Documente Academic
Documente Profesional
Documente Cultură
C.C.S. INTERNATIONAL
EIAI1UP001-AAI-LKO-004
AIRPORT, LUCKNOW
Document: Rev
Cable Schedule R0
Made by Checked by Approved by Date
Divya.S Tanuj.M Vikas.b 03 September 2019
REF. Main HV/LV SLDs and Terminal Building & Service Yard Layout Drawing
LUCKNOW AIRPORT
CABLE SCHEDULE - TERMINAL BUILDING &
SERVICES YARD
Note:
Cable lengths are as per cable routing layout and the actual lengths of cables may vary as per site conditions, so the same shall be
considered by contractor.
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - SERVICE YARD & HV PANELS
Check
Total
Expected Max. Cable/ Cable size System Current Effective whether Resistance Reactance Total Voltage % Voltage % Voltage
Connected Cable Derating No. of Cable
Sr. No. From To Maximum current Duct length adopted Voltage capacity current Col-11 is in Ohm/ Cos φ in Ohm/ Sin φ Length of drop in drop (in drop upto
Load in runs factor Termination
Load in kW (Amps) in mtr. mm2 in Volts Amps capacity more than km km Cable (m) Volts segment) last point
kW
Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16 17 18 19 20 21
33kv HT Panel Board Main
3C x 300
1 33kV HT Meter Receiving Substation Near Meter 12600.0 12600.0 244.9 15 33000 2 350 0.80 560.00 Yes 0.13 0.90 0.111 0.436 4.00 30.00 0.53 0.002 0.00
(33KV)
Room
Bus - 1,
Existing Terminal - 2 900.0 900.0 52.5 1030 3C x 300 11000 1 355 0.80 284.00 Yes 0.13 0.90 0.083 0.436 2.00 1030.00 14.34 0.130 0.17
Feeder - 1
11kV HT Panel Board Change
Bus - 1,
Over Panel - 1, Panel Feeder - 2 4800.0 4800.0 279.9 25 3C x 300 11000 1 355 0.80 284.00 Yes 0.13 0.90 0.083 0.436 2.00 25.00 1.86 0.017 0.06
Feeder - 2
Location:-Service Yard
11kV HT Panel Board - HVAC/
Bus - 2,
11kV Main HT Service Yard, 3600.0 3600.0 210.0 30 3C x 300 11000 1 355 0.80 284.00 Yes 0.13 0.90 0.083 0.436 2.00 30.00 1.67 0.015 0.06
Feeder - 1
Panel Board, Bus - 2, Panel Feeder - 3
7 11kV HT Panel Board - HVAC/
Location : Service Bus - 3,
Yard Service Yard, 3600.0 3600.0 210.0 25 3C x 300 11000 1 355 0.80 284.00 Yes 0.13 0.90 0.083 0.436 2.00 25.00 1.39 0.013 0.05
Feeder - 5
Bus - 3, Panel Feeder - 3,
11kV HT Panel Board Change
Bus - 3,
Over Panel - 2, Panel Feeder - 4 4800.0 4800.0 279.9 30 3C x 300 11000 1 355 0.80 284.00 Yes 0.13 0.90 0.083 0.436 2.00 30.00 2.23 0.020 0.06
Feeder - 6
Location:-Service Yard
2000KVA, 11/0.433 kV, Oil Type Main LT Panel Feeder - 2, Bus - 1 3200A Bus
19 1710.0 1710.0 2400.1 50 433 1 3200 0.90 2880.00 Yes 0.02 0.95 0.006 0.312 2.00 50.00 4.07 0.940 0.94
Transformer-1 (HVAC/Service Yard) Duct
2000KVA, 11/0.433 kV, Oil Type Main LT Panel Feeder - 2, Bus - 2 3200A Bus
20 1710.0 1710.0 2400.1 45 433 1 3200 0.90 2880.00 Yes 0.02 0.95 0.006 0.312 2.00 45.00 3.66 0.846 0.85
Transformer-2 (HVAC/Service Yard) Duct
2000KVA, 11/0.433 kV, Oil Type Main LT Panel Feeder - 3, Bus -3 3200A Bus
21 1710.0 1710.0 2400.1 30 433 1 3200 0.90 2880.00 Yes 0.02 0.95 0.006 0.312 2.00 30.00 2.44 0.564 0.56
Transformer-3 (HVAC/Service Yard) Duct
DG Aux. Panel-1 165.0 165.0 255.1 86.00 3.5C x 300 433 2 461 0.80 737.60 Yes 0.13 0.90 0.071 0.436 4.00 172.00 2.81 0.648 1.59
1600A Bus
Chiller - 1 (Working) 630.0 630.0 1314.7 35.00 433 1 1600 0.90 1440.00 Yes 0.04 0.80 0.011 0.600 2.00 35.00 2.92 0.674 1.61
Duct
1600A Bus
Chiller - 3 (Working) 630.0 630.0 1314.7 35.00 433 1 1600 0.90 1440.00 Yes 0.04 0.80 0.011 0.600 2.00 35.00 2.92 0.674 1.61
Duct
Bus - 1
WTP Feeder - 2 (Stand By) 195.0 80.6 339.1 41.00 3.5C x 300 433 1 461 0.80 368.80 Yes 0.13 0.80 0.071 0.600 2.00 41.00 3.52 0.814 1.75
Fire Fighting Panel Feeder - 2 210.0 200.0 365.2 45.00 3.5C x 240 433 2 402 0.80 643.20 Yes 0.16 0.80 0.072 0.600 4.00 90.00 2.46 0.568 1.51
1000A Bus
HWG - 3 (Working) 500.0 500.0 869.5 20.00 433 1 1000 0.90 900.00 Yes 0.07 0.80 0.017 0.600 2.00 20.00 1.88 0.434 1.37
Duct
Service Yard L&P Panel 47.3 47.3 73.1 20.00 3.5C x 70 433 1 176 0.80 140.80 Yes 0.57 0.90 0.077 0.436 2.00 20.00 1.38 0.318 1.26
External Development 50.0 30.0 46.4 70.00 3.5C x 185 433 1 339 0.80 271.20 Yes 0.21 0.90 0.072 0.436 2.00 70.00 1.24 0.287 1.23
Main LT Panel.
22 Location:
HVAC/Service Yard 800A Bus
Capacitor Panel - 2 (400 KVAR) 400.0 556.5 25.00 433 1 800 0.90 720.00 Yes 0.08 0.90 0.021 0.436 2.00 25.00 1.94 0.447 1.29
Duct
1000A Bus
HWG - 2 (Working) 500.0 500.0 869.5 17.00 433 1 1000 0.90 900.00 Yes 0.07 0.80 0.017 0.600 2.00 17.00 1.60 0.369 1.21
Duct
HVAC Pump Panel Feeder - 2 1600A Bus
780.0 780.0 1356.5 17.00 433 1 1600 0.90 1440.00 Yes 0.04 0.80 0.011 0.600 2.00 17.00 1.46 0.338 1.18
(Stand By) Duct
Bus - 2 WTP Feeder - 1 (Working) 195.0 80.6 339.1 51.00 3.5C x 300 433 1 461 0.80 368.80 Yes 0.13 0.80 0.071 0.600 2.00 51.00 4.38 1.012 1.86
STP 229.4 151.8 264.0 110.00 3.5C x 300 433 2 461 0.80 737.60 Yes 0.13 0.80 0.071 0.600 4.00 220.00 3.68 0.850 1.70
Fire Fighting Panel Feeder - 1 200.0 200.0 347.8 47.00 3.5C x 240 433 2 402 0.80 643.20 Yes 0.16 0.80 0.072 0.600 4.00 94.00 2.45 0.565 1.41
Service Yard Ventilation Panel 69.5 69.5 107.4 30.00 3.5C x 70 433 1 176 0.80 140.80 Yes 0.57 0.90 0.077 0.436 2.00 30.00 3.04 0.701 1.55
2000A Bus
Capacitor Panel - 3 (1000 KVAR) 1000.0 1391.2 20.00 433 1 2000 0.90 1800.00 Yes 0.03 0.90 0.008 0.436 2.00 20.00 1.54 0.355 0.92
Duct
1600A Bus
Chiller - 2 (Working) 630.0 630.0 1314.7 35.00 433 1 1600 0.90 1440.00 Yes 0.04 0.80 0.011 0.600 2.00 35.00 2.92 0.674 1.24
Duct
1600A Bus
Chiller - 4 (Stand By) 630.0 630.0 1314.7 35.00 433 1 1600 0.90 1440.00 Yes 0.04 0.80 0.011 0.600 2.00 35.00 2.92 0.674 1.24
Duct
Bus - 3
HVAC Pump Panel Feeder - 1 1600A Bus
789.0 789.0 1372.1 19.00 433 1 1600 0.90 1440.00 Yes 0.04 0.80 0.011 0.600 2.00 19.00 1.65 0.382 0.95
(Working) Duct
1000A Bus
HWG - 1 (Working) 500.0 500.0 869.5 20.00 433 1 1000 0.90 900.00 Yes 0.07 0.80 0.017 0.600 2.00 20.00 1.88 0.434 1.00
Duct
1000A Bus
DG Aux. Panel-2 150.5 150.5 261.7 76.00 433 1 1000 0.90 900.00 Yes 0.07 0.80 0.017 0.600 2.00 76.00 2.15 0.496 1.06
Duct
PMS Pump Set- 1 (Working) 3.0 3.0 5.2 31.00 3C x 4 433 1 30 0.80 24.00 Yes 9.48 0.80 0.098 0.600 2.00 31.00 2.14 0.494 1.44
HW Pump - 1 (Working)
15.0 15.0 26.1 22.00 3C X 10 433 2 53 0.80 84.80 Yes 3.94 0.80 0.084 0.600 4.00 44.00 1.59 0.368 1.31
(Sd Starter)
HW Pump - 3 (Working)
15.0 15.0 26.1 25.00 3C X 10 433 2 53 0.80 84.80 Yes 3.94 0.80 0.084 0.600 4.00 50.00 1.81 0.418 1.36
(Sd Starter)
CHW Secondary Pump - 1
75.0 75.0 130.4 36.00 3C x 95 433 1 221 0.80 176.80 Yes 0.41 0.80 0.074 0.600 2.00 36.00 3.04 0.701 1.65
(Working) VFD
HVAC Pumps Panel
CHW Secondary Pump - 3
23 Loc: Service Yard 75.0 75.0 130.4 39.00 3C x 95 433 1 221 0.80 176.80 Yes 0.41 0.80 0.074 0.600 2.00 39.00 3.29 0.759 1.71
(Working) VFD
AC Plant Room
Cooling Tower - 3, F-1 (Working) 37.0 37.0 64.3 84.00 3C x 35 433 2 117 0.80 187.20 Yes 1.11 0.80 0.080 0.600 4.00 168.00 4.38 1.012 2.20
Cooling Tower - 3, F-2 (Working) 37.0 37.0 64.3 86.00 3C x 35 433 2 117 0.80 187.20 Yes 1.11 0.80 0.080 0.600 4.00 172.00 4.49 1.036 2.22
Cooling Tower - 4, F-1 (Stand By) 37.0 37.0 64.3 93.00 3C x 35 433 2 117 0.80 187.20 Yes 1.11 0.80 0.080 0.600 4.00 186.00 4.85 1.120 2.30
Cooling Tower - 4, F-2 (Stand By) 37.0 37.0 64.3 93.00 3C x 35 433 2 117 0.80 187.20 Yes 1.11 0.80 0.080 0.600 4.00 186.00 4.85 1.120 2.30
PMS Pump Set - 2 (Working) 3.0 3.0 5.2 31.00 3C x 4 433 1 30 0.80 24.00 Yes 9.48 0.80 0.098 0.600 2.00 31.00 2.14 0.494 1.68
HW Pump - 2 (Working) 15.0 15.0 26.1 24.00 3C X 10 433 2 53 0.80 84.80 Yes 3.94 0.80 0.084 0.600 4.00 48.00 1.74 0.401 1.58
Bus - 2 HW Pump - 4 (Stand By) 15.0 15.0 26.1 26.00 3C X 10 433 2 53 0.80 84.80 Yes 3.94 0.80 0.084 0.600 4.00 52.00 1.88 0.434 1.62
CDW Pump - 2 (Working) 75.0 75.0 130.4 45.00 3C x 95 433 2 221 0.80 353.60 Yes 0.41 0.80 0.074 0.600 4.00 90.00 1.90 0.438 1.62
CDW Pump - 3 (Working) 75.0 75.0 130.4 46.00 3C x 95 433 2 221 0.80 353.60 Yes 0.41 0.80 0.074 0.600 4.00 92.00 1.94 0.448 1.63
AC Plant Room Fan - 2 11.0 11.0 19.1 50.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 50.00 5.30 1.225 2.77
AC Plant Room Fan - 3 11.0 11.0 19.1 70.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 70.00 7.43 1.715 3.26
AC Plant Room Fan - 4 11.0 11.0 19.1 70.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 70.00 7.43 1.715 3.26
33kV Room - Fan - 1 1.5 1.5 2.6 80.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 80.00 1.16 0.267 1.81
33kV Room - Fan - 2 3.7 3.7 6.4 95.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 95.00 3.39 0.783 2.33
24 Service Yard Ventilation Panel
11kV Room, Fan - 1 5.5 5.5 9.6 50.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 50.00 2.65 0.613 2.16
11kV Room, Fan - 1 5.5 5.5 9.6 65.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 65.00 3.45 0.796 2.34
AC Plant Air Washer Pump 3.0 3.0 5.2 50.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 50.00 1.45 0.334 1.88
AHU-4 11KV Room 2.2 2.2 3.8 55.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 55.00 1.17 0.270 1.82
AHU-5 LT Panel Room 3.0 3.0 5.2 32.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 32.00 0.93 0.214 1.76
AHU-6 Office 1.1 1.1 1.9 40.00 3C x 10 433 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 40.00 0.42 0.098 1.64
EMDB Sy 4C x 16
26 UPS 2.4 2.4 3.7 30.00 433 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 30.00 0.26 0.060 1.58
(Ser. Yard) Cu.
TERMINAL BUILDING
2500KVA, 11/0.433 kV, Dry Type Main LT Panel Feeder - 1, Bus - 1 4000A Bus
31 2250.0 2250.0 3000.2 50 433 1 4000 0.90 3600.00 Yes 0.02 0.90 0.004 0.436 2.00 50.00 4.15 0.958 0.96
Transformer-1 (T-3 Basement) Duct
2500KVA, 11/0.433 kV, Dry Type Main LT Panel Feeder - 2, Bus - 2 4000A Bus
32 2250.0 2250.0 3000.2 38 433 1 4000 0.90 3600.00 Yes 0.02 0.90 0.004 0.436 2.00 38.00 3.15 0.728 0.73
Transformer-2 (T-3 Basement) Duct
2500KVA, 11/0.433 kV, Dry Type Main LT Panel Feeder - 3, Bus - 3 4000A Bus
33 2250.0 2250.0 3000.2 25 433 1 4000 0.90 3600.00 Yes 0.02 0.90 0.004 0.436 2.00 25.00 2.07 0.479 0.48
Transformer-3 (T-3 Basement) Duct
33/11kV, 6.3MVA
34 Power Star Point Neutral Grounding Panel 45 1C x 185 11000 1 1.000 2.00 45.00
Transformer - 1
33/11kV, 6.3MVA
35 Power Star Point Neutral Grounding Panel 42 1C x 185 11000 1 1.000 2.00 42.00
Transformer - 2
33/11kV, 6.3MVA
36 Power Star Point Neutral Grounding Panel 30 1C x 185 11000 1 1.000 2.00 30.00
Transformer - 3
D.G. Neutral
37 11kV, D.G. Set - 1 Neutral Grounding Panel 27 1C x 185 11000 1 1.000 2.00 27.00
Point
D.G. Neutral
38 11kV, D.G. Set - 2 Neutral Grounding Panel 32 1C x 185 11000 1 1.000 2.00 32.00
Point
D.G. Neutral
39 11kV, D.G. Set - 3 Neutral Grounding Panel 37 1C x 185 11000 1 1.000 2.00 37.00
Point
D.G. Neutral
40 11kV, D.G. Set - 4 Neutral Grounding Panel 45 1C x 185 11000 1 1.000 2.00 45.00
Point
D.G. Neutral
41 11kV, D.G. Set - 5 Neutral Grounding Panel 53 1C x 185 11000 1 1.000 2.00 53.00
Point
D.G. Neutral
42 11kV, D.G. Set - 6 Neutral Grounding Panel 55 1C x 185 11000 1 1.000 2.00 55.00
Point
316.00 10137.00
Note: Cable lengths are as per cable routing layout and the actual lengths of cables may vary as per site conditions, so the same shall be considered by contractor.
