- ---
Arm. vert. gch. 68.07 107.34 15.93 -5.19 -3.07 -0.78 -0.36 --- ---
Arm. horz. gch. 93.77 -20.62 3.63 46.88 -2.17 -0.75 -0.21 --- ---
Béton 38.73 -24.77 3.08 47.68 0.50 -0.75 -0.21 --- ---
Arm. transve. 27.27 60.57 13.71 21.74 --- --- --- 3.30 0.25
R+2
Arm. vert. drt. 77.01 132.59 14.03 -24.70 0.00 -0.45 -0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 74.24 65.21 5.36 -37.20 0.00 -0.15 -0.05 --- ---
Arm. vert. gch. 81.19 132.59 14.03 -24.70 -1.03 -0.45 -0.13 --- ---
Arm. horz. gch. 81.12 127.48 13.39 -25.73 -0.97 -0.43 -0.12 --- ---
Béton 38.77 -280.14 -4.94 23.22 -5.60 0.02 -0.05 --- ---
Arm. transve. 17.91 84.66 10.80 13.39 --- --- --- 2.02 0.79
R+1
Arm. vert. drt. 120.43 218.98 27.44 -26.90 0.00 -0.46 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 127.92 167.28 28.55 -42.24 0.00 -0.42 -0.16 --- ---
Arm. vert. gch. 132.39 207.38 24.50 -19.07 -5.04 -0.95 -0.44 --- ---
Arm. horz. gch. 136.34 167.28 28.55 -42.24 -1.04 -0.42 -0.16 --- ---
Béton 52.35 -403.63 -50.39 45.13 -8.07 0.50 0.16 --- ---
Arm. transve. 18.28 145.05 32.42 -23.08 --- --- --- 2.21 -0.05
RDC
Arm. vert. drt. 101.96 179.97 13.71 -29.51 0.00 -0.14 -0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 113.57 -172.20 11.27 83.26 3.44 -0.87 -0.14 --- ---
Arm. vert. gch. 102.36 179.94 13.70 -29.53 -0.30 -0.14 -0.12 --- ---
Arm. horz. gch. 145.61 -172.01 11.56 83.14 -3.44 -0.94 -0.14 --- ---
Béton 57.88 -173.39 11.51 83.42 3.47 -0.92 -0.14 --- ---
Arm. transve. 8.25 32.04 -3.06 -62.32 --- --- --- 0.80 0.60
SS1
Arm. vert. drt. 39.45 18.48 4.03 51.26 0.15 0.02 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 106.24 -43.75 3.34 -74.63 0.88 0.10 0.14 --- ---
Page 81
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3b: Longueur: 493 cm [Noeud initial: 24.86;37.35 -> Noeud final: 24.86;42.28]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 38.98 18.48 4.03 51.26 0.00 0.02 -0.02 --- ---
Arm. horz. gch. 107.97 -44.04 3.36 -74.72 -0.88 0.09 0.15 --- ---
Béton 53.95 -53.67 -1.47 -68.88 1.07 0.19 0.12 --- ---
Arm. transve. 8.57 -43.06 3.26 -73.72 --- --- --- -0.78 -0.67
Mur VA7d: Longueur: 167.4 cm [Noeud initial: 33.84;48.96 -> Noeud final: 33.84;50.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
RDC
Arm. vert. drt. 125.76 179.00 13.72 -26.31 0.38 0.07 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 63.73 122.46 20.64 -55.44 0.34 0.08 -0.12 --- ---
Arm. vert. gch. 125.85 166.40 26.58 -39.26 0.00 0.11 0.01 --- ---
Arm. horz. gch. 98.81 122.65 20.57 -55.47 0.00 0.08 -0.11 --- ---
Béton 77.05 -208.17 -36.06 126.95 -4.16 0.10 0.03 --- ---
Arm. transve. 9.24 64.12 20.93 -58.43 --- --- --- 0.42 0.70
SS1
Arm. vert. drt. 97.10 64.44 -1.06 -33.50 0.71 0.11 -0.28 --- ---
(e=30.0 cm)
Arm. horz. drt. 112.22 -97.81 -9.92 167.54 1.96 -0.17 0.19 --- ---
Arm. vert. gch. 114.20 86.22 25.76 -16.40 -1.81 -0.19 0.01 --- ---
Arm. horz. gch. 111.34 -97.81 -9.92 167.54 -1.96 -0.17 0.19 --- ---
Béton 100.87 -97.81 -9.92 167.54 -1.96 -0.17 0.19 --- ---
Arm. transve. 29.45 -97.65 -9.97 166.09 --- --- --- 2.32 -1.21
Mur VA24b: Longueur: 117.782 cm [Noeud initial: 45.20;40.23 -> Noeud final: 45.20;41.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 153.42 -17.31 -12.12 -8.26 13.80 1.75 0.40 --- ---
(e=30.0 cm)
Arm. horz. drt. 151.17 8.27 8.31 1.83 6.13 2.32 2.39 --- ---
Arm. vert. gch. 106.09 -11.24 -16.20 -11.08 -14.05 -1.77 -0.49 --- ---
Arm. horz. gch. 155.92 16.01 8.92 3.21 -6.03 -2.60 -2.42 --- ---
Béton 21.32 15.41 8.57 3.07 0.00 -2.61 -2.44 --- ---
Arm. transve. 4.29 1.90 -19.20 -5.85 --- --- --- -1.57 -5.93
R+14
Arm. vert. drt. 6.04 -75.62 -79.91 34.35 -5.35 -0.55 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 4.91 -86.84 -102.88 43.29 -2.05 -0.13 -0.04 --- ---
Arm. vert. gch. 40.38 -66.66 30.30 -3.05 1.33 -0.16 0.19 --- ---
Arm. horz. gch. 108.87 -66.66 30.30 -3.05 -1.33 -0.16 0.19 --- ---
Béton 18.58 -99.22 -103.23 44.21 1.98 0.17 -0.22 --- ---
Arm. transve. 2.13 -36.29 -0.60 11.96 --- --- --- 3.05 0.17
R+13
Arm. vert. drt. 4.61 -39.78 -30.43 13.54 -3.94 -1.45 -0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.57 -39.50 -30.69 13.68 -3.94 -1.45 -0.15 --- ---
Arm. vert. gch. 4.77 -44.32 -4.10 2.87 3.77 1.39 -0.14 --- ---
Arm. horz. gch. 2.13 -34.71 -23.48 10.83 3.76 1.42 0.10 --- ---
Béton 12.56 -63.56 0.96 13.02 1.27 -0.05 -0.06 --- ---
Arm. transve. 3.30 -32.21 -19.09 9.31 --- --- --- 1.49 -4.49
R+12
Arm. vert. drt. 5.10 -45.22 -5.15 -0.37 -4.26 -1.61 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.21 -54.02 -41.69 17.57 -1.60 -0.57 -0.12 --- ---
Page 82
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA24b: Longueur: 117.782 cm [Noeud initial: 45.20;40.23 -> Noeud final: 45.20;41.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 5.50 -54.54 -5.72 1.03 4.02 1.50 -0.15 --- ---
Arm. horz. gch. 2.15 -40.81 -22.92 10.41 4.07 1.51 0.16 --- ---
Béton 15.15 -77.93 -0.69 10.86 1.56 -0.05 -0.06 --- ---
Arm. transve. 3.06 -39.42 -19.12 9.14 --- --- --- 1.57 -4.09
R+11
Arm. vert. drt. 5.81 -56.01 -6.81 -1.76 -4.40 -1.66 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.25 -64.15 -42.40 18.39 -1.66 -0.59 -0.12 --- ---
Arm. vert. gch. 6.23 -65.58 -7.43 -0.37 4.17 1.55 -0.16 --- ---
Arm. horz. gch. 2.03 -45.41 -19.25 9.21 4.58 1.69 0.18 --- ---
Béton 17.82 -93.23 -2.28 9.79 1.86 -0.05 -0.06 --- ---
Arm. transve. 3.19 -49.71 -19.48 9.48 --- --- --- 1.59 -4.29
R+10
Arm. vert. drt. 6.54 -66.53 -8.43 -3.03 -4.60 -1.72 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.29 -74.04 -43.03 19.32 1.48 -0.61 -0.13 --- ---
Arm. vert. gch. 6.94 -76.16 -9.08 -1.61 4.34 1.61 -0.16 --- ---
Arm. horz. gch. 1.97 -95.12 -41.07 19.40 1.90 0.08 -0.02 --- ---
Béton 20.44 -108.71 -3.86 8.96 2.17 -0.05 -0.06 --- ---
Arm. transve. 3.25 -61.29 -19.89 9.91 --- --- --- 1.63 -4.37
R+9
Arm. vert. drt. 7.31 -78.58 -10.25 -4.32 -4.73 -1.76 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.32 -84.19 -43.54 20.23 1.68 -0.63 -0.13 --- ---
Arm. vert. gch. 7.58 -86.01 -10.65 -2.87 4.46 1.65 -0.16 --- ---
Arm. horz. gch. 2.00 -110.71 -41.64 20.26 2.21 0.08 -0.02 --- ---
Béton 23.16 -124.12 -5.45 8.15 2.48 -0.05 -0.06 --- ---
Arm. transve. 3.31 -71.92 -20.13 10.31 --- --- --- 1.68 -4.44
R+8
Arm. vert. drt. 8.02 -90.08 -12.01 -5.61 -4.80 -1.78 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.34 -93.03 -43.79 21.07 1.86 -0.63 -0.13 --- ---
Arm. vert. gch. 8.22 -96.28 -12.28 -4.14 4.54 1.67 -0.16 --- ---
Arm. horz. gch. 2.02 -126.24 -42.05 21.06 -2.52 0.07 -0.02 --- ---
Béton 25.85 -139.41 -7.05 7.30 2.79 -0.05 -0.06 --- ---
Arm. transve. 3.38 -84.00 -20.39 10.67 --- --- --- 1.70 -4.53
R+7
Arm. vert. drt. 8.71 -101.77 -13.81 -6.92 -4.84 -1.78 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.33 -101.17 -43.77 21.83 2.02 -0.63 -0.13 --- ---
Arm. vert. gch. 8.82 -105.97 -13.85 -5.43 4.60 1.68 -0.15 --- ---
Arm. horz. gch. 2.03 -141.67 -42.29 21.81 2.83 0.07 -0.02 --- ---
Béton 28.52 -154.56 -8.67 6.41 3.09 -0.04 -0.06 --- ---
Arm. transve. 3.38 -96.38 -20.61 11.02 --- --- --- 1.68 -4.54
R+6
Arm. vert. drt. 9.49 -169.56 -10.30 5.46 -3.39 -0.04 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.32 -111.80 -34.10 18.12 2.24 -1.67 -0.23 --- ---
Arm. vert. gch. 9.49 -169.56 -10.30 5.46 3.39 -0.04 -0.05 --- ---
Arm. horz. gch. 2.03 -156.98 -42.36 22.49 3.14 0.07 -0.02 --- ---
Béton 31.16 -169.56 -10.30 5.46 3.39 -0.04 -0.05 --- ---
Arm. transve. 3.36 -109.07 -20.78 11.36 --- --- --- 1.64 -4.52
R+5
Arm. vert. drt. 10.32 -184.39 -11.95 4.44 -3.69 -0.04 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.29 -121.17 -33.93 18.63 2.42 -1.63 -0.23 --- ---
Arm. vert. gch. 10.32 -184.39 -11.95 4.44 3.69 -0.04 -0.05 --- ---
Arm. horz. gch. 2.02 -172.16 -42.22 23.09 3.44 0.07 -0.02 --- ---
Béton 33.77 -184.39 -11.95 4.44 3.69 -0.04 -0.05 --- ---
Page 83
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA24b: Longueur: 117.782 cm [Noeud initial: 45.20;40.23 -> Noeud final: 45.20;41.41]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 3.30 -122.00 -20.92 11.68 --- --- --- 1.58 -4.45
R+4
Arm. vert. drt. 11.15 -199.14 -13.60 3.27 -3.98 -0.04 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.23 -130.31 -33.52 19.03 -4.03 -1.53 -0.22 --- ---
Arm. vert. gch. 11.15 -199.14 -13.60 3.27 3.98 -0.04 -0.05 --- ---
Arm. horz. gch. 2.00 -187.25 -41.85 23.57 -3.74 0.06 -0.02 --- ---
Béton 36.36 -199.14 -13.60 3.27 3.98 -0.04 -0.05 --- ---
Arm. transve. 3.84 -131.65 -24.46 13.80 --- --- --- 1.83 -5.19
R+3
Arm. vert. drt. 11.96 -213.60 -15.35 0.94 -4.27 -0.05 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.19 -139.53 -32.96 19.17 -3.69 -1.49 -0.24 --- ---
Arm. vert. gch. 11.96 -213.60 -15.35 0.94 4.27 -0.05 -0.05 --- ---
Arm. horz. gch. 1.98 -202.43 -41.27 23.70 -4.05 0.07 -0.02 --- ---
Béton 38.90 -213.60 -15.35 0.94 4.27 -0.05 -0.05 --- ---
Arm. transve. 3.83 -143.67 -24.22 13.86 --- --- --- 1.96 -5.12
R+2
Arm. vert. drt. 12.45 -222.43 1.00 3.56 -4.45 -0.00 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.25 -197.08 -26.33 10.35 3.94 -0.01 -0.04 --- ---
Arm. vert. gch. 12.45 -222.43 1.00 3.56 4.45 -0.00 0.01 --- ---
Arm. horz. gch. 1.24 -197.08 -26.33 10.35 3.94 -0.01 -0.04 --- ---
Béton 42.58 -222.43 1.00 3.56 -4.45 -0.00 0.01 --- ---
Arm. transve. 0.77 -169.38 0.73 1.27 --- --- --- -1.08 0.21
R+1
Arm. vert. drt. 14.05 -250.99 -15.87 -14.14 -5.02 0.04 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.36 -214.13 -28.48 12.57 4.28 -0.05 -0.03 --- ---
Arm. vert. gch. 14.05 -250.99 -15.87 -14.14 5.02 0.04 -0.01 --- ---
Arm. horz. gch. 1.38 -231.34 -28.83 -12.13 4.63 0.04 0.02 --- ---
Béton 46.57 -244.05 -1.25 -1.19 -4.88 0.02 0.00 --- ---
Arm. transve. 1.09 -151.54 -1.45 0.56 --- --- --- -1.53 0.34
RDC
Arm. vert. drt. 17.57 -313.85 -16.61 -13.76 -6.28 0.07 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.65 -313.05 -35.82 -16.12 6.26 0.10 0.04 --- ---
Arm. vert. gch. 17.57 -313.85 -16.61 -13.76 6.28 0.07 0.02 --- ---
Arm. horz. gch. 1.73 -313.05 -35.82 -16.12 6.26 0.10 0.04 --- ---
Béton 58.09 -313.75 -15.85 -13.28 -6.27 0.07 0.01 --- ---
Arm. transve. 0.48 -192.34 -13.86 -5.98 --- --- --- -0.58 -0.37
SS1
Arm. vert. drt. 30.14 -538.26 -64.46 -64.36 -10.77 -0.21 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.13 -538.26 -64.46 -64.36 10.77 -0.21 -0.07 --- ---
Arm. vert. gch. 30.14 -538.26 -64.46 -64.36 10.77 -0.21 -0.07 --- ---
Arm. horz. gch. 2.96 -536.66 -62.76 -56.90 10.73 0.00 -0.01 --- ---
Béton 95.18 -536.66 -62.76 -56.90 -10.73 0.00 -0.01 --- ---
Arm. transve. 0.73 -437.30 -40.07 -90.73 --- --- --- 1.05 -0.12
Mur VA23d: Longueur: 117.482 cm [Noeud initial: 37.69;40.23 -> Noeud final: 37.69;41.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 152.19 -32.02 -5.60 -4.02 14.86 1.87 0.51 --- ---
(e=30.0 cm)
Arm. horz. drt. 137.80 -8.62 2.81 -2.34 6.54 2.75 2.54 --- ---
Page 84
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA23d: Longueur: 117.482 cm [Noeud initial: 37.69;40.23 -> Noeud final: 37.69;41.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 90.73 -25.10 -5.65 -4.29 -14.87 -1.89 -0.39 --- ---
Arm. horz. gch. 126.18 -5.34 2.65 -1.63 -6.83 -2.48 -2.60 --- ---
Béton 23.93 -33.25 -5.90 -4.25 14.82 1.87 0.51 --- ---
Arm. transve. 6.84 -14.28 -6.27 -4.14 --- --- --- 2.60 9.47
R+14
Arm. vert. drt. 3.45 -22.93 -2.22 -0.60 -3.63 -0.44 0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 0.53 -23.87 -2.97 5.93 0.48 -0.67 -0.01 --- ---
Arm. vert. gch. 3.49 -30.11 1.06 9.97 2.99 -0.03 0.07 --- ---
Arm. horz. gch. 0.53 -19.63 -2.41 2.67 3.03 0.73 0.03 --- ---
Béton 9.36 -30.11 1.06 9.97 2.99 -0.03 0.07 --- ---
Arm. transve. 2.53 -21.97 -0.33 4.53 --- --- --- -3.53 -0.79
R+13
Arm. vert. drt. 3.82 -38.11 -7.64 11.26 -2.76 -1.01 0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 0.98 -38.11 -7.64 11.26 0.76 -1.01 0.08 --- ---
Arm. vert. gch. 3.46 -29.52 -5.90 2.99 2.99 1.09 -0.03 --- ---
Arm. horz. gch. 0.93 -29.52 -5.90 2.99 2.99 1.09 -0.03 --- ---
Béton 8.40 -48.39 -9.69 10.29 -0.97 0.08 0.03 --- ---
Arm. transve. 2.19 -31.47 -3.70 6.45 --- --- --- 1.81 2.56
R+12
Arm. vert. drt. 4.52 -48.82 -9.71 10.21 -2.91 -1.09 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.15 -48.82 -9.71 10.21 0.98 -1.09 0.06 --- ---
Arm. vert. gch. 4.34 -44.01 -5.77 8.37 3.07 1.08 0.29 --- ---
Arm. horz. gch. 1.08 -39.21 -7.79 1.94 -0.78 1.17 -0.02 --- ---
Béton 10.87 -63.38 -11.17 9.75 1.27 0.01 -0.05 --- ---
Arm. transve. 2.54 -44.22 -6.03 5.67 --- --- --- 1.92 3.09
R+11
Arm. vert. drt. 4.61 -45.98 -6.62 3.99 -3.34 -1.19 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.06 -62.39 -12.36 9.71 1.25 -1.11 0.07 --- ---
Arm. vert. gch. 5.09 -57.14 -8.05 8.19 3.06 1.08 0.29 --- ---
Arm. horz. gch. 1.21 -49.92 -9.90 5.39 3.15 1.18 -0.05 --- ---
Béton 13.34 -77.31 -12.17 8.25 1.55 -0.00 -0.11 --- ---
Arm. transve. 2.52 -56.37 -8.25 4.15 --- --- --- 1.91 3.07
R+10
Arm. vert. drt. 5.25 -93.80 -18.55 8.11 -1.88 0.04 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.18 -74.44 -14.72 10.02 1.49 -1.15 0.07 --- ---
Arm. vert. gch. 5.85 -68.75 -10.06 8.15 3.20 1.14 0.31 --- ---
Arm. horz. gch. 1.31 -56.56 -11.19 0.15 -1.13 1.24 -0.02 --- ---
Béton 15.86 -92.22 -14.46 7.92 1.84 -0.00 -0.11 --- ---
Arm. transve. 2.64 -68.17 -10.29 3.97 --- --- --- 2.03 3.19
R+9
Arm. vert. drt. 6.07 -108.46 -21.43 8.04 -2.17 0.04 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.31 -87.17 -17.22 10.96 -3.14 -1.16 0.07 --- ---
Arm. vert. gch. 6.43 -78.54 -12.14 3.11 3.22 1.15 0.36 --- ---
Arm. horz. gch. 1.32 -78.54 -12.14 3.11 3.22 1.15 0.36 --- ---
Béton 18.39 -106.60 -15.70 6.63 2.13 -0.01 -0.03 --- ---
Arm. transve. 2.70 -79.53 -12.28 3.62 --- --- --- 2.07 3.27
R+8
Arm. vert. drt. 6.91 -92.60 -15.45 4.79 -2.67 -0.22 -0.76 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.43 -99.37 -19.62 11.41 -3.22 -1.18 0.07 --- ---
Arm. vert. gch. 7.05 -89.43 -14.05 2.67 3.21 1.15 0.37 --- ---
Arm. horz. gch. 1.46 -72.71 -14.36 0.11 -1.45 1.15 -0.03 --- ---
Béton 20.97 -121.64 -17.93 6.58 2.43 -0.01 -0.03 --- ---
Page 85
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA23d: Longueur: 117.482 cm [Noeud initial: 37.69;40.23 -> Noeud final: 37.69;41.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 2.61 -93.59 -14.29 8.81 --- --- --- 2.10 3.09
R+7
Arm. vert. drt. 7.83 -112.55 -16.27 10.94 -2.25 -0.12 -1.51 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.54 -111.71 -22.04 11.74 2.23 -1.18 0.07 --- ---
Arm. vert. gch. 7.83 -112.55 -16.27 10.94 2.25 -0.12 -1.51 --- ---
Arm. horz. gch. 1.59 -84.00 -16.58 -0.13 3.16 1.16 -0.03 --- ---
Béton 23.54 -136.68 -20.18 6.53 2.73 -0.01 -0.03 --- ---
Arm. transve. 2.60 -105.84 -16.34 9.48 --- --- --- 2.09 3.08
R+6
Arm. vert. drt. 8.76 -126.02 -18.19 11.52 -2.52 -0.13 -1.48 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.65 -124.16 -24.49 12.10 -3.23 -1.17 0.06 --- ---
Arm. vert. gch. 8.76 -126.02 -18.19 11.52 2.52 -0.13 -1.48 --- ---
Arm. horz. gch. 1.68 -92.18 -18.19 -0.09 -1.84 1.15 -0.02 --- ---
Béton 26.10 -151.67 -22.43 6.45 3.03 -0.01 -0.03 --- ---
Arm. transve. 2.54 -118.23 -18.41 10.33 --- --- --- 2.04 3.02
R+5
Arm. vert. drt. 9.72 -139.85 -20.16 12.56 -2.80 -0.14 -1.44 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.76 -136.71 -26.96 12.78 -3.21 -1.15 0.06 --- ---
Arm. vert. gch. 9.72 -139.85 -20.16 12.56 2.80 -0.14 -1.44 --- ---
Arm. horz. gch. 1.73 -121.91 -19.73 1.93 -2.44 1.08 0.36 --- ---
Béton 29.70 -139.34 -20.96 0.33 2.79 -0.03 0.04 --- ---
Arm. transve. 2.46 -130.70 -20.51 11.22 --- --- --- 1.96 2.93
R+4
Arm. vert. drt. 11.52 -165.68 -25.11 0.11 -3.31 -0.03 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.85 -149.06 -29.40 13.20 -3.06 -1.09 0.04 --- ---
Arm. vert. gch. 11.52 -165.68 -25.11 0.11 3.31 -0.03 0.03 --- ---
Arm. horz. gch. 1.80 -132.43 -21.61 2.21 2.71 1.00 0.35 --- ---
Béton 35.28 -165.68 -25.11 0.11 3.31 -0.03 0.03 --- ---
Arm. transve. 2.34 -143.20 -22.67 12.20 --- --- --- 1.83 2.81
R+3
Arm. vert. drt. 12.32 -177.25 -29.71 -0.08 -3.54 -0.06 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.02 -160.97 -31.77 14.55 3.22 -1.21 0.09 --- ---
Arm. vert. gch. 12.32 -177.25 -29.71 -0.08 3.54 -0.06 0.05 --- ---
Arm. horz. gch. 2.06 -118.52 -23.43 0.49 3.73 1.28 -0.06 --- ---
Béton 37.32 -177.25 -29.71 -0.08 3.54 -0.06 0.05 --- ---
Arm. transve. 2.22 -155.08 -22.41 12.36 --- --- --- 3.17 -0.27
R+2
Arm. vert. drt. 13.77 -197.99 -18.51 0.29 -3.96 0.00 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.65 -119.79 -28.53 0.10 2.40 0.06 -0.02 --- ---
Arm. vert. gch. 13.77 -197.99 -18.51 0.29 3.96 0.00 -0.03 --- ---
Arm. horz. gch. 1.71 -119.79 -28.53 0.10 2.40 0.06 -0.02 --- ---
Béton 44.01 -197.99 -18.51 0.29 -3.96 0.00 -0.03 --- ---
Arm. transve. 0.92 -117.44 -11.33 -14.97 --- --- --- -1.32 0.05
R+1
Arm. vert. drt. 15.44 -221.99 -26.90 0.24 -4.44 0.00 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.92 -116.52 -33.13 0.19 2.33 0.06 0.02 --- ---
Arm. vert. gch. 15.44 -221.99 -26.90 0.24 4.44 0.00 -0.05 --- ---
Arm. horz. gch. 1.98 -116.55 -33.13 0.17 2.33 0.06 0.02 --- ---
Béton 48.33 -221.99 -26.90 0.24 4.44 0.00 -0.05 --- ---
Arm. transve. 0.93 -118.84 -18.64 -17.52 --- --- --- -1.33 0.07
RDC
Arm. vert. drt. 15.28 -219.78 -27.70 -0.22 -4.40 0.08 0.04 --- ---
(e=30.0 cm)
Page 86
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA23d: Longueur: 117.482 cm [Noeud initial: 37.69;40.23 -> Noeud final: 37.69;41.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. drt. 1.65 -141.46 -35.57 -2.11 2.83 0.06 -0.03 --- ---
Arm. vert. gch. 15.28 -219.78 -27.70 -0.22 4.40 0.08 0.04 --- ---
Arm. horz. gch. 1.71 -141.35 -35.57 -2.15 -2.83 0.06 -0.03 --- ---
Béton 47.78 -219.78 -27.70 -0.22 -4.40 0.08 0.04 --- ---
Arm. transve. 0.33 -167.14 -23.88 10.67 --- --- --- -0.47 -0.01
SS1
Arm. vert. drt. 17.52 -252.00 -30.14 0.08 -5.04 -0.11 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.91 -154.52 -39.43 -2.41 -3.09 -0.12 -0.00 --- ---
Arm. vert. gch. 17.52 -252.00 -30.14 0.08 5.04 -0.11 -0.06 --- ---
Arm. horz. gch. 1.86 -74.35 -31.88 0.10 -1.49 -0.02 -0.02 --- ---
Béton 55.10 -252.00 -30.14 0.08 5.04 -0.11 -0.06 --- ---
Arm. transve. 0.97 -171.35 -19.57 17.40 --- --- --- 1.38 0.11
Mur VA23c: Longueur: 332.8 cm [Noeud initial: 37.69;41.40 -> Noeud final: 37.69;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 62.44 -7.58 0.66 7.63 4.11 0.52 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 47.58 -7.58 0.66 7.63 4.11 0.52 0.22 --- ---
Arm. vert. gch. 78.56 -7.05 0.27 4.26 -5.51 -0.70 -0.24 --- ---
Arm. horz. gch. 46.31 -5.30 -0.15 3.88 -3.82 -0.82 -0.41 --- ---
Béton 12.33 -40.51 -20.48 38.26 0.81 -0.17 -0.14 --- ---
Arm. transve. 2.71 -10.63 -3.39 3.98 --- --- --- -3.88 -0.01
R+13
Arm. vert. drt. 4.24 -60.84 0.40 15.83 -1.22 0.06 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.13 -33.79 -23.61 22.75 0.68 -0.04 -0.06 --- ---
Arm. vert. gch. 4.24 -60.84 0.40 15.83 1.22 0.06 -0.02 --- ---
Arm. horz. gch. 1.11 -23.26 -23.07 6.51 0.47 0.05 0.01 --- ---
Béton 15.18 -60.84 0.40 15.83 1.22 0.06 -0.02 --- ---
Arm. transve. 2.06 -27.11 -4.06 2.39 --- --- --- -2.96 -0.04
R+12
Arm. vert. drt. 5.08 -73.03 -0.54 12.27 -1.46 0.06 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.15 -36.63 -24.07 22.51 0.73 -0.04 -0.06 --- ---
Arm. vert. gch. 5.08 -73.03 -0.54 12.27 1.46 0.06 -0.01 --- ---
Arm. horz. gch. 1.18 -25.53 -24.60 7.19 0.51 0.06 0.01 --- ---
Béton 17.73 -73.03 -0.54 12.27 1.46 0.06 -0.01 --- ---
Arm. transve. 2.23 -36.79 -5.14 0.98 --- --- --- -3.20 -0.03
R+11
Arm. vert. drt. 5.99 -86.09 -10.12 0.38 -1.72 0.07 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.17 -33.41 -25.32 7.27 0.67 0.05 0.01 --- ---
Arm. vert. gch. 5.99 -86.09 -10.12 0.38 1.72 0.07 -0.05 --- ---
Arm. horz. gch. 1.22 -33.41 -25.32 7.27 -0.67 0.05 0.01 --- ---
Béton 18.90 -86.09 -10.12 0.38 -1.72 0.07 -0.05 --- ---
Arm. transve. 2.23 -45.65 -6.48 1.05 --- --- --- -3.20 -0.03
R+10
Arm. vert. drt. 6.39 -91.85 -10.82 0.21 -1.84 0.08 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.23 -41.44 -26.54 8.38 0.83 0.05 0.01 --- ---
Arm. vert. gch. 6.39 -91.85 -10.82 0.21 1.84 0.08 -0.05 --- ---
Arm. horz. gch. 1.27 -41.44 -26.54 8.38 0.83 0.05 0.01 --- ---
Béton 20.17 -91.85 -10.82 0.21 -1.84 0.08 -0.05 --- ---
Arm. transve. 2.29 -54.88 -7.79 0.06 --- --- --- -3.29 -0.03
Page 87
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA23c: Longueur: 332.8 cm [Noeud initial: 37.69;41.40 -> Noeud final: 37.69;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+9
Arm. vert. drt. 7.37 -105.98 -12.49 0.14 -2.12 0.07 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.28 -46.45 -27.48 9.44 0.93 0.05 0.02 --- ---
Arm. vert. gch. 7.37 -105.98 -12.49 0.14 2.12 0.07 -0.05 --- ---
Arm. horz. gch. 1.32 -46.45 -27.48 9.44 0.93 0.05 0.02 --- ---
Béton 23.24 -105.98 -12.49 0.14 -2.12 0.07 -0.05 --- ---
Arm. transve. 2.34 -64.30 -9.13 -0.72 --- --- --- -3.36 -0.03
R+8
Arm. vert. drt. 7.89 -113.54 -13.44 -0.30 -2.27 0.06 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.31 -50.65 -28.26 10.36 1.01 0.05 0.02 --- ---
Arm. vert. gch. 7.89 -113.54 -13.44 -0.30 2.27 0.06 -0.04 --- ---
Arm. horz. gch. 1.35 -50.65 -28.26 10.36 1.01 0.05 0.02 --- ---
Béton 24.86 -113.54 -13.44 -0.30 -2.27 0.06 -0.04 --- ---
Arm. transve. 2.37 -74.07 -10.48 -1.55 --- --- --- -3.39 -0.03
R+7
Arm. vert. drt. 9.04 -130.05 -16.43 0.02 -2.60 0.08 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.35 -54.17 -28.92 11.24 1.08 0.05 0.02 --- ---
Arm. vert. gch. 9.04 -130.05 -16.43 0.02 2.60 0.08 -0.02 --- ---
Arm. horz. gch. 1.38 -54.17 -28.92 11.24 1.08 0.05 0.02 --- ---
Béton 28.31 -130.05 -16.43 0.02 -2.60 0.08 -0.02 --- ---
Arm. transve. 2.35 -84.00 -11.85 -2.30 --- --- --- -3.37 -0.03
R+6
Arm. vert. drt. 9.97 -143.41 -18.12 0.05 -2.87 0.06 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.37 -54.96 -29.34 12.01 1.10 0.05 0.02 --- ---
Arm. vert. gch. 9.97 -143.41 -18.12 0.05 2.87 0.06 -0.02 --- ---
Arm. horz. gch. 1.40 -54.96 -29.34 12.01 1.10 0.05 0.02 --- ---
Béton 31.19 -143.41 -18.12 0.05 -2.87 0.06 -0.02 --- ---
Arm. transve. 2.33 -94.12 -13.23 -3.05 --- --- --- -3.33 -0.02
R+5
Arm. vert. drt. 11.78 -169.42 -23.99 -0.01 -3.39 0.07 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.38 -56.51 -29.66 12.72 1.13 0.05 0.02 --- ---
Arm. vert. gch. 11.78 -169.42 -23.99 -0.01 3.39 0.07 -0.02 --- ---
Arm. horz. gch. 1.45 -169.34 -23.97 -0.05 -3.39 0.07 -0.01 --- ---
Béton 36.42 -169.42 -23.99 -0.01 -3.39 0.07 -0.02 --- ---
Arm. transve. 2.26 -104.47 -14.64 -4.10 --- --- --- -3.24 -0.02
R+4
Arm. vert. drt. 12.72 -183.00 -26.01 0.02 -3.66 0.06 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.50 -183.00 -26.01 0.02 -3.66 0.06 -0.02 --- ---
Arm. vert. gch. 12.72 -183.00 -26.01 0.02 3.66 0.06 -0.02 --- ---
Arm. horz. gch. 1.56 -182.42 -25.92 -0.11 3.65 0.07 -0.02 --- ---
Béton 39.29 -183.00 -26.01 0.02 -3.66 0.06 -0.02 --- ---
Arm. transve. 2.14 -115.00 -16.10 -5.56 --- --- --- -3.06 -0.01
R+3
Arm. vert. drt. 12.95 -186.18 -31.54 0.11 -3.72 0.09 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.81 -186.18 -31.54 0.11 3.72 0.09 -0.02 --- ---
Arm. vert. gch. 12.95 -186.18 -31.54 0.11 3.72 0.09 -0.02 --- ---
Arm. horz. gch. 1.91 -186.10 -31.52 0.02 -3.72 0.10 -0.01 --- ---
Béton 39.40 -184.00 -26.85 0.01 -3.68 0.06 -0.01 --- ---
Arm. transve. 2.15 -125.40 -17.74 -7.32 --- --- --- -3.08 -0.02
R+2
Arm. vert. drt. 13.66 -196.41 -25.17 -0.30 -3.93 0.07 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.71 -124.83 -29.84 0.32 2.50 0.08 0.04 --- ---
Page 88
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA23c: Longueur: 332.8 cm [Noeud initial: 37.69;41.40 -> Noeud final: 37.69;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 13.66 -196.41 -25.17 -0.30 3.93 0.07 0.03 --- ---
Arm. horz. gch. 1.80 -124.83 -29.84 0.32 2.50 0.08 0.04 --- ---
Béton 42.64 -196.41 -25.17 -0.30 -3.93 0.07 0.03 --- ---
Arm. transve. 0.98 -166.48 -20.74 -21.19 --- --- --- -1.12 0.85
R+1
Arm. vert. drt. 15.92 -228.89 -19.75 0.81 -4.58 0.07 -0.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.80 -169.85 -27.30 -0.39 -3.40 -0.37 -0.06 --- ---
Arm. vert. gch. 15.92 -228.89 -19.75 0.81 4.58 0.07 -0.09 --- ---
Arm. horz. gch. 1.81 -183.10 -37.59 12.43 3.66 0.09 -0.02 --- ---
Béton 47.50 -256.53 -13.56 -17.38 -5.13 0.05 -0.05 --- ---
Arm. transve. 1.02 -156.01 -16.15 -19.40 --- --- --- -1.45 0.14
RDC
Arm. vert. drt. 17.24 -307.83 -21.02 -27.61 -6.16 0.11 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.84 -213.15 -29.30 -0.01 4.26 -0.21 -0.01 --- ---
Arm. vert. gch. 17.24 -307.83 -21.02 -27.61 6.16 0.11 -0.01 --- ---
Arm. horz. gch. 1.87 -248.73 -38.57 -7.23 -4.97 0.12 0.07 --- ---
Béton 52.48 -234.99 -22.30 0.80 4.70 -0.20 -0.09 --- ---
Arm. transve. 0.83 -130.49 -9.04 6.43 --- --- --- -1.19 -0.09
SS1
Arm. vert. drt. 71.77 18.48 15.72 25.68 0.00 -0.14 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 108.38 18.48 15.72 25.68 0.00 -0.14 0.06 --- ---
Arm. vert. gch. 76.51 18.48 15.72 25.68 -0.83 -0.14 0.06 --- ---
Arm. horz. gch. 95.69 -56.64 10.05 49.74 -1.23 -0.33 0.00 --- ---
Béton 57.01 -257.20 -25.76 -0.10 -5.14 0.02 0.02 --- ---
Arm. transve. 1.31 -137.83 -17.97 35.98 --- --- --- 1.88 -0.02
Mur VA26d: Longueur: 287.818 cm [Noeud initial: 56.56;37.35 -> Noeud final: 56.56;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 1.87 -10.56 -1.33 2.99 -2.16 -0.27 -0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 0.48 -32.67 -10.36 -14.32 0.65 0.02 -0.10 --- ---
Arm. vert. gch. 2.11 -4.63 0.37 1.39 3.15 0.64 -0.08 --- ---
Arm. horz. gch. 0.68 -9.39 -1.75 18.12 -0.19 0.35 -0.06 --- ---
Béton 5.49 -26.74 -2.75 -6.94 -0.53 -0.00 -0.21 --- ---
Arm. transve. 1.38 -3.37 0.48 -8.22 --- --- --- 1.97 -0.19
R+13
Arm. vert. drt. 2.09 -16.66 -2.10 0.30 -1.93 -0.24 -0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 0.47 3.55 -0.36 -12.86 0.00 -0.27 -0.00 --- ---
Arm. vert. gch. 2.15 -14.90 -0.30 -1.09 2.20 0.28 -0.14 --- ---
Arm. horz. gch. 0.48 -0.91 -0.83 -12.65 -0.02 0.27 0.01 --- ---
Béton 5.73 -33.66 -4.73 15.31 0.67 0.04 -0.05 --- ---
Arm. transve. 0.89 -7.61 -0.14 -8.76 --- --- --- 1.27 0.14
R+12
Arm. vert. drt. 2.88 -51.47 -5.95 8.48 -1.03 -0.03 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 0.52 1.54 -0.79 -13.10 0.00 -0.32 -0.03 --- ---
Arm. vert. gch. 2.88 -51.47 -5.95 8.48 1.03 -0.03 -0.05 --- ---
Arm. horz. gch. 0.55 3.53 -0.62 -14.98 0.00 0.29 0.01 --- ---
Béton 7.61 -50.29 -4.76 13.53 1.01 -0.01 -0.06 --- ---
Arm. transve. 0.99 -9.87 -0.66 -11.03 --- --- --- 1.41 0.12
Page 89
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA26d: Longueur: 287.818 cm [Noeud initial: 56.56;37.35 -> Noeud final: 56.56;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+11
Arm. vert. drt. 3.86 -68.91 -8.24 10.20 -1.38 -0.05 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 0.59 2.77 -0.69 -15.68 0.00 -0.32 -0.03 --- ---
Arm. vert. gch. 3.86 -68.91 -8.24 10.20 1.38 -0.05 -0.06 --- ---
Arm. horz. gch. 0.63 -2.30 -1.24 -16.52 -0.05 0.38 -0.01 --- ---
Béton 9.83 -66.32 -6.53 16.67 1.33 -0.01 -0.07 --- ---
Arm. transve. 1.02 -10.04 -2.44 -11.17 --- --- --- 1.40 0.39
R+10
Arm. vert. drt. 60.52 17.19 0.71 -18.47 0.56 0.27 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 62.34 17.19 0.71 -18.47 0.56 0.27 0.01 --- ---
