Documente Academic
Documente Profesional
Documente Cultură
Test Result: The test item passed / failed the test specification(s).
Other Aspects: Brief description or additional details could be given by the labs here.
This test report relates to the test sample sub mitted and list of documents attached.
Approved by /
Tested by: Issued by:
Authorized Signatory:
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
[LAB LOGO]
TEST REPORT
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes
— Safety Requirements for Portable Sealed Secondary Cells and for Batteries
Made from Them for Use in Portable Applications
Part 2 Lithium Systems
Report Reference No.................... :
Date of issue ................................. : (see cover page)
Total number of pages .................... (see cover page)
Testing Laboratory ...................... :
Address ........................................ :
Test specification:
Standard ....................................... : IS 16046 (Part 2):2018 / IEC 62133-2:2017
Approved by /
Tested by: Issued by:
Authorized Signatory:
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
Report No. XXXX 001 IS 16046:2015 / IEC 62133:2012 Page 3 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/Failing in the
requirement tested.
.........................................................................
(Approving Authority)
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
Report No. XXX X 001 IS 16046 (Part 2):2018 / IEC 62133-2:2017 Page 4 of 44
Dated: DD/MM/YYYY
Attachment – 1
Attachment – 2
Attachment – 3
Attachment – 4
Attachment – 5
Attachment – 6
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
Report No. XXX X 001 IS 16046 (Part 2):2018 / IEC 62133-2:2017 Page 5 of 44
Dated: DD/MM/YYYY
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
Report No. XXX X 001 IS 16046 (Part 2):2018 / IEC 62133-2:2017 Page 6 of 44
Dated: DD/MM/YYYY
General remarks:
The test results presented in this report relate only to the object tested.
This report shall not be reproduced, except in full, without the written approval of the Issuing testing
laboratory.
"(See Enclosure #)" refers to additional information appended to the report.
"(See appended table)" refers to a table appended to the report.
Laboratory Conditions
Ambient Temperature…………………………………… :
Ambient Humidity……………………………………. :
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
Report No. XXX X 001 IS 16046 (Part 2):2018 / IEC 62133-2:2017 Page 7 of 44
Dated: DD/MM/YYYY
Laser classific atio n ..................... .... .. ............ : < delet e this line, if not applic a ble >
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 8 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 9 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 10 of 44
Dated: DD/MM/YYYY
5.3 Venting
Battery cases and cells incorporate a pressure relief
mechanism or are constructed so that they relieve
excessive internal pressure at a value and rate that
will preclude rupture, explosion and self-ignition
Encapsulation used to support cells within an outer
casing does not cause the battery to overheat during
normal operation nor inhibit pressure relief
Total number of Requirements to be observed / inspected =
Total No of applicable Requirement =
No of Requirements for which the sample passed:
Total number of tests to be conducted :
Total No of applicable Tests =
No. of tests for which the sample passed:
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 11 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 12 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 13 of 44
Dated: DD/MM/YYYY
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 14 of 44
Dated: DD/MM/YYYY
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 15 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 16 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 17 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 18 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 19 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 20 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 21 of 44
Dated: DD/MM/YYYY
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 22 of 44
Dated: DD/MM/YYYY
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 23 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 24 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 25 of 44
Dated: DD/MM/YYYY
9 MARKING
9.1 Cell marking
Cells marked as specified in IEC 61960, except
coin cells
Coin cells whose external surface area is too small
to accommodate the markings on the cells show
the designation and polarity
By agreement between the cell manufacturer and
the battery and/or end product manufacturer,
component cells used in the manufacture of a
battery need not be marked
9.2 Battery marking
Batteries marked as specified in IEC 61960, except
for coin batteries
Coin batteries whose external surface area is too
small to accommodate the markings on the
batteries show the designation and polarity.
Batteries also marked with an appropriate caution
statement
Terminals have clear polarity marking on the
external surface of the battery
Batteries with keyed external connectors designed
for connection to specific end products need not be
marked with polarity markings if the design of the
external connector prevents reverse polarity
connections
9.3 Caution for ingestion of small cells and batteries
Coin cells and batteries identified as small batteries
according to 8.2 include a caution statement
regarding the hazards of ingestion in accordance
with 8.2
When small cells and batteries are intended for
direct sale in consumer-replaceable applications,
caution for ingestion given on the immediate
package
9.4 Other information
Storage and disposal instructions
Recommended charging instructions
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 26 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 27 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 28 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 30 of 44
Dated: DD/MM/YYYY
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 31 of 44
Dated: DD/MM/YYYY
Certificate: It is certified that the above tests were performed and found to be passing/failing in the
requirement tested.
...............................................................................
(Approving Authority
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 32 of 44
Dated: DD/MM/YYYY
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 33 of 44
Dated: DD/MM/YYYY
Supplementary information:
- No fire or explosion
- No leakage
- Others (please explain)
Supplementary information:
- No fire or explosion
- Others (please explain)
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 34 of 44
Dated: DD/MM/YYYY
Supplementary information:
- No fire or explosion
- Others (please explain)
Supplementary information:
- No fire or explosion
- Others (please explain)
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 35 of 44
Dated: DD/MM/YYYY
Supplementary information:
- No fire or explosion
- Others (please explain)
Supplementary information:
- No fire or explosion
- Others (please explain)
Supplementary information:
- No fire or explosion
- No rupture
- No leakage
- No venting
- Others (please explain)
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 36 of 44
Dated: DD/MM/YYYY
Supplementary information:
- No fire or explosion
- No rupture
- No leakage
- No venting
- Others (please explain)
Supplementary information:
1) Identify one of the following:
1: Nickel particle inserted between positive and negative (active material) coated area.
2: Nickel particle inserted between positive aluminium foil and negative active material coated area.
- No fire or explosion
- Others (please explain)
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 37 of 44
Dated: DD/MM/YYYY
Supplementary information:
1) Coin cells with internal resistance less than or equal to 3 , see test result on corresponding tables
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 38 of 44
Dated: DD/MM/YYYY
ATTAC HM EN T
Enclosure s
Supplement Description
Id
01
02
03
04
05
06
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 39 of 44
Dated: DD/MM/YYYY
01
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 40 of 44
Dated: DD/MM/YYYY
02
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 41 of 44
Dated: DD/MM/YYYY
03
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 42 of 44
Dated: DD/MM/YYYY
04
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 43 of 44
Dated: DD/MM/YYYY
05
BIS_BAT/SCAB_IS16046(P ART2)_V1.0
IS 16046 (Part 2):2018 / IEC 62133-2:2017
Report No. XXX X 001 Page 44 of 44
Dated: DD/MM/YYYY
06
BIS_BAT/SCAB_IS16046(P ART2)_V1.0