800A Bus
Main LT Panel. Bus - 2 (Basement) Capacitor Panel - 2 400.0 400.0 533.4 15 415 1 800 0.90 720.00 Yes 0.08 0.80 0.02 0.60 2.00 15.00 1.05 0.25 0.98
Duct
3200A Bus
Main LT Panel. Bus - 2 (Basement) Main Emergency LT Panel, Feeder - 3 1700.0 1700.0 2627.9 16 415 1 3000 0.90 2700.00 Yes 0.02 0.90 0.01 0.44 2.00 16.00 1.41 0.34 1.07
Duct
Main LT Panel. Bus - 2 (Basement) Pump Panel 50.0 50.0 77.3 18 3.5C x 50 415 1 140 0.80 112.00 Yes 0.82 0.90 0.08 0.44 2.00 18.00 1.86 0.45 1.18
1000A Bus
Main LT Panel. Bus - 2 (Basement) BHS Feeder (Future) 300.0 300.0 521.7 58 415 1 1000 0.90 900.00 Yes 0.07 0.80 0.02 0.60 2.00 58.00 3.27 0.79 1.52
Duct
2500A Bus
Main LT Panel. Bus - 3 (Basement) Capacitor Panel - 3 1200.0 1200.0 1600.1 15 415 1 2500 0.90 2250.00 Yes 0.02 0.80 0.01 0.60 2.00 15.00 0.88 0.21 0.69
Duct
3200A Bus
Main LT Panel. Bus - 3 (Basement) Main Emergency LT Panel, Feeder - 2 1700.0 1700.0 2627.9 18 415 1 3000 0.90 2700.00 Yes 0.02 0.90 0.01 0.44 2.00 18.00 1.58 0.38 0.86
Duct
1250A Bus
Main LT Panel. Bus - 3 (Basement) Main AHU Panel - 1, Feeder - 2 761.4 685.2 1015.2 72 415 1 1250 0.90 1125.00 Yes 0.05 0.90 0.01 0.44 2.00 72.00 6.70 1.61 2.09
Duct
Main Lighting Panel Feeder - 2 1250A Bus
Main LT Panel. Bus - 3 (Basement) 437.0 350.0 541.0 25 415 1 1250 0.90 1125.00 Yes 0.05 0.90 0.01 0.44 2.00 25.00 1.24 0.30 0.78
Loc: Bas. Mezz Duct
Main Power Panel Feeder -2 1600A Bus
Main LT Panel. Bus - 3 (Basement) 676.6 606.3 937.2 32 415 1 1600 0.90 1440.00 Yes 0.04 0.90 0.01 0.44 2.00 32.00 2.00 0.48 0.96
Loc: Bas. Mezz LT Panel Rm Duct
1000A Bus
Main LT Panel. Bus - 3 (Basement) BHS Panel Feeder - 2 300.0 300.0 417.4 58 415 1 1000 0.90 900.00 Yes 0.07 0.80 0.02 0.60 2.00 58.00 2.61 0.63 1.11
Duct
1000A Bus
Main LT Panel. Bus - 3 (Basement) Retail Meter Board, Feeder - 2 500.0 500.0 869.5 65 415 1 1000 0.90 900.00 Yes 0.07 0.80 0.02 0.60 2.00 65.00 6.10 1.47 1.95
Duct
1000A Bus
Main LT Panel. Bus - 3 (Basement) Main PBB Panel Feeder - 2 560.0 448.0 692.5 65 415 1 1000 0.90 900.00 Yes 0.07 0.90 0.02 0.44 2.00 65.00 5.15 1.24 1.72
Duct
Main Lift & Esc. Panel, Feeder - 2 1000A Bus
Main LT Panel. Bus - 3 (Basement) 596.5 483.2 746.9 70 415 1 1000 0.90 900.00 Yes 0.07 0.90 0.02 0.44 2.00 70.00 5.98 1.44 1.92
Loc: Bas. Mezz
Duct
ELV Panel, Feeder - 2
Main LT Panel. Bus - 3 (Basement) 126.0 126.0 194.8 118 3.5C x 240 415 1 402 0.80 321.60 Yes 0.16 0.90 0.07 0.44 2.00 118.00 6.98 1.68 2.16
Secondary Data Centre
MAIN EMERGENCY PANEL
3200A Bus
Main Smoke Ext. Panel Feeder - 1 1313.9 1313.9 2285.0 22 415 1 3200 0.90 2880.00 Yes 0.02 0.80 0.01 0.60 2.00 22.00 1.60 0.38 1.64
Duct
1250A Bus
UPS Input Panel Feeder - 1 600.0 600.0 927.5 50 415 1 1250 0.90 1125.00 Yes 0.05 0.90 0.01 0.44 2.00 50.00 4.25 1.02 2.28
Duct
Bus-1
Basement Ventilation Panel - 1 154.6 154.6 239.0 95 3.5C x 240 415 1 402 0.80 321.60 Yes 0.16 0.90 0.07 0.44 2.00 95.00 6.96 1.68 2.93
Pressurization Panel - 1 44.0 44.0 68.0 170 3.5C x 120 415 1 258 0.80 206.40 Yes 0.33 0.90 0.07 0.44 2.00 170.00 6.49 1.56 2.82
VTPN DB - 1 (Sump) 14.9 14.9 23.1 75 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.08 0.44 2.00 75.00 4.26 1.03 3.66
Basement Ventilation Panel - 3 135.0 135.0 208.7 145 3.5C x 240 415 1 402 0.80 321.60 Yes 0.16 0.90 0.07 0.44 2.00 145.00 9.28 2.24 3.30
Main Emergency
Basement Ventilation Panel - 4 180.0 180.0 278.2 80 3.5C x 240 415 2 402 0.80 643.20 Yes 0.16 0.90 0.07 0.44 4.00 160.00 3.41 0.82 1.89
Panel
Loc: - Basement
Bus-2 Pressurization Panel - 2 38.5 38.5 59.5 90 3.5C x 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.08 0.44 2.00 90.00 5.05 1.22 2.28
Mezannine
VTPN DB - 2 (Sump) 20.1 20.1 31.1 210 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.07 0.44 2.00 210.00 4.55 1.10 3.74
ELV Panel, Feeder - 1
150.0 150.0 231.9 200 3.5C x 300 415 1 461 0.80 368.80 Yes 0.13 0.90 0.07 0.44 2.00 200.00 11.72 2.82 3.89
Primary Data Centre
MAIN PANELS 7
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOWLUCKNOW AIRPORT Date : 28th Aug' 2019
CABLE SCHEDULE - MAIN PANELS
TERMINAL BUILDING
Cable/
Total Expected Max. System Current Effective Check whether Reactance Voltage % Voltage
Duct Cable size Derating Resistance No. of Cable Total Length of % Voltage drop
Sr. No. From To Connected Maximum current Voltage in Cable runs capacity current Col-11 is more Cos φ in Sin φ drop in drop (in
length in adopted mm2 factor in Ohm/km Termination Cable (m) upto last point
Load in kW Load in kW (Amps) Volts Amps capacity than Col-5 Ohm/km Volts segment)
mtr.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16 17 18 19 20 21
3200A Bus
Main Smoke Ext. Panel Feeder - 2 1313.9 1313.9 2285.0 22 415 1 3200 0.90 2880.00 Yes 0.02 0.80 0.01 0.60 2.00 22.00 1.60 0.38 1.24
Duct
1250A Bus
UPS Input Panel Feeder - 2 600.0 600.0 927.5 50 415 1 1250 0.90 1125.00 Yes 0.05 0.90 0.01 0.44 2.00 50.00 4.25 1.02 1.88
Duct
Bus-3
Basement Ventilation Panel - 2 222.0 222.0 343.2 150 3.5C x 300 415 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 300.00 6.59 1.59 2.45
Pressurization Panel - 3 49.5 49.5 76.5 170 3.5C x 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.08 0.44 2.00 170.00 12.25 2.95 3.81
MAIN AHU PANEL
AHU Panel - 1, Feeder - 1
Main AHU Panel, Bus - 1 87.8 87.8 135.7 196 3.5C x 185 415 1 339 0.80 271.20 Yes 0.21 0.90 0.07 0.44 2.00 196.00 10.20 2.46 5.10
Departure
AHU Panel - 2, Feeder - 1
Main AHU Panel, Bus - 1 74.7 74.7 115.5 106 3.5C x 120 415 1 258 0.80 206.40 Yes 0.33 0.90 0.07 0.44 2.00 106.00 6.87 1.65 4.29
Departure
AHU Panel - 4, Feeder - 1
Main AHU Panel, Bus - 1 50.2 50.2 77.6 206 3.5C x 185 415 1 339 0.80 271.20 Yes 0.21 0.90 0.07 0.44 2.00 206.00 6.13 1.48 4.12
Departure
AHU Panel - 5, Feeder - 1
Main AHU Panel, Bus - 1 89.0 89.0 137.6 236 3.5C x 240 415 2 402 0.80 643.20 Yes 0.16 0.90 0.07 0.44 4.00 472.00 4.98 1.20 3.84
Departure
AHU Panel - 1, Feeder - 1
Main AHU Panel, Bus - 1 71.1 71.1 109.8 272 3.5C x 300 415 1 461 0.80 368.80 Yes 0.13 0.90 0.07 0.44 2.00 272.00 7.64 1.84 4.48
Mezz
AHU Panel - 2, Feeder - 1
Main AHU Panel, Bus - 1 27.5 27.5 42.5 232 3.5C x 240 415 1 402 0.80 321.60 Yes 0.16 0.90 0.07 0.44 2.00 232.00 3.03 0.73 3.37
Mezz
AHU Panel - 3, Feeder - 1
Main AHU Panel, Bus - 1 47.6 47.6 73.6 192 3.5C x 185 415 1 339 0.80 271.20 Yes 0.21 0.90 0.07 0.44 2.00 192.00 5.39 1.30 3.94
Mezz
AHU Panel - 4, Feeder - 1
Main AHU Panel, Bus - 1 57.2 57.2 88.4 222 3.5C x 185 415 1 339 0.80 271.20 Yes 0.21 0.90 0.07 0.44 2.00 222.00 7.52 1.81 4.45
Mezz
AHU Panel -1, Basement
Main AHU Panel, Bus - 1 121.0 121.0 187.0 92 3.5C x 300 415 1 461 0.80 368.80 Yes 0.13 0.90 0.07 0.44 2.00 92.00 4.40 1.06 3.70
INT. & DOM BRH, Feeder - 1
AHU Panel -2,
Main AHU Panel, Bus - 1 9.0 9.0 13.9 32 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.08 0.44 2.00 32.00 1.10 0.26 2.90
Basement Substation Area, Feeder - 1
AHU Panel - 1, Feeder - 1
Main AHU Panel, Bus - 2, 59.6 59.6 92.1 186 3.5C x 300 415 1 339 0.80 271.20 Yes 0.13 0.90 0.07 0.44 2.00 186.00 4.38 1.06 3.70
Arrival
AHU Panel - 2, Feeder - 1
Main AHU Panel, Bus - 2, 66.7 66.7 103.1 86 3.5C x 185 415 1 258 0.80 206.40 Yes 0.21 0.90 0.07 0.44 2.00 86.00 3.40 0.82 3.46
Arrival
Lift & Esc. Panel - 1 195.0 195.0 301.4 276 3.5C x 300 415 4 461 0.80 1475.20 Yes 0.13 0.90 0.07 0.44 8.00 1104.00 5.32 1.28 3.68
Lift & Esc. Panel - 2 121.0 121.0 187.0 162 3.5C x 300 415 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 324.00 3.88 0.93 3.33
Main Lift & Esc. Panel Lift & Esc. Panel - 3 98.5 98.5 152.3 226 3.5C x 300 415 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 452.00 4.40 1.06 3.46
Lift & Esc. Panel - 4 108.0 108.0 166.9 106 3.5C x 300 415 1 461 0.80 368.80 Yes 0.13 0.90 0.07 0.44 2.00 106.00 4.53 1.09 3.49
Lift & Esc. Panel - 5 74.0 74.0 114.4 186 3.5C x 185 415 2 339 0.80 542.40 Yes 0.21 0.90 0.07 0.44 4.00 372.00 4.08 0.98 3.38
MAIN PANELS 8
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOWLUCKNOW AIRPORT Date : 28th Aug' 2019
CABLE SCHEDULE - MAIN PANELS
TERMINAL BUILDING
Cable/
Total Expected Max. System Current Effective Check whether Reactance Voltage % Voltage
Duct Cable size Derating Resistance No. of Cable Total Length of % Voltage drop
Sr. No. From To Connected Maximum current Voltage in Cable runs capacity current Col-11 is more Cos φ in Sin φ drop in drop (in
length in adopted mm2 factor in Ohm/km Termination Cable (m) upto last point
Load in kW Load in kW (Amps) Volts Amps capacity than Col-5 Ohm/km Volts segment)
mtr.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16 17 18 19 20 21
MAIN RETAIL METER BOARD PANEL
Meter Board - 3, Departure 200.0 200.0 278.2 227 3.5C x 300 433 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 454.00 8.08 1.87 4.29
Meter Board - 1, Departure 50.0 50.0 69.6 193 3.5C x 185 433 2 339 0.80 542.40 Yes 0.21 0.90 0.07 0.44 4.00 386.00 2.57 0.59 3.02
Main Retail Meter Board Panel
Meter Board - 1, Arrival 100.0 100.0 139.1 88 3.5C x 300 433 1 461 0.80 368.80 Yes 0.13 0.90 0.07 0.44 2.00 88.00 3.13 0.72 3.15
Loc: - Basement Mezz.
Meter Board - 2, Departure 100.0 100.0 139.1 80 3.5C x 185 433 1 339 0.80 271.20 Yes 0.21 0.90 0.07 0.44 2.00 80.00 4.27 0.99 3.41
Meter Board - 2, Arrival 50.0 50.0 69.6 158 3.5C x 300 433 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 316.00 1.41 0.32 2.75
MAIN PBB PANEL
PBB Panel - 1
160.0 160.0 222.6 235 3.5C x 300 415 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 470.00 6.69 1.61 3.75
Feeder - 1
PBB Panel - 2
Bus - 1 200.0 200.0 278.2 163 3.5C x 300 415 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 326.00 5.80 1.40 3.54
Feeder - 1
PBB Panel - 3
200.0 200.0 278.2 225 3.5C x 300 415 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 450.00 8.01 1.93 4.07
Main PBB Panel Feeder - 1
Loc.- Basement
Mezz. PBB Panel - 1
160.0 160.0 222.6 235 3.5C x 300 415 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 470.00 6.69 1.61 3.75
Feeder - 2
PBB Panel - 2
Bus - 2 200.0 200.0 278.2 163 3.5C x 300 415 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 326.00 5.80 1.40 3.54
Feeder -2
PBB Panel - 3
200.0 200.0 278.2 225 3.5C x 300 415 2 461 0.80 737.60 Yes 0.13 0.90 0.07 0.44 4.00 450.00 8.01 1.93 4.07
Feeder -2
MAIN SMOKE EXHAUST PANEL
Smole Ext. Panel-1, Mezz Level
Main Smoke Ext. Panel, 51.8 51.8 72.1 150 3.5C x 240 415 1 402 0.80 321.60 Yes 0.16 0.90 0.07 0.44 2.00 150.00 3.32 0.80 2.44
(Cor-1&2)
Smole Ext. Panel-2, Mezz Level
Main Smoke Ext. Panel, 38.7 38.7 53.8 168 3.5C x 240 415 1 402 0.80 321.60 Yes 0.16 0.90 0.07 0.44 2.00 168.00 2.78 0.67 2.31
(Cor-3)
Smole Ext. Panel-3, Mezz Level
Main Smoke Ext. Panel, 41.5 41.5 57.7 286 3.5C x 300 415 1 461 0.80 368.80 Yes 0.13 0.90 0.07 0.44 2.00 286.00 4.23 1.02 2.66
(Cor-4&5)
Immigration Smoke Ext Eanel, Mezz
Main Smoke Ext. Panel, 61.2 61.2 85.1 152 3.5C x 300 415 1 461 0.80 368.80 Yes 0.13 0.90 0.07 0.44 2.00 152.00 3.32 0.80 2.44
Level
Smole Ext. Panel-1,
Main Smoke Ext. Panel, 153.0 153.0 212.9 116 3.5C x 240 415 1 402 0.80 321.60 Yes 0.16 0.90 0.07 0.44 2.00 116.00 7.58 1.83 3.47
DOM. BRH Mezz Level
Smole Ext. Panel-2,
Main Smoke Ext. Panel, 115.5 115.5 160.7 122 3.5C x 240 415 1 402 0.80 321.60 Yes 0.16 0.90 0.07 0.44 2.00 122.00 6.02 1.45 3.09
DOM. BRH Mezz Level
INT BRH Smole Ext. Panel,
Main Smoke Ext. Panel, 218.0 218.0 303.3 146 3.5C x 240 415 3 402 0.80 964.80 Yes 0.16 0.90 0.07 0.44 6.00 438.00 4.53 1.09 2.73
Mezz Level
Smoke Exhaust Panel-1
Main Smoke Ext. Panel, 280.0 280.0 389.5 176 3.5C x 300 415 3 461 0.80 1106.40 Yes 0.13 0.90 0.07 0.44 6.00 528.00 5.86 1.41 3.05
Departure Level
Smoke Exhaust Panel-2
Main Smoke Ext. Panel, 284.0 284.0 395.1 186 3.5C x 300 415 3 461 0.80 1106.40 Yes 0.13 0.90 0.07 0.44 6.00 558.00 6.28 1.51 3.15
Departure Level
Smoke Exhaust Panel-3
Main Smoke Ext. Panel, 284.0 284.0 395.1 232 3.5C x 300 415 3 461 0.80 1106.40 Yes 0.13 0.90 0.07 0.44 6.00 696.00 7.83 1.89 3.53
Departure Level
Smoke Exhaust Panel-4
Main Smoke Ext. Panel, 314.0 314.0 436.9 186 3.5C x 300 415 3 461 0.80 1106.40 Yes 0.13 0.90 0.07 0.44 6.00 558.00 6.94 1.67 3.31
Departure Level
Smoke Exhaust Panel-5
Main Smoke Ext. Panel, 164.0 164.0 228.2 296 3.5C x 300 415 3 461 0.80 1106.40 Yes 0.13 0.90 0.07 0.44 6.00 888.00 5.76 1.39 3.03
Departure Level
Smoke Exhaust Panel-1
Main Smoke Ext. Panel, 16.3 16.3 22.7 172 3.5C x 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.08 0.44 2.00 172.00 3.67 0.89 2.53
Arrival Level
MAIN LIGHTING PANEL
Main Lighting Panel, Bus - 1 Walkway Lighting Panel, Feeder-1 18.2 14.6 20.3 85 3.5C x 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.08 0.44 2.00 85.00 1.62 0.39 1.72
Main Lighting Panel, Bus - 1 Lighting Panel-1, Departure, Feeder-1 19.5 15.6 21.7 206 3.5C x 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.07 0.44 2.00 206.00 3.11 0.75 2.08
Main Lighting Panel, Bus - 1 Lighting Panel-2, Departure, Feeder-1 35.9 28.7 40.0 148 3.5C x 185 415 1 339 0.80 271.20 Yes 0.21 0.90 0.07 0.44 2.00 148.00 2.27 0.55 1.88
Main Lighting Panel, Bus - 1 Lighting Panel-3, Departure, Feeder-1 46.7 37.4 52.0 78 3.5C x 120 415 1 258 0.80 206.40 Yes 0.33 0.90 0.07 0.44 2.00 78.00 2.27 0.55 1.88
Main Lighting Panel, Bus - 1 Lighting Panel-4, Departure, Feeder-1 49.0 39.2 54.5 268 3.5C x 300 415 1 461 0.80 368.80 Yes 0.13 0.90 0.07 0.44 2.00 268.00 3.74 0.90 2.23
Main Lighting Panel, Bus - 1 Lighting Panel-1, Mezz, Feeder-1 29.9 23.9 33.3 168 3.5C x 150 415 1 294 0.80 235.20 Yes 0.27 0.90 0.07 0.44 2.00 168.00 2.61 0.63 1.96
Main Lighting Panel, Bus - 1 Lighting Panel-2, Mezz, Feeder-1 8.0 6.4 8.9 106 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.08 0.44 2.00 106.00 2.32 0.56 1.89
Main Lighting Panel, Bus - 1 Lighting Panel-3, Mezz, Feeder-1 16.0 12.8 17.8 206 3.5C x 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.07 0.44 2.00 206.00 2.56 0.62 1.95
Main Lighting Panel, Bus - 1 Lighting Panel-1, Arrival, Feeder-1 27.4 21.9 30.5 198 3.5C x 150 415 1 294 0.80 235.20 Yes 0.27 0.90 0.07 0.44 2.00 198.00 2.82 0.68 2.01
Main Lighting Panel, Bus - 1 Lighting Panel-2, Arrival, Feeder-1 36.9 29.5 41.1 128 3.5C x 50 415 1 140 0.80 112.00 Yes 0.82 0.90 0.08 0.44 2.00 128.00 7.04 1.70 3.03
Main Lighting Panel, Bus - 1 Lighting Panel-3, Arrival, Feeder-1 36.4 29.1 40.5 48 3.5C x 50 415 1 140 0.80 112.00 Yes 0.82 0.90 0.08 0.44 2.00 48.00 2.60 0.63 1.96
Main Lighting Panel, Bus - 1 Lighting Panel-4, Arrival, Feeder-1 27.4 21.9 30.5 218 3.5C x 240 415 1 402 0.80 321.60 Yes 0.16 0.90 0.07 0.44 2.00 218.00 2.04 0.49 1.82
MAIN PANELS 9
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOWLUCKNOW AIRPORT Date : 28th Aug' 2019
CABLE SCHEDULE - MAIN PANELS
TERMINAL BUILDING
Cable/
Total Expected Max. System Current Effective Check whether Reactance Voltage % Voltage
Duct Cable size Derating Resistance No. of Cable Total Length of % Voltage drop
Sr. No. From To Connected Maximum current Voltage in Cable runs capacity current Col-11 is more Cos φ in Sin φ drop in drop (in
length in adopted mm2 factor in Ohm/km Termination Cable (m) upto last point
Load in kW Load in kW (Amps) Volts Amps capacity than Col-5 Ohm/km Volts segment)
mtr.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16 17 18 19 20 21
Main Lighting Panel, Bus - 1 Lighting Panel-5, Arrival, Feeder-1 24.6 19.7 27.4 193 3.5C x 185 415 1 339 0.80 271.20 Yes 0.21 0.90 0.07 0.44 2.00 193.00 2.03 0.49 1.82
Main Lighting Panel, Bus - 1 Basement Lighting Panel-1, Feeder-1 62.1 49.7 69.1 86 3.5C x 120 415 1 258 0.80 206.40 Yes 0.33 0.90 0.07 0.44 2.00 86.00 3.33 0.80 2.13
Main Lighting Panel, Bus - 1 Lighting Panel-1, Arrival, Feeder-2 27.4 21.9 30.5 198 3.5C x 150 415 1 294 0.80 235.20 Yes 0.27 0.90 0.07 0.44 2.00 198.00 2.82 0.68 1.46
Main Lighting Panel, Bus - 1 Lighting Panel-2, Arrival, Feeder-2 36.9 29.5 41.1 128 3.5C x 50 415 1 140 0.80 112.00 Yes 0.82 0.90 0.08 0.44 2.00 128.00 7.04 1.70 3.03
Main Lighting Panel, Bus - 1 Lighting Panel-3, Arrival, Feeder-2 36.4 29.1 40.5 48 3.5C x 50 415 1 140 0.80 112.00 Yes 0.82 0.90 0.08 0.44 2.00 48.00 2.60 0.63 1.96
Main Lighting Panel, Bus - 1 Lighting Panel-4, Arrival, Feeder-2 27.4 21.9 30.5 218 3.5C x 240 415 1 402 0.80 321.60 Yes 0.16 0.90 0.07 0.44 2.00 218.00 2.04 0.49 1.82
Main Lighting Panel, Bus - 1 Lighting Panel-5, Arrival, Feeder-2 24.6 19.7 27.4 193 3.5C x 185 415 1 339 0.80 271.20 Yes 0.21 0.90 0.07 0.44 2.00 193.00 2.03 0.49 1.82
Main Lighting Panel, Bus - 2 Lighting Panel-1, Mezz, Feeder-2 29.9 23.9 33.3 168 3.5C x 150 415 1 294 0.80 235.20 Yes 0.27 0.90 0.07 0.44 2.00 168.00 2.61 0.63 1.96
Main Lighting Panel, Bus - 2 Lighting Panel-2, Mezz, Feeder-2 11.5 9.2 12.8 106 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.08 0.44 2.00 106.00 3.34 0.80 2.14
Main Lighting Panel, Bus - 2 Lighting Panel-3, Mezz, Feeder-2 7.2 5.8 8.0 206 3.5C x 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.07 0.44 2.00 206.00 1.15 0.28 1.61
Main Lighting Panel, Bus - 2 Basement Lighting Panel-1, Feeder-2 62.1 49.7 69.1 86 3.5C x 120 415 1 258 0.80 206.40 Yes 0.33 0.90 0.07 0.44 2.00 86.00 3.33 0.80 2.13
Main Lighting Panel, Bus - 2 Lighting Panel-1, Departure, Feeder-2 19.5 15.6 21.7 206 3.5C x 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.07 0.44 2.00 206.00 3.11 0.75 2.08
Main Lighting Panel, Bus - 2 Lighting Panel-2, Departure, Feeder-2 35.9 28.7 40.0 148 3.5C x 185 415 1 339 0.80 271.20 Yes 0.21 0.90 0.07 0.44 2.00 148.00 2.27 0.55 1.88
Main Lighting Panel, Bus - 2 Lighting Panel-3, Departure, Feeder-2 46.7 37.4 52.0 78 3.5C x 120 415 1 258 0.80 206.40 Yes 0.33 0.90 0.07 0.44 2.00 78.00 2.27 0.55 1.88
Main Lighting Panel, Bus - 2 Lighting Panel-4, Departure, Feeder-2 49.0 39.2 54.5 268 3.5C x 300 415 1 461 0.80 368.80 Yes 0.13 0.90 0.07 0.44 2.00 268.00 3.74 0.90 2.23
UPS Input panel 200kVA UPS-1 180.0 180.0 250.4 14 1C x 185 415 4 385 0.80 1232.00 Yes 0.13 0.90 0.09 0.44 8.00 56.00 0.23 0.06 2.34
UPS Input panel 200kVA UPS-2 180.0 180.0 250.4 16 1C x 185 415 4 385 0.80 1232.00 Yes 0.13 0.90 0.09 0.44 8.00 64.00 0.27 0.06 2.34
UPS Input panel 200kVA UPS-3 180.0 180.0 250.4 18 1C x 185 415 4 385 0.80 1232.00 Yes 0.13 0.90 0.09 0.44 8.00 72.00 0.30 0.07 1.96
UPS Input panel 200kVA UPS-4 180.0 180.0 250.4 21 1C x 185 415 4 385 0.80 1232.00 Yes 0.13 0.90 0.09 0.44 8.00 84.00 0.35 0.08 1.97
MAIN PANELS 10
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOWLUCKNOW AIRPORT Date : 28th Aug' 2019
CABLE SCHEDULE - MAIN PANELS
TERMINAL BUILDING
Cable/
Total Expected Max. System Current Effective Check whether Reactance Voltage % Voltage
Duct Cable size Derating Resistance No. of Cable Total Length of % Voltage drop
Sr. No. From To Connected Maximum current Voltage in Cable runs capacity current Col-11 is more Cos φ in Sin φ drop in drop (in
length in adopted mm2 factor in Ohm/km Termination Cable (m) upto last point
Load in kW Load in kW (Amps) Volts Amps capacity than Col-5 Ohm/km Volts segment)
mtr.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16 17 18 19 20 21
UPS Output Panel
UPS Main Distribution Panel Feeder -1 169.7 177.3 246.7 40 3.5C x 150 415 2 294 0.80 470.40 Yes 0.27 0.90 0.07 0.44 4.00 80.00 2.31 0.56 2.89
UPS Output Panel UPS Sub Distribution Panel (Utility) 20.7 20.7 28.8 88 3.5C x 50 415 1 140 0.80 112.00 Yes 0.82 0.90 0.08 0.44 2.00 88.00 3.39 0.82 3.15
UPS Main Distribution Panel Feeder -2 169.7 144.2 200.6 40 3.5C x 150 415 2 294 0.80 470.40 Yes 0.27 0.90 0.07 0.44 4.00 80.00 1.88 0.45 2.79
Main UPS Panel UPS Panel-1, Arrival Level 34.2 34.2 47.6 168 3.5C X 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.077 0.44 2.00 168.00 7.53 1.81 4.71