Arm. vert. gch. 61.81 27.40 0.88 -12.35 -0.31 -0.12 0.06 --- ---
Arm. horz. gch. 58.87 18.09 1.87 -16.12 -0.57 -0.23 0.01 --- ---
Béton 13.64 16.18 0.60 -18.50 0.57 0.28 0.01 --- ---
Arm. transve. 1.24 -30.78 -5.72 -8.44 --- --- --- 1.71 0.47
R+9
Arm. vert. drt. 66.50 22.79 1.20 -18.19 0.49 0.24 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 63.63 22.79 1.20 -18.19 0.49 0.24 0.02 --- ---
Arm. vert. gch. 70.42 33.82 1.61 -12.49 -0.28 -0.11 0.06 --- ---
Arm. horz. gch. 66.15 11.37 0.39 -20.47 -0.77 -0.32 -0.03 --- ---
Béton 14.96 11.37 0.39 -20.47 -0.77 -0.32 -0.03 --- ---
Arm. transve. 1.30 -28.17 -3.75 -17.01 --- --- --- 1.85 0.18
R+8
Arm. vert. drt. 77.54 42.29 2.49 -13.35 0.00 -0.09 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 74.96 11.68 -0.66 -23.98 0.77 0.36 -0.01 --- ---
Arm. vert. gch. 83.02 42.29 2.49 -13.35 -0.24 -0.09 0.06 --- ---
Arm. horz. gch. 78.53 20.25 1.64 -23.05 -0.76 -0.32 -0.03 --- ---
Béton 17.96 10.38 -0.82 -24.02 0.78 0.37 -0.02 --- ---
Arm. transve. 7.04 32.64 3.96 -17.56 --- --- --- 0.72 0.23
R+7
Arm. vert. drt. 98.62 51.17 1.98 -19.25 0.00 -0.17 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 87.20 23.17 0.37 -26.50 0.72 0.35 -0.01 --- ---
Arm. vert. gch. 70.01 51.17 1.98 -19.25 -0.41 -0.17 0.03 --- ---
Arm. horz. gch. 84.93 31.91 3.31 -25.73 -0.75 -0.30 -0.03 --- ---
Béton 19.85 -141.25 -13.28 26.02 -2.82 0.01 -0.06 --- ---
Arm. transve. 12.25 28.05 2.71 -25.14 --- --- --- 1.26 0.38
R+6
Arm. vert. drt. 81.74 66.14 3.52 -22.05 0.00 -0.15 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 97.41 35.37 1.57 -29.47 0.69 0.34 -0.02 --- ---
Arm. vert. gch. 86.90 66.14 3.52 -22.05 -0.41 -0.15 0.04 --- ---
Arm. horz. gch. 105.68 45.82 5.37 -28.90 -0.71 -0.29 -0.02 --- ---
Béton 23.14 -166.25 -15.85 29.77 3.32 -0.01 -0.07 --- ---
Arm. transve. 12.44 41.36 4.68 -28.22 --- --- --- 1.19 0.37
R+5
Arm. vert. drt. 92.91 84.40 5.01 -26.47 0.00 -0.13 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 73.35 49.20 3.12 -32.66 0.60 0.31 -0.02 --- ---
Arm. vert. gch. 100.06 84.40 5.01 -26.47 -0.43 -0.13 0.04 --- ---
Arm. horz. gch. 115.48 57.57 7.16 -33.08 -0.72 -0.28 -0.02 --- ---
Béton 26.89 -194.80 -18.28 35.41 3.90 -0.02 -0.07 --- ---
Arm. transve. 12.79 52.50 6.37 -32.31 --- --- --- 1.11 0.35
R+4
Arm. vert. drt. 91.25 121.00 13.59 -23.46 0.33 0.14 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 88.51 63.44 6.73 -38.95 0.52 0.27 -0.01 --- ---
Page 90
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA26d: Longueur: 287.818 cm [Noeud initial: 56.56;37.35 -> Noeud final: 56.56;40.23]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 89.76 104.63 10.18 -35.58 -0.29 -0.01 0.05 --- ---
Arm. horz. gch. 93.87 66.07 10.77 -38.67 -0.57 -0.23 -0.01 --- ---
Béton 31.72 -236.96 -28.34 33.06 4.74 -0.37 -0.17 --- ---
Arm. transve. 8.26 60.40 9.86 -37.77 --- --- --- 0.93 0.35
R+3
Arm. vert. drt. 95.76 106.02 8.19 -48.80 0.00 -0.05 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.26 101.12 7.40 -51.82 0.00 -0.06 0.15 --- ---
Arm. vert. gch. 102.99 106.02 8.19 -48.80 -0.81 -0.05 0.15 --- ---
Arm. horz. gch. 105.53 101.12 7.40 -51.82 -0.89 -0.06 0.15 --- ---
Béton 42.58 -0.59 -5.16 -55.74 -1.48 -0.18 0.13 --- ---
Arm. transve. 10.16 15.01 5.36 -54.79 --- --- --- 1.16 0.36
R+2
Arm. vert. drt. 86.98 109.77 3.96 -25.59 0.77 0.16 -0.28 --- ---
(e=30.0 cm)
Arm. horz. drt. 62.71 -42.17 5.83 -83.64 0.84 0.27 -0.07 --- ---
Arm. vert. gch. 86.87 92.69 11.03 -48.18 0.00 0.20 -0.01 --- ---
Arm. horz. gch. 108.32 -17.90 6.18 86.28 -0.36 -0.14 -0.14 --- ---
Béton 54.07 -18.05 0.66 71.68 0.36 -0.38 -0.03 --- ---
Arm. transve. 4.64 27.95 -0.72 -44.17 --- --- --- 0.21 0.35
R+1
Arm. vert. drt. 98.97 155.65 4.64 47.70 0.41 -0.39 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 126.83 35.24 96.45 49.86 5.00 2.55 1.07 --- ---
Arm. vert. gch. 100.20 155.65 4.64 47.70 0.00 -0.39 -0.07 --- ---
Arm. horz. gch. 131.41 32.20 96.54 49.98 0.00 2.54 1.07 --- ---
Béton 49.56 39.12 8.68 82.20 0.37 -0.23 -0.07 --- ---
Arm. transve. 41.72 39.86 55.83 42.12 --- --- --- -4.85 2.01
RDC
Arm. vert. drt. 94.85 161.27 11.28 -33.48 0.44 -0.57 0.54 --- ---
(e=30.0 cm)
Arm. horz. drt. 145.79 66.51 27.83 -42.16 2.55 3.80 -0.27 --- ---
Arm. vert. gch. 99.09 161.17 11.29 -33.57 0.00 -0.57 0.54 --- ---
Arm. horz. gch. 102.56 104.34 15.16 -57.79 0.00 0.03 0.08 --- ---
Béton 41.74 -289.42 -7.32 30.76 -5.79 0.61 -0.14 --- ---
Arm. transve. 64.33 32.93 39.09 -28.69 --- --- --- 5.57 -9.97
SS1
Arm. vert. drt. 71.63 91.90 6.65 -29.56 1.82 0.46 -0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 116.07 -60.48 1.54 -66.15 1.21 1.77 -0.10 --- ---
Arm. vert. gch. 58.20 92.14 6.69 -29.47 0.00 0.46 -0.12 --- ---
Arm. horz. gch. 67.67 -1.84 7.38 -62.31 -0.15 -0.15 0.54 --- ---
Béton 53.11 -60.48 1.54 -66.15 -1.21 1.77 -0.10 --- ---
Arm. transve. 47.62 39.86 14.41 -16.49 --- --- --- 4.49 0.10
Mur VA3h: Longueur: 245 cm [Noeud initial: 24.86;42.28 -> Noeud final: 24.86;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+17
Arm. vert. drt. 268.65 100.77 171.58 -57.59 2.51 2.65 -0.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 479.41 100.77 171.58 -57.59 2.51 2.65 -0.63 --- ---
Arm. vert. gch. 207.21 99.96 174.79 -58.60 0.00 1.89 -0.45 --- ---
Arm. horz. gch. 259.18 99.96 174.79 -58.60 0.00 1.89 -0.45 --- ---
Béton 39.41 100.97 173.61 -58.21 0.00 2.37 -0.61 --- ---
Arm. transve. 4.39 -8.22 -1.21 -10.43 --- --- --- -6.25 -0.78
Page 91
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3h: Longueur: 245 cm [Noeud initial: 24.86;42.28 -> Noeud final: 24.86;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+16
Arm. vert. drt. 140.22 74.25 10.11 -12.34 1.16 0.17 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 113.70 56.75 17.94 -21.36 0.21 0.14 0.19 --- ---
Arm. vert. gch. 80.12 74.25 10.11 -12.34 0.00 0.17 -0.00 --- ---
Arm. horz. gch. 109.22 54.65 17.90 -21.73 0.00 0.15 0.21 --- ---
Béton 21.48 2.78 1.19 22.40 0.00 -0.62 -0.59 --- ---
Arm. transve. 10.51 38.09 5.85 -15.93 --- --- --- 0.87 0.72
R+15
Arm. vert. drt. 65.79 21.05 -3.76 -13.49 4.11 0.86 0.66 --- ---
(e=30.0 cm)
Arm. horz. drt. 110.23 18.31 16.22 -35.64 0.65 0.57 0.03 --- ---
Arm. vert. gch. 56.81 18.71 16.36 -35.69 0.00 0.55 0.04 --- ---
Arm. horz. gch. 102.95 10.99 36.52 -12.77 0.00 0.14 0.54 --- ---
Béton 27.51 14.34 1.95 -36.63 0.34 0.43 0.03 --- ---
Arm. transve. 4.18 12.64 1.05 -33.94 --- --- --- 0.28 0.31
R+14
Arm. vert. drt. 50.68 46.89 5.64 -9.43 0.00 0.01 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 68.38 10.03 18.54 -28.84 0.56 0.32 0.02 --- ---
Arm. vert. gch. 55.00 39.17 3.86 -16.63 -0.21 -0.03 0.06 --- ---
Arm. horz. gch. 114.40 2.65 35.46 -10.94 0.00 0.04 0.41 --- ---
Béton 19.82 6.68 17.34 -25.41 0.65 0.37 0.01 --- ---
Arm. transve. 3.03 -51.64 -17.06 32.68 --- --- --- 4.25 0.14
R+13
Arm. vert. drt. 52.90 19.73 18.62 -25.92 0.51 0.29 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.28 9.22 19.78 -30.85 0.60 0.33 0.02 --- ---
Arm. vert. gch. 62.79 44.67 7.15 0.17 -2.00 -0.49 0.14 --- ---
Arm. horz. gch. 107.51 1.42 39.73 -11.83 0.00 0.03 0.47 --- ---
Béton 21.90 6.88 18.73 -28.40 0.65 0.36 0.02 --- ---
Arm. transve. 11.80 39.76 7.73 3.48 --- --- --- 1.15 -0.20
R+12
Arm. vert. drt. 52.95 20.42 19.37 -25.67 0.47 0.26 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.12 3.00 19.94 -32.43 0.58 0.33 0.02 --- ---
Arm. vert. gch. 59.55 50.76 5.87 -4.98 -0.87 -0.19 -0.03 --- ---
Arm. horz. gch. 108.51 -6.03 40.49 -12.02 -0.12 0.03 0.48 --- ---
Béton 25.10 3.00 19.93 -32.43 0.58 0.33 0.02 --- ---
Arm. transve. 9.14 37.70 7.18 9.90 --- --- --- 0.90 -0.14
R+11
Arm. vert. drt. 51.20 16.12 19.91 -26.69 0.52 0.29 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.39 -5.17 19.78 -32.65 0.57 0.33 0.03 --- ---
Arm. vert. gch. 52.95 44.97 5.52 -1.86 -1.00 -0.22 -0.06 --- ---
Arm. horz. gch. 107.86 -10.33 40.51 -11.84 -0.21 0.02 0.48 --- ---
Béton 25.51 -5.17 19.78 -32.65 0.57 0.33 0.03 --- ---
Arm. transve. 3.10 -69.90 -16.74 12.90 --- --- --- 4.37 -0.12
R+10
Arm. vert. drt. 39.36 30.96 0.20 -1.53 0.99 0.27 0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.66 -11.78 19.97 -34.56 0.56 0.32 0.03 --- ---
Arm. vert. gch. 48.29 23.01 4.24 -3.69 -2.23 -0.52 0.17 --- ---
Arm. horz. gch. 110.15 -16.70 41.27 -12.66 -0.33 0.01 0.48 --- ---
Béton 23.88 -54.17 2.24 24.10 1.08 -2.65 -0.05 --- ---
Arm. transve. 3.09 -67.65 -17.07 11.48 --- --- --- 4.36 -0.13
R+9
Arm. vert. drt. 43.36 25.34 -10.99 -1.57 1.94 0.52 0.30 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.94 -22.69 19.76 -35.81 0.54 0.32 0.03 --- ---
Page 92
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3h: Longueur: 245 cm [Noeud initial: 24.86;42.28 -> Noeud final: 24.86;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 54.57 26.13 4.50 -2.58 -2.61 -0.61 0.21 --- ---
Arm. horz. gch. 149.47 -30.74 40.67 -10.79 -0.61 -0.08 0.42 --- ---
Béton 24.58 -45.62 2.48 25.95 0.91 -2.43 -0.02 --- ---
Arm. transve. 3.08 -64.22 -17.23 10.60 --- --- --- 4.35 -0.13
R+8
Arm. vert. drt. 46.15 25.62 -8.67 -0.42 2.10 0.56 0.34 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.29 -37.74 16.41 -37.04 1.03 0.62 0.00 --- ---
Arm. vert. gch. 50.28 24.27 4.51 1.40 -2.71 -0.65 0.21 --- ---
Arm. horz. gch. 145.37 -44.07 39.86 -11.19 -0.88 -0.03 0.45 --- ---
Béton 24.74 -48.11 2.71 25.79 0.96 -2.38 -0.02 --- ---
Arm. transve. 3.05 -61.26 -17.41 10.36 --- --- --- 4.32 -0.13
R+7
Arm. vert. drt. 48.58 24.75 -10.18 2.83 2.21 0.59 0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.85 -43.52 16.06 -38.61 0.98 0.61 0.01 --- ---
Arm. vert. gch. 52.68 22.17 4.73 1.03 -3.10 -0.74 0.23 --- ---
Arm. horz. gch. 138.70 -62.31 38.79 -10.01 -1.25 -0.09 0.41 --- ---
Béton 25.35 -43.94 2.98 27.56 0.88 -2.30 -0.01 --- ---
Arm. transve. 3.04 -52.04 -17.39 6.06 --- --- --- 4.29 -0.15
R+6
Arm. vert. drt. 54.06 23.55 -15.48 2.99 2.86 0.76 0.41 --- ---
(e=30.0 cm)
Arm. horz. drt. 141.04 -51.65 15.16 -39.75 1.03 0.60 0.01 --- ---
Arm. vert. gch. 80.37 31.60 6.48 -5.32 -4.35 -1.02 0.34 --- ---
Arm. horz. gch. 123.12 -45.70 3.22 27.84 -0.91 -2.25 -0.01 --- ---
Béton 26.26 -51.65 15.16 -39.75 1.03 0.60 0.01 --- ---
Arm. transve. 3.02 -30.27 -10.89 -10.78 --- --- --- 4.26 -0.38
R+5
Arm. vert. drt. 82.95 35.72 -21.66 -2.90 4.88 1.26 0.71 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.66 27.29 11.74 14.33 0.35 1.25 -0.04 --- ---
Arm. vert. gch. 91.41 47.56 8.53 -3.28 -4.20 -0.99 0.31 --- ---
Arm. horz. gch. 125.02 -42.85 3.51 29.07 -0.86 -2.17 0.00 --- ---
Béton 26.16 -42.85 3.51 29.07 0.86 -2.17 0.00 --- ---
Arm. transve. 2.88 -5.81 -8.25 -14.00 --- --- --- 4.07 -0.40
R+4
Arm. vert. drt. 95.32 52.32 -20.23 -3.50 4.56 1.19 0.67 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.27 36.87 10.99 12.91 0.35 1.22 -0.04 --- ---
Arm. vert. gch. 116.06 73.74 11.74 -4.50 -4.18 -0.98 0.29 --- ---
Arm. horz. gch. 87.42 -37.21 3.40 27.98 -0.74 -2.09 0.00 --- ---
Béton 34.12 -5.70 -29.82 46.52 0.70 0.44 -0.06 --- ---
Arm. transve. 36.92 58.49 9.46 1.36 --- --- --- 3.60 -0.77
R+3
Arm. vert. drt. 116.02 79.07 -17.89 -6.05 4.15 1.09 0.59 --- ---
(e=30.0 cm)
Arm. horz. drt. 93.29 4.94 2.79 -25.24 0.95 0.75 -0.06 --- ---
Arm. vert. gch. 89.31 99.29 15.00 0.33 -4.37 -1.04 0.35 --- ---
Arm. horz. gch. 82.23 -35.61 3.20 26.48 -0.71 -2.02 -0.00 --- ---
Béton 38.85 -226.03 -17.71 -0.25 -4.52 0.13 0.04 --- ---
Arm. transve. 37.13 82.96 12.59 5.58 --- --- --- 3.59 -0.86
R+2
Arm. vert. drt. 82.78 103.42 -11.65 -5.14 3.27 0.84 0.60 --- ---
(e=30.0 cm)
Arm. horz. drt. 88.90 59.48 4.25 -24.79 0.80 0.72 0.18 --- ---
Arm. vert. gch. 99.49 128.22 17.68 4.38 -3.47 -0.79 0.33 --- ---
Arm. horz. gch. 105.37 -36.31 5.39 23.33 -0.73 -1.94 -0.05 --- ---
Béton 36.88 -229.01 -28.82 0.05 -4.58 0.17 -0.01 --- ---
Page 93
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA3h: Longueur: 245 cm [Noeud initial: 24.86;42.28 -> Noeud final: 24.86;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 22.24 112.45 13.37 7.96 --- --- --- 2.21 -0.87
R+1
Arm. vert. drt. 105.71 159.25 20.81 13.55 0.00 -1.26 0.55 --- ---
(e=30.0 cm)
Arm. horz. drt. 112.94 140.45 25.55 27.48 0.00 -1.04 0.10 --- ---
Arm. vert. gch. 134.37 159.25 20.81 13.55 -5.24 -1.26 0.55 --- ---
Arm. horz. gch. 93.17 140.37 25.54 27.48 -2.14 -1.03 0.10 --- ---
Béton 45.35 -318.09 -6.08 2.85 6.36 -0.08 0.09 --- ---
Arm. transve. 27.26 133.19 25.10 24.03 --- --- --- 3.18 -0.44
RDC
Arm. vert. drt. 106.34 169.05 13.91 4.91 0.31 0.10 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 105.99 53.08 2.64 40.68 0.00 -0.01 -0.06 --- ---
Arm. vert. gch. 102.90 169.05 13.91 4.91 0.00 0.10 0.14 --- ---
Arm. horz. gch. 109.90 53.08 2.64 40.68 -0.43 -0.01 -0.06 --- ---
Béton 49.64 -304.87 -36.78 2.08 -6.10 0.54 0.23 --- ---
Arm. transve. 9.16 53.03 3.99 22.42 --- --- --- 0.72 -0.66
SS1
Arm. vert. drt. 30.56 38.19 5.91 8.41 0.09 0.06 0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 46.03 34.22 5.13 9.53 0.20 0.08 0.20 --- ---
Arm. vert. gch. 26.72 21.92 4.88 16.38 -0.01 -0.58 -0.03 --- ---
Arm. horz. gch. 66.32 20.66 4.90 16.26 -0.01 -0.62 -0.04 --- ---
Béton 30.99 -146.74 -17.07 0.38 -2.93 0.07 -0.06 --- ---
Arm. transve. 1.23 -90.00 -2.33 -4.64 --- --- --- -1.54 0.66
Mur VA12c: Longueur: 146.9 cm [Noeud initial: 29.99;43.42 -> Noeud final: 29.99;44.89]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+17
Arm. vert. drt. 233.29 167.63 199.37 -75.20 0.00 -1.11 0.56 --- ---
(e=30.0 cm)
Arm. horz. drt. 250.55 167.63 199.37 -75.20 0.00 -1.11 0.56 --- ---
Arm. vert. gch. 262.40 167.02 200.60 -75.42 -1.60 -1.23 0.63 --- ---
Arm. horz. gch. 284.46 167.02 200.60 -75.42 -1.60 -1.23 0.63 --- ---
Béton 48.60 167.02 200.60 -75.42 0.00 -1.23 0.63 --- ---
Arm. transve. 7.83 8.81 55.29 -20.78 --- --- --- -0.78 -0.50
R+16
Arm. vert. drt. 89.23 -3.76 -3.48 -5.15 9.63 1.58 0.41 --- ---
(e=30.0 cm)
Arm. horz. drt. 81.46 26.08 -4.91 -32.85 0.67 0.15 -0.09 --- ---
Arm. vert. gch. 101.74 -13.39 -0.11 1.31 -7.78 -1.29 -0.36 --- ---
Arm. horz. gch. 80.03 23.10 -3.80 -27.29 -0.88 -0.40 -0.04 --- ---
Béton 20.12 26.08 -4.91 -32.85 0.00 0.15 -0.09 --- ---
Arm. transve. 10.97 23.45 -5.01 -30.75 --- --- --- -1.08 -0.48
R+15
Arm. vert. drt. 112.15 -5.75 -2.13 -0.29 11.22 1.31 1.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 193.97 12.04 63.22 -18.57 0.00 -0.49 0.43 --- ---
Arm. vert. gch. 79.58 -15.92 33.45 -7.15 -8.16 -1.53 0.69 --- ---
Arm. horz. gch. 157.31 11.34 63.22 -18.51 -2.46 -0.51 0.44 --- ---
Béton 17.87 11.34 63.22 -18.51 -2.46 -0.51 0.44 --- ---
Arm. transve. 4.96 -8.24 -9.28 -12.44 --- --- --- -6.81 -1.86
R+14
Arm. vert. drt. 150.49 80.54 147.46 -62.23 0.00 -0.57 0.69 --- ---
(e=30.0 cm)
Arm. horz. drt. 391.38 80.54 147.46 -62.23 0.00 -0.57 0.69 --- ---
Arm. vert. gch. 194.15 80.45 147.50 -62.24 -2.97 -0.58 0.70 --- ---
Page 94
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA12c: Longueur: 146.9 cm [Noeud initial: 29.99;43.42 -> Noeud final: 29.99;44.89]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 440.65 80.45 147.50 -62.24 -2.97 -0.58 0.70 --- ---
Béton 43.70 80.45 147.50 -62.24 0.00 -0.58 0.70 --- ---
Arm. transve. 5.89 27.51 32.60 -32.16 --- --- --- -5.09 2.83
R+13
Arm. vert. drt. 81.22 15.31 -0.64 -2.08 6.84 1.23 0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 94.77 12.08 29.22 -26.79 0.00 -0.07 0.08 --- ---
Arm. vert. gch. 59.57 -2.78 15.81 -11.91 -5.26 -0.71 0.09 --- ---
Arm. horz. gch. 68.93 12.38 29.12 -26.58 -1.38 -0.09 0.09 --- ---
Béton 20.52 12.08 29.22 -26.79 -1.27 -0.07 0.08 --- ---
Arm. transve. 4.81 -9.00 -5.02 -4.52 --- --- --- -6.74 -1.18
R+12
Arm. vert. drt. 83.08 11.58 -0.90 -2.23 7.39 1.33 0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 97.32 5.85 29.92 -28.20 0.00 -0.07 0.08 --- ---
Arm. vert. gch. 63.08 -2.64 16.74 -13.03 -5.51 -0.74 0.09 --- ---
Arm. horz. gch. 71.35 6.38 30.10 -28.24 -1.46 -0.10 0.10 --- ---
Béton 21.76 6.38 30.10 -28.24 -1.46 -0.10 0.10 --- ---
Arm. transve. 4.99 -13.62 -5.70 -5.50 --- --- --- -6.99 -1.24
R+11
Arm. vert. drt. 83.76 7.35 -1.42 -2.63 7.85 1.40 0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 97.37 -1.47 30.30 -28.54 0.03 -0.06 0.08 --- ---
Arm. vert. gch. 61.33 -6.96 17.03 -13.27 -5.70 -0.76 0.10 --- ---
Arm. horz. gch. 71.19 -1.05 30.53 -28.59 -1.45 -0.09 0.10 --- ---
Béton 22.14 -1.05 30.53 -28.59 -1.45 -0.09 0.10 --- ---
Arm. transve. 5.14 -19.06 -6.27 -6.00 --- --- --- -7.20 -1.28
R+10
Arm. vert. drt. 82.15 1.16 -2.07 -3.13 8.25 1.47 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.74 -8.14 31.19 -30.10 0.16 -0.09 0.10 --- ---
Arm. vert. gch. 60.24 -32.44 -0.31 4.01 -9.10 -1.51 0.72 --- ---
Arm. horz. gch. 72.69 -8.14 31.19 -30.10 -1.45 -0.09 0.10 --- ---
Béton 24.36 -50.70 40.06 -2.36 -1.44 -0.25 0.27 --- ---
Arm. transve. 5.34 -25.20 -6.96 -6.86 --- --- --- -7.47 -1.33
R+9
Arm. vert. drt. 77.89 -6.57 -2.80 -3.50 8.53 1.52 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.76 -19.09 31.34 -30.90 0.38 -0.08 0.10 --- ---
Arm. vert. gch. 59.13 -35.95 -0.61 4.33 -9.33 -1.55 0.75 --- ---
Arm. horz. gch. 72.12 -19.09 31.34 -30.90 -1.43 -0.08 0.10 --- ---
Béton 28.25 -61.70 40.26 -2.33 -1.39 -0.25 0.27 --- ---
Arm. transve. 5.46 -31.81 -7.65 -7.61 --- --- --- -7.65 -1.36
R+8
Arm. vert. drt. 71.93 -13.15 -3.83 -4.58 8.49 1.51 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.19 -31.56 31.15 -31.29 0.63 -0.08 0.10 --- ---
Arm. vert. gch. 56.92 -39.57 -0.93 4.59 -9.46 -1.57 0.76 --- ---
Arm. horz. gch. 70.43 -31.56 31.15 -31.29 -1.42 -0.08 0.10 --- ---
Béton 33.25 -74.18 39.96 -2.19 -1.48 -0.24 0.26 --- ---
Arm. transve. 5.61 -39.10 -8.35 -8.33 --- --- --- -7.86 -1.40
R+7
Arm. vert. drt. 65.11 -22.23 -4.74 -5.11 8.62 1.53 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.02 -45.72 30.55 -31.26 0.91 -0.07 0.10 --- ---
Arm. vert. gch. 53.39 -43.40 -1.23 4.83 -9.47 -1.57 0.77 --- ---
Arm. horz. gch. 67.38 -45.72 30.55 -31.26 -1.37 -0.07 0.10 --- ---
Béton 39.36 -87.84 39.12 -1.95 -1.76 -0.22 0.25 --- ---
Arm. transve. 4.63 -46.97 8.49 -5.77 --- --- --- -6.58 -0.22
Page 95
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA12c: Longueur: 146.9 cm [Noeud initial: 29.99;43.42 -> Noeud final: 29.99;44.89]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+6
Arm. vert. drt. 60.47 -39.87 -4.57 -2.39 9.59 1.68 0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 116.24 -95.40 38.81 -2.25 1.91 -0.17 0.23 --- ---
Arm. vert. gch. 54.64 -102.23 37.66 -1.63 2.04 -0.21 0.24 --- ---
Arm. horz. gch. 61.67 -61.87 29.46 -30.78 -1.33 -0.06 0.10 --- ---
Béton 50.91 -112.74 29.79 -0.75 -2.25 0.40 -0.08 --- ---
Arm. transve. 4.63 -55.05 7.86 -5.41 --- --- --- -6.51 -0.21
R+5
Arm. vert. drt. 64.62 -121.42 29.04 -0.86 -2.43 0.43 -0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 110.49 -110.36 36.86 -1.90 2.21 -0.16 0.22 --- ---
Arm. vert. gch. 62.25 -117.17 35.55 -1.25 2.34 -0.20 0.23 --- ---
Arm. horz. gch. 120.83 -111.88 36.74 -1.74 -2.24 -0.18 0.23 --- ---
Béton 56.15 -125.06 28.73 -0.62 -2.50 0.42 -0.10 --- ---
Arm. transve. 4.47 -60.88 7.37 -5.31 --- --- --- -6.33 -0.21
R+4
Arm. vert. drt. 42.40 -47.69 -5.30 -3.03 8.73 1.53 0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.22 -126.91 34.07 -1.42 2.54 -0.15 0.20 --- ---
Arm. vert. gch. 71.15 -133.74 32.68 -0.74 2.67 -0.18 0.21 --- ---
Arm. horz. gch. 111.18 -126.93 34.08 -1.42 -2.54 -0.15 0.20 --- ---
Béton 59.30 -132.08 33.56 -1.00 -2.64 -0.17 0.21 --- ---
Arm. transve. 4.20 -70.56 6.07 -4.53 --- --- --- -5.95 -0.19
R+3
Arm. vert. drt. 41.13 -53.84 -5.89 -3.65 9.11 1.54 0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 32.67 -53.84 -5.89 -3.65 9.11 1.54 0.16 --- ---
Arm. vert. gch. 32.84 -7.30 -39.38 9.92 -3.80 -0.62 0.17 --- ---
Arm. horz. gch. 17.52 -7.27 -39.39 9.92 -3.80 -0.62 0.17 --- ---
Béton 28.27 -156.88 21.59 1.14 3.14 0.40 -0.12 --- ---
Arm. transve. 4.08 -81.37 4.49 -3.73 --- --- --- -5.78 -0.17
R+2
Arm. vert. drt. 11.57 -168.30 17.61 0.61 -3.37 0.23 -0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.38 -15.20 -37.41 12.66 -2.36 -0.34 0.12 --- ---
Arm. vert. gch. 11.57 -168.30 17.61 0.61 3.37 0.23 -0.11 --- ---
Arm. horz. gch. 2.07 -22.19 -43.90 14.17 0.44 -0.02 -0.12 --- ---
Béton 30.33 -168.30 17.61 0.61 3.37 0.23 -0.11 --- ---
Arm. transve. 1.88 -91.28 2.85 -0.18 --- --- --- -2.66 -0.09
R+1
Arm. vert. drt. 50.95 48.66 -1.43 1.25 0.54 0.05 -0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 38.86 31.25 5.81 4.60 1.47 0.18 -0.01 --- ---
Arm. vert. gch. 51.31 50.34 -1.25 1.54 -0.39 0.02 0.06 --- ---
Arm. horz. gch. 11.04 13.22 -30.07 11.00 -1.63 -0.22 0.08 --- ---
Béton 33.46 -248.64 -31.41 -23.84 4.97 -0.20 -0.05 --- ---
Arm. transve. 1.21 -102.10 -1.28 3.04 --- --- --- -1.72 -0.04
RDC
Arm. vert. drt. 80.04 68.38 10.51 12.78 0.38 0.01 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 75.86 68.38 10.51 12.78 0.38 0.01 0.06 --- ---
Arm. vert. gch. 76.64 76.25 0.50 7.72 0.00 -0.01 0.00 --- ---
Arm. horz. gch. 71.41 68.05 10.48 12.75 0.00 0.01 0.06 --- ---
Béton 58.11 -420.62 -38.91 -57.58 8.41 0.00 0.12 --- ---
Arm. transve. 0.73 -187.38 -35.09 -53.30 --- --- --- 0.57 -0.87
SS1
Arm. vert. drt. 83.01 15.58 -5.10 69.21 0.00 -0.37 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 105.82 -132.11 -8.31 -94.35 2.64 -0.45 -0.04 --- ---
Page 96
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA12c: Longueur: 146.9 cm [Noeud initial: 29.99;43.42 -> Noeud final: 29.99;44.89]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 84.64 13.34 -7.91 71.00 -0.15 -0.46 0.04 --- ---
Arm. horz. gch. 117.08 -131.89 -8.17 -94.25 -2.64 -0.48 -0.04 --- ---
Béton 60.17 -131.89 -8.17 -94.25 2.64 -0.48 -0.04 --- ---
Arm. transve. 11.59 2.99 -14.27 50.99 --- --- --- -0.84 1.17
Mur M1: Longueur: 203.7 cm [Noeud initial: 56.56;46.63 -> Noeud final: 58.59;46.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 1.96 -34.93 -0.30 -1.04 -0.70 0.01 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.07 0.87 -17.17 -10.96 -0.10 -0.01 -0.00 --- ---
Arm. vert. gch. 1.96 -34.93 -0.30 -1.04 0.70 0.01 0.00 --- ---
Arm. horz. gch. 1.13 -2.06 -16.27 -9.41 0.35 0.31 0.17 --- ---
Béton 5.10 -34.93 -0.30 -1.04 -0.70 0.01 0.00 --- ---
Arm. transve. 1.25 0.03 -1.11 18.95 --- --- --- 0.31 -1.77
R+14
Arm. vert. drt. 86.36 55.01 -0.22 6.77 0.00 0.01 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 33.00 30.50 -0.31 9.34 0.00 0.04 -0.02 --- ---
Arm. vert. gch. 86.25 55.01 -0.22 6.77 -0.01 0.01 -0.04 --- ---
Arm. horz. gch. 94.41 49.21 0.02 0.27 0.00 0.00 -0.02 --- ---
Béton 21.53 49.21 0.02 0.27 0.00 0.00 -0.02 --- ---
Arm. transve. 0.39 41.71 -0.38 6.23 --- --- --- 0.04 -0.01
R+13
Arm. vert. drt. 102.56 69.72 0.07 1.44 0.00 0.02 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 17.63 63.39 -0.19 2.73 0.00 0.00 0.02 --- ---
Arm. vert. gch. 103.20 69.72 0.07 1.44 -0.01 0.02 -0.04 --- ---
Arm. horz. gch. 16.60 65.24 -0.11 2.44 -0.01 0.01 -0.02 --- ---
Béton 14.42 -98.22 0.71 -3.26 1.96 -0.02 0.03 --- ---
Arm. transve. 0.27 -11.10 -4.67 -1.16 --- --- --- 0.11 -0.37
R+12
Arm. vert. drt. 94.54 64.12 0.03 -1.01 0.00 0.01 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 15.89 61.56 -1.10 -2.62 0.00 0.01 -0.04 --- ---
Arm. vert. gch. 94.27 64.12 0.03 -1.01 -0.01 0.01 -0.03 --- ---
Arm. horz. gch. 12.70 61.55 -1.09 -2.62 -0.01 0.01 -0.03 --- ---
Béton 15.03 -102.43 0.70 -0.84 2.05 -0.01 0.02 --- ---
Arm. transve. 0.30 -15.62 -4.73 -1.31 --- --- --- 0.20 -0.37
R+11
Arm. vert. drt. 83.32 56.88 1.10 -0.18 0.00 -0.01 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 21.98 36.03 -0.07 4.54 0.00 0.03 0.04 --- ---
Arm. vert. gch. 83.51 56.88 1.10 -0.18 -0.01 -0.01 -0.00 --- ---
Arm. horz. gch. 18.88 36.05 -0.06 4.54 -0.02 0.03 0.03 --- ---
Béton 14.40 -98.11 0.52 0.04 -1.96 -0.01 0.01 --- ---
Arm. transve. 0.34 -19.40 -4.71 -1.13 --- --- --- 0.29 -0.39
R+10
Arm. vert. drt. 67.11 45.83 1.05 -0.08 0.00 -0.01 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 10.15 40.69 0.07 0.12 0.00 0.03 0.03 --- ---
Arm. vert. gch. 67.51 45.83 1.05 -0.08 -0.03 -0.01 -0.00 --- ---
Arm. horz. gch. 10.18 42.53 -0.64 1.73 -0.01 0.01 -0.02 --- ---
Béton 15.00 -102.21 0.57 -2.68 -2.04 -0.01 -0.01 --- ---
Arm. transve. 0.36 -25.28 -4.52 -1.09 --- --- --- 0.29 -0.43
Page 97
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur M1: Longueur: 203.7 cm [Noeud initial: 56.56;46.63 -> Noeud final: 58.59;46.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+9
Arm. vert. drt. 70.38 44.85 -0.14 4.89 0.00 0.03 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 24.09 44.72 -0.14 4.90 0.00 0.03 0.02 --- ---
Arm. vert. gch. 70.16 46.31 -0.08 2.87 -0.01 0.01 0.00 --- ---
Arm. horz. gch. 22.22 32.50 -0.03 5.56 -0.01 0.01 0.02 --- ---
Béton 16.65 -113.35 0.70 -4.85 -2.27 -0.01 -0.01 --- ---
Arm. transve. 0.44 -30.06 -4.53 0.04 --- --- --- 0.32 -0.55
R+8
Arm. vert. drt. 84.19 56.17 -0.16 2.57 0.00 0.02 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 16.82 56.11 -0.16 2.58 0.00 0.02 0.02 --- ---
Arm. vert. gch. 84.13 56.17 -0.16 2.57 -0.02 0.02 0.02 --- ---
Arm. horz. gch. 14.32 56.12 -0.16 2.58 -0.02 0.02 0.02 --- ---
Béton 19.46 -132.51 0.74 -4.58 -2.65 -0.02 -0.03 --- ---
Arm. transve. 0.38 -35.27 -4.57 -0.54 --- --- --- 0.33 -0.44
R+7
Arm. vert. drt. 86.14 57.51 -0.14 2.59 0.00 0.01 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 16.84 57.50 -0.14 2.59 0.00 0.01 0.02 --- ---
Arm. vert. gch. 86.12 57.51 -0.14 2.59 -0.02 0.01 0.02 --- ---
Arm. horz. gch. 14.67 57.51 -0.14 2.59 -0.02 0.01 0.02 --- ---
Béton 20.99 -142.91 0.68 -4.60 -2.86 -0.01 -0.03 --- ---
Arm. transve. 0.39 -39.71 -4.40 -0.91 --- --- --- 0.35 -0.43
R+6
Arm. vert. drt. 106.09 67.32 -0.32 7.69 0.00 0.00 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 40.72 52.55 -0.01 9.89 0.00 -0.01 0.04 --- ---
Arm. vert. gch. 105.49 67.32 -0.32 7.69 -0.03 0.00 0.04 --- ---
Arm. horz. gch. 39.20 52.56 -0.01 9.89 -0.03 -0.01 0.04 --- ---
Béton 23.76 -161.44 0.81 -9.70 -3.23 0.00 -0.05 --- ---
Arm. transve. 0.81 52.19 -0.44 7.17 --- --- --- -0.09 0.00
R+5
Arm. vert. drt. 111.90 87.20 -0.14 7.03 0.00 0.00 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 65.14 38.29 -0.93 21.77 0.00 0.01 0.05 --- ---
Arm. vert. gch. 111.55 87.20 -0.14 7.03 -0.04 0.00 0.04 --- ---
Arm. horz. gch. 62.65 38.30 -0.93 21.77 -0.01 0.01 0.05 --- ---
Béton 27.75 -189.75 0.55 -9.06 -3.80 -0.00 -0.05 --- ---
Arm. transve. 0.68 66.87 -0.30 11.87 --- --- --- -0.09 0.01
R+4
Arm. vert. drt. 113.54 122.49 -0.39 11.52 0.00 0.01 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 80.47 26.00 5.07 25.86 0.00 0.03 0.03 --- ---
Arm. vert. gch. 113.19 122.49 -0.39 11.51 -0.04 0.01 0.05 --- ---
Arm. horz. gch. 78.16 26.00 5.07 25.86 -0.04 0.03 0.03 --- ---
Béton 33.62 -233.37 0.77 -13.56 -4.67 -0.00 -0.05 --- ---
Arm. transve. 2.56 22.99 4.89 25.77 --- --- --- 0.19 -0.14
R+3
Arm. vert. drt. 100.68 155.11 -1.48 9.19 0.00 -0.02 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.85 106.13 0.11 0.69 0.00 -0.01 0.01 --- ---
Arm. vert. gch. 101.42 155.11 -1.48 9.19 -0.13 -0.02 0.01 --- ---
Arm. horz. gch. 71.98 41.04 1.97 26.62 -0.07 -0.02 0.05 --- ---
Béton 39.07 -274.37 1.63 -10.96 -5.49 0.02 -0.02 --- ---
Arm. transve. 5.23 37.74 1.80 26.54 --- --- --- 0.45 -0.13
R+2
