What material should be used for the gypsum partition wall Aluminum studs 70 mm to be used for gypsum partition wall support
3
support system frame? system frame.
Partition wall thickness is 130mm, 2x15mm gypsum board with
What is the thickness of the partition wall, and the gypsum
4 70mm aluminum studs, acoustic insulation to be achieved 60dB.
board to be used?
Is carpet laying part of the scope of works? If yes, who is the Yes, it is, the supplier is to be determined, carpet to match the first
5
supplier? floor office
Yes, doors are a part of China State’s scope, to be purchased by China
Is fixing of doors part of scope of works? If yes, who is the
State, supplied by Tawa.
6 supplier, and would the washroom doors on the hallway be
Yes, the washroom doors on the hallway to be replaced.
replaced?
1
appliances, cabinets to be supplied by TAWA
works? If yes, what type, and who is the supplier?
What point should water inlet to the sanitary appliance be No water inlet in the kitchenette
9
tapped from?
Is the glass manifestation and magnetic wall sheets part of our Installation of both items is China State’s scope of work, magnetic
10 scope of works? If yes, what is their specifications? wall sheets to be supplied by Adjaye Associates and painted to match
the wall color, glass manifestation to be supplied by China State.
Is the foldable wall that divides meeting rooms 2 & 3 part of Yes, it is, detail to be determined.
11
scope of works? If yes, what is its specification?
If possible, should the partition walls be attached to the soffit of Partition walls to be attached to the soffit of the slab, further details to
12 the existing ceiling? If not, would the old ceiling be reused or be determined.
new ones will be fixed. If the latter, what is its specification?
Is the item labelled F07 on Drwg Sheet 50-000 part of our scope No, item F07 is part of TAWA’s scope of work.
13
of works? If yes, what is its specification?
Yes, existing tile skirting to be removed and replaced with MDF, as for
14 Should the existing tile skirting be removed?
detail in the first floor office.
Should the additional lighting fixtures be LED or same as the Additional lightning to be the same as the existing fluorescent tube
15
existing fluorescent tube type? type.