Main UPS Panel UPS Panel-2, Arrival Level 19.1 25.6 35.6 67 4C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.08 0.44 2.00 67.00 9.22 2.22 5.11
Main UPS Panel UPS Panel-3 Arrival Level 30.2 31.2 43.4 178 3.5C X 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.077 0.44 2.00 178.00 7.28 1.75 4.65
Main UPS Panel UPS Panel-1, Mezz Level 21.4 12.4 17.3 226 3.5C x 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.07 0.44 2.00 226.00 2.72 0.65 3.55
Main UPS Panel UPS Panel-2, Mezz Level 18.8 26.9 37.4 68 3.5C x 50 415 1 140 0.80 112.00 Yes 0.82 0.90 0.08 0.44 2.00 68.00 3.40 0.82 3.71
Main UPS Panel UPS Panel-3, Mezz Level 14.5 15.5 21.6 178 3.5C x 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.07 0.44 2.00 178.00 2.67 0.64 3.54
Main UPS Panel UPS Panel-1, Departure Level 31.5 31.5 43.8 242 3.5C x 120 415 1 258 0.80 206.40 Yes 0.33 0.90 0.07 0.44 2.00 242.00 5.95 1.43 4.33
Main UPS Panel UPS Panel-2, Departure Level 26.7 26.7 37.1 175 3.5C x 120 415 1 258 0.80 206.40 Yes 0.33 0.90 0.07 0.44 2.00 175.00 3.65 0.88 3.67
Main UPS Panel UPS Panel-3, Departure Level 48.1 48.1 66.9 86 3.5C X 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.077 0.44 2.00 86.00 5.42 1.31 4.09
Main UPS Panel UPS Panel-4, Departure Level 73.8 73.8 102.7 212 3.5C x 300 415 1 461 0.80 368.80 Yes 0.13 0.90 0.07 0.44 2.00 212.00 5.58 1.34 4.13
Main UPS Panel UPS Panel-1, Basement 26.7 26.7 37.1 132 3.5C x 50 415 1 140 0.80 112.00 Yes 0.82 0.90 0.08 0.44 2.00 132.00 6.56 1.58 4.37
MAIN PANELS 11
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - PBB, LIFT, ESC & METER BOARD
Check
Total Cable/ No. of Total
Expected Max. Cable size System Current Effective whether Resistan Reactanc Voltage % Voltage % Voltage
Connecte Duct Cable Derating Cable Length
Sr. No. From To Maximum current adopted Voltage in capacity current Col-11 is ce in Cos φ e in drop in drop (in drop upto
d Load length runs factor Termina of Cable
Load in kW (Amps) mm2 Volts Amps capacity more than Ohm/km Ohm/km Volts segment) last point
in kW in mtr. tion (m)
Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PBB Panel - 1, Arrival Level 160.0 160.0
PBB-1 40.0 40.0 61.8 165 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 165.00 6.54 1.575 5.33
PBB-2 40.0 40.0 61.8 160 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 160.00 6.34 1.527 5.28
1 PBB Panel - 1, Arrival Level
PBB-3 40.0 40.0 61.8 75 3.5C X 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.077 2.00 75.00 4.10 0.988 4.74
PBB-4 40.0 40.0 61.8 75 3.5C X 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.077 2.00 75.00 4.10 0.988 4.74
PBB-5 40.0 40.0 61.8 180 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 180.00 7.13 1.718 5.26
PBB-6 40.0 40.0 61.8 180 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 180.00 7.13 1.718 5.26
2 PBB Panel - 2, Arrival Level PBB-7 40.0 40.0 61.8 95 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 95.00 3.76 0.907 4.45
PBB-8 40.0 40.0 61.8 95 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 95.00 3.76 0.907 4.45
PBB-9 40.0 40.0 61.8 95 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 95.00 3.76 0.907 4.45
PBB-10 40.0 40.0 61.8 80 3.5C X 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.077 2.00 80.00 4.37 1.054 5.13
PBB-11 40.0 40.0 61.8 115 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 115.00 4.56 1.098 5.17
3 PBB Panel - 3, Arrival Level PBB-12 40.0 40.0 61.8 120 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 120.00 4.75 1.145 5.22
PBB-13 40.0 40.0 61.8 210 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 210.00 8.32 2.005 6.08
PBB-14 40.0 40.0 61.8 215 3.5C X 95 415 1 221 0.80 176.80 Yes 0.41 0.90 0.074 2.00 215.00 8.52 2.052 6.12
LIFT-15 20.0 20.0 30.9 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 156.00 8.35 2.011 5.69
156
LIFT-16 20.0 20.0 30.9 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 161.00 8.61 2.075 5.76
161
LIFT-17 20.0 20.0 30.9 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 166.00 8.88 2.140 5.82
166
LIFT-18 18.0 18.0 27.8 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 155.00 7.46 1.798 5.48
155
LIFT-19 18.0 18.0 27.8 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 192.00 9.24 2.227 5.91
Lift & Esc. Panel - 1 192
4
Loc:- Elect. RM. AR-3
LIFT-20 18.0 18.0 27.8 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 166.00 17.57 4.233 7.92
166
LIFT-29 22.0 22.0 34.0 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 60.00 3.53 0.851 4.53
60
LIFT-30 22.0 22.0 34.0 3.5C X 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.077 2.00 256.00 7.69 1.854 5.54
256
ESC-1 18.5 18.5 28.6 77 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 77.00 3.81 0.918 4.60
ESC-2 18.5 18.5 28.6 78 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 78.00 3.86 0.930 4.61
121.0 121.0
Lift & Esc. Panel - 2
LIFT-24 20.00 20.00 30.92 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 36.00 1.93 0.464 3.92
36
LIFT-25 20.00 20.00 30.92 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 32.00 1.71 0.412 3.87
32
LIFT-26 20.00 20.00 30.92 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 36.00 1.93 0.464 3.92
Lift & Esc. Panel - 3 36
6
Loc. - Elect. RM MZ7
LIFT-27 10.00 10.00 15.46 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 150.00 5.57 1.341 4.80
150
LIFT-28 10.00 10.00 15.46 3.5C X 50 415 1 140 0.80 112.00 Yes 0.82 0.90 0.078 2.00 258.00 5.10 1.228 4.69
258
ESC-5 18.50 18.50 28.60 3.5C X 50 415 1 140 0.80 112.00 Yes 0.82 0.90 0.078 2.00 272.00 9.94 2.396 5.86
272
Lift & Esc. Panel - 4 108.00 108.00
LIFT-3 22.00 22.00 34.01 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 170.00 10.00 2.410 5.90
170
LIFT-4 22.00 22.00 34.01 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 185.00 10.89 2.623 6.11
185
Lift & Esc. Panel - 4 LIFT-8 22.00 22.00 34.01 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 42.00 2.47 0.596 4.09
7 42
Loc. - Elect. RM DP6
LIFT-9 22.00 22.00 34.01 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 42.00 2.47 0.596 4.09
42
LIFT-10 10.00 10.00 15.46 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 36.00 1.34 0.322 3.81
36
LIFT-11 10.00 10.00 15.46 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 70.00 1.87 0.451 3.94
70
Lift & Esc. Panel -5 74.00 74.00
LIFT-1 22.00 22.00 34.01 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 73.00 4.30 1.035 4.42
73
LIFT-2 22.00 22.00 34.01 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 86.00 5.06 1.219 4.60
86
Lift & Esc. Panel -5
8 LIFT-5 10.00 10.00 15.46 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 100.00 2.67 0.645 4.03
Loc. - Elect. RM DP2 100
LIFT-6 10.00 10.00 15.46 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 102.00 2.73 0.657 4.04
102
LIFT-7 10.00 10.00 15.46 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 48.00 1.28 0.309 3.69
48
Meter Board Retail -1,
100.0 100.0
Arrival Level
F&B-2 7.0 7.0 10.8 65 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 65.00 1.22 0.293 3.45
F&B-3 6.0 6.0 9.3 57 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 57.00 0.91 0.220 3.37
F&B-4 8.0 8.0 12.4 57 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 57.00 1.22 0.294 3.45
F&B-5 7.0 7.0 10.8 70 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 70.00 1.31 0.316 3.47
F&B-6 9.0 9.0 13.9 58 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 58.00 1.40 0.336 3.49
F&B-7 6.0 6.0 9.3 68 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 68.00 1.51 0.365 3.52
Meter Board Retail-1, Arrival F&B-8 9.0 9.0 13.9 91 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 91.00 2.19 0.528 3.68
9 Level
Loc- Elect. RM AR5 RETAIL-1 8.0 8.0 12.4 96 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 96.00 4.52 1.088 4.24
RETAIL-2 8.0 8.0 12.4 72 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 72.00 3.39 0.816 3.97
RETAIL-3 8.0 8.0 12.4 28 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 28.00 1.32 0.317 3.47
RETAIL-4 5.0 5.0 7.7 60 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 60.00 1.76 0.425 3.58
RETAIL-5 5.0 5.0 7.7 87 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 87.00 1.61 0.389 3.54
RETAIL-6 4.0 4.0 6.2 89 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 89.00 1.32 0.318 3.47
RETAIL-6A 4.0 4.0 6.2 92 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 92.00 1.37 0.329 3.48
RETAIL-7 8.0 8.0 12.4 92 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 92.00 4.33 1.043 3.80
RETAIL-8 7.0 7.0 10.8 87 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 87.00 3.58 0.863 3.62
RETAIL-9 6.0 6.0 9.3 87 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 87.00 3.07 0.740 3.49
Meter Board Retail-2, Arrival
10 Level RETAIL-10 6.0 6.0 9.3 47 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 47.00 1.66 0.400 3.15
Loc- Elect. RM AR6
RETAIL-11 7.0 7.0 10.8 35 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 35.00 0.91 0.219 2.97
RETAIL-12 8.0 8.0 12.4 29 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 29.00 0.86 0.207 2.96
RETAIL-13 8.0 8.0 12.4 29 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 29.00 0.62 0.150 2.90
F&B-1 4.0 4.0 6.2 61 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 61.00 0.65 0.157 3.18
F&B-2 4.0 4.0 6.2 67 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 67.00 0.72 0.173 3.20
F&B-3 4.0 4.0 6.2 106 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 106.00 1.13 0.273 3.30
F&B-4 4.0 4.0 6.2 86 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 86.00 0.92 0.222 3.24
Meter Board Retail -1, F&B-5 4.0 4.0 6.2 65 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 65.00 0.70 0.168 3.19
11 Departure Level
Loc- Elect. RM DP2 F&B-6 4.0 4.0 6.2 134 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 134.00 1.43 0.345 3.37
RETAIL-1 4.0 4.0 6.2 39 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 39.00 0.92 0.221 3.24
RETAIL-2 4.0 4.0 6.2 47 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 47.00 0.70 0.168 3.19
RETAIL-3 5.0 5.0 7.7 86 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 86.00 1.15 0.277 3.30
RETAIL-4 4.0 4.0 6.2 96 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 96.00 1.03 0.247 3.27
RETAIL-5 4.0 4.0 6.2 72 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 72.00 0.77 0.186 3.21
Meter Board Retail -2,
100.0 100.0
Departure Level
F&B-7 5.0 5.0 7.7 33 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 33.00 0.97 0.234 3.65
F&B-8 5.0 5.0 7.7 50 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 50.00 1.47 0.354 3.77
F&B-9 5.0 5.0 7.7 63 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 63.00 0.84 0.203 3.62
F&B-10 5.0 5.0 7.7 116 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 116.00 1.55 0.374 3.79
F&B-11 5.0 5.0 7.7 127 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 127.00 3.73 0.900 4.31
RETAIL-6 6.0 6.0 9.3 43 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 43.00 1.52 0.366 3.78
RETAIL-7 6.0 6.0 9.3 29 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 29.00 1.02 0.247 3.66
RETAIL-8 6.0 6.0 9.3 29 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 29.00 0.65 0.156 3.57
Meter Board Retail -2,
12 Departure Level RETAIL-9 10.0 10.0 15.5 25 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 25.00 0.67 0.161 3.57
Loc- Elect. RM DP5
RETAIL-10 8.0 8.0 12.4 61 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 61.00 1.81 0.436 3.85
RETAIL-11 6.0 6.0 9.3 69 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 69.00 1.11 0.267 3.68
RETAIL-12 7.0 7.0 10.8 70 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 70.00 2.88 0.694 4.11
RETAIL-13 6.0 6.0 9.3 84 4C X 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 84.00 2.96 0.714 4.13
RETAIL-14 5.0 5.0 7.7 107 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 107.00 1.43 0.345 3.76
RETAIL-15 5.0 5.0 7.7 107 4C X 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 107.00 1.99 0.478 3.89
RETAIL-16 5.0 5.0 7.7 86 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 86.00 1.15 0.277 3.69
RETAIL-17 5.0 5.0 7.7 86 4C X 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 86.00 1.15 0.277 3.69
4C x 10
LDB- 1B 6.0 9.3 86.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 86.00 2.96 0.713 2.85
Cu.
4C x 16
LDB- 2B 10.0 15.5 106.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 106.00 3.85 0.929 3.06
Cu.
4C x 16
LDB- 3B 10.0 15.5 106.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 106.00 3.85 0.929 3.06
Cu.
4C x 16
Basement LDB- 4B 7.8 12.1 106.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 106.00 3.01 0.724 2.86
Cu.
1 Level, Lighting
Panel-1 4C x 16
LDB- 5B 6.1 9.4 116.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 116.00 2.57 0.620 2.75
Cu.
4C x 16
LDB- 6B 8.4 13.0 121.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 121.00 3.70 0.890 3.03
Cu.
4C x 16
LDB- 7B 8.8 13.6 121.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 121.00 3.87 0.933 3.07
Cu.
4C x 10
LDB- 8B 5.0 7.7 121.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 121.00 3.47 0.836 2.97
Cu.
4C x 10
LDB-1AR 6.3 9.7 76.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 76.00 2.75 0.662 2.67
Cu.
Lighting Panel - 4C x 10
LDB-2AR 4.4 6.8 132.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 132.00 3.33 0.803 2.81
1 Arrival Level Cu.
2
Loc: - Elect RM 4C x 10
AR1 LDB-3AR 4.4 6.8 132.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 132.00 3.33 0.803 2.81
Cu.
4C x 16
LDB-13AR 12.3 19.0 186.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 186.00 8.32 2.004 4.02
Cu.
4C x 10
LDB-4AR 4.9 7.6 15.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 15.00 0.42 0.102 3.13
Cu.
4C x 10
LDB-5AR 6.6 10.2 65.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 65.00 2.46 0.593 3.62
Cu.
4C x 6
LDB-14AR 2.8 4.3 20.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 20.00 0.54 0.130 3.16
Cu.
4C x 6
LDB-15AR 2.8 4.3 20.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 20.00 0.54 0.130 3.16
Lighting Panel - Cu.
2 Arrival Lvl. 4C x 6
3 LDB-16AR 3.2 4.9 20.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 20.00 0.61 0.148 3.18
Loc: - Elect RM Cu.
AR2 4C x 6
LDB-17AR 4.0 6.2 20.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 20.00 0.77 0.185 3.21
Cu.
4C x 10
LDB-18AR 4.6 7.1 20.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 20.00 0.53 0.127 3.15
Cu.
4C x 6
LDB-19AR 4.0 6.2 20.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 20.00 0.77 0.185 3.21
Cu.
4C x 6
LDB-20AR 4.0 6.2 66.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 66.00 2.53 0.611 3.64
Cu.
LIGHTING PANEL - 3 ARRIVAL LVL. 36.4
4C x 10
LDB-6AR 5.8 9.0 15.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 15.00 0.50 0.120 2.08
Cu.
4C x 10
LDB-7AR 5.5 8.5 16.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 16.00 0.50 0.122 2.08
Cu.
4C x 6
LDB-21AR 4.0 6.2 82.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 82.00 3.15 0.759 2.72
Cu.
4C x 10
LDB-9AR 4.6 7.1 10.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 10.00 0.26 0.064 1.89
Cu.
Lighting Panel - 4C x 10
LDB-10AR 7.8 12.1 76.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 76.00 3.40 0.819 2.64
4 Arrival Lvl. Cu.
Loc: - Elect RM 4C x 10
LDB-11AR 6.5 10.0 78.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 78.00 2.91 0.701 2.52
AR7 Cu.
LDB-12AR 8.5 13.1 156.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 156.00 5.04 1.216 3.04
4C x 16
LDB-8AR 7.8 12.1 10.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 10.00 0.28 0.068 1.89
Cu.
4C x 6
LDB-27AR 4.0 6.2 49.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 49.00 1.88 0.453 2.27
Cu.
Lighting Panel - 4C x 6
LDB-28AR 4.0 6.2 49.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 49.00 1.88 0.453 2.27
5 Arrival Lvl. Cu.
Loc: - Elect RM 4C x 6
LDB-29AR 3.2 4.9 49.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 49.00 1.51 0.363 2.18
AR6 Cu.
4C x 6
LDB-30AR 2.8 4.3 49.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 49.00 1.32 0.317 2.14
Cu.
4C x 6
LDB-31AR 2.8 4.3 49.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 49.00 1.32 0.317 2.14
Cu.
LIGHTING PANEL - 1 MEZZANINE LVL. 29.9
4C x 10
LDB-1 MZ 6.0 9.3 65.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 65.00 2.24 0.539 2.50
Cu.
4C x 10
Lighting Panel - LDB-2 MZ 6.3 9.7 53.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 53.00 1.92 0.462 2.42
Cu.
1 Mezzanine
4C x 10
Lvl. LDB-3 MZ 8.0 12.4 86.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 86.00 3.95 0.951 2.91
Cu.
Loc: - Elect RM
4C x 16
MZ2 LDB-5MZ 6.6 10.2 186.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 186.00 4.46 1.075 3.04
Cu.
LDB-RESTING AREA 3.0 4.6 208.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 208.00 1.73 0.416 2.38
Lighting Panel - 4C x 6
2 Mezzanine LDB-4 MZ 3.5 5.4 15.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 15.00 0.50 0.121 2.01
Cu.
Lvl.
Loc: - Elect RM 4C x 10
LDB-9 MZ 4.5 7.0 15.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 15.00 0.39 0.093 1.98
MZ3 Cu.
4C x 6
Lighting Panel - LDB-6 MZ 4.0 6.2 94.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 94.00 3.61 0.870 2.82
Cu.
3 Mezzanine
4C x 10
Lvl. LDB-7 MZ 6.5 10.0 16.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 16.00 0.60 0.144 2.09
Cu.
Loc: - Elect RM
MZ5 4C x 10
LDB-8 MZ 5.5 8.5 200.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 200.00 6.31 1.521 3.47
Cu.
4C x 6
Lighting Panel - LDB-3DP 1.5 2.3 102.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 102.00 1.47 0.354 2.44
Cu.
1 Departure
4C x 10
Lvl. LDB-9DP 9.0 13.9 78.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 78.00 4.03 0.970 3.05
Cu.
Loc: - Elect RM
DP1 4C x 10
LDB-10DP 9.0 13.9 78.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 78.00 4.03 0.970 3.05
Cu.
4C x 10
LDB-1DP 4.5 7.0 81.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 81.00 2.09 0.504 2.59
Cu.
Lighting Panel - LDB-2DP 2.2 3.4 106.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 106.00 0.89 0.214 2.09
2 Departure
4C x 10
Lvl. LDB-18DP 10.5 16.2 25.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 25.00 1.51 0.363 2.24
Cu.
Loc: - Elect RM
DP3 4C x 16
LDB-19DP 11.5 17.8 25.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 25.00 1.05 0.252 2.13
Cu.
4C x 10
LDB-20DP 7.2 11.1 16.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 16.00 0.66 0.159 2.04
Cu.
4C x 10
LDB-4DP 5.2 16.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 16.00 0.00 0.000 1.88
Cu.
LDB-5DP 1.5 2.3 146.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 146.00 0.83 0.201 2.08
Lighting Panel -
3 Departure 4C x 10
LDB-11DP 7.5 11.6 21.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 21.00 0.90 0.218 2.10
Lvl. Cu.
Loc: - Elect RM 4C x 10
LDB-15DP 9.0 13.9 82.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 82.00 4.23 1.020 2.90
DP6 Cu.
4C x 16
LDB-16DP 10.5 16.2 30.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 30.00 1.15 0.276 2.16
Cu.
4C x 16
LDB-17DP 13.0 20.1 30.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 30.00 1.42 0.342 2.22
Cu.
LIGHTING PANEL - 4 DEPARTURE LVL.
49.0
LOC: - ELECT RM DP8
4C x 10
LDB-6DP 4.9 7.6 82.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 82.00 2.30 0.555 2.79
Cu.
LDB-7DP 4.8 7.4 111.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 111.00 2.03 0.488 2.72
Lighting Panel -
4C x 16
4 Departure LDB-8DP 5.5 8.5 133.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 133.00 2.66 0.641 2.87
Cu.
Lvl.