Arm. vert. drt. 124.92 197.87 0.91 3.70 0.00 -0.00 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 66.66 45.43 2.34 20.12 0.08 0.16 0.02 --- ---
Page 98
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur M1: Longueur: 203.7 cm [Noeud initial: 56.56;46.63 -> Noeud final: 58.59;46.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 125.10 197.87 0.91 3.70 -0.09 -0.00 0.05 --- ---
Arm. horz. gch. 64.34 101.28 0.56 17.12 -0.07 -0.20 -0.01 --- ---
Béton 46.06 -322.74 -0.14 -3.73 6.45 -0.00 -0.05 --- ---
Arm. transve. 6.98 68.52 1.64 13.33 --- --- --- 0.58 0.34
R+1
Arm. vert. drt. 112.49 276.42 -9.69 9.09 0.02 -0.01 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 144.14 -184.48 72.48 -0.67 -3.69 0.15 0.04 --- ---
Arm. vert. gch. 112.15 276.42 -9.69 9.09 0.00 -0.01 0.05 --- ---
Arm. horz. gch. 141.03 -186.25 72.96 1.14 3.73 0.08 0.02 --- ---
Béton 78.43 -174.53 63.37 0.23 3.49 0.09 0.04 --- ---
Arm. transve. 5.19 71.35 7.81 28.66 --- --- --- -0.59 0.20
RDC
Arm. vert. drt. 81.12 197.27 5.42 -9.51 0.01 -0.02 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 149.80 -26.41 91.83 49.43 0.53 0.10 -0.17 --- ---
Arm. vert. gch. 81.41 197.27 5.42 -9.51 0.00 -0.02 0.05 --- ---
Arm. horz. gch. 151.12 -26.41 91.83 49.43 -0.53 0.10 -0.17 --- ---
Béton 60.75 42.09 0.34 -80.76 0.07 0.06 0.06 --- ---
Arm. transve. 1.29 53.88 -16.77 -92.87 --- --- --- -0.06 -0.10
SS1
Arm. vert. drt. 58.23 20.04 -11.98 -118.70 0.00 -0.03 0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 91.74 -12.18 -0.31 -118.17 0.24 -0.05 0.01 --- ---
Arm. vert. gch. 59.14 20.24 -11.69 -118.49 -0.03 -0.03 0.08 --- ---
Arm. horz. gch. 92.54 -12.18 -0.31 -118.17 -0.24 -0.05 0.01 --- ---
Béton 88.25 -12.18 -0.31 -118.17 0.24 -0.05 0.01 --- ---
Arm. transve. 2.43 -17.02 -0.48 -115.40 --- --- --- 0.28 0.07
Mur M2: Longueur: 210 cm [Noeud initial: 24.86;37.35 -> Noeud final: 26.97;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 63.21 8.10 10.55 -34.61 0.04 -0.06 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 132.37 30.16 97.36 5.44 0.00 0.04 0.05 --- ---
Arm. vert. gch. 62.25 -2.68 16.24 -41.90 -0.07 0.02 0.05 --- ---
Arm. horz. gch. 130.55 30.16 97.36 5.44 -0.02 0.04 0.05 --- ---
Béton 29.57 -6.33 -0.01 39.86 0.13 -0.01 -0.00 --- ---
Arm. transve. 0.43 -16.80 -17.24 19.40 --- --- --- -0.61 -0.00
R+14
Arm. vert. drt. 66.38 18.94 94.86 11.77 0.15 0.31 0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 304.88 18.94 94.86 11.77 0.15 0.31 0.10 --- ---
Arm. vert. gch. 59.34 18.94 94.86 11.77 0.00 0.31 0.10 --- ---
Arm. horz. gch. 288.71 23.44 97.81 3.75 0.00 0.07 0.04 --- ---
Béton 14.45 -37.90 -135.13 -21.64 0.76 -0.26 -0.12 --- ---
Arm. transve. 0.32 -13.70 -20.09 12.69 --- --- --- -0.01 0.46
R+13
Arm. vert. drt. 70.47 24.42 90.83 13.98 0.14 0.28 0.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 188.59 19.01 95.31 14.66 0.19 0.35 0.12 --- ---
Arm. vert. gch. 68.89 34.52 93.91 8.55 0.00 0.04 0.03 --- ---
Arm. horz. gch. 183.12 26.68 101.75 8.37 0.00 0.10 0.05 --- ---
Béton 16.12 -10.36 33.68 25.30 -0.21 -0.01 0.06 --- ---
Arm. transve. 0.34 -16.82 -15.85 13.29 --- --- --- -0.01 0.48
Page 99
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur M2: Longueur: 210 cm [Noeud initial: 24.86;37.35 -> Noeud final: 26.97;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+12
Arm. vert. drt. 85.55 30.79 93.64 19.72 0.17 0.31 0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 154.23 25.95 108.30 11.87 0.09 0.17 0.06 --- ---
Arm. vert. gch. 81.58 36.00 103.11 15.88 0.00 0.15 0.06 --- ---
Arm. horz. gch. 148.86 25.95 108.30 11.87 0.00 0.17 0.06 --- ---
Béton 32.30 -23.66 -0.10 -42.68 0.47 -0.02 -0.08 --- ---
Arm. transve. 0.31 -14.29 -21.89 9.54 --- --- --- -0.06 0.44
R+11
Arm. vert. drt. 94.43 31.35 99.33 23.87 0.21 0.36 0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 166.74 22.99 115.21 14.54 0.15 0.26 0.09 --- ---
Arm. vert. gch. 87.12 31.35 99.33 23.87 0.00 0.36 0.12 --- ---
Arm. horz. gch. 159.16 32.09 111.03 18.66 0.00 0.24 0.08 --- ---
Béton 35.77 -21.96 0.02 48.02 0.44 -0.01 -0.00 --- ---
Arm. transve. 0.34 -9.05 35.71 40.67 --- --- --- 0.10 0.47
R+10
Arm. vert. drt. 87.85 25.06 106.14 25.76 0.29 0.48 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 136.01 13.49 113.16 24.30 0.36 0.59 0.18 --- ---
Arm. vert. gch. 78.38 25.06 106.14 25.76 0.00 0.48 0.15 --- ---
Arm. horz. gch. 127.03 19.50 122.00 16.61 0.00 0.34 0.11 --- ---
Béton 43.34 -28.56 0.05 58.29 -0.57 -0.02 0.00 --- ---
Arm. transve. 0.77 -34.82 -8.17 -63.45 --- --- --- -0.07 -0.06
R+9
Arm. vert. drt. 81.83 22.71 102.75 23.88 0.29 0.48 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 141.88 12.37 128.10 17.11 0.27 0.44 0.14 --- ---
Arm. vert. gch. 72.26 22.77 103.57 23.76 0.00 0.48 0.15 --- ---
Arm. horz. gch. 131.52 12.37 128.10 17.11 0.00 0.44 0.14 --- ---
Béton 45.02 -30.73 0.01 60.55 -0.61 -0.01 0.00 --- ---
Arm. transve. 0.49 -29.14 37.45 48.27 --- --- --- 0.06 0.69
R+8
Arm. vert. drt. 81.22 21.79 105.45 23.68 0.32 0.52 0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 146.59 4.03 132.68 16.95 0.34 0.54 0.17 --- ---
Arm. vert. gch. 70.87 21.79 105.45 23.68 0.00 0.52 0.16 --- ---
Arm. horz. gch. 133.89 4.03 132.68 16.95 0.00 0.54 0.17 --- ---
Béton 43.80 -48.25 0.06 57.97 0.97 -0.02 -0.03 --- ---
Arm. transve. 4.87 -47.98 44.10 40.08 --- --- --- 0.01 0.60
R+7
Arm. vert. drt. 88.26 19.05 112.95 28.75 0.41 0.66 0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 150.58 -4.62 136.07 17.14 0.41 0.66 0.20 --- ---
Arm. vert. gch. 75.25 19.05 112.95 28.75 0.00 0.66 0.20 --- ---
Arm. horz. gch. 135.35 -4.62 136.07 17.14 -0.09 0.66 0.20 --- ---
Béton 48.35 -52.04 0.14 64.12 1.04 -0.02 -0.02 --- ---
Arm. transve. 5.78 -57.37 44.62 44.29 --- --- --- -0.00 0.71
R+6
Arm. vert. drt. 84.39 40.30 8.01 21.13 0.15 0.02 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 153.12 -14.17 137.94 17.32 0.49 0.79 0.24 --- ---
Arm. vert. gch. 85.19 29.77 11.73 32.06 -0.06 -0.76 0.00 --- ---
Arm. horz. gch. 135.29 -14.17 137.94 17.32 -0.28 0.79 0.24 --- ---
Béton 48.13 -55.28 0.06 63.61 1.11 -0.01 -0.02 --- ---
Arm. transve. 6.84 -70.43 44.33 49.16 --- --- --- -0.03 0.84
R+5
Arm. vert. drt. 91.40 62.74 8.80 11.03 0.06 0.04 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 137.69 -26.46 137.73 18.78 0.60 0.97 0.29 --- ---
Page 100
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur M2: Longueur: 210 cm [Noeud initial: 24.86;37.35 -> Noeud final: 26.97;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 89.89 62.74 8.80 11.03 0.00 0.04 0.04 --- ---
Arm. horz. gch. 118.84 -26.46 137.73 18.78 -0.53 0.97 0.29 --- ---
Béton 49.95 -62.81 -0.03 65.88 1.26 -0.02 -0.02 --- ---
Arm. transve. 7.94 -84.37 43.49 54.63 --- --- --- -0.05 0.99
R+4
Arm. vert. drt. 85.97 58.47 12.16 35.59 0.00 -0.75 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 151.57 -40.84 135.17 17.56 0.82 1.09 0.32 --- ---
Arm. vert. gch. 88.53 58.47 12.16 35.59 -0.09 -0.75 -0.00 --- ---
Arm. horz. gch. 127.83 -40.84 135.17 17.56 -0.82 1.09 0.32 --- ---
Béton 59.90 -95.07 -0.15 76.90 1.90 -0.02 -0.04 --- ---
Arm. transve. 9.55 -98.89 41.48 59.56 --- --- --- -0.09 1.13
R+3
Arm. vert. drt. 91.96 88.58 11.27 19.79 0.35 0.06 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 124.68 -59.10 127.75 11.62 1.18 1.14 0.33 --- ---
Arm. vert. gch. 93.18 79.44 12.92 32.44 -0.11 -0.80 -0.00 --- ---
Arm. horz. gch. 103.59 -59.10 127.75 11.62 -1.18 1.14 0.33 --- ---
Béton 55.32 -73.73 0.01 72.51 1.47 0.00 -0.03 --- ---
Arm. transve. 10.10 -116.87 37.53 58.36 --- --- --- -0.14 1.21
R+2
Arm. vert. drt. 92.90 128.15 14.40 20.88 0.11 0.07 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 178.44 -39.05 72.53 23.35 0.78 0.69 0.27 --- ---
Arm. vert. gch. 91.70 128.15 14.40 20.88 0.00 0.07 0.03 --- ---
Arm. horz. gch. 150.00 -94.12 82.88 6.84 -1.88 0.72 0.27 --- ---
Béton 41.64 -93.07 48.41 1.94 -1.86 0.69 -0.27 --- ---
Arm. transve. 2.24 119.41 0.48 19.57 --- --- --- 0.27 0.01
R+1
Arm. vert. drt. 115.02 203.65 13.50 34.64 0.00 -0.80 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 78.40 -54.08 56.90 31.27 1.08 0.57 0.22 --- ---
Arm. vert. gch. 117.44 203.65 13.50 34.64 -0.05 -0.80 0.03 --- ---
Arm. horz. gch. 107.21 96.83 -0.22 76.73 0.00 0.04 -0.07 --- ---
Béton 68.42 -149.16 34.70 3.13 -2.98 0.85 -0.30 --- ---
Arm. transve. 8.54 153.34 24.65 19.59 --- --- --- -0.83 0.02
RDC
Arm. vert. drt. 104.52 190.04 18.27 4.31 1.36 0.29 0.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 112.11 104.84 50.92 27.26 0.54 0.15 0.11 --- ---
Arm. vert. gch. 95.96 190.04 18.27 4.31 0.00 0.29 0.09 --- ---
Arm. horz. gch. 105.10 104.87 50.59 27.64 0.00 0.15 0.11 --- ---
Béton 59.62 -67.83 -22.35 97.35 1.36 -0.12 -0.11 --- ---
Arm. transve. 7.07 -68.25 -22.36 96.75 --- --- --- -0.54 0.43
SS1
Arm. vert. drt. 43.26 51.93 5.08 -22.54 0.85 0.22 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.52 -36.73 -14.33 72.12 0.73 0.22 0.03 --- ---
Arm. vert. gch. 41.14 37.57 8.76 -36.47 0.00 0.11 0.03 --- ---
Arm. horz. gch. 90.95 -36.59 -14.29 72.06 -0.73 0.22 0.03 --- ---
Béton 49.59 -55.70 -26.35 81.24 -1.11 -0.10 -0.07 --- ---
Arm. transve. 6.24 42.02 9.56 -7.61 --- --- --- 0.69 0.27
Page 101
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA31: Longueur: 302.5 cm [Noeud initial: 9.77;38.41 -> Noeud final: 9.77;41.43]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+11
Arm. vert. drt. 118.79 -2.60 3.24 7.61 7.00 1.44 0.71 --- ---
(e=30.0 cm)
Arm. horz. drt. 107.43 -43.88 -29.47 71.61 0.88 0.22 0.05 --- ---
Arm. vert. gch. 121.99 -8.08 -2.92 -14.87 -8.44 -1.74 -0.72 --- ---
Arm. horz. gch. 87.79 -1.49 8.47 -19.91 -2.08 -0.62 -0.15 --- ---
Béton 43.17 -44.28 -29.50 71.80 0.89 0.21 0.05 --- ---
Arm. transve. 4.17 -18.68 -10.97 -22.01 --- --- --- -5.96 0.29
R+10
Arm. vert. drt. 5.90 -47.49 -4.23 -3.75 -5.40 -1.15 -0.96 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.06 -43.80 -23.58 14.95 0.88 0.12 0.00 --- ---
Arm. vert. gch. 6.16 -46.93 -6.05 1.48 5.89 1.31 -0.44 --- ---
Arm. horz. gch. 1.17 -43.30 -23.60 14.98 0.87 0.13 0.01 --- ---
Béton 14.01 -46.20 -5.84 1.42 5.57 0.70 -0.20 --- ---
Arm. transve. 3.06 -40.54 -4.89 -11.98 --- --- --- -4.36 0.51
R+9
Arm. vert. drt. 6.81 -64.37 -8.27 8.47 -5.28 -1.18 0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.11 -64.37 -8.27 8.47 1.29 -1.18 0.39 --- ---
Arm. vert. gch. 6.79 -54.79 -7.06 1.65 6.20 1.38 -0.46 --- ---
Arm. horz. gch. 1.18 -43.00 -23.57 12.18 0.86 0.15 0.01 --- ---
Béton 15.99 -71.95 -7.75 0.28 1.44 -0.11 -0.03 --- ---
Arm. transve. 3.04 -49.64 -5.56 -6.54 --- --- --- -4.33 0.50
R+8
Arm. vert. drt. 7.78 -79.73 -10.24 8.24 -5.42 -1.21 0.40 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.24 -79.73 -10.24 8.24 -5.42 -1.21 0.40 --- ---
Arm. vert. gch. 7.29 -61.78 -7.97 1.72 6.36 1.42 -0.46 --- ---
Arm. horz. gch. 1.22 -61.78 -7.97 1.72 -1.24 1.42 -0.46 --- ---
Béton 19.56 -88.04 -9.28 0.15 1.76 -0.11 -0.03 --- ---
Arm. transve. 3.04 -55.01 -6.21 -6.91 --- --- --- -4.32 0.51
R+7
Arm. vert. drt. 7.39 -77.35 -9.92 5.22 -4.99 -1.11 0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.18 -71.54 -9.17 4.12 -5.46 -1.21 0.44 --- ---
Arm. vert. gch. 8.00 -85.92 -4.81 3.89 5.19 1.11 1.00 --- ---
Arm. horz. gch. 1.28 -68.01 -8.77 1.87 6.51 1.45 -0.47 --- ---
Béton 22.36 -100.76 -10.52 0.09 2.02 -0.10 -0.04 --- ---
Arm. transve. 3.08 -59.74 -6.83 -7.37 --- --- --- -4.37 0.52
R+6
Arm. vert. drt. 8.02 -82.40 -10.56 4.33 -5.57 -1.23 0.44 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.27 -82.40 -10.56 4.33 1.65 -1.23 0.44 --- ---
Arm. vert. gch. 8.89 -101.23 -5.87 3.83 5.19 1.11 1.02 --- ---
Arm. horz. gch. 1.33 -72.56 -9.36 2.03 6.62 1.47 -0.47 --- ---
Béton 24.92 -112.32 -11.70 -0.30 2.25 -0.10 -0.04 --- ---
Arm. transve. 3.08 -61.95 -7.23 -8.09 --- --- --- -4.38 0.53
R+5
Arm. vert. drt. 8.96 -160.11 -20.65 12.80 -3.20 -0.24 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.37 -82.70 -14.39 8.77 1.65 -0.99 -1.07 --- ---
Arm. vert. gch. 9.68 -116.43 -6.91 3.80 5.04 1.09 1.03 --- ---
Arm. horz. gch. 1.36 -125.41 -21.18 -0.12 2.51 0.21 -0.04 --- ---
Béton 27.97 -126.07 -13.03 0.29 2.52 -0.10 -0.04 --- ---
Arm. transve. 3.34 -53.85 -7.10 -13.41 --- --- --- -4.75 0.57
R+4
Arm. vert. drt. 64.94 -26.37 -3.37 -3.08 6.39 1.41 -0.40 --- ---
(e=30.0 cm)
Arm. horz. drt. 49.90 -26.37 -3.37 -3.08 6.39 1.41 -0.40 --- ---
Page 102
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA31: Longueur: 302.5 cm [Noeud initial: 9.77;38.41 -> Noeud final: 9.77;41.43]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 10.63 -139.33 -8.79 2.55 4.39 0.95 0.95 --- ---
Arm. horz. gch. 1.35 -79.44 -10.25 2.39 6.43 1.42 -0.45 --- ---
Béton 30.53 -137.78 -14.22 0.26 2.76 -0.09 -0.03 --- ---
Arm. transve. 3.16 -52.41 -7.34 -14.02 --- --- --- -4.49 0.56
R+3
Arm. vert. drt. 81.13 -22.30 -2.84 -2.17 7.24 1.53 -0.37 --- ---
(e=30.0 cm)
Arm. horz. drt. 52.32 -22.30 -2.84 -2.17 7.24 1.53 -0.37 --- ---
Arm. vert. gch. 11.53 -154.46 -9.68 3.55 4.44 1.00 0.97 --- ---
Arm. horz. gch. 1.59 -145.58 -25.03 -0.23 2.91 0.22 -0.03 --- ---
Béton 32.02 -142.61 -12.26 -0.02 2.85 -0.10 -0.04 --- ---
Arm. transve. 3.37 -53.34 -7.71 -13.36 --- --- --- -4.80 0.55
R+2
Arm. vert. drt. 95.42 37.29 4.72 -8.00 2.09 0.36 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 67.39 0.91 -1.28 -21.97 1.61 0.38 0.01 --- ---
Arm. vert. gch. 61.43 33.93 1.73 -8.08 0.00 0.21 0.20 --- ---
Arm. horz. gch. 37.36 30.16 -0.60 -9.62 0.00 0.18 0.31 --- ---
Béton 36.85 -164.56 -14.53 0.15 3.29 -0.09 -0.03 --- ---
Arm. transve. 1.78 -49.56 -6.11 -11.99 --- --- --- -1.92 1.66
R+1
Arm. vert. drt. 110.24 63.67 16.05 -22.99 0.24 0.18 0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 91.95 61.51 25.85 -19.96 0.65 0.25 0.24 --- ---
Arm. vert. gch. 111.63 63.67 16.05 -22.99 0.00 0.18 0.20 --- ---
Arm. horz. gch. 92.73 30.11 5.94 -40.95 -0.16 0.05 0.08 --- ---
Béton 38.97 -272.60 -23.12 54.14 5.45 -0.06 -0.12 --- ---
Arm. transve. 1.41 -44.56 -6.15 -28.45 --- --- --- -1.54 1.32
RDC
Arm. vert. drt. 13.31 -239.34 -26.56 -3.54 -4.79 -0.04 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.58 -106.38 -34.85 6.67 2.13 0.16 -0.08 --- ---
Arm. vert. gch. 13.31 -239.34 -26.56 -3.54 4.79 -0.04 0.06 --- ---
Arm. horz. gch. 1.72 -106.34 -34.85 6.66 -2.13 0.18 -0.09 --- ---
Béton 37.54 -169.12 -15.26 -0.04 3.38 -0.10 0.01 --- ---
Arm. transve. 0.69 -108.92 -15.40 21.05 --- --- --- -0.99 -0.05
SS1
Arm. vert. drt. 12.92 -187.25 -23.65 -0.16 -3.74 -0.01 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.40 -187.25 -23.65 -0.16 -3.74 -0.01 -0.02 --- ---
Arm. vert. gch. 12.92 -187.25 -23.65 -0.16 3.74 -0.01 -0.02 --- ---
Arm. horz. gch. 1.38 -187.25 -23.65 -0.16 3.74 -0.01 -0.02 --- ---
Béton 40.31 -187.25 -23.65 -0.16 3.74 -0.01 -0.02 --- ---
Arm. transve. 0.56 -103.12 -21.78 20.98 --- --- --- -0.81 -0.02
Mur VP24: Longueur: 638.7 cm [Noeud initial: 46.32;55.40 -> Noeud final: 52.71;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 104.84 -51.12 -43.90 181.70 1.02 -0.27 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 79.75 -153.20 -26.14 186.94 3.06 0.58 -0.05 --- ---
Arm. vert. gch. 111.43 46.93 6.00 -93.13 -0.68 -0.34 0.02 --- ---
Arm. horz. gch. 111.40 -153.20 -26.14 186.94 -3.06 0.58 -0.05 --- ---
Béton 112.39 -153.20 -26.14 186.94 3.06 0.58 -0.05 --- ---
Arm. transve. 10.66 12.68 10.86 -93.48 --- --- --- 1.22 0.18
Page 103
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA17: Longueur: 150.9 cm [Noeud initial: 5.92;37.35 -> Noeud final: 7.43;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 85.33 -7.43 -1.76 -3.51 5.61 3.32 1.32 --- ---
(e=30.0 cm)
Arm. horz. drt. 91.73 27.32 42.21 -12.68 0.36 -0.24 0.23 --- ---
Arm. vert. gch. 70.98 27.40 42.08 -12.69 0.00 -0.27 0.23 --- ---
Arm. horz. gch. 161.14 27.40 42.08 -12.69 0.00 -0.27 0.23 --- ---
Béton 9.78 -16.30 -1.72 0.26 -5.65 -1.08 0.22 --- ---
Arm. transve. 2.78 -14.75 1.47 5.22 --- --- --- 3.94 -0.48
R+14
Arm. vert. drt. 63.42 32.99 45.25 -11.47 0.00 -0.33 0.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.05 28.39 48.57 -11.86 0.00 -0.37 0.31 --- ---
Arm. vert. gch. 78.55 32.97 45.10 -11.45 -0.09 -0.34 0.28 --- ---
Arm. horz. gch. 184.21 29.16 48.79 -12.01 -0.23 -0.42 0.31 --- ---
Béton 11.32 -30.33 -3.36 -0.20 -5.39 -1.05 0.27 --- ---
Arm. transve. 2.46 -31.96 1.12 3.75 --- --- --- 3.46 -0.62
R+13
Arm. vert. drt. 75.59 40.52 48.26 -12.76 0.00 -0.37 0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 106.21 37.13 51.96 -13.42 0.00 -0.43 0.33 --- ---
Arm. vert. gch. 91.40 40.51 48.13 -12.74 -0.07 -0.37 0.31 --- ---
Arm. horz. gch. 198.19 37.13 51.96 -13.42 -0.15 -0.43 0.33 --- ---
Béton 14.17 -39.45 -1.70 -4.36 -0.79 3.67 1.41 --- ---
Arm. transve. 2.75 -49.85 0.73 4.63 --- --- --- 3.87 -0.61
R+12
Arm. vert. drt. 82.73 43.75 54.04 -14.42 0.00 -0.47 0.34 --- ---
(e=30.0 cm)
Arm. horz. drt. 114.91 37.87 56.71 -14.56 0.00 -0.51 0.35 --- ---
Arm. vert. gch. 102.33 43.75 54.04 -14.42 -0.21 -0.47 0.34 --- ---
Arm. horz. gch. 216.73 37.87 56.71 -14.56 -0.28 -0.51 0.35 --- ---
Béton 15.72 -74.99 -6.82 0.79 -3.86 -0.66 -0.09 --- ---
Arm. transve. 2.74 -68.22 0.39 5.30 --- --- --- 3.86 -0.60
R+11
Arm. vert. drt. 86.59 45.14 62.82 -16.73 0.00 -0.83 0.49 --- ---
(e=30.0 cm)
Arm. horz. drt. 123.82 41.60 63.84 -16.69 0.00 -0.85 0.50 --- ---
Arm. vert. gch. 120.48 45.14 62.82 -16.73 -0.75 -0.83 0.49 --- ---
Arm. horz. gch. 254.21 41.60 63.83 -16.69 -0.79 -0.85 0.50 --- ---
Béton 18.41 -93.23 -8.73 0.87 -3.98 -0.69 -0.10 --- ---
Arm. transve. 2.72 -87.69 0.02 7.00 --- --- --- 3.85 -0.54
R+10
Arm. vert. drt. 87.59 44.53 68.11 -17.98 0.00 -0.94 0.54 --- ---
(e=30.0 cm)
Arm. horz. drt. 133.59 41.79 69.63 -18.11 0.00 -0.97 0.55 --- ---
Arm. vert. gch. 125.80 44.53 68.11 -17.98 -0.89 -0.94 0.54 --- ---
Arm. horz. gch. 277.89 41.80 69.63 -18.11 -0.92 -0.97 0.55 --- ---
Béton 21.24 -119.60 -0.23 10.12 -2.39 -0.55 -0.17 --- ---
Arm. transve. 2.80 -107.24 -0.38 7.57 --- --- --- 3.96 -0.53
R+9
Arm. vert. drt. 88.42 44.39 71.01 -18.59 0.00 -0.99 0.56 --- ---
(e=30.0 cm)
Arm. horz. drt. 141.59 42.76 73.96 -19.19 0.00 -1.04 0.58 --- ---
Arm. vert. gch. 129.95 43.03 73.90 -19.22 -1.03 -1.04 0.58 --- ---
Arm. horz. gch. 294.97 43.03 73.90 -19.22 -1.03 -1.04 0.58 --- ---
Béton 25.46 -143.17 -0.76 10.96 -2.86 -0.56 -0.16 --- ---
Arm. transve. 2.89 -129.35 -0.88 8.16 --- --- --- 4.09 -0.54
R+8
Arm. vert. drt. 92.16 45.55 76.14 -19.97 0.00 -1.08 0.60 --- ---
(e=30.0 cm)
Arm. horz. drt. 147.31 40.69 77.53 -19.91 0.00 -1.10 0.61 --- ---
Page 104
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA17: Longueur: 150.9 cm [Noeud initial: 5.92;37.35 -> Noeud final: 7.43;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 136.05 45.55 76.14 -19.97 -1.08 -1.08 0.60 --- ---
Arm. horz. gch. 308.47 41.03 77.47 -19.94 -1.12 -1.11 0.61 --- ---
Béton 29.73 -167.01 -1.30 11.73 -3.34 -0.57 -0.16 --- ---
Arm. transve. 3.04 -144.60 -1.80 4.31 --- --- --- 4.27 -0.76
R+7
Arm. vert. drt. 92.54 44.61 80.27 -20.96 0.00 -1.16 0.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 153.27 44.19 80.32 -20.92 0.00 -1.15 0.63 --- ---
Arm. vert. gch. 139.47 44.61 80.27 -20.96 -1.19 -1.16 0.63 --- ---
Arm. horz. gch. 320.82 44.61 80.27 -20.96 -1.19 -1.16 0.63 --- ---
Béton 33.13 -179.75 -0.87 21.72 3.60 -0.24 0.11 --- ---
Arm. transve. 3.27 -154.24 -2.52 0.96 --- --- --- 4.56 -1.00
R+6
Arm. vert. drt. 87.34 41.15 81.87 -21.12 0.00 -1.20 0.64 --- ---
(e=30.0 cm)
Arm. horz. drt. 145.29 38.62 83.03 -21.24 0.00 -1.22 0.65 --- ---
Arm. vert. gch. 134.16 41.15 81.87 -21.12 -1.26 -1.20 0.64 --- ---
Arm. horz. gch. 284.77 38.62 83.03 -21.24 -1.27 -1.22 0.65 --- ---
Béton 43.48 -97.03 -2.28 -13.90 -1.94 4.23 1.51 --- ---
Arm. transve. 3.23 -176.48 -3.04 1.85 --- --- --- 4.48 -0.93
R+5
Arm. vert. drt. 89.53 58.02 0.14 -2.64 0.00 0.04 -0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 158.97 38.47 84.29 -21.71 0.00 -1.25 0.65 --- ---
Arm. vert. gch. 136.44 38.47 84.29 -21.71 -1.34 -1.25 0.65 --- ---
Arm. horz. gch. 335.51 38.47 84.29 -21.71 -1.34 -1.25 0.65 --- ---
Béton 47.21 -105.71 -2.04 -14.76 -2.11 4.13 1.47 --- ---
Arm. transve. 3.11 -195.86 -3.57 2.64 --- --- --- 4.35 -0.86
R+4
Arm. vert. drt. 107.68 56.14 8.23 -3.79 2.30 0.37 -0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 158.21 31.46 84.96 -21.52 0.00 -1.26 0.64 --- ---
Arm. vert. gch. 75.26 68.26 11.06 -5.37 -2.68 -0.47 0.26 --- ---
Arm. horz. gch. 326.34 31.46 84.96 -21.52 -1.42 -1.26 0.64 --- ---
Béton 47.30 -258.89 1.84 22.51 -5.18 -0.21 0.18 --- ---
Arm. transve. 15.51 60.84 2.24 -7.31 --- --- --- -1.66 0.18
R+3
Arm. vert. drt. 120.47 131.44 12.92 -35.25 0.00 -0.15 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 183.03 11.71 100.49 -24.56 0.00 -1.91 0.53 --- ---
Arm. vert. gch. 123.96 131.44 12.92 -35.25 -0.91 -0.15 -0.05 --- ---
Arm. horz. gch. 171.32 11.71 100.49 -24.56 -1.29 -1.91 0.53 --- ---
Béton 56.99 -318.24 -5.28 36.26 6.36 -0.65 -0.44 --- ---
Arm. transve. 16.18 80.15 8.92 -28.39 --- --- --- 1.79 -0.97
R+2
Arm. vert. drt. 98.61 133.03 15.66 -9.59 0.05 -0.30 0.74 --- ---
(e=30.0 cm)
Arm. horz. drt. 96.05 45.50 25.83 -34.72 1.57 2.39 0.56 --- ---
Arm. vert. gch. 106.73 133.03 15.66 -9.59 0.00 -0.30 0.74 --- ---
Arm. horz. gch. 128.19 -34.72 78.70 -10.09 -1.02 -1.41 0.52 --- ---
Béton 54.11 -391.57 -26.05 23.57 7.83 -0.22 0.12 --- ---
Arm. transve. 5.16 -257.25 -27.97 35.73 --- --- --- -5.72 4.55
R+1
Arm. vert. drt. 100.21 309.17 3.43 17.02 0.07 0.02 0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.85 180.01 48.47 84.23 0.22 0.02 0.06 --- ---
Arm. vert. gch. 99.98 309.17 3.43 17.02 0.00 0.02 0.08 --- ---
Arm. horz. gch. 155.78 180.01 48.47 84.23 0.00 0.02 0.06 --- ---
Béton 70.77 -156.42 57.41 2.88 3.13 -0.96 0.34 --- ---
Page 105
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA17: Longueur: 150.9 cm [Noeud initial: 5.92;37.35 -> Noeud final: 7.43;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 5.28 52.90 1.84 15.73 --- --- --- -0.47 -0.02
RDC
Arm. vert. drt. 80.74 240.06 53.40 -12.19 0.50 0.07 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.65 -101.41 34.11 62.16 2.03 0.03 -0.01 --- ---
Arm. vert. gch. 78.67 240.06 53.40 -12.19 0.00 0.07 -0.06 --- ---
Arm. horz. gch. 101.58 -172.80 35.89 -64.21 -3.46 -0.29 -0.10 --- ---
Béton 46.45 2.83 5.38 60.73 0.27 0.12 0.07 --- ---
Arm. transve. 3.45 -109.77 29.62 48.77 --- --- --- -0.11 0.29
SS1
Arm. vert. drt. 29.66 15.81 7.13 62.16 0.21 0.06 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 86.56 -33.30 5.04 69.16 0.67 0.01 0.00 --- ---
Arm. vert. gch. 28.91 15.93 7.12 62.12 0.00 0.05 0.00 --- ---
Arm. horz. gch. 86.19 -33.30 5.04 69.16 -0.67 0.01 0.00 --- ---
Béton 42.90 12.92 -0.79 56.70 0.00 0.10 0.01 --- ---
Arm. transve. 1.46 12.18 2.97 50.41 --- --- --- -0.16 0.08
Mur VA17b: Longueur: 272.5 cm [Noeud initial: 3.19;37.35 -> Noeud final: 5.92;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 120.06 216.96 27.41 -29.02 0.00 -0.05 -0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 79.54 -102.55 -6.09 111.24 2.05 0.09 0.10 --- ---
Arm. vert. gch. 121.37 216.96 27.41 -29.02 -0.43 -0.05 -0.11 --- ---
Arm. horz. gch. 232.46 82.35 0.07 -1.13 0.09 0.01 -0.06 --- ---
Béton 79.52 82.35 0.07 -1.13 0.09 0.01 -0.06 --- ---
Arm. transve. 17.02 -10.21 10.50 64.04 --- --- --- 1.17 -1.11
R+1
Arm. vert. drt. 138.34 415.86 45.50 -35.09 0.00 -0.13 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 81.00 94.75 -0.12 -0.42 0.00 0.01 -0.03 --- ---
Arm. vert. gch. 143.23 415.86 45.50 -35.09 -1.00 -0.13 -0.00 --- ---
Arm. horz. gch. 110.97 415.86 45.50 -35.09 -1.00 -0.13 -0.00 --- ---
Béton 65.77 -520.13 -56.29 45.26 10.40 -0.04 0.03 --- ---
Arm. transve. 25.98 145.73 10.99 -68.36 --- --- --- -0.44 -2.27
RDC
Arm. vert. drt. 141.37 412.53 34.89 42.21 0.88 0.11 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 62.22 92.94 19.23 106.10 0.37 0.06 0.12 --- ---
Arm. vert. gch. 139.40 412.53 34.89 42.21 0.00 0.11 0.04 --- ---
Arm. horz. gch. 105.38 18.96 22.90 110.08 -0.08 -0.30 -0.06 --- ---
Béton 69.91 -118.71 -28.96 -114.83 2.37 -0.18 0.10 --- ---
Arm. transve. 9.84 253.98 22.32 82.87 --- --- --- 1.16 -0.09
SS1
Arm. vert. drt. 40.00 43.60 3.07 73.52 0.00 -0.09 -0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 101.92 11.12 10.82 85.29 0.00 -0.21 -0.07 --- ---
Arm. vert. gch. 40.96 43.60 3.07 73.52 -0.08 -0.09 -0.08 --- ---
Arm. horz. gch. 108.04 7.92 10.08 86.22 -0.06 -0.23 -0.09 --- ---
Béton 60.72 -0.46 7.84 79.25 -0.07 -0.22 -0.08 --- ---
Arm. transve. 5.23 -19.87 -8.18 67.48 --- --- --- -0.34 0.32
Page 106
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur AL-2: Longueur: 50.3 cm [Noeud initial: 9.77;44.73 -> Noeud final: 10.27;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 63.18 -8.75 -9.39 65.89 0.17 0.52 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 105.28 -109.86 2.35 76.67 2.20 -0.05 0.17 --- ---
Arm. vert. gch. 85.45 -8.54 -9.10 65.60 -0.17 0.51 0.09 --- ---
Arm. horz. gch. 103.12 -107.04 2.67 76.05 -2.14 -0.05 0.18 --- ---
Béton 49.65 -123.91 -2.82 79.69 -2.48 0.09 -0.07 --- ---
Arm. transve. 102.59 -32.44 -18.24 68.72 --- --- --- -8.51 9.51
Mur AL-3: Longueur: 180.4 cm [Noeud initial: 15.42;44.73 -> Noeud final: 17.23;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 93.89 -40.56 -35.09 -140.14 0.81 0.35 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 94.08 -40.56 -35.09 -140.14 0.81 0.35 -0.03 --- ---
Arm. vert. gch. 92.56 -40.56 -35.09 -140.14 -0.81 0.35 -0.03 --- ---
Arm. horz. gch. 88.98 -40.89 -35.22 -140.29 -0.82 0.34 -0.03 --- ---
Béton 83.95 -42.22 -36.29 -141.14 -0.84 0.34 -0.03 --- ---
Arm. transve. 1.25 -40.32 -23.58 -32.35 --- --- --- 1.76 -0.25
Mur AL-4: Longueur: 190 cm [Noeud initial: 17.23;44.73 -> Noeud final: 19.13;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 99.50 -34.33 -30.49 142.01 0.69 0.15 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.44 -33.29 -29.39 140.96 0.67 0.16 0.03 --- ---
Arm. vert. gch. 98.68 -34.33 -30.49 142.01 -0.69 0.15 0.03 --- ---
Arm. horz. gch. 95.95 -34.33 -30.49 142.01 -0.69 0.15 0.03 --- ---
Béton 84.46 -34.64 -30.64 142.02 -0.69 0.15 0.03 --- ---
Arm. transve. 1.98 -36.08 -30.75 126.66 --- --- --- -0.22 0.10
Mur AL-5: Longueur: 433.8 cm [Noeud initial: 20.53;44.73 -> Noeud final: 24.86;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 96.05 -19.60 -40.91 130.79 0.39 -0.15 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 86.94 -56.90 -14.48 118.44 1.14 -0.00 0.12 --- ---
Arm. vert. gch. 99.45 -19.60 -40.91 130.79 -0.72 -0.15 -0.03 --- ---
Arm. horz. gch. 85.02 -56.90 -14.48 118.44 -1.14 -0.00 0.12 --- ---
Béton 81.56 -10.62 -24.19 109.76 -1.04 -0.27 0.02 --- ---
Arm. transve. 31.06 38.75 3.56 34.92 --- --- --- 3.70 -0.47
Mur AL-6: Longueur: 295.846 cm [Noeud initial: 17.28;39.55 -> Noeud final: 17.23;42.51]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 74.10 -69.82 -11.16 -102.87 1.40 -0.07 0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 90.18 -85.49 -11.66 -98.82 1.71 -0.06 0.03 --- ---
Arm. vert. gch. 76.25 -69.82 -11.16 -102.87 -1.40 -0.07 0.07 --- ---
Arm. horz. gch. 92.09 -85.49 -11.66 -98.82 -1.71 -0.06 0.03 --- ---
Page 107
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur AL-6: Longueur: 295.846 cm [Noeud initial: 17.28;39.55 -> Noeud final: 17.23;42.51]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 64.53 -141.36 -2.17 -101.52 2.83 -0.02 0.00 --- ---
