RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

ITEM DESCRIPCION PARCIAL INCIDENCIA


01 MOV DE TIERRAS Y ESTRUCTURAS S/ 1,722,541.52 36.42%
02 ARQUITECTURA S/ 1,907,362.40 40.32%
03 INSTALACIONES SANITARIAS S/ 459,017.16 9.70%
04 INSTALACIONES ELECTRICAS S/ 459,017.16 9.70%
05 EQUIPAMIENTO S/ 182,300.00 3.85%
COSTO DIRECTO S/ 4,730,238.23
GG S/ 336,779.00 7.12%
SUB-TOTAL S/ 5,067,017.23
IGV S/ 912,063.10 18.00%
TOTAL S/ 5,979,080.33
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01 OBRAS PROVISIONALES
01.01 OBRAS PROVISIONALES Y ESTRUCTURAS
01.01.01 ALMACEN, OFICINA Y GUARDIANIA glb 1.00 2,500.00 2,500.00
01.01.02 CARTEL DE OBRA u 1.00 1,200.00 1,200.00
01.01.03 SSHH OBREROS u 1.00 1,268.98 1,268.98
01.01.04 AGUA PARA LA CONSTRUCCION mes 7.00 600.00 4,200.00
01.01.05 CERCO PROVISIONAL DE OBRA m 42.00 261.59 10,986.78
01.02 TRABAJOS EN PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 450.00 11.85 5,332.50
01.02.02 TRAZO NIVELES Y REPLANTEO INICIAL m2 450.00 3.07 1,381.50
01.02.03 TRAZO NIVELES Y REPLANTEO DURANTE LA EJECUCION m2 2,835.00 1.97 5,584.95
01.02.04 LIMPIEZA PERMANENTE mes 6.00 592.62 3,555.72
01.02.05 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 17,436.00 17,436.00
01.03 CALZADURAS
01.03.01 EXCAVACION MANUAL PARA CALZADURAS m3 2,592.30 34.22 88,708.51
01.03.02 ENCOFRADO Y DESENCOFRADO DE CALZADURAS m2 135.00 43.20 5,832.00
01.03.03 ACARREO DE MATERIAL EXCAVADO A ZONA DE ELIMINACIÓN m3 777.70 13.24 10,296.75
01.03.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO D=5KM m3 3,370.00 18.67 62,917.90
01.04 MOVIMIENTO DE TIERRAS
01.04.01 EXCAVACION DE ZAPATAS Y PLATEA DE CIENTACIÓN CON MAQUINARIA m3 3,458.87 25.42 87,924.48
01.04.02 ACARREO DE MATERIAL EXCAVADO A ZONA DE ELIMINACIÓN m3 1,037.66 13.24 13,738.62
01.04.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO D=5KM m3 3,458.87 18.67 64,577.10
01.04.04 NIVELACION INTERIOR Y COMACTADO m2 420.40 9.34 3,926.54
02 OBRAS DE CONCRETO SIMPLE
02.01 SOLADO DE CONCRETO e= 4" F´C 140 kg/cm2 m3 42.00 109.51 4,599.42
02.02 FALSA ZAPATA DE CONCRETO 1:10 + 30% P.G. m3 110.54 256.50 28,353.51
03 OBRAS DE CONCRETO CONCRETO ARMADO
03.01 ZAPATAS
03.01.01 CONCRETO f 'c=280 kg/cm2 EN PLATEA DE CIMENTACIÓN m3 271.84 435.33 118,340.11
03.01.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 14,654.90 4.51 66,093.60
03.02 MURO DE CONTENCION
03.02.01 CONCRETO F'c=210 kg/cm2 EN MURO DE CONTENCIÓN m3 112.05 404.98 45,378.01
03.02.02 ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION m2 916.28 39.59 36,275.53
03.02.03 ACERO fy=4200 kg/cm2 GRADO 60 EN MUROS DE CONTENCION kg 3,721.60 4.53 16,858.85
03.03 COLUMNAS Y PLACAS
03.03.01 PRIMER SOTANO
03.03.01.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 16.05 404.98 6,499.93
03.03.01.02 ENCOFRADO Y DESENCOFRADO m2 1,324.96 39.59 52,455.17
03.03.01.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 4,369.27 4.50 19,661.72
03.03.02 SEGUNDO SOTANO
03.03.02.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99
03.03.02.02 ENCOFRADO Y DESENCOFRADO m2 121.07 39.59 4,793.16
03.03.02.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 3,730.91 4.50 16,789.10
03.03.03 PRIMER NIVEL
03.03.03.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99
03.03.03.02 ENCOFRADO Y DESENCOFRADO m2 121.07 39.59 4,793.16
03.03.03.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 3,617.27 4.50 16,277.72
03.03.04 SEGUNDO NIVEL
03.03.04.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99
03.03.04.02 ENCOFRADO Y DESENCOFRADO m2 121.07 39.59 4,793.16
03.03.04.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 3,617.27 4.50 16,277.72
03.03.05 TERCER NIVEL
03.03.05.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99
03.03.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 121.07 39.59 4,793.16
03.03.05.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 2,963.56 4.50 13,336.02
03.03.06 CUARTO NIVEL
03.03.06.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


03.03.06.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 121.07 39.59 4,793.16
03.03.06.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 2,598.42 4.50 11,692.89
03.03.07 QUINTO NIVEL
03.03.07.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99
03.03.07.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 121.07 39.59 4,793.16
03.03.07.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 2,311.92 4.50 10,403.64
03.03.08 SEXTO NIVEL
03.03.08.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99
03.03.08.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 121.07 39.59 4,793.16
03.03.08.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 2,208.71 4.50 9,939.20
03.03.09 ENTRETECHO NIVEL
03.03.09.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 26.72 404.98 10,821.07
03.03.09.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 182.84 39.59 7,238.64
03.03.09.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 1,634.63 4.50 7,355.84
03.04 VIGAS
03.04.01 PRIMER SOTANO
03.04.02 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 20.17 411.37 8,297.33
03.04.03 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 180.82 54.17 9,795.02
03.04.04 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 2,160.68 4.98 10,760.19
03.04.05 SEGUNDO SOTANO
03.04.06 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 26.25 411.37 10,798.46
03.04.07 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 232.91 54.17 12,616.73
03.04.08 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 2,904.09 4.98 14,462.37
03.04.09 PRIMER NIVEL
03.04.10 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 31.62 411.37 13,007.52
03.04.11 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 273.83 54.17 14,833.37
03.04.12 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,885.99 4.98 19,352.23
03.04.13 SEGUNDO NIVEL
03.04.14 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 31.44 411.37 12,933.47
03.04.15 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 271.60 54.17 14,712.57
03.04.16 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,909.87 4.98 19,471.15
03.04.17 TERCER NIVEL
03.04.18 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 32.50 411.37 13,369.53
03.04.19 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 283.99 54.17 15,383.74
03.04.20 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,931.48 4.98 19,578.77
03.04.21 CUARTO NIVEL
03.04.22 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 31.48 411.37 12,949.93
03.04.23 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 272.08 54.17 14,738.57
03.04.24 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,909.87 4.98 19,471.15
03.04.25 QUINTO NIVEL
03.04.26 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 31.53 411.37 12,970.50
03.04.27 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 272.73 54.17 14,773.78
03.04.28 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,800.53 4.98 18,926.64
03.04.29 SEXTO NIVEL
03.04.30 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 29.85 411.37 12,279.39
03.04.31 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 263.76 54.17 14,287.88
03.04.32 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,563.38 4.98 17,745.63
03.04.33 ENTRETECHO NIVEL
03.04.34 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 23.91 411.37 9,835.86
03.04.35 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 198.80 54.17 10,769.00
03.04.36 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 0.00 4.98
03.05 LOSAS ALIGERADAS
03.05.01 PRIMER SOTANO
03.05.01.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 44.25 411.37 18,203.12
03.05.01.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 362.88 38.42 13,941.85
03.05.01.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,638.69 4.98 13,140.68
03.05.01.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 343.92 17.34 5,963.57
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


03.05.02 SEGUNDO SOTANO
03.05.02.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 35.29 411.37 14,517.25
03.05.02.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 286.21 38.42 10,996.19
03.05.02.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,897.18 4.98 14,427.96
03.05.02.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 373.10 17.34 6,469.55
03.05.03 PRIMER NIVEL
03.05.03.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 44.25 411.37 18,203.12
03.05.03.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 0.00 38.42
03.05.03.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 3,042.81 4.98 15,153.19
03.05.03.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 188.77 17.34 3,273.27
03.05.04 SEGUNDO NIVEL
03.05.04.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 35.29 411.37 14,517.25
03.05.04.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 28.00 38.42 1,075.76
03.05.04.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,733.64 4.98 13,613.53
03.05.04.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 193.63 17.34 3,357.54
03.05.05 TERCER NIVEL
03.05.05.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 15.14 411.37 6,228.14
03.05.05.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 16.00 38.42 614.72
03.05.05.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,723.17 4.98 13,561.39
03.05.05.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 190.85 17.34 3,309.34
03.05.06 CUARTO NIVEL
03.05.06.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 63.26 411.37 26,023.27
03.05.06.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 30.00 38.42 1,152.60
03.05.06.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,707.53 4.98 13,483.50
03.05.06.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 193.63 17.34 3,357.54
03.05.07 QUINTO NIVEL
03.05.07.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 30.58 411.37 12,579.69
03.05.07.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 0.00 38.42
03.05.07.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,524.36 4.98 12,571.31
03.05.07.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 193.63 17.34 3,357.54
03.05.08 SEXTO NIVEL
03.05.08.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 23.56 411.37 9,691.88
03.05.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 17.00 38.42 653.14
03.05.08.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 1,186.42 4.98 5,908.37
03.05.08.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 76.67 17.34 1,329.46
03.06 ESCALERAS
03.06.01 CONCRETO F'c=210 kg/cm2 EN ESCALERAS m3 68.00 470.75 32,011.00
03.06.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 125.00 52.56 6,570.00
03.06.03 ACERO CORRUGADO fy=4200 kg/cm2 EN ESCALERAS kg 492.36 4.98 2,451.95
03.07 CUBIERTAS
03.07.01 ESTRUCTURA METALICA PARA SOPORTE DE TECHO m2 325.00 150.00 48,750.00
01 ARQUITECTURA
01.01 PRIMER SOTANO
01.01.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 132.48 82.83 10,973.32
01.01.01.02 MURO DE DRYWALL (DINETELES) u 12.00 100.00 1,200.00
01.01.02 REVOQUES Y REVESTIMIENTOS
01.01.02.01 TARRAJEO EN MUROS INTERIORES m2 264.96 21.65 5,736.38
01.01.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 238.56 26.75 6,381.48
01.01.02.03 TARRAJEO DE VIGAS m2 108.78 33.95 3,693.08
01.01.02.04 VESTIDURA DE DERRAMES m 49.57 13.80 684.07
01.01.02.05 BRUÑAS m 167.73 5.68 952.71
01.01.03 CIELORRASOS
01.01.03.01 CIELORRASOS CON YESO m2 325.74 24.23 7,892.68
01.01.04 PISOS Y PAVIMENTOS
01.01.04.01 PISOS
01.01.04.02 PISO DE CERAMICO DE 40X40 cm m2 60.84 48.30 2,938.57
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.01.05 ZOCALOS Y CONTRAZOCALOS
01.01.05.01 CONTRAZOCALOS
01.01.05.02 CONTRAZOCALO CERAMICO m 100.00 17.86 1,786.00
01.01.06 CARPINTERIA DE MADERA
01.01.06.01 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 13.00 255.00 3,315.00
01.01.07 CERRAJERIA
01.01.07.01 BISAGRAS
01.01.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 48.00 20.86 1,001.28
01.01.07.03 CERRADURAS
01.01.07.04 CERRADURA DE BOLA SEGURO INTERIOR pza 12.00 69.09 829.08
01.01.08 VIDRIOS, CRISTALES Y SIMILARES
01.01.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 364.25 0.00
01.01.09 PINTURA
01.01.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 325.74 13.75 4,478.93
01.01.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 264.96 10.00 2,649.60
01.01.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 108.78 13.75 1,495.73
01.01.09.04 PINTURA REFLECTIVA 2 MANOS m 46.00 16.82 773.72
01.01.10 VARIOS
01.01.10.01 LIMPIEZA
01.01.10.02 LIMPIEZA PERMANENTE EN OBRA mes 7.00 581.33 4,069.31
01.01.10.03 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.01.10.04 LIMPIEZA DE VIDRIOS p2 364.25 1.16 422.53
01.02 SEGUNDO SOTANO
01.02.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.02.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 119.21 82.83 9,874.16
01.02.01.02 MURO DE DRYWALL (DINETELES) u 13.00 100.00 1,300.00
01.02.02 REVOQUES Y REVESTIMIENTOS
01.02.02.01 TARRAJEO EN MUROS INTERIORES m2 225.66 21.65 4,885.54
01.02.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 245.91 26.75 6,578.09
01.02.02.03 TARRAJEO DE VIGAS m2 102.27 33.95 3,472.07
01.02.02.04 VESTIDURA DE DERRAMES m 53.04 13.80 731.95
01.02.02.05 BRUÑAS m 167.73 5.68 952.71
01.02.03 CIELORRASOS
01.02.03.01 CIELORRASOS CON YESO m2 355.62 24.23 8,616.67
01.02.04 PISOS Y PAVIMENTOS
01.02.04.01 PISOS
01.02.04.02 PISO DE CERAMICO DE 40X40 cm m2 55.33 48.30 2,672.44
01.02.05 ZOCALOS Y CONTRAZOCALOS
01.02.05.01 CONTRAZOCALOS
01.02.05.02 CONTRAZOCALO CERAMICO m 110.00 17.86 1,964.60
01.02.06 CARPINTERIA DE MADERA
01.02.06.01 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 63.18 255.00 16,110.90
01.02.07 CERRAJERIA
01.02.07.01 BISAGRAS
01.02.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 52.00 20.86 1,084.72
01.02.07.03 CERRADURAS
01.02.07.04 CERRADURA DE BOLA SEGURO INTERIOR pza 13.00 69.09 898.17
01.02.08 VIDRIOS, CRISTALES Y SIMILARES
01.02.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 503.75 0.00
01.02.09 PINTURA
01.02.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 355.62 13.75 4,889.78
01.02.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 225.66 10.00 2,256.60