Loc: - Elect RM LDB-13DP 12.4 19.2 82.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 82.00 2.81 0.678 2.91
DP8
4C x 16
LDB-14DP 14.0 21.6 156.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 156.00 7.94 1.913 4.15
Cu.
4C x 16
LDB-12DP 7.4 11.4 80.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 80.00 2.15 0.519 2.75
Cu.
WALKWAY LIGHTING PANEL 18.2
LDB-1TR 4.2 6.5 175.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 175.00 2.03 0.490 2.21
LDB-2TR 4.8 7.4 160.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 160.00 2.13 0.512 2.23
Walkway
Lighting Panel
LDB-3TR 5.0 7.7 150.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 150.00 2.08 0.500 2.22
LDB-4TR 4.2 6.5 150.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 150.00 1.74 0.420 2.14
PDB-1B 25.0 38.6 100.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 100.00 9.51 2.292 4.83
Power Panel- PDB-2B 12.0 18.5 110.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 110.00 5.02 1.210 3.75
1, Basement
Loc: Elec Rm
Bas. PDB-3B 21.2 32.8 120.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 120.00 7.04 1.697 4.24
PDB-4B 11.0 17.0 122.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 122.00 5.11 1.230 3.77
PDB-1AR 24.8 38.3 72.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 72.00 6.79 1.637 4.32
Power Panel- 1
Arrival Lvl. 4C x 16
PDB-2AR 26.9 41.6 32.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 32.00 3.13 0.754 3.43
Loc: Elec Rm Cu.
AR2
PDB-10AR 7.0 10.8 165.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 165.00 4.39 1.059 3.74
PDB-9AR 5.5 8.5 465.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 465.00 9.73 2.344 5.60
4C x 16
PDB-4AR 15.5 24.0 42.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 42.00 2.37 0.570 3.25
Cu.
Power Panel- 3
Arrival Lvl.
PDB-5AR 22.9 35.4 16.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 16.00 1.39 0.336 3.02
Loc: Elec Rm
AR6
4C x 16
PDB-1 MZ 25.1 38.8 65.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 65.00 5.93 1.429 4.34
Cu.
PDB-2 MZ 19.0 29.4 56.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 56.00 4.05 0.975 3.89
Power Panel- 1 PDB-7 MZ 19.4 30.0 146.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 146.00 10.78 2.596 5.51
Mezzanine Lvl.
Loc: Elec Rm
MZ2 PDB-8 MZ 14.2 22.0 86.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 86.00 4.65 1.119 4.03
PDB-RESTING AREA 11.2 17.3 206.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 206.00 8.78 2.115 5.03
ACDB-1 5.0 7.7 22.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 22.00 0.42 0.101 3.01
PDB-3 MZ 15.5 24.0 205.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 205.00 8.80 2.119 6.14
PDB-4 MZ 18.4 28.4 16.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 16.00 1.12 0.270 4.29
Power Panel- 2 PDB-5 MZ 8.0 12.4 206.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 206.00 6.27 1.511 5.53
Mezzanine Lvl.
Loc: Elec Rm
4C x 16
MZ5 KITCHEN - VTPN DB 30.0 46.4 26.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 26.00 2.84 0.683 4.70
Cu.
4C x 16
PDB-6 MZ 13.0 20.1 89.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 89.00 4.21 1.014 5.03
Cu.
ACDB-3 8.0 12.4 16.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 16.00 0.49 0.117 4.14
4C x 16
PDB-1 DP 25.2 39.0 16.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 16.00 1.47 0.353 3.03
Cu.
Power Panel- 1 PDB-2 DP 20.4 31.5 86.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 86.00 6.67 1.608 4.28
Departure Lvl.
Loc: Elec Rm
DP1 PDB-11 DP 15.5 24.0 106.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 106.00 6.25 1.506 4.18
ACDB-1 4.0 6.2 86.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 86.00 1.31 0.315 2.99
4C x 16
PDB-3 DP 21.1 32.6 16.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 16.00 1.23 0.296 2.98
Cu.
PDB-4 DP 24.1 37.3 96.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 96.00 6.40 1.543 4.23
Power Panel- 2
Departure Lvl.
PDB-9 DP 15.5 24.0 120.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 120.00 5.15 1.241 3.92
Loc: Elec Rm
DP4
PDB-10 DP 15.5 24.0 176.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 176.00 10.38 2.501 5.18
ACDB-2 DP 4.0 6.2 120.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 120.00 1.83 0.440 3.12
PDB-5 DP 14.0 21.6 120.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 120.00 4.65 1.121 4.75
Power Panel- 3
Departure Lvl. 4C x 16
PDB-6 DP 20.7 32.0 106.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 106.00 7.98 1.922 5.55
Loc: Elec Rm Cu.
DP8
4C x 16
PDB-12 DP 15.6 24.1 146.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 146.00 8.28 1.995 5.63
Cu.
4C x 16
PDB-7 DP 21.0 32.5 12.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 12.00 0.92 0.221 2.79
Cu.
Power Panel- 4
Departure Lvl.
PDB-8 DP 15.0 23.2 90.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 90.00 3.74 0.900 3.47
Loc: Elec Rm
DP7
ACDB-3 DP 3.5 5.4 16.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 16.00 0.16 0.037 2.61
UDB-1B 3.5 5.4 106.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 106.00 1.41 0.340 4.71
UDB-2B 2.8 4.3 112.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 112.00 1.19 0.287 4.66
VTPN - DB - UDB-1B 10.0 15.5 112.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 112.00 4.26 1.027 5.39
UPS Panel-1 4C x 10
EMDB-1B 3.5 5.4 102.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 102.00 2.05 0.493 4.86
Basement Cu.
4C x 10
EMDB-2B 3.1 4.8 116.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 116.00 2.06 0.497 4.87
Cu.
4C x 6
EMDB-3B 1.2 1.9 122.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 122.00 1.41 0.339 4.71
Cu.
4C x 10
EMDB-4B 2.6 4.0 122.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 122.00 1.82 0.438 4.81
Cu.
UDB-1AR 4.1 6.3 82.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 82.00 1.28 0.308 5.01
4C x 16
UDB-2AR 9.0 13.9 42.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 42.00 1.37 0.331 5.04
Cu.
VTPN -UPSDB-1AR 15.0 23.2 66.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 66.00 2.74 0.660 5.37
UPS Panel-1
Arrival Lvl. 4C x 6
EMDB-1AR 1.1 1.7 92.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 92.00 0.97 0.234 4.94
Loc: Elec Rm Cu.
AR2
EMDB-2AR 1.0 1.5 146.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 146.00 0.56 0.134 4.84
4C x 6
EMDB-3AR 2.5 3.9 12.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 12.00 0.29 0.069 4.78
Cu.
4C x 16
EMDB-8AR 1.5 2.3 166.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 166.00 0.91 0.218 4.92
Cu.
4C x 10
UDB-3AR 4.7 7.3 26.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 26.00 0.70 0.169 5.28
Cu.
UPS Panel-2
Arrival Lvl. 4C x 16
UDB-5AR 12.4 19.2 32.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 32.00 1.44 0.348 5.46
Loc: Elec Rm Cu.
AR5
4C x 6
EMDB-4AR 2.0 3.1 26.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 26.00 0.50 0.120 5.23
Cu.
4C x 16
UDB-4AR 13.0 20.1 10.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 10.00 0.47 0.114 4.76
Cu.
4C x 16
VTPN- UPSDB-2AR 12.5 19.3 5.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 5.00 0.23 0.055 4.70
Cu.
4C x 6
UPS Panel-3 EMDB-5AR 1.7 2.6 95.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 95.00 1.55 0.374 5.02
Cu.
Arrival Lvl.
Loc: Elec Rm
4C x 6
AR7 EMDB-6AR 1.5 2.3 10.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 10.00 0.14 0.035 4.68
Cu.
EMDB-7AR 1.5 2.3 112.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 112.00 0.64 0.154 4.80
EMDB-Driver Canteen 1 2 300 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 300.00 1.14 0.275 4.91
4C x 16
UDB-1MZ 8.1 12.5 16.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 16.00 0.47 0.114 3.66
Cu.
4C x 16
UPS Panel-1 UDB-2MZ 9.0 13.9 186.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 186.00 6.09 1.466 5.01
Cu.
Mezzanine Lvl.
Loc: Elec Rm
4C x 6
MZ1 EMDB-1MZ 1.5 2.3 16.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 16.00 0.23 0.056 3.60
Cu.
EMDB-2MZ 2.8 4.3 92.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 92.00 0.98 0.236 3.78
UDB-4MZ 16.6 25.7 16.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 16.00 1.01 0.243 3.96
4C x 6
EMDB-4MZ 2.2 3.4 48.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 48.00 1.01 0.244 3.96
Cu.
4C x 10
UDB-3MZ 8.1 12.5 79.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 79.00 3.67 0.885 4.42
Cu.
UPS Panel-3 EMDB-3MZ 1.7 2.6 206.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 206.00 1.33 0.321 3.86
Mezzanine Lvl.
Loc: Elec Rm
4C x 6
MZ5 EMDB-5MZ 1.5 2.3 89.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 89.00 1.28 0.309 3.85
Cu.
4C x 6
EMDB-6AR 3.2 4.9 92.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 92.00 2.83 0.681 4.22
Cu.
4C x 16
UDB-1 DP 18.0 27.8 16.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 16.00 1.05 0.252 4.58
Cu.
UPS Panel-1 UDB-2 DP 10.0 15.5 86.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 86.00 3.27 0.788 5.11
Departure Lvl.
Loc: Elec Rm
4C x 6
DP1 EMDB-1 DP 1.5 2.3 70.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 70.00 1.01 0.243 4.57
Cu.
4C x 6
EMDB-9 DP 2.0 3.1 86.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 86.00 1.65 0.398 4.72
Cu.
UDB-3 DP 16.0 24.7 102.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 102.00 4.52 1.089 4.76
UPS Panel-2
UDB-10 DP 8.6 13.3 52.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 52.00 1.70 0.410 4.08
Departure Lvl.
Loc: Elec Rm
EMDB-2 DP 1.0 1.5 96.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 96.00 0.37 0.088 3.75
DP3
4C x 6
EMDB-1TR 1.1 1.7 100.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 100.00 1.06 0.254 3.92
Cu.
UPS Panel-3 Departure Lvl. 48.1
4C x 16
UDB-8 DP 18.6 28.8 81.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 81.00 5.48 1.320 5.41
Cu.
UPS Panel-3 4C x 16
UDB-9 DP 21.5 33.2 26.0 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 26.00 2.03 0.490 4.58
Departure Lvl. Cu.
Loc: Elec Rm 4C x 6
EMDB-4 DP 1.5 2.3 32.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 32.00 0.46 0.111 4.21
DP5 Cu.
4C x 10
EMDB-12 DP 6.5 10.0 18.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 18.00 0.67 0.162 4.26
Cu.
UPS Panel-4 Departure Lvl. 73.8
UDB-5DP 5.0 7.7 82.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 82.00 1.13 0.273 4.41
UDB-6DP 19.6 30.3 16.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 16.00 1.19 0.287 4.42
UDB-7DP 6.5 10.0 91.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 91.00 1.64 0.395 4.53
4C x 6
EMDB-6DP 1.6 2.5 16.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 16.00 0.25 0.059 4.19
Cu.
EMDB-7DP 1.0 1.5 196.0 4C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 0.436 2.00 196.00 0.75 0.180 4.31
UPS Panel-4 4C x 6
EMDB-8DP 1.1 1.7 206.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 206.00 2.18 0.524 4.66
Departure Lvl. Cu.
4C x 6
EMDB-10DP 2.5 3.9 90.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 90.00 2.16 0.520 4.65
Cu.
4C x 10
EMDB-11DP 6.7 10.4 90.0 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 90.00 3.46 0.834 4.97
Cu.
4C x 6
EMDB-2TR 1.1 1.7 100.0 415 1 50 0.80 40.00 Yes 3.94 0.90 0.090 0.436 2.00 100.00 1.06 0.254 4.39
Cu.
UDB-4DP 14.2 22.0 196.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 196.00 7.70 1.856 5.99
UDB-4ADP 14.5 22.4 196.0 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 0.436 2.00 196.00 7.87 1.896 6.03
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
BASEMENT VENTILATION PANEL-1 154.6 154.6
S/A FAN NORMAL ZONE-1 18.5 18.5 28.6 53 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 53.00 9.40 2.266 5.20
E/A FAN NORMAL ZONE-1 18.5 18.5 28.6 35 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 35.00 6.21 1.497 4.43
S/A FAN FIRE ZONE-1 18.5 18.5 28.6 33 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 33.00 5.86 1.411 4.35
E/A FAN FIRE ZONE-1 18.5 18.5 28.6 27 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 27.00 4.79 1.155 4.09
S/A FAN NORMAL ZONE-2 18.5 18.5 28.6 35 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 35.00 6.21 1.497 4.43
BASEMENT
VENTILATION PANEL-1 E/A FAN NORMAL ZONE-2 18.5 18.5 28.6 27 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 27.00 4.79 1.155 4.09
1
(ZONE 1,2 &
SUBSTATION) S/A FAN FIRE ZONE-2 18.5 18.5 28.6 53 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 53.00 9.40 2.266 5.20
E/A FAN FIRE ZONE-2 18.5 18.5 28.6 35 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 35.00 6.21 1.497 4.43
HT ROOM-S/A ZONE-1 1.1 1.1 1.7 57 3C x 6 415 1 40 0.80 32.00 Yes 5.90 0.90 0.090 2.00 57.00 0.90 0.216 3.15
HT ROOM-E/A ZONE-6 1.1 1.1 1.7 156 3C x 6 415 1 40 0.80 32.00 Yes 5.90 0.90 0.090 2.00 156.00 2.46 0.592 3.53
TRAFO. ROOM- S/A FAN 2.2 2.2 3.4 57 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 57.00 1.20 0.290 3.22
TRAFO. ROOM- E/A FAN 2.2 2.2 3.4 158 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 158.00 3.33 0.803 3.74
S/A FAN NORMAL ZONE-3 18.5 18.5 28.6 61 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 61.00 10.82 2.608 5.06
E/A FAN NORMAL ZONE-3 18.5 18.5 28.6 83 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 83.00 14.73 3.549 6.00
S/A FAN FIRE ZONE-3 18.5 18.5 28.6 60 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 60.00 10.65 2.566 5.01
E/A FAN FIRE ZONE-3 18.5 18.5 28.6 83 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 83.00 14.73 3.549 6.00
S/A FAN NORMAL ZONE-4 18.5 18.5 28.6 20 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 20.00 3.55 0.855 3.30
BASEMENT E/A FAN NORMAL ZONE-4 18.5 18.5 28.6 45 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 45.00 7.99 1.924 4.37
2 VENTILATION PANEL-2
(ZONE 3 TO 5)
S/A FAN FIRE ZONE-4 18.5 18.5 28.6 20 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 20.00 3.55 0.855 3.30
E/A FAN FIRE ZONE-4 18.5 18.5 28.6 45 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 45.00 7.99 1.924 4.37
S/A FAN NORMAL ZONE-5 18.5 18.5 28.6 57 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 57.00 10.11 2.437 4.88
E/A FAN NORMAL ZONE-5 18.5 18.5 28.6 37 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 37.00 6.57 1.582 4.03
S/A FAN FIRE ZONE-5 18.5 18.5 28.6 57 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 57.00 10.11 2.437 4.88
E/A FAN FIRE ZONE-5 18.5 18.5 28.6 36 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 36.00 6.39 1.539 3.99
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
S/A FAN NORMAL ZONE-6 15.0 15.0 23.2 103 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 103.00 9.23 2.224 5.53
E/A FAN NORMAL ZONE-6 15.0 15.0 23.2 68 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 68.00 9.78 2.358 5.66
S/A FAN FIRE ZONE-6 15.0 15.0 23.2 103 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 103.00 9.23 2.224 5.53
E/A FAN FIRE ZONE-6 15.0 15.0 23.2 66 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 66.00 9.50 2.288 5.59
BASEMENT S/A FAN NORMAL ZONE-7 15.0 15.0 23.2 24 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 24.00 3.45 0.832 4.14
3 VENTILATION PANEL-3
(ZONE 6, 7 & LT PANEL) E/A FAN NORMAL ZONE-7 15.0 15.0 23.2 22 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 22.00 3.17 0.763 4.07
S/A FAN FIRE ZONE-7 15.0 15.0 23.2 22 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 22.00 3.17 0.763 4.07
E/A FAN FIRE ZONE-7 15.0 15.0 23.2 17 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 17.00 2.45 0.589 3.89
S/A FAN LT PANEL ROOM 7.5 7.5 11.6 145 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 145.00 10.43 2.514 5.82
E/A FAN LT PANEL ROOM 7.5 7.5 11.6 25 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 25.00 1.80 0.433 3.74
S/A FAN NORMAL ZONE-8 15.0 15.0 23.2 73 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 73.00 6.54 1.576 3.47
E/A FAN NORMAL ZONE-8 15.0 15.0 23.2 103 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 103.00 14.82 3.571 5.46
S/A FAN FIRE ZONE-8 15.0 15.0 23.2 73 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 73.00 6.54 1.576 3.47
E/A FAN FIRE ZONE-8 15.0 15.0 23.2 103 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 103.00 14.82 3.571 5.46
S/A FAN NORMAL ZONE-9 15.0 15.0 23.2 56 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 56.00 5.02 1.209 3.10
BASEMENT E/A FAN NORMAL ZONE-9 15.0 15.0 23.2 15 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 15.00 2.16 0.520 2.41
4 VENTILATION PANEL-4
(ZONE 8 TO 10) S/A FAN FIRE ZONE-9 15.0 15.0 23.2 56 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 56.00 5.02 1.209 3.10
E/A FAN FIRE ZONE-9 15.0 15.0 23.2 15 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 15.00 2.16 0.520 2.41
S/A FAN NORMAL ZONE-10 15.0 15.0 23.2 108 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 108.00 6.16 1.485 3.37
E/A FAN NORMAL ZONE-10 15.0 15.0 23.2 44 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 44.00 6.33 1.525 3.41
S/A FAN FIRE ZONE-10 15.0 15.0 23.2 108 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 108.00 6.16 1.485 3.37
E/A FAN FIRE ZONE-10 15.0 15.0 23.2 44 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 44.00 6.33 1.525 3.41
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
SMOKE EXT. PANEL-1, MEZZ LEVEL
51.8 51.8
(COR-1&2)
S/A FAN-1 CORRIDOR-1, TRUSS 2.2 2.2 3.4 86 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 86.00 1.81 0.437 2.88
E/A FAN-1 CORRIDOR-1 2.2 2.2 3.4 108 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 108.00 2.28 0.549 2.99
S/A FAN-2 CORRIDOR-1, TRUSS 2.2 2.2 3.4 96 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 96.00 2.03 0.488 2.93
E/A FAN-3 CORRIDOR-1 2.2 2.2 3.4 106 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 106.00 2.24 0.539 2.98
PRESS. FAN-4 5.5 5.5 8.5 56 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 56.00 2.95 0.712 3.15
PRESS. FAN-2 5.5 5.5 8.5 66 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 66.00 3.48 0.839 3.28
SMOKE EXT. PANEL-1,
MEZZ LEVEL S/A FAN-1, CORRIDOR-2,
5 3.7 3.7 5.7 126 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 126.00 4.47 1.078 3.52
(COR-1&2) TRUSS
LOC: ELEC. RM MZ2
E/A FAN-1 CORRIDOR-2 7.5 7.5 11.6 126 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 126.00 9.06 2.184 4.62
E/A FAN-2 CORRIDOR-2 7.5 7.5 11.6 106 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 106.00 7.63 1.838 4.28
FAN SECTION KITCHEN 2.2 2.2 3.4 156 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 156.00 3.29 0.793 3.23
S/A FAN-1 CORRIDOR-3 5.5 5.5 8.5 76 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 76.00 4.01 0.966 3.28
E/A FAN-1 CORRIDOR-3 5.5 5.5 8.5 65 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 65.00 3.43 0.826 3.14
S/A FAN-2 CORRIDOR-3 3.7 3.7 5.7 76 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 76.00 2.70 0.650 2.96
E/A FAN-2 CORRIDOR-3 3.7 3.7 5.7 78 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 78.00 2.77 0.667 2.98
SMOKE EXT. PANEL-2,
6 COR-3, MEZZ LEVEL S/A FAN-3 CORRIDOR-3 3.7 3.7 5.7 160 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 160.00 5.68 1.368 3.68
LOC: ELEC. RM MZ8
E/A FAN-3 CORRIDOR-3 3.7 3.7 5.7 192 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 192.00 6.81 1.642 3.95
S/A FAN-4 CORRIDOR-3 3.7 3.7 5.7 245 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 245.00 8.70 2.095 4.41
E/A FAN-4 CORRIDOR-3 3.7 3.7 5.7 246 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 246.00 8.73 2.104 4.41
PRESS. FAN-5 5.5 5.5 8.5 140 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 140.00 7.39 1.780 4.09
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
S/A FAN-1 CORRIDOR-4 3.7 3.7 5.7 42 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 42.00 1.49 0.359 3.02
E/A FAN-1 CORRIDOR-4 3.7 3.7 5.7 43 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 43.00 1.53 0.368 3.03
S/A FAN-2 CORRIDOR-4 5.5 5.5 8.5 106 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 106.00 5.59 1.348 4.01
E/A FAN-2 CORRIDOR-4 5.5 5.5 8.5 42 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 42.00 2.22 0.534 3.19
SMOKE EXT. PANEL-3,
MEZZ LEVEL
S/A FAN-1 CORRIDOR-5 5.5 5.5 8.5 106 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 106.00 5.59 1.348 4.01
(COR-4&5)
LOC: ELEC. RM MZ7
E/A FAN-1 CORRIDOR-5 5.5 5.5 8.5 146 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 146.00 7.70 1.856 4.52
S/A FAN-2 CORRIDOR-5 5.5 5.5 8.5 196 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 196.00 10.34 2.492 5.15
E/A FAN-2 CORRIDOR-5 5.5 5.5 8.5 202 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 202.00 10.66 2.568 5.23
FAN SECTION (BUFFER STORE) 1.1 1.1 1.7 125 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 125.00 1.32 0.318 2.98
S/A FAN-1, TRUSS LEVEL 15.0 15.0 23.2 56 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 56.00 5.02 1.209 3.65
E/A FAN-1 5.5 5.5 8.5 25 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 25.00 0.82 0.198 2.64
S/A FAN-2, TRUSS LEVEL 15.0 15.0 23.2 63 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 63.00 9.06 2.184 4.62