Arm. transve. 0.82 -67.71 -13.78 -22.81 --- --- --- -1.14 -0.08
Mur AL-7: Longueur: 243.1 cm [Noeud initial: 9.77;43.13 -> Noeud final: 9.77;45.56]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 100.08 2.42 8.30 132.57 0.00 -0.20 0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.35 2.22 8.54 132.63 0.00 -0.20 0.12 --- ---
Arm. vert. gch. 95.05 2.42 8.30 132.57 -0.26 -0.20 0.12 --- ---
Arm. horz. gch. 69.88 -6.42 5.47 133.19 -0.35 -0.47 0.00 --- ---
Béton 96.41 -5.05 -11.97 128.85 -0.81 -0.72 -0.08 --- ---
Arm. transve. 32.88 -6.56 -28.12 133.94 --- --- --- 3.27 -1.05
Mur AL-8: Longueur: 172 cm [Noeud initial: 8.05;45.56 -> Noeud final: 9.77;45.56]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 93.89 -0.18 -5.47 -103.77 0.45 0.83 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 92.51 -0.18 -5.47 -103.77 0.45 0.83 -0.04 --- ---
Arm. vert. gch. 127.15 61.32 5.42 -51.10 -3.88 -0.74 0.35 --- ---
Arm. horz. gch. 94.03 -5.82 5.30 -98.82 -0.95 -0.62 -0.04 --- ---
Béton 79.07 -8.44 -1.25 -103.87 -0.17 0.50 0.28 --- ---
Arm. transve. 15.42 -8.58 -1.08 -94.52 --- --- --- 1.76 0.59
Mur AL-9: Longueur: 107.2 cm [Noeud initial: 8.05;45.56 -> Noeud final: 8.05;46.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 137.33 2.92 -1.60 101.79 0.00 0.69 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 138.92 2.92 -1.60 101.79 0.00 0.69 0.05 --- ---
Arm. vert. gch. 81.91 2.92 -1.60 101.79 -0.03 0.69 0.05 --- ---
Arm. horz. gch. 112.43 2.92 -1.60 101.79 -0.03 0.69 0.05 --- ---
Béton 74.02 2.70 -3.31 98.93 0.00 0.85 0.09 --- ---
Arm. transve. 27.30 2.06 -2.63 94.13 --- --- --- 2.83 -0.70
Mur AL-11: Longueur: 877.1 cm [Noeud initial: 14.73;46.63 -> Noeud final: 14.73;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 99.19 12.50 -1.35 88.12 0.27 0.08 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 97.67 -10.83 5.39 96.05 0.22 0.09 0.00 --- ---
Arm. vert. gch. 95.58 12.50 -1.35 88.12 0.00 0.08 0.05 --- ---
Arm. horz. gch. 96.15 -10.83 5.39 96.05 -0.22 0.09 0.00 --- ---
Béton 59.00 -7.78 -0.61 79.41 0.16 -0.09 -0.01 --- ---
Arm. transve. 9.79 30.22 -5.58 7.12 --- --- --- -1.14 0.21
Page 108
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur AL-12: Longueur: 877.422 cm [Noeud initial: 19.82;46.63 -> Noeud final: 19.82;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 96.19 10.58 -1.08 90.25 0.00 -0.08 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.94 -8.59 -0.75 99.65 0.17 0.01 0.03 --- ---
Arm. vert. gch. 67.89 9.91 -1.22 87.06 -0.69 -0.21 -0.04 --- ---
Arm. horz. gch. 90.67 -12.56 4.45 95.32 -0.25 -0.10 0.00 --- ---
Béton 72.75 3.46 -30.39 -97.63 -0.41 -0.18 -0.03 --- ---
Arm. transve. 7.40 34.20 -7.43 -4.40 --- --- --- 0.86 -0.15
Mur AL-13: Longueur: 302.5 cm [Noeud initial: 26.97;44.73 -> Noeud final: 29.99;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 84.72 21.58 -2.66 36.71 0.09 0.24 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.04 -20.38 -11.57 -66.09 0.41 -0.04 0.01 --- ---
Arm. vert. gch. 98.57 37.99 4.58 13.75 -1.75 -0.49 -0.11 --- ---
Arm. horz. gch. 99.75 -20.38 -11.57 -66.09 -0.41 -0.04 0.01 --- ---
Béton 45.73 -34.56 -27.44 -76.63 -0.69 -0.13 -0.02 --- ---
Arm. transve. 11.69 20.85 -3.39 36.67 --- --- --- 1.26 -0.77
Mur AL-14: Longueur: 184.8 cm [Noeud initial: 29.99;44.73 -> Noeud final: 31.84;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 92.36 -20.48 -42.64 -112.29 0.41 0.03 0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.28 -32.78 -29.88 -105.02 0.66 0.18 0.01 --- ---
Arm. vert. gch. 94.26 -20.48 -42.64 -112.29 -0.41 0.03 0.10 --- ---
Arm. horz. gch. 92.66 -52.95 -28.35 -105.43 -1.06 -0.18 -0.13 --- ---
Béton 67.41 -21.53 -43.78 -112.60 0.43 0.03 0.10 --- ---
Arm. transve. 14.28 -27.55 -21.70 -70.22 --- --- --- 0.90 0.91
Mur AL-17: Longueur: 385 cm [Noeud initial: 29.99;49.54 -> Noeud final: 33.84;49.54]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 84.49 -8.51 -11.59 -90.97 0.42 0.14 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 84.61 -0.56 6.47 -82.83 0.01 -0.16 0.03 --- ---
Arm. vert. gch. 81.96 -0.56 6.47 -82.83 -0.01 -0.16 0.03 --- ---
Arm. horz. gch. 87.62 -0.56 6.47 -82.83 -0.01 -0.16 0.03 --- ---
Béton 58.00 -17.40 -27.17 -97.51 0.35 0.03 -0.02 --- ---
Arm. transve. 5.84 -41.30 -24.55 -80.93 --- --- --- 0.57 0.39
Mur AL-18: Longueur: 403.4 cm [Noeud initial: 14.73;46.63 -> Noeud final: 18.76;46.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 104.20 -35.60 -9.52 130.08 0.71 0.19 0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 117.37 -35.60 -9.52 130.08 0.71 0.19 0.12 --- ---
Arm. vert. gch. 101.34 -35.60 -9.52 130.08 -0.71 0.19 0.12 --- ---
Arm. horz. gch. 112.19 -35.60 -9.52 130.08 -0.71 0.19 0.12 --- ---
Page 109
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur AL-18: Longueur: 403.4 cm [Noeud initial: 14.73;46.63 -> Noeud final: 18.76;46.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 86.12 -36.91 -0.68 115.67 0.74 0.11 -0.02 --- ---
Arm. transve. 14.89 5.36 3.44 59.28 --- --- --- -1.46 0.99
Mur AL-20: Longueur: 158.9 cm [Noeud initial: 29.99;44.89 -> Noeud final: 29.99;46.48]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 109.62 -10.19 -31.85 152.06 0.20 0.04 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 97.58 -7.70 -23.29 145.72 0.15 0.03 -0.02 --- ---
Arm. vert. gch. 110.13 -10.19 -31.85 152.06 -0.20 0.04 -0.04 --- ---
Arm. horz. gch. 97.59 -7.70 -23.29 145.72 -0.15 0.03 -0.02 --- ---
Béton 95.79 -47.03 -37.59 161.34 0.94 -0.00 -0.00 --- ---
Arm. transve. 5.47 -9.39 -30.64 150.51 --- --- --- 0.62 -0.16
Mur VA12b: Longueur: 272.5 cm [Noeud initial: 3.19;46.63 -> Noeud final: 5.92;46.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+8
Arm. vert. drt. 90.09 60.59 0.06 -2.01 0.00 -0.01 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 207.86 -23.88 -1.72 -0.92 1.43 11.70 -0.71 --- ---
Arm. vert. gch. 89.70 60.59 0.06 -2.01 -0.01 -0.01 -0.04 --- ---
Arm. horz. gch. 185.78 -15.65 -10.91 7.02 0.31 -11.78 0.71 --- ---
Béton 32.68 -96.37 -0.97 15.84 1.93 -3.90 -0.23 --- ---
Arm. transve. 1.62 -8.03 -9.95 -5.06 --- --- --- -0.48 2.27
R+7
Arm. vert. drt. 68.29 67.77 0.65 -7.50 0.06 0.01 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 180.91 -25.34 -2.04 0.03 1.23 10.36 -0.52 --- ---
Arm. vert. gch. 105.96 67.77 0.65 -7.50 0.00 0.01 0.05 --- ---
Arm. horz. gch. 165.19 -19.65 -9.93 7.01 -1.31 -10.44 0.50 --- ---
Béton 29.79 -127.45 -1.63 20.32 -2.55 -3.44 0.00 --- ---
Arm. transve. 4.58 43.66 3.62 -21.84 --- --- --- -0.50 -0.28
R+6
Arm. vert. drt. 94.26 94.45 0.57 -9.23 0.05 0.05 0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 199.47 -23.57 -1.82 -0.53 1.21 10.00 -0.59 --- ---
Arm. vert. gch. 94.32 94.45 0.57 -9.23 0.00 0.05 0.04 --- ---
Arm. horz. gch. 181.04 -26.32 -9.60 8.08 -1.28 -10.09 0.55 --- ---
Béton 32.30 -177.82 0.26 13.70 3.56 -0.19 0.05 --- ---
Arm. transve. 10.60 41.50 -2.57 -29.42 --- --- --- 0.79 0.70
R+5
Arm. vert. drt. 104.85 127.76 0.59 -10.18 0.06 0.04 0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 217.72 -29.89 1.37 0.95 1.34 10.60 -0.72 --- ---
Arm. vert. gch. 105.34 127.76 0.59 -10.18 0.00 0.04 0.08 --- ---
Arm. horz. gch. 186.77 -25.44 -12.06 7.46 -1.37 -10.69 0.65 --- ---
Béton 39.91 -220.57 -1.42 25.71 -4.41 0.20 -0.02 --- ---
Arm. transve. 9.20 61.39 -2.48 -32.30 --- --- --- 1.05 0.31
R+4
Arm. vert. drt. 109.61 167.41 0.49 -11.95 0.10 0.01 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 207.36 -32.08 2.68 0.02 1.22 9.98 -0.54 --- ---
Arm. vert. gch. 110.09 167.41 0.49 -11.95 0.00 0.01 0.11 --- ---
Arm. horz. gch. 175.48 -29.09 -13.07 9.76 -1.24 -10.09 0.46 --- ---
Page 110
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA12b: Longueur: 272.5 cm [Noeud initial: 3.19;46.63 -> Noeud final: 5.92;46.63]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 45.03 -252.76 -1.63 25.96 5.06 -0.19 -0.15 --- ---
Arm. transve. 10.56 87.25 -1.71 -35.07 --- --- --- 0.91 0.42
R+3
Arm. vert. drt. 75.53 218.00 15.33 -29.03 0.82 0.28 0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 65.86 181.48 18.20 -32.16 1.15 0.33 -0.03 --- ---
Arm. vert. gch. 115.77 218.00 15.33 -29.03 0.00 0.28 0.19 --- ---
Arm. horz. gch. 104.09 204.09 25.78 -21.87 0.00 0.05 0.06 --- ---
Béton 58.58 -415.91 -3.38 16.26 8.32 -0.05 -0.11 --- ---
Arm. transve. 17.23 178.32 17.86 -31.91 --- --- --- -1.57 -0.64
R+2
Arm. vert. drt. 87.55 261.90 20.39 -23.50 0.96 0.31 0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 141.75 161.03 0.02 0.28 -0.03 -0.00 0.03 --- ---
Arm. vert. gch. 85.66 261.90 20.39 -23.50 0.00 0.31 0.24 --- ---
Arm. horz. gch. 389.13 183.47 -0.15 -0.45 0.00 -0.02 -0.00 --- ---
Béton 78.88 183.47 -0.15 -0.45 0.00 -0.02 -0.00 --- ---
Arm. transve. 13.33 203.92 9.38 -3.45 --- --- --- -1.57 1.49
R+1
Arm. vert. drt. 95.80 434.78 47.16 -35.73 0.88 0.11 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.72 157.64 0.17 -0.86 -0.13 -0.02 0.01 --- ---
Arm. vert. gch. 93.64 434.78 47.16 -35.73 0.00 0.11 -0.03 --- ---
Arm. horz. gch. 81.29 434.78 47.16 -35.73 0.00 0.11 -0.03 --- ---
Béton 75.29 -626.51 -67.37 53.90 -12.53 0.02 0.01 --- ---
Arm. transve. 21.06 228.87 12.84 -1.46 --- --- --- -2.02 1.42
RDC
Arm. vert. drt. 91.54 422.61 31.87 40.20 0.00 -0.10 -0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 94.77 -239.79 -12.04 -148.11 4.80 0.14 -0.05 --- ---
Arm. vert. gch. 93.61 422.61 31.87 40.20 -0.79 -0.10 -0.08 --- ---
Arm. horz. gch. 93.45 175.62 15.44 99.54 -0.36 -0.07 -0.09 --- ---
Béton 91.15 -239.79 -12.04 -148.11 -4.80 0.14 -0.05 --- ---
Arm. transve. 9.10 266.74 18.83 81.39 --- --- --- -1.06 0.20
SS1
Arm. vert. drt. 38.08 71.62 4.29 99.99 0.19 0.13 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.75 43.23 14.59 108.25 0.00 0.09 0.01 --- ---
Arm. vert. gch. 37.02 71.62 4.29 99.99 0.00 0.13 0.11 --- ---
Arm. horz. gch. 102.21 43.23 14.59 108.25 -0.02 0.09 0.01 --- ---
Béton 76.40 -161.71 -14.20 -124.26 -3.23 0.21 -0.07 --- ---
Arm. transve. 8.12 -183.58 -6.67 -116.93 --- --- --- -0.35 -0.88
Mur VA9c: Longueur: 169.3 cm [Noeud initial: 37.69;53.71 -> Noeud final: 37.69;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 66.91 -74.70 -48.84 -158.04 1.49 -0.58 0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 92.90 -74.70 -48.84 -158.04 1.49 -0.58 0.10 --- ---
Arm. vert. gch. 93.83 -74.70 -48.84 -158.04 -1.49 -0.58 0.10 --- ---
Arm. horz. gch. 76.04 -76.39 -49.46 -158.96 -1.53 -0.62 0.11 --- ---
Béton 95.05 -76.39 -49.46 -158.96 -1.53 -0.62 0.11 --- ---
Arm. transve. 2.21 -74.61 -48.74 -157.06 --- --- --- 3.06 0.25
Page 111
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur M3: Longueur: 4678.9 cm [Noeud initial: 9.77;59.73 -> Noeud final: 56.56;59.74]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 76.91 33.26 3.19 -89.89 0.56 0.67 0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 88.22 -66.93 -12.93 152.30 1.34 0.29 0.45 --- ---
Arm. vert. gch. 117.79 33.26 3.19 -89.89 0.00 0.67 0.27 --- ---
Arm. horz. gch. 123.00 -66.93 -12.93 152.30 -1.34 0.29 0.45 --- ---
Béton 110.85 -69.73 -7.37 143.27 1.60 1.13 -0.55 --- ---
Arm. transve. 26.10 32.15 -0.97 -80.58 --- --- --- 3.06 0.17
Mur M5: Longueur: 433.1 cm [Noeud initial: 56.56;55.40 -> Noeud final: 56.56;59.74]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 98.84 -55.50 -14.49 -155.35 1.11 -0.09 -0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.52 -55.50 -14.49 -155.35 1.11 -0.09 -0.10 --- ---
Arm. vert. gch. 63.51 30.41 3.66 81.27 -1.65 -0.91 0.04 --- ---
Arm. horz. gch. 97.60 -57.74 -17.78 -154.86 -1.15 -0.74 0.03 --- ---
Béton 93.78 -62.80 -15.46 -154.97 1.26 0.05 0.24 --- ---
Arm. transve. 33.61 31.20 1.29 75.62 --- --- --- 2.97 -0.28
Mur VA9: Longueur: 224.9 cm [Noeud initial: 36.56;53.71 -> Noeud final: 38.81;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 173.88 92.28 142.38 47.43 2.36 2.73 0.96 --- ---
(e=30.0 cm)
Arm. horz. drt. 279.64 92.28 142.38 47.43 2.36 2.73 0.96 --- ---
Arm. vert. gch. 191.69 92.28 142.38 47.43 0.00 2.73 0.96 --- ---
Arm. horz. gch. 201.04 92.28 142.38 47.43 0.00 2.73 0.96 --- ---
Béton 34.62 92.28 142.38 47.43 0.00 2.73 0.96 --- ---
Arm. transve. 3.73 5.02 35.30 -27.45 --- --- --- -0.76 5.22
R+13
Arm. vert. drt. 225.38 82.79 126.31 31.37 1.75 1.64 0.69 --- ---
(e=30.0 cm)
Arm. horz. drt. 507.22 74.30 131.46 31.46 1.81 1.70 0.71 --- ---
Arm. vert. gch. 164.53 82.79 126.31 31.37 0.00 1.64 0.69 --- ---
Arm. horz. gch. 254.58 74.30 131.46 31.46 0.00 1.70 0.71 --- ---
Béton 24.68 76.25 130.95 31.58 0.00 1.69 0.71 --- ---
Arm. transve. 2.16 -14.15 -4.95 24.89 --- --- --- -0.25 -3.07
R+12
Arm. vert. drt. 231.82 82.03 132.65 31.94 2.00 1.84 0.77 --- ---
(e=30.0 cm)
Arm. horz. drt. 525.03 71.81 135.78 31.24 2.05 1.89 0.79 --- ---
Arm. vert. gch. 163.69 82.03 132.65 31.94 0.00 1.84 0.77 --- ---
Arm. horz. gch. 257.45 75.10 135.21 31.55 0.00 1.88 0.79 --- ---
Béton 26.04 1.08 2.20 30.92 0.15 -0.15 -0.43 --- ---
Arm. transve. 2.23 -20.21 -6.03 26.58 --- --- --- -0.28 -3.17
R+11
Arm. vert. drt. 228.58 76.82 138.49 32.34 2.08 1.92 0.80 --- ---
(e=30.0 cm)
Arm. horz. drt. 540.05 69.16 140.25 31.70 2.11 1.94 0.81 --- ---
Arm. vert. gch. 157.61 76.82 138.49 32.34 0.00 1.92 0.80 --- ---
Arm. horz. gch. 264.46 69.16 140.25 31.70 0.00 1.94 0.81 --- ---
Béton 30.22 1.89 2.92 35.83 0.19 -0.17 -0.50 --- ---
Arm. transve. 2.27 -25.37 -6.75 28.28 --- --- --- -0.28 -3.22
Page 112
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA9: Longueur: 224.9 cm [Noeud initial: 36.56;53.71 -> Noeud final: 38.81;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+10
Arm. vert. drt. 219.21 69.70 140.07 31.75 2.11 1.94 0.81 --- ---
(e=30.0 cm)
Arm. horz. drt. 552.34 66.53 143.87 32.12 2.17 1.99 0.83 --- ---
Arm. vert. gch. 147.23 69.70 140.07 31.75 0.00 1.94 0.81 --- ---
Arm. horz. gch. 270.10 66.53 143.87 32.12 0.00 1.99 0.83 --- ---
Béton 29.85 -1.37 2.79 35.25 0.18 -0.18 -0.51 --- ---
Arm. transve. 2.29 -27.40 -7.12 29.37 --- --- --- -0.29 -3.26
R+9
Arm. vert. drt. 214.71 64.32 144.23 31.94 2.17 2.00 0.84 --- ---
(e=30.0 cm)
Arm. horz. drt. 560.59 57.96 147.09 31.69 2.22 2.04 0.85 --- ---
Arm. vert. gch. 140.61 64.32 144.23 31.94 0.00 2.00 0.84 --- ---
Arm. horz. gch. 273.11 57.96 147.09 31.69 0.00 2.04 0.85 --- ---
Béton 29.25 -15.12 1.55 34.54 0.30 -0.18 -0.47 --- ---
Arm. transve. 2.29 -32.02 -7.62 29.37 --- --- --- -0.30 -3.25
R+8
Arm. vert. drt. 208.50 59.77 144.88 31.54 2.18 2.01 0.84 --- ---
(e=30.0 cm)
Arm. horz. drt. 562.61 50.48 148.45 31.10 2.24 2.06 0.86 --- ---
Arm. vert. gch. 133.99 59.77 144.88 31.54 0.00 2.01 0.84 --- ---
Arm. horz. gch. 273.31 50.48 148.45 31.10 0.00 2.06 0.86 --- ---
Béton 32.95 -18.57 1.70 38.79 0.37 -0.20 -0.53 --- ---
Arm. transve. 2.26 -36.11 -8.00 29.58 --- --- --- -0.30 -3.22
R+7
Arm. vert. drt. 198.62 51.78 147.06 31.11 2.21 2.05 0.85 --- ---
(e=30.0 cm)
Arm. horz. drt. 558.29 51.78 147.06 31.11 2.21 2.05 0.85 --- ---
Arm. vert. gch. 123.00 51.78 147.06 31.11 0.00 2.05 0.85 --- ---
Arm. horz. gch. 271.39 51.78 147.06 31.11 0.00 2.05 0.85 --- ---
Béton 33.71 -29.34 0.81 39.34 0.59 -0.21 -0.53 --- ---
Arm. transve. 2.22 -35.39 -7.95 29.58 --- --- --- -0.30 -3.15
R+6
Arm. vert. drt. 177.75 38.33 145.77 29.37 2.19 2.03 0.85 --- ---
(e=30.0 cm)
Arm. horz. drt. 549.47 31.81 146.88 28.78 2.21 2.05 0.85 --- ---
Arm. vert. gch. 102.79 38.33 145.77 29.37 0.00 2.03 0.85 --- ---
Arm. horz. gch. 265.27 31.81 146.88 28.78 0.00 2.05 0.85 --- ---
Béton 33.74 -36.50 0.31 39.74 -0.73 -0.21 -0.52 --- ---
Arm. transve. 2.14 -39.78 -8.28 30.29 --- --- --- -0.30 -3.04
R+5
Arm. vert. drt. 155.47 25.38 141.74 27.22 2.13 1.98 0.82 --- ---
(e=30.0 cm)
Arm. horz. drt. 528.32 16.70 142.70 26.35 2.14 1.99 0.83 --- ---
Arm. vert. gch. 82.68 25.38 141.74 27.22 0.00 1.98 0.82 --- ---
Arm. horz. gch. 254.52 25.38 141.74 27.22 0.00 1.98 0.82 --- ---
Béton 34.24 -156.45 -20.44 0.17 -3.13 0.24 0.05 --- ---
Arm. transve. 2.05 -154.14 -7.93 -24.50 --- --- --- 0.20 2.92
R+4
Arm. vert. drt. 124.04 5.59 138.05 24.71 2.06 1.92 0.79 --- ---
(e=30.0 cm)
Arm. horz. drt. 507.08 5.59 138.05 24.71 2.06 1.92 0.79 --- ---
Arm. vert. gch. 89.62 57.97 0.78 2.60 0.00 -0.13 -0.28 --- ---
Arm. horz. gch. 376.91 5.59 138.05 24.71 0.00 1.92 0.79 --- ---
Béton 38.30 -85.91 112.92 1.88 -1.72 0.74 -0.32 --- ---
Arm. transve. 1.93 -21.60 5.21 24.72 --- --- --- -1.37 -2.41
R+3
Arm. vert. drt. 123.38 79.29 -0.54 2.70 0.50 -0.09 -0.26 --- ---
(e=30.0 cm)
Arm. horz. drt. 454.04 -35.26 127.16 18.26 1.84 1.84 0.75 --- ---
Page 113
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA9: Longueur: 224.9 cm [Noeud initial: 36.56;53.71 -> Noeud final: 38.81;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 120.10 79.33 -0.55 2.69 0.00 -0.09 -0.25 --- ---
Arm. horz. gch. 333.80 -35.26 127.16 18.26 -0.71 1.84 0.75 --- ---
Béton 45.58 -248.95 -1.00 -19.99 4.98 -0.17 -0.01 --- ---
Arm. transve. 3.14 -226.25 -17.24 -19.00 --- --- --- -3.69 -2.58
R+2
Arm. vert. drt. 92.73 59.50 -1.04 1.45 0.36 -0.09 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 360.38 -52.98 115.76 16.13 1.06 0.20 0.05 --- ---
Arm. vert. gch. 100.52 47.84 -38.42 -2.61 -1.93 -0.37 0.40 --- ---
Arm. horz. gch. 352.73 -53.41 116.07 16.22 -1.07 0.10 0.01 --- ---
Béton 39.62 -269.41 -0.36 17.79 5.39 -0.42 0.31 --- ---
Arm. transve. 3.03 -195.36 -7.24 -0.79 --- --- --- -3.01 -2.86
R+1
Arm. vert. drt. 155.78 155.86 -4.96 3.09 0.29 -0.07 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 112.96 40.65 11.19 28.22 0.22 0.14 0.21 --- ---
Arm. vert. gch. 153.35 155.86 -4.96 3.09 0.00 -0.07 -0.04 --- ---
Arm. horz. gch. 98.53 48.17 11.08 27.90 0.00 0.12 0.19 --- ---
Béton 50.30 -378.07 -49.03 -26.73 -7.56 0.34 0.21 --- ---
Arm. transve. 7.16 45.17 0.56 24.89 --- --- --- 0.65 0.04
RDC
Arm. vert. drt. 132.81 126.45 -11.37 -18.02 0.00 -0.18 0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 90.14 40.60 0.55 -31.01 0.00 0.04 -0.11 --- ---
Arm. vert. gch. 146.05 126.32 -11.36 -18.06 -0.91 -0.18 0.25 --- ---
Arm. horz. gch. 83.60 40.60 0.55 -31.01 -0.10 0.04 -0.11 --- ---
Béton 51.80 -299.39 -39.64 -14.36 -5.99 0.27 -0.15 --- ---
Arm. transve. 1.98 -220.07 -3.81 10.27 --- --- --- -1.82 -2.01
SS1
Arm. vert. drt. 75.37 69.80 6.63 -2.16 0.58 0.19 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 34.10 69.80 6.63 -2.16 0.58 0.19 -0.02 --- ---
Arm. vert. gch. 69.31 69.80 6.63 -2.16 0.00 0.19 -0.02 --- ---
Arm. horz. gch. 24.18 69.80 6.63 -2.16 0.00 0.19 -0.02 --- ---
Béton 40.35 -223.65 -1.00 -19.76 4.47 -0.11 0.04 --- ---
Arm. transve. 1.63 -227.70 -2.36 -18.52 --- --- --- -1.58 1.72
Mur VA10: Longueur: 223.9 cm [Noeud initial: 44.08;53.71 -> Noeud final: 46.31;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 20.04 -36.68 43.43 -0.61 -0.73 0.40 -0.43 --- ---
(e=30.0 cm)
Arm. horz. drt. 166.18 -8.83 56.13 1.51 -0.18 0.07 -0.21 --- ---
Arm. vert. gch. 56.60 10.84 -105.07 13.55 -2.73 -0.56 0.92 --- ---
Arm. horz. gch. 165.47 -8.83 56.13 1.51 -0.18 0.07 -0.21 --- ---
Béton 30.98 10.90 -105.04 13.43 -2.70 -0.56 0.92 --- ---
Arm. transve. 2.15 -12.26 -52.40 17.60 --- --- --- -2.12 2.23
R+14
Arm. vert. drt. 80.59 32.62 58.14 10.58 0.37 0.46 0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 212.34 23.98 60.84 10.06 0.40 0.49 0.19 --- ---
Arm. vert. gch. 67.61 32.62 58.14 10.58 0.00 0.46 0.18 --- ---
Arm. horz. gch. 179.36 23.98 60.84 10.06 0.00 0.49 0.19 --- ---
Béton 12.56 -64.64 -105.14 -27.21 -1.68 -1.77 -0.66 --- ---
Arm. transve. 1.54 -30.58 1.48 -8.38 --- --- --- 0.14 2.20
Page 114
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA10: Longueur: 223.9 cm [Noeud initial: 44.08;53.71 -> Noeud final: 46.31;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+13
Arm. vert. drt. 93.00 39.95 59.91 11.30 0.42 0.53 0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 224.73 26.68 63.88 10.36 0.47 0.58 0.22 --- ---
Arm. vert. gch. 78.44 39.95 59.91 11.30 0.00 0.53 0.20 --- ---
Arm. horz. gch. 186.24 26.68 63.88 10.36 0.00 0.58 0.22 --- ---
Béton 15.07 -87.34 -9.85 1.69 -1.75 0.33 0.29 --- ---
Arm. transve. 1.61 -43.47 0.27 -11.80 --- --- --- 0.11 2.30
R+12
Arm. vert. drt. 93.86 38.43 64.50 11.84 0.47 0.59 0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 233.38 22.97 66.77 10.16 0.50 0.62 0.24 --- ---
Arm. vert. gch. 77.61 38.43 64.50 11.84 0.00 0.59 0.23 --- ---
Arm. horz. gch. 192.21 22.97 66.77 10.16 0.00 0.62 0.24 --- ---
Béton 18.08 -82.66 -10.91 0.04 -1.65 0.16 0.00 --- ---
Arm. transve. 1.67 -55.26 -0.83 -13.80 --- --- --- 0.10 2.39
R+11
Arm. vert. drt. 80.93 29.09 66.60 10.88 0.50 0.63 0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 242.08 21.83 69.26 10.33 0.54 0.66 0.25 --- ---
Arm. vert. gch. 63.37 29.09 66.60 10.88 0.00 0.63 0.24 --- ---
Arm. horz. gch. 198.04 21.83 69.26 10.33 0.00 0.66 0.25 --- ---
Béton 21.83 -99.79 -13.15 -0.05 -2.00 0.19 0.01 --- ---
Arm. transve. 1.73 -66.93 -1.83 -15.80 --- --- --- 0.10 2.47
R+10
Arm. vert. drt. 65.53 18.10 68.50 9.69 0.53 0.67 0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 249.24 11.15 72.31 9.47 0.58 0.71 0.27 --- ---
Arm. vert. gch. 46.65 18.10 68.50 9.69 0.00 0.67 0.25 --- ---
Arm. horz. gch. 202.43 11.15 72.31 9.47 0.00 0.71 0.27 --- ---
Béton 25.55 -116.81 -15.38 -0.07 -2.34 0.22 0.01 --- ---
Arm. transve. 1.79 -82.78 -3.27 -16.34 --- --- --- 0.09 2.56
R+9
Arm. vert. drt. 55.58 9.73 71.81 9.21 0.57 0.72 0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 252.63 -2.35 74.56 8.06 0.61 0.76 0.28 --- ---
Arm. vert. gch. 35.17 9.73 71.81 9.21 0.00 0.72 0.27 --- ---
Arm. horz. gch. 204.03 -2.35 74.56 8.06 -0.05 0.76 0.28 --- ---
Béton 29.26 -133.79 -17.59 -0.15 -2.68 0.24 0.02 --- ---
Arm. transve. 1.82 -94.77 -4.36 -15.89 --- --- --- 0.08 2.61
R+8
Arm. vert. drt. 47.51 4.31 71.77 8.45 0.57 0.73 0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 252.74 -14.76 75.66 6.66 0.62 0.78 0.29 --- ---
Arm. vert. gch. 26.74 4.31 71.77 8.45 0.00 0.73 0.27 --- ---
Arm. horz. gch. 203.78 -14.76 75.66 6.66 -0.30 0.78 0.29 --- ---
Béton 32.97 -150.77 -19.81 -0.22 -3.02 0.27 0.03 --- ---
Arm. transve. 1.84 -107.23 -5.55 -15.94 --- --- --- 0.06 2.64
R+7
Arm. vert. drt. 35.51 -5.11 73.62 7.65 0.59 0.76 0.28 --- ---
(e=30.0 cm)
Arm. horz. drt. 250.78 -19.21 75.41 6.12 0.62 0.79 0.29 --- ---
Arm. vert. gch. 27.46 -47.11 44.63 2.98 0.94 0.52 -0.21 --- ---
Arm. horz. gch. 202.10 -27.58 75.91 5.12 -0.55 0.80 0.29 --- ---
Béton 36.62 -167.43 -21.99 -0.32 -3.35 0.30 0.03 --- ---
Arm. transve. 1.86 -120.04 -6.80 -16.07 --- --- --- 0.05 2.66
R+6
Arm. vert. drt. 38.48 -62.83 52.00 3.82 -1.26 0.62 -0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 246.78 -34.90 75.37 4.23 0.70 0.79 0.29 --- ---
Page 115
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA10: Longueur: 223.9 cm [Noeud initial: 44.08;53.71 -> Noeud final: 46.31;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 37.09 -62.83 52.00 3.82 1.26 0.62 -0.24 --- ---
Arm. horz. gch. 199.96 -34.90 75.37 4.23 -0.70 0.79 0.29 --- ---
Béton 38.80 -177.40 -23.29 -0.37 -3.55 0.32 0.04 --- ---
Arm. transve. 1.85 -132.43 -7.96 -16.95 --- --- --- 0.03 2.65
R+5
Arm. vert. drt. 49.74 -81.80 50.30 6.44 -1.64 0.59 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 235.65 -57.91 73.10 1.07 1.16 0.78 0.28 --- ---
Arm. vert. gch. 48.51 -81.80 50.30 6.44 1.64 0.59 -0.23 --- ---
Arm. horz. gch. 193.72 -57.91 73.10 1.07 -1.16 0.78 0.28 --- ---
Béton 42.42 -193.98 -25.45 -0.41 -3.88 0.34 0.04 --- ---
Arm. transve. 1.79 -147.45 -9.40 -17.23 --- --- --- 0.02 2.57
R+4
Arm. vert. drt. 65.01 -107.40 47.12 9.90 -2.15 0.55 -0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 225.30 -72.89 70.29 -0.76 1.46 0.73 0.26 --- ---
Arm. vert. gch. 64.14 -107.40 47.12 9.90 2.15 0.55 -0.21 --- ---
Arm. horz. gch. 187.14 -72.89 70.29 -0.76 -1.46 0.73 0.26 --- ---
Béton 44.95 -205.61 -26.98 -0.40 -4.11 0.36 0.04 --- ---
Arm. transve. 1.69 -160.45 -10.78 -18.75 --- --- --- 0.02 2.42
R+3
Arm. vert. drt. 96.31 -159.12 41.75 16.94 -3.18 0.51 -0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 205.50 -110.08 63.40 -6.31 2.20 0.73 0.25 --- ---
Arm. vert. gch. 91.02 -151.25 43.55 15.37 3.03 0.55 -0.23 --- ---
Arm. horz. gch. 169.79 -110.08 63.40 -6.31 -2.20 0.73 0.25 --- ---
Béton 53.88 -245.13 -32.20 0.21 -4.90 0.62 -0.15 --- ---
Arm. transve. 3.71 -233.81 -16.34 -7.24 --- --- --- -4.23 -2.84
R+2
Arm. vert. drt. 92.80 -153.41 45.11 12.92 -3.07 -0.67 0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 122.36 -153.38 45.17 12.90 3.07 -0.68 0.27 --- ---
Arm. vert. gch. 104.66 -171.97 41.39 16.26 3.44 -0.85 0.34 --- ---
Arm. horz. gch. 153.54 -153.38 45.17 12.90 -3.07 -0.68 0.27 --- ---
Béton 59.68 -271.16 -35.83 -0.27 -5.42 0.77 -0.07 --- ---
Arm. transve. 3.54 -251.36 -12.82 -1.49 --- --- --- -3.84 -2.97
R+1
Arm. vert. drt. 138.12 101.38 -2.62 3.01 0.40 -0.08 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 60.63 33.14 7.12 6.83 1.74 0.35 0.27 --- ---
Arm. vert. gch. 133.87 101.38 -2.62 3.01 0.00 -0.08 -0.06 --- ---
Arm. horz. gch. 54.82 78.36 5.96 -8.19 0.00 -0.05 0.10 --- ---
Béton 62.44 -270.02 -18.65 0.65 5.40 -1.21 -0.20 --- ---
Arm. transve. 3.09 -266.78 -13.03 -3.31 --- --- --- -3.44 -2.50
RDC
Arm. vert. drt. 84.08 63.57 5.69 -0.08 0.00 0.05 -0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 43.48 39.34 7.38 5.07 0.00 0.07 0.10 --- ---
Arm. vert. gch. 89.87 44.19 -12.38 -15.00 -1.20 -0.21 0.28 --- ---
Arm. horz. gch. 39.47 43.70 -12.40 -15.10 -1.23 -0.21 0.28 --- ---
Béton 64.04 -368.14 -48.92 -14.70 -7.36 0.36 -0.18 --- ---
Arm. transve. 2.54 -266.95 -12.17 7.04 --- --- --- -3.10 -1.63
SS1
Arm. vert. drt. 56.75 43.59 0.27 0.13 0.00 0.01 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 5.33 43.59 0.27 0.13 0.00 0.01 -0.03 --- ---
Arm. vert. gch. 61.42 43.59 0.27 0.13 -0.36 0.01 -0.03 --- ---
Arm. horz. gch. 13.89 43.59 0.27 0.13 -0.36 0.01 -0.03 --- ---
Béton 46.13 -241.93 3.82 -13.55 -4.84 0.18 -0.16 --- ---
Page 116
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA10: Longueur: 223.9 cm [Noeud initial: 44.08;53.71 -> Noeud final: 46.31;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 1.87 -142.73 -29.84 11.87 --- --- --- -2.53 0.92
Mur VA5: Longueur: 225 cm [Noeud initial: 44.07;55.40 -> Noeud final: 46.32;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 148.50 68.47 9.06 -4.44 2.89 0.45 -0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 502.76 38.70 -0.34 1.64 0.57 0.04 -0.13 --- ---
Arm. vert. gch. 116.45 77.16 -1.19 2.66 0.00 0.08 -0.23 --- ---
Arm. horz. gch. 244.48 8.71 60.03 9.74 -2.55 -1.36 -0.80 --- ---
Béton 50.96 38.70 -0.34 1.64 0.57 0.04 -0.13 --- ---
Arm. transve. 2.32 -27.89 1.23 -10.29 --- --- --- -3.32 0.11
R+1
Arm. vert. drt. 116.83 177.31 -2.75 4.47 0.83 0.04 -0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 91.13 -89.90 52.56 -8.01 1.80 -0.81 -0.41 --- ---
Arm. vert. gch. 112.87 177.79 -2.85 4.37 0.00 0.04 -0.14 --- ---
Arm. horz. gch. 176.55 -89.91 52.58 -8.02 -1.80 -0.81 -0.41 --- ---
Béton 33.23 -188.59 0.38 -14.20 3.77 -0.06 -0.11 --- ---
Arm. transve. 10.38 100.46 0.77 15.37 --- --- --- -0.94 -0.02
RDC
Arm. vert. drt. 114.58 175.57 -18.33 16.01 0.00 0.08 -0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 88.48 24.99 -8.19 -40.69 0.92 0.20 0.00 --- ---