01.02.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 102.27 13.75 1,406.21
01.02.09.04 PINTURA REFLECTIVA 2 MANOS m2 56.00 16.82 941.92
01.02.10 VARIOS
01.02.10.01 LIMPIEZA
01.02.10.02 LIMPIEZA PERMANENTE EN OBRA mes 8.00 581.33 4,650.64
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.02.10.03 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.02.10.04 LIMPIEZA DE VIDRIOS p2 503.75 1.16 584.35
01.03 PRIMER NIVEL
01.04 DEPARTAMENTO 101
01.04.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.04.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 189.64 82.83 15,707.88
01.04.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00
01.04.02 REVOQUES Y REVESTIMIENTOS
01.04.02.01 TARRAJEO EN MUROS INTERIORES m2 347.36 21.65 7,520.34
01.04.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 69.70 26.75 1,864.48
01.04.02.03 TARRAJEO DE VIGAS m2 70.96 33.95 2,409.09
01.04.02.04 VESTIDURA DE DERRAMES m 174.10 13.80 2,402.58
01.04.02.05 BRUÑAS m 148.70 5.68 844.62
01.04.03 CIELORRASOS
01.04.03.01 CIELORRASOS CON YESO m2 130.26 24.23 3,156.20
01.04.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 22.60 50.43 1,139.72
01.04.04 PISOS Y PAVIMENTOS 0.00
01.04.04.01 CONTRA PISOS 0.00
01.04.04.02 CONTRAPISO DE CONCRETO E=5CM m2 186.48 56.97 10,623.77
01.04.04.03 PISOS 0.00
01.04.04.04 PISO DE PORCELANATO 60X60 cm m2 69.21 60.77 4,205.89
01.04.04.05 PISO DE MADERA ESTRUCTURADA m2 102.06 87.82 8,962.91
01.04.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.04.05.01 ZOCALOS 0.00
01.04.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 64.44 54.10 3,486.20
01.04.05.02 CONTRAZOCALOS 0.00
01.04.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 58.62 75.45 4,422.88
01.04.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 96.02 86.85 8,339.34
01.04.06 CARPINTERIA DE MADERA 0.00
01.04.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.04.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 35.40 255.00 9,027.00
01.04.07 CERRAJERIA 0.00
01.04.07.01 BISAGRAS 0.00
01.04.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52
01.04.07.03 CERRADURAS 0.00
01.04.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.04.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63
01.04.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.04.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 765.31 0.00 0.00
01.04.08.02 VIDRIO TEMPLADO p2 664.22 25.95 17,236.51
01.04.09 PINTURA 0.00
01.04.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 130.26 13.75 1,791.08
01.04.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 347.36 10.00 3,473.60
01.04.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 70.96 13.75 975.70
01.04.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 37.50 17.97 673.88
01.04.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 96.02 10.13 972.68
01.04.10 VARIOS 0.00
01.04.10.01 MESA PARA OVALINES EN SS.HH u 3.00 915.25 2,745.75
01.04.10.02 MESAS DE GRANITO PARA COCINA m 9.00 1,019.94 9,179.46
01.04.10.03 MUEBLES 0.00
01.04.10.04 ROPERO EN HABITACIONES m 12.26 932.20 11,428.77
01.04.10.05 REPOSTEROS EN COCINA m 16.65 432.20 7,196.13
01.04.10.06 GRASS SINTETICO EN JARIDÍN m2 12.26 79.24 971.48
01.04.10.07 LIMPIEZA 0.00
01.04.10.08 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.04.10.09 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.04.10.10 LIMPIEZA DE VIDRIOS p2 765.31 1.16 887.76
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.05 DEPARTAMENTO 102 0.00
01.05.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.05.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 234.81 82.83 19,449.31
01.05.01.02 MURO DE DRYWALL (DINETELES) u 9.00 100.00 900.00
01.05.02 REVOQUES Y REVESTIMIENTOS 0.00
01.05.02.01 TARRAJEO EN MUROS INTERIORES m2 368.11 21.65 7,969.58
01.05.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48
01.05.02.03 TARRAJEO DE VIGAS m2 42.04 33.95 1,427.26
01.05.02.04 VESTIDURA DE DERRAMES m 59.11 13.80 815.72
01.05.02.05 BRUÑAS m 73.73 5.68 418.79
01.05.03 CIELORRASOS 0.00
01.05.03.01 CIELORRASOS CON YESO m2 79.62 24.23 1,929.19
01.05.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 8.33 50.43 420.08
01.05.04 PISOS Y PAVIMENTOS 0.00
01.05.04.01 CONTRA PISOS 0.00
01.05.04.02 CONTRAPISO DE CONCRETO E=5CM m2 87.95 56.97 5,010.51
01.05.04.03 PISOS 0.00
01.05.04.04 PISO DE PORCELANATO 60X60 cm m2 45.13 60.77 2,742.55
01.05.04.05 PISO DE MADERA ESTRUCTURADA m2 60.51 87.82 5,313.99
01.05.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.05.05.01 ZOCALOS 0.00
01.05.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06
01.05.05.02 CONTRAZOCALOS 0.00
01.05.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 37.22 75.45 2,808.25
01.05.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62
01.05.06 CARPINTERIA DE MADERA 0.00
01.05.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.05.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60
01.05.07 CERRAJERIA 0.00
01.05.07.01 BISAGRAS 0.00
01.05.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 28.00 20.86 584.08
01.05.07.03 CERRADURAS 0.00
01.05.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.05.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 6.00 69.09 414.54
01.05.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.05.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 365.05 0.00 0.00
01.05.08.02 VIDRIO TEMPLADO p2 200.21 25.95 5,195.45
01.05.09 PINTURA 0.00
01.05.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 79.62 13.75 1,094.78
01.05.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 368.11 10.00 3,681.10
01.05.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 42.04 13.75 578.05
01.05.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 13.02 17.97 233.97
01.05.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 55.77 10.13 564.95
01.05.10 VARIOS 0.00
01.05.10.01 MESA PARA OVALINES EN SS.HH u 2.00 915.25 1,830.50
01.05.10.02 MESAS DE GRANITO PARA COCINA m 5.66 1,019.94 5,772.86
01.05.10.03 MUEBLES 0.00
01.05.10.04 ROPERO EN HABITACIONES m 6.51 932.20 6,068.62
01.05.10.05 REPOSTEROS EN COCINA m 15.75 432.20 6,807.15
01.05.10.06 GRASS SINTETICO EN JARIDÍN m2 8.33 79.24 660.07
01.05.10.07 LIMPIEZA 0.00
01.05.10.08 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.05.10.09 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.05.10.10 LIMPIEZA DE VIDRIOS p2 365.05 1.16 423.46
01.06 SEGUNDO NIVEL 0.00
01.07 DEPARTAMENTO 201 0.00
01.07.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.07.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 234.81 82.83 19,449.31
01.07.01.02 MURO DE DRYWALL (DINETELES) u 9.00 100.00 900.00
01.07.02 REVOQUES Y REVESTIMIENTOS 0.00
01.07.02.01 TARRAJEO EN MUROS INTERIORES m2 368.11 21.65 7,969.58
01.07.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48
01.07.02.03 TARRAJEO DE VIGAS m2 42.04 33.95 1,427.26
01.07.02.04 VESTIDURA DE DERRAMES m 59.11 13.80 815.72
01.07.02.05 BRUÑAS m 73.73 5.68 418.79
01.07.03 CIELORRASOS 0.00
01.07.03.01 CIELORRASOS CON YESO m2 79.62 24.23 1,929.19
01.07.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 31.08 50.43 1,567.36
01.07.04 PISOS Y PAVIMENTOS 0.00
01.07.04.01 CONTRA PISOS 0.00
01.07.04.02 CONTRAPISO DE CONCRETO E=5CM m2 105.64 56.97 6,018.31
01.07.04.03 PISOS 0.00
01.07.04.04 PISO DE PORCELANATO 60X60 cm m2 45.13 60.77 2,742.55
01.07.04.05 PISO DE MADERA ESTRUCTURADA m2 60.51 87.82 5,313.99
01.07.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.07.05.01 ZOCALOS 0.00
01.07.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06
01.07.05.02 CONTRAZOCALOS 0.00
01.07.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 37.22 75.45 2,808.25
01.07.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62
01.07.06 CARPINTERIA DE MADERA 0.00
01.07.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.07.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60
01.07.07 CERRAJERIA 0.00
01.07.07.01 BISAGRAS 0.00
01.07.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52
01.07.07.03 CERRADURAS 0.00
01.07.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.07.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63
01.07.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.07.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,101.15 0.00 0.00
01.07.08.02 VIDRIO TEMPLADO p2 201.28 25.95 5,223.22
01.07.09 PINTURA 0.00
01.07.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 147.49 13.75 2,027.99
01.07.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 380.39 10.00 3,803.90
01.07.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 70.96 13.75 975.70
01.07.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 4.00 17.97 71.88
01.07.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 96.02 10.13 972.68
01.07.10 VARIOS 0.00
01.07.10.01 MESA PARA OVALINES EN SS.HH u 3.00 915.25 2,745.75
01.07.10.02 MESAS DE GRANITO PARA COCINA m 9.00 1,019.94 9,179.46
01.07.10.03 MUEBLES 0.00
01.07.10.04 ROPERO EN HABITACIONES m 12.26 932.20 11,428.77
01.07.10.05 REPOSTEROS EN COCINA m 16.65 432.20 7,196.13
01.07.10.06 LIMPIEZA 0.00
01.07.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.07.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.07.10.09 LIMPIEZA DE VIDRIOS p2 1,101.15 1.16 1,277.33
01.08 DEPARTAMENTO 202 0.00
01.08.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.08.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 234.81 82.83 19,449.31
01.08.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00
01.08.02 REVOQUES Y REVESTIMIENTOS 0.00
01.08.02.01 TARRAJEO EN MUROS INTERIORES m2 366.98 21.65 7,945.12
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.08.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48
01.08.02.03 TARRAJEO DE VIGAS m2 42.04 33.95 1,427.26
01.08.02.04 VESTIDURA DE DERRAMES m 59.11 13.80 815.72
01.08.02.05 BRUÑAS m 73.73 5.68 418.79
01.08.03 CIELORRASOS 0.00
01.08.03.01 CIELORRASOS CON YESO m2 81.28 24.23 1,969.41
01.08.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 15.40 50.43 776.62
01.08.04 PISOS Y PAVIMENTOS 0.00
01.08.04.01 CONTRA PISOS 0.00
01.08.04.02 CONTRAPISO DE CONCRETO E=5CM m2 96.68 56.97 5,507.86
01.08.04.03 PISOS 0.00
01.08.04.04 PISO DE PORCELANATO 60X60 cm m2 34.51 60.77 2,097.17
01.08.04.05 PISO DE MADERA ESTRUCTURADA m2 62.17 87.82 5,459.77
01.08.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.08.05.01 ZOCALOS 0.00
01.08.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06
01.08.05.02 CONTRAZOCALOS 0.00
01.08.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 19.76 75.45 1,490.89
01.08.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62
01.08.06 CARPINTERIA DE MADERA 0.00
01.08.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.08.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60
01.08.07 CERRAJERIA 0.00
01.08.07.01 BISAGRAS 0.00
01.08.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 28.00 20.86 584.08
01.08.07.03 CERRADURAS 0.00
01.08.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.08.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 6.00 69.09 414.54
01.08.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.08.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 377.25 0.00 0.00
01.08.08.02 VIDRIO TEMPLADO p2 151.77 25.95 3,938.43
01.08.09 PINTURA 0.00
01.08.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 96.68 13.75 1,329.35
01.08.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 366.98 10.00 3,669.80
01.08.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 42.04 13.75 578.05
01.08.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 13.02 17.97 233.97
01.08.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 55.77 10.13 564.95
01.08.10 VARIOS 0.00
01.08.10.01 MESA PARA OVALINES EN SS.HH u 2.00 915.25 1,830.50
01.08.10.02 MESAS DE GRANITO PARA COCINA m 5.66 1,019.94 5,772.86
01.08.10.03 MUEBLES 0.00
01.08.10.04 ROPERO EN HABITACIONES m 6.51 932.20 6,068.62
01.08.10.05 REPOSTEROS EN COCINA m 15.75 432.20 6,807.15
01.08.10.06 LIMPIEZA 0.00
01.08.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.08.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.08.10.09 LIMPIEZA DE VIDRIOS p2 377.25 1.16 437.61
01.09 TERCER NIVEL 0.00
01.10 DEPARTAMENTO 301 0.00
01.10.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.10.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 176.75 82.83 14,640.20
01.10.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00
01.10.02 REVOQUES Y REVESTIMIENTOS 0.00
01.10.02.01 TARRAJEO EN MUROS INTERIORES m2 380.39 21.65 8,235.44
01.10.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 69.70 26.75 1,864.48
01.10.02.03 TARRAJEO DE VIGAS m2 70.96 33.95 2,409.09
01.10.02.04 VESTIDURA DE DERRAMES m 299.40 13.80 4,131.72
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.10.02.05 BRUÑAS m 148.70 5.68 844.62
01.10.03 CIELORRASOS 0.00
01.10.03.01 CIELORRASOS CON YESO m2 130.87 24.23 3,170.98
01.10.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 22.55 50.43 1,137.20
01.10.04 PISOS Y PAVIMENTOS 0.00
01.10.04.01 CONTRA PISOS 0.00
01.10.04.02 CONTRAPISO DE CONCRETO E=5CM m2 152.42 56.97 8,683.37
01.10.04.03 PISOS 0.00
01.10.04.04 PISO DE PORCELANATO 60X60 cm m2 49.75 60.77 3,023.31
01.10.04.05 PISO DE MADERA ESTRUCTURADA m2 102.67 87.82 9,016.48
01.10.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.10.05.01 ZOCALOS 0.00
01.10.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 64.44 54.10 3,486.20
01.10.05.02 CONTRAZOCALOS 0.00
01.10.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 25.89 75.45 1,953.40
01.10.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 96.02 86.85 8,339.34
01.10.06 CARPINTERIA DE MADERA 0.00
01.10.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.10.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 12.60 255.00 3,213.00
01.10.07 CERRAJERIA 0.00
01.10.07.01 BISAGRAS 0.00
01.10.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52
01.10.07.03 CERRADURAS 0.00
01.10.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.10.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63
01.10.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.10.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,101.15 0.00 0.00