SMOKE EXT PANEL- E/A FAN-2 5.5 5.5 8.5 23 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 23.00 1.21 0.292 2.73
IMMIGRATION , MEZZ
LEVEL
LOC: ELEC. RM MZ2 E/A FAN-3 5.5 5.5 8.5 32 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 32.00 1.69 0.407 2.85
E/A FAN-4 5.5 5.5 8.5 32 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 32.00 1.69 0.407 2.85
PRESS FAN-6 3.7 3.7 5.7 36 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 36.00 1.28 0.308 2.75
PRESS FAN7 5.5 5.5 8.5 42 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 42.00 2.22 0.534 2.97
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
SMOKE EXT PANEL-1 DOM BRH -1, MEZZ LEVEL 153.0 153.0
S/A FAN-9, TRUSS 15.0 15.0 23.2 46 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 46.00 6.62 1.595 5.06
S/A FAN-10, TRUSS 15.0 15.0 23.2 46 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 46.00 6.62 1.595 5.06
S/A FAN-11, TRUSS 15.0 15.0 23.2 46 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 46.00 6.62 1.595 5.06
S/A FAN-12, TRUSS DOM BRH 15.0 15.0 23.2 46 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 46.00 6.62 1.595 5.06
S/A FAN-13, TRUSS DOM BRH 15.0 15.0 23.2 82 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 82.00 7.35 1.770 5.24
SMOKE EXT PANEL-1
DOM BRH -1, MEZZ
S/A FAN-14, TRUSS DOM BRH 15.0 15.0 23.2 82 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 82.00 7.35 1.770 5.24
LEVEL
LOC: ELEC. RM MZ4
S/A FAN-15, TRUSS BRH 15.0 15.0 23.2 82 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 82.00 7.35 1.770 5.24
S/A FAN-16, TRUSS DOM BRH 15.0 15.0 23.2 82 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 82.00 7.35 1.770 5.24
S/A FAN-1, TRUSS INT BRH 11.0 11.0 17.0 66 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 66.00 2.76 0.666 4.13
E/A FAN-11 DOM BRH 11.0 11.0 17.0 46 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 46.00 1.92 0.464 3.93
E/A FAN-12 DOM BRH 11.0 11.0 17.0 48 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 48.00 2.01 0.484 3.95
S/A FAN-17 DOM BRH 15.0 15.0 23.2 132 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 132.00 11.83 2.850 5.94
S/A FAN-18 DOM BRH 15.0 15.0 23.2 132 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 132.00 11.83 2.850 5.94
S/A FAN-19 DOM BRH 15.0 15.0 23.2 132 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 132.00 11.83 2.850 5.94
SMOKE EXT PANEL-2
DOM BRH , MEZZ
S/A FAN-20 DOM BRH 15.0 15.0 23.2 132 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 132.00 11.83 2.850 5.94
LEVEL
LOC: ELEC. RM MZ4
E/A FAN-13 DOM BRH 18.5 18.5 28.6 36 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 36.00 3.98 0.959 4.05
E/A FAN-14 DOM BRH 18.5 18.5 28.6 38 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 38.00 4.20 1.012 4.10
E/A FAN-7 DOM BRH 18.5 18.5 28.6 38 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 38.00 4.20 1.012 4.10
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
INT BRH SMOKE EXT PANEL MEZZ LEVEL 218.0 218.0
S/A FAN-2 INT BRH 11.0 11.0 17.0 86 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 86.00 5.65 1.362 4.09
S/A FAN-3 INT BRH 11.0 11.0 17.0 86 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 86.00 5.65 1.362 4.09
S/A FAN-4 INT BRH 11.0 11.0 17.0 86 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 86.00 5.65 1.362 4.09
E/A FAN-1 INT BRH 18.5 18.5 28.6 182 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 182.00 12.81 3.086 5.82
E/A FAN-2 INT BRH 18.5 18.5 28.6 182 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 182.00 12.81 3.086 5.82
E/A FAN-3 INT BRH 18.5 18.5 28.6 172 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 172.00 12.10 2.917 5.65
INT BRH SMOKE EXT
E/A FAN-4 INT BRH 18.5 18.5 28.6 172 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 172.00 12.10 2.917 5.65
PANEL MEZZ LEVEL
E/A FAN-5 INT BRH 18.5 18.5 28.6 182 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 182.00 12.81 3.086 5.82
E/A FAN-6 INT BRH 18.5 18.5 28.6 186 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 186.00 13.09 3.154 5.89
E/A FAN-8 INT BRH 18.5 18.5 28.6 222 3C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 222.00 11.37 2.739 5.47
E/A FAN-9 INT BRH 18.5 18.5 28.6 222 3C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 222.00 11.37 2.739 5.47
E/A FAN-10 INT BRH 18.5 18.5 28.6 226 3C x 35 415 1 117 0.80 93.60 Yes 1.11 0.90 0.080 2.00 226.00 11.57 2.789 5.52
HRW-2 18.5 18.5 28.6 126 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 126.00 8.87 2.137 4.87
SMOKE EXT PANEL-1 DEPARTURE LEVEL 280.0 280.0
S/A FAN-1 11.0 11.0 17.0 28 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 28.00 2.95 0.712 3.76
S/A FAN-2 11.0 11.0 17.0 34 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 34.00 3.59 0.864 3.92
S/A FAN-3 11.0 11.0 17.0 56 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 56.00 5.91 1.424 4.48
S/A FAN-4 11.0 11.0 17.0 58 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 58.00 6.12 1.475 4.53
S/A FAN-5 15.0 15.0 23.2 46 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 46.00 4.12 0.993 4.05
S/A FAN-6 15.0 15.0 23.2 56 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 56.00 5.02 1.209 4.26
S/A FAN-7 15.0 15.0 23.2 66 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 66.00 5.91 1.425 4.48
S/A FAN-8 15.0 15.0 23.2 82 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 82.00 7.35 1.770 4.82
E/A FAN-1 15.0 15.0 23.2 48 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 48.00 4.30 1.036 4.09
SMOKE EXT PANEL-1 E/A FAN-2 15.0 15.0 23.2 42 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 42.00 3.76 0.907 3.96
DEPARTURE LEVEL
LOC: TRUSS LEVEL E/A FAN-3 15.0 15.0 23.2 42 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 42.00 3.76 0.907 3.96
E/A FAN-4 15.0 15.0 23.2 46 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 46.00 4.12 0.993 4.05
E/A FAN-5 15.0 15.0 23.2 62 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 62.00 5.55 1.339 4.39
E/A FAN-6 11.0 11.0 17.0 52 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 52.00 3.42 0.823 3.88
E/A FAN-7 15.0 15.0 23.2 82 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 82.00 7.35 1.770 4.82
E/A FAN-8 15.0 15.0 23.2 90 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 90.00 8.06 1.943 5.00
E/A FAN-9 15.0 15.0 23.2 74 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 74.00 6.63 1.598 4.65
E/A FAN-10 15.0 15.0 23.2 82 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 82.00 7.35 1.770 4.82
E/A FAN-11 15.0 15.0 23.2 102 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 102.00 9.14 2.202 5.25
E/A FAN-12 15.0 15.0 23.2 106 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 106.00 9.50 2.288 5.34
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
S/A FAN-9 11.0 11.0 17.0 39 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 39.00 4.11 0.992 4.15
S/A FAN-10 11.0 11.0 17.0 42 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 42.00 4.43 1.068 4.22
S/A FAN-11 11.0 11.0 17.0 45 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 45.00 4.75 1.144 4.30
S/A FAN-12 11.0 11.0 17.0 46 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 46.00 4.85 1.170 4.32
S/A FAN-13 15.0 15.0 23.2 132 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 132.00 7.53 1.815 4.97
S/A FAN-14 15.0 15.0 23.2 136 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 136.00 7.76 1.870 5.02
S/A FAN-15 15.0 15.0 23.2 142 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 142.00 8.10 1.953 5.11
S/A FAN-16 15.0 15.0 23.2 146 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 146.00 8.33 2.008 5.16
E/A FAN-13 15.0 15.0 23.2 46 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 46.00 4.12 0.993 4.15
SMOKE EXT PANEL-2 E/A FAN-14 15.0 15.0 23.2 42 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 42.00 3.76 0.907 4.06
DEPARTURE
LOC: TRUSS LEVEL E/A FAN-15 15.0 15.0 23.2 56 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 56.00 5.02 1.209 4.36
E/A FAN-16 15.0 15.0 23.2 62 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 62.00 5.55 1.339 4.49
E/A FAN-17 15.0 15.0 23.2 96 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 96.00 8.60 2.073 5.23
E/A FAN-18 15.0 15.0 23.2 96 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 96.00 8.60 2.073 5.23
E/A FAN-19 15.0 15.0 23.2 96 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 96.00 8.60 2.073 5.23
E/A FAN-20 15.0 15.0 23.2 106 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 106.00 9.50 2.288 5.44
E/A FAN-21 15.0 15.0 23.2 145 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 145.00 8.27 1.994 5.15
E/A FAN-22 15.0 15.0 23.2 146 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 146.00 8.33 2.008 5.16
E/A FAN-23 15.0 15.0 23.2 152 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 152.00 8.67 2.090 5.24
E/A FAN-24 15.0 15.0 23.2 156 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 156.00 8.90 2.145 5.30
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
SMOKE EXT PANEL-3
284.0 284.0
DEPARTURE
S/A FAN-17 11.0 11.0 17.0 42 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 42.00 4.43 1.068 4.60
S/A FAN-18 11.0 11.0 17.0 46 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 46.00 4.85 1.170 4.70
S/A FAN-19 11.0 11.0 17.0 56 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 56.00 5.91 1.424 4.95
S/A FAN-20 11.0 11.0 17.0 62 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 62.00 6.54 1.576 5.10
S/A FAN-21 15.0 15.0 23.2 82 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 82.00 7.35 1.770 5.30
S/A FAN-22 15.0 15.0 23.2 86 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 86.00 7.71 1.857 5.38
S/A FAN-23 15.0 15.0 23.2 96 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 96.00 8.60 2.073 5.60
S/A FAN-24 15.0 15.0 23.2 102 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 102.00 9.14 2.202 5.73
E/A FAN-25 15.0 15.0 23.2 66 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 66.00 5.91 1.425 4.95
SMOKE EXT PANEL-3 E/A FAN-26 15.0 15.0 23.2 76 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 76.00 6.81 1.641 5.17
DEPARTURE,
LOC: TRUSS LEVEL E/A FAN-27 15.0 15.0 23.2 82 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 82.00 7.35 1.770 5.30
E/A FAN-28 15.0 15.0 23.2 92 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 92.00 8.24 1.986 5.51
E/A FAN-29 15.0 15.0 23.2 126 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 126.00 7.19 1.733 5.26
E/A FAN-30 15.0 15.0 23.2 132 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 132.00 7.53 1.815 5.34
E/A FAN-31 15.0 15.0 23.2 56 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 56.00 5.02 1.209 4.74
E/A FAN-32 15.0 15.0 23.2 46 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 46.00 4.12 0.993 4.52
E/A FAN-33 15.0 15.0 23.2 52 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 52.00 4.66 1.123 4.65
E/A FAN-34 15.0 15.0 23.2 44 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 44.00 3.94 0.950 4.48
E/A FAN-35 15.0 15.0 23.2 82 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 82.00 7.35 1.770 5.30
E/A FAN-36 15.0 15.0 23.2 72 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 72.00 6.45 1.554 5.08
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
S/A FAN-25 11.0 11.0 17.0 54 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 54.00 5.70 1.373 4.69
S/A FAN-26 11.0 11.0 17.0 56 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 56.00 5.91 1.424 4.74
S/A FAN-27 11.0 11.0 17.0 63 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 63.00 6.65 1.602 4.92
S/A FAN-28 11.0 11.0 17.0 68 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 68.00 7.17 1.729 5.04
S/A FAN-29 15.0 15.0 23.2 92 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 92.00 8.24 1.986 5.30
S/A FAN-30 15.0 15.0 23.2 96 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 96.00 8.60 2.073 5.39
S/A FAN-31 15.0 15.0 23.2 106 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 106.00 9.50 2.288 5.60
S/A FAN-32 15.0 15.0 23.2 112 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 112.00 10.03 2.418 5.73
E/A FAN-37 15.0 15.0 23.2 16 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 16.00 1.43 0.345 3.66
E/A FAN-38 15.0 15.0 23.2 16 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 16.00 1.43 0.345 3.66
SMOKE EXT PANEL-4 E/A FAN-39 15.0 15.0 23.2 16 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 16.00 1.43 0.345 3.66
DEPARTURE,
LOC: TRUSS LEVEL E/A FAN-40 15.0 15.0 23.2 16 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 16.00 1.43 0.345 3.66
E/A FAN-41 15.0 15.0 23.2 26 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 26.00 2.33 0.561 3.87
E/A FAN-42 15.0 15.0 23.2 26 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 26.00 2.33 0.561 3.87
E/A FAN-43 15.0 15.0 23.2 96 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 96.00 8.60 2.073 5.39
E/A FAN-44 15.0 15.0 23.2 104 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 104.00 9.32 2.245 5.56
E/A FAN-45 15.0 15.0 23.2 88 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 88.00 7.88 1.900 5.21
E/A FAN-46 15.0 15.0 23.2 92 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 92.00 8.24 1.986 5.30
E/A FAN-47 15.0 15.0 23.2 116 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 116.00 10.39 2.504 5.82
E/A FAN-48 15.0 15.0 23.2 122 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 122.00 10.93 2.634 5.95
E/A FAN-49 15.0 15.0 23.2 152 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 152.00 8.67 2.090 5.40
E/A FAN-50 15.0 15.0 23.2 156 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.90 0.080 2.00 156.00 8.90 2.145 5.46
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
S/A FAN-33 11.0 11.0 17.0 32 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 32.00 3.38 0.814 3.84
S/A FAN-34 11.0 11.0 17.0 36 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 36.00 3.80 0.915 3.94
S/A FAN-35 11.0 11.0 17.0 35 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 35.00 3.69 0.890 3.92
S/A FAN-36 11.0 11.0 17.0 36 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 36.00 3.80 0.915 3.94
E/A FAN-51 15.0 15.0 23.2 82 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 82.00 11.80 2.843 5.87
SMOKE EXT PANEL-5 E/A FAN-52 15.0 15.0 23.2 86 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 86.00 7.71 1.857 4.89
DEPARTURE,
LOC: TRUSS LEVEL E/A FAN-53 15.0 15.0 23.2 46 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 46.00 4.12 0.993 4.02
E/A FAN-54 15.0 15.0 23.2 52 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 52.00 4.66 1.123 4.15
E/A FAN-55 15.0 15.0 23.2 72 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 72.00 6.45 1.554 4.58
E/A FAN-56 15.0 15.0 23.2 76 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 76.00 6.81 1.641 4.67
E/A FAN-57 15.0 15.0 23.2 102 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 102.00 9.14 2.202 5.23
E/A FAN-58 15.0 15.0 23.2 106 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 106.00 9.50 2.288 5.32
SMOKE EXT.PANEL-1 E/A FAN-1, COR-1 1.5 1.5 2.3 86 3C x 6 415 1 40 0.80 32.00 Yes 5.90 0.90 0.090 2.00 86.00 1.85 0.445 2.97
ARRIVAL LEVEL
LOC: ELEC RM AR1 E/A FAN-2, COR-1 1.5 1.5 2.3 86 3C x 6 415 1 40 0.80 32.00 Yes 5.90 0.90 0.090 2.00 86.00 1.85 0.445 2.97
COR-2 SMOKE EXT PANEL 9.6 9.6 14.8 92 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 92.00 5.28 1.271 3.80
S/A FAN, COR-2 2.2 2.2 3.4 126 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 126.00 2.66 0.641 4.44
COR-2 SMOKE EXT
PANEL E/A FAN, COR-2 3.7 3.7 5.7 66 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 66.00 2.34 0.564 4.36
LOC: ELEC RM AR5
PRESS FAN-1 3.7 3.7 5.7 46 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 46.00 1.63 0.393 4.19
Check
Cable/ No. of Total
Total Expected Max. Cable size System Current Effective whether Resistanc Reactance Voltage % Voltage % Voltage
Duct Cable Derating Cable Length
Sr. No. From To Connected Maximum current adopted Voltage capacity current Col-11 is e in Cos φ in drop in drop (in drop upto
length in 2 runs factor Terminati of Cable
Load in kW Load in kW (Amps) mm in Volts Amps capacity more Ohm/km Ohm/km Volts segment) last point
mtr. on (m)
than Col-5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Pressurization Panel-1 44.0 44.0
Press Fan-1 (Upper Dep.) 5.5 5.5 8.5 98 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 98.00 5.17 1.246 4.06
Press Fan-2 (Upper Dep.) 5.5 5.5 8.5 100 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 100.00 5.28 1.271 4.09
Press Fan-3 (Upper Dep.) 5.5 5.5 8.5 105 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 105.00 5.54 1.335 4.15
Pressurization Press Fan-4 (Upper Dep.) 5.5 5.5 8.5 102 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 102.00 5.38 1.297 4.12
Panel-1
Loc: Truss Level Press Fan-5 (Upper Dep.) 5.5 5.5 8.5 116 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 116.00 6.12 1.475 4.29
Press Fan-6 (Upper Dep.) 5.5 5.5 8.5 116 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 116.00 6.12 1.475 4.29
Press Fan-1 (Truss Level) 5.5 5.5 8.5 65 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 65.00 3.43 0.826 3.65
Press Fan-2 (Truss Level) 5.5 5.5 8.5 66 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 66.00 3.48 0.839 3.66
Press Fan-3 (Truss Level) 5.5 5.5 8.5 30 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 30.00 1.58 0.381 2.66
Press Fan-4 (Truss Level) 5.5 5.5 8.5 30 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 30.00 1.58 0.381 2.66
Press Fan-5 (Truss Level) 5.5 5.5 8.5 48 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 48.00 2.53 0.610 2.89
Pressurization
Panel-2 Press Fan-6 (Truss Level) 5.5 5.5 8.5 48 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 48.00 2.53 0.610 2.89
Loc: Truss Level
Press Fan-7 (Truss Level) 5.5 5.5 8.5 58 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 58.00 3.06 0.737 3.02
Press Fan-8 (Truss Level) 5.5 5.5 8.5 156 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 156.00 8.23 1.983 4.27
Press Fan-8A (Truss Level) 5.5 5.5 8.5 160 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 160.00 8.44 2.034 4.32
Press Fan-9 (Truss Level) 5.5 5.5 8.5 48 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 48.00 2.53 0.610 4.42
Press Fan-10 (Truss Level) 5.5 5.5 8.5 66 3C x 6 415 1 40 0.80 32.00 Yes 5.90 0.90 0.090 2.00 66.00 5.20 1.253 5.07
Press Fan-11 (Truss Level) 5.5 5.5 8.5 68 3C x 6 415 1 40 0.80 32.00 Yes 5.90 0.90 0.090 2.00 68.00 5.36 1.291 5.10
Press Fan-6 (Upper Dep.) 5.5 5.5 8.5 116 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 116.00 6.12 1.475 5.29
Pressurization
Panel-3 Press Fan-7 (Upper Dep.) 5.5 5.5 8.5 116 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 116.00 6.12 1.475 5.29
Loc: Truss Level
Press Fan-8 (Upper Dep.) 5.5 5.5 8.5 122 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 122.00 6.44 1.551 5.36
Press Fan-9 (Upper Dep.) 5.5 5.5 8.5 122 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.90 0.084 2.00 122.00 6.44 1.551 5.36
Press Fan-10 (Upper Dep.) 5.5 5.5 8.5 232 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 232.00 7.62 1.836 5.65
Press Fan-11 (Upper Dep.) 5.5 5.5 8.5 236 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.90 0.080 2.00 236.00 7.75 1.868 5.68
AHU-AR-05 22 22 38.3 176 3C x 50 415 1 140 0.80 112.00 Yes 0.82 0.80 0.078 0.600 2.00 176.00 8.20 1.975 5.67
AHU-AR-06 22 22 38.3 170 3C x 50 415 1 140 0.80 112.00 Yes 0.82 0.80 0.078 0.600 2.00 170.00 7.92 1.908 5.61
AHU PANEL-1, AHU-AR-07 18.5 18.5 32.2 86 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 86.00 6.13 1.478 5.18
BASEMENT
AHU-AR-08 18.5 18.5 32.2 80 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 80.00 8.92 2.148 5.85
INT&DOM BRH
AHU-AR-09 18.5 18.5 32.2 36 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 36.00 4.01 0.967 4.67
AHU-AR-10 18.5 18.5 32.2 126 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 126.00 8.99 2.166 5.87
AHU-7 LT PANEL ROOM 3 3 5.2 86 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 86.00 1.55 0.375 4.07
9.0 9.0
AHU-1 SCADA ROOM 1.5 1.5 2.6 66 3C x 6 415 1 40 0.80 32.00 Yes 5.9 0.80 0.09 0.600 2.00 66.00 1.42 0.343 3.25
AHU-2 UPS ROOM 1.5 1.5 2.6 42 3C x 6 415 1 40 0.80 32.00 Yes 5.9 0.80 0.09 0.600 2.00 42.00 0.91 0.218 3.12
AHU PANEL-2,
AHU-3 UPS ROOM 1.5 1.5 2.6 42 3C x 6 415 1 40 0.80 32.00 Yes 5.9 0.80 0.09 0.600 2.00 42.00 0.91 0.218 3.12
BASEMENT
SUBSTATION AREA
AHU-4 MED. S ROOM 1.5 1.5 2.6 32 3C x 4 415 1 30 0.80 24.00 Yes 9.48 0.80 0.098 0.600 2.00 32.00 1.10 0.266 3.17
AHU-5 EMT. ROOM 1.5 1.5 2.6 32 3C x 4 415 1 30 0.80 24.00 Yes 9.48 0.80 0.098 0.600 2.00 32.00 1.10 0.266 3.17
AHU-6 EMT. ROOM 1.5 1.5 2.6 36 3C x 4 415 1 30 0.80 24.00 Yes 9.48 0.80 0.098 0.600 2.00 36.00 1.24 0.300 3.20
59.6 59.6
AHU SUB PANEL-3 12.7 12.7 22.1 126 4C x 35 415 1 117 0.80 93.60 Yes 1.11 0.80 0.08 0.600 2.00 126.00 4.51 1.087 4.78
AHU Panel-1 Arrival
AHU-AR-4 CUSTOM+RED & INT.