Arm. vert. gch. 120.41 175.57 -18.33 16.01 -0.58 0.08 -0.20 --- ---
Arm. horz. gch. 80.34 44.16 -4.55 -35.78 0.00 0.11 -0.03 --- ---
Béton 37.24 -206.30 6.77 -35.10 -4.13 -0.83 -0.26 --- ---
Arm. transve. 15.12 23.13 -8.60 -41.11 --- --- --- -1.40 -0.37
SS1
Arm. vert. drt. 59.01 1.41 -7.77 -88.58 0.00 -0.24 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.38 -74.15 -7.23 113.09 1.48 0.83 -0.23 --- ---
Arm. vert. gch. 66.75 66.43 8.59 -18.21 -2.30 -0.35 0.01 --- ---
Arm. horz. gch. 87.45 -64.67 4.55 -97.18 -1.29 -0.12 -0.06 --- ---
Béton 86.56 -74.56 -7.37 113.11 1.49 0.83 -0.23 --- ---
Arm. transve. 5.11 -64.67 4.55 -97.18 --- --- --- -0.41 -0.44
Mur VA5b: Longueur: 225.5 cm [Noeud initial: 36.56;55.40 -> Noeud final: 38.81;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 161.24 62.18 141.45 39.30 0.00 -0.34 -0.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 311.27 62.18 141.45 39.30 0.00 -0.34 -0.29 --- ---
Arm. vert. gch. 198.55 62.03 141.41 39.24 -1.06 -0.36 -0.30 --- ---
Arm. horz. gch. 506.21 62.03 141.41 39.24 -1.06 -0.36 -0.30 --- ---
Béton 32.00 -15.52 -56.97 -40.30 -3.48 -0.38 0.05 --- ---
Arm. transve. 2.10 -30.72 1.27 -18.50 --- --- --- -3.00 0.04
R+1
Arm. vert. drt. 126.22 240.55 -3.07 -12.03 0.56 0.05 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 250.93 -53.02 123.22 13.88 1.06 0.11 -0.03 --- ---
Arm. vert. gch. 124.27 240.55 -3.07 -12.03 0.00 0.05 0.14 --- ---
Arm. horz. gch. 247.58 -53.51 123.22 13.78 -1.07 0.10 -0.03 --- ---
Béton 37.46 -265.72 4.41 10.77 -5.31 0.02 0.09 --- ---
Page 117
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA5b: Longueur: 225.5 cm [Noeud initial: 36.56;55.40 -> Noeud final: 38.81;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 8.00 52.10 -3.15 -39.55 --- --- --- -0.76 -0.09
RDC
Arm. vert. drt. 117.32 220.63 -14.21 -23.98 0.00 0.02 0.17 --- ---
(e=30.0 cm)
Arm. horz. drt. 108.67 -95.65 40.89 52.53 1.91 -0.11 0.08 --- ---
Arm. vert. gch. 122.50 220.55 -14.17 -24.02 -0.65 0.02 0.17 --- ---
Arm. horz. gch. 109.44 -95.65 40.89 52.53 -1.91 -0.11 0.08 --- ---
Béton 47.91 -338.86 -11.92 -41.03 -6.78 0.02 -0.08 --- ---
Arm. transve. 11.53 59.91 25.97 30.78 --- --- --- -0.72 0.87
SS1
Arm. vert. drt. 91.81 149.44 19.08 29.24 1.05 0.20 -0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 120.87 -149.81 -2.24 -176.43 3.00 -0.11 -0.30 --- ---
Arm. vert. gch. 87.12 149.44 19.08 29.24 0.00 0.20 -0.16 --- ---
Arm. horz. gch. 117.50 -149.81 -2.24 -176.43 -3.00 -0.11 -0.30 --- ---
Béton 111.52 -120.00 -0.84 -145.74 -2.40 -0.09 -0.21 --- ---
Arm. transve. 17.93 56.75 10.67 37.16 --- --- --- -0.96 1.84
Mur VP26: Longueur: 271.9 cm [Noeud initial: 33.84;55.41 -> Noeud final: 36.56;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 101.07 45.21 9.31 67.76 0.07 0.11 0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.89 45.21 9.31 67.76 0.07 0.11 0.23 --- ---
Arm. vert. gch. 99.94 48.71 11.26 55.42 -1.14 -0.43 -0.04 --- ---
Arm. horz. gch. 95.97 45.21 9.31 67.76 0.00 0.11 0.23 --- ---
Béton 77.64 -178.58 -33.45 -124.44 3.57 -0.02 -0.40 --- ---
Arm. transve. 18.27 38.50 9.61 51.68 --- --- --- 1.65 -0.06
Mur VA5c: Longueur: 224.8 cm [Noeud initial: 16.15;55.40 -> Noeud final: 18.40;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 174.48 77.50 10.59 -5.42 3.57 0.51 -0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 214.77 39.34 -0.60 -1.41 0.31 0.07 0.19 --- ---
Arm. vert. gch. 77.84 -12.93 -16.95 -2.13 -9.31 -0.89 0.11 --- ---
Arm. horz. gch. 53.10 19.01 3.30 -22.06 0.00 0.45 -0.13 --- ---
Béton 24.55 -69.05 -138.54 -45.43 -7.03 -3.29 -1.85 --- ---
Arm. transve. 3.57 -3.96 -60.98 -11.35 --- --- --- 3.27 -3.92
R+1
Arm. vert. drt. 129.79 176.17 23.11 -8.08 2.21 0.31 -0.17 --- ---
(e=30.0 cm)
Arm. horz. drt. 107.14 174.51 22.93 -8.03 2.33 0.33 -0.18 --- ---
Arm. vert. gch. 113.45 176.17 23.11 -8.08 0.00 0.31 -0.17 --- ---
Arm. horz. gch. 81.31 176.17 23.11 -8.08 0.00 0.31 -0.17 --- ---
Béton 33.72 -257.02 -31.62 10.12 -5.14 0.27 -0.09 --- ---
Arm. transve. 6.44 29.63 -15.56 35.47 --- --- --- -0.45 0.37
RDC
Arm. vert. drt. 126.37 190.40 -6.28 20.72 0.00 -0.06 -0.40 --- ---
(e=30.0 cm)
Arm. horz. drt. 83.80 -2.23 -5.95 39.67 0.67 0.18 -0.03 --- ---
Arm. vert. gch. 140.53 190.39 -6.28 20.73 -1.42 -0.06 -0.40 --- ---
Arm. horz. gch. 176.49 -201.89 33.12 -43.90 -4.04 -0.82 -0.31 --- ---
Béton 45.03 -204.12 30.30 -45.11 4.08 -0.96 -0.35 --- ---
Page 118
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA5c: Longueur: 224.8 cm [Noeud initial: 16.15;55.40 -> Noeud final: 18.40;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 3.22 -3.01 -29.61 -1.82 --- --- --- 2.80 -3.61
SS1
Arm. vert. drt. 60.81 18.56 3.19 -70.66 0.47 0.13 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 76.59 -13.67 -3.26 -84.65 1.55 0.40 -0.09 --- ---
Arm. vert. gch. 68.43 25.34 6.09 69.40 -0.64 -0.12 -0.00 --- ---
Arm. horz. gch. 102.45 25.34 6.09 69.40 -0.64 -0.12 -0.00 --- ---
Béton 63.78 -14.08 -3.34 -84.69 -0.28 0.39 -0.10 --- ---
Arm. transve. 5.08 41.77 7.12 -13.90 --- --- --- 0.55 0.29
Mur VA8: Longueur: 224.9 cm [Noeud initial: 16.15;53.71 -> Noeud final: 18.40;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 115.96 38.02 80.49 -18.29 0.80 0.92 -0.38 --- ---
(e=30.0 cm)
Arm. horz. drt. 302.24 38.02 80.49 -18.29 0.80 0.92 -0.38 --- ---
Arm. vert. gch. 88.92 38.03 80.43 -18.28 0.00 0.92 -0.38 --- ---
Arm. horz. gch. 239.12 38.02 80.49 -18.29 0.00 0.92 -0.38 --- ---
Béton 17.52 -71.20 -140.22 38.63 1.42 -2.81 1.17 --- ---
Arm. transve. 2.86 -23.62 -38.31 25.61 --- --- --- -2.75 3.04
R+14
Arm. vert. drt. 83.82 31.62 67.42 -9.60 0.59 0.73 -0.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 250.00 24.94 71.49 -9.03 0.62 0.77 -0.30 --- ---
Arm. vert. gch. 62.99 31.62 67.42 -9.60 0.00 0.73 -0.29 --- ---
Arm. horz. gch. 198.79 24.94 71.49 -9.03 0.00 0.77 -0.30 --- ---
Béton 18.33 -74.39 -157.04 34.06 1.49 -2.31 0.92 --- ---
Arm. transve. 1.76 -39.54 -37.13 25.21 --- --- --- -1.31 2.16
R+13
Arm. vert. drt. 97.80 38.73 69.51 -11.28 0.63 0.79 -0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 266.45 27.34 75.41 -10.27 0.69 0.84 -0.33 --- ---
Arm. vert. gch. 75.66 38.73 69.51 -11.28 0.00 0.79 -0.31 --- ---
Arm. horz. gch. 210.09 27.34 75.41 -10.27 0.00 0.84 -0.33 --- ---
Béton 18.73 -90.78 -160.33 38.11 1.82 -2.38 0.95 --- ---
Arm. transve. 1.80 -59.78 -39.79 27.71 --- --- --- -1.32 2.21
R+12
Arm. vert. drt. 99.52 37.25 75.97 -11.70 0.71 0.88 -0.35 --- ---
(e=30.0 cm)
Arm. horz. drt. 281.20 24.31 80.08 -10.06 0.75 0.91 -0.36 --- ---
Arm. vert. gch. 74.48 37.25 75.97 -11.70 0.00 0.88 -0.35 --- ---
Arm. horz. gch. 220.58 24.31 80.08 -10.06 0.00 0.91 -0.36 --- ---
Béton 19.21 -113.59 -160.22 41.96 -2.27 -2.39 0.95 --- ---
Arm. transve. 1.80 -73.57 -41.49 29.06 --- --- --- -1.30 2.23
R+11
Arm. vert. drt. 88.97 28.75 81.56 -10.87 0.77 0.95 -0.37 --- ---
(e=30.0 cm)
Arm. horz. drt. 294.44 16.77 84.91 -9.27 0.80 0.97 -0.38 --- ---
Arm. vert. gch. 61.53 28.75 81.56 -10.87 0.00 0.95 -0.37 --- ---
Arm. horz. gch. 230.53 16.77 84.91 -9.27 0.00 0.97 -0.38 --- ---
Béton 19.82 -117.57 -165.25 43.45 -2.35 -2.45 0.97 --- ---
Arm. transve. 1.82 -85.36 -43.18 30.42 --- --- --- -1.29 2.27
R+10
Arm. vert. drt. 71.87 17.76 83.09 -9.01 0.79 0.97 -0.38 --- ---
(e=30.0 cm)
Arm. horz. drt. 306.78 8.65 89.39 -8.35 0.86 1.04 -0.41 --- ---
Arm. vert. gch. 42.82 17.76 83.08 -9.01 0.00 0.97 -0.38 --- ---
Page 119
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA8: Longueur: 224.9 cm [Noeud initial: 16.15;53.71 -> Noeud final: 18.40;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 239.37 8.65 89.39 -8.35 0.00 1.04 -0.41 --- ---
Béton 22.57 -104.41 -15.62 -0.03 -2.09 0.22 -0.00 --- ---
Arm. transve. 1.83 -92.41 -44.38 31.76 --- --- --- -1.26 2.30
R+9
Arm. vert. drt. 61.70 9.29 88.20 -8.24 0.84 1.03 -0.41 --- ---
(e=30.0 cm)
Arm. horz. drt. 315.28 -1.11 92.96 -7.08 0.90 1.08 -0.43 --- ---
Arm. vert. gch. 29.87 9.29 88.19 -8.24 0.00 1.03 -0.41 --- ---
Arm. horz. gch. 246.01 -1.11 92.96 -7.08 -0.02 1.08 -0.43 --- ---
Béton 25.96 -120.08 -17.89 -0.00 -2.40 0.25 -0.00 --- ---
Arm. transve. 1.84 -97.99 -45.37 32.74 --- --- --- -1.24 2.32
R+8
Arm. vert. drt. 46.53 2.95 79.63 -6.05 0.77 0.99 -0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 318.39 -12.95 95.16 -5.32 0.92 1.11 -0.44 --- ---
Arm. vert. gch. 15.45 2.95 79.63 -6.05 0.00 0.99 -0.39 --- ---
Arm. horz. gch. 249.68 -12.95 95.16 -5.32 -0.26 1.11 -0.44 --- ---
Béton 29.42 -136.07 -20.20 -0.01 -2.72 0.28 -0.00 --- ---
Arm. transve. 1.82 -104.70 -46.12 33.36 --- --- --- -1.20 2.32
R+7
Arm. vert. drt. 35.43 -5.36 82.52 -5.06 0.80 1.02 -0.40 --- ---
(e=30.0 cm)
Arm. horz. drt. 316.67 -25.38 95.87 -3.30 0.92 1.12 -0.44 --- ---
Arm. vert. gch. 19.45 -40.65 64.51 -4.29 0.81 0.80 0.32 --- ---
Arm. horz. gch. 251.16 -25.38 95.87 -3.30 0.92 1.12 -0.44 --- ---
Béton 32.88 -152.06 -22.51 -0.01 -3.04 0.31 -0.00 --- ---
Arm. transve. 1.81 -105.87 -46.22 34.12 --- --- --- -1.16 2.31
R+6
Arm. vert. drt. 32.94 -55.66 64.05 -6.98 -1.11 0.79 0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 309.79 -39.70 94.98 -0.80 0.90 1.10 -0.44 --- ---
Arm. vert. gch. 28.46 -55.66 64.05 -6.98 1.11 0.79 0.31 --- ---
Arm. horz. gch. 250.26 -39.70 94.98 -0.80 -0.79 1.10 -0.44 --- ---
Béton 36.35 -168.07 -24.83 -0.01 -3.36 0.33 -0.00 --- ---
Arm. transve. 1.78 -112.03 -46.54 34.83 --- --- --- -1.12 2.29
R+5
Arm. vert. drt. 42.45 -72.92 62.34 -10.16 -1.46 0.75 0.30 --- ---
(e=30.0 cm)
Arm. horz. drt. 298.16 -56.02 92.20 2.20 1.12 1.06 -0.42 --- ---
Arm. vert. gch. 38.99 -72.92 62.34 -10.16 1.46 0.75 0.30 --- ---
Arm. horz. gch. 245.07 -56.02 92.20 2.20 -1.12 1.06 -0.42 --- ---
Béton 38.31 -177.12 -26.12 -0.01 -3.54 0.35 -0.00 --- ---
Arm. transve. 1.73 -110.52 -45.87 35.59 --- --- --- -1.06 2.25
R+4
Arm. vert. drt. 55.84 -96.33 58.74 -14.42 -1.93 0.68 0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 281.31 -78.36 87.14 6.22 1.57 0.98 -0.39 --- ---
Arm. vert. gch. 53.53 -96.33 58.74 -14.42 1.93 0.68 0.27 --- ---
Arm. horz. gch. 235.11 -78.36 87.14 6.22 -1.57 0.98 -0.39 --- ---
Béton 40.44 -183.40 -20.56 -0.03 -3.67 0.16 -0.01 --- ---
Arm. transve. 1.67 -103.81 -44.44 36.92 --- --- --- -0.99 2.18
R+3
Arm. vert. drt. 107.50 40.05 -2.78 9.35 2.39 0.50 0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 258.32 -108.67 78.87 12.14 2.17 0.91 -0.35 --- ---
Arm. vert. gch. 88.91 -154.20 53.18 -25.41 3.08 0.68 0.26 --- ---
Arm. horz. gch. 217.31 -108.67 78.87 12.14 -2.17 0.91 -0.35 --- ---
Béton 52.44 -238.63 -26.80 1.84 4.77 -0.07 -0.51 --- ---
Arm. transve. 5.19 -236.27 -38.74 -19.40 --- --- --- -6.77 -3.07
Page 120
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA8: Longueur: 224.9 cm [Noeud initial: 16.15;53.71 -> Noeud final: 18.40;53.71]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 18.22 -262.01 -29.87 4.73 -5.24 -0.18 -0.66 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.43 -29.77 -53.54 -16.74 -3.19 -0.54 -0.62 --- ---
Arm. vert. gch. 18.22 -262.01 -29.87 4.73 5.24 -0.18 -0.66 --- ---
Arm. horz. gch. 3.15 -209.47 -26.68 2.07 4.19 2.98 0.12 --- ---
Béton 56.86 -259.01 -28.97 2.12 5.18 -0.04 -0.44 --- ---
Arm. transve. 5.84 -160.48 -37.47 3.25 --- --- --- -5.07 6.65
R+1
Arm. vert. drt. 149.28 129.14 6.48 11.71 1.32 0.29 0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 87.06 79.55 5.53 18.25 0.97 0.25 0.21 --- ---
Arm. vert. gch. 132.38 129.16 6.48 11.71 0.00 0.29 0.22 --- ---
Arm. horz. gch. 64.20 79.56 5.54 18.26 0.00 0.25 0.21 --- ---
Béton 59.14 -436.77 -46.48 29.28 -8.74 0.44 -0.31 --- ---
Arm. transve. 26.48 73.08 5.17 18.01 --- --- --- -2.10 -1.17
RDC
Arm. vert. drt. 105.39 107.13 -8.76 5.83 0.00 -0.25 -0.28 --- ---
(e=30.0 cm)
Arm. horz. drt. 36.68 52.76 7.34 1.30 0.00 0.10 0.24 --- ---
Arm. vert. gch. 124.17 107.13 -8.76 5.83 -1.54 -0.25 -0.28 --- ---
Arm. horz. gch. 68.10 4.43 -6.53 33.18 -0.61 -0.01 -0.01 --- ---
Béton 58.88 -426.02 -32.08 -28.34 8.52 -0.29 -0.26 --- ---
Arm. transve. 3.25 -261.31 -35.03 0.84 --- --- --- -4.45 0.32
SS1
Arm. vert. drt. 23.93 -432.92 -48.05 55.85 -8.66 0.08 -0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.59 -215.06 -45.33 -6.40 4.30 -1.06 -0.07 --- ---
Arm. vert. gch. 23.93 -432.92 -48.05 55.85 8.66 0.08 -0.06 --- ---
Arm. horz. gch. 2.30 -432.92 -48.05 55.85 8.66 0.08 -0.06 --- ---
Béton 71.64 -404.53 -45.04 56.41 -8.09 0.14 -0.11 --- ---
Arm. transve. 2.35 -306.05 -37.25 -59.43 --- --- --- -3.30 0.71
Mur VP15: Longueur: 422.6 cm [Noeud initial: 11.93;55.40 -> Noeud final: 16.15;55.40]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 97.90 22.87 0.57 92.81 0.00 0.35 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 87.31 5.05 18.62 82.83 0.16 0.10 0.01 --- ---
Arm. vert. gch. 97.81 22.87 0.57 92.81 -0.06 0.35 -0.01 --- ---
Arm. horz. gch. 85.62 5.68 18.65 82.76 0.00 0.09 0.01 --- ---
Béton 70.97 -45.46 -29.58 -119.25 -0.91 -0.16 -0.03 --- ---
Arm. transve. 12.93 13.87 6.66 79.52 --- --- --- 1.29 -0.87
Mur VA14a: Longueur: 139.9 cm [Noeud initial: 10.27;44.73 -> Noeud final: 11.67;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 105.39 4.01 -22.58 -8.86 20.41 2.39 2.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 63.85 -11.49 4.57 44.06 4.95 0.62 0.13 --- ---
Arm. vert. gch. 241.96 101.43 54.70 20.42 -17.70 -2.40 -2.73 --- ---
Arm. horz. gch. 242.79 104.36 56.37 21.06 -17.20 -2.35 -2.69 --- ---
Béton 35.77 104.36 56.37 21.06 0.00 -2.35 -2.69 --- ---
Arm. transve. 80.89 60.87 11.53 13.55 --- --- --- -9.47 -3.68
Page 121
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14a: Longueur: 139.9 cm [Noeud initial: 10.27;44.73 -> Noeud final: 11.67;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 195.15 -24.70 -26.20 -10.36 17.20 2.09 2.47 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.67 30.46 66.48 17.70 0.00 -2.04 -2.49 --- ---
Arm. vert. gch. 120.55 30.63 64.53 17.16 -15.25 -2.08 -2.54 --- ---
Arm. horz. gch. 228.87 30.46 66.48 17.70 -14.79 -2.04 -2.49 --- ---
Béton 34.57 28.67 65.13 17.21 0.00 -2.08 -2.54 --- ---
Arm. transve. 30.80 20.27 12.84 9.18 --- --- --- -7.54 -3.90
R+13
Arm. vert. drt. 89.32 -32.00 -28.90 -10.63 18.14 2.24 2.58 --- ---
(e=30.0 cm)
Arm. horz. drt. 119.55 44.36 72.03 20.38 0.00 -2.21 -2.66 --- ---
Arm. vert. gch. 140.52 43.52 71.00 20.12 -15.94 -2.26 -2.72 --- ---
Arm. horz. gch. 278.47 42.88 71.23 20.08 -15.94 -2.27 -2.73 --- ---
Béton 39.42 42.88 71.23 20.08 0.00 -2.27 -2.73 --- ---
Arm. transve. 29.29 26.95 14.83 12.52 --- --- --- -7.89 -4.10
R+12
Arm. vert. drt. 86.73 -43.01 -29.42 -10.94 18.62 2.29 2.66 --- ---
(e=30.0 cm)
Arm. horz. drt. 124.44 37.02 74.85 21.00 0.00 -2.23 -2.69 --- ---
Arm. vert. gch. 139.42 37.10 74.16 20.85 -16.10 -2.30 -2.76 --- ---
Arm. horz. gch. 286.78 35.94 74.38 20.80 -16.10 -2.30 -2.77 --- ---
Béton 40.68 35.94 74.38 20.80 0.00 -2.30 -2.77 --- ---
Arm. transve. 30.10 20.09 15.35 12.90 --- --- --- -7.87 -4.19
R+11
Arm. vert. drt. 83.78 -53.38 -30.13 -11.27 19.00 2.34 2.72 --- ---
(e=30.0 cm)
Arm. horz. drt. 128.45 32.14 77.14 21.63 0.00 -2.25 -2.73 --- ---
Arm. vert. gch. 138.30 30.46 76.47 21.45 -16.29 -2.33 -2.82 --- ---
Arm. horz. gch. 293.43 28.82 76.66 21.38 -16.29 -2.33 -2.83 --- ---
Béton 41.90 28.82 76.66 21.38 0.00 -2.33 -2.83 --- ---
Arm. transve. 31.35 14.45 15.85 13.36 --- --- --- -7.89 -4.30
R+10
Arm. vert. drt. 79.93 -65.40 -30.96 -11.74 19.37 2.38 2.77 --- ---
(e=30.0 cm)
Arm. horz. drt. 132.28 26.07 79.51 22.35 0.00 -2.28 -2.77 --- ---
Arm. vert. gch. 138.56 26.56 78.93 22.21 -16.50 -2.37 -2.87 --- ---
Arm. horz. gch. 300.81 25.31 79.33 22.23 -16.38 -2.36 -2.86 --- ---
Béton 43.08 24.44 79.09 22.12 0.00 -2.37 -2.87 --- ---
Arm. transve. 32.35 10.51 16.54 14.00 --- --- --- -7.98 -4.37
R+9
Arm. vert. drt. 75.27 -77.12 -33.59 -12.84 19.65 2.43 2.83 --- ---
(e=30.0 cm)
Arm. horz. drt. 135.06 23.66 72.52 20.48 0.00 -1.30 -1.62 --- ---
Arm. vert. gch. 136.00 18.27 81.02 22.78 -16.61 -2.39 -2.90 --- ---
Arm. horz. gch. 305.82 18.27 81.02 22.78 -16.61 -2.39 -2.90 --- ---
Béton 44.08 15.67 81.12 22.67 0.00 -2.39 -2.90 --- ---
Arm. transve. 8.04 -78.63 -17.72 24.13 --- --- --- -9.23 6.48
R+8
Arm. vert. drt. 69.44 -88.58 -35.62 -13.77 19.70 2.44 2.85 --- ---
(e=30.0 cm)
Arm. horz. drt. 135.74 5.36 82.09 22.87 0.00 -2.39 -2.90 --- ---
Arm. vert. gch. 131.50 8.47 82.06 23.02 -16.56 -2.39 -2.90 --- ---
Arm. horz. gch. 307.43 8.47 82.06 23.02 -16.56 -2.39 -2.90 --- ---
Béton 48.13 0.98 72.44 20.09 -11.83 -1.78 -2.19 --- ---
Arm. transve. 7.93 -88.55 -18.14 24.38 --- --- --- -9.10 6.39
R+7
Arm. vert. drt. 62.08 -100.04 -37.20 -14.58 19.50 2.42 2.84 --- ---
(e=30.0 cm)
Arm. horz. drt. 135.39 -1.44 81.91 22.92 0.03 -2.34 -2.86 --- ---
Page 122
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14a: Longueur: 139.9 cm [Noeud initial: 10.27;44.73 -> Noeud final: 11.67;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 125.01 -2.56 81.94 22.90 -16.34 -2.36 -2.87 --- ---
Arm. horz. gch. 304.92 -2.56 81.94 22.90 -16.34 -2.36 -2.87 --- ---
Béton 52.02 -11.75 72.08 19.72 -11.63 -1.76 -2.16 --- ---
Arm. transve. 7.79 -97.79 -18.40 24.58 --- --- --- -8.95 6.27
R+6
Arm. vert. drt. 63.60 -18.70 80.71 22.27 -15.91 -2.30 -2.82 --- ---
(e=30.0 cm)
Arm. horz. drt. 133.45 -14.55 80.83 22.50 0.29 -2.30 -2.81 --- ---
Arm. vert. gch. 116.58 -14.55 80.83 22.50 -15.93 -2.30 -2.81 --- ---
Arm. horz. gch. 298.63 -14.55 80.83 22.50 -15.93 -2.30 -2.81 --- ---
Béton 56.00 -26.37 70.66 19.14 -11.28 -1.71 -2.11 --- ---
Arm. transve. 7.55 -102.08 -18.15 24.20 --- --- --- -8.69 6.06
R+5
Arm. vert. drt. 66.62 -36.25 77.49 21.13 -15.14 -2.20 -2.70 --- ---
(e=30.0 cm)
Arm. horz. drt. 128.69 -30.32 77.60 21.41 0.61 -2.12 -2.60 --- ---
Arm. vert. gch. 104.46 -30.08 77.69 21.39 -15.29 -2.21 -2.71 --- ---
Arm. horz. gch. 285.34 -30.08 77.69 21.39 -15.29 -2.21 -2.71 --- ---
Béton 59.84 -42.34 67.99 18.18 -10.77 -1.64 -2.03 --- ---
Arm. transve. 7.24 -131.30 2.60 -10.79 --- --- --- 8.74 -5.17
R+4
Arm. vert. drt. 69.53 -57.33 72.30 19.31 -14.03 -2.04 -2.52 --- ---
(e=30.0 cm)
Arm. horz. drt. 123.14 -40.74 73.63 20.30 0.81 -1.90 -2.35 --- ---
Arm. vert. gch. 88.93 -48.47 73.31 19.97 -14.35 -2.08 -2.56 --- ---
Arm. horz. gch. 266.96 -48.47 73.31 19.97 -14.35 -2.08 -2.56 --- ---
Béton 62.08 -55.84 63.87 17.00 -10.10 -1.53 -1.91 --- ---
Arm. transve. 6.80 -135.58 1.47 -10.45 --- --- --- 8.17 -4.92
R+3
Arm. vert. drt. 75.43 -85.44 66.36 17.94 -13.09 -1.91 -2.35 --- ---
(e=30.0 cm)
Arm. horz. drt. 110.48 -75.27 67.15 18.64 1.51 -1.82 -2.25 --- ---
Arm. vert. gch. 69.24 -75.68 67.50 18.66 -13.41 -1.94 -2.39 --- ---
Arm. horz. gch. 244.59 -75.68 67.50 18.66 -13.41 -1.94 -2.39 --- ---
Béton 71.14 -86.89 58.80 15.71 -9.49 -1.44 -1.80 --- ---
Arm. transve. 6.12 -164.30 -17.45 -11.96 --- --- --- 8.07 2.94
R+2
Arm. vert. drt. 68.54 -116.77 57.46 12.86 -8.35 -1.14 -1.79 --- ---
(e=30.0 cm)
Arm. horz. drt. 106.66 -92.66 58.25 13.95 1.85 -1.00 -1.54 --- ---
Arm. vert. gch. 43.98 -117.90 24.01 2.32 2.36 -1.03 -1.65 --- ---
Arm. horz. gch. 187.19 -106.49 58.26 13.46 -8.63 -1.17 -1.83 --- ---
Béton 68.77 -122.16 50.45 10.80 -5.73 -0.83 -1.29 --- ---
Arm. transve. 3.80 -167.69 -7.63 3.81 --- --- --- 4.73 -2.46
R+1
Arm. vert. drt. 63.58 -122.72 41.03 10.69 -6.42 -0.87 -1.34 --- ---
(e=30.0 cm)
Arm. horz. drt. 76.65 -110.43 42.60 11.94 2.21 -0.79 -1.21 --- ---
Arm. vert. gch. 47.93 -127.66 35.47 8.88 2.55 -0.62 -0.96 --- ---
Arm. horz. gch. 136.94 -110.58 42.33 11.63 -6.62 -0.89 -1.36 --- ---
Béton 69.96 -118.11 41.60 11.11 -6.38 -0.86 -1.33 --- ---
Arm. transve. 2.57 -177.56 -15.28 -12.84 --- --- --- 3.11 1.83
RDC
Arm. vert. drt. 16.13 -297.93 -12.99 -16.15 -5.96 -0.16 -0.24 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.85 -224.40 -38.75 54.60 -4.49 -0.07 -0.00 --- ---
Arm. vert. gch. 16.13 -297.93 -12.99 -16.15 5.96 -0.16 -0.24 --- ---
Arm. horz. gch. 1.79 -224.49 -38.75 54.60 4.49 -0.06 0.01 --- ---
Béton 49.66 -268.41 2.01 0.10 5.37 -0.01 -0.03 --- ---
Page 123
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14a: Longueur: 139.9 cm [Noeud initial: 10.27;44.73 -> Noeud final: 11.67;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 1.73 -159.01 -4.81 -3.69 --- --- --- -2.16 -1.10
SS1
Arm. vert. drt. 13.93 -209.57 -27.11 1.82 -4.19 0.02 0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.65 -197.83 -35.02 -12.36 3.96 -0.01 0.19 --- ---
Arm. vert. gch. 13.93 -209.57 -27.11 1.82 4.19 0.02 0.19 --- ---
Arm. horz. gch. 107.88 -76.51 11.39 -54.46 -1.53 -0.05 0.14 --- ---
Béton 43.43 -209.57 -27.11 1.82 -4.19 0.02 0.19 --- ---
Arm. transve. 1.22 -71.08 -7.73 22.79 --- --- --- -1.71 0.02
Mur VA14b: Longueur: 139.7 cm [Noeud initial: 14.03;44.73 -> Noeud final: 15.42;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 213.34 110.60 113.66 39.81 0.00 -0.64 -0.83 --- ---
(e=30.0 cm)
Arm. horz. drt. 267.06 110.60 113.66 39.81 0.00 -0.64 -0.83 --- ---
Arm. vert. gch. 209.42 106.61 109.24 38.38 -5.87 -0.96 -1.07 --- ---
Arm. horz. gch. 311.95 107.33 110.10 38.59 -5.65 -0.93 -1.06 --- ---
Béton 41.86 -23.34 0.20 52.83 -0.47 0.03 0.31 --- ---
Arm. transve. 2.83 -26.55 1.71 20.11 --- --- --- 4.04 0.33
R+14
Arm. vert. drt. 126.78 32.04 124.91 39.39 0.00 -0.50 -0.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 426.54 25.14 129.64 40.76 0.00 -0.51 -0.64 --- ---
Arm. vert. gch. 201.86 24.82 123.86 39.06 -4.47 -0.77 -0.87 --- ---
Arm. horz. gch. 484.18 23.17 125.84 39.52 -4.26 -0.75 -0.85 --- ---
Béton 37.81 23.17 125.84 39.52 -4.26 -0.75 -0.85 --- ---
Arm. transve. 2.17 -45.80 1.34 10.82 --- --- --- 3.10 0.13
R+13
Arm. vert. drt. 145.65 45.19 128.03 41.82 0.00 -0.60 -0.75 --- ---
(e=30.0 cm)
Arm. horz. drt. 437.94 35.95 133.05 43.35 0.00 -0.63 -0.78 --- ---
Arm. vert. gch. 231.23 37.55 127.68 41.69 -4.86 -0.91 -1.02 --- ---
Arm. horz. gch. 511.12 33.64 129.98 42.27 -4.62 -0.88 -1.00 --- ---
Béton 40.70 33.64 129.98 42.27 -4.62 -0.88 -1.00 --- ---
Arm. transve. 2.33 -62.85 1.42 13.01 --- --- --- 3.33 0.13
R+12
Arm. vert. drt. 138.10 36.38 133.09 43.27 0.00 -0.62 -0.78 --- ---
(e=30.0 cm)
Arm. horz. drt. 447.00 23.76 136.71 44.18 0.00 -0.63 -0.80 --- ---
Arm. vert. gch. 219.15 25.69 131.73 42.68 -4.84 -0.92 -1.04 --- ---
Arm. horz. gch. 520.02 23.41 132.98 42.96 -4.70 -0.90 -1.03 --- ---
Béton 41.81 23.76 136.71 44.18 -2.40 -0.63 -0.80 --- ---
Arm. transve. 2.36 -80.31 1.47 12.88 --- --- --- 3.37 0.12
R+11
Arm. vert. drt. 127.48 23.89 138.62 45.03 0.00 -0.63 -0.79 --- ---
(e=30.0 cm)
Arm. horz. drt. 458.16 15.36 140.27 45.36 0.00 -0.63 -0.79 --- ---
Arm. vert. gch. 207.35 15.52 135.10 43.70 -4.71 -0.91 -1.03 --- ---
Arm. horz. gch. 528.27 12.18 136.23 43.91 -4.59 -0.90 -1.02 --- ---
Béton 43.15 12.83 140.37 45.28 -2.19 -0.62 -0.78 --- ---
Arm. transve. 2.39 -95.81 1.57 18.10 --- --- --- 3.42 0.17
R+10
Arm. vert. drt. 111.49 8.33 141.84 45.92 0.00 -0.64 -0.80 --- ---
(e=30.0 cm)
Arm. horz. drt. 464.54 2.37 143.04 46.10 0.00 -0.63 -0.79 --- ---
Arm. vert. gch. 197.91 4.73 137.38 44.31 -4.85 -0.94 -1.05 --- ---
Page 124
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14b: Longueur: 139.7 cm [Noeud initial: 14.03;44.73 -> Noeud final: 15.42;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 535.42 -0.03 138.99 44.67 -4.61 -0.91 -1.03 --- ---
Béton 44.41 -1.58 142.97 45.94 -2.23 -0.63 -0.79 --- ---
Arm. transve. 2.92 -122.17 1.64 2.87 --- --- --- 4.18 0.04
R+9
Arm. vert. drt. 95.15 -6.58 141.39 45.48 0.13 -0.64 -0.79 --- ---
(e=30.0 cm)
Arm. horz. drt. 465.33 -15.16 144.39 46.26 0.30 -0.64 -0.80 --- ---
Arm. vert. gch. 181.33 -10.57 139.07 44.63 -4.90 -0.95 -1.07 --- ---
Arm. horz. gch. 536.44 -15.76 140.00 44.74 -4.78 -0.94 -1.06 --- ---
Béton 45.50 -18.86 144.31 46.10 -2.20 -0.64 -0.80 --- ---
Arm. transve. 2.95 -141.79 1.74 2.26 --- --- --- 4.23 0.03
R+8
Arm. vert. drt. 81.47 -21.00 140.93 45.04 0.42 -0.64 -0.79 --- ---
(e=30.0 cm)
Arm. horz. drt. 460.20 -33.77 143.91 45.79 0.68 -0.64 -0.80 --- ---
Arm. vert. gch. 159.88 -27.79 138.82 44.26 -4.88 -0.95 -1.07 --- ---
Arm. horz. gch. 530.69 -27.68 139.29 44.42 -4.71 -0.93 -1.05 --- ---
Béton 49.15 -154.37 29.62 1.40 3.09 -0.24 -0.46 --- ---
Arm. transve. 2.96 -161.85 1.84 1.40 --- --- --- 4.24 0.02
R+7
Arm. vert. drt. 71.18 -108.03 59.51 15.84 -3.37 -0.55 -0.59 --- ---
(e=30.0 cm)
Arm. horz. drt. 450.21 -51.73 141.89 44.80 1.03 -0.63 -0.79 --- ---
Arm. vert. gch. 140.08 -37.67 137.47 43.64 -4.39 -0.89 -1.01 --- ---
Arm. horz. gch. 520.03 -43.48 137.44 43.53 -4.73 -0.93 -1.05 --- ---
Béton 54.01 -169.72 30.13 1.45 3.39 -0.24 -0.47 --- ---
Arm. transve. 2.94 -182.22 1.94 0.76 --- --- --- 4.21 0.01
R+6
Arm. vert. drt. 81.86 -127.85 56.26 14.33 -3.35 -0.54 -0.58 --- ---
(e=30.0 cm)
Arm. horz. drt. 434.92 -65.74 137.98 43.42 1.31 -0.61 -0.77 --- ---
Arm. vert. gch. 112.49 -183.39 30.17 1.43 3.67 -0.25 -0.60 --- ---
Arm. horz. gch. 505.26 -58.97 135.51 42.68 -4.21 -0.86 -0.99 --- ---
Béton 58.39 -183.39 30.17 1.43 3.67 -0.25 -0.60 --- ---
Arm. transve. 2.89 -203.05 2.06 0.39 --- --- --- 4.13 0.01
R+5
Arm. vert. drt. 95.09 -157.85 59.44 14.91 -3.16 0.10 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 411.78 -90.32 132.17 41.10 1.81 -0.58 -0.74 --- ---
Arm. vert. gch. 117.55 -191.60 30.10 1.46 3.83 -0.24 -0.59 --- ---
Arm. horz. gch. 473.15 -87.51 128.41 39.81 -4.36 -0.86 -0.98 --- ---
Béton 60.99 -191.60 30.10 1.46 3.83 -0.24 -0.59 --- ---
Arm. transve. 2.81 -224.18 2.18 -0.03 --- --- --- 4.02 -0.00
R+4
Arm. vert. drt. 112.05 -183.79 52.76 12.21 -3.68 0.11 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 379.06 -118.08 123.40 37.84 2.36 -0.54 -0.68 --- ---
Arm. vert. gch. 120.40 -196.23 30.42 1.51 3.92 -0.25 -0.58 --- ---
Arm. horz. gch. 441.09 -108.26 122.31 37.60 -3.69 -0.76 -0.89 --- ---
Béton 63.21 -330.16 3.00 7.71 6.60 -0.09 -0.05 --- ---
Arm. transve. 2.63 -245.43 2.30 0.16 --- --- --- 3.77 -0.01
R+3
Arm. vert. drt. 132.41 -216.02 44.06 8.90 -4.32 0.14 0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 335.59 -156.70 111.21 33.67 3.13 -0.47 -0.60 --- ---
Arm. vert. gch. 132.48 -216.02 44.06 8.90 4.32 0.14 0.05 --- ---
Arm. horz. gch. 381.37 -150.77 108.67 32.76 -3.56 -0.72 -0.81 --- ---
Béton 68.96 -360.23 3.21 6.72 7.20 -0.10 -0.05 --- ---
Arm. transve. 2.25 -244.11 2.46 16.40 --- --- --- 3.23 0.10
Page 125
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14b: Longueur: 139.7 cm [Noeud initial: 14.03;44.73 -> Noeud final: 15.42;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 141.79 -232.46 82.68 18.55 -4.65 -0.32 -0.47 --- ---
(e=30.0 cm)
Arm. horz. drt. 242.36 -212.40 84.01 19.63 4.25 -0.34 -0.50 --- ---
Arm. vert. gch. 139.90 -231.28 74.99 16.15 4.63 -0.32 -0.47 --- ---
Arm. horz. gch. 275.00 -201.34 83.85 19.89 -4.03 -0.48 -0.68 --- ---
Béton 75.38 -393.86 1.86 4.87 7.88 -0.08 -0.04 --- ---
Arm. transve. 1.73 -304.55 -37.21 -21.51 --- --- --- 1.22 2.16
R+1
Arm. vert. drt. 147.83 -241.09 51.03 11.50 -4.82 -0.13 -0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 180.28 -209.22 62.17 16.77 4.18 -0.24 -0.33 --- ---
Arm. vert. gch. 147.54 -241.09 51.03 11.50 4.82 -0.13 -0.20 --- ---
Arm. horz. gch. 197.77 -209.22 62.17 16.77 -4.18 -0.24 -0.33 --- ---
Béton 83.13 -434.55 -1.45 2.16 8.69 -0.13 -0.07 --- ---
Arm. transve. 1.22 -287.16 -6.81 12.12 --- --- --- 1.75 0.17
RDC