01.10.08.02 VIDRIO TEMPLADO p2 252.31 25.95 6,547.44
01.10.09 PINTURA 0.00
01.10.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 152.30 13.75 2,094.13
01.10.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 380.39 10.00 3,803.90
01.10.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 70.96 13.75 975.70
01.10.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 14.70 17.97 264.16
01.10.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 96.02 10.13 972.68
01.10.10 VARIOS 0.00
01.10.10.01 MESA PARA OVALINES EN SS.HH u 3.00 915.25 2,745.75
01.10.10.02 MESAS DE GRANITO PARA COCINA m 9.00 1,019.94 9,179.46
01.10.10.03 MUEBLES 0.00
01.10.10.04 ROPERO EN HABITACIONES m 12.26 932.20 11,428.77
01.10.10.05 REPOSTEROS EN COCINA m 16.65 432.20 7,196.13
01.10.10.06 LIMPIEZA 0.00
01.10.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.10.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.10.10.09 LIMPIEZA DE VIDRIOS p2 1,101.15 1.16 1,277.33
01.11 DEPARTAMENTO 302 0.00
01.11.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.11.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 174.56 82.83 14,458.80
01.11.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00
01.11.02 REVOQUES Y REVESTIMIENTOS 0.00
01.11.02.01 TARRAJEO EN MUROS INTERIORES m2 366.98 21.65 7,945.12
01.11.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48
01.11.02.03 TARRAJEO DE VIGAS m2 2.04 33.95 69.26
01.11.02.04 VESTIDURA DE DERRAMES m 0.25 13.80 3.45
01.11.02.05 BRUÑAS m 73.73 5.68 418.79
01.11.03 CIELORRASOS 0.00
01.11.03.01 CIELORRASOS CON YESO m2 81.28 24.23 1,969.41
01.11.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 11.44 50.43 576.92
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.11.04 PISOS Y PAVIMENTOS 0.00
01.11.04.01 CONTRA PISOS 0.00
01.11.04.02 CONTRAPISO DE CONCRETO E=5CM m2 92.72 56.97 5,282.26
01.11.04.03 PISOS 0.00
01.11.04.04 PISO DE PORCELANATO 60X60 cm m2 30.55 60.77 1,856.52
01.11.04.05 PISO DE MADERA ESTRUCTURADA m2 62.17 87.82 5,459.77
01.11.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.11.05.01 ZOCALOS 0.00
01.11.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06
01.11.05.02 CONTRAZOCALOS 0.00
01.11.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 19.76 75.45 1,490.89
01.11.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62
01.11.06 CARPINTERIA DE MADERA 0.00
01.11.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.11.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60
01.11.07 CERRAJERIA 0.00
01.11.07.01 BISAGRAS 0.00
01.11.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 28.00 20.86 584.08
01.11.07.03 CERRADURAS 0.00
01.11.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.11.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 6.00 69.09 414.54
01.11.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.11.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 377.25 0.00 0.00
01.11.08.02 VIDRIO TEMPLADO p2 133.47 25.95 3,463.55
01.11.09 PINTURA 0.00
01.11.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 92.72 13.75 1,274.90
01.11.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 366.98 10.00 3,669.80
01.11.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 2.04 13.75 28.05
01.11.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 13.02 17.97 233.97
01.11.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 55.77 10.13 564.95
01.11.10 VARIOS 0.00
01.11.10.01 MESA PARA OVALINES EN SS.HH u 2.00 915.25 1,830.50
01.11.10.02 MESAS DE GRANITO PARA COCINA m 5.66 1,019.94 5,772.86
01.11.10.03 MUEBLES 0.00
01.11.10.04 ROPERO EN HABITACIONES m 6.51 932.20 6,068.62
01.11.10.05 REPOSTEROS EN COCINA m 15.75 432.20 6,807.15
01.11.10.06 LIMPIEZA 0.00
01.11.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.11.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.11.10.09 LIMPIEZA DE VIDRIOS p2 377.25 1.16 437.61
01.12 CUARTO NIVEL 0.00
01.13 DEPARTAMENTO 401 0.00
01.13.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.13.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 176.75 82.83 14,640.20
01.13.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00
01.13.02 REVOQUES Y REVESTIMIENTOS 0.00
01.13.02.01 TARRAJEO EN MUROS INTERIORES m2 380.39 21.65 8,235.44
01.13.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 69.70 26.75 1,864.48
01.13.02.03 TARRAJEO DE VIGAS m2 70.96 33.95 2,409.09
01.13.02.04 VESTIDURA DE DERRAMES m 299.40 13.80 4,131.72
01.13.02.05 BRUÑAS m 1,487.00 5.68 8,446.16
01.13.03 CIELORRASOS 0.00
01.13.03.01 CIELORRASOS CON YESO m2 130.87 24.23 3,170.98
01.13.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 23.35 50.43 1,177.54
01.13.04 PISOS Y PAVIMENTOS 0.00
01.13.04.01 CONTRA PISOS 0.00
01.13.04.02 CONTRAPISO DE CONCRETO E=5CM m2 146.21 56.97 8,329.58
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.13.04.03 PISOS 0.00
01.13.04.04 PISO DE PORCELANATO 60X60 cm m2 43.54 60.77 2,645.93
01.13.04.05 PISO DE MADERA ESTRUCTURADA m2 102.67 87.82 9,016.48
01.13.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.13.05.01 ZOCALOS 0.00
01.13.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 64.44 54.10 3,486.20
01.13.05.02 CONTRAZOCALOS 0.00
01.13.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 25.86 75.45 1,951.14
01.13.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 96.02 86.85 8,339.34
01.13.06 CARPINTERIA DE MADERA 0.00
01.13.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.13.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 12.60 255.00 3,213.00
01.13.07 CERRAJERIA 0.00
01.13.07.01 BISAGRAS 0.00
01.13.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52
01.13.07.03 CERRADURAS 0.00
01.13.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.13.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63
01.13.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.13.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,101.15 0.00 0.00
01.13.08.02 VIDRIO TEMPLADO p2 220.66 25.95 5,726.13
01.13.09 PINTURA 0.00
01.13.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 130.87 13.75 1,799.46
01.13.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 380.39 10.00 3,803.90
01.13.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 70.96 13.75 975.70
01.13.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 14.70 17.97 264.16
01.13.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 96.02 10.13 972.68
01.13.10 VARIOS 0.00
01.13.10.01 MESA PARA OVALINES EN SS.HH u 3.00 915.25 2,745.75
01.13.10.02 MESAS DE GRANITO PARA COCINA m 9.00 1,019.94 9,179.46
01.13.10.03 MUEBLES 0.00
01.13.10.04 ROPERO EN HABITACIONES m 12.26 932.20 11,428.77
01.13.10.05 REPOSTEROS EN COCINA m 16.65 432.20 7,196.13
01.13.10.06 LIMPIEZA 0.00
01.13.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.13.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.13.10.09 LIMPIEZA DE VIDRIOS p2 1,101.15 1.16 1,277.33
01.14 DEPARTAMENTO 402 0.00
01.14.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.14.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 174.56 82.83 14,458.80
01.14.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00
01.14.02 REVOQUES Y REVESTIMIENTOS 0.00
01.14.02.01 TARRAJEO EN MUROS INTERIORES m2 366.98 21.65 7,945.12
01.14.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48
01.14.02.03 TARRAJEO DE VIGAS m2 42.04 33.95 1,427.26
01.14.02.04 VESTIDURA DE DERRAMES m 60.25 13.80 831.45
01.14.02.05 BRUÑAS m 73.73 5.68 418.79
01.14.03 CIELORRASOS 0.00
01.14.03.01 CIELORRASOS CON YESO m2 81.28 24.23 1,969.41
01.14.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 11.44 50.43 576.92
01.14.04 PISOS Y PAVIMENTOS 0.00
01.14.04.01 CONTRA PISOS 0.00
01.14.04.02 CONTRAPISO DE CONCRETO E=5CM m2 92.72 56.97 5,282.26
01.14.04.03 PISOS 0.00
01.14.04.04 PISO DE PORCELANATO 60X60 cm m2 30.55 60.77 1,856.52
01.14.04.05 PISO DE MADERA ESTRUCTURADA m2 62.17 87.82 5,459.77
01.14.05 ZOCALOS Y CONTRAZOCALOS 0.00
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.14.05.01 ZOCALOS 0.00
01.14.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06
01.14.05.02 CONTRAZOCALOS 0.00
01.14.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 19.76 75.45 1,490.89
01.14.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62
01.14.06 CARPINTERIA DE MADERA 0.00
01.14.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.14.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60
01.14.07 CERRAJERIA 0.00
01.14.07.01 BISAGRAS 0.00
01.14.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 28.00 20.86 584.08
01.14.07.03 CERRADURAS 0.00
01.14.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.14.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 6.00 69.09 414.54
01.14.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.14.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 377.25 0.00 0.00
01.14.08.02 VIDRIO TEMPLADO p2 133.47 25.95 3,463.55
01.14.09 PINTURA 0.00
01.14.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 92.72 13.75 1,274.90
01.14.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 366.98 10.00 3,669.80
01.14.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 42.04 13.75 578.05
01.14.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 13.02 17.97 233.97
01.14.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 55.77 10.13 564.95
01.14.10 VARIOS 0.00
01.14.10.01 MESA PARA OVALINES EN SS.HH u 2.00 915.25 1,830.50
01.14.10.02 MESAS DE GRANITO PARA COCINA m 5.66 1,019.94 5,772.86
01.14.10.03 MUEBLES 0.00
01.14.10.04 ROPERO EN HABITACIONES m 6.51 932.20 6,068.62
01.14.10.05 REPOSTEROS EN COCINA m 15.75 432.20 6,807.15
01.14.10.06 LIMPIEZA 0.00
01.14.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.14.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.14.10.09 LIMPIEZA DE VIDRIOS p2 377.25 1.16 437.61
01.15 QUINTO NIVEL 0.00
01.16 DEPARTAMENTO 501 0.00
01.16.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.16.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 176.75 82.83 14,640.20
01.16.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00
01.16.02 REVOQUES Y REVESTIMIENTOS 0.00
01.16.02.01 TARRAJEO EN MUROS INTERIORES m2 380.39 21.65 8,235.44
01.16.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 69.70 26.75 1,864.48
01.16.02.03 TARRAJEO DE VIGAS m2 70.96 33.95 2,409.09
01.16.02.04 VESTIDURA DE DERRAMES m 299.40 13.80 4,131.72
01.16.02.05 BRUÑAS m 148.70 5.68 844.62
01.16.03 CIELORRASOS 0.00
01.16.03.01 CIELORRASOS CON YESO m2 130.87 24.23 3,170.98
01.16.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 33.10 50.43 1,669.23
01.16.04 PISOS Y PAVIMENTOS 0.00
01.16.04.01 CONTRA PISOS 0.00
01.16.04.02 CONTRAPISO DE CONCRETO E=5CM m2 146.21 56.97 8,329.58
01.16.04.03 PISOS 0.00
01.16.04.04 PISO DE PORCELANATO 60X60 cm m2 43.54 60.77 2,645.93
01.16.04.05 PISO DE MADERA ESTRUCTURADA m2 102.67 87.82 9,016.48
01.16.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.16.05.01 ZOCALOS 0.00
01.16.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 64.44 54.10 3,486.20
01.16.05.02 CONTRAZOCALOS 0.00
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.16.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 25.86 75.45 1,951.14
01.16.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 96.02 86.85 8,339.34
01.16.06 CARPINTERIA DE MADERA 0.00
01.16.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.16.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 12.60 255.00 3,213.00
01.16.07 CERRAJERIA 0.00
01.16.07.01 BISAGRAS 0.00
01.16.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52
01.16.07.03 CERRADURAS 0.00
01.16.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.16.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63
01.16.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.16.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,101.15 0.00 0.00
01.16.08.02 VIDRIO TEMPLADO p2 220.66 25.95 5,726.13
01.16.09 PINTURA 0.00
01.16.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 130.87 13.75 1,799.46
01.16.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 380.39 10.00 3,803.90
01.16.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 70.96 13.75 975.70
01.16.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 14.70 17.97 264.16
01.16.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 96.02 10.13 972.68
01.16.10 VARIOS 0.00
01.16.10.01 MESA PARA OVALINES EN SS.HH u 3.00 915.25 2,745.75
01.16.10.02 MESAS DE GRANITO PARA COCINA m 6.00 1,019.94 6,119.64
01.16.10.03 MUEBLES 0.00
01.16.10.04 ROPERO EN HABITACIONES m 12.26 932.20 11,428.77
01.16.10.05 REPOSTEROS EN COCINA m 16.65 432.20 7,196.13
01.16.10.06 LIMPIEZA 0.00
01.16.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.16.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.16.10.09 LIMPIEZA DE VIDRIOS p2 1,101.15 1.16 1,277.33
01.17 DEPARTAMENTO 502 0.00
01.17.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.17.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 174.56 82.83 14,458.80
01.17.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00
01.17.02 REVOQUES Y REVESTIMIENTOS 0.00
01.17.02.01 TARRAJEO EN MUROS INTERIORES m2 366.98 21.65 7,945.12
01.17.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48
01.17.02.03 TARRAJEO DE VIGAS m2 42.04 33.95 1,427.26
01.17.02.04 VESTIDURA DE DERRAMES m 60.25 13.80 831.45
01.17.02.05 BRUÑAS m 73.73 5.68 418.79
01.17.03 CIELORRASOS 0.00
01.17.03.01 CIELORRASOS CON YESO m2 81.28 24.23 1,969.41
01.17.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 11.44 50.43 576.92
01.17.04 PISOS Y PAVIMENTOS 0.00
01.17.04.01 CONTRA PISOS 0.00
01.17.04.02 CONTRAPISO DE CONCRETO E=5CM m2 92.72 56.97 5,282.26
01.17.04.03 PISOS 0.00
01.17.04.04 PISO DE PORCELANATO 60X60 cm m2 30.55 60.77 1,856.52
01.17.04.05 PISO DE MADERA ESTRUCTURADA m2 62.17 87.82 5,459.77
01.17.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.17.05.01 ZOCALOS 0.00
01.17.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06
01.17.05.02 CONTRAZOCALOS 0.00
01.17.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 19.76 75.45 1,490.89
01.17.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62