Lvl. 15 15 26.1 96 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 96.00 8.67 2.090 5.79
MEZZANINE
Loc: Elec RM AR2A
AHU-AR-03A IMMIGRATION 11 11 19.1 16 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 16.00 1.06 0.255 3.95
AHU-AR-12 OFFICES 3.7 3.7 6.4 126 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 126.00 4.50 1.084 4.78
FAN SECTION WASTE AREA 2.2 2.2 3.8 135 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 135.00 2.86 0.690 4.39
66.7 66.7
AHU-AR-11 DOM ARRIVAL
18.5 18.5 32.2 102 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 102.00 7.28 1.753 5.21
CONCOURSE
AHU-AR-13 OFFICES 11 11 19.1 156 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 156.00 6.62 1.594 5.05
AHU-AR-14B VIP RECEPTION, CONF.
AHU Panel-2 Arrival ROOM & MEETING ROOM AT 3.7 3.7 6.4 206 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 206.00 7.35 1.772 5.23
Lvl. MEZZANINE
Loc: Elec RM AR5
AHU-AR-14A VIP LOUNGE, CONF.
15 15 26.1 216 3C x 50 415 1 140 0.80 112.00 Yes 0.82 0.80 0.078 0.600 2.00 216.00 6.86 1.653 5.11
ROOM, MEETING ROOM & GOODS IN
AHU 38
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - AHU
TERMINAL BUILDING
Expected Check %
Total Cable/ No. of Total
Max. Cable size System Current Effective whether Resistance Reactanc Voltage % Voltage Voltage
Connecte Duct Cable Derating Cable Length
Sr. No. From To Maximu current adopted Voltage capacity current Col-11 is in Ohm/ Cos φ e in Sin φ drop in drop (in drop
d Load length in 2 runs factor Termina of Cable
m Load (Amps) mm in Volts Amps capacity more than km Ohm/km Volts segment) upto last
in kW mtr. tion (m)
in kW Col-5 point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
12.7 12.7
AHU-AR-02 INTERNATIONAL COACH
7.5 7.5 13.0 26 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 26.00 1.17 0.283 5.07
AHU SUB Panel-3 GATES
Arrival Lvl. AHU-AR-3B IMMIGRATION 3.7 3.7 6.4 36 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 36.00 1.28 0.310 5.09
Loc: Elec RM AR3
CSU-CONTROL ROOM 1.5 1.5 2.6 42 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 42.00 0.61 0.146 4.93
71.05 71.05
CSU - OFFEICE & MEETING ROOM 2.2 2.2 3.8 32 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 32.00 0.42 0.102 4.58
CSU - OFFEICE & MEETING ROOM 2.2 2.2 3.8 32 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 32.00 0.42 0.102 4.58
AHU-MZ-01- POTENTIAL & HBS
15 15 26.1 59 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 59.00 5.33 1.285 5.77
SCREENING-1
AHU-DP-1A 11 11 19.1 31 3C x 6 415 1 40 0.80 32.00 Yes 5.9 0.80 0.09 0.600 2.00 31.00 4.90 1.182 5.66
AHU Panel-1 AHU-MZ-03 5.5 5.5 9.6 56 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 56.00 1.86 0.447 4.93
Mezzanine Lvl.
Loc: Elec RM MZ1 HRW-1 (WHEEL) 0.55 0.55 1.0 106 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 106.00 0.22 0.054 4.54
HRW-1 15 15 26.1 106 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 106.00 6.13 1.477 5.96
HRW-1 18.5 18.5 32.2 106 3C x 35 415 1 117 0.80 93.60 Yes 1.11 0.80 0.080 0.600 2.00 106.00 5.53 1.332 5.81
C/S AHU UPS ROOM-2 1.1 1.1 1.9 56 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 56.00 0.37 0.089 4.57
27.5 27.5
AHU-MZ-06 GATE ROOM-1 11 11 19.1 16 3C x 6 415 1 40 0.80 32.00 Yes 5.9 0.80 0.09 0.600 2.00 16.00 2.53 0.610 3.98
AHU Panel-2
Mezzanine Lvl. AHU-MZ-07 GATE ROOM-2 11 11 19.1 86 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 86.00 9.12 2.199 5.57
Loc: AHU RM MZ8
AHU-DP-12A OPEN RETAIL, F&B-1 5.5 5.5 9.6 62 3C x 6 415 1 40 0.80 32.00 Yes 5.9 0.80 0.09 0.600 2.00 62.00 4.90 1.182 4.55
47.6 47.6
AHU-MZ-04 HBS SCREENING 15 15 26.1 176 3C x 35 415 1 117 0.80 93.60 Yes 1.11 0.80 0.080 0.600 2.00 176.00 7.44 1.793 5.73
TFA-AR-01 BAGGAGE CLAIM 15 15 26.1 106 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 106.00 6.13 1.477 5.42
AHU Panel-3 AHU-MZ-05 CORRIDOR 5.5 5.5 9.6 66 3C x 6 415 1 40 0.80 32.00 Yes 5.9 0.80 0.09 0.600 2.00 66.00 5.22 1.258 5.20
Mezzanine Lvl.
Loc: Near TFA-AR-01 CSU-UPS ROOM-1 1.1 1.1 1.9 216 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 216.00 2.29 0.552 4.49
AHU-MZ-11 11 11 19.1 156 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 156.00 6.62 1.594 5.53
57.2 57.2
AHU-MZ-12 CANTEEN 3.7 3.7 6.4 106 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 106.00 2.36 0.569 5.02
AHU-MZ-09 CORRIDOR 11 11 19.1 38 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 38.00 1.61 0.388 4.84
AHU Panel-4 CSU SCRUBBER KITCHEN 15 15 26.1 126 3C x 35 415 1 117 0.80 93.60 Yes 1.11 0.80 0.080 0.600 2.00 126.00 5.33 1.284 5.74
Mezzanine Lvl.
Loc: Elec RM MZ7 TFA-MZ-01 KITCHEN 11 11 19.1 106 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 106.00 4.50 1.083 5.54
AHU-MZ-08 CORRIDOR 11 11 19.1 108 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 108.00 4.58 1.104 5.56
AHU-DP-18A,
5.5 5.5 9.6 56 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 56.00 2.97 0.716 5.17
OPEN RETAIL & F&B-3
AHU 39
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - AHU
TERMINAL BUILDING
Expected Check %
Total Cable/ No. of Total
Max. Cable size System Current Effective whether Resistance Reactanc Voltage % Voltage Voltage
Connecte Duct Cable Derating Cable Length
Sr. No. From To Maximu current adopted Voltage capacity current Col-11 is in Ohm/ Cos φ e in Sin φ drop in drop (in drop
d Load length in 2 runs factor Termina of Cable
m Load (Amps) mm in Volts Amps capacity more than km Ohm/km Volts segment) upto last
in kW mtr. tion (m)
in kW Col-5 point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
87.8 87.8
AHU-DP-1B, CHECK IN & INT.
11 11 19.1 46 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 46.00 3.05 0.735 5.83
SECURITY CHECK
AHU-DP-2, CHECK IN & INT.
11 11 19.1 86 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 86.00 3.65 0.879 5.97
SECURITY CHECK AT MEZZANINE
AHU-DP-4A,
7.5 7.5 13.0 96 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 96.00 4.34 1.045 6.14
INT. CIP LOUNGE
AHU Panel-1
Departure Lvl. AHU-DP-12,
Loc: Elec RM DP3 OPEN RETAIL & F&B1, 11 11 19.1 66 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 66.00 4.37 1.054 6.15
INT. SECURITY & SMOKING ROOM
AHU-DP-10, INT. COR. & PRAYER
3.7 3.7 6.4 76 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 76.00 2.71 0.654 5.75
ROOM
AHU SUB PANEL-3 42.5 42.5 73.9 100 3.5C x 185 415 1 339 0.80 271.20 Yes 0.211 0.80 0.072 0.600 2.00 100.00 2.71 0.654 5.75
CSU-MEDICAL ROOM 1.1 1.1 1.9 128 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 128.00 1.36 0.327 5.42
74.7 74.7
AHU-MZ-02
3.7 3.7 6.4 92 3C x 10 415 1 53 0.80 42.40 Yes 3.94 0.80 0.084 0.600 2.00 92.00 3.28 0.791 5.08
LANDSIDE RESTING
AHU-DP-03, CHECKIN COUNC. &
TICKETING COUNTER-1 AT MEZZ 7.5 7.5 13.0 96 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 96.00 4.34 1.045 5.34
LVL.
AHU-DP-4A
7.5 7.5 13.0 96 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 96.00 4.34 1.045 5.34
CHECK IN CONCOURSE AT MEZ LVL
42.5 42.5
AHU-DP-13, OPEN RETAIL & F&B1,
18.5 18.5 32.2 55 3C x 95 433 1 221 0.80 176.80 Yes 0.41 0.80 0.074 0.600 2.00 55.00 1.14 0.264 6.01
AHU SUB Panel-3 INT. SECURITY CHECK
Departure Lvl. AHU-DP-14, FLEXIBLE COR. & F&B,
18.5 18.5 32.2 25 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 25.00 1.78 0.430 6.18
Loc: Elec RM DP4 SEARCH AREA
AHU-DP-15A AT MEZZANINE 5.5 5.5 9.6 85 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 85.00 1.80 0.434 6.18
50.2 50.2
AHU 40
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - AHU
TERMINAL BUILDING
Expected Check %
Total Cable/ No. of Total
Max. Cable size System Current Effective whether Resistance Reactanc Voltage % Voltage Voltage
Connecte Duct Cable Derating Cable Length
Sr. No. From To Maximu current adopted Voltage capacity current Col-11 is in Ohm/ Cos φ e in Sin φ drop in drop (in drop
d Load length in 2 runs factor Termina of Cable
m Load (Amps) mm in Volts Amps capacity more than km Ohm/km Volts segment) upto last
in kW mtr. tion (m)
in kW Col-5 point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
AHU-DP-6, CHECK IN CONC. &
TICKETING COUNTER-2 AT 7.5 7.5 13.0 98 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 98.00 4.43 1.067 5.18
MEZZANINE
AHU-DO-7A, CHECK IN CONCOURSE,
15 15 26.1 51 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 51.00 4.61 1.110 5.23
F&B3 AT MEZZANINE
AHU-DP-7B 7.5 7.5 13.0 56 3C x 16 415 1 70 0.80 56.00 Yes 2.44 0.80 0.080 0.600 2.00 56.00 2.53 0.610 4.72
89 89
AHU-DP-16, DOM. SECURITY CHECK 15 15 26.1 112 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 112.00 6.48 1.561 5.40
AHU-DP-17, OPEN RETAIL, F&B2,3 15 15 26.1 106 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 106.00 6.13 1.477 5.32
AHU Panel-5 AHU-DP-19, DOMESTIC OPEN OPEN
11 11 19.1 146 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 146.00 6.19 1.492 5.33
Departure Lvl. RETAIL-3
Loc: Elec RM DP8 AHU-20, WAIT & CORRIDOR
18.5 18.5 32.2 246 3C x 95 433 1 221 0.80 176.80 Yes 0.41 0.80 0.074 0.600 2.00 246.00 5.12 1.181 5.02
AT MEZZANINE
AHU-21, WAIT & CORRIDOR
18.5 18.5 32.2 240 3C x 95 433 1 221 0.80 176.80 Yes 0.41 0.80 0.074 0.600 2.00 240.00 4.99 1.153 4.99
AT MEZZANINE
AHU-MZ-10 11 11 19.1 141 3C x 25 415 1 99 0.80 79.20 Yes 1.54 0.80 0.080 0.600 2.00 141.00 5.98 1.441 5.28
AHU 41
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - SERVICES YARD SUB PANELS
Check
%
Expected Cable/ whether No. of Total %
Total Max. Cable size System Current Effective Resistan Reactanc Voltage Voltage
Maximu Duct Cable Derating Col-11 is Cable Length Voltage
Sr. No. From To Connected current adopted Voltage capacity current ce in Cos φ e in Sin φ drop in drop
m Load length in runs factor more Termina of Cable drop (in
Load in kW (Amps) mm2 in Volts Amps capacity Ohm/km Ohm/km Volts upto last
in kW mtr. than Col- tion (m) segment)
point
5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
STP Distribution Panel
229.4 151.8
Loc: STP Pump Room
STP Distribution Panel STP Panel-1 124.6 85.8 132.6 58 3.5C x 120 415 1 258 0.80 206.40 Yes 0.33 0.90 0.072 0.436 2.00 58.00 4.31 1.040 2.74
STP Distribution Panel STP Panel-2 57.1 37.7 58.2 62 3.5C X 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.077 0.436 2.00 62.00 3.40 0.820 2.52
STP Distribution Panel STP Panel-3 47.7 28.3 43.8 68 3.5C X 70 415 1 176 0.80 140.80 Yes 0.57 0.90 0.077 0.436 2.00 68.00 2.81 0.676 2.37
Axial Fan-Set-1, 1 3C x 4
5.5 5.5 8.5 49 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 49.00 3.86 0.931 2.52
DG Auxiliary Panel-1 (DOL) Cu.
Loc: Service Yard DG Axial Fan-Set-1, 1 3C x 4
5.5 5.5 8.5 50 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 50.00 3.94 0.950 2.54
Room (DOL) Cu.
Axial Fan-Set-2, 1 3C x 4
5.5 5.5 8.5 56 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 56.00 4.41 1.064 2.65
(DOL) Cu.
Axial Fan-Set-2, 2 3C x 4
5.5 5.5 8.5 58 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 58.00 4.57 1.102 2.69
(DOL) Cu.
Check
%
Expected Cable/ whether No. of Total %
Total Max. Cable size System Current Effective Resistan Reactanc Voltage Voltage
Maximu Duct Cable Derating Col-11 is Cable Length Voltage
Sr. No. From To Connected current adopted Voltage capacity current ce in Cos φ e in Sin φ drop in drop
m Load length in runs factor more Termina of Cable drop (in
Load in kW (Amps) mm2 in Volts Amps capacity Ohm/km Ohm/km Volts upto last
in kW mtr. than Col- tion (m) segment)
point
5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Airwasher-4
11.0 11.0 17.0 62 3C x 16 415 2 70 0.80 112.00 Yes 2.44 0.90 0.080 0.436 4.00 124.00 2.04 0.491 1.55
(sd Starter)
Airwasher-4
11.0 11.0 17.0 65 3C x 16 415 2 70 0.80 112.00 Yes 2.44 0.90 0.080 0.436 4.00 130.00 2.14 0.515 1.57
(sd Starter)
Airwasher-5
11.0 11.0 17.0 66 3C x 16 415 2 70 0.80 112.00 Yes 2.44 0.90 0.080 0.436 4.00 132.00 2.17 0.522 1.58
(sd Starter)
Airwasher-5
11.0 11.0 17.0 65 3C x 16 415 2 70 0.80 112.00 Yes 2.44 0.90 0.080 0.436 4.00 130.00 2.14 0.515 1.57
(sd Starter)
Airwasher pump-4 3C x 4
3.0 3.0 4.6 62 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 62.00 2.67 0.642 1.70
(DOL) Cu.
Airwasher pump-5 3C x 4
3.0 3.0 4.6 66 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 66.00 2.84 0.684 1.74
(DOL) Cu.
Axial Fan-Set-3, 1 3C x 4
5.5 5.5 8.5 66 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 66.00 5.20 1.254 2.31
(DOL) Cu.
Axial Fan-Set-3, 1 3C x 4
5.5 5.5 8.5 67 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 67.00 5.28 1.273 2.33
(DOL) Cu.
Axial Fan-Set-4, 1 3C x 4
5.5 5.5 8.5 72 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 72.00 5.68 1.368 2.43
(DOL) Cu.
Axial Fan-Set-4, 2 3C x 4
DG Auxiliary Panel-2 5.5 5.5 8.5 72 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 72.00 5.68 1.368 2.43
(DOL) Cu.
Loc: Service Yard DG
Room Axial Fan-Set-5, 1 3C x 4
5.5 5.5 8.5 76 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 76.00 5.99 1.443 2.50
(DOL) Cu.
Axial Fan-Set-5, 2 3C x 4
5.5 5.5 8.5 77 415 1 37 0.80 29.60 Yes 5.90 0.90 0.098 0.436 2.00 77.00 6.07 1.462 2.52
(DOL) Cu.
Check
%
Expected Cable/ whether No. of Total %
Total Max. Cable size System Current Effective Resistan Reactanc Voltage Voltage
Maximu Duct Cable Derating Col-11 is Cable Length Voltage
Sr. No. From To Connected current adopted Voltage capacity current ce in Cos φ e in Sin φ drop in drop
m Load length in runs factor more Termina of Cable drop (in
Load in kW (Amps) mm2 in Volts Amps capacity Ohm/km Ohm/km Volts upto last
in kW mtr. than Col- tion (m) segment)
point
5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
WTP Panel 80.6
3C x 4
Sump Pump 1 1 3 52 415 1 37 0.80 29.60 Yes 5.90 0.80 0.098 0.600 2.00 52.00 1.12 0.269 2.13
Cu.
Check
%
Expected Cable/ whether No. of Total %
Total Max. Cable size System Current Effective Resistan Reactanc Voltage Voltage
Maximu Duct Cable Derating Col-11 is Cable Length Voltage
Sr. No. From To Connected current adopted Voltage capacity current ce in Cos φ e in Sin φ drop in drop
m Load length in runs factor more Termina of Cable drop (in
Load in kW (Amps) mm2 in Volts Amps capacity Ohm/km Ohm/km Volts upto last
in kW mtr. than Col- tion (m) segment)
point
5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Fire Fighting Panel-1 200.0 200.0
4C x 16
UPS-1 42.0 42.0 64.9 28 415 2 85 0.80 136.00 Yes 1.47 0.90 0.080 0.436 4.00 56.00 2.14 0.515 2.43
Cu.
ELV UPS Input Panel-2 4C x 16
UPS-2 42.0 42.0 64.9 32 415 2 85 0.80 136.00 Yes 1.47 0.90 0.080 0.436 4.00 64.00 2.44 0.589 2.51
Secondary Data Centre Cu.
4C x 16
UPS-3 42.0 42.0 64.9 36 415 2 85 0.80 136.00 Yes 1.47 0.90 0.080 0.436 4.00 72.00 2.75 0.662 2.82
Cu.
4C x 10
Tunnel Lighting DB-1 10.0 10.0 15.5 60.00 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 60.00 3.44 0.829 2.06
Cu.
4C x 16
Utility Tunnel L&P Tunnel Power DB-1 15.0 15.0 23.2 60.00 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 60.00 3.27 0.788 2.02
Cu.
27 Panel
Loc: Service Yard Area Tunnel Lighting DB-2 4C x 10
12.0 12.0 18.5 66.00 415 1 67 0.80 53.60 Yes 2.34 0.90 0.084 0.436 2.00 66.00 4.54 1.095 2.32
Cu.
4C x 16
Tunnel Power DB-2 18.9 18.9 29.2 65.00 415 1 85 0.80 68.00 Yes 1.47 0.90 0.080 0.436 2.00 65.00 4.47 1.076 2.30
Cu.
