STRAW BALE GRAIN STORAGE UNIT

ROOFING SYSTEM

NOVEMBER 2019
COMPONENT E: ROOFING

COMPONENT D: SECONDARY BAMBOO GRID AND FRAMING

COMPONENT A: BAMBOO STRUCTURAL BEAMS

COMPONENT C: INSULATION

COMPONENT B: BAMBOO GRID AND CHATAI SYSTEM

FINAL COMPONENTS

COMPONENTS S.B./A‐01 01
ROOF SYSTEM SECTION
X

COMPONENT E: BAMBOO CHATAI OVER 
TARPAULIN OVER BAMBOO CHATAI

COMPONENT D: STAGGERED BAMBOO 
FRAMING GRID
COMPONENT A: BAMBOO BEAM – B1

KEY 3D MS L‐ANGLE TO FIX BEAM TO BASE

LVL +3150

LVL +2870
LVL +2770

FILLER BAMBOO

COMPONENT C: 150 THK 
PUFF INSULATION

COMPONENT B: BAMBOO 
CHATAI  ANCHORED TO A 
BAMBOO GRID

APPROX 3150 MM
7 LAYERS OF 350 HIGH
STRAW BALE

LVL +320

PLINTH ±00

SECTION XX

ROOF SYSTEM S.B./A‐02 02
COMPONENT A  ‐ BAMBOO BEAM STRUCTURAL SYSTEM

B1

The total span for the roof is 7.3M. A composite bamboo beam 
system is designed to support the weight of the insulation and 
SIZE – 9M X 6M the roof. 
3D View of Base Model with Structural 
Bamboo System

STRUCTURAL DETAILS S.B./A‐03 03
COMPONENT A  ‐ BAMBOO BEAM STRUCTURAL SYSTEM

B1
B1
B1
B1
B1

B1

B1

The bamboo beam B1 is placed at a distance of 1.5M/3ft apart each. 7 Beams are 
used for a span of 9M.

The beams are fixed to the top of the walls with an MS L‐Channel.

STRUCTURAL DETAILS S.B./A‐04 04
COMPONENT A ‐ BEAM CONSTRUCTION DETAILS
B

A bamboo beam is made of even number of Bamboos.

B Holes are drilled into the bamboo for steel bars to hold the beam in place. 
A 4 Bamboos are stacked on top of each other and in a rack and ratchet straps are  Perpendicular at the center and diagonal at the and. 
used to tie them in place. These are then tightened around by steel wires.

HOLES DRILLED AT END FOR DIAGONAL STEEL PINS

RACHET STRAPS TO HOLD BEAM TOGETHER
HOLES DRILLED AT CENTRE FOR PERPENDICULAR STEEL PINS

4 NUMBER BAMBOO TO CREATE ONE BEAM

TWO BEAMS TIED TOGETHER TO CREATE B1

STRUCTURAL DETAILS S.B./A‐05 05
COMPONENT B ‐ BAMBOO CHATAI SYSTEM

A secondary bamboo grid system 
at 3FT each is constructed under 
the main Structure

A 5Ft X 3Ft bamboo chatai is 
attached to the grid to support 
the insulation In the roof 

ROOF SYSTEM FOR 
INSULATION
S.B./A‐06 06
COMPONENT B ‐ BAMBOO CHATAI SYSTEM 5FT

3FT
BAMBOO CHATAI/MATT

MAIN STRUCTURAL SYSTEM WITH BAMBOO 
BEAMS B1
SECONDARY BAMBOO GRID AT 3FT TO 
SUPPORT CHATAI ROOF
BAMBOO CHATAI ANCHORED TO SECONDARY 
GRID. SIZE – 5FT X 3 FT

ROOF SYSTEM FOR 
INSULATION
S.B./A‐07 07
COMPONENT C ‐ INSULATION

INSULATION FOR ROOF WOULD BE LAID ON TOP OF THE FIRST LAYER OF BAMBOO 
CHATAI. THIS WOULD CREATE AN ADDITIONAL AIR POCKET BETWEEN THE TWO ROOFS, 
GIVING HIGHER INSULATION TO THE STRUCTURE INTERNALLY.

PUF INSULATION –Polyurethane foam insulation panels TECHNICAL DETAILS

PUF panels are Lightweight, energy‐efficient and durable panels consisting of a rigid 
core sandwiched between sheet metal structural boards. PUF insulated sandwich 
panels integrate joists and studs, insulation, vapor and air barriers.

INSULATION S.B./A‐08 08
COMPONENT D – SECONDARY BABMBOO FRAMING SYSTEM

DUE TO THE 9M SPAN, A STAGERED 
BAMBOO GRID IS PROPOSED

EDGE FRAMING SYSTEM IN BAMBOO

BAMBOO STRUCTURE WITH B1 BEAMS

ROOF GRID SYSTEM S.B./A‐09 09
COMPONENT D – SECONDARY FRAMING SYSTEM/JOINERY DETAILS

DETAIL A DETAIL B

HOLES ARE DRILLED INTO THE 
STAGGERED BAMBOO AND 
STEEL/WOODEN PINS ARE INTSERTED  FOR JOINING TWO BAMBOOS PERPENDICULAR TO 
INTO THEM.  EACH OTHER, A WOODEN STAKE IS INSERTED 
1.
THEY ARE THEN TIED BY A  THREAD FOR  INTO ONE, AND THEY’RE TIED TOGETHER WITH 
ADDITIONAL SUPPORT. THIS IS FURTHER  THE HELP OF A ROPE.
TIED TO THE MAIN BAMBOO STRUCT.
2.

ROOF GRID SYSTEM S.B./A‐10 10
COMPONENT E – FINAL ROOF SYSTEM

1. BABMOO CHATAI SYSTEM. SIZE 5Ft X 3FT

2. TARPAULIN SHEET FOR WATERPROOFING
3. BAMBOO CHATAI SYSTEM. SIZE 5Ft X 3FT

SECONDARY BAMBOO RAFTER SYSTEM

MAIN STRUCTURE – B1

INSULATION LAID OVER BAMBOO CHATAI

BABMOO CHATAI SYSTEM. SIZE 5Ft X 3FT
LAID OVER THE 3FT X 5 FT BAMBOO GRID

A BAMBOO CHATAI SYSTEM IS PROPOSED FOR FINAL ROOFING. A 
TARPAULIN SHEET IS SANDWICHED BETWEEN TWO BAMBOO 
CHATAI SYSTEMS FOR WATERPROOFING PURPOSES. THE BAMBOO 
IS ANCHORED TO THE BAMBOO RAFTERS

ROOF SYSTEM S.B./A‐11 11
ROOFING DETAIL DETAIL A

COMPONENT E: FINAL ROOF SYSTEM (BAMBOO 
CHATAI OVER TARPAULIN OVER BAMBOO CHATAI)

COMPONENT D: STAGGERED BAMBOO GRID

COMPONENT A: MAIN STRUCTURAL BAMBOO
BEAM – B1, CREATING AN
AIR POCKET

COMPONENT B: BAMBOO CHATAI 
ANCHORED TO SECONDARY BAMBOO GRID
COMPONENT C: 150 THICK PUF INSULATION
OVER BAMBOO CHATAI

FILLER BAMBOO MEMBERS

MS L‐ANGLE TO FIX BAMBOO BEAMS 
TO BASE

DETAIL A

ROOF SYSTEM S.B./A‐12 12