01.17.06 CARPINTERIA DE MADERA 0.00
01.17.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.17.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60
01.17.07 CERRAJERIA 0.00
01.17.07.01 BISAGRAS 0.00
01.17.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 28.00 20.86 584.08
01.17.07.03 CERRADURAS 0.00
01.17.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.17.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 6.00 69.09 414.54
01.17.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.17.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 377.25 0.00 0.00
01.17.08.02 VIDRIO TEMPLADO p2 133.47 25.95 3,463.55
01.17.09 PINTURA 0.00
01.17.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 92.72 13.75 1,274.90
01.17.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 366.98 10.00 3,669.80
01.17.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 42.04 13.75 578.05
01.17.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 13.02 17.97 233.97
01.17.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 55.77 10.13 564.95
01.17.10 VARIOS 0.00
01.17.10.01 MESA PARA OVALINES EN SS.HH u 2.00 915.25 1,830.50
01.17.10.02 MESAS DE GRANITO PARA COCINA m 5.66 1,019.94 5,772.86
01.17.10.03 MUEBLES 0.00
01.17.10.04 ROPERO EN HABITACIONES m 6.51 932.20 6,068.62
01.17.10.05 REPOSTEROS EN COCINA m 15.75 432.20 6,807.15
01.17.10.06 LIMPIEZA 0.00
01.17.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.17.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.17.10.09 LIMPIEZA DE VIDRIOS p2 377.25 1.16 437.61
01.18 SEXTO NIVEL 0.00
01.19 DEPARTAMENTO 601 DUPLEX 0.00
01.19.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.19.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 292.32 82.83 24,212.87
01.19.01.02 MURO DE DRYWALL (DINETELES) u 10.00 100.00 1,000.00
01.19.02 REVOQUES Y REVESTIMIENTOS 0.00
01.19.02.01 TARRAJEO EN MUROS INTERIORES m2 521.77 21.65 11,296.32
01.19.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 107.19 26.75 2,867.33
01.19.02.03 TARRAJEO DE VIGAS m2 59.04 33.95 2,004.41
01.19.02.04 VESTIDURA DE DERRAMES m 135.06 13.80 1,863.83
01.19.02.05 BRUÑAS m 158.39 5.68 899.66
01.19.03 CIELORRASOS 0.00
01.19.03.01 CIELORRASOS CON YESO m2 166.42 24.23 4,032.36
01.19.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 138.20 50.43 6,969.43
01.19.04 PISOS Y PAVIMENTOS 0.00
01.19.04.01 CONTRA PISOS 0.00
01.19.04.02 CONTRAPISO DE CONCRETO E=5CM m2 289.36 56.97 16,484.84
01.19.04.03 PISOS 0.00
01.19.04.04 PISO DE PORCELANATO 60X60 cm m2 142.25 60.77 8,644.53
01.19.04.05 PISO DE MADERA ESTRUCTURADA m2 147.11 87.82 12,919.20
01.19.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.19.05.01 ZOCALOS 0.00
01.19.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 99.94 54.10 5,406.75
01.19.05.02 CONTRAZOCALOS 0.00
01.19.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 14.00 75.45 1,056.30
01.19.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 126.79 86.85 11,011.71
01.19.06 CARPINTERIA DE MADERA 0.00
01.19.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.19.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.08 255.00 2,570.40
01.19.07 CERRAJERIA 0.00
01.19.07.01 BISAGRAS 0.00
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.19.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 40.00 20.86 834.40
01.19.07.03 CERRADURAS 0.00
01.19.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.19.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 9.00 69.09 621.81
01.19.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.19.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,203.78 0.00 0.00
01.19.08.02 VIDRIO TEMPLADO p2 508.92 25.95 13,206.47
01.19.09 PINTURA 0.00
01.19.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 166.42 13.75 2,288.28
01.19.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 521.77 10.00 5,217.70
01.19.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 59.04 13.75 811.80
01.19.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 12.10 17.97 217.44
01.19.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 126.79 10.13 1,284.38
01.19.10 VARIOS 0.00
01.19.10.01 MESA PARA OVALINES EN SS.HH u 4.00 915.25 3,661.00
01.19.10.02 MESAS DE GRANITO PARA COCINA m 16.30 1,019.94 16,625.02
01.19.10.03 MUEBLES 0.00
01.19.10.04 ROPERO EN HABITACIONES m 13.05 932.20 12,165.21
01.19.10.05 REPOSTEROS EN COCINA m 16.30 432.20 7,044.86
01.19.10.06 LIMPIEZA 0.00
01.19.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.19.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.19.10.09 LIMPIEZA DE VIDRIOS p2 1,203.78 1.16 1,396.38
01.20 DEPARTAMENTO 602 DUPLEX
01.20.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.20.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 208.43 82.83 17,264.26
01.20.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00
01.20.02 REVOQUES Y REVESTIMIENTOS
01.20.02.01 TARRAJEO EN MUROS INTERIORES m2 326.11 21.65 7,060.28
01.20.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 94.47 26.75 2,527.07
01.20.02.03 TARRAJEO DE VIGAS m2 50.59 33.95 1,717.53
01.20.02.04 VESTIDURA DE DERRAMES m 37.71 13.80 520.40
01.20.02.05 BRUÑAS m 178.39 5.68 1,013.26
01.20.03 CIELORRASOS 0.00
01.20.03.01 CIELORRASOS CON YESO m2 48.11 24.23 1,165.71
01.20.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 99.14 50.43 4,999.63
01.20.04 PISOS Y PAVIMENTOS 0.00
01.20.04.01 CONTRA PISOS 0.00
01.20.04.02 CONTRAPISO DE CONCRETO E=5CM m2 155.45 56.97 8,855.99
01.20.04.03 PISOS 0.00
01.20.04.04 PISO DE PORCELANATO 60X60 cm m2 52.73 60.77 3,204.40
01.20.04.05 PISO DE MADERA ESTRUCTURADA m2 102.72 87.82 9,020.87
01.20.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.20.05.01 ZOCALOS 0.00
01.20.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 87.97 54.10 4,759.18
01.20.05.02 CONTRAZOCALOS 0.00
01.20.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 14.00 75.45 1,056.30
01.20.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 104.45 86.85 9,071.48
01.20.06 CARPINTERIA DE MADERA 0.00
01.20.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73
01.20.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 12.39 255.00 3,159.45
01.20.07 CERRAJERIA 0.00
01.20.07.01 BISAGRAS 0.00
01.20.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52
01.20.07.03 CERRADURAS 0.00
01.20.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36
01.20.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.20.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.20.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,266.79 0.00 0.00
01.20.08.02 VIDRIO TEMPLADO p2 181.48 25.95 4,709.41
01.20.09 PINTURA 0.00
01.20.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 48.11 13.75 661.51
01.20.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 326.11 10.00 3,261.10
01.20.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 50.59 13.75 695.61
01.20.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 14.49 17.97 260.39
01.20.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 104.45 10.13 1,058.08
01.20.10 VARIOS 0.00
01.20.10.01 MESA PARA OVALINES EN SS.HH u 4.00 915.25 3,661.00
01.20.10.02 MESAS DE GRANITO PARA COCINA m 16.30 1,019.94 16,625.02
01.20.10.03 MUEBLES 0.00
01.20.10.04 ROPERO EN HABITACIONES m 8.61 932.20 8,026.24
01.20.10.05 REPOSTEROS EN COCINA m 15.18 432.20 6,560.80
01.20.10.06 LIMPIEZA 0.00
01.20.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.20.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.20.10.09 LIMPIEZA DE VIDRIOS p2 1,266.79 1.16 1,469.48
01.21 FACHADA PRINCIPAL 0.00
01.21.01 REVOQUES Y REVESTIMIENTOS 0.00
01.21.01.01 TARRAJEO EN MUROS EXTERIORES m2 876.15 25.53 22,368.11
01.21.01.02 BRUÑAS m 205.31 5.68 1,166.16
01.21.01.03 TARRAJEO EN GRADAS m2 56.65 21.88 1,239.50
01.21.02 CIELORRASOS 0.00
01.21.02.01 CIELORRASOS CON YESO m2 94.02 24.23 2,278.10
01.21.02.02 CIELO RASO TARRAJEO DE CEMENTO m2 27.52 50.43 1,387.83
01.21.02.03 CIELO RASO CON PORCELANATI TIPO MADERA m2 132.77 70.35 9,340.37
01.21.03 PISOS Y PAVIMENTOS 0.00
01.21.03.01 PISOS 0.00
01.21.03.02 PISO DE PORCELANATO 60X60 cm m2 48.07 60.77 2,921.21
01.21.03.03 PISO DE CERAMICO DE 40X40 cm m2 95.50 48.30 4,612.65
01.21.04 ZOCALOS Y CONTRAZOCALOS 0.00
01.21.04.01 ZOCALOS 0.00
01.21.04.01.01 ZOCALO DE CERAMICO H=0.60 m m2 72.32 45.38 3,281.88
01.21.04.01.02 ZOCALO PORCELANATO TIPO MADERA m2 152.39 60.13 9,163.21
01.21.04.01.03 ZOCALO PORCELANATO TIPO PIEDRA m2 48.95 60.13 2,943.36
01.21.04.02 CONTRAZOCALOS
01.21.04.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 88.37 75.45 6,667.52
01.21.05 CARPINTERIA METALICA CON VIDRIO LAMINADO (INC CERRAJERIA)
01.21.05.01 PUERTAS m2 7.61 350.00 2,663.50
01.21.05.02 BARANDA METALICA m 93.84 180.00 16,891.20
01.21.06 VIDRIOS, CRISTALES Y SIMILARES
01.21.06.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 34.39 0.00
01.21.06.02 VIDRIO INSULADO EN VENTANAS Y MAMPARAS glb 1.00 225,126.23 225,126.23
01.21.07 PINTURA 0.00
01.21.07.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 94.02 13.75 1,292.78
01.21.07.02 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS (INC IMPRIMANTE) m2 876.15 13.75 12,047.06
01.21.08 EQUIPAMIENTO Y MOBILIARIO 0.00
01.21.08.01 MUEBLE SECCIONAL u 1.00 2,500.00 2,500.00
01.21.08.02 MESA DE CENTRO EN HALL RECEPCIÓN u 1.00 1,000.00 1,000.00
01.21.08.03 SILLA PARA ATENCIÓN RECEPCIÓN u 1.00 450.00 450.00
01.21.09 VARIOS 0.00
01.21.09.01 BARRA DE RECEPCIÓN u 1.00 3,100.00 3,100.00
01.21.09.02 LETRERO INGRESO HALL glb 1.00 280.00 280.00
01.21.09.03 LETREROS DE SEÑALIZACIÓN Y SEGURIDAD glb 1.00 850.00 850.00
01.21.09.04 JARDINERAS EN HALL RECEPCIÓN glb 1.00 0.00
RESUMEN PRESUPUESTO

OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018


CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018
UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019

Item Descripción Und. Metrado Precio S/. Parcial S/.


01.21.09.05 LIMPIEZA 0.00
01.21.09.06 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98
01.21.09.07 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77
01.21.09.08 LIMPIEZA DE VIDRIOS p2 34.39 1.16 39.89
02 INSTALACIONES SANITARIAS
02.01 SOTANO glb 1.00 45,901.72 45,901.72
02.02 SEMISOTANO glb 1.00 45,901.72 45,901.72
02.03 1ER NIVEL glb 1.00 58,754.20 58,754.20
02.04 2DO NIVEL glb 1.00 58,754.20 58,754.20
02.05 3ER NIVEL glb 1.00 58,754.20 58,754.20
02.06 4TO NIVEL glb 1.00 58,754.20 58,754.20
02.07 5TO NIVEL glb 1.00 58,754.20 58,754.20
02.08 6TO NIVEL Y ENTRETECHO glb 1.00 73,442.74 73,442.74
03 INSTALACIONES ELECTRICAS
03.01 SOTANO glb 1.00 45,901.72 45,901.72
03.02 SEMISOTANO glb 1.00 45,901.72 45,901.72
03.03 1ER NIVEL glb 1.00 58,754.20 58,754.20
03.04 2DO NIVEL glb 1.00 58,754.20 58,754.20
03.05 3ER NIVEL glb 1.00 58,754.20 58,754.20
03.06 4TO NIVEL glb 1.00 58,754.20 58,754.20
03.07 5TO NIVEL glb 1.00 58,754.20 58,754.20
03.08 6TO NIVEL Y ENTRETECHO glb 1.00 73,442.74 73,442.74
04 EQUIPAMIENTO
04.01 ASCENSOR glb 1.00 102,300.00 102,300.00
04.02 ASCENSOR DE VEHICULOS glb 1.00 80,000.00 80,000.00
COSTO DIRECTO 4,730,238.23
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01 OBRAS PROVISIONALES
01.01 OBRAS PROVISIONALES Y ESTRUCTURAS
01.01.01 ALMACEN, OFICINA Y GUARDIANIA glb 1.00 2,500.00 2,500.00 2,500.00
01.01.02 CARTEL DE OBRA u 1.00 1,200.00 1,200.00 1,200.00
01.01.03 SSHH OBREROS u 1.00 1,268.98 1,268.98 1,268.98
01.01.04 AGUA PARA LA CONSTRUCCION mes 7.00 600.00 4,200.00 4,200.00
01.01.05 CERCO PROVISIONAL DE OBRA m 42.00 261.59 10,986.78 10,986.78
01.02 TRABAJOS EN PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 450.00 11.85 5,332.50 5,332.50
01.02.02 TRAZO NIVELES Y REPLANTEO INICIAL m2 450.00 3.07 1,381.50 1,381.50
01.02.03 TRAZO NIVELES Y REPLANTEO DURANTE LA EJECUCION m2 2,835.00 1.97 5,584.95 5,584.95
01.02.04 LIMPIEZA PERMANENTE mes 6.00 592.62 3,555.72 3,555.72
01.02.05 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 17,436.00 17,436.00 17,436.00
01.03 CALZADURAS
01.03.01 EXCAVACION MANUAL PARA CALZADURAS m3 2,592.30 34.22 88,708.51 88,708.51
01.03.02 ENCOFRADO Y DESENCOFRADO DE CALZADURAS m2 135.00 43.20 5,832.00 5,832.00
01.03.03 ACARREO DE MATERIAL EXCAVADO A ZONA DE ELIMINACIÓN m3 777.70 13.24 10,296.75 10,296.75
01.03.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO D=5KM m3 3,370.00 18.67 62,917.90 62,917.90
01.04 MOVIMIENTO DE TIERRAS
01.04.01 EXCAVACION DE ZAPATAS Y PLATEA DE CIENTACIÓN CON MAQUINARIA m3 3,458.87 25.42 87,924.48 87,924.48
01.04.02 ACARREO DE MATERIAL EXCAVADO A ZONA DE ELIMINACIÓN m3 1,037.66 13.24 13,738.62 13,738.62
01.04.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO D=5KM m3 3,458.87 18.67 64,577.10 32,288.55 32,288.55
01.04.04 NIVELACION INTERIOR Y COMACTADO m2 420.40 9.34 3,926.54 1,963.27 1,963.27
02 OBRAS DE CONCRETO SIMPLE
02.01 SOLADO DE CONCRETO e= 4" F´C 140 kg/cm2 m3 42.00 109.51 4,599.42 4,599.42
02.02 FALSA ZAPATA DE CONCRETO 1:10 + 30% P.G. m3 110.54 256.50 28,353.51 28,353.51
03 OBRAS DE CONCRETO CONCRETO ARMADO
03.01 ZAPATAS
03.01.01 CONCRETO f 'c=280 kg/cm2 EN PLATEA DE CIMENTACIÓN m3 271.84 435.33 118,340.11 59,170.06 59,170.06
03.01.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 14,654.90 4.51 66,093.60 33,046.80 33,046.80
03.02 MURO DE CONTENCION
03.02.01 CONCRETO F'c=210 kg/cm2 EN MURO DE CONTENCIÓN m3 112.05 404.98 45,378.01 22,689.01 22,689.01
03.02.02 ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION m2 916.28 39.59 36,275.53 18,137.77 18,137.77
03.02.03 ACERO fy=4200 kg/cm2 GRADO 60 EN MUROS DE CONTENCION kg 3,721.60 4.53 16,858.85 8,429.43 8,429.43
03.03 COLUMNAS Y PLACAS
03.03.01 PRIMER SOTANO
03.03.01.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 16.05 404.98 6,499.93 6,499.93
03.03.01.02 ENCOFRADO Y DESENCOFRADO m2 1,324.96 39.59 52,455.17 52,455.17
03.03.01.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 4,369.27 4.50 19,661.72 19,661.72
03.03.02 SEGUNDO SOTANO
03.03.02.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99 6,341.99
03.03.02.02 ENCOFRADO Y DESENCOFRADO m2 121.07 39.59 4,793.16 4,793.16
03.03.02.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 3,730.91 4.50 16,789.10 16,789.10
03.03.03 PRIMER NIVEL
