ON CONSTR
ND WATER TANK
ACTIVITIES/WORKS
1.) GENERAL REQUIREMENTS
2.) SITE CLEARING AND GRUBBING
3.) EXCAVATION
4.) LAYING CONRETE UNDERLAY
5.) FIXING STAKES AND FORMS
6.) FIXING SLAB REINFORCEMENT
7.) FIXING WALL REINFORCEMENT
8.) INSTALLATIONG OF SERVICE PIPES AND PUMPS
9.) PLACE AND COMPACT CONCRETE
10.) FINISHES
CONSTRUCTION DURATION
NUMBER OF DAYS
ES/WORKS OPTIMISTIC PESSIMISTIC MOST LIKELY AVERAGE
1 2 1 2
ING 1 2 1 2
3 6 4 5
Y 1 2 1 2
1 2 1 2
NT 1 2 1 2
ENT 1 2 1 2
E PIPES AND PUMPS 1 2 1 2
CRETE 2 3 2 3
2 3 2 3
TOTAL: 25
COST ESTIMATION
PROJECT: DESIGN ON GROUND WATER TANK
INPUT:
VOULME OF RCC WORKS: 42 CONSTRUCTION DURATION: 0 DAYS
WEGHT OF STEEL: 9891
₱5,544.00
₱90,846.53
₱616.28
₱565.00
₱879.97
₱1,177.00
₱2,333.70
₱6,525.80
₱23.70
₱698.80
₱593.60
₱557.76
₱300.00
₱526.48
₱469.04
₱593.60
₱2,080.00
₱350.00
₱400.00
₱600.00
₱72,000.00
₱700.00
₱4,000.00
₱4,000.00
₱26,000.00
₱7,500.00
₱200.00
₱500.00
₱75.00
₱1,320.00
₱980.00
₱1,200.00
₱0.25
₱7.67
₱2.77
₱2,475.00
₱680.00