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
runs factor Termination drop
Load in kW (Amps) mtr. mm2 Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
3 High Mast-1 2.0 3.1 435 4C x 16 1 61 0.80 48.80 2 435 3.36 0.81 3.94
4 High Mast-2 2.0 3.1 450 4C x 16 1 61 0.80 48.80 2 450 3.48 0.84 3.97
5 High Mast-3 2.0 3.1 370 4C x 16 1 61 0.80 48.80 2 370 2.86 0.69 3.82
External Development Feeder-
6 Terminal Building Feeder Pillar-3 23.1 35.7 510 3.5C x 185 1 285 0.80 228.00 2 510 6.97 1.680 4.81
7 Feeder Pillar-4-Landscape 23.1 35.7 410 3.5C x 185 1 285 0.80 228.00 2 410 5.60 1.350 4.48
8 VTPN DB- Driver Canteen 22.0 34.0 355 3.5C x 50 1 140 0.80 112.00 2 355 10.45 2.52 5.65
9 Feeder Pillar-1 19.0 29.4 210 3.5C x 120 1 225 0.80 180.00 2 210 3.46 0.83 3.06
External Development-Service
10 Feeder Pillar-2 21.8 33.7 420 3.5C x 185 1 285 0.80 228.00 2 420 5.42 1.31 3.53
Yard
11 High Mast 2.0 3.1 245 4C x 16 1 61 0.80 48.80 2 245 1.89 0.46 2.68
Feeder Pillar-1
Light Pole-1
12 Feeder Pillar-1 1.5 2.3 80 4C x 16 1 61 0.80 48.80 2 80.00 0.46 0.11 3.17
FP1/RYB1
Light Pole-2
13 Feeder Pillar-1 1.4 2.1 25 4C x 10 1 48 0.80 38.40 2 25.00 0.21 0.05 3.22
FP1/RYB1
Light Pole-3
14 Feeder Pillar-1 1.2 1.9 25 4C x 10 1 48 0.80 38.40 2 25.00 0.19 0.05 3.27
FP1/RYB1
EXT LIGHTING 46
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-4
15 Feeder Pillar-1 1.1 1.7 25 4C x 10 1 48 0.80 38.40 2 25.00 0.17 0.04 3.31
FP1/RYB1
Light Pole-5
16 Feeder Pillar-1 0.9 1.5 25 4C x 10 1 48 0.80 38.40 2 25.00 0.15 0.04 3.34
FP1/RYB1
Light Pole-6
17 Feeder Pillar-1 0.8 1.3 25 4C x 10 1 48 0.80 38.40 2 25.00 0.13 0.03 3.37
FP1/RYB1
Light Pole-7
18 Feeder Pillar-1 0.7 1.0 25 4C x 10 1 48 0.80 38.40 2 25.00 0.10 0.03 3.40
FP1/RYB1
Light Pole-8
19 Feeder Pillar-1 0.5 0.8 25 4C x 10 1 48 0.80 38.40 2 25.00 0.08 0.02 3.42
FP1/RYB1
Light Pole-9
20 Feeder Pillar-1 0.4 0.6 25 4C x 10 1 48 0.80 38.40 2 25.00 0.06 0.02 3.43
FP1/RYB1
Light Pole-10
21 Feeder Pillar-1 0.3 0.4 25 4C x 10 1 48 0.80 38.40 2 25.00 0.04 0.01 3.44
FP1/RYB1
Light Pole-11
22 Feeder Pillar-1 0.1 0.2 25 4C x 10 1 48 0.80 38.40 2 25.00 0.02 0.01 3.45
FP1/RYB1
Light Pole-1
23 Feeder Pillar-1 1.2 1.9 90 4C x 16 1 61 0.80 48.80 2 90.00 0.42 0.10 3.16
FP1/RYB2
Light Pole-2
24 Feeder Pillar-1 1.1 1.7 25 4C x 16 1 61 0.80 48.80 2 25.00 0.10 0.03 3.19
FP1/RYB2
Light Pole-3
25 Feeder Pillar-1 0.9 1.5 25 4C x 10 1 48 0.80 38.40 2 25.00 0.15 0.04 3.22
FP1/RYB2
Light Pole-4
26 Feeder Pillar-1 0.8 1.3 25 4C x 10 1 48 0.80 38.40 2 25.00 0.13 0.03 3.25
FP1/RYB2
Light Pole-5
27 Feeder Pillar-1 0.7 1.0 25 4C x 10 1 48 0.80 38.40 2 25.00 0.10 0.03 3.28
FP1/RYB2
Light Pole-6
28 Feeder Pillar-1 0.5 0.8 25 4C x 10 1 48 0.80 38.40 2 25.00 0.08 0.02 3.30
FP1/RYB2
Light Pole-7
29 Feeder Pillar-1 0.4 0.6 25 4C x 10 1 48 0.80 38.40 2 25.00 0.06 0.02 3.31
FP1/RYB2
Light Pole-8
30 Feeder Pillar-1 0.3 0.4 25 4C x 10 1 48 0.80 38.40 2 25.00 0.04 0.01 3.32
FP1/RYB2
Light Pole-9
31 Feeder Pillar-1 0.1 0.2 25 4C x 10 1 48 0.80 38.40 2 25.00 0.02 0.01 3.33
FP1/RYB2
Light Pole-1
32 Feeder Pillar-1 1.4 2.1 175 4C x 16 1 61 0.80 48.80 2 175.00 0.91 0.22 3.28
FP1/RYB3
Light Pole-2
33 Feeder Pillar-1 1.2 1.9 25 4C x 16 1 61 0.80 48.80 2 25.00 0.12 0.03 3.31
FP1/RYB3
Light Pole-3
34 Feeder Pillar-1 1.1 1.7 25 4C x 16 1 61 0.80 48.80 2 25.00 0.10 0.03 3.33
FP1/RYB3
Light Pole-4
35 Feeder Pillar-1 0.9 1.5 25 4C x 16 1 61 0.80 48.80 2 25.00 0.09 0.02 3.36
FP1/RYB3
EXT LIGHTING 47
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-5
36 Feeder Pillar-1 0.8 1.3 25 4C x 16 1 61 0.80 48.80 2 25.00 0.08 0.02 3.37
FP1/RYB3
Light Pole-6
37 Feeder Pillar-1 0.7 1.0 25 4C x 16 1 61 0.80 48.80 2 25.00 0.07 0.02 3.39
FP1/RYB3
Light Pole-7
38 Feeder Pillar-1 0.5 0.8 25 4C x 16 1 61 0.80 48.80 2 25.00 0.05 0.01 3.40
FP1/RYB3
Light Pole-8
39 Feeder Pillar-1 0.4 0.6 25 4C x 16 1 61 0.80 48.80 2 25.00 0.04 0.01 3.41
FP1/RYB3
Light Pole-9
40 Feeder Pillar-1 0.3 0.4 25 4C x 16 1 61 0.80 48.80 2 25.00 0.03 0.01 3.42
FP1/RYB3
Light Pole-10
41 Feeder Pillar-1 0.1 0.2 25 4C x 16 1 61 0.80 48.80 2 25.00 0.01 0.00 3.42
FP1/RYB3
Light Pole-1
42 Feeder Pillar-1 1.3 1.9 85 4C x 16 1 61 0.80 48.80 2 85.00 0.41 0.10 3.16
FP1/RYB4
Light Pole-2
43 Feeder Pillar-1 1.2 1.8 18 4C x 10 1 48 0.80 38.40 2 18.00 0.13 0.03 3.19
FP1/RYB4
Light Pole-3
44 Feeder Pillar-1 1.1 1.7 18 4C x 10 1 48 0.80 38.40 2 18.00 0.13 0.03 3.22
FP1/RYB4
Light Pole-4
45 Feeder Pillar-1 1.1 1.6 18 4C x 10 1 48 0.80 38.40 2 18.00 0.12 0.03 3.25
FP1/RYB4
Light Pole-5
46 Feeder Pillar-1 1.0 1.5 18 4C x 10 1 48 0.80 38.40 2 18.00 0.11 0.03 3.28
FP1/RYB4
Light Pole-6
47 Feeder Pillar-1 0.9 1.4 18 4C x 10 1 48 0.80 38.40 2 18.00 0.10 0.02 3.30
FP1/RYB4
Light Pole-7
48 Feeder Pillar-1 0.8 1.3 18 4C x 10 1 48 0.80 38.40 2 18.00 0.09 0.02 3.32
FP1/RYB4
Light Pole-8
49 Feeder Pillar-1 0.8 1.2 18 4C x 10 1 48 0.80 38.40 2 18.00 0.09 0.02 3.34
FP1/RYB4
Light Pole-9
50 Feeder Pillar-1 0.7 1.1 18 4C x 10 1 48 0.80 38.40 2 18.00 0.08 0.02 3.36
FP1/RYB4
Light Pole-10
51 Feeder Pillar-1 0.6 1.0 18 4C x 10 1 48 0.80 38.40 2 18.00 0.07 0.02 3.38
FP1/RYB4
Light Pole-11
52 Feeder Pillar-1 0.6 0.9 18 4C x 10 1 48 0.80 38.40 2 18.00 0.06 0.02 3.40
FP1/RYB4
Light Pole-12
53 Feeder Pillar-1 0.5 0.8 18 4C x 10 1 48 0.80 38.40 2 18.00 0.05 0.01 3.41
FP1/RYB4
Light Pole-13
54 Feeder Pillar-1 0.4 0.6 18 4C x 10 1 48 0.80 38.40 2 18.00 0.05 0.01 3.42
FP1/RYB4
Light Pole-14
55 Feeder Pillar-1 0.4 0.5 18 4C x 10 1 48 0.80 38.40 2 18.00 0.04 0.01 3.43
FP1/RYB4
Light Pole-15
56 Feeder Pillar-1 0.3 0.4 18 4C x 10 1 48 0.80 38.40 2 18.00 0.03 0.01 3.44
FP1/RYB4
EXT LIGHTING 48
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-16
57 Feeder Pillar-1 0.2 0.3 18 4C x 10 1 48 0.80 38.40 2 18.00 0.02 0.01 3.44
FP1/RYB4
Light Pole-17
58 Feeder Pillar-1 0.1 0.2 18 4C x 10 1 48 0.80 38.40 2 18.00 0.02 0.00 3.45
FP1/RYB4
Light Pole-18
59 Feeder Pillar-1 0.1 0.1 18 4C x 10 1 48 0.80 38.40 2 18.00 0.01 0.00 3.45
FP1/RYB4
Light Pole-1
60 Feeder Pillar-1 0.5 0.8 95 4C x 16 1 61 0.80 48.80 2 95.00 0.18 0.04 3.10
FP1/RYB5
Light Pole-2
61 Feeder Pillar-1 0.5 0.7 13 4C x 16 1 61 0.80 48.80 2 13.00 0.02 0.01 3.11
FP1/RYB5
Light Pole-3
62 Feeder Pillar-1 0.4 0.6 13 4C x 16 1 61 0.80 48.80 2 13.00 0.02 0.01 3.11
FP1/RYB5
Light Pole-4
63 Feeder Pillar-1 0.4 0.6 13 4C x 16 1 61 0.80 48.80 2 13.00 0.02 0.00 3.12
FP1/RYB5
Light Pole-5
64 Feeder Pillar-1 0.4 0.5 13 4C x 16 1 61 0.80 48.80 2 13.00 0.02 0.00 3.12
FP1/RYB5
Light Pole-6
65 Feeder Pillar-1 0.3 0.5 13 4C x 16 1 61 0.80 48.80 2 13.00 0.02 0.00 3.13
FP1/RYB5
Light Pole-7
66 Feeder Pillar-1 0.3 0.4 13 4C x 16 1 61 0.80 48.80 2 13.00 0.01 0.00 3.13
FP1/RYB5
Light Pole-8
67 Feeder Pillar-1 0.2 0.4 13 4C x 16 1 61 0.80 48.80 2 13.00 0.01 0.00 3.13
FP1/RYB5
Light Pole-9
68 Feeder Pillar-1 0.2 0.3 13 4C x 16 1 61 0.80 48.80 2 13.00 0.01 0.00 3.14
FP1/RYB5
Light Pole-10
69 Feeder Pillar-1 0.2 0.3 13 4C x 16 1 61 0.80 48.80 2 13.00 0.01 0.00 3.14
FP1/RYB5
Light Pole-11
70 Feeder Pillar-1 0.1 0.2 13 4C x 16 1 61 0.80 48.80 2 13.00 0.01 0.00 3.14
FP1/RYB5
Light Pole-12
71 Feeder Pillar-1 0.1 0.2 13 4C x 10 1 48 0.80 38.40 2 13.00 0.01 0.00 3.14
FP1/RYB5
Light Pole-13
72 Feeder Pillar-1 0.1 0.1 13 4C x 10 1 48 0.80 38.40 2 13.00 0.01 0.00 3.14
FP1/RYB5
Light Pole-14
73 Feeder Pillar-1 0.0 0.1 13 4C x 10 1 48 0.80 38.40 2 13.00 0.00 0.00 3.14
FP1/RYB5
Light Pole-1
74 Feeder Pillar-1 0.4 0.6 300 4C x 25 1 80 0.80 64.00 2 300.00 0.28 0.07 3.13
FP1/RYB6
Light Pole-2
75 Feeder Pillar-1 0.4 0.5 13 4C x 25 1 80 0.80 64.00 2 13.00 0.01 0.00 3.13
FP1/RYB6
Light Pole-3
76 Feeder Pillar-1 0.3 0.5 13 4C x 25 1 80 0.80 64.00 2 13.00 0.01 0.00 3.13
FP1/RYB6
Light Pole-4
77 Feeder Pillar-1 0.3 0.4 13 4C x 25 1 80 0.80 64.00 2 13.00 0.01 0.00 3.14
FP1/RYB6
EXT LIGHTING 49
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-5
78 Feeder Pillar-1 0.2 0.4 13 4C x 16 1 61 0.80 48.80 2 13.00 0.01 0.00 3.14
FP1/RYB6
Light Pole-6
79 Feeder Pillar-1 0.2 0.3 13 4C x 16 1 61 0.80 48.80 2 13.00 0.01 0.00 3.14
FP1/RYB6
Light Pole-7
80 Feeder Pillar-1 0.2 0.3 13 4C x 16 1 61 0.80 48.80 2 13.00 0.01 0.00 3.14
FP1/RYB6
Light Pole-8
81 Feeder Pillar-1 0.1 0.2 13 4C x 16 1 61 0.80 48.80 2 13.00 0.01 0.00 3.15
FP1/RYB6
Light Pole-9
82 Feeder Pillar-1 0.1 0.2 13 4C x 16 1 61 0.80 48.80 2 13.00 0.01 0.00 3.15
FP1/RYB6
Light Pole-10
83 Feeder Pillar-1 0.1 0.1 13 4C x 16 1 61 0.80 48.80 2 13.00 0.00 0.00 3.15
FP1/RYB6
Light Pole-11
84 Feeder Pillar-1 0.0 0.1 13 4C x 16 1 61 0.80 48.80 2 13.00 0.00 0.00 3.15
FP1/RYB6
Feeder Pillar-2
Light Pole-1
85 Feeder Pillar-2 1.4 2.1 42 4C x 10 1 48 0.80 38.40 2 42.00 0.35 0.08 3.62
FP2/RYB1
Light Pole-2
86 Feeder Pillar-2 1.2 1.9 35 4C x 10 1 48 0.80 38.40 2 35.00 0.26 0.06 3.68
FP2/RYB1
Light Pole-3
87 Feeder Pillar-2 1.1 1.7 35 4C x 10 1 48 0.80 38.40 2 35.00 0.23 0.06 3.74
FP2/RYB1
Light Pole-4
88 Feeder Pillar-2 0.9 1.5 35 4C x 10 1 48 0.80 38.40 2 35.00 0.21 0.05 3.79
FP2/RYB1
Light Pole-5
89 Feeder Pillar-2 0.8 1.3 35 4C x 10 1 48 0.80 38.40 2 35.00 0.18 0.04 3.83
FP2/RYB1
Light Pole-6
90 Feeder Pillar-2 0.7 1.0 35 4C x 10 1 48 0.80 38.40 2 35.00 0.15 0.04 3.86
FP2/RYB1
Light Pole-7
91 Feeder Pillar-2 0.5 0.8 35 4C x 10 1 48 0.80 38.40 2 35.00 0.12 0.03 3.89
FP2/RYB1
Light Pole-8
92 Feeder Pillar-2 0.4 0.6 35 4C x 10 1 48 0.80 38.40 2 35.00 0.09 0.02 3.91
FP2/RYB1
Light Pole-9
93 Feeder Pillar-2 0.3 0.4 35 4C x 10 1 48 0.80 38.40 2 35.00 0.06 0.01 3.93
FP2/RYB1
Light Pole-10
94 Feeder Pillar-2 0.1 0.2 35 4C x 10 1 48 0.80 38.40 2 35.00 0.03 0.01 3.94
FP2/RYB1
Light Pole-1
95 Feeder Pillar-2 2.2 3.3 5 4C x 10 1 48 0.80 38.40 2 5.00 0.07 0.02 3.55
FP2/RYB2
Light Pole-2
96 Feeder Pillar-2 2.0 3.1 35 4C x 10 1 48 0.80 38.40 2 35.00 0.44 0.11 3.65
FP2/RYB2
EXT LIGHTING 50
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-3
97 Feeder Pillar-2 1.9 2.9 35 4C x 10 1 48 0.80 38.40 2 35.00 0.41 0.10 3.75
FP2/RYB2
Light Pole-4
98 Feeder Pillar-2 1.8 2.7 35 4C x 10 1 48 0.80 38.40 2 35.00 0.38 0.09 3.85
FP2/RYB2
Light Pole-5
99 Feeder Pillar-2 1.6 2.5 35 4C x 10 1 48 0.80 38.40 2 35.00 0.35 0.08 3.93
FP2/RYB2
Light Pole-6
100 Feeder Pillar-2 1.5 2.3 35 4C x 10 1 48 0.80 38.40 2 35.00 0.32 0.08 4.01
FP2/RYB2
Light Pole-7
101 Feeder Pillar-2 1.4 2.1 35 4C x 10 1 48 0.80 38.40 2 35.00 0.29 0.07 4.08
FP2/RYB2
Light Pole-8
102 Feeder Pillar-2 1.2 1.9 35 4C x 10 1 48 0.80 38.40 2 35.00 0.26 0.06 4.14
FP2/RYB2
Light Pole-9
103 Feeder Pillar-2 1.1 1.7 35 4C x 10 1 48 0.80 38.40 2 35.00 0.23 0.06 4.20
FP2/RYB2
Light Pole-10
104 Feeder Pillar-2 0.9 1.5 35 4C x 10 1 48 0.80 38.40 2 35.00 0.21 0.05 4.25
FP2/RYB2
Light Pole-11
105 Feeder Pillar-2 0.8 1.3 35 4C x 10 1 48 0.80 38.40 2 35.00 0.18 0.04 4.29
FP2/RYB2
Light Pole-12
106 Feeder Pillar-2 0.7 1.0 35 4C x 10 1 48 0.80 38.40 2 35.00 0.15 0.04 4.33
FP2/RYB2
Light Pole-13
107 Feeder Pillar-2 0.5 0.8 35 4C x 10 1 48 0.80 38.40 2 35.00 0.12 0.03 4.35
FP2/RYB2
Light Pole-14
108 Feeder Pillar-2 0.4 0.6 35 4C x 10 1 48 0.80 38.40 2 35.00 0.09 0.02 4.38
FP2/RYB2
Light Pole-15
109 Feeder Pillar-2 0.3 0.4 35 4C x 10 1 48 0.80 38.40 2 35.00 0.06 0.01 4.39
FP2/RYB2
Light Pole-16
110 Feeder Pillar-2 0.1 0.2 35 4C x 10 1 48 0.80 38.40 2 35.00 0.03 0.01 4.40
FP2/RYB2
Light Pole-1
111 Feeder Pillar-2 1.8 2.7 120 4C x 16 1 61 0.80 48.80 2 120.00 0.81 0.20 3.73
FP2/RYB3
Light Pole-2
112 Feeder Pillar-2 1.6 2.5 35 4C x 10 1 48 0.80 38.40 2 35.00 0.35 0.08 3.81
FP2/RYB3
Light Pole-3
113 Feeder Pillar-2 1.5 2.3 35 4C x 10 1 48 0.80 38.40 2 35.00 0.32 0.08 3.89
FP2/RYB3
Light Pole-4
114 Feeder Pillar-2 1.4 2.1 35 4C x 10 1 48 0.80 38.40 2 35.00 0.29 0.07 3.96
FP2/RYB3
Light Pole-5
115 Feeder Pillar-2 1.2 1.9 35 4C x 10 1 48 0.80 38.40 2 35.00 0.26 0.06 4.03
FP2/RYB3
Light Pole-6
116 Feeder Pillar-2 1.1 1.7 35 4C x 10 1 48 0.80 38.40 2 35.00 0.23 0.06 4.08
FP2/RYB3
Light Pole-7
117 Feeder Pillar-2 0.9 1.5 35 4C x 10 1 48 0.80 38.40 2 35.00 0.21 0.05 4.13
FP2/RYB3
EXT LIGHTING 51
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-8
118 Feeder Pillar-2 0.8 1.3 35 4C x 10 1 48 0.80 38.40 2 35.00 0.18 0.04 4.17
FP2/RYB3
Light Pole-9
119 Feeder Pillar-2 0.7 1.0 35 4C x 10 1 48 0.80 38.40 2 35.00 0.15 0.04 4.21
FP2/RYB3
Light Pole-10
120 Feeder Pillar-2 0.5 0.8 35 4C x 10 1 48 0.80 38.40 2 35.00 0.12 0.03 4.24
FP2/RYB3
Light Pole-11
121 Feeder Pillar-2 0.4 0.6 35 4C x 10 1 48 0.80 38.40 2 35.00 0.09 0.02 4.26
FP2/RYB3
Light Pole-12
122 Feeder Pillar-2 0.3 0.4 35 4C x 10 1 48 0.80 38.40 2 35.00 0.06 0.01 4.27
FP2/RYB3
Light Pole-13
123 Feeder Pillar-2 0.1 0.2 35 4C x 10 1 48 0.80 38.40 2 35.00 0.03 0.01 4.28
FP2/RYB3
Light Pole-1
124 Feeder Pillar-2 1.5 2.3 300 4C x 25 1 80 0.80 64.00 2 300.00 1.10 0.26 3.80
FP2/RYB4
Light Pole-2
125 Feeder Pillar-2 1.4 2.1 25 4C x 25 1 80 0.80 64.00 2 25.00 0.08 0.02 3.82
FP2/RYB4
Light Pole-3
126 Feeder Pillar-2 1.2 1.9 25 4C x 25 1 80 0.80 64.00 2 25.00 0.07 0.02 3.83
FP2/RYB4
Light Pole-4
127 Feeder Pillar-2 1.1 1.7 25 4C x 16 1 61 0.80 48.80 2 25.00 0.10 0.03 3.86
FP2/RYB4
Light Pole-5
128 Feeder Pillar-2 0.9 1.5 25 4C x 16 1 61 0.80 48.80 2 25.00 0.09 0.02 3.88
FP2/RYB4
Light Pole-6
129 Feeder Pillar-2 0.8 1.3 25 4C x 16 1 61 0.80 48.80 2 25.00 0.08 0.02 3.90
FP2/RYB4