Arm. vert. drt. 26.25 -468.80 -56.81 59.50 -9.38 0.04 -0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.79 -425.65 -59.08 54.02 -8.51 -0.00 -0.04 --- ---
Arm. vert. gch. 26.25 -468.80 -56.81 59.50 9.38 0.04 -0.14 --- ---
Arm. horz. gch. 2.81 -425.86 -59.08 54.11 8.52 0.04 -0.05 --- ---
Béton 86.95 -454.22 2.71 -8.49 9.08 0.01 0.05 --- ---
Arm. transve. 0.79 -336.23 0.70 -12.74 --- --- --- 1.12 0.13
SS1
Arm. vert. drt. 45.09 -126.44 10.54 -78.10 -2.53 -0.06 0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.42 -133.11 11.40 -90.12 2.66 -0.04 0.02 --- ---
Arm. vert. gch. 44.32 -126.44 10.54 -78.10 2.53 -0.06 0.02 --- ---
Arm. horz. gch. 105.90 -133.42 11.32 -90.19 -2.67 -0.06 0.01 --- ---
Béton 70.09 -326.09 -50.31 0.87 6.52 -0.22 -0.11 --- ---
Arm. transve. 1.31 -132.82 -6.15 26.53 --- --- --- -1.85 0.04
Mur VA14c: Longueur: 139.9 cm [Noeud initial: 19.13;44.73 -> Noeud final: 20.53;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 96.60 53.74 -16.35 -2.51 1.19 0.29 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 94.49 9.40 24.28 6.33 1.01 0.11 0.32 --- ---
Arm. vert. gch. 83.17 56.72 -17.26 -2.54 0.00 0.26 -0.14 --- ---
Arm. horz. gch. 71.73 -30.38 2.62 -38.61 -1.62 -0.39 -0.15 --- ---
Béton 28.07 -30.34 2.61 -38.78 -1.48 -0.36 -0.14 --- ---
Arm. transve. 2.21 -30.62 1.96 -18.58 --- --- --- 3.16 -0.17
R+14
Arm. vert. drt. 6.09 -58.71 -5.35 -0.87 -4.62 -0.89 -0.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.85 -44.35 -33.79 0.56 1.01 0.26 -0.41 --- ---
Arm. vert. gch. 5.32 -49.01 -10.79 2.44 4.25 0.78 -0.37 --- ---
Arm. horz. gch. 2.15 -44.67 -33.65 0.55 1.34 0.32 -0.43 --- ---
Béton 14.30 -58.71 -5.35 -0.87 -4.62 -0.89 -0.29 --- ---
Arm. transve. 2.36 -51.42 1.39 -4.14 --- --- --- 3.39 -0.05
R+13
Arm. vert. drt. 24.39 -43.47 33.45 3.12 -0.87 -0.00 0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.75 -41.31 33.70 2.96 0.83 0.04 0.32 --- ---
Arm. vert. gch. 6.60 -94.85 23.53 -0.46 1.90 -0.32 0.55 --- ---
Arm. horz. gch. 98.34 -41.07 33.58 2.97 -0.82 -0.00 0.33 --- ---
Page 126
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14c: Longueur: 139.9 cm [Noeud initial: 19.13;44.73 -> Noeud final: 20.53;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 19.38 -43.48 33.41 3.12 0.87 -0.00 0.33 --- ---
Arm. transve. 2.50 -71.17 1.36 -4.87 --- --- --- 3.58 -0.05
R+12
Arm. vert. drt. 29.54 -50.24 32.08 2.71 -1.00 0.08 0.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.40 -48.19 32.16 2.60 0.98 0.09 0.29 --- ---
Arm. vert. gch. 7.66 -86.03 -16.43 3.39 4.59 0.85 -0.44 --- ---
Arm. horz. gch. 2.48 -89.24 -39.03 3.01 1.78 0.35 -0.52 --- ---
Béton 24.35 -127.08 1.76 -5.02 2.54 -0.19 0.01 --- ---
Arm. transve. 2.12 -90.08 1.50 -13.67 --- --- --- 3.03 -0.18
R+11
Arm. vert. drt. 38.04 -63.45 32.99 2.79 -1.27 0.10 0.30 --- ---
(e=30.0 cm)
Arm. horz. drt. 101.65 -63.34 33.08 2.79 1.27 0.09 0.31 --- ---
Arm. vert. gch. 8.82 -107.79 -18.77 4.17 4.43 0.83 -0.45 --- ---
Arm. horz. gch. 94.58 -63.34 33.08 2.79 1.27 0.09 0.31 --- ---
Béton 29.82 -155.70 1.73 -4.86 3.11 -0.19 0.01 --- ---
Arm. transve. 2.11 -109.90 1.48 -13.88 --- --- --- 3.01 -0.18
R+10
Arm. vert. drt. 10.36 -130.54 -13.47 -2.58 -4.81 -0.94 -0.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.45 -123.97 -44.36 4.17 2.48 0.30 -0.54 --- ---
Arm. vert. gch. 77.66 -126.95 28.84 -0.65 2.54 -0.37 0.65 --- ---
Arm. horz. gch. 96.52 -125.15 28.96 -0.63 -2.50 -0.38 0.64 --- ---
Béton 40.54 -126.95 28.84 -0.65 2.54 -0.37 0.65 --- ---
Arm. transve. 2.12 -130.00 1.48 -14.33 --- --- --- 3.03 -0.18
R+9
Arm. vert. drt. 12.00 -214.30 1.73 -4.43 -4.29 -0.19 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.59 -139.47 -46.79 4.60 2.79 0.31 -0.56 --- ---
Arm. vert. gch. 85.92 -140.26 29.14 -0.80 2.81 -0.38 0.60 --- ---
Arm. horz. gch. 100.74 -134.09 30.28 -0.70 -2.68 -0.39 0.66 --- ---
Béton 44.72 -140.26 29.14 -0.80 2.81 -0.38 0.60 --- ---
Arm. transve. 2.11 -150.43 1.48 -14.49 --- --- --- 3.02 -0.17
R+8
Arm. vert. drt. 13.69 -244.44 1.76 -4.14 -4.89 -0.19 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.71 -160.40 -49.07 5.29 3.21 0.33 -0.58 --- ---
Arm. vert. gch. 93.17 -152.04 30.61 -0.88 3.04 -0.39 0.61 --- ---
Arm. horz. gch. 103.99 -142.86 31.31 -0.79 -2.86 -0.40 0.67 --- ---
Béton 48.45 -152.04 30.61 -0.88 3.04 -0.39 0.61 --- ---
Arm. transve. 2.09 -171.23 1.50 -14.45 --- --- --- 3.00 -0.17
R+7
Arm. vert. drt. 15.41 -275.25 1.80 -3.80 -5.51 -0.19 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.81 -171.12 -50.88 5.57 3.42 0.34 -0.59 --- ---
Arm. vert. gch. 99.08 -161.66 31.91 -0.95 3.23 -0.40 0.63 --- ---
Arm. horz. gch. 106.64 -149.50 32.14 -0.86 -2.99 -0.41 0.67 --- ---
Béton 52.68 -275.25 1.80 -3.80 5.51 -0.19 0.01 --- ---
Arm. transve. 2.07 -192.46 1.52 -14.38 --- --- --- 2.96 -0.16
R+6
Arm. vert. drt. 17.18 -306.82 1.86 -3.42 -6.14 -0.19 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.34 -193.38 -52.65 6.43 3.87 0.33 -0.59 --- ---
Arm. vert. gch. 102.89 -167.85 32.49 -1.02 3.36 -0.41 0.63 --- ---
Arm. horz. gch. 108.42 -156.76 32.72 -0.94 -3.14 -0.41 0.68 --- ---
Béton 58.72 -306.82 1.86 -3.42 6.14 -0.19 0.01 --- ---
Arm. transve. 2.03 -214.24 1.56 -14.09 --- --- --- 2.90 -0.14
Page 127
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14c: Longueur: 139.9 cm [Noeud initial: 19.13;44.73 -> Noeud final: 20.53;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+5
Arm. vert. drt. 18.99 -339.24 1.93 -3.01 -6.78 -0.19 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.40 -208.92 -53.83 7.04 -4.18 0.33 -0.59 --- ---
Arm. vert. gch. 107.95 -176.04 32.70 -1.14 3.52 -0.41 0.61 --- ---
Arm. horz. gch. 110.85 -161.49 33.54 -0.95 -3.23 -0.42 0.62 --- ---
Béton 64.93 -339.24 1.93 -3.01 6.78 -0.19 0.01 --- ---
Arm. transve. 1.97 -236.61 1.60 -13.61 --- --- --- 2.81 -0.12
R+4
Arm. vert. drt. 20.86 -372.58 2.03 -2.43 -7.45 -0.19 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.43 -224.20 -54.47 8.03 4.48 0.33 -0.59 --- ---
Arm. vert. gch. 110.45 -180.09 33.36 -1.11 3.60 -0.41 0.60 --- ---
Arm. horz. gch. 109.91 -180.09 33.36 -1.11 -3.60 -0.41 0.60 --- ---
Béton 71.30 -372.58 2.03 -2.43 7.45 -0.19 0.01 --- ---
Arm. transve. 1.87 -259.70 1.67 -13.08 --- --- --- 2.68 -0.10
R+3
Arm. vert. drt. 22.79 -407.06 1.76 -2.72 -8.14 -0.19 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.43 -224.57 -52.34 8.18 -4.49 0.09 -0.48 --- ---
Arm. vert. gch. 100.21 -163.52 31.61 -1.00 3.27 -0.39 0.66 --- ---
Arm. horz. gch. 105.26 -162.03 31.86 -0.95 -3.24 -0.40 0.63 --- ---
Béton 77.90 -407.06 1.76 -2.72 8.14 -0.19 0.01 --- ---
Arm. transve. 1.88 -275.17 -4.06 -14.43 --- --- --- 2.70 0.02
R+2
Arm. vert. drt. 24.98 -446.06 2.15 -0.00 -8.92 -0.31 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.45 -251.91 -43.86 2.97 5.04 0.25 -0.60 --- ---
Arm. vert. gch. 24.98 -446.06 2.15 -0.00 8.92 -0.31 -0.00 --- ---
Arm. horz. gch. 2.71 -251.92 -43.84 2.96 -5.04 0.25 -0.60 --- ---
Béton 85.36 -446.06 2.15 -0.00 8.92 -0.31 -0.00 --- ---
Arm. transve. 1.30 -322.47 1.37 -3.46 --- --- --- 1.86 -0.06
R+1
Arm. vert. drt. 27.57 -492.41 -1.95 0.59 -9.85 -0.01 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.68 -464.69 -58.38 -16.69 -9.29 0.17 0.36 --- ---
Arm. vert. gch. 27.57 -492.41 -1.95 0.59 9.85 -0.01 0.11 --- ---
Arm. horz. gch. 2.85 -464.91 -58.43 -16.87 9.30 0.21 0.38 --- ---
Béton 93.99 -492.41 -1.95 0.59 9.85 -0.01 0.11 --- ---
Arm. transve. 0.65 -348.38 -7.34 -0.80 --- --- --- 0.91 0.16
RDC
Arm. vert. drt. 27.74 -495.38 2.36 11.85 -9.91 0.03 -0.13 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.68 -373.44 -61.24 -34.08 -7.47 0.50 0.13 --- ---
Arm. vert. gch. 27.74 -495.38 2.36 11.85 9.91 0.03 -0.13 --- ---
Arm. horz. gch. 3.12 -373.37 -61.25 -34.06 -7.47 0.53 0.15 --- ---
Béton 94.85 -495.38 2.36 11.85 9.91 0.03 -0.13 --- ---
Arm. transve. 1.48 -492.04 -4.65 12.91 --- --- --- -1.86 -0.84
SS1
Arm. vert. drt. 82.51 -170.18 8.71 91.09 -3.40 -0.08 -0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 108.27 -121.90 25.28 102.89 2.44 -0.11 0.02 --- ---
Arm. vert. gch. 80.81 -170.18 8.71 91.09 3.40 -0.08 -0.08 --- ---
Arm. horz. gch. 109.59 -121.90 25.28 102.89 -2.44 -0.11 0.02 --- ---
Béton 72.55 -407.11 -50.99 17.94 8.14 -0.14 0.23 --- ---
Arm. transve. 1.35 -172.21 7.68 19.74 --- --- --- -1.89 0.18
Page 128
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14d: Longueur: 139.9 cm [Noeud initial: 31.84;44.73 -> Noeud final: 33.24;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+17
Arm. vert. drt. 186.26 146.89 180.83 69.60 0.00 -1.02 -0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 203.81 146.89 180.83 69.60 0.00 -1.02 -0.39 --- ---
Arm. vert. gch. 113.31 146.89 180.83 69.60 -0.87 -1.02 -0.39 --- ---
Arm. horz. gch. 127.50 146.89 180.83 69.60 -0.87 -1.02 -0.39 --- ---
Béton 43.66 146.89 180.83 69.60 0.00 -1.02 -0.39 --- ---
Arm. transve. 1.54 -12.89 2.68 14.26 --- --- --- 1.99 -0.86
R+16
Arm. vert. drt. 92.42 109.50 -1.58 9.53 0.00 -0.02 0.37 --- ---
(e=30.0 cm)
Arm. horz. drt. 79.75 -11.76 1.69 44.23 0.24 0.01 0.30 --- ---
Arm. vert. gch. 92.56 109.41 -1.59 9.51 -0.58 -0.03 0.37 --- ---
Arm. horz. gch. 70.19 -7.57 -2.64 45.08 -0.15 -0.06 0.04 --- ---
Béton 28.52 -11.76 1.69 44.23 -0.24 0.01 0.30 --- ---
Arm. transve. 2.07 -9.62 -0.97 22.30 --- --- --- 2.94 0.22
R+15
Arm. vert. drt. 75.37 80.51 7.56 10.74 0.69 0.09 -0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.55 -5.09 -0.26 43.30 0.54 0.13 0.10 --- ---
Arm. vert. gch. 74.86 84.99 12.84 10.48 0.00 0.00 -0.11 --- ---
Arm. horz. gch. 97.27 -5.11 -2.27 47.69 -0.20 -0.20 0.07 --- ---
Béton 34.56 -2.15 -1.88 44.91 -0.23 -0.21 0.08 --- ---
Arm. transve. 1.88 -14.34 1.41 -6.52 --- --- --- 2.65 -0.12
R+14
Arm. vert. drt. 50.57 55.92 -0.91 12.34 0.00 -0.01 -0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 135.62 24.22 33.09 -10.40 1.42 0.43 0.01 --- ---
Arm. vert. gch. 57.00 55.85 -0.99 12.41 -0.36 -0.02 -0.21 --- ---
Arm. horz. gch. 110.27 13.41 31.34 -0.30 -2.27 -0.35 -0.18 --- ---
Béton 24.69 -0.69 5.04 29.79 -0.17 -0.12 0.22 --- ---
Arm. transve. 1.96 -28.41 -1.36 0.79 --- --- --- 2.76 -0.24
R+13
Arm. vert. drt. 48.62 53.71 -1.18 12.11 0.00 -0.01 -0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 128.85 22.70 33.88 -10.37 1.42 0.43 0.03 --- ---
Arm. vert. gch. 53.96 53.48 -1.34 12.24 -0.38 -0.03 -0.21 --- ---
Arm. horz. gch. 71.08 7.68 33.34 0.42 -2.13 -0.34 -0.21 --- ---
Béton 13.30 -74.54 7.32 -2.01 -1.49 0.02 -0.21 --- ---
Arm. transve. 2.00 -39.58 -1.40 0.74 --- --- --- 2.84 -0.24
R+12
Arm. vert. drt. 45.39 49.80 -1.91 12.16 0.00 0.00 -0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 116.88 19.45 34.56 -10.52 1.41 0.42 0.04 --- ---
Arm. vert. gch. 51.31 49.32 -2.12 12.29 -0.34 -0.01 -0.21 --- ---
Arm. horz. gch. 102.42 1.77 34.70 0.70 -2.21 -0.35 -0.21 --- ---
Béton 16.64 -70.20 0.59 8.75 -1.40 -0.18 0.09 --- ---
Arm. transve. 2.06 -46.72 -1.48 0.43 --- --- --- 2.89 -0.28
R+11
Arm. vert. drt. 41.71 46.64 -2.46 12.05 0.00 -0.23 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 68.47 12.21 35.28 -10.63 1.40 0.42 0.04 --- ---
Arm. vert. gch. 55.45 46.64 -2.46 12.05 -1.05 -0.23 -0.23 --- ---
Arm. horz. gch. 109.27 -2.13 40.58 2.34 -0.22 -0.02 -0.11 --- ---
Béton 20.30 -86.16 0.48 7.76 1.72 -0.25 0.08 --- ---
Arm. transve. 2.09 -56.56 -1.51 0.54 --- --- --- 2.92 -0.29
R+10
Arm. vert. drt. 42.79 47.94 -2.67 12.28 0.00 -0.23 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 68.52 4.72 35.73 -10.69 1.40 0.42 0.05 --- ---
Page 129
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14d: Longueur: 139.9 cm [Noeud initial: 31.84;44.73 -> Noeud final: 33.24;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 56.85 47.94 -2.67 12.28 -1.08 -0.23 -0.23 --- ---
Arm. horz. gch. 119.19 -10.06 44.54 3.48 -0.20 0.02 -0.10 --- ---
Béton 24.02 -102.09 0.54 7.46 2.04 -0.25 0.08 --- ---
Arm. transve. 2.13 -66.21 -1.53 0.42 --- --- --- 2.97 -0.29
R+9
Arm. vert. drt. 52.18 59.73 -1.72 12.80 0.00 -0.21 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 67.71 -5.41 35.85 -10.59 1.40 0.42 0.05 --- ---
Arm. vert. gch. 65.50 59.73 -1.72 12.80 -1.00 -0.21 -0.23 --- ---
Arm. horz. gch. 119.58 -19.32 44.99 3.33 -0.39 0.02 -0.10 --- ---
Béton 26.29 -111.79 0.60 7.93 2.24 -0.24 0.08 --- ---
Arm. transve. 2.14 -75.52 -1.52 0.39 --- --- --- 2.99 -0.30
R+8
Arm. vert. drt. 51.65 59.28 -1.73 12.53 0.00 -0.22 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 66.43 -22.53 44.63 3.22 0.45 0.03 -0.09 --- ---
Arm. vert. gch. 65.20 59.28 -1.73 12.53 -1.03 -0.22 -0.23 --- ---
Arm. horz. gch. 118.55 -22.29 44.69 3.19 -0.45 0.02 -0.09 --- ---
Béton 29.76 -127.03 0.73 9.12 2.54 0.17 0.12 --- ---
Arm. transve. 2.14 -85.02 -1.47 0.26 --- --- --- 2.99 -0.29
R+7
Arm. vert. drt. 51.45 58.60 -1.89 12.35 0.00 -0.23 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.22 -33.70 44.69 3.15 0.67 0.03 -0.09 --- ---
Arm. vert. gch. 65.12 58.60 -1.89 12.35 -1.08 -0.23 -0.23 --- ---
Arm. horz. gch. 141.71 -33.47 44.74 3.11 -0.67 0.02 -0.10 --- ---
Béton 33.15 -142.15 0.72 10.02 2.84 0.17 0.13 --- ---
Arm. transve. 2.11 -94.73 -1.37 0.05 --- --- --- 2.97 -0.28
R+6
Arm. vert. drt. 53.38 60.64 -1.77 12.21 0.00 -0.25 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 139.69 -38.20 44.15 3.18 0.76 0.03 -0.09 --- ---
Arm. vert. gch. 66.81 60.64 -1.77 12.21 -1.13 -0.25 -0.23 --- ---
Arm. horz. gch. 139.88 -37.99 44.21 3.14 -0.76 0.02 -0.10 --- ---
Béton 32.40 -179.53 1.00 -20.83 -3.59 -0.22 -0.07 --- ---
Arm. transve. 2.06 -105.64 -1.25 0.13 --- --- --- 2.91 -0.25
R+5
Arm. vert. drt. 53.67 61.49 -1.55 11.71 0.00 -0.26 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 135.96 -52.62 43.03 3.02 1.05 0.04 -0.09 --- ---
Arm. vert. gch. 67.27 61.49 -1.55 11.71 -1.16 -0.26 -0.23 --- ---
Arm. horz. gch. 135.70 -52.44 43.09 2.98 -1.05 0.02 -0.10 --- ---
Béton 36.19 -200.98 1.34 -21.30 -4.02 -0.21 -0.06 --- ---
Arm. transve. 1.66 -97.30 2.96 10.71 --- --- --- 2.18 0.87
R+4
Arm. vert. drt. 58.32 67.80 -0.91 11.34 0.00 -0.26 -0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 128.06 -64.61 40.58 2.91 1.29 0.03 -0.09 --- ---
Arm. vert. gch. 71.72 67.80 -0.91 11.34 -1.16 -0.26 -0.22 --- ---
Arm. horz. gch. 127.86 -58.29 40.59 3.02 -1.17 0.02 -0.09 --- ---
Béton 40.15 -223.26 1.73 -21.89 -4.47 -0.20 -0.05 --- ---
Arm. transve. 1.58 -106.78 2.61 10.44 --- --- --- 2.07 0.86
R+3
Arm. vert. drt. 69.85 82.70 0.42 11.46 0.00 -0.29 -0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 32.31 82.70 0.42 11.46 0.00 -0.29 -0.23 --- ---
Arm. vert. gch. 84.33 82.70 0.42 11.46 -1.28 -0.29 -0.23 --- ---
Arm. horz. gch. 104.08 -87.73 30.51 0.99 -1.81 -0.29 -0.19 --- ---
Béton 44.11 -245.50 1.78 -22.81 -4.91 -0.21 -0.04 --- ---
Page 130
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14d: Longueur: 139.9 cm [Noeud initial: 31.84;44.73 -> Noeud final: 33.24;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 1.60 -110.95 -0.57 12.23 --- --- --- 2.26 0.26
R+2
Arm. vert. drt. 36.17 39.64 6.01 5.54 0.00 -0.01 0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 38.36 39.20 6.04 5.55 0.00 -0.01 0.10 --- ---
Arm. vert. gch. 37.30 39.64 6.01 5.54 -0.36 -0.01 0.10 --- ---
Arm. horz. gch. 35.39 35.63 6.53 5.77 -0.37 -0.01 0.11 --- ---
Béton 48.12 -255.35 0.48 3.93 5.11 -0.16 -0.03 --- ---
Arm. transve. 1.09 -166.57 -0.75 -0.97 --- --- --- 1.55 -0.05
R+1
Arm. vert. drt. 81.41 96.99 4.84 8.45 0.00 -0.01 0.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 52.44 76.30 6.61 9.06 0.22 0.00 0.00 --- ---
Arm. vert. gch. 82.14 96.99 4.84 8.45 -0.19 -0.01 0.06 --- ---
Arm. horz. gch. 51.69 76.30 6.61 9.06 0.00 0.00 0.00 --- ---
Béton 54.45 -288.95 0.37 4.34 5.78 -0.13 0.00 --- ---
Arm. transve. 0.88 -169.09 -1.00 -2.19 --- --- --- 1.23 -0.14
RDC
Arm. vert. drt. 17.45 -316.59 1.68 10.69 -6.33 0.00 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.54 -236.98 -33.13 22.07 -4.74 0.05 0.03 --- ---
Arm. vert. gch. 17.45 -316.59 1.68 10.69 6.33 0.00 0.01 --- ---
Arm. horz. gch. 1.59 -237.38 -33.19 22.12 -4.75 0.06 0.03 --- ---
Béton 58.95 -312.80 1.88 -5.63 6.26 0.00 0.00 --- ---
Arm. transve. 0.57 -263.56 -20.22 7.15 --- --- --- -0.81 -0.08
SS1
Arm. vert. drt. 91.65 -223.69 16.67 -96.80 -4.47 -0.28 -0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.07 -135.11 33.06 -97.36 2.70 -0.54 -0.16 --- ---
Arm. vert. gch. 88.44 -227.78 18.74 -57.18 4.56 -0.29 -0.12 --- ---
Arm. horz. gch. 57.60 -135.11 33.06 -97.36 -2.70 -0.54 -0.16 --- ---
Béton 78.87 -131.09 -29.89 -130.24 -2.62 -0.40 -0.02 --- ---
Arm. transve. 1.27 -115.92 -31.93 -80.72 --- --- --- 1.74 0.33
Mur VA14e: Longueur: 139.8 cm [Noeud initial: 36.98;44.73 -> Noeud final: 38.38;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 74.02 10.56 -52.78 13.46 6.46 1.16 -0.40 --- ---
(e=30.0 cm)
Arm. horz. drt. 129.55 -85.67 45.51 7.33 2.31 -0.14 -0.63 --- ---
Arm. vert. gch. 93.67 63.92 -12.80 1.31 0.00 0.03 0.04 --- ---
Arm. horz. gch. 147.11 -85.56 45.51 7.37 -1.71 -0.14 -0.64 --- ---
Béton 32.98 -5.32 -9.08 43.50 0.85 0.05 0.05 --- ---
Arm. transve. 3.54 -69.86 15.96 -31.14 --- --- --- 3.66 -3.49
R+14
Arm. vert. drt. 15.92 -26.29 32.17 -0.27 -0.53 0.01 -0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 103.09 -22.21 35.98 1.72 0.44 -0.08 -0.18 --- ---
Arm. vert. gch. 36.31 -61.27 21.34 0.10 1.23 -0.64 0.77 --- ---
Arm. horz. gch. 109.87 -21.34 35.94 1.74 -0.43 -0.09 -0.18 --- ---
Béton 20.97 -61.27 21.34 0.10 1.23 -0.64 0.77 --- ---
Arm. transve. 2.20 -56.50 2.40 -0.88 --- --- --- -3.15 -0.07
R+13
Arm. vert. drt. 9.33 5.39 39.54 4.10 -0.54 -0.16 -0.20 --- ---
(e=30.0 cm)
Arm. horz. drt. 113.63 5.39 39.54 4.10 -0.54 -0.16 -0.20 --- ---
Arm. vert. gch. 58.53 38.01 -2.78 1.04 -0.20 0.05 0.08 --- ---
Page 131
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14e: Longueur: 139.8 cm [Noeud initial: 36.98;44.73 -> Noeud final: 38.38;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 137.84 8.15 41.19 4.99 -0.66 -0.19 -0.23 --- ---
Béton 18.10 -52.23 18.18 0.12 1.04 -0.64 0.77 --- ---
Arm. transve. 2.34 -54.64 3.37 -0.64 --- --- --- -3.36 -0.04
R+12
Arm. vert. drt. 37.95 21.00 40.90 4.58 0.00 -0.13 -0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 124.16 5.32 42.75 5.13 0.00 -0.18 -0.23 --- ---
Arm. vert. gch. 59.22 38.24 -2.98 1.20 -0.21 0.06 0.08 --- ---
Arm. horz. gch. 143.41 5.93 42.93 5.26 -0.69 -0.20 -0.24 --- ---
Béton 19.66 -57.17 18.18 0.04 1.14 -0.65 0.77 --- ---
Arm. transve. 2.36 -60.49 3.49 -0.97 --- --- --- -3.37 -0.03
R+11
Arm. vert. drt. 26.74 12.16 41.72 4.68 0.00 -0.12 -0.17 --- ---
(e=30.0 cm)
Arm. horz. drt. 128.55 -1.41 44.37 5.47 0.03 -0.18 -0.23 --- ---
Arm. vert. gch. 39.47 12.16 41.72 4.68 -0.38 -0.12 -0.17 --- ---
Arm. horz. gch. 147.74 -2.24 44.57 5.60 -0.70 -0.20 -0.25 --- ---
Béton 21.85 -64.04 18.23 -0.02 1.28 -0.65 0.78 --- ---
Arm. transve. 2.36 -66.56 3.52 -1.20 --- --- --- -3.38 -0.03
R+10
Arm. vert. drt. 11.23 -0.83 42.49 4.74 0.02 -0.13 -0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 131.83 -12.35 45.92 5.88 0.25 -0.21 -0.26 --- ---
Arm. vert. gch. 43.15 -71.77 18.27 -0.06 1.44 -0.65 0.78 --- ---
Arm. horz. gch. 150.73 -12.35 45.92 5.88 -0.71 -0.21 -0.26 --- ---
Béton 24.34 -71.77 18.27 -0.06 1.44 -0.65 0.78 --- ---
Arm. transve. 2.37 -71.88 3.53 -1.71 --- --- --- -3.40 -0.03
R+9
Arm. vert. drt. 18.70 -31.83 43.08 4.15 -0.64 -0.11 -0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 133.85 -25.03 46.82 5.99 0.50 -0.20 -0.26 --- ---
Arm. vert. gch. 48.16 -79.66 18.31 -0.11 1.59 -0.65 0.79 --- ---
Arm. horz. gch. 151.50 -25.03 46.82 5.99 -0.70 -0.20 -0.26 --- ---
Béton 26.89 -79.66 18.31 -0.11 1.59 -0.65 0.79 --- ---
Arm. transve. 2.38 -75.19 3.51 -2.19 --- --- --- -3.41 -0.02
R+8
Arm. vert. drt. 28.42 -46.92 43.66 4.24 -0.94 -0.12 -0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 134.32 -39.77 47.12 5.95 0.80 -0.19 -0.25 --- ---
Arm. vert. gch. 53.16 -87.61 18.33 -0.15 1.75 -0.66 0.79 --- ---
Arm. horz. gch. 150.16 -39.77 47.12 5.95 -0.80 -0.19 -0.25 --- ---
Béton 29.48 -87.61 18.33 -0.15 1.75 -0.66 0.79 --- ---
Arm. transve. 2.18 -76.59 3.10 3.28 --- --- --- -3.12 -0.05
R+7
Arm. vert. drt. 40.30 -65.90 43.34 4.06 -1.32 -0.11 -0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 132.79 -58.23 46.64 5.70 1.16 -0.18 -0.24 --- ---
Arm. vert. gch. 58.14 -95.56 18.33 -0.19 1.91 -0.66 0.79 --- ---
Arm. horz. gch. 146.42 -58.23 46.64 5.70 -1.16 -0.18 -0.24 --- ---
Béton 32.39 -143.39 -12.27 1.04 2.87 -0.21 -0.29 --- ---
Arm. transve. 2.17 -78.22 3.05 3.05 --- --- --- -3.11 -0.04
R+6
Arm. vert. drt. 52.11 -84.96 42.00 3.58 -1.70 -0.08 -0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 129.37 -75.85 45.39 5.26 1.52 -0.16 -0.22 --- ---
Arm. vert. gch. 63.10 -103.52 18.31 -0.24 2.07 -0.66 0.80 --- ---
Arm. horz. gch. 140.58 -75.85 45.39 5.26 -1.52 -0.16 -0.22 --- ---
Béton 35.60 -158.21 -13.94 0.46 3.16 -0.19 -0.29 --- ---
Arm. transve. 2.14 -81.72 2.99 3.25 --- --- --- -3.07 -0.04
Page 132
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA14e: Longueur: 139.8 cm [Noeud initial: 36.98;44.73 -> Noeud final: 38.38;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+5
Arm. vert. drt. 63.75 -103.87 41.41 3.66 -2.08 -0.09 -0.17 --- ---
(e=30.0 cm)
Arm. horz. drt. 123.74 -98.20 43.30 4.62 1.96 -0.13 -0.20 --- ---
Arm. vert. gch. 68.10 -111.55 18.27 -0.28 2.23 -0.66 0.80 --- ---
Arm. horz. gch. 132.33 -98.20 43.30 4.62 -1.96 -0.13 -0.20 --- ---
Béton 38.91 -173.50 -15.67 -0.17 3.47 -0.17 -0.28 --- ---
Arm. transve. 1.92 -94.29 3.24 -5.87 --- --- --- -2.75 0.01
R+4
Arm. vert. drt. 14.14 -203.38 -27.25 -0.21 -4.07 0.30 0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 4.47 -107.83 -107.71 -37.84 -2.16 1.44 1.37 --- ---
Arm. vert. gch. 76.45 -124.86 39.89 3.71 2.50 -0.09 -0.17 --- ---
Arm. horz. gch. 120.40 -124.82 39.94 3.73 -2.50 -0.09 -0.17 --- ---
Béton 42.44 -189.79 -17.51 -0.93 3.80 -0.15 -0.28 --- ---
Arm. transve. 1.69 -173.20 3.71 6.88 --- --- --- -2.32 -0.03
R+3
Arm. vert. drt. 16.44 -236.44 -31.63 -0.51 -4.73 0.35 0.07 --- ---
(e=30.0 cm)
Arm. horz. drt. 4.29 -95.76 -103.64 -37.38 -1.92 1.41 1.34 --- ---
Arm. vert. gch. 78.84 -128.87 18.15 -0.37 2.58 -0.66 0.80 --- ---
Arm. horz. gch. 84.07 -128.87 18.15 -0.37 -2.58 -0.66 0.80 --- ---
Béton 46.63 -209.12 -19.68 -1.89 4.18 -0.11 -0.29 --- ---
Arm. transve. 1.67 -188.58 3.77 6.79 --- --- --- -2.29 -0.03
R+2
Arm. vert. drt. 18.86 -271.30 -36.38 -0.59 -5.43 0.37 0.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.79 -75.09 -92.65 -32.15 -1.50 1.36 1.37 --- ---
Arm. vert. gch. 90.97 -148.55 18.65 -1.51 2.97 -0.62 0.74 --- ---
Arm. horz. gch. 87.59 -139.96 18.97 -1.55 -2.80 -0.67 0.80 --- ---
Béton 49.51 -148.55 18.65 -1.52 2.97 -0.62 0.74 --- ---
Arm. transve. 1.36 -59.49 1.24 0.86 --- --- --- -1.95 -0.03
R+1
Arm. vert. drt. 127.13 100.68 0.29 -5.30 0.00 0.04 -0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 54.26 99.98 13.05 -7.21 0.00 -0.31 0.17 --- ---
Arm. vert. gch. 156.06 99.98 13.05 -7.21 -2.12 -0.31 0.17 --- ---
Arm. horz. gch. 102.63 -157.39 21.89 -1.51 -3.15 -0.81 0.96 --- ---
Béton 54.74 -243.08 -37.74 4.47 4.86 -2.35 -0.56 --- ---
Arm. transve. 1.73 -223.62 2.27 6.77 --- --- --- -2.38 0.03
RDC
Arm. vert. drt. 120.83 57.73 -46.00 -13.88 3.96 0.92 0.75 --- ---
(e=30.0 cm)
Arm. horz. drt. 41.57 32.78 6.11 -1.59 0.62 0.28 -0.36 --- ---
Arm. vert. gch. 81.32 57.73 -46.00 -13.88 0.00 0.92 0.75 --- ---
Arm. horz. gch. 21.96 33.93 -50.21 -16.91 0.00 1.02 0.82 --- ---
Béton 61.41 -259.10 -3.11 19.54 5.18 -0.99 0.13 --- ---
Arm. transve. 1.61 -259.10 -3.11 19.54 --- --- --- -2.16 -0.44
SS1
Arm. vert. drt. 150.66 225.63 23.86 -21.07 0.00 -0.22 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 96.72 117.98 10.64 -44.34 0.00 -0.03 -0.04 --- ---
Arm. vert. gch. 103.65 225.63 23.86 -21.07 -1.20 -0.22 0.11 --- ---
Arm. horz. gch. 94.76 -83.94 -3.67 -74.38 -1.68 -0.26 0.01 --- ---
Béton 96.90 -551.89 -60.79 -70.03 -11.04 0.28 0.36 --- ---
Arm. transve. 31.09 148.20 14.28 -38.89 --- --- --- 3.68 -0.32
Page 133
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA16: Longueur: 140.2 cm [Noeud initial: 52.01;44.73 -> Noeud final: 53.41;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 92.81 56.79 1.74 -5.65 0.00 -0.09 -0.47 --- ---
(e=30.0 cm)
Arm. horz. drt. 79.47 -18.55 3.65 -35.89 2.04 0.51 -0.11 --- ---
Arm. vert. gch. 84.45 11.09 -9.37 14.28 -6.60 -0.91 0.05 --- ---
Arm. horz. gch. 104.96 -85.38 33.45 -1.83 -1.71 -0.18 0.41 --- ---
Béton 27.94 -18.55 3.65 -35.89 -0.37 0.51 -0.11 --- ---
Arm. transve. 2.93 -8.67 -7.25 -26.25 --- --- --- -4.18 0.04
R+14
Arm. vert. drt. 59.93 -22.83 1.66 -3.14 5.88 0.94 -0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 96.42 -50.39 33.50 1.72 1.01 -0.17 0.39 --- ---
Arm. vert. gch. 70.43 -8.08 -41.62 -6.09 -5.50 -0.89 -0.20 --- ---
Arm. horz. gch. 103.03 -50.39 33.50 1.72 -1.28 -0.17 0.39 --- ---
Béton 25.65 -57.52 32.47 1.85 1.15 -0.16 0.29 --- ---
Arm. transve. 2.38 -22.97 2.59 -12.18 --- --- --- -3.40 0.21
R+13
Arm. vert. drt. 59.05 33.78 -2.43 -4.00 0.00 -0.13 -0.53 --- ---
(e=30.0 cm)
Arm. horz. drt. 48.39 -29.14 1.24 -4.11 6.15 0.98 -0.20 --- ---
Arm. vert. gch. 68.02 33.78 -2.43 -4.00 -1.22 -0.13 -0.53 --- ---
Arm. horz. gch. 103.61 -68.28 33.25 1.43 -1.37 -0.23 0.36 --- ---
Béton 34.17 -76.65 32.21 1.58 1.53 -0.21 0.22 --- ---
Arm. transve. 2.50 -29.60 2.51 -14.06 --- --- --- -3.58 0.21
R+12
Arm. vert. drt. 55.20 30.85 -3.46 -4.32 0.00 -0.13 -0.53 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.16 -72.65 34.02 1.40 1.45 -0.23 0.36 --- ---
Arm. vert. gch. 63.50 30.85 -3.46 -4.32 -1.22 -0.13 -0.53 --- ---
Arm. horz. gch. 105.89 -72.65 34.02 1.40 -1.45 -0.23 0.36 --- ---
Béton 37.90 -85.00 33.12 1.49 1.70 -0.21 0.19 --- ---
Arm. transve. 2.51 -36.57 2.44 -13.92 --- --- --- -3.59 0.21
R+11
Arm. vert. drt. 46.84 -76.76 34.34 1.35 -1.54 -0.22 0.28 --- ---
(e=30.0 cm)
Arm. horz. drt. 96.27 -75.95 34.52 1.34 1.52 -0.23 0.31 --- ---
Arm. vert. gch. 53.75 23.95 -4.20 -4.54 -1.25 -0.13 -0.54 --- ---
Arm. horz. gch. 107.20 -75.95 34.52 1.34 -1.52 -0.23 0.31 --- ---
Béton 33.94 -76.14 31.52 1.59 1.52 -0.20 0.17 --- ---
Arm. transve. 2.55 -43.07 2.38 -14.22 --- --- --- -3.65 0.21
R+10
Arm. vert. drt. 49.09 -80.35 34.89 1.30 -1.61 -0.23 0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 97.64 -79.75 35.05 1.29 1.60 -0.23 0.30 --- ---
Arm. vert. gch. 48.94 -79.75 35.05 1.29 1.60 -0.23 0.30 --- ---
Arm. horz. gch. 108.78 -79.75 35.05 1.29 -1.60 -0.23 0.30 --- ---
Béton 35.82 -80.35 34.89 1.30 1.61 -0.23 0.27 --- ---
Arm. transve. 2.57 -49.62 2.32 -14.30 --- --- --- -3.67 0.21
R+9
Arm. vert. drt. 49.88 -81.58 35.25 1.26 -1.63 -0.23 0.26 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.55 -80.55 35.40 1.25 1.61 -0.23 0.28 --- ---
Arm. vert. gch. 50.71 -82.80 24.96 1.59 1.66 -0.14 -0.19 --- ---
Arm. horz. gch. 109.78 -80.55 35.40 1.25 -1.61 -0.23 0.28 --- ---
Béton 36.37 -81.58 35.25 1.26 1.63 -0.23 0.26 --- ---
Arm. transve. 2.56 -55.98 2.28 -14.22 --- --- --- -3.66 0.21
R+8
Arm. vert. drt. 50.83 -83.06 35.46 1.23 -1.66 -0.22 0.23 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.00 -81.69 35.59 1.22 1.63 -0.23 0.25 --- ---
Page 134
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA16: Longueur: 140.2 cm [Noeud initial: 52.01;44.73 -> Noeud final: 53.41;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 56.65 -92.44 25.14 1.68 1.85 -0.14 -0.20 --- ---
