November 16, 2016 45


Welcome!

PURPOSE OF TODAY�S MEETING


Ŷ To obtain public input on preliminary design plans for the Loop 202
(South Mountain Freeway) Project
Ŷ Not to debate project alignment and “build or no build” options
¿QDOL]HGGXULQJHQYLURQPHQWDOSKDVH

AGENDA
6 - 6:30 p.m. Visit information stations and speak one-on-one with
project representatives

6:30 - 7:30 p.m. Formal presentation followed by brief Q& A

7:30 - 8 p.m. Visit information stations and speak one-on-one with


project representatives

YOUR INPUT IS IMPORTANT TO US!


Ŷ Submit your comments at today’s meeting
Ɣ Speak to project representatives in person
Ɣ Write your comments on the forms provided and hand them to a
project team member
Ŷ Send us your comments
Ɣ Email: southmountainfreewayinfo@ c202p.com
Ɣ Project website: southmountainfreeway.com
Ŷ Mail your comments to us at the following address
Ɣ South Mountain Freeway Project Team; 411 N. Roosevelt Ave.
Chandler, AZ 85226
Ŷ Call us at the project hotline:
Ɣ 1.855.SMF.L202 (1.855.SMF.L202) / Para españ ol: 623.239.4558

November 16, 2016 46


Construction Segments
and Schedule

75th Ave.

67th Ave.

59th Ave.

51st Ave.

43rd Ave.
SR
17
51 LEGEND
Roosevelt 10 SR 202L Alignment
South Mountain Freeway
Van Buren
Interchange Locations
UPRR I-10 Papago Downtown 10
Phoenix Gila River Indian Community
Buckeye Rd. Segment
nal
RID Ca 17
Lower Buckeye Rd.
Elwood
Broadway Rd. 10
Salt River

Southern Ave. Phoenix


Salt River 60
Baseline Rd. Segment
C
LAC
Dobbins Rd.

Elliot Rd.

South Mountain Park


Estrella Dr.
Center Pecos
51st Ave. Segment Segment 10
Ivanhoe St.
Gila River
Indian Community
LOOP

202
17th Ave.

Desert
Foothills
Pkwy.

24th St.

32nd St.

40th St.

2016 2017 2018 2019


WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL

PROJECT SCHEDULE OVERVIEW

Design Phase and


Preconstruction Activities

Utility Relocation

Construction Phase*

PUBLIC INVOLVEMENT OPPORTUNITIES*


Public Meetings to Obtain Input Pecos, Salt River Center
on Preliminary Design Plans and I-10 Segments Segment

Public Meetings to Share


Final Plans, Present Pecos, Salt River Center
Construction Information and and I-10 Segments Segment
Introduce Construction Managers

* Notes:
1. Preliminary Schedule � Subject to Change.
2. Due to the nature of the design-build project delivery method being used for the South Mountain Freeway Project and the fact that it is a 22-mile project, construction activities will occur in multiple locations
within each construction segment during the construction phase.

November 16, 2016 47


Landscaping and
Aesthetic Design Concepts

Five Different Character Areas for Landscape Architectural Design

Five Unique Aesthetic Areas

November 16, 2016 48


Landscape and Aesthetics

Noise

Right-of-Way

Diverging Diamond Interchange

ADOT Title VI Notice

November 16, 2016 49


APPENDIX H:
Preliminary Design
Public Input Meetings Presentation

November 16, 2016 50

S-ar putea să vă placă și