03.03.03.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99 6,341.99
03.03.03.02 ENCOFRADO Y DESENCOFRADO m2 121.07 39.59 4,793.16 4,793.16
03.03.03.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 3,617.27 4.50 16,277.72 16,277.72
03.03.04 SEGUNDO NIVEL
03.03.04.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99 6,341.99
03.03.04.02 ENCOFRADO Y DESENCOFRADO m2 121.07 39.59 4,793.16 4,793.16
03.03.04.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 3,617.27 4.50 16,277.72 16,277.72
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
03.03.05 TERCER NIVEL
03.03.05.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99 6,341.99
03.03.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 121.07 39.59 4,793.16 4,793.16
03.03.05.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 2,963.56 4.50 13,336.02 13,336.02
03.03.06 CUARTO NIVEL
03.03.06.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99 6,341.99
03.03.06.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 121.07 39.59 4,793.16 4,793.16
03.03.06.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 2,598.42 4.50 11,692.89 11,692.89
03.03.07 QUINTO NIVEL
03.03.07.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99 6,341.99
03.03.07.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 121.07 39.59 4,793.16 4,793.16
03.03.07.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 2,311.92 4.50 10,403.64 10,403.64
03.03.08 SEXTO NIVEL
03.03.08.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 15.66 404.98 6,341.99 6,341.99
03.03.08.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 121.07 39.59 4,793.16 4,793.16
03.03.08.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 2,208.71 4.50 9,939.20 9,939.20
03.03.09 ENTRETECHO NIVEL
03.03.09.01 CONCRETO EN COLUMNAS F'c=210 kg/cm2 m3 26.72 404.98 10,821.07 10,821.07
03.03.09.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 182.84 39.59 7,238.64 7,238.64
03.03.09.03 ACERO CORRUGADO fy=4200 kg/cm2 EN COLUMNAS kg 1,634.63 4.50 7,355.84 7,355.84
03.04 VIGAS
03.04.01 PRIMER SOTANO
03.04.02 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 20.17 411.37 8,297.33 5,808.13 2,489.20
03.04.03 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 180.82 54.17 9,795.02 6,856.51 2,938.51
03.04.04 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 2,160.68 4.98 10,760.19 7,532.13 3,228.06
03.04.05 SEGUNDO SOTANO
03.04.06 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 26.25 411.37 10,798.46 10,798.46
03.04.07 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 232.91 54.17 12,616.73 12,616.73
03.04.08 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 2,904.09 4.98 14,462.37 14,462.37
03.04.09 PRIMER NIVEL
03.04.10 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 31.62 411.37 13,007.52 13,007.52
03.04.11 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 273.83 54.17 14,833.37 14,833.37
03.04.12 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,885.99 4.98 19,352.23 19,352.23
03.04.13 SEGUNDO NIVEL
03.04.14 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 31.44 411.37 12,933.47 12,933.47
03.04.15 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 271.60 54.17 14,712.57 14,712.57
03.04.16 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,909.87 4.98 19,471.15 19,471.15
03.04.17 TERCER NIVEL
03.04.18 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 32.50 411.37 13,369.53 13,369.53
03.04.19 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 283.99 54.17 15,383.74 15,383.74
03.04.20 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,931.48 4.98 19,578.77 19,578.77
03.04.21 CUARTO NIVEL
03.04.22 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 31.48 411.37 12,949.93 12,949.93
03.04.23 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 272.08 54.17 14,738.57 14,738.57
03.04.24 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,909.87 4.98 19,471.15 19,471.15
03.04.25 QUINTO NIVEL
03.04.26 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 31.53 411.37 12,970.50 12,970.50
03.04.27 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 272.73 54.17 14,773.78 14,773.78
03.04.28 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,800.53 4.98 18,926.64 18,926.64
03.04.29 SEXTO NIVEL
03.04.30 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 29.85 411.37 12,279.39 12,279.39
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
03.04.31 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 263.76 54.17 14,287.88 14,287.88
03.04.32 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 3,563.38 4.98 17,745.63 17,745.63
03.04.33 ENTRETECHO NIVEL
03.04.34 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 23.91 411.37 9,835.86 9,835.86
03.04.35 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 198.80 54.17 10,769.00 10,769.00
03.04.36 ACERO CORRUGADO fy=4200 kg/cm2 EN VIGAS kg 0.00 4.98 0.00
03.05 LOSAS ALIGERADAS
03.05.01 PRIMER SOTANO
03.05.01.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 44.25 411.37 18,203.12 9,101.56 9,101.56
03.05.01.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 362.88 38.42 13,941.85 6,970.93 6,970.93
03.05.01.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,638.69 4.98 13,140.68 6,570.34 6,570.34
03.05.01.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 343.92 17.34 5,963.57 2,981.79 2,981.79
03.05.02 SEGUNDO SOTANO
03.05.02.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 35.29 411.37 14,517.25 14,517.25
03.05.02.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 286.21 38.42 10,996.19 10,996.19
03.05.02.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,897.18 4.98 14,427.96 14,427.96
03.05.02.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 373.10 17.34 6,469.55 6,469.55
03.05.03 PRIMER NIVEL
03.05.03.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 44.25 411.37 18,203.12 18,203.12
03.05.03.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 0.00 38.42 0.00
03.05.03.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 3,042.81 4.98 15,153.19 15,153.19
03.05.03.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 188.77 17.34 3,273.27 3,273.27
03.05.04 SEGUNDO NIVEL
03.05.04.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 35.29 411.37 14,517.25 14,517.25
03.05.04.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 28.00 38.42 1,075.76 1,075.76
03.05.04.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,733.64 4.98 13,613.53 13,613.53
03.05.04.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 193.63 17.34 3,357.54 3,357.54
03.05.05 TERCER NIVEL
03.05.05.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 15.14 411.37 6,228.14 6,228.14
03.05.05.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 16.00 38.42 614.72 614.72
03.05.05.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,723.17 4.98 13,561.39 13,561.39
03.05.05.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 190.85 17.34 3,309.34 3,309.34
03.05.06 CUARTO NIVEL
03.05.06.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 63.26 411.37 26,023.27 26,023.27
03.05.06.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 30.00 38.42 1,152.60 1,152.60
03.05.06.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,707.53 4.98 13,483.50 13,483.50
03.05.06.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 193.63 17.34 3,357.54 3,357.54
03.05.07 QUINTO NIVEL
03.05.07.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 30.58 411.37 12,579.69 12,579.69
03.05.07.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 0.00 38.42 0.00
03.05.07.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 2,524.36 4.98 12,571.31 12,571.31
03.05.07.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 193.63 17.34 3,357.54 3,357.54
03.05.08 SEXTO NIVEL
03.05.08.01 CONCRETO F'c=210 kg/cm2 EN LOSA ALIGERADA m3 23.56 411.37 9,691.88 9,691.88
03.05.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 17.00 38.42 653.14 653.14
03.05.08.03 ACERO CORRUGADO fy=4200 kg/cm2 EN LOSA ALIGERADA kg 1,186.42 4.98 5,908.37 5,908.37
03.05.08.04 PLASTOFORMO 15x30cm x 3.00 m LOSA ALIGERADA m2 76.67 17.34 1,329.46 1,329.46
03.06 ESCALERAS
03.06.01 CONCRETO F'c=210 kg/cm2 EN ESCALERAS m3 68.00 470.75 32,011.00 6,402.20 6,402.20 6,402.20 6,402.20 6,402.20
03.06.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 125.00 52.56 6,570.00 1,314.00 1,314.00 1,314.00 1,314.00 1,314.00
03.06.03 ACERO CORRUGADO fy=4200 kg/cm2 EN ESCALERAS kg 492.36 4.98 2,451.95 490.39 490.39 490.39 490.39 490.39
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
03.07 CUBIERTAS
03.07.01 ESTRUCTURA METALICA PARA SOPORTE DE TECHO m2 325.00 150.00 48,750.00 48,750.00
01 ARQUITECTURA
01.01 PRIMER SOTANO
01.01.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 132.48 82.83 10,973.32 10,973.32
01.01.01.02 MURO DE DRYWALL (DINETELES) u 12.00 100.00 1,200.00 1,200.00
01.01.02 REVOQUES Y REVESTIMIENTOS
01.01.02.01 TARRAJEO EN MUROS INTERIORES m2 264.96 21.65 5,736.38 5,736.38
01.01.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 238.56 26.75 6,381.48 6,381.48
01.01.02.03 TARRAJEO DE VIGAS m2 108.78 33.95 3,693.08 3,693.08
01.01.02.04 VESTIDURA DE DERRAMES m 49.57 13.80 684.07 684.07
01.01.02.05 BRUÑAS m 167.73 5.68 952.71 952.71
01.01.03 CIELORRASOS
01.01.03.01 CIELORRASOS CON YESO m2 325.74 24.23 7,892.68 7,892.68
01.01.04 PISOS Y PAVIMENTOS
01.01.04.01 PISOS
01.01.04.02 PISO DE CERAMICO DE 40X40 cm m2 60.84 48.30 2,938.57 2,938.57
01.01.05 ZOCALOS Y CONTRAZOCALOS
01.01.05.01 CONTRAZOCALOS
01.01.05.02 CONTRAZOCALO CERAMICO m 100.00 17.86 1,786.00 1,786.00
01.01.06 CARPINTERIA DE MADERA
01.01.06.01 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 13.00 255.00 3,315.00 3,315.00
01.01.07 CERRAJERIA
01.01.07.01 BISAGRAS
01.01.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 48.00 20.86 1,001.28 1,001.28
01.01.07.03 CERRADURAS
01.01.07.04 CERRADURA DE BOLA SEGURO INTERIOR pza 12.00 69.09 829.08 829.08
01.01.08 VIDRIOS, CRISTALES Y SIMILARES
01.01.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 364.25 0.00 0.00
01.01.09 PINTURA
01.01.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 325.74 13.75 4,478.93 4,478.93
01.01.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 264.96 10.00 2,649.60 2,649.60
01.01.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 108.78 13.75 1,495.73 1,495.73
01.01.09.04 PINTURA REFLECTIVA 2 MANOS m 46.00 16.82 773.72 773.72
01.01.10 VARIOS
01.01.10.01 LIMPIEZA
01.01.10.02 LIMPIEZA PERMANENTE EN OBRA mes 7.00 581.33 4,069.31 581.33 581.33 581.33 581.33 581.33 581.33 581.33
01.01.10.03 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.01.10.04 LIMPIEZA DE VIDRIOS p2 364.25 1.16 422.53 422.53
01.02 SEGUNDO SOTANO
01.02.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.02.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 119.21 82.83 9,874.16 9,874.16
01.02.01.02 MURO DE DRYWALL (DINETELES) u 13.00 100.00 1,300.00 1,300.00
01.02.02 REVOQUES Y REVESTIMIENTOS
01.02.02.01 TARRAJEO EN MUROS INTERIORES m2 225.66 21.65 4,885.54 4,885.54
01.02.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 245.91 26.75 6,578.09 6,578.09
01.02.02.03 TARRAJEO DE VIGAS m2 102.27 33.95 3,472.07 3,472.07
01.02.02.04 VESTIDURA DE DERRAMES m 53.04 13.80 731.95 731.95
01.02.02.05 BRUÑAS m 167.73 5.68 952.71 952.71
01.02.03 CIELORRASOS
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.02.03.01 CIELORRASOS CON YESO m2 355.62 24.23 8,616.67 8,616.67
01.02.04 PISOS Y PAVIMENTOS
01.02.04.01 PISOS
01.02.04.02 PISO DE CERAMICO DE 40X40 cm m2 55.33 48.30 2,672.44 2,672.44
01.02.05 ZOCALOS Y CONTRAZOCALOS
01.02.05.01 CONTRAZOCALOS
01.02.05.02 CONTRAZOCALO CERAMICO m 110.00 17.86 1,964.60 1,964.60
01.02.06 CARPINTERIA DE MADERA
01.02.06.01 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 63.18 255.00 16,110.90 16,110.90
01.02.07 CERRAJERIA
01.02.07.01 BISAGRAS
01.02.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 52.00 20.86 1,084.72 1,084.72
01.02.07.03 CERRADURAS
01.02.07.04 CERRADURA DE BOLA SEGURO INTERIOR pza 13.00 69.09 898.17 898.17
01.02.08 VIDRIOS, CRISTALES Y SIMILARES
01.02.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 503.75 0.00 0.00
01.02.09 PINTURA
01.02.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 355.62 13.75 4,889.78 4,889.78
01.02.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 225.66 10.00 2,256.60 2,256.60
01.02.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 102.27 13.75 1,406.21 1,406.21
01.02.09.04 PINTURA REFLECTIVA 2 MANOS m2 56.00 16.82 941.92 941.92
01.02.10 VARIOS
01.02.10.01 LIMPIEZA
01.02.10.02 LIMPIEZA PERMANENTE EN OBRA mes 8.00 581.33 4,650.64 664.38 664.38 664.38 664.38 664.38 664.38 664.38
01.02.10.03 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.02.10.04 LIMPIEZA DE VIDRIOS p2 503.75 1.16 584.35 584.35
01.03 PRIMER NIVEL
01.04 DEPARTAMENTO 101
01.04.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.04.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 189.64 82.83 15,707.88 15,707.88
01.04.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00 800.00
01.04.02 REVOQUES Y REVESTIMIENTOS
01.04.02.01 TARRAJEO EN MUROS INTERIORES m2 347.36 21.65 7,520.34 7,520.34
01.04.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 69.70 26.75 1,864.48 1,864.48
01.04.02.03 TARRAJEO DE VIGAS m2 70.96 33.95 2,409.09 2,409.09
01.04.02.04 VESTIDURA DE DERRAMES m 174.10 13.80 2,402.58 2,402.58
01.04.02.05 BRUÑAS m 148.70 5.68 844.62 844.62
01.04.03 CIELORRASOS
01.04.03.01 CIELORRASOS CON YESO m2 130.26 24.23 3,156.20 3,156.20
01.04.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 22.60 50.43 1,139.72 1,139.72
01.04.04 PISOS Y PAVIMENTOS 0.00
01.04.04.01 CONTRA PISOS 0.00
01.04.04.02 CONTRAPISO DE CONCRETO E=5CM m2 186.48 56.97 10,623.77 5,311.89 5,311.89
01.04.04.03 PISOS 0.00
01.04.04.04 PISO DE PORCELANATO 60X60 cm m2 69.21 60.77 4,205.89 4,205.89
01.04.04.05 PISO DE MADERA ESTRUCTURADA m2 102.06 87.82 8,962.91 8,962.91
01.04.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.04.05.01 ZOCALOS 0.00
01.04.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 64.44 54.10 3,486.20 3,486.20
01.04.05.02 CONTRAZOCALOS 0.00
