Sunteți pe pagina 1din 4

DESIGN OF PILE CAP (INPUT VALUE IN YELLOW CELL ONLY)

UNDER REAM PILE WITH BULB AT BOTTOM


1) INPUT DATA
1.1 LOAD FROM COLUMN (UNFACTORED) P= 1800 KN FROM STAAD FILE
1.2 PILE LOAD CARRYING CAPACITY = 500 KN FROM SOIL REPORT
1.3 SOIL BEARING CAPACITY (SBC) = 75 KN/MM2
1.4 DIA OF PILE (Dp) = 450 mm
1.5 THICKNESS OF PILE CAP = 1025 mm
1.6 DIA OF BULB (Db) = 1125 mm
1.7 SPACING OF PILE C/C = 1688 mm
1.7 NO. OF PILE = 4.000

2) CALCULATION OF REINFORCEMENT FOR MOMENT

2.0 REACTION ON 1 PILE ( R ) = 495 KN


2.1 MOMENT AT FACE OF COLUMN = 470.25 KN-M
(no. of pile in one direction*R*L)
EFF. THICKNESS REQUIRED(ASSUME
0.15%OF STEEL) = 659 mm
2.2
2.3 CLEAR COVER = 75 mm
2.4 REQ. THICKNESS OF PILE CAP (Tc) = 734 mm
2.5 BOTTOM REINFORCEMENT = 988 mm2
2.6 dia of bar used = 12 mm
2.7 spacing required = 127 mm
2.8 TOP REINFORCEMENT = 791 mm2
2.9 spacing required = 159 mm

3) CALCULATION OF REINFORCEMENT FOR ONE WAY SHEAR AT 0.5d


3.1 TO START WITH EFFECTIVE THICK.(ASSUME) = 950 mm
3.2 NOMINAL SHEAR STRESS = 0.938 N/mm2 inc thick TABLE 19
OF IS-456
3.3 REQ. THICKNESS OF PILE CAP (Tc) = 1025 mm
3.4 BOTTOM REINFORCEMENT = 1425 mm2
3.5 dia of bar used = 16 mm
3.6 spacing required = 157 mm
3.7 TOP REINFORCEMENT = 1140 mm2
3.8 spacing required = 196 mm
0.4 1.7 0.4
0.4

0.75
1.7 0.75 2.5 m

0.4

2.5 m
CRITICAL
SEC. 4
MOMENT

475

R= 495 CRITICAL
SEC. FOR
ONE WAY
L1= 700 SHEAR AT
0.5d

L2= 475 675

SHEAR FORCE AT CRITICAL = 742.50 KN


DESIGN OF PILE CAP (INPUT VALUE IN YELLOW CELL ONLY)
UNDER REAM PILE WITH BULB AT BOTTOM
1) INPUT DATA
1.1 LOAD FROM COLUMN (UNFACTORED) P= 1800 KN FROM STAAD FILE
1.2 PILE LOAD CARRYING CAPACITY = 500 KN FROM SOIL REPORT
1.3 SOIL BEARING CAPACITY (SBC) = 75 KN/MM2
1.4 DIA OF PILE (Dp) = 450 mm
1.5 THICKNESS OF PILE CAP = 1075 mm
1.6 DIA OF BULB (Db) = 1125 mm
1.7 SPACING OF PILE C/C = 1688 mm
1.7 NO. OF PILE = 4.000

2) CALCULATION OF REINFORCEMENT FOR MOMENT

2.0 REACTION ON 1 PILE ( R ) = 495 KN


2.1 MOMENT AT FACE OF COLUMN = 470.25 KN-M
(no. of pile in one direction*R*L)
EFF. THICKNESS REQUIRED(ASSUME
0.15%OF STEEL) = 659 mm
2.2
2.3 CLEAR COVER = 75 mm
2.4 REQ. THICKNESS OF PILE CAP (Tc) = 734 mm
2.5 BOTTOM REINFORCEMENT = 988 mm2
2.6 dia of bar used = 12 mm
2.7 spacing required = 127 mm
2.8 TOP REINFORCEMENT = 791 mm2
2.9 spacing required = 159 mm

3) CALCULATION OF REINFORCEMENT FOR ONE WAY SHEAR AT 0.5d


3.1 TO START WITH EFFECTIVE THICK.(ASSUME) = 1000 mm
3.2 NOMINAL SHEAR STRESS = 0.264 N/mm2 ok TABLE 19
OF IS-456
3.3 REQ. THICKNESS OF PILE CAP (Tc) = 1075 mm
3.4 BOTTOM REINFORCEMENT = 1500 mm2
3.5 dia of bar used = 16 mm
3.6 spacing required = 149 mm
3.7 TOP REINFORCEMENT = 1200 mm2
3.8 spacing required = 187 mm
0.4 1.7 0.4
0.4

0.75
1.7 0.75 2.5 m

0.4

2.5 m
CRITICAL
SEC. 4
MOMENT

475

R= 495 CRITICAL
SEC. FOR
ONE WAY
L1= 250 SHEAR AT
0.5d

L2= 500 200

220
SHEAR FORCE AT CRITICAL = 220.00 KN

S-ar putea să vă placă și