COST ESTIMATION

PROJECT: DESIGN OF UNDERGROUND WATER TANK


INPUT:
VOULME OF RCC WORKS: 42 CONSTRUCTION DURATION: 25 DAYS
WEGHT OF STEEL: 9891

CONSTRUCTION REQUIREMENTS QUANTITY COST


1.) GENERAL REQUIREMENTS
Facilities for the Engineers 1 ₱5,544.00
2.) EARTHWORKS
Clearing and Grubbing 0.05 ₱4,542.33
Structure Excavation 65 ₱40,058.20
Foundation Backfill 65 ₱36,725.00
3.) SUBBASE AND BASE COURSE
Aaggregate Subbase Course 42 ₱36,958.74
Crushed Aggregate Course 21 ₱24,717.00
Cement Treated Base Course 378 ₱882,138.60
4.) STEEL REINFORCEMENT
Reinforcing Steel Grade 60 ₱234,416.70
5.) LABOR COST
Civil Engineer 1 ₱52,000.00
Heavy Equipment Operator 1 ₱13,944.00
Light Eqipument Operator 1 ₱13,162.00
Foreman 1 ₱15,000.00
Common Laborer 7 ₱52,500.00
Skilled Laborer 1 ₱8,750.00
First Aider 1 ₱10,000.00
Safety Officer 1 ₱15,000.00
6.) EQUIPMENT COST
Water Pump 1 ₱72,000.00
Conrete Vibrator 1 ₱17,500.00
Water Truck 1 ₱100,000.00
Dump Truck 1 ₱100,000.00
Cargo Truck 1 ₱650,000.00
Jackhammer 1 ₱187,500.00
Concrete Screeder 1 ₱5,000.00
Bar Cutter 4 ₱50,000.00
7.) OTHER MATERIALS
Flaglets 5 ₱375.00
Collapsible Signages 3 ₱3,960.00
Caution Tape 3 ₱2,940.00
Medical Kit Set 1 ₱1,200.00
Helmet 10 ₱62.50
Working Gloves 10 ₱1,917.50
Safety Shoes 10 ₱692.50
Waterproofing Membrane 138.03 ₱341,624.25
Concrete Binder 34.17 ₱23,235.60
Tax: ₱263,860.41
Grand Total: ₱3,267,324.32

```
ON CONSTR
ND WATER TANK
ACTIVITIES/WORKS
1.) GENERAL REQUIREMENTS
2.) SITE CLEARING AND GRUBBING
3.) EXCAVATION
4.) LAYING CONRETE UNDERLAY
5.) FIXING STAKES AND FORMS
6.) FIXING SLAB REINFORCEMENT
7.) FIXING WALL REINFORCEMENT
8.) INSTALLATIONG OF SERVICE PIPES AND PUMPS
9.) PLACE AND COMPACT CONCRETE
10.) FINISHES
CONSTRUCTION DURATION
NUMBER OF DAYS
ES/WORKS OPTIMISTIC PESSIMISTIC MOST LIKELY AVERAGE
1 2 1 2
ING 1 2 1 2
3 6 4 5
Y 1 2 1 2
1 2 1 2
NT 1 2 1 2
ENT 1 2 1 2
E PIPES AND PUMPS 1 2 1 2
CRETE 2 3 2 3
2 3 2 3
TOTAL: 25
COST ESTIMATION
PROJECT: DESIGN ON GROUND WATER TANK
INPUT:
VOULME OF RCC WORKS: 42 CONSTRUCTION DURATION: 0 DAYS
WEGHT OF STEEL: 9891

CONSTRUCTION REQUIREMENTS QUANTITY COST


1.) GENERAL REQUIREMENTS
Facilities for the Engineers 1 ₱5,544.00
ON CONSTRUC
WATER TANK
ACTIVITIES/WORKS
CONSTRUCTION DURATION
NUMBER OF DAYS
ES/WORKS OPTIMISTIC PESSIMISTIC MOST LIKELY AVERAGE
COST OF MATERIALS,EQUIPMENT AND WORKS
DESCRIPTION UNIT QUANTITY COST
1.) GENERAL REQUIREMENTS
Facilities for the Engineers ₱5,544.00
2.) EARTHWORKS
Clearing and Grubbing sqm 10,000 ₱90,846.53
Structure Excavation cu.m 1 ₱616.28
Foundation Backfill cu.m 1 ₱565.00
3.) SUBBASE AND BASE COURSE
Aaggregate Subbase Course cu.m ₱879.97
Crushed Aggregate Cousre cu.m ₱1,177.00
Cement Treated Base Course cu.m ₱2,333.70
Structural Concrete Class A cu.m 1 ₱6,525.80
4.) STEEL REINFORCEMENT
Reinforcing Steel Grade 60 Kg 1 ₱23.70
5.) LABOR COST
Foreman Day 1 ₱698.80
Plumber Day 1 ₱593.60
Heavy Equipment Operator Day 1 ₱557.76
Common Laborer Day 1 ₱300.00
Light Eqipument Operator Day 1 ₱526.48
Driver Day 1 ₱469.04
Electrician Day 1 ₱593.60
Civil Engineer Day 1 ₱2,080.00
Skilled Laborer Day 1 ₱350.00
First Aider Day 1 ₱400.00
Part Tme Safety Officer Day 2 ₱600.00
6.) EQUIPMENT COST
Water Pump 1 ₱72,000.00
Conrete Vibrator Day 1 ₱700.00
Water Truck Day 1 ₱4,000.00
Dump Truck Day 1 ₱4,000.00
Cargo Truck Day 1 ₱26,000.00
Jackhammer Day 2 ₱7,500.00
Concrete Screeder Day 3 ₱200.00
Bar Cutter Day 4 ₱500.00
7.) OTHER MATERIALS
Flaglets pcs 1 ₱75.00
Collapsible Signages pcs 1 ₱1,320.00
Caution Tape pcs 1 ₱980.00
Medical Kit Set 1 ₱1,200.00
Helmet man-days 1 ₱0.25
Working Gloves man-days 1 ₱7.67
Safety Shoes man-days 1 ₱2.77
Waterproofing Membrane sq.m 1 ₱2,475.00
Concrete Surfcae Binder sq.m 1 ₱680.00
T AND WORKS
COST

₱5,544.00

₱90,846.53
₱616.28
₱565.00

₱879.97
₱1,177.00
₱2,333.70
₱6,525.80

₱23.70

₱698.80
₱593.60
₱557.76
₱300.00
₱526.48
₱469.04
₱593.60
₱2,080.00
₱350.00
₱400.00
₱600.00

₱72,000.00
₱700.00
₱4,000.00
₱4,000.00
₱26,000.00
₱7,500.00
₱200.00
₱500.00

₱75.00
₱1,320.00
₱980.00
₱1,200.00
₱0.25
₱7.67
₱2.77
₱2,475.00
₱680.00