01.04.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 58.62 75.45 4,422.88 4,422.88
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.04.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 96.02 86.85 8,339.34 8,339.34
01.04.06 CARPINTERIA DE MADERA 0.00
01.04.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.04.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 35.40 255.00 9,027.00 9,027.00
01.04.07 CERRAJERIA 0.00
01.04.07.01 BISAGRAS 0.00
01.04.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52 667.52
01.04.07.03 CERRADURAS 0.00
01.04.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.04.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63 483.63
01.04.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.04.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 765.31 0.00 0.00 0.00
01.04.08.02 VIDRIO TEMPLADO p2 664.22 25.95 17,236.51 17,236.51
01.04.09 PINTURA 0.00
01.04.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 130.26 13.75 1,791.08 1,791.08
01.04.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 347.36 10.00 3,473.60 3,473.60
01.04.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 70.96 13.75 975.70 975.70
01.04.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 37.50 17.97 673.88 673.88
01.04.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 96.02 10.13 972.68 972.68
01.04.10 VARIOS 0.00
01.04.10.01 MESA PARA OVALINES EN SS.HH u 3.00 915.25 2,745.75 2,745.75
01.04.10.02 MESAS DE GRANITO PARA COCINA m 9.00 1,019.94 9,179.46 9,179.46
01.04.10.03 MUEBLES 0.00
01.04.10.04 ROPERO EN HABITACIONES m 12.26 932.20 11,428.77 11,428.77
01.04.10.05 REPOSTEROS EN COCINA m 16.65 432.20 7,196.13 7,196.13
01.04.10.06 GRASS SINTETICO EN JARIDÍN m2 12.26 79.24 971.48 971.48
01.04.10.07 LIMPIEZA 0.00
01.04.10.08 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.04.10.09 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.04.10.10 LIMPIEZA DE VIDRIOS p2 765.31 1.16 887.76 887.76
01.05 DEPARTAMENTO 102 0.00
01.05.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.05.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 234.81 82.83 19,449.31 19,449.31
01.05.01.02 MURO DE DRYWALL (DINETELES) u 9.00 100.00 900.00 900.00
01.05.02 REVOQUES Y REVESTIMIENTOS 0.00 0.00
01.05.02.01 TARRAJEO EN MUROS INTERIORES m2 368.11 21.65 7,969.58 7,969.58
01.05.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48 1,524.48
01.05.02.03 TARRAJEO DE VIGAS m2 42.04 33.95 1,427.26 1,427.26
01.05.02.04 VESTIDURA DE DERRAMES m 59.11 13.80 815.72 815.72
01.05.02.05 BRUÑAS m 73.73 5.68 418.79 418.79
01.05.03 CIELORRASOS 0.00
01.05.03.01 CIELORRASOS CON YESO m2 79.62 24.23 1,929.19 1,929.19
01.05.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 8.33 50.43 420.08 420.08
01.05.04 PISOS Y PAVIMENTOS 0.00
01.05.04.01 CONTRA PISOS 0.00
01.05.04.02 CONTRAPISO DE CONCRETO E=5CM m2 87.95 56.97 5,010.51 2,505.26 2,505.26
01.05.04.03 PISOS 0.00
01.05.04.04 PISO DE PORCELANATO 60X60 cm m2 45.13 60.77 2,742.55 2,742.55
01.05.04.05 PISO DE MADERA ESTRUCTURADA m2 60.51 87.82 5,313.99 5,313.99
01.05.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.05.05.01 ZOCALOS 0.00
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.05.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06 3,537.06
01.05.05.02 CONTRAZOCALOS 0.00
01.05.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 37.22 75.45 2,808.25 2,808.25
01.05.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62 4,843.62
01.05.06 CARPINTERIA DE MADERA 0.00
01.05.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.05.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60 2,784.60
01.05.07 CERRAJERIA 0.00
01.05.07.01 BISAGRAS 0.00
01.05.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 28.00 20.86 584.08 584.08
01.05.07.03 CERRADURAS 0.00
01.05.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.05.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 6.00 69.09 414.54 414.54
01.05.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.05.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 365.05 0.00 0.00 0.00
01.05.08.02 VIDRIO TEMPLADO p2 200.21 25.95 5,195.45 5,195.45
01.05.09 PINTURA 0.00
01.05.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 79.62 13.75 1,094.78 1,094.78
01.05.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 368.11 10.00 3,681.10 3,681.10
01.05.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 42.04 13.75 578.05 578.05
01.05.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 13.02 17.97 233.97 233.97
01.05.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 55.77 10.13 564.95 564.95
01.05.10 VARIOS 0.00
01.05.10.01 MESA PARA OVALINES EN SS.HH u 2.00 915.25 1,830.50 1,830.50
01.05.10.02 MESAS DE GRANITO PARA COCINA m 5.66 1,019.94 5,772.86 5,772.86
01.05.10.03 MUEBLES 0.00
01.05.10.04 ROPERO EN HABITACIONES m 6.51 932.20 6,068.62 6,068.62
01.05.10.05 REPOSTEROS EN COCINA m 15.75 432.20 6,807.15 6,807.15
01.05.10.06 GRASS SINTETICO EN JARIDÍN m2 8.33 79.24 660.07 660.07
01.05.10.07 LIMPIEZA 0.00
01.05.10.08 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.05.10.09 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.05.10.10 LIMPIEZA DE VIDRIOS p2 365.05 1.16 423.46 423.46
01.06 SEGUNDO NIVEL 0.00
01.07 DEPARTAMENTO 201 0.00
01.07.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.07.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 234.81 82.83 19,449.31 19,449.31
01.07.01.02 MURO DE DRYWALL (DINETELES) u 9.00 100.00 900.00 900.00
01.07.02 REVOQUES Y REVESTIMIENTOS 0.00 0.00
01.07.02.01 TARRAJEO EN MUROS INTERIORES m2 368.11 21.65 7,969.58 7,969.58
01.07.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48 1,524.48
01.07.02.03 TARRAJEO DE VIGAS m2 42.04 33.95 1,427.26 1,427.26
01.07.02.04 VESTIDURA DE DERRAMES m 59.11 13.80 815.72 815.72
01.07.02.05 BRUÑAS m 73.73 5.68 418.79 418.79
01.07.03 CIELORRASOS 0.00
01.07.03.01 CIELORRASOS CON YESO m2 79.62 24.23 1,929.19 1,929.19
01.07.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 31.08 50.43 1,567.36 1,567.36
01.07.04 PISOS Y PAVIMENTOS 0.00
01.07.04.01 CONTRA PISOS 0.00
01.07.04.02 CONTRAPISO DE CONCRETO E=5CM m2 105.64 56.97 6,018.31 3,009.16 3,009.16
01.07.04.03 PISOS 0.00
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.07.04.04 PISO DE PORCELANATO 60X60 cm m2 45.13 60.77 2,742.55 2,742.55
01.07.04.05 PISO DE MADERA ESTRUCTURADA m2 60.51 87.82 5,313.99 5,313.99
01.07.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.07.05.01 ZOCALOS 0.00
01.07.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06 3,537.06
01.07.05.02 CONTRAZOCALOS 0.00
01.07.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 37.22 75.45 2,808.25 2,808.25
01.07.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62 4,843.62
01.07.06 CARPINTERIA DE MADERA 0.00
01.07.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.07.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60 2,784.60
01.07.07 CERRAJERIA 0.00
01.07.07.01 BISAGRAS 0.00
01.07.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52 667.52
01.07.07.03 CERRADURAS 0.00
01.07.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.07.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63 483.63
01.07.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.07.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,101.15 0.00 0.00 0.00
01.07.08.02 VIDRIO TEMPLADO p2 201.28 25.95 5,223.22 5,223.22
01.07.09 PINTURA 0.00
01.07.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 147.49 13.75 2,027.99 2,027.99
01.07.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 380.39 10.00 3,803.90 3,803.90
01.07.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 70.96 13.75 975.70 975.70
01.07.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 4.00 17.97 71.88 71.88
01.07.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 96.02 10.13 972.68 972.68
01.07.10 VARIOS 0.00
01.07.10.01 MESA PARA OVALINES EN SS.HH u 3.00 915.25 2,745.75 2,745.75
01.07.10.02 MESAS DE GRANITO PARA COCINA m 9.00 1,019.94 9,179.46 9,179.46
01.07.10.03 MUEBLES 0.00
01.07.10.04 ROPERO EN HABITACIONES m 12.26 932.20 11,428.77 11,428.77
01.07.10.05 REPOSTEROS EN COCINA m 16.65 432.20 7,196.13 7,196.13
01.07.10.06 LIMPIEZA 0.00
01.07.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.07.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.07.10.09 LIMPIEZA DE VIDRIOS p2 1,101.15 1.16 1,277.33 1,277.33
01.08 DEPARTAMENTO 202 0.00
01.08.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.08.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 234.81 82.83 19,449.31 19,449.31
01.08.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00 800.00
01.08.02 REVOQUES Y REVESTIMIENTOS 0.00
01.08.02.01 TARRAJEO EN MUROS INTERIORES m2 366.98 21.65 7,945.12 7,945.12
01.08.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48 1,524.48
01.08.02.03 TARRAJEO DE VIGAS m2 42.04 33.95 1,427.26 1,427.26
01.08.02.04 VESTIDURA DE DERRAMES m 59.11 13.80 815.72 815.72
01.08.02.05 BRUÑAS m 73.73 5.68 418.79 418.79
01.08.03 CIELORRASOS 0.00
01.08.03.01 CIELORRASOS CON YESO m2 81.28 24.23 1,969.41 1,969.41
01.08.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 15.40 50.43 776.62 776.62
01.08.04 PISOS Y PAVIMENTOS 0.00
01.08.04.01 CONTRA PISOS 0.00
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.08.04.02 CONTRAPISO DE CONCRETO E=5CM m2 96.68 56.97 5,507.86 2,753.93 2,753.93
01.08.04.03 PISOS 0.00
01.08.04.04 PISO DE PORCELANATO 60X60 cm m2 34.51 60.77 2,097.17 2,097.17
01.08.04.05 PISO DE MADERA ESTRUCTURADA m2 62.17 87.82 5,459.77 5,459.77
01.08.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.08.05.01 ZOCALOS 0.00
01.08.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06 3,537.06
01.08.05.02 CONTRAZOCALOS 0.00
01.08.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 19.76 75.45 1,490.89 1,490.89
01.08.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62 4,843.62
01.08.06 CARPINTERIA DE MADERA 0.00
01.08.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.08.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60 2,784.60
01.08.07 CERRAJERIA 0.00
01.08.07.01 BISAGRAS 0.00
01.08.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 28.00 20.86 584.08 584.08
01.08.07.03 CERRADURAS 0.00
01.08.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.08.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 6.00 69.09 414.54 414.54
01.08.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.08.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 377.25 0.00 0.00 0.00
01.08.08.02 VIDRIO TEMPLADO p2 151.77 25.95 3,938.43 3,938.43
01.08.09 PINTURA 0.00
01.08.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 96.68 13.75 1,329.35 1,329.35
01.08.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 366.98 10.00 3,669.80 3,669.80
01.08.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 42.04 13.75 578.05 578.05
01.08.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 13.02 17.97 233.97 233.97
01.08.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 55.77 10.13 564.95 564.95
01.08.10 VARIOS 0.00
01.08.10.01 MESA PARA OVALINES EN SS.HH u 2.00 915.25 1,830.50 1,830.50
01.08.10.02 MESAS DE GRANITO PARA COCINA m 5.66 1,019.94 5,772.86 5,772.86
01.08.10.03 MUEBLES 0.00
01.08.10.04 ROPERO EN HABITACIONES m 6.51 932.20 6,068.62 6,068.62
01.08.10.05 REPOSTEROS EN COCINA m 15.75 432.20 6,807.15 6,807.15
01.08.10.06 LIMPIEZA 0.00
01.08.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.08.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.08.10.09 LIMPIEZA DE VIDRIOS p2 377.25 1.16 437.61 437.61
01.09 TERCER NIVEL 0.00
01.10 DEPARTAMENTO 301 0.00
01.10.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.10.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 176.75 82.83 14,640.20 14,640.20
01.10.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00 800.00
01.10.02 REVOQUES Y REVESTIMIENTOS 0.00
01.10.02.01 TARRAJEO EN MUROS INTERIORES m2 380.39 21.65 8,235.44 8,235.44
01.10.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 69.70 26.75 1,864.48 1,864.48
01.10.02.03 TARRAJEO DE VIGAS m2 70.96 33.95 2,409.09 2,409.09
01.10.02.04 VESTIDURA DE DERRAMES m 299.40 13.80 4,131.72 4,131.72
01.10.02.05 BRUÑAS m 148.70 5.68 844.62 844.62
01.10.03 CIELORRASOS 0.00
01.10.03.01 CIELORRASOS CON YESO m2 130.87 24.23 3,170.98 3,170.98
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.10.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 22.55 50.43 1,137.20 1,137.20
01.10.04 PISOS Y PAVIMENTOS 0.00
01.10.04.01 CONTRA PISOS 0.00
01.10.04.02 CONTRAPISO DE CONCRETO E=5CM m2 152.42 56.97 8,683.37 8,683.37
01.10.04.03 PISOS 0.00
01.10.04.04 PISO DE PORCELANATO 60X60 cm m2 49.75 60.77 3,023.31 3,023.31
01.10.04.05 PISO DE MADERA ESTRUCTURADA m2 102.67 87.82 9,016.48 9,016.48
01.10.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.10.05.01 ZOCALOS 0.00
01.10.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 64.44 54.10 3,486.20 3,486.20
01.10.05.02 CONTRAZOCALOS 0.00
01.10.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 25.89 75.45 1,953.40 1,953.40
01.10.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 96.02 86.85 8,339.34 8,339.34
01.10.06 CARPINTERIA DE MADERA 0.00
01.10.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.10.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 12.60 255.00 3,213.00 3,213.00
01.10.07 CERRAJERIA 0.00
01.10.07.01 BISAGRAS 0.00
01.10.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52 667.52
01.10.07.03 CERRADURAS 0.00
01.10.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.10.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63 483.63
01.10.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.10.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,101.15 0.00 0.00 0.00
01.10.08.02 VIDRIO TEMPLADO p2 252.31 25.95 6,547.44 6,547.44
01.10.09 PINTURA 0.00
01.10.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 152.30 13.75 2,094.13 2,094.13
01.10.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 380.39 10.00 3,803.90 3,803.90
01.10.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 70.96 13.75 975.70 975.70
01.10.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 14.70 17.97 264.16 264.16