Light Pole-7
130 Feeder Pillar-2 0.7 1.0 25 4C x 16 1 61 0.80 48.80 2 25.00 0.07 0.02 3.92
FP2/RYB4
Light Pole-8
131 Feeder Pillar-2 0.5 0.8 25 4C x 16 1 61 0.80 48.80 2 25.00 0.05 0.01 3.93
FP2/RYB4
Light Pole-9
132 Feeder Pillar-2 0.4 0.6 25 4C x 16 1 61 0.80 48.80 2 25.00 0.04 0.01 3.94
FP2/RYB4
Light Pole-10
133 Feeder Pillar-2 0.3 0.4 25 4C x 16 1 61 0.80 48.80 2 25.00 0.03 0.01 3.94
FP2/RYB4
Light Pole-11
134 Feeder Pillar-2 0.1 0.2 25 4C x 16 1 61 0.80 48.80 2 25.00 0.01 0.00 3.95
FP2/RYB4
Light Pole-1
135 Feeder Pillar-2 2.2 3.3 250 4C x 25 1 80 0.80 64.00 2 250.00 1.33 0.32 3.85
FP2/RYB5
Light Pole-2
136 Feeder Pillar-2 2.0 3.1 22 4C x 25 1 80 0.80 64.00 2 22.00 0.11 0.03 3.88
FP2/RYB5
Light Pole-3
137 Feeder Pillar-2 1.9 2.9 22 4C x 25 1 80 0.80 64.00 2 22.00 0.10 0.02 3.90
FP2/RYB5
Light Pole-4
138 Feeder Pillar-2 1.8 2.7 22 4C x 25 1 80 0.80 64.00 2 22.00 0.10 0.02 3.93
FP2/RYB5
EXT LIGHTING 52
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-5
139 Feeder Pillar-2 1.6 2.5 22 4C x 25 1 80 0.80 64.00 2 22.00 0.09 0.02 3.95
FP2/RYB5
Light Pole-6
140 Feeder Pillar-2 1.5 2.3 22 4C x 25 1 80 0.80 64.00 2 22.00 0.08 0.02 3.97
FP2/RYB5
Light Pole-7
141 Feeder Pillar-2 1.4 2.1 22 4C x 16 1 61 0.80 48.80 2 22.00 0.11 0.03 3.99
FP2/RYB5
Light Pole-8
142 Feeder Pillar-2 1.2 1.9 22 4C x 16 1 61 0.80 48.80 2 22.00 0.10 0.02 4.02
FP2/RYB5
Light Pole-9
143 Feeder Pillar-2 1.1 1.7 22 4C x 16 1 61 0.80 48.80 2 22.00 0.09 0.02 4.04
FP2/RYB5
Light Pole-10
144 Feeder Pillar-2 0.9 1.5 22 4C x 16 1 61 0.80 48.80 2 22.00 0.08 0.02 4.06
FP2/RYB5
Light Pole-11
145 Feeder Pillar-2 0.8 1.3 22 4C x 16 1 61 0.80 48.80 2 22.00 0.07 0.02 4.08
FP2/RYB5
Light Pole-12
146 Feeder Pillar-2 0.7 1.0 22 4C x 16 1 61 0.80 48.80 2 22.00 0.06 0.01 4.09
FP2/RYB5
Light Pole-13
147 Feeder Pillar-2 0.5 0.8 22 4C x 16 1 61 0.80 48.80 2 22.00 0.05 0.01 4.10
FP2/RYB5
Light Pole-14
148 Feeder Pillar-2 0.4 0.6 22 4C x 16 1 61 0.80 48.80 2 22.00 0.03 0.01 4.11
FP2/RYB5
Light Pole-15
149 Feeder Pillar-2 0.3 0.4 22 4C x 16 1 61 0.80 48.80 2 22.00 0.02 0.01 4.12
FP2/RYB5
Light Pole-16
150 Feeder Pillar-2 0.1 0.2 22 4C x 16 1 61 0.80 48.80 2 22.00 0.01 0.00 4.12
FP2/RYB5
Light Pole-1
151 Feeder Pillar-2 1.3 1.9 75 4C x 10 1 48 0.80 38.40 2 75.00 0.59 0.14 3.67
FP2/RYB6
Light Pole-2
152 Feeder Pillar-2 1.2 1.8 18 4C x 10 1 48 0.80 38.40 2 18.00 0.13 0.03 3.71
FP2/RYB6
Light Pole-3
153 Feeder Pillar-2 1.1 1.7 18 4C x 10 1 48 0.80 38.40 2 18.00 0.13 0.03 3.74
FP2/RYB6
Light Pole-4
154 Feeder Pillar-2 1.1 1.6 18 4C x 10 1 48 0.80 38.40 2 18.00 0.12 0.03 3.76
FP2/RYB6
Light Pole-5
155 Feeder Pillar-2 1.0 1.5 18 4C x 10 1 48 0.80 38.40 2 18.00 0.11 0.03 3.79
FP2/RYB6
Light Pole-6
156 Feeder Pillar-2 0.9 1.4 18 4C x 10 1 48 0.80 38.40 2 18.00 0.10 0.02 3.82
FP2/RYB6
Light Pole-7
157 Feeder Pillar-2 0.8 1.3 18 4C x 10 1 48 0.80 38.40 2 18.00 0.09 0.02 3.84
FP2/RYB6
Light Pole-8
158 Feeder Pillar-2 0.8 1.2 18 4C x 10 1 48 0.80 38.40 2 18.00 0.09 0.02 3.86
FP2/RYB6
Light Pole-9
159 Feeder Pillar-2 0.7 1.1 18 4C x 10 1 48 0.80 38.40 2 18.00 0.08 0.02 3.88
FP2/RYB6
EXT LIGHTING 53
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-10
160 Feeder Pillar-2 0.6 1.0 18 4C x 10 1 48 0.80 38.40 2 18.00 0.07 0.02 3.89
FP2/RYB6
Light Pole-11
161 Feeder Pillar-2 0.6 0.9 18 4C x 10 1 48 0.80 38.40 2 18.00 0.06 0.02 3.91
FP2/RYB6
Light Pole-12
162 Feeder Pillar-2 0.5 0.8 18 4C x 10 1 48 0.80 38.40 2 18.00 0.05 0.01 3.92
FP2/RYB6
Light Pole-13
163 Feeder Pillar-2 0.4 0.6 18 4C x 10 1 48 0.80 38.40 2 18.00 0.05 0.01 3.93
FP2/RYB6
Light Pole-14
164 Feeder Pillar-2 0.4 0.5 18 4C x 10 1 48 0.80 38.40 2 18.00 0.04 0.01 3.94
FP2/RYB6
Light Pole-15
165 Feeder Pillar-2 0.3 0.4 18 4C x 10 1 48 0.80 38.40 2 18.00 0.03 0.01 3.95
FP2/RYB6
Light Pole-16
166 Feeder Pillar-2 0.2 0.3 18 4C x 10 1 48 0.80 38.40 2 18.00 0.02 0.01 3.96
FP2/RYB6
167 Feeder Pillar-2 Light Pole-17 FP2/RYB6 0.1 0.2 18 4C x 10 1 48 0.80 38.40 2 18.00 0.02 0.00 3.96
Light Pole-18
168 Feeder Pillar-2 0.1 0.1 18 4C x 10 1 48 0.80 38.40 2 18.00 0.01 0.00 3.96
FP2/RYB6
Feeder Pillar-3
Light Pole-1
169 Feeder Pillar-3 2.0 3.1 215 4C x 16 1 61 0.80 48.80 2 215.00 1.68 0.41 5.22
FP3/RYB1
Light Pole-2
170 Feeder Pillar-3 1.9 2.9 25 4C x 16 1 61 0.80 48.80 2 25.00 0.18 0.04 5.26
FP3/RYB1
Light Pole-3
171 Feeder Pillar-3 1.8 2.7 25 4C x 16 1 61 0.80 48.80 2 25.00 0.17 0.04 5.30
FP3/RYB1
Light Pole-4
172 Feeder Pillar-3 1.6 2.5 25 4C x 16 1 61 0.80 48.80 2 25.00 0.16 0.04 5.34
FP3/RYB1
Light Pole-5
173 Feeder Pillar-3 1.5 2.3 25 4C x 16 1 61 0.80 48.80 2 25.00 0.14 0.03 5.37
FP3/RYB1
Light Pole-6
174 Feeder Pillar-3 1.4 2.1 25 4C x 16 1 61 0.80 48.80 2 25.00 0.13 0.03 5.41
FP3/RYB1
Light Pole-7
175 Feeder Pillar-3 1.2 1.9 25 4C x 16 1 61 0.80 48.80 2 25.00 0.12 0.03 5.43
FP3/RYB1
Light Pole-8
176 Feeder Pillar-3 1.1 1.7 25 4C x 16 1 61 0.80 48.80 2 25.00 0.10 0.03 5.46
FP3/RYB1
Light Pole-9
177 Feeder Pillar-3 0.9 1.5 25 4C x 16 1 61 0.80 48.80 2 25.00 0.09 0.02 5.48
FP3/RYB1
Light Pole-10
178 Feeder Pillar-3 0.8 1.3 25 4C x 16 1 61 0.80 48.80 2 25.00 0.08 0.02 5.50
FP3/RYB1
Light Pole-11
179 Feeder Pillar-3 0.7 1.0 25 4C x 16 1 61 0.80 48.80 2 25.00 0.07 0.02 5.52
FP3/RYB1
EXT LIGHTING 54
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-12
180 Feeder Pillar-3 0.5 0.8 25 4C x 16 1 61 0.80 48.80 2 25.00 0.05 0.01 5.53
FP3/RYB1
Light Pole-13
181 Feeder Pillar-3 0.4 0.6 25 4C x 16 1 61 0.80 48.80 2 25.00 0.04 0.01 5.54
FP3/RYB1
Light Pole-14
182 Feeder Pillar-3 0.3 0.4 25 4C x 16 1 61 0.80 48.80 2 25.00 0.03 0.01 5.54
FP3/RYB1
Light Pole-15
183 Feeder Pillar-3 0.1 0.2 25 4C x 16 1 61 0.80 48.80 2 25.00 0.01 0.00 5.55
FP3/RYB1
Light Pole-1
184 Feeder Pillar-3 1.5 2.3 60 4C x 10 1 48 0.80 38.40 2 60.00 0.55 0.13 4.94
FP3/RYB2
Light Pole-2
185 Feeder Pillar-3 1.4 2.1 25 4C x 10 1 48 0.80 38.40 2 25.00 0.21 0.05 4.99
FP3/RYB2
Light Pole-3
186 Feeder Pillar-3 1.2 1.9 25 4C x 10 1 48 0.80 38.40 2 25.00 0.19 0.05 5.04
FP3/RYB2
Light Pole-4
187 Feeder Pillar-3 1.1 1.7 25 4C x 10 1 48 0.80 38.40 2 25.00 0.17 0.04 5.08
FP3/RYB2
Light Pole-5
188 Feeder Pillar-3 0.9 1.5 25 4C x 10 1 48 0.80 38.40 2 25.00 0.15 0.04 5.12
FP3/RYB2
Light Pole-6
189 Feeder Pillar-3 0.8 1.3 25 4C x 10 1 48 0.80 38.40 2 25.00 0.13 0.03 5.15
FP3/RYB2
Light Pole-7
190 Feeder Pillar-3 0.7 1.0 25 4C x 10 1 48 0.80 38.40 2 25.00 0.10 0.03 5.17
FP3/RYB2
Light Pole-8
191 Feeder Pillar-3 0.5 0.8 25 4C x 10 1 48 0.80 38.40 2 25.00 0.08 0.02 5.19
FP3/RYB2
Light Pole-9
192 Feeder Pillar-3 0.4 0.6 25 4C x 10 1 48 0.80 38.40 2 25.00 0.06 0.02 5.21
FP3/RYB2
Light Pole-10
193 Feeder Pillar-3 0.3 0.4 25 4C x 10 1 48 0.80 38.40 2 25.00 0.04 0.01 5.22
FP3/RYB2
Light Pole-11
194 Feeder Pillar-3 0.1 0.2 25 4C x 10 1 48 0.80 38.40 2 25.00 0.02 0.01 5.22
FP3/RYB2
Light Pole-1
195 Feeder Pillar-3 2.0 3.1 80 4C x 10 1 48 0.80 38.40 2 80.00 1.01 0.24 5.05
FP3/RYB3
Light Pole-2
196 Feeder Pillar-3 1.9 2.9 25 4C x 10 1 48 0.80 38.40 2 25.00 0.29 0.07 5.12
FP3/RYB3
Light Pole-3
197 Feeder Pillar-3 1.8 2.7 25 4C x 10 1 48 0.80 38.40 2 25.00 0.27 0.07 5.19
FP3/RYB3
Light Pole-4
198 Feeder Pillar-3 1.6 2.5 25 4C x 10 1 48 0.80 38.40 2 25.00 0.25 0.06 5.25
FP3/RYB3
Light Pole-5
199 Feeder Pillar-3 1.5 2.3 25 4C x 10 1 48 0.80 38.40 2 25.00 0.23 0.06 5.31
FP3/RYB3
Light Pole-6
200 Feeder Pillar-3 1.4 2.1 25 4C x 10 1 48 0.80 38.40 2 25.00 0.21 0.05 5.36
FP3/RYB3
EXT LIGHTING 55
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-7
201 Feeder Pillar-3 1.2 1.9 25 4C x 10 1 48 0.80 38.40 2 25.00 0.19 0.05 5.40
FP3/RYB3
Light Pole-8
202 Feeder Pillar-3 1.1 1.7 25 4C x 10 1 48 0.80 38.40 2 25.00 0.17 0.04 5.44
FP3/RYB3
Light Pole-9
203 Feeder Pillar-3 0.9 1.5 25 4C x 10 1 48 0.80 38.40 2 25.00 0.15 0.04 5.48
FP3/RYB3
Light Pole-10
204 Feeder Pillar-3 0.8 1.3 25 4C x 10 1 48 0.80 38.40 2 25.00 0.13 0.03 5.51
FP3/RYB3
Light Pole-11
205 Feeder Pillar-3 0.7 1.0 25 4C x 10 1 48 0.80 38.40 2 25.00 0.10 0.03 5.53
FP3/RYB3
Light Pole-12
206 Feeder Pillar-3 0.5 0.8 25 4C x 10 1 48 0.80 38.40 2 25.00 0.08 0.02 5.55
FP3/RYB3
Light Pole-13
207 Feeder Pillar-3 0.4 0.6 25 4C x 10 1 48 0.80 38.40 2 25.00 0.06 0.02 5.57
FP3/RYB3
Light Pole-14
208 Feeder Pillar-3 0.3 0.4 25 4C x 10 1 48 0.80 38.40 2 25.00 0.04 0.01 5.58
FP3/RYB3
Light Pole-15
209 Feeder Pillar-3 0.1 0.2 25 4C x 10 1 48 0.80 38.40 2 25.00 0.02 0.01 5.58
FP3/RYB3
Light Pole-1
210 Feeder Pillar-3 1.6 2.5 192 4C x 16 1 61 0.80 48.80 2 192.00 1.20 0.29 5.10
FP3/RYB4
Light Pole-2
211 Feeder Pillar-3 1.5 2.3 25 4C x 16 1 61 0.80 48.80 2 25.00 0.14 0.03 5.14
FP3/RYB4
Light Pole-3
212 Feeder Pillar-3 1.4 2.1 25 4C x 16 1 61 0.80 48.80 2 25.00 0.13 0.03 5.17
FP3/RYB4
Light Pole-4
213 Feeder Pillar-3 1.2 1.9 25 4C x 16 1 61 0.80 48.80 2 25.00 0.12 0.03 5.20
FP3/RYB4
Light Pole-5
214 Feeder Pillar-3 1.1 1.7 25 4C x 16 1 61 0.80 48.80 2 25.00 0.10 0.03 5.22
FP3/RYB4
Light Pole-6
215 Feeder Pillar-3 0.9 1.5 25 4C x 16 1 61 0.80 48.80 2 25.00 0.09 0.02 5.24
FP3/RYB4
Light Pole-7
216 Feeder Pillar-3 0.8 1.3 25 4C x 16 1 61 0.80 48.80 2 25.00 0.08 0.02 5.26
FP3/RYB4
Light Pole-8
217 Feeder Pillar-3 0.7 1.0 25 4C x 16 1 61 0.80 48.80 2 25.00 0.07 0.02 5.28
FP3/RYB4
Light Pole-9
218 Feeder Pillar-3 0.5 0.8 25 4C x 16 1 61 0.80 48.80 2 25.00 0.05 0.01 5.29
FP3/RYB4
Light Pole-10
219 Feeder Pillar-3 0.4 0.6 25 4C x 16 1 61 0.80 48.80 2 25.00 0.04 0.01 5.30
FP3/RYB4
Light Pole-11
220 Feeder Pillar-3 0.3 0.4 25 4C x 16 1 61 0.80 48.80 2 25.00 0.03 0.01 5.31
FP3/RYB4
Light Pole-12
221 Feeder Pillar-3 0.1 0.2 25 4C x 16 1 61 0.80 48.80 2 25.00 0.01 0.00 5.31
FP3/RYB4
EXT LIGHTING 56
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-1
222 Feeder Pillar-3 1.9 2.9 195 4C x 16 1 61 0.80 48.80 2 195.00 1.42 0.34 5.15
FP3/RYB5
Light Pole-2
223 Feeder Pillar-3 1.8 2.7 25 4C x 16 1 61 0.80 48.80 2 25.00 0.17 0.04 5.20
FP3/RYB5
Light Pole-3
224 Feeder Pillar-3 1.6 2.5 25 4C x 16 1 61 0.80 48.80 2 25.00 0.16 0.04 5.23
FP3/RYB5
Light Pole-4
225 Feeder Pillar-3 1.5 2.3 25 4C x 16 1 61 0.80 48.80 2 25.00 0.14 0.03 5.27
FP3/RYB5
Light Pole-5
226 Feeder Pillar-3 1.4 2.1 25 4C x 16 1 61 0.80 48.80 2 25.00 0.13 0.03 5.30
FP3/RYB5
Light Pole-6
227 Feeder Pillar-3 1.2 1.9 25 4C x 16 1 61 0.80 48.80 2 25.00 0.12 0.03 5.33
FP3/RYB5
Light Pole-7
228 Feeder Pillar-3 1.1 1.7 25 4C x 16 1 61 0.80 48.80 2 25.00 0.10 0.03 5.35
FP3/RYB5
Light Pole-8
229 Feeder Pillar-3 0.9 1.5 25 4C x 16 1 61 0.80 48.80 2 25.00 0.09 0.02 5.37
FP3/RYB5
Light Pole-9
230 Feeder Pillar-3 0.8 1.3 25 4C x 16 1 61 0.80 48.80 2 25.00 0.08 0.02 5.39
FP3/RYB5
Light Pole-10
231 Feeder Pillar-3 0.7 1.0 25 4C x 16 1 61 0.80 48.80 2 25.00 0.07 0.02 5.41
FP3/RYB5
Light Pole-11
232 Feeder Pillar-3 0.5 0.8 25 4C x 16 1 61 0.80 48.80 2 25.00 0.05 0.01 5.42
FP3/RYB5
Light Pole-12
233 Feeder Pillar-3 0.4 0.6 25 4C x 16 1 61 0.80 48.80 2 25.00 0.04 0.01 5.43
FP3/RYB5
Light Pole-13
234 Feeder Pillar-3 0.3 0.4 25 4C x 16 1 61 0.80 48.80 2 25.00 0.03 0.01 5.44
FP3/RYB5
Light Pole-14
235 Feeder Pillar-3 0.1 0.2 25 4C x 16 1 61 0.80 48.80 2 25.00 0.01 0.00 5.44
FP3/RYB5
Light Pole-1
236 Feeder Pillar-3 2.0 3.1 225 4C x 16 1 61 0.80 48.80 2 225.00 1.76 0.42 5.24
FP3/RYB6
Light Pole-2
237 Feeder Pillar-3 1.9 2.9 25 4C x 16 1 61 0.80 48.80 2 25.00 0.18 0.04 5.28
FP3/RYB6
Light Pole-3
238 Feeder Pillar-3 1.8 2.7 25 4C x 16 1 61 0.80 48.80 2 25.00 0.17 0.04 5.32
FP3/RYB6
Light Pole-4
239 Feeder Pillar-3 1.6 2.5 25 4C x 16 1 61 0.80 48.80 2 25.00 0.16 0.04 5.36
FP3/RYB6
Light Pole-5
240 Feeder Pillar-3 1.5 2.3 25 4C x 16 1 61 0.80 48.80 2 25.00 0.14 0.03 5.39
FP3/RYB6
Light Pole-6
241 Feeder Pillar-3 1.4 2.1 25 4C x 16 1 61 0.80 48.80 2 25.00 0.13 0.03 5.42
FP3/RYB6
Light Pole-7
242 Feeder Pillar-3 1.2 1.9 25 4C x 16 1 61 0.80 48.80 2 25.00 0.12 0.03 5.45
FP3/RYB6
EXT LIGHTING 57
NAME OF WORK : CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT C.C.S. INTERNATIONAL AIRPORT, LUCKNOW Date : 28th Aug' 2019
CABLE SCHEDULE - EXTERNAL LIGHTING
Expected Max. Cable Cable size Current Effective Total Voltage % Voltage
Cable Derating No. of Cable % Voltage
S. No. From To Maximum current length in adopted capacity current Length of drop in drop upto
2 runs factor Termination drop
Load in kW (Amps) mtr. mm Amps capacity Cable (m) Volts last point
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Light Pole-8
243 Feeder Pillar-3 1.1 1.7 25 4C x 16 1 61 0.80 48.80 2 25.00 0.10 0.03 5.48
FP3/RYB6
Light Pole-9
244 Feeder Pillar-3 0.9 1.5 25 4C x 16 1 61 0.80 48.80 2 25.00 0.09 0.02 5.50
FP3/RYB6
Light Pole-10
245 Feeder Pillar-3 0.8 1.3 25 4C x 16 1 61 0.80 48.80 2 25.00 0.08 0.02 5.52
FP3/RYB6
Light Pole-11
246 Feeder Pillar-3 0.7 1.0 25 4C x 16 1 61 0.80 48.80 2 25.00 0.07 0.02 5.53
FP3/RYB6
Light Pole-12
247 Feeder Pillar-3 0.5 0.8 25 4C x 16 1 61 0.80 48.80 2 25.00 0.05 0.01 5.55
FP3/RYB6
Light Pole-13
248 Feeder Pillar-3 0.4 0.6 25 4C x 16 1 61 0.80 48.80 2 25.00 0.04 0.01 5.56
FP3/RYB6
Light Pole-14
249 Feeder Pillar-3 0.3 0.4 25 4C x 16 1 61 0.80 48.80 2 25.00 0.03 0.01 5.56
FP3/RYB6
Light Pole-15
250 Feeder Pillar-3 0.1 0.2 25 4C x 16 1 61 0.80 48.80 2 25.00 0.01 0.00 5.57
FP3/RYB6
Note: All Cables for External Lighting shall be of Aluminium Armoured XLPE Type.
EXT LIGHTING 58