3. Overlap
Example: a secant pile wall with a diameter D = 1200 (1180) mm
and pile spacing A = 1000 mm has an overlap Ü = D - A = 20 cm
Sound overlap reduces leaking joints.
Pile Spacing A
Overlap Ü
Joint
length
approx.
70cm
Ove
rlap
Example 1: Example 2:
0.5% = 0.5 cm/m; 1.0% = 1.0 cm/m;
Pile length 15.0 m Pile length 15.0 m
Deviation
hwo 28.4.2005 Seite 7
Parameters determining the
waterthightness of joints
6. Soil deposits in the joints
Cohesive soils, in particular, are prone to soil being deposited in the
joints which can subsequently result in leaks depending on the degree
of drying out and differential hydrostatic pressure.
Static withdrawal of the casing - at least for the visible part + ~ 1 m of the
pile wall will reduce leaking joints.
7. (continued)
Pile construction sequences - A
see also UHB Instruction 7.5.2.160