01.10.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 96.02 10.13 972.68 972.68
01.10.10 VARIOS 0.00
01.10.10.01 MESA PARA OVALINES EN SS.HH u 3.00 915.25 2,745.75 2,745.75
01.10.10.02 MESAS DE GRANITO PARA COCINA m 9.00 1,019.94 9,179.46 9,179.46
01.10.10.03 MUEBLES 0.00
01.10.10.04 ROPERO EN HABITACIONES m 12.26 932.20 11,428.77 11,428.77
01.10.10.05 REPOSTEROS EN COCINA m 16.65 432.20 7,196.13 7,196.13
01.10.10.06 LIMPIEZA 0.00
01.10.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.10.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.10.10.09 LIMPIEZA DE VIDRIOS p2 1,101.15 1.16 1,277.33 1,277.33
01.11 DEPARTAMENTO 302 0.00
01.11.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.11.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 174.56 82.83 14,458.80 14,458.80
01.11.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00 800.00
01.11.02 REVOQUES Y REVESTIMIENTOS 0.00 0.00
01.11.02.01 TARRAJEO EN MUROS INTERIORES m2 366.98 21.65 7,945.12 7,945.12
01.11.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48 1,524.48
01.11.02.03 TARRAJEO DE VIGAS m2 2.04 33.95 69.26 69.26
01.11.02.04 VESTIDURA DE DERRAMES m 0.25 13.80 3.45 3.45
01.11.02.05 BRUÑAS m 73.73 5.68 418.79 418.79
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.11.03 CIELORRASOS 0.00
01.11.03.01 CIELORRASOS CON YESO m2 81.28 24.23 1,969.41 1,969.41
01.11.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 11.44 50.43 576.92 576.92
01.11.04 PISOS Y PAVIMENTOS 0.00
01.11.04.01 CONTRA PISOS 0.00
01.11.04.02 CONTRAPISO DE CONCRETO E=5CM m2 92.72 56.97 5,282.26 5,282.26
01.11.04.03 PISOS 0.00
01.11.04.04 PISO DE PORCELANATO 60X60 cm m2 30.55 60.77 1,856.52 1,856.52
01.11.04.05 PISO DE MADERA ESTRUCTURADA m2 62.17 87.82 5,459.77 5,459.77
01.11.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.11.05.01 ZOCALOS 0.00
01.11.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06 3,537.06
01.11.05.02 CONTRAZOCALOS 0.00
01.11.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 19.76 75.45 1,490.89 1,490.89
01.11.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62 4,843.62
01.11.06 CARPINTERIA DE MADERA 0.00
01.11.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.11.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60 2,784.60
01.11.07 CERRAJERIA 0.00
01.11.07.01 BISAGRAS 0.00
01.11.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 28.00 20.86 584.08 584.08
01.11.07.03 CERRADURAS 0.00
01.11.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.11.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 6.00 69.09 414.54 414.54
01.11.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.11.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 377.25 0.00 0.00 0.00
01.11.08.02 VIDRIO TEMPLADO p2 133.47 25.95 3,463.55 3,463.55
01.11.09 PINTURA 0.00
01.11.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 92.72 13.75 1,274.90 1,274.90
01.11.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 366.98 10.00 3,669.80 3,669.80
01.11.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 2.04 13.75 28.05 28.05
01.11.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 13.02 17.97 233.97 233.97
01.11.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 55.77 10.13 564.95 564.95
01.11.10 VARIOS 0.00
01.11.10.01 MESA PARA OVALINES EN SS.HH u 2.00 915.25 1,830.50 1,830.50
01.11.10.02 MESAS DE GRANITO PARA COCINA m 5.66 1,019.94 5,772.86 5,772.86
01.11.10.03 MUEBLES 0.00
01.11.10.04 ROPERO EN HABITACIONES m 6.51 932.20 6,068.62 6,068.62
01.11.10.05 REPOSTEROS EN COCINA m 15.75 432.20 6,807.15 6,807.15
01.11.10.06 LIMPIEZA 0.00
01.11.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.11.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.11.10.09 LIMPIEZA DE VIDRIOS p2 377.25 1.16 437.61 437.61
01.12 CUARTO NIVEL 0.00
01.13 DEPARTAMENTO 401 0.00
01.13.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.13.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 176.75 82.83 14,640.20 14,640.20
01.13.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00 800.00
01.13.02 REVOQUES Y REVESTIMIENTOS 0.00
01.13.02.01 TARRAJEO EN MUROS INTERIORES m2 380.39 21.65 8,235.44 8,235.44
01.13.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 69.70 26.75 1,864.48 1,864.48
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.13.02.03 TARRAJEO DE VIGAS m2 70.96 33.95 2,409.09 2,409.09
01.13.02.04 VESTIDURA DE DERRAMES m 299.40 13.80 4,131.72 4,131.72
01.13.02.05 BRUÑAS m 1,487.00 5.68 8,446.16 8,446.16
01.13.03 CIELORRASOS 0.00
01.13.03.01 CIELORRASOS CON YESO m2 130.87 24.23 3,170.98 3,170.98
01.13.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 23.35 50.43 1,177.54 1,177.54
01.13.04 PISOS Y PAVIMENTOS 0.00
01.13.04.01 CONTRA PISOS 0.00
01.13.04.02 CONTRAPISO DE CONCRETO E=5CM m2 146.21 56.97 8,329.58 8,329.58
01.13.04.03 PISOS 0.00
01.13.04.04 PISO DE PORCELANATO 60X60 cm m2 43.54 60.77 2,645.93 2,645.93
01.13.04.05 PISO DE MADERA ESTRUCTURADA m2 102.67 87.82 9,016.48 9,016.48
01.13.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.13.05.01 ZOCALOS 0.00
01.13.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 64.44 54.10 3,486.20 3,486.20
01.13.05.02 CONTRAZOCALOS 0.00
01.13.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 25.86 75.45 1,951.14 1,951.14
01.13.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 96.02 86.85 8,339.34 8,339.34
01.13.06 CARPINTERIA DE MADERA 0.00
01.13.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.13.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 12.60 255.00 3,213.00 3,213.00
01.13.07 CERRAJERIA 0.00
01.13.07.01 BISAGRAS 0.00
01.13.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52 667.52
01.13.07.03 CERRADURAS 0.00
01.13.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.13.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63 483.63
01.13.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.13.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,101.15 0.00 0.00 0.00
01.13.08.02 VIDRIO TEMPLADO p2 220.66 25.95 5,726.13 5,726.13
01.13.09 PINTURA 0.00
01.13.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 130.87 13.75 1,799.46 1,799.46
01.13.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 380.39 10.00 3,803.90 3,803.90
01.13.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 70.96 13.75 975.70 975.70
01.13.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 14.70 17.97 264.16 264.16
01.13.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 96.02 10.13 972.68 972.68
01.13.10 VARIOS 0.00
01.13.10.01 MESA PARA OVALINES EN SS.HH u 3.00 915.25 2,745.75 2,745.75
01.13.10.02 MESAS DE GRANITO PARA COCINA m 9.00 1,019.94 9,179.46 9,179.46
01.13.10.03 MUEBLES 0.00
01.13.10.04 ROPERO EN HABITACIONES m 12.26 932.20 11,428.77 11,428.77
01.13.10.05 REPOSTEROS EN COCINA m 16.65 432.20 7,196.13 7,196.13
01.13.10.06 LIMPIEZA 0.00
01.13.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.13.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.13.10.09 LIMPIEZA DE VIDRIOS p2 1,101.15 1.16 1,277.33 1,277.33
01.14 DEPARTAMENTO 402 0.00
01.14.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.14.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 174.56 82.83 14,458.80 14,458.80
01.14.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00 800.00
01.14.02 REVOQUES Y REVESTIMIENTOS 0.00 0.00
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.14.02.01 TARRAJEO EN MUROS INTERIORES m2 366.98 21.65 7,945.12 7,945.12
01.14.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48 1,524.48
01.14.02.03 TARRAJEO DE VIGAS m2 42.04 33.95 1,427.26 1,427.26
01.14.02.04 VESTIDURA DE DERRAMES m 60.25 13.80 831.45 831.45
01.14.02.05 BRUÑAS m 73.73 5.68 418.79 418.79
01.14.03 CIELORRASOS 0.00
01.14.03.01 CIELORRASOS CON YESO m2 81.28 24.23 1,969.41 1,969.41
01.14.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 11.44 50.43 576.92 576.92
01.14.04 PISOS Y PAVIMENTOS 0.00
01.14.04.01 CONTRA PISOS 0.00
01.14.04.02 CONTRAPISO DE CONCRETO E=5CM m2 92.72 56.97 5,282.26 5,282.26
01.14.04.03 PISOS 0.00
01.14.04.04 PISO DE PORCELANATO 60X60 cm m2 30.55 60.77 1,856.52 1,856.52
01.14.04.05 PISO DE MADERA ESTRUCTURADA m2 62.17 87.82 5,459.77 5,459.77
01.14.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.14.05.01 ZOCALOS 0.00
01.14.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06 3,537.06
01.14.05.02 CONTRAZOCALOS 0.00
01.14.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 19.76 75.45 1,490.89 1,490.89
01.14.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62 4,843.62
01.14.06 CARPINTERIA DE MADERA 0.00
01.14.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.14.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60 2,784.60
01.14.07 CERRAJERIA 0.00
01.14.07.01 BISAGRAS 0.00
01.14.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 28.00 20.86 584.08 584.08
01.14.07.03 CERRADURAS 0.00
01.14.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.14.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 6.00 69.09 414.54 414.54
01.14.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.14.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 377.25 0.00 0.00 0.00
01.14.08.02 VIDRIO TEMPLADO p2 133.47 25.95 3,463.55 3,463.55
01.14.09 PINTURA 0.00
01.14.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 92.72 13.75 1,274.90 1,274.90
01.14.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 366.98 10.00 3,669.80 3,669.80
01.14.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 42.04 13.75 578.05 578.05
01.14.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 13.02 17.97 233.97 233.97
01.14.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 55.77 10.13 564.95 564.95
01.14.10 VARIOS 0.00
01.14.10.01 MESA PARA OVALINES EN SS.HH u 2.00 915.25 1,830.50 1,830.50
01.14.10.02 MESAS DE GRANITO PARA COCINA m 5.66 1,019.94 5,772.86 5,772.86
01.14.10.03 MUEBLES 0.00
01.14.10.04 ROPERO EN HABITACIONES m 6.51 932.20 6,068.62 6,068.62
01.14.10.05 REPOSTEROS EN COCINA m 15.75 432.20 6,807.15 6,807.15
01.14.10.06 LIMPIEZA 0.00
01.14.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.14.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.14.10.09 LIMPIEZA DE VIDRIOS p2 377.25 1.16 437.61 437.61
01.15 QUINTO NIVEL 0.00
01.16 DEPARTAMENTO 501 0.00
01.16.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.16.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 176.75 82.83 14,640.20 14,640.20
01.16.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00 800.00
01.16.02 REVOQUES Y REVESTIMIENTOS 0.00 0.00
01.16.02.01 TARRAJEO EN MUROS INTERIORES m2 380.39 21.65 8,235.44 8,235.44
01.16.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 69.70 26.75 1,864.48 1,864.48
01.16.02.03 TARRAJEO DE VIGAS m2 70.96 33.95 2,409.09 2,409.09
01.16.02.04 VESTIDURA DE DERRAMES m 299.40 13.80 4,131.72 4,131.72
01.16.02.05 BRUÑAS m 148.70 5.68 844.62 844.62
01.16.03 CIELORRASOS 0.00
01.16.03.01 CIELORRASOS CON YESO m2 130.87 24.23 3,170.98 3,170.98
01.16.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 33.10 50.43 1,669.23 1,669.23
01.16.04 PISOS Y PAVIMENTOS 0.00
01.16.04.01 CONTRA PISOS 0.00
01.16.04.02 CONTRAPISO DE CONCRETO E=5CM m2 146.21 56.97 8,329.58 8,329.58
01.16.04.03 PISOS 0.00
01.16.04.04 PISO DE PORCELANATO 60X60 cm m2 43.54 60.77 2,645.93 2,645.93
01.16.04.05 PISO DE MADERA ESTRUCTURADA m2 102.67 87.82 9,016.48 9,016.48
01.16.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.16.05.01 ZOCALOS 0.00
01.16.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 64.44 54.10 3,486.20 3,486.20
01.16.05.02 CONTRAZOCALOS 0.00
01.16.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 25.86 75.45 1,951.14 1,951.14
01.16.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 96.02 86.85 8,339.34 8,339.34
01.16.06 CARPINTERIA DE MADERA 0.00
01.16.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.16.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 12.60 255.00 3,213.00 3,213.00
01.16.07 CERRAJERIA 0.00
01.16.07.01 BISAGRAS 0.00
01.16.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52 667.52
01.16.07.03 CERRADURAS 0.00
01.16.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.16.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63 483.63
01.16.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.16.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,101.15 0.00 0.00 0.00
01.16.08.02 VIDRIO TEMPLADO p2 220.66 25.95 5,726.13 5,726.13
01.16.09 PINTURA 0.00
01.16.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 130.87 13.75 1,799.46 1,799.46
01.16.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 380.39 10.00 3,803.90 3,803.90
01.16.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 70.96 13.75 975.70 975.70
01.16.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 14.70 17.97 264.16 264.16
01.16.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 96.02 10.13 972.68 972.68
01.16.10 VARIOS 0.00
01.16.10.01 MESA PARA OVALINES EN SS.HH u 3.00 915.25 2,745.75 2,745.75
01.16.10.02 MESAS DE GRANITO PARA COCINA m 6.00 1,019.94 6,119.64 6,119.64
01.16.10.03 MUEBLES 0.00
01.16.10.04 ROPERO EN HABITACIONES m 12.26 932.20 11,428.77 11,428.77
01.16.10.05 REPOSTEROS EN COCINA m 16.65 432.20 7,196.13 7,196.13
01.16.10.06 LIMPIEZA 0.00
01.16.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.16.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.16.10.09 LIMPIEZA DE VIDRIOS p2 1,101.15 1.16 1,277.33 1,277.33
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.17 DEPARTAMENTO 502 0.00
01.17.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.17.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 174.56 82.83 14,458.80 14,458.80
01.17.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00 800.00
01.17.02 REVOQUES Y REVESTIMIENTOS 0.00 0.00
01.17.02.01 TARRAJEO EN MUROS INTERIORES m2 366.98 21.65 7,945.12 7,945.12
01.17.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 56.99 26.75 1,524.48 1,524.48
01.17.02.03 TARRAJEO DE VIGAS m2 42.04 33.95 1,427.26 1,427.26
01.17.02.04 VESTIDURA DE DERRAMES m 60.25 13.80 831.45 831.45
01.17.02.05 BRUÑAS m 73.73 5.68 418.79 418.79
01.17.03 CIELORRASOS 0.00
