Sunteți pe pagina 1din 2

2/6/2020 Design-Build ADOT Loop 202 South Mountain Freeway - Fluor

Projects

A Fluor managed limited liability company (LLC) was awarded a design-


Client
build and maintain project by the Arizona Department of
Arizona Department of Transportation (ADOT)
Transportation (ADOT) to complete work on the largest highway
Location project in the state's history. The LLC is providing design, construction
Phoenix, AZ, U.S. and 30 years of maintenance services for the Loop 202 South Mountain
Freeway. This project is the rst freeway project procured under
ADOT Loop 202 South Arizona's public-private-partnership (P3) statute and ADOT's rst
design-build-maintain project ever. The project is located in the
Mountain Freeway
Phoenix metropolitan area and is funded by a combination of Regional
Area Road Fund revenues, Highway User Revenue Fund revenues and
federal funds dedicated to the Maricopa County region and ADOT.

The project includes 46 new bridges, 15 interchanges, 12 miles of


sound wall and 22 miles of the new 202 freeway, as well as 4.5 miles of
tie-in freeway work in the I-10 Papago Segment.

Client's Challenge
ADOT's plans called for the Loop 202 South Mountain Freeway Project ADOT's goal was for the project to be completed safely, ahead of
to deliver 22 miles of improved mobility via four lanes in each direction schedule, on-budget and designed with long-term maintenance in-
– three general-use lanes and one High-Occupancy Vehicle lane – and mind while maintaining excellent stakeholder relations.
to include modern features of rubberized asphalt and aesthetics that
re ect nearby communities.

https://www.fluor.com/projects/design-build-loop-202-freeway-p3-arizona 1/2
2/6/2020 Design-Build ADOT Loop 202 South Mountain Freeway - Fluor

Fluor's Solution
The Fluor-led LLC, Connect 202 Partners, is a design-build and <
maintenance partnership comprised of Fluor Enterprises Inc., Granite Fluor managed over 120 subcontractors, including small, local and
Construction Co., Ames Construction Inc., Parsons Brinckerho Inc. as disadvantaged business enterprises supporting the project through
the lead designer, and Fluor and DBi Services, LLC, providing the long- design and engineering support, tra c control, security, hauling
term maintenance. ADOT funded the project's capital costs with a services, demolition, clearing operations, landscaping and other scopes
combination of available public funds from sales tax revenues and tax- of work as outlined by the contract with ADOT. A series of public
exempt bonds. Fluor booked the project in the rst quarter of 2016. outreach meetings were held along the corridor to obtain feedback
and garner public support for the project. The project also allowed for
Freeway construction began September 2016 with crews widening the extensive rst responder and military training in abandoned
shoulders and extending the existing Loop 202 high-occupancy commercial and residential buildings purchased by ADOT that will be
vehicle lanes from Pecos Road near 48th Street to the I-10/Loop 202 demolished by the Fluor-led joint venture.
interchange. This initial phase was completed prior to mainline freeway
construction, which began in early 2017. In November 2018, Connect 202 Partners was named as part of the
esteemed Arizona Million Dollar Circle of Excellence (MDCE). The
Over 1,400 construction workers were on site at peak, approximately Arizona MDCE recognizes businesses that lead the way in supplier
500 of which were self-perform LLC employees. The team conducted
diversity in the state of Arizona by spending more than $1 million
extensive safety training for all project employees, and the project
annually with women and minority business enterprises.
achieved more than 5.5 million work hours without a lost-time incident.
Fluor o ces in Aliso Viejo, California; Dallas, Texas; and Greenville, South Fluor-DBi's maintenance personnel were actively involved with the
Carolina supported the project. design and construction teams to optimize the design while reducing
the long-term maintenance costs on the project. Fluor and DBi
The LLC self-performed earthwork, drainage, bridge construction, and Services, LLC, will maintain the lanes for 30 years with oversight from
asphalt paving, and managed the other aspects of the project ADOT.
including noise walls, overhead signage and intelligent transportation
system infrastructure for this project.

Conclusion
A Fluor-led LLC was chosen by ADOT to provide design, construction Construction began in 2016, and the project o cially opened to tra c
and maintenance services for the Loop 202 South Mountain Freeway. in December 2019.
This is the largest highway project in Arizona's history.