Arm. horz. gch. 110.25 -81.69 35.59 1.22 -1.63 -0.23 0.25 --- ---
Béton 37.03 -83.06 35.46 1.23 1.66 -0.22 0.23 --- ---
Arm. transve. 2.50 -62.59 2.26 -14.08 --- --- --- -3.57 0.20
R+7
Arm. vert. drt. 51.34 -83.82 35.52 1.21 -1.68 -0.22 0.19 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.03 -82.58 35.62 1.20 1.65 -0.22 0.22 --- ---
Arm. vert. gch. 62.96 -102.69 25.34 1.79 2.05 -0.14 -0.21 --- ---
Arm. horz. gch. 110.16 -82.58 35.62 1.20 1.65 -0.22 0.22 --- ---
Béton 37.37 -83.82 35.52 1.21 1.68 -0.22 0.19 --- ---
Arm. transve. 2.44 -70.46 -3.80 -16.15 --- --- --- -3.49 -0.00
R+6
Arm. vert. drt. 51.84 -84.55 35.45 1.20 -1.69 -0.22 0.14 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.60 -81.85 35.48 1.17 1.64 -0.22 0.17 --- ---
Arm. vert. gch. 69.73 -113.69 25.57 1.91 2.27 -0.14 -0.23 --- ---
Arm. horz. gch. 109.61 -81.85 35.48 1.17 -1.64 -0.22 0.17 --- ---
Béton 37.76 -113.69 25.57 1.91 2.27 -0.14 -0.23 --- ---
Arm. transve. 2.33 -77.38 2.23 -13.63 --- --- --- -3.33 0.18
R+5
Arm. vert. drt. 46.58 -75.98 34.43 1.08 -1.52 -0.21 0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 95.65 -75.98 34.43 1.08 1.52 -0.21 0.12 --- ---
Arm. vert. gch. 79.51 -129.60 27.17 2.11 2.59 -0.15 -0.22 --- ---
Arm. horz. gch. 106.23 -75.98 34.43 1.08 1.52 -0.21 0.12 --- ---
Béton 60.29 -129.60 27.17 2.11 -2.59 -0.15 -0.22 --- ---
Arm. transve. 2.18 -177.51 2.96 -3.10 --- --- --- 3.11 -0.33
R+4
Arm. vert. drt. 12.38 -221.18 4.06 -10.15 -4.42 -0.09 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 83.32 -139.49 26.01 2.33 -2.79 -0.14 -0.26 --- ---
Arm. vert. gch. 85.58 -139.49 26.01 2.33 2.79 -0.14 -0.26 --- ---
Arm. horz. gch. 92.79 -139.49 26.01 2.33 -2.79 -0.14 -0.26 --- ---
Béton 64.89 -139.49 26.01 2.33 -2.79 -0.14 -0.26 --- ---
Arm. transve. 2.09 -196.08 -6.76 -7.90 --- --- --- 2.99 -0.14
R+3
Arm. vert. drt. 74.58 44.54 -1.38 -2.83 0.59 0.02 0.17 --- ---
(e=30.0 cm)
Arm. horz. drt. 96.30 -60.41 34.68 -0.26 1.21 -0.20 -0.03 --- ---
Arm. vert. gch. 91.52 -149.07 28.70 1.42 2.98 -0.17 -0.21 --- ---
Arm. horz. gch. 106.70 -60.41 34.68 -0.26 1.21 -0.20 -0.03 --- ---
Béton 69.35 -149.07 28.70 1.42 -2.98 -0.17 -0.21 --- ---
Arm. transve. 2.05 -102.08 -1.17 -6.52 --- --- --- -2.85 0.73
R+2
Arm. vert. drt. 140.24 120.97 17.23 -22.61 0.48 0.11 -0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 85.24 40.77 8.25 -56.97 0.00 -0.15 -0.01 --- ---
Arm. vert. gch. 90.68 115.02 16.71 -24.36 -0.86 -0.15 0.00 --- ---
Arm. horz. gch. 82.49 40.77 8.25 -56.97 -0.52 -0.15 -0.01 --- ---
Béton 43.98 -206.74 -29.20 -1.64 -4.13 -0.05 -0.24 --- ---
Arm. transve. 2.39 31.68 7.22 -52.39 --- --- --- 0.21 0.02
R+1
Arm. vert. drt. 132.89 230.35 35.06 -30.24 0.57 0.17 -0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.53 230.35 35.06 -30.24 0.57 0.17 -0.15 --- ---
Arm. vert. gch. 129.96 228.44 34.80 -31.04 -0.37 -0.01 -0.08 --- ---
Arm. horz. gch. 100.00 228.44 34.80 -31.04 -0.37 -0.01 -0.08 --- ---
Béton 50.80 -386.20 -49.64 36.60 7.72 -0.03 -0.06 --- ---
Page 135
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA16: Longueur: 140.2 cm [Noeud initial: 52.01;44.73 -> Noeud final: 53.41;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 2.18 111.93 19.18 -37.12 --- --- --- -0.18 0.11
RDC
Arm. vert. drt. 131.24 248.81 5.28 41.28 0.00 -0.22 -0.29 --- ---
(e=30.0 cm)
Arm. horz. drt. 97.60 61.96 1.63 70.19 0.00 0.02 0.11 --- ---
Arm. vert. gch. 139.45 248.33 5.50 41.42 -1.01 -0.23 -0.30 --- ---
Arm. horz. gch. 174.24 81.70 -0.54 1.28 0.00 -0.06 0.17 --- ---
Béton 48.83 -377.63 -57.76 -56.02 -7.55 0.09 -0.10 --- ---
Arm. transve. 7.61 132.15 2.31 59.23 --- --- --- -1.17 0.43
SS1
Arm. vert. drt. 21.59 -50.14 -8.38 71.84 1.00 -0.04 -0.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 91.14 -110.59 -5.46 95.46 2.21 -0.03 -0.03 --- ---
Arm. vert. gch. 24.36 13.52 1.08 -18.09 -1.76 -0.29 0.07 --- ---
Arm. horz. gch. 92.27 -110.59 -5.46 95.46 -2.21 -0.03 -0.03 --- ---
Béton 59.52 -115.68 -6.25 95.83 2.31 -0.02 -0.03 --- ---
Arm. transve. 0.94 -120.34 -43.13 71.33 --- --- --- 1.28 -0.37
Mur AL-21: Longueur: 235.4 cm [Noeud initial: 11.67;44.73 -> Noeud final: 14.03;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 70.70 -30.80 -34.50 -70.32 0.62 0.01 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 105.05 -45.05 -17.29 71.15 0.90 -0.38 -0.04 --- ---
Arm. vert. gch. 91.61 -8.73 -3.51 46.63 -2.49 -0.49 0.01 --- ---
Arm. horz. gch. 94.96 -97.87 -10.03 74.73 -1.96 -0.49 -0.12 --- ---
Béton 46.21 -97.87 -10.03 74.73 -1.96 -0.49 -0.12 --- ---
Arm. transve. 1.69 -42.11 -28.67 61.66 --- --- --- -2.40 0.04
Mur VA16b: Longueur: 176.9 cm [Noeud initial: 53.41;44.73 -> Noeud final: 55.18;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 93.48 59.90 2.73 4.18 0.20 0.59 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 64.90 -39.02 -5.88 -89.09 0.78 0.12 -0.04 --- ---
Arm. vert. gch. 90.27 59.90 2.73 4.18 0.00 0.59 -0.01 --- ---
Arm. horz. gch. 102.66 -38.96 -5.64 -88.88 -0.78 0.11 -0.04 --- ---
Béton 65.01 -64.25 -1.00 -86.17 -1.28 0.14 -0.10 --- ---
Arm. transve. 1.67 -35.90 -4.43 -79.95 --- --- --- -0.15 -0.09
R+1
Arm. vert. drt. 131.23 127.79 1.61 7.42 0.13 0.33 0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 93.95 67.07 -0.87 32.04 0.00 -0.04 0.09 --- ---
Arm. vert. gch. 128.26 127.79 1.61 7.42 0.00 0.33 0.08 --- ---
Arm. horz. gch. 91.26 67.07 -0.87 32.04 -0.03 -0.04 0.09 --- ---
Béton 32.05 -219.32 1.69 -23.80 -4.39 0.05 -0.01 --- ---
Arm. transve. 5.74 67.07 -0.87 32.04 --- --- --- -0.52 -0.06
RDC
Arm. vert. drt. 106.12 83.55 14.35 -42.39 0.49 0.06 0.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 84.15 -122.51 1.80 110.08 2.45 0.06 0.02 --- ---
Arm. vert. gch. 104.29 83.55 14.35 -42.39 0.00 0.06 0.15 --- ---
Arm. horz. gch. 82.89 -122.51 1.80 110.08 -2.45 0.06 0.02 --- ---
Béton 67.49 -126.39 1.59 109.83 -2.53 0.07 0.03 --- ---
Page 136
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA16b: Longueur: 176.9 cm [Noeud initial: 53.41;44.73 -> Noeud final: 55.18;44.73]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 3.25 -99.87 -6.72 108.66 --- --- --- -0.14 0.36
SS1
Arm. vert. drt. 122.28 153.19 19.68 51.23 0.00 -0.18 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 106.02 22.10 19.27 109.20 0.00 -0.12 -0.02 --- ---
Arm. vert. gch. 129.14 153.44 19.70 50.55 -1.00 -0.19 -0.04 --- ---
Arm. horz. gch. 108.26 22.10 19.27 109.20 -0.28 -0.12 -0.02 --- ---
Béton 84.75 -41.72 0.33 113.62 0.83 -0.05 -0.00 --- ---
Arm. transve. 3.70 -96.93 -18.32 91.56 --- --- --- -0.28 0.34
Mur VA19a: Longueur: 181.1 cm [Noeud initial: 12.62;37.35 -> Noeud final: 14.43;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 183.08 88.59 110.87 39.87 0.00 -2.01 -0.58 --- ---
(e=30.0 cm)
Arm. horz. drt. 215.41 88.59 110.87 39.87 0.00 -2.01 -0.58 --- ---
Arm. vert. gch. 202.35 88.71 110.85 39.95 -0.58 -2.06 -0.60 --- ---
Arm. horz. gch. 174.19 88.71 110.85 39.95 -0.58 -2.06 -0.60 --- ---
Béton 27.27 88.71 110.85 39.95 -0.58 -2.06 -0.60 --- ---
Arm. transve. 3.33 -33.23 -41.23 -20.75 --- --- --- 2.27 4.10
R+14
Arm. vert. drt. 147.18 69.16 123.99 32.04 0.00 -2.19 -0.70 --- ---
(e=30.0 cm)
Arm. horz. drt. 247.93 65.14 127.18 31.96 0.00 -2.21 -0.71 --- ---
Arm. vert. gch. 182.62 69.16 123.99 32.04 -1.32 -2.19 -0.70 --- ---
Arm. horz. gch. 228.57 65.58 127.17 32.11 -1.37 -2.26 -0.72 --- ---
Béton 27.38 -10.85 11.70 -28.71 -1.14 0.12 -0.75 --- ---
Arm. transve. 2.49 -40.42 -40.98 -19.23 --- --- --- 1.15 3.37
R+13
Arm. vert. drt. 161.47 76.91 127.30 34.13 0.00 -2.19 -0.69 --- ---
(e=30.0 cm)
Arm. horz. drt. 260.01 72.15 131.28 34.15 0.00 -2.21 -0.70 --- ---
Arm. vert. gch. 194.51 76.91 127.30 34.13 -1.20 -2.19 -0.69 --- ---
Arm. horz. gch. 236.72 72.82 131.24 34.32 -1.26 -2.27 -0.72 --- ---
Béton 26.65 -6.81 11.17 -28.06 -0.82 0.17 -0.75 --- ---
Arm. transve. 2.59 -57.69 -42.65 -21.00 --- --- --- 1.29 3.47
R+12
Arm. vert. drt. 162.94 77.69 135.49 35.81 0.00 -2.39 -0.73 --- ---
(e=30.0 cm)
Arm. horz. drt. 241.07 69.57 138.30 35.03 0.00 -2.39 -0.73 --- ---
Arm. vert. gch. 198.57 77.69 135.49 35.81 -1.41 -2.39 -0.73 --- ---
Arm. horz. gch. 197.86 70.48 138.23 35.24 -1.45 -2.44 -0.74 --- ---
Béton 25.56 77.69 135.49 35.81 0.00 -2.39 -0.73 --- ---
Arm. transve. 2.71 -72.49 -44.70 -22.40 --- --- --- 1.32 3.58
R+11
Arm. vert. drt. 163.18 76.87 147.58 38.46 0.00 -3.09 -0.96 --- ---
(e=30.0 cm)
Arm. horz. drt. 249.03 70.32 149.04 37.65 0.00 -3.07 -0.95 --- ---
Arm. vert. gch. 216.20 76.87 147.58 38.46 -2.11 -3.09 -0.96 --- ---
Arm. horz. gch. 218.93 71.44 148.93 37.88 -2.12 -3.11 -0.96 --- ---
Béton 28.52 76.87 147.58 38.46 0.00 -3.09 -0.96 --- ---
Arm. transve. 2.97 -86.46 -48.30 -24.13 --- --- --- 1.46 3.92
R+10
Arm. vert. drt. 152.95 72.16 154.26 39.16 0.00 -3.28 -1.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 197.75 68.96 156.39 39.02 0.00 -3.29 -1.02 --- ---
Arm. vert. gch. 221.37 72.16 154.26 39.16 -2.25 -3.28 -1.02 --- ---
Page 137
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19a: Longueur: 181.1 cm [Noeud initial: 12.62;37.35 -> Noeud final: 14.43;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. gch. 299.83 70.32 156.28 39.30 -2.29 -3.33 -1.03 --- ---
Béton 29.80 70.32 156.28 39.30 0.00 -3.33 -1.03 --- ---
Arm. transve. 3.11 -97.13 -51.04 -26.08 --- --- --- 1.53 4.13
R+9
Arm. vert. drt. 145.37 66.63 157.42 38.87 0.00 -3.34 -1.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 199.70 60.68 160.15 38.39 0.00 -3.36 -1.04 --- ---
Arm. vert. gch. 214.95 66.63 157.42 38.87 -2.29 -3.34 -1.03 --- ---
Arm. horz. gch. 303.75 62.29 160.04 38.71 -2.33 -3.40 -1.05 --- ---
Béton 29.71 62.29 160.04 38.71 0.00 -3.40 -1.05 --- ---
Arm. transve. 3.17 -108.28 -52.83 -27.09 --- --- --- 1.54 4.22
R+8
Arm. vert. drt. 138.09 61.51 159.59 38.50 0.00 -3.39 -1.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 199.60 54.85 161.59 37.78 0.00 -3.39 -1.05 --- ---
Arm. vert. gch. 208.96 61.51 159.60 38.50 -2.33 -3.39 -1.05 --- ---
Arm. horz. gch. 305.02 53.94 162.16 37.85 -2.37 -3.45 -1.07 --- ---
Béton 29.57 61.51 159.60 38.50 0.00 -3.39 -1.05 --- ---
Arm. transve. 3.21 -117.54 -53.87 -27.64 --- --- --- 1.56 4.27
R+7
Arm. vert. drt. 126.66 53.55 161.90 37.76 0.00 -3.44 -1.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 199.13 51.46 162.00 37.35 0.00 -3.40 -1.05 --- ---
Arm. vert. gch. 198.67 53.55 161.91 37.76 -2.37 -3.44 -1.06 --- ---
Arm. horz. gch. 304.48 53.55 161.91 37.76 -2.37 -3.44 -1.06 --- ---
Béton 29.60 -126.42 -9.14 -1.50 -2.53 0.55 -0.32 --- ---
Arm. transve. 3.22 -127.34 -54.42 -28.33 --- --- --- 1.57 4.28
R+6
Arm. vert. drt. 107.64 40.95 161.96 35.87 0.00 -3.44 -1.06 --- ---
(e=30.0 cm)
Arm. horz. drt. 195.65 40.95 161.96 35.87 0.00 -3.44 -1.06 --- ---
Arm. vert. gch. 179.51 40.95 161.96 35.87 -2.35 -3.44 -1.06 --- ---
Arm. horz. gch. 300.63 40.95 161.96 35.87 -2.35 -3.44 -1.06 --- ---
Béton 32.96 -140.96 -9.85 -1.57 -2.82 0.55 -0.31 --- ---
Arm. transve. 3.20 -136.91 -54.48 -28.82 --- --- --- 1.56 4.25
R+5
Arm. vert. drt. 91.16 27.88 156.94 32.90 0.00 -3.30 -1.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 245.39 25.31 157.03 32.41 0.00 -3.26 -1.01 --- ---
Arm. vert. gch. 149.17 27.88 156.94 32.90 -2.24 -3.30 -1.02 --- ---
Arm. horz. gch. 219.14 27.88 156.95 32.90 -2.24 -3.30 -1.02 --- ---
Béton 36.47 -155.49 -10.56 -1.65 -3.11 0.55 -0.31 --- ---
Arm. transve. 3.16 -142.97 -53.67 -29.30 --- --- --- 1.55 4.17
R+4
Arm. vert. drt. 66.41 9.63 153.48 29.71 0.00 -3.20 -0.98 --- ---
(e=30.0 cm)
Arm. horz. drt. 265.38 6.84 153.56 29.18 0.00 -3.16 -0.97 --- ---
Arm. vert. gch. 123.44 9.63 153.48 29.71 -2.15 -3.20 -0.98 --- ---
Arm. horz. gch. 264.17 9.62 153.48 29.71 -2.15 -3.20 -0.98 --- ---
Béton 39.43 -169.97 -11.26 -1.71 -3.40 0.54 -0.30 --- ---
Arm. transve. 2.99 -145.23 -51.75 -30.06 --- --- --- 1.49 4.00
R+3
Arm. vert. drt. 86.64 49.19 7.37 9.23 0.00 -0.12 0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 237.85 -18.18 140.55 23.31 0.36 -2.80 -0.86 --- ---
Arm. vert. gch. 89.22 49.19 7.37 9.23 -0.85 -0.12 0.39 --- ---
Arm. horz. gch. 234.16 -15.19 140.48 23.88 -1.85 -2.85 -0.88 --- ---
Béton 43.79 -98.06 80.15 -2.87 -1.96 -0.90 0.44 --- ---
Arm. transve. 2.87 -145.13 -48.55 -33.23 --- --- --- 1.51 3.81
Page 138
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19a: Longueur: 181.1 cm [Noeud initial: 12.62;37.35 -> Noeud final: 14.43;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+2
Arm. vert. drt. 93.15 -153.90 65.87 9.09 -3.08 -0.94 0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 396.63 -54.98 157.51 12.44 1.10 -2.50 -0.86 --- ---
Arm. vert. gch. 94.23 -153.90 65.87 9.09 3.08 -0.94 0.39 --- ---
Arm. horz. gch. 550.62 -51.87 157.46 13.10 -1.59 -2.55 -0.89 --- ---
Béton 53.09 -119.08 70.54 3.78 2.38 -1.09 0.44 --- ---
Arm. transve. 1.73 -136.84 -42.29 -7.92 --- --- --- 0.96 2.28
R+1
Arm. vert. drt. 111.09 211.32 7.62 13.13 0.00 -0.05 0.18 --- ---
(e=30.0 cm)
Arm. horz. drt. 199.06 -65.93 116.09 9.63 1.32 -1.64 -0.52 --- ---
Arm. vert. gch. 111.13 211.30 7.62 13.13 -0.30 -0.05 0.18 --- ---
Arm. horz. gch. 267.04 -62.12 116.22 10.49 -1.24 -1.71 -0.56 --- ---
Béton 64.27 -143.01 50.31 2.40 2.86 -0.66 0.27 --- ---
Arm. transve. 2.51 43.19 -1.40 37.20 --- --- --- -0.22 0.09
RDC
Arm. vert. drt. 58.90 60.26 -33.95 55.21 0.68 0.33 0.10 --- ---
(e=30.0 cm)
Arm. horz. drt. 102.48 -133.40 41.83 86.89 2.67 -0.02 -0.09 --- ---
Arm. vert. gch. 53.65 60.24 -33.93 55.21 0.00 0.33 0.10 --- ---
Arm. horz. gch. 104.44 -133.40 41.81 86.90 -2.67 -0.02 -0.09 --- ---
Béton 79.95 -58.62 -1.40 105.73 -1.17 -0.22 0.06 --- ---
Arm. transve. 1.23 -111.93 -10.01 7.42 --- --- --- 1.63 -0.02
SS1
Arm. vert. drt. 26.12 -7.52 0.19 50.26 0.15 0.00 0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 64.44 -58.15 -2.85 65.21 1.16 0.24 0.00 --- ---
Arm. vert. gch. 28.94 -7.52 0.19 50.26 -0.15 0.00 0.03 --- ---
Arm. horz. gch. 96.12 -57.81 -2.87 65.20 -1.16 0.22 0.01 --- ---
Béton 49.34 -59.98 -2.13 63.03 1.20 0.27 0.00 --- ---
Arm. transve. 0.78 -138.74 -21.83 -34.15 --- --- --- -1.07 -0.21
Mur VA19b: Longueur: 181.2 cm [Noeud initial: 20.13;37.35 -> Noeud final: 21.94;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 138.59 102.41 127.81 -42.55 0.00 -1.96 0.81 --- ---
(e=30.0 cm)
Arm. horz. drt. 293.88 89.35 140.12 42.81 0.00 -1.89 -0.51 --- ---
Arm. vert. gch. 251.27 102.29 127.60 -42.52 -1.02 -1.98 0.81 --- ---
Arm. horz. gch. 381.03 89.35 140.12 42.81 -0.24 -1.89 -0.51 --- ---
Béton 39.63 -28.93 -0.32 -47.04 -0.58 0.27 -0.52 --- ---
Arm. transve. 3.30 -24.09 -51.94 -21.71 --- --- --- 2.44 4.04
R+14
Arm. vert. drt. 139.72 72.29 130.16 -29.28 0.00 -1.94 0.81 --- ---
(e=30.0 cm)
Arm. horz. drt. 169.83 69.01 134.19 -29.72 0.00 -1.99 0.83 --- ---
Arm. vert. gch. 197.55 72.16 129.09 -29.13 -1.58 -1.97 0.81 --- ---
Arm. horz. gch. 354.33 69.18 133.99 -29.74 -1.59 -2.01 0.83 --- ---
Béton 32.71 -11.32 -12.33 32.82 3.33 -0.07 1.11 --- ---
Arm. transve. 3.14 -34.36 -47.64 -22.65 --- --- --- 1.32 4.28
R+13
Arm. vert. drt. 151.43 81.19 132.69 -29.00 0.00 -1.97 0.81 --- ---
(e=30.0 cm)
Arm. horz. drt. 173.23 75.69 137.44 -29.25 0.00 -2.03 0.84 --- ---
Arm. vert. gch. 208.43 81.26 131.63 -28.90 -1.50 -1.99 0.81 --- ---
Arm. horz. gch. 361.30 76.03 137.26 -29.31 -1.53 -2.06 0.84 --- ---
Page 139
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19b: Longueur: 181.2 cm [Noeud initial: 20.13;37.35 -> Noeud final: 21.94;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 31.94 -14.56 -8.23 32.04 1.68 0.15 1.14 --- ---
Arm. transve. 3.19 -46.94 -48.22 -24.60 --- --- --- 1.43 4.32
R+12
Arm. vert. drt. 156.74 83.67 139.74 -30.60 0.00 -2.15 0.87 --- ---
(e=30.0 cm)
Arm. horz. drt. 179.93 76.46 143.58 -30.33 0.00 -2.16 0.88 --- ---
Arm. vert. gch. 219.22 83.64 139.75 -30.62 -1.69 -2.15 0.87 --- ---
Arm. horz. gch. 377.73 76.98 143.42 -30.41 -1.69 -2.18 0.89 --- ---
Béton 32.63 -33.54 -12.19 32.75 3.65 -0.04 1.15 --- ---
Arm. transve. 3.25 -55.48 -49.28 -25.57 --- --- --- 1.43 4.41
R+11
Arm. vert. drt. 153.93 80.68 147.09 -31.54 0.00 -2.30 0.92 --- ---
(e=30.0 cm)
Arm. horz. drt. 186.13 74.52 149.64 -31.13 0.00 -2.28 0.93 --- ---
Arm. vert. gch. 220.99 80.68 147.09 -31.54 -1.84 -2.30 0.92 --- ---
Arm. horz. gch. 392.91 75.23 149.51 -31.24 -1.81 -2.30 0.93 --- ---
Béton 33.46 -37.41 -12.40 33.64 3.68 -0.04 1.18 --- ---
Arm. transve. 3.30 -61.33 -50.14 -26.31 --- --- --- 1.45 4.48
R+10
Arm. vert. drt. 147.59 75.72 151.52 -31.80 0.00 -2.39 0.96 --- ---
(e=30.0 cm)
Arm. horz. drt. 191.81 72.48 155.04 -31.96 0.00 -2.38 0.96 --- ---
Arm. vert. gch. 217.44 75.72 151.52 -31.80 -1.93 -2.39 0.96 --- ---
Arm. horz. gch. 406.59 72.69 155.07 -32.01 -1.92 -2.41 0.97 --- ---
Béton 34.05 -37.48 -12.80 34.21 3.72 -0.05 1.20 --- ---
Arm. transve. 3.35 -62.47 -50.75 -27.45 --- --- --- 1.47 4.55
R+9
Arm. vert. drt. 142.20 71.32 155.89 -32.16 0.00 -2.47 0.99 --- ---
(e=30.0 cm)
Arm. horz. drt. 195.24 65.45 159.56 -31.99 0.00 -2.47 0.99 --- ---
Arm. vert. gch. 214.76 71.32 155.89 -32.16 -2.02 -2.47 0.99 --- ---
Arm. horz. gch. 416.28 66.47 159.53 -32.14 -2.02 -2.50 1.00 --- ---
Béton 34.64 -36.73 -13.28 34.78 3.73 -0.05 1.23 --- ---
Arm. transve. 3.38 -63.46 -51.13 -28.08 --- --- --- 1.48 4.59
R+8
Arm. vert. drt. 136.23 66.89 158.57 -32.20 0.00 -2.53 1.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 196.56 59.30 161.92 -31.82 0.00 -2.52 1.01 --- ---
Arm. vert. gch. 142.89 66.89 158.57 -32.20 -2.09 -2.53 1.00 --- ---
Arm. horz. gch. 413.32 60.47 161.95 -31.99 -2.07 -2.55 1.02 --- ---
Béton 34.94 -31.11 -13.62 35.01 3.66 -0.06 1.23 --- ---
Arm. transve. 3.38 -62.01 -50.81 -28.25 --- --- --- 1.48 4.58
R+7
Arm. vert. drt. 85.25 60.02 161.59 -32.12 0.00 -2.59 1.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 193.66 58.40 162.50 -32.01 0.00 -2.56 1.02 --- ---
Arm. vert. gch. 138.54 60.02 161.59 -32.12 -2.15 -2.59 1.02 --- ---
Arm. horz. gch. 414.50 58.40 162.50 -32.01 -2.09 -2.56 1.02 --- ---
Béton 34.60 -26.68 -13.83 34.78 3.62 -0.06 1.22 --- ---
Arm. transve. 3.35 -60.65 -50.09 -28.60 --- --- --- 1.47 4.54
R+6
Arm. vert. drt. 73.94 48.59 161.94 -31.11 0.00 -2.60 1.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 186.91 46.67 162.80 -30.95 0.00 -2.57 1.02 --- ---
Arm. vert. gch. 140.52 48.59 161.94 -31.11 -2.16 -2.60 1.03 --- ---
Arm. horz. gch. 650.05 46.67 162.80 -30.95 -2.10 -2.57 1.02 --- ---
Béton 34.58 -4.89 -14.80 34.34 3.56 -0.05 1.20 --- ---
Arm. transve. 3.34 -59.33 -49.02 -28.76 --- --- --- 1.46 4.46
Page 140
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19b: Longueur: 181.2 cm [Noeud initial: 20.13;37.35 -> Noeud final: 21.94;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+5
Arm. vert. drt. 74.40 4.72 -14.86 32.80 3.33 -0.06 1.15 --- ---
(e=30.0 cm)
Arm. horz. drt. 179.47 27.93 158.66 -28.31 0.00 -2.49 0.99 --- ---
Arm. vert. gch. 125.42 36.42 156.34 -28.94 -2.06 -2.49 0.99 --- ---
Arm. horz. gch. 627.25 27.93 158.66 -28.31 -2.03 -2.49 0.99 --- ---
Béton 33.34 1.02 -15.05 32.93 3.44 -0.05 1.16 --- ---
Arm. transve. 3.24 -53.08 -47.06 -28.97 --- --- --- 1.44 4.32
R+4
Arm. vert. drt. 75.67 11.86 -15.07 30.18 3.16 -0.05 1.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 172.14 16.35 153.20 -26.62 0.00 -2.39 0.95 --- ---
Arm. vert. gch. 106.93 18.93 152.50 -26.88 -1.99 -2.42 0.96 --- ---
Arm. horz. gch. 602.68 18.68 152.64 -26.85 -1.99 -2.42 0.96 --- ---
Béton 35.51 -153.97 -11.43 -2.46 -3.08 0.63 -0.28 --- ---
Arm. transve. 3.08 -45.37 -44.23 -29.62 --- --- --- 1.39 4.10
R+3
Arm. vert. drt. 91.17 88.21 0.03 -6.63 0.00 -0.09 -0.54 --- ---
(e=30.0 cm)
Arm. horz. drt. 390.30 -19.20 139.91 -21.29 0.38 -2.11 0.86 --- ---
Arm. vert. gch. 107.99 58.61 12.38 -9.37 -4.36 -0.78 0.28 --- ---
Arm. horz. gch. 377.12 -16.54 139.47 -21.58 -1.72 -2.14 0.87 --- ---
Béton 43.62 -96.98 128.51 6.07 -1.94 -1.95 -0.65 --- ---
Arm. transve. 2.88 -33.83 -40.43 -33.32 --- --- --- 1.34 3.84
R+2
Arm. vert. drt. 113.92 55.33 -5.57 30.48 2.13 0.07 1.31 --- ---
(e=30.0 cm)
Arm. horz. drt. 454.08 -129.64 164.36 -6.45 2.59 -2.25 -0.38 --- ---
Arm. vert. gch. 74.06 -141.83 158.87 -9.70 2.84 -2.11 -0.35 --- ---
Arm. horz. gch. 580.27 -126.76 164.83 -5.72 2.54 -2.31 -0.41 --- ---
Béton 55.14 -300.10 0.22 -38.65 -6.00 0.05 -0.98 --- ---
Arm. transve. 4.88 9.27 -40.41 25.71 --- --- --- -0.73 6.88
R+1
Arm. vert. drt. 121.24 237.80 -4.08 -7.71 0.00 -0.06 -0.21 --- ---
(e=30.0 cm)
Arm. horz. drt. 143.25 -131.78 127.80 -5.23 2.64 -1.56 -0.19 --- ---
Arm. vert. gch. 123.54 237.80 -4.08 -7.71 -0.65 -0.06 -0.21 --- ---
Arm. horz. gch. 278.71 -128.38 128.02 -4.38 2.57 -1.64 -0.23 --- ---
Béton 64.32 -496.79 -64.25 44.82 9.94 -0.10 0.03 --- ---
Arm. transve. 5.23 -35.40 1.16 -61.32 --- --- --- 0.37 0.33
RDC
Arm. vert. drt. 101.77 164.90 21.78 -26.09 1.80 0.31 0.16 --- ---
(e=30.0 cm)
Arm. horz. drt. 111.87 -175.82 40.03 117.77 3.52 -0.09 -0.09 --- ---
Arm. vert. gch. 93.41 164.90 21.78 -26.09 0.00 0.31 0.16 --- ---
Arm. horz. gch. 114.71 -175.82 40.01 117.76 -3.52 -0.10 -0.09 --- ---
Béton 79.08 -104.15 -7.92 130.97 2.08 -0.34 -0.01 --- ---
Arm. transve. 1.39 -110.03 -10.30 37.01 --- --- --- 1.87 0.08
SS1
Arm. vert. drt. 26.41 -85.89 -13.99 97.01 1.72 0.24 -0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 99.46 -89.73 -12.58 96.03 1.79 0.28 0.03 --- ---
Arm. vert. gch. 25.85 -85.89 -13.99 97.01 -1.72 0.24 -0.00 --- ---
Arm. horz. gch. 93.33 -85.89 -13.99 97.01 -1.72 0.24 -0.00 --- ---
Béton 59.61 -89.04 -14.38 97.30 -1.78 0.25 -0.01 --- ---
Arm. transve. 3.23 -86.39 -14.01 96.19 --- --- --- -0.23 0.21
Page 141
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VP2: Longueur: 285.2 cm [Noeud initial: 14.43;37.35 -> Noeud final: 17.28;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 73.65 -37.32 -8.23 77.63 0.75 0.25 -0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 87.83 -37.32 -8.23 77.63 0.75 0.25 -0.11 --- ---
Arm. vert. gch. 75.54 -37.32 -8.23 77.63 -0.75 0.25 -0.11 --- ---
Arm. horz. gch. 85.77 -37.32 -8.23 77.63 -0.75 0.25 -0.11 --- ---
Béton 46.96 -39.43 -8.77 77.71 0.79 0.26 -0.12 --- ---
Arm. transve. 1.24 -92.90 -19.81 -12.65 --- --- --- -1.71 0.36
Mur VP3: Longueur: 284.7 cm [Noeud initial: 17.28;37.35 -> Noeud final: 20.13;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 68.90 -61.02 -13.00 95.38 1.22 0.39 0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 64.86 -62.44 -13.24 96.31 1.25 0.40 0.08 --- ---
Arm. vert. gch. 78.35 -70.51 -13.46 101.06 -1.41 -0.31 -0.03 --- ---
Arm. horz. gch. 108.99 -70.51 -13.46 101.06 -1.41 -0.31 -0.03 --- ---
Béton 60.97 -73.09 -14.19 101.25 1.46 -0.32 -0.04 --- ---
Arm. transve. 3.56 -46.65 -10.53 -66.89 --- --- --- -0.21 -0.31
Mur VA19c: Longueur: 199.9 cm [Noeud initial: 32.84;37.35 -> Noeud final: 34.84;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 133.97 96.49 140.78 46.18 0.00 -2.55 -1.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 252.11 96.49 140.78 46.18 0.00 -2.55 -1.03 --- ---
Arm. vert. gch. 271.14 96.74 140.72 46.26 -2.25 -2.62 -1.05 --- ---
Arm. horz. gch. 372.05 96.74 140.72 46.26 -2.25 -2.62 -1.05 --- ---
Béton 34.12 96.74 140.72 46.26 0.00 -2.62 -1.05 --- ---
Arm. transve. 3.04 -20.61 2.90 -38.30 --- --- --- 3.58 -2.38
R+13
Arm. vert. drt. 157.14 84.47 139.08 30.87 0.00 -2.40 -0.93 --- ---
(e=30.0 cm)
Arm. horz. drt. 174.99 79.68 141.78 30.60 0.00 -2.42 -0.94 --- ---
Arm. vert. gch. 228.73 84.47 139.08 30.87 -2.21 -2.40 -0.93 --- ---
Arm. horz. gch. 382.48 77.15 142.47 30.40 -2.27 -2.47 -0.95 --- ---
Béton 25.28 -7.04 2.24 -25.57 0.86 0.16 -0.89 --- ---
Arm. transve. 2.53 13.65 16.53 30.59 --- --- --- 0.24 -0.21
R+12
Arm. vert. drt. 164.64 88.18 144.82 32.69 0.00 -2.52 -0.97 --- ---
(e=30.0 cm)
Arm. horz. drt. 181.72 81.82 147.00 32.17 0.00 -2.52 -0.98 --- ---
Arm. vert. gch. 239.23 88.18 144.82 32.69 -2.28 -2.52 -0.97 --- ---
Arm. horz. gch. 396.91 82.53 146.97 32.32 -2.33 -2.56 -0.99 --- ---
Béton 25.89 -9.44 2.56 -26.15 0.93 0.17 -0.91 --- ---
Arm. transve. 2.90 11.04 17.43 32.48 --- --- --- 0.30 -0.20
R+11
Arm. vert. drt. 160.79 85.04 150.34 33.07 0.00 -2.63 -1.02 --- ---
(e=30.0 cm)
Arm. horz. drt. 185.76 80.17 151.36 32.55 0.00 -2.62 -1.01 --- ---
Arm. vert. gch. 239.05 85.04 150.34 33.07 -2.40 -2.63 -1.02 --- ---
Arm. horz. gch. 407.83 78.72 151.75 32.46 -2.43 -2.66 -1.03 --- ---
Béton 26.42 85.04 150.34 33.07 0.00 -2.63 -1.02 --- ---
Arm. transve. 2.74 8.18 17.94 34.04 --- --- --- 0.27 -0.22
Page 142
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19c: Longueur: 199.9 cm [Noeud initial: 32.84;37.35 -> Noeud final: 34.84;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+10
Arm. vert. drt. 155.94 81.37 153.47 33.19 0.00 -2.70 -1.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 189.76 76.66 155.79 32.90 0.00 -2.71 -1.05 --- ---
Arm. vert. gch. 236.29 81.37 153.47 33.19 -2.47 -2.70 -1.04 --- ---
Arm. horz. gch. 418.01 77.80 155.73 33.09 -2.51 -2.74 -1.06 --- ---
Béton 26.87 77.80 155.73 33.09 0.00 -2.74 -1.06 --- ---
Arm. transve. 2.69 1.41 18.06 35.64 --- --- --- 0.25 -0.23
R+9
Arm. vert. drt. 151.16 77.52 158.24 33.53 0.00 -2.79 -1.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 192.44 76.18 158.32 33.31 0.00 -2.76 -1.06 --- ---
Arm. vert. gch. 234.53 77.52 158.24 33.53 -2.57 -2.79 -1.08 --- ---
Arm. horz. gch. 425.37 73.61 159.12 33.13 -2.59 -2.81 -1.08 --- ---
Béton 30.10 0.77 18.74 36.83 -0.25 -0.19 0.39 --- ---
Arm. transve. 2.62 -0.92 18.49 35.64 --- --- --- 0.22 -0.24
R+8
Arm. vert. drt. 144.87 73.22 159.38 33.19 0.00 -2.82 -1.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 193.74 65.85 161.76 32.61 0.00 -2.83 -1.09 --- ---
Arm. vert. gch. 228.99 73.22 159.38 33.19 -2.59 -2.82 -1.08 --- ---
Arm. horz. gch. 430.02 67.40 161.67 32.86 -2.64 -2.86 -1.10 --- ---
Béton 30.18 -1.64 19.04 36.87 -0.27 -0.20 0.39 --- ---
Arm. transve. 2.56 -6.82 18.55 36.64 --- --- --- 0.20 -0.25
R+7
Arm. vert. drt. 135.95 66.72 162.60 33.04 0.00 -2.88 -1.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 194.71 64.97 162.70 32.77 0.00 -2.84 -1.10 --- ---
Arm. vert. gch. 222.16 66.72 162.60 33.04 -2.65 -2.88 -1.11 --- ---
Arm. horz. gch. 432.35 66.72 162.60 33.04 -2.65 -2.88 -1.11 --- ---
Béton 30.13 -2.23 19.32 36.78 -0.28 -0.20 0.39 --- ---
Arm. transve. 2.52 -12.80 18.42 37.14 --- --- --- 0.19 -0.25
R+6
Arm. vert. drt. 120.59 56.32 162.90 31.96 0.00 -2.88 -1.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 192.80 54.37 163.01 31.66 0.00 -2.85 -1.10 --- ---
Arm. vert. gch. 207.10 56.32 162.90 31.96 -2.66 -2.88 -1.11 --- ---
Arm. horz. gch. 429.79 56.32 162.90 31.96 -2.66 -2.88 -1.11 --- ---
Béton 32.14 -175.23 -4.71 -14.95 3.50 -0.53 -0.09 --- ---
Arm. transve. 2.44 -20.59 18.11 37.94 --- --- --- 0.18 -0.25
R+5
Arm. vert. drt. 103.03 44.71 160.68 30.33 0.00 -2.84 -1.09 --- ---
(e=30.0 cm)
Arm. horz. drt. 187.96 42.57 160.80 30.01 0.00 -2.80 -1.08 --- ---
Arm. vert. gch. 188.20 44.71 160.68 30.33 -2.61 -2.84 -1.09 --- ---
Arm. horz. gch. 420.34 44.71 160.68 30.33 -2.61 -2.84 -1.09 --- ---
Béton 32.08 -171.61 0.36 -30.18 -3.43 -0.15 -0.07 --- ---
Arm. transve. 2.42 -185.99 -5.59 -37.71 --- --- --- 2.42 -2.46
R+4
Arm. vert. drt. 101.20 62.06 2.56 6.89 0.00 -0.09 0.41 --- ---
(e=30.0 cm)
Arm. horz. drt. 282.54 26.39 158.80 28.25 0.00 -2.75 -1.06 --- ---