01.17.03.01 CIELORRASOS CON YESO m2 81.28 24.23 1,969.41 1,969.41
01.17.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 11.44 50.43 576.92 576.92
01.17.04 PISOS Y PAVIMENTOS 0.00
01.17.04.01 CONTRA PISOS 0.00
01.17.04.02 CONTRAPISO DE CONCRETO E=5CM m2 92.72 56.97 5,282.26 5,282.26
01.17.04.03 PISOS 0.00
01.17.04.04 PISO DE PORCELANATO 60X60 cm m2 30.55 60.77 1,856.52 1,856.52
01.17.04.05 PISO DE MADERA ESTRUCTURADA m2 62.17 87.82 5,459.77 5,459.77
01.17.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.17.05.01 ZOCALOS 0.00
01.17.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 65.38 54.10 3,537.06 3,537.06
01.17.05.02 CONTRAZOCALOS 0.00
01.17.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 19.76 75.45 1,490.89 1,490.89
01.17.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 55.77 86.85 4,843.62 4,843.62
01.17.06 CARPINTERIA DE MADERA 0.00
01.17.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.17.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.92 255.00 2,784.60 2,784.60
01.17.07 CERRAJERIA 0.00
01.17.07.01 BISAGRAS 0.00
01.17.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 28.00 20.86 584.08 584.08
01.17.07.03 CERRADURAS 0.00
01.17.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.17.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 6.00 69.09 414.54 414.54
01.17.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.17.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 377.25 0.00 0.00 0.00
01.17.08.02 VIDRIO TEMPLADO p2 133.47 25.95 3,463.55 3,463.55
01.17.09 PINTURA 0.00
01.17.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 92.72 13.75 1,274.90 1,274.90
01.17.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 366.98 10.00 3,669.80 3,669.80
01.17.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 42.04 13.75 578.05 578.05
01.17.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 13.02 17.97 233.97 233.97
01.17.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 55.77 10.13 564.95 564.95
01.17.10 VARIOS 0.00
01.17.10.01 MESA PARA OVALINES EN SS.HH u 2.00 915.25 1,830.50 1,830.50
01.17.10.02 MESAS DE GRANITO PARA COCINA m 5.66 1,019.94 5,772.86 5,772.86
01.17.10.03 MUEBLES 0.00
01.17.10.04 ROPERO EN HABITACIONES m 6.51 932.20 6,068.62 6,068.62
01.17.10.05 REPOSTEROS EN COCINA m 15.75 432.20 6,807.15 6,807.15
01.17.10.06 LIMPIEZA 0.00
01.17.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.17.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.17.10.09 LIMPIEZA DE VIDRIOS p2 377.25 1.16 437.61 437.61
01.18 SEXTO NIVEL 0.00
01.19 DEPARTAMENTO 601 DUPLEX 0.00
01.19.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
01.19.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 292.32 82.83 24,212.87 24,212.87
01.19.01.02 MURO DE DRYWALL (DINETELES) u 10.00 100.00 1,000.00 1,000.00
01.19.02 REVOQUES Y REVESTIMIENTOS 0.00
01.19.02.01 TARRAJEO EN MUROS INTERIORES m2 521.77 21.65 11,296.32 11,296.32
01.19.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 107.19 26.75 2,867.33 2,867.33
01.19.02.03 TARRAJEO DE VIGAS m2 59.04 33.95 2,004.41 2,004.41
01.19.02.04 VESTIDURA DE DERRAMES m 135.06 13.80 1,863.83 1,863.83
01.19.02.05 BRUÑAS m 158.39 5.68 899.66 899.66
01.19.03 CIELORRASOS 0.00
01.19.03.01 CIELORRASOS CON YESO m2 166.42 24.23 4,032.36 4,032.36
01.19.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 138.20 50.43 6,969.43 6,969.43
01.19.04 PISOS Y PAVIMENTOS 0.00
01.19.04.01 CONTRA PISOS 0.00
01.19.04.02 CONTRAPISO DE CONCRETO E=5CM m2 289.36 56.97 16,484.84 16,484.84
01.19.04.03 PISOS 0.00
01.19.04.04 PISO DE PORCELANATO 60X60 cm m2 142.25 60.77 8,644.53 8,644.53
01.19.04.05 PISO DE MADERA ESTRUCTURADA m2 147.11 87.82 12,919.20 12,919.20
01.19.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.19.05.01 ZOCALOS 0.00
01.19.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 99.94 54.10 5,406.75 5,406.75
01.19.05.02 CONTRAZOCALOS 0.00
01.19.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 14.00 75.45 1,056.30 1,056.30
01.19.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 126.79 86.85 11,011.71 11,011.71
01.19.06 CARPINTERIA DE MADERA 0.00
01.19.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.19.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 10.08 255.00 2,570.40 2,570.40
01.19.07 CERRAJERIA 0.00
01.19.07.01 BISAGRAS 0.00
01.19.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 40.00 20.86 834.40 834.40
01.19.07.03 CERRADURAS 0.00
01.19.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.19.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 9.00 69.09 621.81 621.81
01.19.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.19.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,203.78 0.00 0.00 0.00
01.19.08.02 VIDRIO TEMPLADO p2 508.92 25.95 13,206.47 13,206.47
01.19.09 PINTURA 0.00
01.19.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 166.42 13.75 2,288.28 2,288.28
01.19.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 521.77 10.00 5,217.70 5,217.70
01.19.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 59.04 13.75 811.80 811.80
01.19.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 12.10 17.97 217.44 217.44
01.19.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 126.79 10.13 1,284.38 1,284.38
01.19.10 VARIOS 0.00
01.19.10.01 MESA PARA OVALINES EN SS.HH u 4.00 915.25 3,661.00 3,661.00
01.19.10.02 MESAS DE GRANITO PARA COCINA m 16.30 1,019.94 16,625.02 16,625.02
01.19.10.03 MUEBLES 0.00
01.19.10.04 ROPERO EN HABITACIONES m 13.05 932.20 12,165.21 12,165.21
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.19.10.05 REPOSTEROS EN COCINA m 16.30 432.20 7,044.86 7,044.86
01.19.10.06 LIMPIEZA 0.00
01.19.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.19.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.19.10.09 LIMPIEZA DE VIDRIOS p2 1,203.78 1.16 1,396.38 1,396.38
01.20 DEPARTAMENTO 602 DUPLEX
01.20.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.20.01.01 MURO DE LADRILLO KK MECANIZADO SOGA m2 208.43 82.83 17,264.26 17,264.26
01.20.01.02 MURO DE DRYWALL (DINETELES) u 8.00 100.00 800.00 800.00
01.20.02 REVOQUES Y REVESTIMIENTOS
01.20.02.01 TARRAJEO EN MUROS INTERIORES m2 326.11 21.65 7,060.28 7,060.28
01.20.02.02 TARRAJEO DE COLUMNAS Y PLACAS m2 94.47 26.75 2,527.07 2,527.07
01.20.02.03 TARRAJEO DE VIGAS m2 50.59 33.95 1,717.53 1,717.53
01.20.02.04 VESTIDURA DE DERRAMES m 37.71 13.80 520.40 520.40
01.20.02.05 BRUÑAS m 178.39 5.68 1,013.26 1,013.26
01.20.03 CIELORRASOS 0.00
01.20.03.01 CIELORRASOS CON YESO m2 48.11 24.23 1,165.71 1,165.71
01.20.03.02 CIELO RASO TARRAJEO DE CEMENTO m2 99.14 50.43 4,999.63 4,999.63
01.20.04 PISOS Y PAVIMENTOS 0.00
01.20.04.01 CONTRA PISOS 0.00
01.20.04.02 CONTRAPISO DE CONCRETO E=5CM m2 155.45 56.97 8,855.99 8,855.99
01.20.04.03 PISOS 0.00
01.20.04.04 PISO DE PORCELANATO 60X60 cm m2 52.73 60.77 3,204.40 3,204.40
01.20.04.05 PISO DE MADERA ESTRUCTURADA m2 102.72 87.82 9,020.87 9,020.87
01.20.05 ZOCALOS Y CONTRAZOCALOS 0.00
01.20.05.01 ZOCALOS 0.00
01.20.05.01.01 ZOCALO DE PORCELANATO 60 X 60 CM, H=1.2 m2 87.97 54.10 4,759.18 4,759.18
01.20.05.02 CONTRAZOCALOS 0.00
01.20.05.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 14.00 75.45 1,056.30 1,056.30
01.20.05.04 CONTRAZOCALO DE MADERA AGUANO DE 8 cm ' X 3/4"', RODON 3/4'' m 104.45 86.85 9,071.48 9,071.48
01.20.06 CARPINTERIA DE MADERA 0.00
01.20.06.01 PUERTA DE MADERA TABLERO REBAJADO DE AGUANO m2 2.10 346.06 726.73 726.73
01.20.06.02 PUERTA DE MADERA CONTRAPLACADA (P-06) 0.80x2.03m m2 12.39 255.00 3,159.45 3,159.45
01.20.07 CERRAJERIA 0.00
01.20.07.01 BISAGRAS 0.00
01.20.07.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" u 32.00 20.86 667.52 667.52
01.20.07.03 CERRADURAS 0.00
01.20.07.04 CERRADURA FORTE DE 2 GOLPES pza 1.00 145.36 145.36 145.36
01.20.07.05 CERRADURA DE BOLA SEGURO INTERIOR pza 7.00 69.09 483.63 483.63
01.20.08 VIDRIOS, CRISTALES Y SIMILARES 0.00
01.20.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,266.79 0.00 0.00 0.00
01.20.08.02 VIDRIO TEMPLADO p2 181.48 25.95 4,709.41 4,709.41
01.20.09 PINTURA 0.00
01.20.09.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 48.11 13.75 661.51 661.51
01.20.09.02 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 326.11 10.00 3,261.10 3,261.10
01.20.09.03 PINTURA LATEX EN VIGAS 2 MANOS INC. IMPRIMANTE m2 50.59 13.75 695.61 695.61
01.20.09.04 PINTURA EN CARPINTERIA DE MADERA CON BARNIZ u 14.49 17.97 260.39 260.39
01.20.09.05 PINTURA DE CONTRAZOCALO CON BARNIZ m 104.45 10.13 1,058.08 1,058.08
01.20.10 VARIOS 0.00
01.20.10.01 MESA PARA OVALINES EN SS.HH u 4.00 915.25 3,661.00 3,661.00
01.20.10.02 MESAS DE GRANITO PARA COCINA m 16.30 1,019.94 16,625.02 16,625.02
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
01.20.10.03 MUEBLES 0.00
01.20.10.04 ROPERO EN HABITACIONES m 8.61 932.20 8,026.24 8,026.24
01.20.10.05 REPOSTEROS EN COCINA m 15.18 432.20 6,560.80 6,560.80
01.20.10.06 LIMPIEZA 0.00
01.20.10.07 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.20.10.08 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.20.10.09 LIMPIEZA DE VIDRIOS p2 1,266.79 1.16 1,469.48 1,469.48
01.21 FACHADA PRINCIPAL 0.00
01.21.01 REVOQUES Y REVESTIMIENTOS 0.00
01.21.01.01 TARRAJEO EN MUROS EXTERIORES m2 876.15 25.53 22,368.11 11,184.06 11,184.06
01.21.01.02 BRUÑAS m 205.31 5.68 1,166.16 583.08 583.08
01.21.01.03 TARRAJEO EN GRADAS m2 56.65 21.88 1,239.50 619.75 619.75
01.21.02 CIELORRASOS 0.00
01.21.02.01 CIELORRASOS CON YESO m2 94.02 24.23 2,278.10 2,278.10
01.21.02.02 CIELO RASO TARRAJEO DE CEMENTO m2 27.52 50.43 1,387.83 1,387.83
01.21.02.03 CIELO RASO CON PORCELANATI TIPO MADERA m2 132.77 70.35 9,340.37 9,340.37
01.21.03 PISOS Y PAVIMENTOS 0.00
01.21.03.01 PISOS 0.00
01.21.03.02 PISO DE PORCELANATO 60X60 cm m2 48.07 60.77 2,921.21 2,921.21
01.21.03.03 PISO DE CERAMICO DE 40X40 cm m2 95.50 48.30 4,612.65 4,612.65
01.21.04 ZOCALOS Y CONTRAZOCALOS 0.00
01.21.04.01 ZOCALOS 0.00
01.21.04.01.01 ZOCALO DE CERAMICO H=0.60 m m2 72.32 45.38 3,281.88 3,281.88
01.21.04.01.02 ZOCALO PORCELANATO TIPO MADERA m2 152.39 60.13 9,163.21 9,163.21
01.21.04.01.03 ZOCALO PORCELANATO TIPO PIEDRA m2 48.95 60.13 2,943.36 2,943.36
01.21.04.02 CONTRAZOCALOS
01.21.04.03 CONTRAZOCALO DE PORCELANATO H= 10 CM m 88.37 75.45 6,667.52 6,667.52
01.21.05 CARPINTERIA METALICA CON VIDRIO LAMINADO (INC CERRAJERIA)
01.21.05.01 PUERTAS m2 7.61 350.00 2,663.50 2,663.50
01.21.05.02 BARANDA METALICA m 93.84 180.00 16,891.20 8,445.60 8,445.60
01.21.06 VIDRIOS, CRISTALES Y SIMILARES
01.21.06.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 34.39 0.00
01.21.06.02 VIDRIO INSULADO EN VENTANAS Y MAMPARAS glb 1.00 225,126.23 225,126.23 56,281.56 56,281.56 56,281.56 56,281.56
01.21.07 PINTURA 0.00
01.21.07.01 PINTURA LATEX EN CIELORRASO 2 MANOS INC. IMPRIMANTE m2 94.02 13.75 1,292.78 1,292.78
01.21.07.02 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS (INC IMPRIMANTE) m2 876.15 13.75 12,047.06 12,047.06
01.21.08 EQUIPAMIENTO Y MOBILIARIO 0.00
01.21.08.01 MUEBLE SECCIONAL u 1.00 2,500.00 2,500.00 2,500.00
01.21.08.02 MESA DE CENTRO EN HALL RECEPCIÓN u 1.00 1,000.00 1,000.00 1,000.00
01.21.08.03 SILLA PARA ATENCIÓN RECEPCIÓN u 1.00 450.00 450.00 450.00
01.21.09 VARIOS 0.00
01.21.09.01 BARRA DE RECEPCIÓN u 1.00 3,100.00 3,100.00 3,100.00
01.21.09.02 LETRERO INGRESO HALL glb 1.00 280.00 280.00 280.00
01.21.09.03 LETREROS DE SEÑALIZACIÓN Y SEGURIDAD glb 1.00 850.00 850.00 850.00
01.21.09.04 JARDINERAS EN HALL RECEPCIÓN glb 1.00 0.00 0.00
01.21.09.05 LIMPIEZA 0.00
01.21.09.06 LIMPIEZA PERMANENTE EN OBRA mes 6.00 581.33 3,487.98 581.33 581.33 581.33 581.33 581.33 581.33
01.21.09.07 LIMPIEZA FINAL DE OBRA glb 1.00 673.77 673.77 673.77
01.21.09.08 LIMPIEZA DE VIDRIOS p2 34.39 1.16 39.89 39.89
02 INSTALACIONES SANITARIAS
02.01 SOTANO glb 1.00 45,901.72 45,901.72 45,901.72
CRONOGRAMA DE OBRA
OBRA: EDIFICIO MULTIFAMILIAR TERRAZAS DE SANTA MONICA FECHA PPTO : 15/05/2018 DURACION DE OBRA
CLIENTE: CONSORCIO JERGO SAC FECHA DE INICIO: 15/06/2018 DIAS CALENDARIOS

UBICACIÓN: WANCHAQ - CUSCO FECHA DE FIN 14/03/2019 272.0 DURACION DE OBRA


DE 15.06 A 14.07 DE 15.07 A 14.08 DE 15.08 A 14.09 DE 15.09 A 14.10 DE 15.10 A 14.11 DE 15.11 A 14.12 DE 15.15 A 14.01 DE 15.01 A 14.02 DE 15.02 A 14.03
Item Descripción Und. Metrado Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
02.02 SEMISOTANO glb 1.00 45,901.72 45,901.72 45,901.72
02.03 1ER NIVEL glb 1.00 61,202.29 58,754.20 58,754.20
02.04 2DO NIVEL glb 1.00 61,202.29 58,754.20 58,754.20
02.05 3ER NIVEL glb 1.00 61,202.29 58,754.20 58,754.20
02.06 4TO NIVEL glb 1.00 61,202.29 58,754.20 58,754.20
02.07 5TO NIVEL glb 1.00 61,202.29 58,754.20 29,377.10 29,377.10
02.08 6TO NIVEL Y ENTRETECHO glb 1.00 61,202.29 73,442.74 73,442.74
03 INSTALACIONES ELECTRICAS
03.01 SOTANO glb 1.00 45,901.72 45,901.72 45,901.72
03.02 SEMISOTANO glb 1.00 45,901.72 45,901.72 45,901.72
03.03 1ER NIVEL glb 1.00 61,202.29 58,754.20 58,754.20
03.04 2DO NIVEL glb 1.00 61,202.29 58,754.20 58,754.20
03.05 3ER NIVEL glb 1.00 61,202.29 58,754.20 58,754.20
03.06 4TO NIVEL glb 1.00 61,202.29 58,754.20 58,754.20
03.07 5TO NIVEL glb 1.00 61,202.29 58,754.20 29,377.10 29,377.10
03.08 6TO NIVEL Y ENTRETECHO glb 1.00 61,202.29 73,442.74 73,442.74
04 EQUIPAMIENTO
04.01 ASCENSOR glb 1.00 102,300.00 102,300.00 12,787.50 12,787.50 12,787.50 12,787.50 12,787.50 12,787.50 12,787.50 12,787.50
04.02 ASCENSOR DE VEHICULOS glb 1.00 80,000.00 80,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00
COSTO DIRECTO 4,730,238.23 431,968.72 525,888.64 548,656.37 509,440.34 504,016.73 632,796.13 630,037.33 580,250.91 367,183.07
GASTOS GENERALES S/ 336,779.00 30,754.90 37,441.72 39,062.71 36,270.65 35,884.50 45,053.22 44,856.80 41,312.15 26,142.35
SUB-TOTAL S/ 5,067,017.23 462,723.62 563,330.36 587,719.08 545,710.99 539,901.24 677,849.34 674,894.13 621,563.06 393,325.42
% AVANCE 9.13% 11.12% 11.60% 10.77% 10.66% 13.38% 13.32% 12.27% 7.76%
% ACUMULADO 9.13% 20.25% 31.85% 42.62% 53.27% 66.65% 79.97% 92.24% 100.00%

Curva S
100.00%

90.00%

80.00%

70.00%
% de Avance
60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9
PROGRAMACION 9.13% 20.25% 31.85% 42.62% 53.27% 66.65% 79.97% 92.24% 100.00%