Arm. vert. gch. 163.29 28.71 158.67 28.60 -2.56 -2.79 -1.07 --- ---
Arm. horz. gch. 410.12 28.71 158.67 28.60 -2.56 -2.79 -1.07 --- ---
Béton 36.44 -196.25 -1.21 -30.54 -3.93 -0.14 -0.06 --- ---
Arm. transve. 2.32 -205.31 -6.54 -38.83 --- --- --- 2.36 -2.34
R+3
Arm. vert. drt. 133.59 84.68 2.43 7.31 0.00 -0.09 0.39 --- ---
(e=30.0 cm)
Arm. horz. drt. 256.28 6.60 152.02 25.38 0.00 -2.60 -1.00 --- ---
Page 143
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19c: Longueur: 199.9 cm [Noeud initial: 32.84;37.35 -> Noeud final: 34.84;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 142.59 9.07 151.88 25.75 -2.42 -2.63 -1.01 --- ---
Arm. horz. gch. 571.94 9.07 151.88 25.75 -2.42 -2.63 -1.01 --- ---
Béton 45.29 -101.41 97.29 -3.09 -2.03 -1.18 0.54 --- ---
Arm. transve. 2.42 -226.30 -7.74 -40.33 --- --- --- 2.60 -2.28
R+2
Arm. vert. drt. 136.12 46.74 -10.80 -24.05 2.08 0.02 -0.71 --- ---
(e=30.0 cm)
Arm. horz. drt. 309.23 -33.21 126.06 13.21 0.66 -2.36 -0.91 --- ---
Arm. vert. gch. 103.62 65.11 0.17 1.95 -0.56 -0.04 0.22 --- ---
Arm. horz. gch. 460.06 -30.62 125.90 13.57 -1.82 -2.39 -0.92 --- ---
Béton 60.99 -136.80 85.99 5.09 2.74 -1.30 0.54 --- ---
Arm. transve. 1.53 -233.63 -11.18 -11.52 --- --- --- 1.26 -1.80
R+1
Arm. vert. drt. 173.40 214.27 -0.29 12.00 0.00 -0.04 0.17 --- ---
(e=30.0 cm)
Arm. horz. drt. 176.49 -47.62 103.31 16.58 0.95 -1.77 -0.67 --- ---
Arm. vert. gch. 111.86 214.27 -0.29 12.00 -0.31 -0.04 0.17 --- ---
Arm. horz. gch. 253.02 -44.36 103.25 17.06 -1.31 -1.82 -0.69 --- ---
Béton 62.78 -434.61 5.14 -18.35 -8.69 -0.06 0.01 --- ---
Arm. transve. 2.96 91.80 -0.01 30.36 --- --- --- -0.27 0.08
RDC
Arm. vert. drt. 69.55 112.45 30.74 -7.44 1.49 0.29 -0.22 --- ---
(e=30.0 cm)
Arm. horz. drt. 168.82 -178.72 35.53 -96.28 3.57 -0.13 0.06 --- ---
Arm. vert. gch. 58.23 112.45 30.74 -7.44 0.00 0.29 -0.22 --- ---
Arm. horz. gch. 104.38 -178.72 35.53 -96.28 -3.57 -0.13 0.06 --- ---
Béton 64.75 -178.72 35.53 -96.28 -3.57 -0.13 0.06 --- ---
Arm. transve. 1.36 -136.65 -9.77 -19.66 --- --- --- 1.75 -0.49
SS1
Arm. vert. drt. 131.69 252.20 -3.66 -25.94 0.00 -0.16 -0.36 --- ---
(e=30.0 cm)
Arm. horz. drt. 83.96 34.99 63.34 -114.20 0.00 -0.36 -0.05 --- ---
Arm. vert. gch. 85.40 252.20 -3.66 -25.94 -0.65 -0.16 -0.36 --- ---
Arm. horz. gch. 83.87 34.99 63.34 -114.20 -0.85 -0.36 -0.05 --- ---
Béton 68.09 34.99 63.34 -114.20 -0.85 -0.36 -0.05 --- ---
Arm. transve. 1.23 33.80 62.45 -112.70 --- --- --- 1.63 -0.53
Mur VA19d: Longueur: 181.5 cm [Noeud initial: 40.53;37.35 -> Noeud final: 42.35;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 251.07 105.71 176.80 54.88 0.00 -2.54 -0.50 --- ---
(e=30.0 cm)
Arm. horz. drt. 478.86 105.71 176.80 54.88 0.00 -2.54 -0.50 --- ---
Arm. vert. gch. 274.33 105.71 176.80 54.88 -0.92 -2.54 -0.50 --- ---
Arm. horz. gch. 432.71 105.71 176.80 54.88 -0.92 -2.54 -0.50 --- ---
Béton 36.18 105.71 176.80 54.88 0.00 -2.54 -0.50 --- ---
Arm. transve. 53.59 11.67 72.23 7.72 --- --- --- -1.56 -6.52
R+13
Arm. vert. drt. 229.33 94.69 201.15 50.16 0.00 -2.51 -0.68 --- ---
(e=30.0 cm)
Arm. horz. drt. 527.76 89.69 205.28 49.46 0.00 -2.56 -0.70 --- ---
Arm. vert. gch. 267.81 94.69 201.15 50.16 -1.60 -2.51 -0.68 --- ---
Arm. horz. gch. 472.89 89.69 205.28 49.46 -1.63 -2.56 -0.70 --- ---
Béton 34.88 94.69 201.15 50.16 0.00 -2.51 -0.68 --- ---
Arm. transve. 44.63 2.81 72.11 -0.25 --- --- --- -0.65 -5.54
Page 144
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19d: Longueur: 181.5 cm [Noeud initial: 40.53;37.35 -> Noeud final: 42.35;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+12
Arm. vert. drt. 239.78 95.22 209.23 51.41 0.00 -2.58 -0.66 --- ---
(e=30.0 cm)
Arm. horz. drt. 636.76 89.99 212.73 50.58 0.00 -2.62 -0.67 --- ---
Arm. vert. gch. 272.52 95.22 209.23 51.41 -1.50 -2.58 -0.66 --- ---
Arm. horz. gch. 523.32 89.99 212.73 50.58 -1.53 -2.62 -0.67 --- ---
Béton 35.78 95.22 209.23 51.41 0.00 -2.58 -0.66 --- ---
Arm. transve. 57.51 -5.06 80.12 2.09 --- --- --- -0.63 -6.14
R+11
Arm. vert. drt. 237.34 91.80 220.64 52.07 0.00 -2.74 -0.72 --- ---
(e=30.0 cm)
Arm. horz. drt. 661.09 87.71 222.62 51.30 0.00 -2.76 -0.73 --- ---
Arm. vert. gch. 293.91 91.80 220.64 52.07 -1.67 -2.74 -0.72 --- ---
Arm. horz. gch. 832.41 87.71 222.62 51.30 -1.69 -2.76 -0.73 --- ---
Béton 38.97 91.80 220.64 52.07 0.00 -2.74 -0.72 --- ---
Arm. transve. 60.45 -11.00 83.69 2.65 --- --- --- -0.70 -6.47
R+10
Arm. vert. drt. 231.18 86.32 230.61 52.07 0.00 -2.86 -0.76 --- ---
(e=30.0 cm)
Arm. horz. drt. 682.58 84.29 231.49 51.65 0.00 -2.87 -0.76 --- ---
Arm. vert. gch. 290.93 86.32 230.61 52.07 -1.77 -2.86 -0.76 --- ---
Arm. horz. gch. 861.01 84.29 231.49 51.65 -1.78 -2.87 -0.76 --- ---
Béton 39.60 86.32 230.61 52.07 0.00 -2.86 -0.76 --- ---
Arm. transve. 61.92 -27.74 85.76 3.66 --- --- --- -0.71 -6.63
R+9
Arm. vert. drt. 223.01 80.69 235.87 51.32 0.00 -2.92 -0.78 --- ---
(e=30.0 cm)
Arm. horz. drt. 700.22 77.30 239.81 51.01 0.00 -2.98 -0.80 --- ---
Arm. vert. gch. 284.51 80.69 235.87 51.32 -1.83 -2.92 -0.78 --- ---
Arm. horz. gch. 885.22 77.30 239.81 51.01 -1.86 -2.98 -0.80 --- ---
Béton 39.66 77.30 239.81 51.01 0.00 -2.98 -0.80 --- ---
Arm. transve. 63.61 -40.64 88.06 4.16 --- --- --- -0.73 -6.81
R+8
Arm. vert. drt. 214.36 74.74 241.18 50.52 0.00 -2.98 -0.80 --- ---
(e=30.0 cm)
Arm. horz. drt. 709.73 68.68 245.39 49.59 0.00 -3.04 -0.82 --- ---
Arm. vert. gch. 277.54 74.74 241.18 50.52 -1.88 -2.98 -0.80 --- ---
Arm. horz. gch. 898.57 68.68 245.39 49.59 -1.91 -3.04 -0.82 --- ---
Béton 39.50 74.74 241.18 50.52 0.00 -2.98 -0.80 --- ---
Arm. transve. 64.06 -57.40 88.76 4.39 --- --- --- -0.73 -6.86
R+7
Arm. vert. drt. 202.13 66.58 247.06 49.30 0.00 -3.05 -0.82 --- ---
(e=30.0 cm)
Arm. horz. drt. 713.05 66.58 247.06 49.30 0.00 -3.05 -0.82 --- ---
Arm. vert. gch. 267.15 66.58 247.06 49.30 -1.93 -3.05 -0.82 --- ---
Arm. horz. gch. 902.83 66.58 247.06 49.30 -1.93 -3.05 -0.82 --- ---
Béton 39.29 66.58 247.06 49.30 0.00 -3.05 -0.82 --- ---
Arm. transve. 64.04 -64.56 89.14 5.10 --- --- --- -0.72 -6.86
R+6
Arm. vert. drt. 181.20 54.11 249.74 46.56 0.00 -3.07 -0.83 --- ---
(e=30.0 cm)
Arm. horz. drt. 712.27 54.11 249.74 46.56 0.00 -3.07 -0.83 --- ---
Arm. vert. gch. 227.10 54.11 249.74 46.56 -1.94 -3.07 -0.83 --- ---
Arm. horz. gch. 588.54 54.11 249.74 46.56 -1.94 -3.07 -0.83 --- ---
Béton 40.19 -90.00 76.87 4.14 -1.80 -0.49 -0.61 --- ---
Arm. transve. 63.81 -77.66 88.55 5.64 --- --- --- -0.72 -6.81
R+5
Arm. vert. drt. 155.59 40.22 245.11 42.42 0.00 -2.98 -0.80 --- ---
(e=30.0 cm)
Arm. horz. drt. 692.41 35.81 246.10 41.45 0.00 -2.99 -0.81 --- ---
Page 145
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19d: Longueur: 181.5 cm [Noeud initial: 40.53;37.35 -> Noeud final: 42.35;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 219.22 40.22 245.11 42.42 -1.87 -2.98 -0.80 --- ---
Arm. horz. gch. 877.71 35.81 246.10 41.45 -1.88 -2.99 -0.81 --- ---
Béton 50.45 -113.16 70.68 3.67 -2.26 -0.44 -0.60 --- ---
Arm. transve. 62.41 -94.94 87.15 6.70 --- --- --- -0.70 -6.68
R+4
Arm. vert. drt. 122.89 21.72 241.93 37.55 0.00 -2.92 -0.78 --- ---
(e=30.0 cm)
Arm. horz. drt. 673.94 21.72 241.93 37.55 0.00 -2.92 -0.78 --- ---
Arm. vert. gch. 184.90 21.72 241.93 37.55 -1.81 -2.92 -0.78 --- ---
Arm. horz. gch. 853.73 21.72 241.93 37.55 -1.81 -2.92 -0.78 --- ---
Béton 70.99 -159.24 68.71 4.76 -3.18 -0.43 -0.60 --- ---
Arm. transve. 59.45 -117.94 83.58 8.18 --- --- --- -0.67 -6.37
R+3
Arm. vert. drt. 114.57 -186.33 67.74 9.52 -3.73 -0.39 -0.59 --- ---
(e=30.0 cm)
Arm. horz. drt. 619.58 -12.26 227.71 27.42 0.25 -2.66 -0.70 --- ---
Arm. vert. gch. 212.48 65.14 10.12 -16.34 -6.24 -0.60 0.72 --- ---
Arm. horz. gch. 505.16 -12.26 227.71 27.42 -1.59 -2.66 -0.70 --- ---
Béton 48.02 -186.33 67.74 9.52 3.73 -0.39 -0.59 --- ---
Arm. transve. 55.38 -139.35 78.97 11.69 --- --- --- -0.57 -5.92
R+2
Arm. vert. drt. 129.03 -210.94 46.69 -7.13 -4.22 -0.31 -0.58 --- ---
(e=30.0 cm)
Arm. horz. drt. 492.42 -59.03 188.72 8.31 1.18 -2.31 -0.55 --- ---
Arm. vert. gch. 68.07 -111.12 92.51 2.09 2.22 -1.30 0.49 --- ---
Arm. horz. gch. 626.33 -50.47 188.15 10.52 -1.11 -2.34 -0.57 --- ---
Béton 79.95 -179.33 48.95 -5.08 3.59 -0.29 -0.55 --- ---
Arm. transve. 44.43 -166.16 57.41 -4.58 --- --- --- -0.94 -4.69
R+1
Arm. vert. drt. 155.01 286.25 36.20 -32.39 0.00 -0.21 0.27 --- ---
(e=30.0 cm)
Arm. horz. drt. 162.09 -68.79 144.35 4.59 -1.38 -1.61 -0.28 --- ---
Arm. vert. gch. 171.88 286.25 36.20 -32.39 -2.32 -0.21 0.27 --- ---
Arm. horz. gch. 315.35 -64.88 144.28 5.68 -1.30 -1.68 -0.34 --- ---
Béton 78.26 -600.44 -75.74 74.73 12.01 -0.04 0.04 --- ---
Arm. transve. 19.17 148.69 23.41 -27.26 --- --- --- 1.65 -0.79
RDC
Arm. vert. drt. 137.28 198.20 27.32 -59.57 2.25 0.26 0.28 --- ---
(e=30.0 cm)
Arm. horz. drt. 126.42 -162.64 46.51 -111.92 3.25 -0.10 0.03 --- ---
Arm. vert. gch. 124.98 198.24 27.34 -59.59 0.00 0.25 0.28 --- ---
Arm. horz. gch. 86.05 -162.63 46.48 -111.93 -3.25 -0.11 0.03 --- ---
Béton 76.53 -68.93 -17.16 -126.48 -1.56 -0.38 -0.12 --- ---
Arm. transve. 16.10 42.20 -20.66 -63.26 --- --- --- 1.26 0.82
SS1
Arm. vert. drt. 22.40 -62.29 -7.20 -80.07 1.25 0.21 -0.03 --- ---
(e=30.0 cm)
Arm. horz. drt. 62.99 -62.60 -7.18 -80.06 1.25 0.26 -0.03 --- ---
Arm. vert. gch. 25.75 -62.29 -7.20 -80.07 -1.25 0.21 -0.03 --- ---
Arm. horz. gch. 94.79 -62.29 -7.20 -80.07 -1.25 0.21 -0.03 --- ---
Béton 52.10 -88.29 -14.71 -85.96 1.77 0.11 -0.08 --- ---
Arm. transve. 0.86 -134.38 -18.46 -30.32 --- --- --- -1.20 -0.02
Page 146
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19e: Longueur: 181 cm [Noeud initial: 48.04;37.35 -> Noeud final: 49.85;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+14
Arm. vert. drt. 198.85 101.95 160.69 50.60 0.00 -2.38 -0.33 --- ---
(e=30.0 cm)
Arm. horz. drt. 238.00 101.95 160.69 50.60 0.00 -2.38 -0.33 --- ---
Arm. vert. gch. 234.21 72.96 11.24 -25.50 -8.03 -0.79 0.98 --- ---
Arm. horz. gch. 299.08 101.95 160.69 50.60 -0.32 -2.38 -0.33 --- ---
Béton 38.56 -17.79 0.13 -46.32 -0.36 -0.06 -0.57 --- ---
Arm. transve. 58.42 13.77 59.11 0.41 --- --- --- -1.64 -6.02
R+13
Arm. vert. drt. 187.27 87.87 185.71 45.32 0.00 -2.39 -0.61 --- ---
(e=30.0 cm)
Arm. horz. drt. 199.08 83.20 189.70 44.66 0.00 -2.44 -0.63 --- ---
Arm. vert. gch. 246.54 68.32 10.45 -23.37 -7.12 -0.64 0.95 --- ---
Arm. horz. gch. 436.83 83.20 189.70 44.66 -1.31 -2.44 -0.63 --- ---
Béton 34.08 -18.35 -18.37 35.94 3.90 0.49 0.91 --- ---
Arm. transve. 43.28 -2.12 63.43 -4.64 --- --- --- -0.84 -5.30
R+12
Arm. vert. drt. 187.53 86.31 193.52 45.93 0.00 -2.44 -0.56 --- ---
(e=30.0 cm)
Arm. horz. drt. 206.83 80.97 197.82 45.14 0.00 -2.49 -0.58 --- ---
Arm. vert. gch. 243.21 92.55 154.60 -36.49 -1.83 -2.32 0.87 --- ---
Arm. horz. gch. 450.39 80.91 197.86 45.12 -1.13 -2.49 -0.58 --- ---
Béton 34.73 -28.81 -0.05 -41.67 -0.58 -0.04 -0.50 --- ---
Arm. transve. 45.23 -12.83 66.14 -3.84 --- --- --- -0.76 -5.55
R+11
Arm. vert. drt. 179.87 80.35 206.19 45.98 0.00 -2.62 -0.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 214.09 75.92 208.38 45.10 0.00 -2.65 -0.64 --- ---
Arm. vert. gch. 245.42 89.69 162.08 -37.45 -1.99 -2.46 0.93 --- ---
Arm. horz. gch. 470.51 75.92 208.38 45.10 -1.29 -2.65 -0.64 --- ---
Béton 36.22 -32.54 -0.19 -43.46 -0.65 -0.03 -0.51 --- ---
Arm. transve. 47.65 -26.97 69.36 -3.51 --- --- --- -0.84 -5.85
R+10
Arm. vert. drt. 166.91 71.27 216.82 44.94 0.00 -2.75 -0.67 --- ---
(e=30.0 cm)
Arm. horz. drt. 220.23 68.89 217.88 44.44 0.00 -2.76 -0.67 --- ---
Arm. vert. gch. 163.37 85.33 165.92 -37.66 -2.06 -2.52 0.95 --- ---
Arm. horz. gch. 478.80 68.89 217.88 44.44 -1.37 -2.76 -0.67 --- ---
Béton 35.88 -30.00 -20.15 37.55 4.41 0.56 1.00 --- ---
Arm. transve. 49.77 -44.43 72.25 -2.94 --- --- --- -0.86 -6.10
R+9
Arm. vert. drt. 108.10 81.44 172.61 -38.47 0.00 -2.64 0.99 --- ---
(e=30.0 cm)
Arm. horz. drt. 220.67 58.90 226.24 42.84 0.00 -2.86 -0.71 --- ---
Arm. vert. gch. 166.84 67.64 10.53 -24.35 -7.46 -0.68 0.99 --- ---
Arm. horz. gch. 491.92 58.57 226.33 42.76 -1.45 -2.87 -0.71 --- ---
Béton 36.11 -28.07 -20.23 38.19 4.36 0.55 1.02 --- ---
Arm. transve. 51.56 -61.96 74.57 -2.51 --- --- --- -0.90 -6.30
R+8
Arm. vert. drt. 104.52 77.10 175.87 -38.59 0.00 -2.70 1.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 222.54 46.32 232.14 40.22 0.00 -2.93 -0.72 --- ---
Arm. vert. gch. 169.28 71.42 10.98 -24.26 -7.39 -0.68 0.98 --- ---
Arm. horz. gch. 498.59 46.32 232.14 40.22 -1.48 -2.93 -0.72 --- ---
Béton 37.69 -8.88 -21.13 39.72 4.42 0.56 1.04 --- ---
Arm. transve. 52.59 -82.10 75.86 -2.12 --- --- --- -0.92 -6.43
R+7
Arm. vert. drt. 99.64 70.95 180.78 -38.91 0.00 -2.78 1.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 221.96 32.84 235.39 37.02 0.00 -2.95 -0.73 --- ---
Page 147
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19e: Longueur: 181 cm [Noeud initial: 48.04;37.35 -> Noeud final: 49.85;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. vert. gch. 170.66 76.27 11.58 -24.13 -7.12 -0.65 0.95 --- ---
Arm. horz. gch. 499.48 32.84 235.39 37.02 -1.49 -2.95 -0.73 --- ---
Béton 37.26 -8.91 -20.03 39.36 4.33 0.55 1.03 --- ---
Arm. transve. 53.01 -102.51 76.24 -1.67 --- --- --- -0.93 -6.48
R+6
Arm. vert. drt. 91.11 61.39 183.00 -38.40 0.00 -2.82 1.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 218.83 17.23 236.16 32.95 0.00 -2.94 -0.73 --- ---
Arm. vert. gch. 175.90 84.40 12.57 -24.20 -6.92 -0.64 0.92 --- ---
Arm. horz. gch. 494.44 17.23 236.16 32.95 -1.47 -2.94 -0.73 --- ---
Béton 40.01 -142.90 73.48 -1.45 -2.86 -0.48 -0.72 --- ---
Arm. transve. 52.81 -123.89 75.73 -1.09 --- --- --- -0.94 -6.45
R+5
Arm. vert. drt. 95.64 92.48 13.47 -23.51 0.00 -0.61 0.87 --- ---
(e=30.0 cm)
Arm. horz. drt. 212.40 -2.15 233.82 27.48 0.04 -2.88 -0.71 --- ---
Arm. vert. gch. 178.56 92.48 13.47 -23.51 -6.56 -0.61 0.87 --- ---
Arm. horz. gch. 481.55 -2.15 233.82 27.48 -1.40 -2.88 -0.71 --- ---
Béton 58.86 -130.10 74.27 4.30 -2.60 -0.43 -0.61 --- ---
Arm. transve. 51.79 -147.88 74.00 -0.39 --- --- --- -0.93 -6.33
R+4
Arm. vert. drt. 112.31 110.32 15.56 -23.30 0.00 -0.57 0.82 --- ---
(e=30.0 cm)
Arm. horz. drt. 201.71 -25.88 226.79 20.36 0.52 -2.76 -0.67 --- ---
Arm. vert. gch. 190.42 110.32 15.56 -23.30 -6.19 -0.57 0.82 --- ---
Arm. horz. gch. 457.93 -25.88 226.79 20.36 -1.30 -2.76 -0.67 --- ---
Béton 75.73 -167.39 65.27 3.89 -3.35 -0.37 -0.60 --- ---
Arm. transve. 49.61 -174.36 70.67 1.01 --- --- --- -0.94 -6.05
R+3
Arm. vert. drt. 158.19 154.92 21.65 -27.64 0.00 -0.55 0.76 --- ---
(e=30.0 cm)
Arm. horz. drt. 280.79 -62.24 214.86 9.81 1.24 -2.51 -0.60 --- ---
Arm. vert. gch. 150.53 154.92 21.65 -27.64 -5.77 -0.55 0.76 --- ---
Arm. horz. gch. 355.94 -62.24 214.86 9.81 -1.24 -2.51 -0.60 --- ---
Béton 102.63 -225.35 64.29 5.15 -4.51 -0.35 -0.66 --- ---
Arm. transve. 48.06 -212.00 66.35 5.61 --- --- --- -0.73 -5.60
R+2
Arm. vert. drt. 94.29 -217.33 42.37 -11.05 -4.35 -0.26 -0.62 --- ---
(e=30.0 cm)
Arm. horz. drt. 331.97 -4.81 185.29 -31.57 0.10 -2.69 1.02 --- ---
Arm. vert. gch. 113.14 -258.88 39.52 -16.34 5.18 -0.31 -0.73 --- ---
Arm. horz. gch. 448.56 -4.81 185.29 -31.57 -1.96 -2.69 1.02 --- ---
Béton 47.09 -258.88 39.52 -16.34 5.18 -0.31 -0.73 --- ---
Arm. transve. 4.33 24.38 -56.51 14.31 --- --- --- 1.43 5.98
R+1
Arm. vert. drt. 216.14 325.84 41.74 -44.76 0.00 -0.17 0.28 --- ---
(e=30.0 cm)
Arm. horz. drt. 201.44 -14.08 147.40 -28.20 0.28 -2.05 0.77 --- ---
Arm. vert. gch. 233.51 325.84 41.74 -44.76 -2.05 -0.17 0.28 --- ---
Arm. horz. gch. 273.76 -11.02 146.71 -28.59 -1.53 -2.15 0.82 --- ---
Béton 89.64 -667.87 -83.78 87.67 13.36 -0.05 0.04 --- ---
Arm. transve. 15.86 173.35 35.06 -44.68 --- --- --- 1.64 -0.87
RDC
Arm. vert. drt. 163.29 223.42 54.47 -22.60 2.73 0.32 0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 135.35 -164.01 96.35 10.05 3.28 -0.67 0.25 --- ---
Arm. vert. gch. 147.66 223.42 54.47 -22.60 0.00 0.32 0.25 --- ---
Arm. horz. gch. 151.95 -160.53 95.67 9.61 -3.21 -0.80 0.30 --- ---
Béton 69.19 -192.79 -6.75 110.99 -3.86 -0.06 -0.07 --- ---
Page 148
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA19e: Longueur: 181 cm [Noeud initial: 48.04;37.35 -> Noeud final: 49.85;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. transve. 13.90 88.74 26.80 -4.27 --- --- --- 1.53 0.55
SS1
Arm. vert. drt. 103.18 170.77 28.00 43.97 0.00 -0.28 0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 87.98 -18.71 49.72 101.19 0.37 -0.05 0.03 --- ---
Arm. vert. gch. 111.38 170.77 28.00 43.97 -1.39 -0.28 0.01 --- ---
Arm. horz. gch. 88.06 -18.71 49.72 101.19 -0.37 -0.05 0.03 --- ---
Béton 60.64 -18.71 49.72 101.19 -0.37 -0.05 0.03 --- ---
Arm. transve. 6.89 -25.35 -1.28 64.10 --- --- --- 0.39 -0.50
Mur VP8: Longueur: 284.4 cm [Noeud initial: 37.69;37.35 -> Noeud final: 40.53;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 69.60 -15.57 -12.23 71.45 0.31 -0.16 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 61.62 -47.57 -8.31 -88.44 0.95 0.17 -0.13 --- ---
Arm. vert. gch. 77.50 -15.57 -12.23 71.45 -0.31 -0.16 -0.01 --- ---
Arm. horz. gch. 97.64 -67.22 -13.41 -96.20 -1.34 0.21 0.13 --- ---
Béton 59.24 -82.92 -15.04 -96.77 1.66 0.29 0.15 --- ---
Arm. transve. 7.55 -69.17 -14.05 -95.97 --- --- --- -0.52 -0.61
Mur VP9: Longueur: 284.3 cm [Noeud initial: 45.20;37.35 -> Noeud final: 48.04;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
RDC
Arm. vert. drt. 110.52 63.24 25.42 -64.17 1.14 0.44 0.11 --- ---
(e=30.0 cm)
Arm. horz. drt. 64.70 -83.19 -41.45 166.05 1.66 0.23 0.03 --- ---
Arm. vert. gch. 107.14 63.24 25.42 -64.17 0.00 0.44 0.11 --- ---
Arm. horz. gch. 103.43 -81.20 -40.80 165.32 -1.62 0.18 0.01 --- ---
Béton 98.78 -83.19 -41.49 166.16 1.66 0.23 0.02 --- ---
Arm. transve. 2.98 -36.10 -22.59 79.24 --- --- --- 0.27 -0.23
SS1
Arm. vert. drt. 98.02 17.32 -14.53 -55.39 0.96 0.29 0.12 --- ---
(e=30.0 cm)
Arm. horz. drt. 89.73 -56.50 9.13 68.80 1.13 0.02 0.03 --- ---
Arm. vert. gch. 89.06 17.22 -14.64 -55.50 0.00 0.28 0.14 --- ---
Arm. horz. gch. 88.53 -56.50 9.13 68.80 -1.13 0.02 0.03 --- ---
Béton 51.69 -41.52 -30.95 -85.93 -0.83 0.23 -0.11 --- ---
Arm. transve. 8.03 -9.11 -29.04 -66.35 --- --- --- -0.73 -0.45
Mur VP11: Longueur: 285 cm [Noeud initial: 34.84;37.35 -> Noeud final: 37.69;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
RDC
Arm. vert. drt. 82.98 -39.25 -42.73 -161.46 0.78 0.23 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 88.27 -84.91 -12.95 -142.53 1.70 -0.02 -0.09 --- ---
Arm. vert. gch. 119.78 -39.25 -42.73 -161.46 -0.78 0.23 -0.05 --- ---
Arm. horz. gch. 91.54 -84.91 -12.95 -142.53 -1.70 -0.02 -0.09 --- ---
Béton 96.35 -40.20 -43.47 -161.85 -0.80 0.25 -0.05 --- ---
Arm. transve. 9.55 -23.67 -16.02 83.03 --- --- --- 0.76 -0.36
SS1
Arm. vert. drt. 57.43 -6.19 -16.20 42.65 0.73 0.25 -0.15 --- ---
(e=30.0 cm)
Page 149
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VP11: Longueur: 285 cm [Noeud initial: 34.84;37.35 -> Noeud final: 37.69;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. drt. 99.50 -80.44 8.10 -79.70 1.61 0.03 -0.04 --- ---
Arm. vert. gch. 47.69 -56.20 8.70 -67.60 -1.12 0.08 -0.03 --- ---
Arm. horz. gch. 97.68 -80.44 8.10 -79.70 -1.61 0.03 -0.04 --- ---
Béton 49.30 -80.44 8.10 -79.70 -1.61 0.03 -0.04 --- ---
Arm. transve. 0.89 -98.06 -25.37 -3.34 --- --- --- -1.25 0.01
Mur VP12: Longueur: 285.2 cm [Noeud initial: 42.35;37.35 -> Noeud final: 45.20;37.35]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
SS1
Arm. vert. drt. 94.88 -22.88 -10.68 -82.09 1.22 0.46 -0.05 --- ---
(e=30.0 cm)
Arm. horz. drt. 98.07 -22.98 -10.75 -82.10 1.21 0.45 -0.06 --- ---
Arm. vert. gch. 84.78 -38.07 -14.64 -91.76 -0.76 -0.32 0.01 --- ---
Arm. horz. gch. 99.95 -37.96 -14.50 -91.66 -0.76 -0.33 0.01 --- ---
Béton 54.76 -40.19 -15.49 -91.92 0.80 -0.34 0.01 --- ---
Arm. transve. 1.21 -87.02 -17.38 -14.30 --- --- --- -1.67 0.40
Mur VA25b: Longueur: 220.182 cm [Noeud initial: 52.71;40.23 -> Noeud final: 52.71;42.43]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
R+15
Arm. vert. drt. 143.38 -27.87 -2.54 -1.67 17.32 2.19 0.77 --- ---
(e=30.0 cm)
Arm. horz. drt. 162.49 -10.32 1.43 -2.56 7.16 3.71 3.00 --- ---
Arm. vert. gch. 98.85 -12.43 -1.57 0.39 -7.82 -0.99 0.08 --- ---
Arm. horz. gch. 42.94 -10.04 -1.16 -0.79 -6.37 -1.38 -0.34 --- ---
Béton 28.27 -27.87 -2.54 -1.67 17.32 2.19 0.77 --- ---
Arm. transve. 4.69 -13.34 -2.19 -5.30 --- --- --- 2.20 6.34
R+14
Arm. vert. drt. 53.37 -14.70 3.57 -0.68 4.78 1.03 -0.25 --- ---
(e=30.0 cm)
Arm. horz. drt. 47.92 -13.89 4.13 -0.89 4.62 1.00 -0.24 --- ---
Arm. vert. gch. 71.45 -19.24 -2.11 -1.69 -6.45 -0.78 -0.62 --- ---
Arm. horz. gch. 32.22 -19.15 -2.09 -1.66 -6.42 -0.78 -0.62 --- ---
Béton 11.84 -20.44 -2.28 -1.85 -6.40 -0.78 -0.61 --- ---
Arm. transve. 3.06 -18.87 -1.38 -1.94 --- --- --- 4.37 0.36
R+13
Arm. vert. drt. 101.19 -4.00 22.43 -8.66 5.72 0.69 -0.57 --- ---
(e=30.0 cm)
Arm. horz. drt. 122.04 -4.00 22.43 -8.66 5.72 0.69 -0.57 --- ---
Arm. vert. gch. 60.69 -29.36 -3.27 -2.90 -6.82 -0.84 -0.61 --- ---
Arm. horz. gch. 25.23 -29.36 -3.27 -2.90 -6.82 -0.84 -0.61 --- ---
Béton 14.35 -20.62 6.50 -1.86 7.45 0.93 -0.83 --- ---
Arm. transve. 3.35 -28.45 -2.19 -3.61 --- --- --- 4.77 0.54
R+12
Arm. vert. drt. 92.73 -10.76 22.81 -8.59 5.79 0.70 -0.56 --- ---
(e=30.0 cm)
Arm. horz. drt. 121.45 -10.76 22.81 -8.59 5.79 0.70 -0.56 --- ---
Arm. vert. gch. 6.31 -32.19 3.46 -0.25 7.61 0.95 -0.83 --- ---
Arm. horz. gch. 3.31 -77.49 -69.86 31.07 1.55 0.02 -0.17 --- ---
Béton 16.09 -29.88 6.46 -1.53 7.70 0.95 -0.83 --- ---
Arm. transve. 3.50 -40.09 -3.08 -5.15 --- --- --- 4.99 0.53
R+11
Arm. vert. drt. 81.70 -19.98 22.91 -8.39 5.89 0.71 -0.57 --- ---
(e=30.0 cm)
Page 150
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA25b: Longueur: 220.182 cm [Noeud initial: 52.71;40.23 -> Noeud final: 52.71;42.43]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Arm. horz. drt. 120.12 -19.98 22.91 -8.39 5.89 0.71 -0.57 --- ---
Arm. vert. gch. 7.10 -43.71 2.63 0.50 7.82 0.97 -0.86 --- ---
Arm. horz. gch. 3.32 -83.75 -70.37 31.69 1.67 0.00 -0.15 --- ---
Béton 18.04 -57.23 -6.47 -5.76 -7.20 -0.88 -0.64 --- ---
Arm. transve. 3.56 -52.25 -3.95 -6.38 --- --- --- 5.08 0.53
R+10
Arm. vert. drt. 62.47 -30.67 21.79 -7.59 5.65 0.68 -0.54 --- ---
(e=30.0 cm)
Arm. horz. drt. 111.11 -30.67 21.79 -7.59 5.65 0.68 -0.54 --- ---
Arm. vert. gch. 7.86 -55.01 2.22 1.00 8.01 1.00 -0.88 --- ---
Arm. horz. gch. 3.28 -87.76 -69.34 31.48 1.76 0.02 -0.16 --- ---
Béton 20.31 -71.12 -7.98 -7.04 -7.43 -0.91 -0.67 --- ---
Arm. transve. 3.68 -64.17 -4.80 -7.74 --- --- --- 5.25 0.54
R+9
Arm. vert. drt. 45.33 -43.12 20.92 -6.89 5.65 0.68 -0.54 --- ---
(e=30.0 cm)
Arm. horz. drt. 104.37 -43.12 20.92 -6.89 5.65 0.68 -0.54 --- ---
Arm. vert. gch. 8.67 -67.88 1.38 1.76 8.11 1.01 -0.88 --- ---
Arm. horz. gch. 3.23 -92.03 -68.36 31.37 1.84 0.00 -0.15 --- ---
Béton 21.83 -67.88 1.38 1.76 8.11 1.01 -0.88 --- ---
Arm. transve. 3.74 -77.90 -5.73 -9.09 --- --- --- 5.33 0.52
R+8
Arm. vert. drt. 8.48 -95.04 -6.59 -10.13 -5.10 -0.96 -0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.15 -94.29 -66.59 30.90 1.89 -0.01 -0.14 --- ---
Arm. vert. gch. 9.44 -81.40 -0.68 3.05 8.09 1.01 -0.88 --- ---
Arm. horz. gch. 3.14 -94.29 -66.59 30.90 -1.89 -0.01 -0.14 --- ---
Béton 23.70 -81.00 0.20 2.67 8.13 1.01 -0.89 --- ---
Arm. transve. 3.75 -92.46 -6.70 -10.44 --- --- --- 5.35 0.50
R+7
Arm. vert. drt. 9.26 -106.88 -7.65 -11.76 -5.27 -0.99 -0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 3.02 -95.09 -63.87 30.01 1.90 -0.02 -0.12 --- ---
Arm. vert. gch. 10.23 -95.50 -1.34 3.76 8.05 1.00 -0.88 --- ---
Arm. horz. gch. 3.01 -95.09 -63.87 30.01 -1.90 -0.02 -0.12 --- ---
Béton 25.61 -95.50 -1.34 3.76 8.05 1.00 -0.88 --- ---
Arm. transve. 3.71 -106.19 -7.62 -11.77 --- --- --- 5.30 0.48
R+6
Arm. vert. drt. 10.09 -121.80 -8.66 -13.16 -5.20 -0.98 -0.08 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.84 -93.92 -60.06 28.62 1.88 -0.02 -0.11 --- ---
Arm. vert. gch. 11.03 -111.21 -3.51 5.17 7.87 0.98 -0.86 --- ---
Arm. horz. gch. 2.83 -94.03 -60.06 28.62 1.88 -0.02 -0.11 --- ---
Béton 27.50 -110.92 -3.14 5.00 7.88 0.98 -0.86 --- ---
Arm. transve. 3.63 -121.80 -8.66 -13.16 --- --- --- 5.18 0.45
R+5
Arm. vert. drt. 10.04 -142.56 -16.18 -14.11 -7.23 -0.89 -0.64 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.60 -90.95 -54.99 26.67 -1.82 -0.02 -0.11 --- ---
Arm. vert. gch. 11.21 -119.50 -3.25 5.35 7.35 0.92 -0.80 --- ---
Arm. horz. gch. 2.59 -90.99 -54.99 26.68 -1.82 -0.02 -0.11 --- ---
Béton 28.04 -119.50 -3.25 5.35 7.35 0.92 -0.80 --- ---
Arm. transve. 3.52 -136.25 -9.67 -14.55 --- --- --- 5.02 0.42
R+4
Arm. vert. drt. 10.64 -157.17 -17.74 -15.03 -7.06 -0.87 -0.62 --- ---
(e=30.0 cm)
Arm. horz. drt. 2.32 -81.88 -48.81 24.11 1.64 -0.04 -0.09 --- ---
Arm. vert. gch. 11.22 -141.71 5.27 2.10 5.18 0.64 -0.53 --- ---
Arm. horz. gch. 2.29 -81.92 -48.82 24.11 1.64 -0.03 -0.09 --- ---
Page 151
Efforts et armatures des poteaux, noyaux et murs
NOVOTEL ALGER A BAB EZZOUAR - mur 30 cm Date: 19/01/19
Mur VA25b: Longueur: 220.182 cm [Noeud initial: 52.71;40.23 -> Noeud final: 52.71;42.43]
Défavorables
Travail
Niveau Vérification Nx Ny Nxy Mx My Mxy Qx Qy
(%)
(t/m) (t/m) (t/m) (t·m/m) (t·m/m) (t·m/m) (t/m) (t/m)
Béton 29.41 -141.71 5.27 2.10 5.18 0.64 -0.53 --- ---
Arm. transve. 3.35 -150.87 -10.05 -15.39 --- --- --- 4.78 0.34
R+3
Arm. vert. drt. 15.70 -280.35 -33.53 -36.89 -5.61 -0.26 -0.01 --- ---
(e=30.0 cm)
Arm. horz. drt. 1.93 -61.08 -27.37 -1.24 1.22 -0.60 -0.53 --- ---
Arm. vert. gch. 15.70 -280.35 -33.53 -36.89 5.61 -0.26 -0.01 --- ---
Arm. horz. gch. 1.91 -76.36 -40.50 20.72 1.53 0.00 -0.10 --- ---
Béton 41.79 -234.12 -27.94 -29.77 4.68 -0.17 -0.02 --- ---
Arm. transve. 2.94 -136.98 -28.68 -29.98 --- --- --- 4.16 -0.67
R+2
Arm. vert. drt. 123.28 43.13 6.53 -50.23 0.00 -0.55 0.80 --- ---
(e=30.0 cm)
Arm. horz. drt. 117.28 -88.77 3.62 -56.24 1.78 0.52 -0.00 --- ---
Arm. vert. gch. 122.31 49.79 6.72 -29.98 -4.63 -0.63 0.58 --- ---
Arm. horz. gch. 123.25 38.35 6.20 -51.71 -2.14 -0.61 0.91 --- ---
Béton 47.05 -39.00 -0.31 -54.20 0.78 -0.46 0.77 --- ---
Arm. transve. 3.62 38.35 6.20 -51.71 --- --- --- 4.33 -2.74
R+1
Arm. vert. drt. 112.89 108.10 14.23 9.10 0.00 -1.24 0.63 --- ---
(e=30.0 cm)
Arm. horz. drt. 110.20 52.36 1.44 -36.83 0.40 0.60 0.58 --- ---
Arm. vert. gch. 100.00 108.10 14.23 9.10 -5.23 -1.24 0.63 --- ---
Arm. horz. gch. 90.23 82.43 24.28 12.34 -2.93 -0.78 0.13 --- ---
Béton 35.99 -262.16 -32.41 -24.30 -5.24 0.71 -0.24 --- ---
Arm. transve. 45.03 43.59 0.86 -35.16 --- --- --- 3.39 2.93
RDC
Arm. vert. drt. 60.01 89.47 11.17 10.98 0.00 -0.13 0.00 --- ---
(e=30.0 cm)
Arm. horz. drt. 115.31 3.81 4.38 54.82 0.00 -0.28 -0.04 --- ---
Arm. vert. gch. 65.55 89.55 11.16 10.96 -0.96 -0.13 -0.01 --- ---
Arm. horz. gch. 80.74 4.06 4.42 54.80 -0.66 -0.31 -0.02 --- ---
Béton 44.47 -261.28 -26.13 -0.68 -5.23 1.09 0.76 --- ---
Arm. transve. 10.26 17.48 4.66 50.68 --- --- --- 1.11 -0.47
SS1
Arm. vert. drt. 26.42 11.11 0.78 19.07 0.91 0.29 -0.04 --- ---
(e=30.0 cm)
Arm. horz. drt. 53.83 11.11 0.78 19.07 0.91 0.29 -0.04 --- ---
Arm. vert. gch. 28.92 13.56 1.88 17.63 -1.39 -0.30 0.13 --- ---
Arm. horz. gch. 74.93 1.04 3.20 28.60 -0.73 -0.10 0.02 --- ---
Béton 48.64 -225.90 -25.66 -3.99 -4.52 0.66 -0.45 --- ---
Arm. transve. 2.40 -245.57 -16.85 -1.34 --- --- --- -3.12 1.38
Page 152